Plant Mannersdorf in a Nutshell Umweltbundesamt, 02.12.2016
Transcript
Page 1: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Plant Mannersdorfin a Nutshell

Umweltbundesamt, 02.12.2016

Page 2: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

LafargeHolcim at a Glance

| 2

Page 3: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

GartenauGmunden

Kirchdorf

Mannersdorf

Wopfing

Peggau

Rohoznik

Cement Plants in Austria / Vienna market

VIENNA

AUSTRIAAUSTRIAVils

Peggau

Wietersdorf

Retznei

Eiberg

Others Others/LafargeHeidelberger /

RohrdorferCRH

| 3

Page 4: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

� First cement production activities on site 1894

� Perlmooser joined Lafarge-Group in 1994

� Current kiln line from 1986Current Kiln Capacity:

Plant Historical Development

Current Kiln Capacity:

� 2.730 t/d ⇒ 860.000 t/y

(1,30 Mt/y)

� Currently (70%AF):

2.360 t/d ⇒ 750.000 t/y

(1,13 Mt/y)

� 2 Quarries: � Limestone (42 years reserves)

� Clay (proven 3 years – probable 34 years) – today, 50% natural clay replaced by clay-

bricks

| 4

Page 5: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

� Health & Safety� Member of Lafarge H&S

Excellence Club

� 1004 days without LTI

� Last LTI: Eye injury at

bypass dust handling

� Market

Key facts

� Market � excellent plant position

to Vienna market

� HR / Lean Organization � 92 Employees

� 10 Apprentices

� 10 permanent Contractors

� Supervisor / Foreman: mainly recruited locally and developed through dual

education system

| 5

Page 6: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

� Plant is Sold Out� 1,15 Mt cement / a

� Kiln UF at ~ 88%

� 9 Cement Types� 90% Bulk /10% Bag

� Dispatch

Key facts

� Dispatch� Truck and Train

� Environment / Stakeholders� Continuous Emission Monitoring:

NOx, SO2, Dust, Hg, TOC

� NOx: First semi-dust SCR installed

in Lafarge (2012)

� Contract with local stakeholders

ensuring wide range of AF-permits

| 6

Page 7: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Cement = ground clinker + gypsum +….

� Hardening under water or under air and giving high

final strenght

� Clinker composition (CS phases):

A hydraulic binder

Oxide

SiO2

Symbol

S

Content

20 to 25 %

Maj

or

elem

ents

7April 2016 |

Al2O3

Fe2O3

CaO

MgO

SO3

Alkalies

Free CaO

A

F

C

M

SK2ONa2O

KN

2 to 7 %

1 to 4,5 %

64 to 70 %

2 %

1%

0,9%

0,5 to 3 %

Maj

or

elem

ents

Min

or

elem

ents

Page 8: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Limestone Quarry

� Mobil crusher� O&K

� Av. Output 700 t/h

� „Load & Carry“

� Komatsu WA 800

8

Komatsu WA 800� 13 m³ bucket capacity

� >95 % CaCO3

� 1 Mio t / yr !

|

Page 9: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

...und natürliche

Suksession

Clay pit - Mining, mixing with bricks & recultivation

9

Suksession

Page 10: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

05/12/201610

Page 11: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Plant Mannersdorf – Aerial Perspective from North

Clinker Silos

CM 7 & 8

Limestone Quarry

Cement Silos

Offices

11|

Cooler Kiln Preheater

Raw Mill

Offices

AF storage

Page 12: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Kiln and Pre-heater Tower

� Preheater Tower� 2 Strings

� 5 Stages

� Separateline Calciner

� Inline Calciner under

12|

Inline Calciner under construction

� SCR in old PreheaterTower

Page 13: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Locations of fuel input

Riser Duct:

SSW (plastics)

13

raw mill

filter

co

al m

ill

2 calciner burners:

Petcoke, Coal, SSW (plastics), Sunflower shells, ISF (Impr. Solid Fuel), HCF (High Cal. Fuel)

Main burner:

Petcoke, Coal, Sunflower shells, Animal meal, SSW (plastics)

SSW (plastics)

|

Page 14: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Alternative Fuel – Storage Hall

Capacity4.500 m³ (700 t)

3 compartments,

1.500m³ each

14

Automatic Craneproviding 2 weigh-feeders &

belt-conveyors:

� Calciner (up to 10 t/h)

� Main-burner (up to 5 t/h)

|

Page 15: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Solid Shredded Waste

Page 16: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Sunflower Shales

Page 17: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

17

Page 18: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Floor +37,3m (4)

17. Oktober

Page 19: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Calciner : 5 m diameter / 1500 m³ / height: 80 m

19

Page 20: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Description of the SCR

