12/11/2019 1 Michael Culmo, PE CME Associates, Inc. Long-term Performance of ABC Details There is a reason that we use ABC High traffic volume Impacts to the travel time Safety of workers and travelers So why should we sacrifice durability? We don’t want to come back in ten years to do it again Impacts to travelers will most likely not reduce over time AASHTO Technology Implementation Group (TIG) Established in 2001 The start of the development of ABC in the US Mantra: Get In, Get Out, and Stay Out Get in and Get Out Accelerated Construction Reduce impacts Stay out Use high quality prefabrication to extend service life Durability is the key Major focus on speed Weekend construction Overnight construction What about durability? Yes and no In this workshop, we will look at the history of durability of ABC and how we move forward Review of in-service performance New specifications for durability Recommendations to improve durability
Transcript
Page 1: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

1

Michael Culmo, PECME Associates, Inc.

Long-term Performance of ABC

Details

• There is a reason that we use ABC• High traffic volume

• Impacts to the travel time

• Safety of workers and travelers

• So why should we sacrifice durability?• We don’t want to come back in ten years to do it again

• Impacts to travelers will most likely not reduce over time

• AASHTO Technology Implementation Group (TIG)• Established in 2001

• The start of the development of ABC in the US

• Mantra: Get In, Get Out, and Stay Out

• Get in and Get Out• Accelerated Construction

• Reduce impacts

• Stay out• Use high quality prefabrication to extend service life

• Durability is the key

• Major focus on speed• Weekend construction

• Overnight construction

• What about durability?

• Yes and no

• In this workshop, we will look at the history of durability of ABC and how we move forward• Review of in-service performance

• New specifications for durability

• Recommendations to improve durability

Page 2: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

2

••

••

•••

••

Page 3: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

3

••

••

#of Times Visited

Bridge

No. Bridge Location Type of ABC Method Used

5 C-476 I-84 over Weber Canyon (Site No. 2) Full Depth Precast Concrete Deck Panels with Welded Tie Connection

5 C-477 I-84 over Weber Canyon (Site No. 1) Full Depth Precast Concrete Deck Panels with Welded Tie Connection

5 C-596 Parrish Lane at I-215 Full Depth Precast Concrete Deck Panels with Welded Tie Connection

4 F-94 I-84 WB over Weber River Full Depth Precast Concrete Deck Panels with Welded Tie Connection

5 F-183 I-80 over Highland Drive (near Kimball) Full Depth Precast Concrete Deck Panels with Welded Tie Connection

5 F-749 US-6 Wildlife Crossing at MP 200 Precast Substructures and Full Depth Precast Deck Panels with Welded Tie Connection

4 F-755 SR-89 over RR, Pleasant Grove

Full Depth Precast Concrete Deck

Panels with Welded Tie Connection,

Precast Approach Slabs and Sleeper

Slabs.

2010 Photo 2011 Photo 2016 Photo

Page 4: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

4

2010 Photo 2011 Photo2013 Photo 2016 Photo

2010 Photo 2016 Photo

2016 Photo 2016 Photo

Page 5: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

5

••

Good

performance

Poor

performance

Page 6: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

6

Good

performance

Fair

performance Fair

performance

#of Times Visited

Bridge

No. Bridge Location Type of ABC Method Used

1 C-389 E 1100 S Street over I-15 (Sam White) SPMT Installation

5 C-573 I-80: Mt Delle to Lambs Canyon SPMT Installation with Precast Approach Slabs

5 C-953 I-215 at 4500 South SPMT Installation

5 C-956 I-80 WB over 300 East SPMT Installation

5 C-957 I-80 WB over 500 East SPMT Installation

5 C-958 I-80 WB over 700 East SPMT Installation

5 C-959 I-80 WB over 900 East SPMT Installation

5 C-960 I-80 WB over 600 East SPMT Installation

5 C-961 I-80 WB On-Ramp over 600 East SPMT Installation

5 C-963 I-80 WB over Highland Drive SPMT Installation

5 C-968 I-215 at 3300 South SPMT Installation

5 F-254 I-80: Mount Delle SPMT Installation with Precast Approach Slabs

••

Page 7: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

7

2009 Photo 2010 Photo2011 Photo2013 Photo

2016 Photo 2009 Photo 2011 Photo2013 Photo 2016 Photo

Method B: Supported at pick

points during deck casting

••••

•••

Page 8: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

8

2013 Photo2016 Photo

2013 Photo2016 Photo

2013 Photo2016 Photo

Page 9: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

9

2016 Photo

Page 10: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

10

••

••

••

Page 11: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

11

••

••

••

Page 12: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

12

Page 13: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

13

• A sampling of some of my favorite ABC Details• Goal: Simplicity of Detailing

• Reduced Costs

• Less problems during construction

Page 14: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

14

• Connect cap piece with CMP Void Connection• Complex details left to one piece

• Simplifies wall panels

• Low moment demand connection

• Easy construction

• Maine DOT Bridge

CIP Footing with Precast Column

• Semi-integral abutment

• Spaced slide shoes• Built level (simple)

• Allows for different jacking systems

• Sliding bearings or Rollers under shoes during slide

• Bridge can be jacked between shoes to allow for permanent bearing installation

• Fewer bearings than conventional construction

Page 15: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

15

2 Beams with Precast Deck

• Eliminates deck connections

• Precast Double Tee for Bridges

• Developed by the PCI NE Bridge Tech Committee

Page 16: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

16

Page 17: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

17

Page 18: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

18

Page 19: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

19

Page 20: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

20

Page 21: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

21

Page 22: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

22

Page 23: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

23

Page 24: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

24

Page 25: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

25

••

Page 26: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

26

••

••

••

••

•••

••

•• ☺

••

••••

Page 27: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC

12/11/2019

27

••