Pemex Farmouts July 2017 Ayin-Batsil Cárdenas-Mora Ogarrio 1
Transcript
Page 1: Presentación de PowerPoint - Pemex...Presentación de PowerPoint Author Patricia Alfaro Created Date 7/10/2017 4:33:24 PM ...

Pemex Farmouts

July 2017

Ayin-Batsil

Cárdenas-Mora

Ogarrio

1

Page 2: Presentación de PowerPoint - Pemex...Presentación de PowerPoint Author Patricia Alfaro Created Date 7/10/2017 4:33:24 PM ...

Bidding Process

1. Call for bids and bidding guidelines

2. Access to the data room and registration

3. Questions and answers

4. Prequalification (operators and non-operators)

5. Final version of the contract

6. Consortia building stage

7. Bidding Day

2

Page 3: Presentación de PowerPoint - Pemex...Presentación de PowerPoint Author Patricia Alfaro Created Date 7/10/2017 4:33:24 PM ...

Data Room Access and Registration

1. Payment for Data Room Access

* Non-operators do not have to pay Data Room Access

25 July 25th

Jun Jul Aug

2. Registration and prequalification appointment

28 July 28th

3

Page 4: Presentación de PowerPoint - Pemex...Presentación de PowerPoint Author Patricia Alfaro Created Date 7/10/2017 4:33:24 PM ...

4

Q&A

The Q&A process is carried out in writing through the website:

www.rondasmexico.gob.mx

Page 5: Presentación de PowerPoint - Pemex...Presentación de PowerPoint Author Patricia Alfaro Created Date 7/10/2017 4:33:24 PM ...

Technical Capabilities for Operators

Ayin-Batsil Shallow waters

Cardenas-Mora and Ogarrio Onshore

1. Experience in at least three offshore projects, in water dephts equal to or greater than 150 meters.

1. Experience in carbonate reservoirs (Cardenas-Mora) and in mature fields (Ogarrio) with:

2. Production of 10 thousand barrels of oil equivalent per day, in water dephts equal to or greater than 150 meters.

3. Capital investments in E&P projects adding up to at least 2 billion dollars (2011-2015).

4. Experience in environmental protection and industrial safety during the last 5 years.

Design and implementation of secondary or enhanced oil recovery techniques in reservoirs with depth equal to or greater than 3,000 meters.

2. Production of 10 thousand barrels of oil equivalent per day (2012-2016).

3. Experience in environmental protection and industrial safety during the last 5 years.

5

Page 6: Presentación de PowerPoint - Pemex...Presentación de PowerPoint Author Patricia Alfaro Created Date 7/10/2017 4:33:24 PM ...

Financial Strength

Ayin-Batsil Shallow waters

Cardenas-Mora and Ogarrio Onshore

Operator • Net worth of 1 billion dollars or

total assets for at least 10 billion dollars and investment-grade credit rating.

Non- operator • Net worth of at least 250 million

dollars.

Operator • Net worth of 150 million dollars;

or assets for 500 million dollars. Non- Operator • Net worth of 50 million dollars.

6

Page 7: Presentación de PowerPoint - Pemex...Presentación de PowerPoint Author Patricia Alfaro Created Date 7/10/2017 4:33:24 PM ...

Consortia Building Stage

9

7

Bids can be submitted by:

a) Single companies, prequalified as operators or

b) Consortia.

During September prequalified companies could request to bid as consortium.

Each Consortium must have at least one Operator.

September 11th to 13th

Sep

11 13

Page 8: Presentación de PowerPoint - Pemex...Presentación de PowerPoint Author Patricia Alfaro Created Date 7/10/2017 4:33:24 PM ...

Bidding Day

– Submission, opening of bids and award declaration are held at the same event.

– Public event

– Live internet broadcast

8

Awarding

Pemex

Farmouts will

be next

October 4th

Page 9: Presentación de PowerPoint - Pemex...Presentación de PowerPoint Author Patricia Alfaro Created Date 7/10/2017 4:33:24 PM ...

4 Prequalification

Schedule

Payment for Data Room Access

9 September 11th to 13th

Bidding Day

September 4th

* Non-operators do not have to pay Data Room Access Deadline to sign contract: Within 90/140 calendar days following the publication of the ruling in the Official Journal of the Federation

25

4

31

July 25th

Jun Jul Aug Sep Oct

Issue of final version of contract

*Registration 28 July 28th

11 13 Consortia building stage

October 4th

4

9

Page 10: Presentación de PowerPoint - Pemex...Presentación de PowerPoint Author Patricia Alfaro Created Date 7/10/2017 4:33:24 PM ...

Disclaimer

This presentation is the sole responsibility of the speaker and does not necessarily represent the

institutional position of the National Hydrocarbons Commission, which reserves its position and

distributes official information through www.rondasmexico.gob.mx, as well as though its

publications in the Official Gazette.

10