PRESENTATION. ORANGE BOWL STADIUM. January 8, 2004. STUDY SCENARIOS. SCENARIO A- Orange Bowl Redevelopment for Professional Baseball, Soccer and Collegiate Football within the existing Stadium. - PowerPoint PPT Presentation
11
PRESENTATION January 8, 2004 ORANGE BOWL STADIUM
Transcript
Page 1: PRESENTATION

PRESENTATION

January 8, 2004

ORANGE BOWL STADIUM

Page 2: PRESENTATION

STUDY SCENARIOS

SCENARIO A- Orange Bowl Redevelopment for Professional Baseball,

Soccer and Collegiate Football within the existing Stadium.SCENARIO B- Create a multi-purpose sports complex that leverages the existing stadium infrastructure at the Orange Bowl and

provides state-of-the-art facilities for Major League Baseball,

Collegiate Football and Professional Soccer.

Page 3: PRESENTATION

DESIGN forFOOTBALL, BASEBALL &

SOCCER

Page 4: PRESENTATION
Page 5: PRESENTATION

MULTI-SPORTS COMPLEX on ORANGE BOWL SITE

Page 6: PRESENTATION

SCENARIO B – MULTI-SPORTS COMPLEX

Site Plan

Page 7: PRESENTATION

SCENARIO B – MULTI-SPORTS COMPLEX

Building Rendering

Page 8: PRESENTATION

CONCLUSION

Page 9: PRESENTATION

SUMMARY

SCENARIO A- Renovate the Orange Bowl Stadium and integrate

baseball as a short term use.

SCENARIO B- Maintain the integrity of the Orange Bowl Stadium for Collegiate

Football and provide a permanent solution for Major League Baseball.

Page 10: PRESENTATION

NEXT STEPS

The following outline highlights immediate action steps to establish a stadium development

plan for the City of Miami that evaluates the Orange Bowl alternatives and new stadium

initiatives.

•Establish a Development Program for each Stadium Alternative

•Define Program Requirements (Baseball, Football & Soccer)

•Prepare Conceptual Design

•Perform Constructability Analysis

•Establish Preliminary Master Project Budget / Master Project Schedule

•Identify Available Funding Sources

•Prepare Draft Financing Document

•Establish Term Sheet

•Secure Appropriate Project Approvals

60 Days

Page 11: PRESENTATION

PRESENTATION

January 8, 2004

ORANGE BOWL STADIUM


Recommended