� 2 field ESP operated at 300 to 350°C

� Rectangular SCR reactor (4*6 m)

integrated in the old preheater tower

� 2 layers equipped with catalyst and

soot blowers, total of 43 m³ catalyst

� Gas conditioning tower below the SCR

reactor

20|

Page 21: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

SCR Mannersdorf - Features

� UREA injection on top

cyclone inlets

� SNCR remains stand by

� Preheat circuit with filter and

electrical heater

UREA

� Filtered and preheated fresh

air for purge

� Catalyst cleaning with

preheated compressed air

� Downcomer water injection

stand by

21|

Page 22: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Operation Results

� NOx target of 200 mg/Nm³ at stack reached from

the beginning

� Positive effect on VOC (~ minus 50 to 75%)

� Hg: almost complete oxidation

� CO: no direct effect, but reduction due to� CO: no direct effect, but reduction due to

stopping SNCR

� Start and stop without impacting the kiln

� Due to carbon fibers in flue gas and high dust

resistivity, the ESP performance is at 15 to 20

g/Nm³ versus planned 2 g/Nm³

22|

Page 23: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Catalyst

• 75-80% TiO2 as carrier

• 8-10% glas fibers

• 5-10% tungsten

• 1-3% V2O5 as active component

23

Page 24: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

NOx Emissions: Kiln/Raw Mill Exhaust gas

Emission Monitoring: NOx (kiln exhaust gas)

24

SCRNOx-Reduction through

Selective Catalytic Reaction

� Commissioning in April 2012

� First in Lafarge, first in

Austria, 4th Worldwide

|

Page 25: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Emissions Monitoring

� Continuous Monitoring of:

� NOx, CO, CO2, NH3, VOC, SO2, Dust, Hg

� Discontinuous Monitoring of:

� Heavy Metals� Heavy Metals

� HCl, HF

� Dioxine/Fourane

� PCDD/F, PAH

25|

Page 26: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Dust Emissions: Kiln/RawMill Exhaust Gas

Emission Monitoring: DUST (kiln exhaust gas)

DUST

26

Bag-Filter(installed in 2000)

|

Page 27: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

VOC Emissions: Kiln/RawMill Exhaust Gas

Emission Monitoring: VOC (kiln exhaust gas)

27|

Page 28: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

SO2 Emissions: Kiln/Raw Mill Exhaust gas

Emission Monitoring: SO2 (kiln exhaust gas)

DUST

28

Managed through blending clay with waste-clay-bricks

DUST

AWG

|

Page 29: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Mercury Emissions: Kiln/Raw Mill Exhaust gas

Emission Monitoring: Hg (kiln exhaust gas)

29

Managed through Active Carbon

Dosing System

|

Page 30: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Discontinuous Emission Monitoring

� Kiln Exhaust gas after Raw-Mill

� 2 times per year

� Measured by TÜV Austria

� Measurements include heavy metals as well as other emissions:

30

mg/Nm³

HCl HF Cd Tl HgSb, As, Pb, Cr, Co, Cu, Mn, Ni, V, Sn gesamt

Dioxine / Furane [ng/Nm³]

Limit: 10 0,7 0,05 0,05 0,05 0,5 0,05

Ø 2012: 0,9 0,125 0,001 0,001 0,029 0,042 0,001

Ø 2013: 1,0 0,07 0,002 0,001 0,014 0,045 0,004

Ø 2014: 2,9 0,15 0,004 0,001 0,019 0,088 0,001

Ø 2015: 2,0 0,100 0,001 0,001 0,013 0,075 0,003

|

Page 31: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Emission Limit Values

Grenzwert (GW)

HMW TWM JMW

NOx 200 (500*) 200 (500*) 200 (500*) mg/Nm³

NH3 - 30 (40**) 30 (40**) mg/Nm³

SO2 350 350 350 mg/Nm³

mg/Nm³, dry at 10% O2

SO2 350 350 350 mg/Nm³

Staub 20 20 20 mg/Nm³

CO - - - mg/Nm³

TOC 120 120 120 mg/Nm³

Hg - 0,050 0,030 mg/Nm³

31

* Without SCR

** Without SCR or RM

|

Page 32: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Cement Grinding

� Clinker Storage Capacity: 135.000 t

(4 clinker silos)

� 2 Cement Mills: ~60 t/h and

~115 t/h

(incl. Slag Dryer)

32|

(incl. Slag Dryer)

� Cement Storage Capacity: 10 cement silos:

54.000 t

Page 33: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

ZM 8 ---- 4,6 m diameter / 16,4 m length

2 * 3 MW

340 t grinding balls

33|

Page 34: Plant Mannersdorf in a Nutshell - circabc.europa.eu · Plant Historical Development 2.730 t/d ⇒860.000 t/y (1,30 Mt/y) Currently (70%AF): 2.360 t/d ⇒750.000 t/y (1,13 Mt/y) 2

Product-Portfolio