• Financially Strong
– FY 2012 Revenue: $7.9 Billion
– Backlog: $14.2 Billion
– $904 Million Cash and Equivalents
• Headquarters in Houston, Texas
• 100+ years of operating history
• 27,000 employees in over 70 countries
• Publicly traded on the NYSE (KBR)
• Extensive service capabilities:
– Engineering, procurement, construction,
commissioning, and start-up to global oil,
gas, petrochemical, and infrastructure
customers
– Defense, logistics, and contingency support
for defense services
KBR History
2008 Acquisition of TGI
2004 KBR draws upon its extensive experience designing CO2 compression systems to help build the world’s first full-scale CO2 capture project in Algeria.
2006 KBR becomes a standalone company
1919 Brown & Root is founded as a road construction company in Houston, Texas by George and Herman Brown along with their brother-in-law Dan Root
1956 Kellogg builds the first Crude oil-based liquid Ethylene cracking facility In Europe.
1977 Kellogg constructs Skikda LNG In Algeria, its first LNG liquefaction plant.
1997 Brown & Root starts construction of the automated People Mover system, which connects terminals at Houston’s Bush Intercontinental Airport.
2005 KBR begins Pearl GTL in Qatar, its first GTL project and what will be the largest GTL plant in the world.
2008 Acquisition of BE&K
2008 Acquisition of Catalyst Interactive
1900 Kellogg is founded by Morris W. Kellogg as a small pipe fabrication company
1947 Brown & Root builds the world’s first offshore platform 43 miles south of Morgan City, Louisiana, beyond the sight of land
1965 Brown & Root builds the first offshore platform in the North Sea for Conoco, which would later become a major offshore hub.
1997 KBR wins LOGCAP contract to support the U.S. military with base camps and other life support services.
1998 M.W. Kellogg Company merges with Brown & Root to form Kellogg Brown & Root (KBR).
2008 Acquisition of Wabi Development Corp
2010 Acquisition of Energo Engineering
1996 Acquisition of Granherne
2001 Acquisition of GVA
2010 Acquisition of
Roberts & Schaefer
2011 KBR acquires remaining
shares of MWKL
4
KBR’s Business Segments
DOWNSTREAM
HYDROCARBONS GROUP
INFRASTRUCTURE, GOVERNMENT & POWER
GAS MONETIZATION OIL & GAS TECHNOLOGY
NORTH AMERICAN
GOVERNMENT &
LOGISTICS
INTERNATIONAL
GOVERNMENT,
DEFENSE
& SUPPORT
SERVICES INFRASTRUCTURE POWER &
INDUSTRIAL
MINING
& MINERALS
SERVICES
VENTURES
U.S. CONSTRUCTION INDUSTRIAL SERVICES KBR CANADA BUILDING GROUP
5
Infrastructure, Government, and Power
Mining & Minerals
Mark Read
Infrastructure
Colin Elliott
International Government,
Defence & Support
Services
Andrew Pringle
N.A. Government &
Logistics
Power & Industrial
Jim Stewart
Ma
rke
t S
ec
tors
S
erv
ice
s
Bu
sin
es
s U
nit
s
Bu
sin
es
s
Gro
up
Infrastructure, Government, and Power
Andy Summers
U.S. Federal Government
Department of Defense Power
Pulp & Paper
Alternate Energy
Transportation
Water
Facilities
Minerals
U.K. Ministry of Defence
Middle East
Asia Pacific (APAC)
KBR Delivers in six distinct markets: Infrastructure & Minerals, Government & Defense, and Power and Industrial
Operations and Maintenance
Logistics Construction Design/Build
Facilities Management
Program & Project Management
Construction Management
Training
Engineering EPC Project
Management Construction
Management
Engineering EPCM Project Management Construction
Management Event Management
Engineering EPC Project
Management Construction
Management
6
7
LG&E / Kentucky Utilities
Carbon Capture Study
2011
LCRA Fayette Power
Project 2 x 600 MW Wet FGD’s
2011
Dominion Kincaid
Dry Sorbent Injection
In Progress
Progress Energy Sherman H. Smith 600 MW Combined
Cycle
2011
Southern Co. Scherer
SCR and WFGD Units 1&2
In Progress
National Grid Croydon & Hendon 400kV Cable Circuit
Replacements
In Progress
Barrow Wind, Eastern Irish Sea 90 MW Offshore
Wind Farm
2006
Dongguan Power, China
120 MW IGCC / TRIG™ Retrofit
In Progress
AGL Energy Macarthur Wind Farm – 420MW
In Progress
LCRA Fayette Power
Project Unit 3 FGD Rebuild
2010
Southern Co. Radcliffe
582 MW IGCC / TRIG™
In Progress
Solid Waste Authority
100 MW Waste-to-Energy Plant
In Progress
Palm Beach County, SWA
Waste to Energy Retrofit
2012
Seminole Electric Coop Wet to Dry Ash
Project
In Progress
Southern Co. Scherer
4 x 880 MW Baghouses
2010
SSE – PMC Scotland $13 Billion
Capital Program
In Progress
Jazan Refinery Saudi Arabia
(5) 2x1F CTCC FEED
In Progress
Dominion Offshore Wind
FEED
In Progress
KBR Power – Major Current / Recent Projects
Kentucky Utilities Ghent
Air Emissions Control Systems
In Progress
Kentucky Utilities
AIR EMISSIONS CONTROL
SYSTEMS PROJECT
Location: Ghent, KY
Scope: EPC
Contract Value: $400 Million
Completion Date: December 2015
Highlights:
• KBR will lead the installation of Particulate Matter Control
Systems on all four units
• Each system will include:
– Pulse-jet fabric filter to capture particulate matter
– Powdered Activated Carbon injection system to capture
mercury
– Lime injection system to protect the pulse-jet fabric filter
from the corrosive effects of sulfuric acid mist
8
Solid Waste Authority
PALM BEACH RENEWABLE
ENERGY FACILITY UNIT 2
Location: West Palm Beach, FL
Scope: EPC
Contract Value: $450 Million
Completion Date: February 2015
Highlights:
• New facility will include three boiler and air pollution control
trains to process in excess of one million tons of municipal
solid waste per year and generate enough electricity to
power 56,000 homes
• Plant processes 3,000 tons of municipal solid waste per day
and generates 95 MW of power
• Includes metals recovery system to maximize the recycle of
aluminum, steel and other metals
9
Dominion
KINCAID DRY SORBENT
INJECTION PROJECT
Location: Kincaid, Illinois
Scope: EPC, Commissioning and Startup
Contract Value: $47 Million
Completion Date: 2013
DSI System: Nol-Tec Systems Sorb-N-Ject
Technology
Highlights:
• 2 x 580 MW PRB coal fired units
• 12 tph DSI injection rate
• 100 tph rail unloading facility
• 50 tph truck unloading
• SBC milling and onsite storage
• 100% redundancy
10
Southern Company (Georgia Power)
PLANT SCHERER UNITS 1 &
2 SCR AND WFGD PROJECT
Location: Forsythe, GA
Scope: Construction Services
Contract Value: $150 Million
Completion Date: 2012
Highlights:
• Construction of the SCR and WFGD is an integral part of
Georgia Power’s air quality control program
• Units 1 & 2 are 2x880 MW – part of the largest coal-fired
power plant in the United States
• WFGDs are supplied by Advatech
Southern Company (Georgia Power)
LANT SCHERER UNITS 1-4
BAGHOUSE PROJECT
Location: Forsythe, GA
Scope: EPC Services
Contract Value: $500+ Million
Completion Date: 2010
Highlights:
• 4 x 880 MW Baghouse and ACI injection system installations
(particulate and mercury control)
• Schedule – engineering started and construction mobilized
in 2007; first unit complete in 2008, and final unit complete in
2010 on schedule
• Over 9,000 tons (4,600 lf) of ductwork
• Upgrades of four 8000/4500 hp ID fans
Progress Energy
RICHMOND COUNTY - UNIT 5
COMBINED CYCLE PROJECT
Location: Hamlet, North Carolina
Scope: General contractor
(including field procurement and
startup support)
Completion Date: 2011
Highlights:
• 630 MW Combined Cycle
– 2 x Siemens 5000F (3) CTG’s
– 2 x Vogt HRSG’s
– GE D-11 STG
• 0.87% Weld Reject Rate
• Completed ahead of schedule January 2011
• Over One Million Hours Without a Recordable / Zero Lost
Time Accidents
14
KBR – Making a Difference Through:
15
• Successfully executing large, complex projects in difficult
locations
• Experienced resources and integrated project teams
• Execution excellence
• Local sustainable development solutions that transform
resources and lives
• Health, Safety, Environmental performance
• Global alliances, partnerships, and purchasing power