Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
INTEGRATED SYSTEM PROCEDURE
HACCP PLA
(CLAUSE 7.. of ISO 22000:2005)
Name Designation Signature Date
Prepared by: Mr. Mujtaba ISO Coordinator
e!ie"ed by: Mr. Waqa MR
Appro!ed by: Mr. Muja!id "li MD
Page 1of 25
8/9/2019 Procedure for HACCP Plan
2/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
DOCUMENT HISTORY
#$%&
DAT#PA'#&
S#CTI(N DC& NAT)# (* A+#ND+#NT
"ll c!ange made in t!e document are noti$ed in t!e Document %itor&. 'or detail o(
amendment) *leae re(er to relevant DCR +Doc. C!ange Requet,.
Page 2of 25
8/9/2019 Procedure for HACCP Plan
3/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
,% Purpose
T!e *ur*oe o( t!i *rocedure i to identi(& *oible (ood a(et& !azard and
control in *lace to ma-e ure t!e (ood a(et& !azard are eliminated or controlled
to enure acce*table level.
% Scope
T!i *rocedure a**lie to all activitie at identi$ed CC
.% esponsibilities
Management Re*reentative and 'ood Sa(et& Team /eader i re*onible
(or
0, T!e im*lementation o( t!i *rocedure
1, Monitoring o( t!e %"CC *eronnel de*uted at CC
2, 3eri$cation and igning o( %"CC record.
% Procedure
%, #stablising a HACCP Team
S*rintec! ac-aging !a etabli!ed a %"CC team made u* o( *eo*le
(rom a 4ide range o( dici*line a given in "**endi5 I. T!e team
include:0. " team leader to convene t!e grou* and to direct t!e 4or- o( t!e
team enuring t!at t!e %"CC conce*t i *ro*erl& a**lied.
1. Member 4it! major role in *roduction o( t!e (ood *ac-aging
material) eac! 4it! an undertanding o( *articular (ood a(et&
!azard and aociated ri-.
% Describing a product
" (ull decri*tion o( t!e *roduct 4it! relevant a(et& in(ormation i
*re*ared a
given in "**endi5 II. "lo in(ormation regarding !o4 t!e *roduct i to
be
*ac-aged) tored and tran*orted i alo conidered toget!er 4it!
(act
Page 3of 25
8/9/2019 Procedure for HACCP Plan
4/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
regarding it6 !el( li(e and recommended torage tem*erature.
/abelling
in(ormation i alo included.
T!i in(ormation 4ill ait t!e %"CC team to identi(& 6real6 !azard
aociated
4it! t!e *roce.
%.Describing a product1s intended use
T!e %"CC team alo de$ne t!e normal or e5*ected ue o( t!e *roduct
b& t!e
cutomer and t!e conumer (or 4!ic! t!e *roduct i intended. T!i
in(ormation i
recorded on t!e ame (orm o( *roduct decri*tion) ee "**endi5 II.
%Construction o2 *lo" Diagram ( Description of Manufacturing
process)
"ll t!e te* involved in t!e *roce (rom receiving t!e ra4 material to
*lacing
t!e end *roduct t!roug! *re*aration) *roceing ) *ac-aging ) torage
and
ditribution i *reented in a detailed 7o4 diagram.
"(ter t!e 7o4 diagram !a been made) a multidici*linar& team 4ill
con$rm it
on8ite during o*erating !our. "n& oberved deviation 4ill reult in an
amendment o( t!e original 7o4 diagram to ma-e it accurate.
%3 Identi4cation and Analysis o2 Ha5ard6s7T!e %"CC team ne5t conduct a !azard anal&i to identi(& (or t!e
%"CC *lan
4!ic! !azard are o( uc! a nature t!at t!eir elimination or reduction to
acce*table
level i eential to t!e *roduction o( a a(e (ood *ac-aging.
Page 4of 25
8/9/2019 Procedure for HACCP Plan
5/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
'ood a(et& !azard (or %"CC *lan !ave been clai$ed into t!ree t&*e
o( !azard:
,% 8iological % Cemical .% Pysical
In conducting t!e !azard anal&i) t!e (ollo4ing !ould be conidered:
a. t!e li-el& occurrence o( !azard and everit& o( t!eir advere !ealt!
e9ect
b. t!e qualitative andor quantitative evaluation o( t!e *reence o(
!azard
c. urvival or multi*lication o( *at!ogenic micro8organim and
unacce*table generation o( c!emical in intermediate *roduct) $nal
*roduct) *roduction line or line environment
d. *roduction or *eritence in (ood o( to5in or ot!er undeirable
*roduct o( microbial metabolim) c!emical or *!&ical agent or
allergen
e. contamination +or recontamination, o( a biological +micro8organim)
*araite,) c!emical or *!&ical nature o( ra4 material) intermediate
*roduct
or $nal *roduct.
Once a (ood a(et& !azard !a been identi$ed) t!en a**ro*riate control
meaure are ta-en into conideration. T!ee are an& action or activit& t!at
can be ued to control t!e identi$ed !azard) uc! t!at it i *revented)
eliminated) or reduced to an acce*table level.
%9 Identi4cation o2 Critical Control Points 6CCPs7
T!e identi$cation o( a critical *oint (or t!e control o( a !azard i done
b& t!e %"CC
team ) according to t!eir judgment ) e5*erience and -no4ledge o( t!e
*roce.
;ac! *roce te* identi$ed in t!e 7o4 diagram i conidered in equence.
T!e team 4ill determine 4!et!er t!e !azard can occur at t!i te*) and i( o
4!et!er control meaure e5it. I( t!e !azard can be controlled adequatel&)
Page 5of 25
8/9/2019 Procedure for HACCP Plan
6/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
and i not bet controlled at anot!er te*) and i eential (or (ood a(et&)
t!en t!i te* i a CC (or t!e *eci$ed !azard.
T!e identi$cation o( critical control *oint !a t4o conequence (or t!e
%"CC team
4!ic! !ould t!en:
,% ;nure t!at a**ro*riate control meaure are e9ectivel& deigned and
im*lemented.
% ;tabli! and im*lement a monitoring &tem at eac! critical *oint.
roduction !ould ceae until control meaure are available and a CC i
introduced.
% Critical ;imits at Critical Control Points
;ac! control meaure aociated 4it! a critical control *oint 4ill give rie to
t!e
*eci$cation o( critical limit. Critical limit corre*ond to t!e e5treme
value acce*table 4it! regard to *roduct a(et&. T!e& e*arate
acce*tabilit& (rom unacce*tabilit&. T!e& are et (or obervable or
meaurable *arameter 4!ic! can demontrate t!at t!e critical *oint i
under control. It !ould be baed on ubtantiated evidence t!at t!e c!oen
value 4ill reult in *roce control.
%< +onitoring Procedures at Critical Control Points
Monitoring i t!e mec!anim (or con$rming t!at critical limit at eac! CC
are being
met. " (requenc& o( obervation or meaurement 4!ic! *rovide reliable
in(ormation i etabli!ed.
T!e *rocedure decribe t!e met!od) t!e (requenc& o( obervation or
meaurement
and t!e recording *rocedure and identi(& eac! critical *oint:
a. 4!o i to *er(orm monitoring and c!ec-ing)
b. 4!en monitoring and c!ec-ing i *er(ormed)
c. !o4 monitoring and c!ec-ing i *er(ormed.
Page 6of 25
8/9/2019 Procedure for HACCP Plan
7/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
Record aociated 4it! monitoring CC mut be igned b& t!e 'ood
Sa(et& Team /eader doing t!e monitoring and t!e record are veri$ed b&
Management Re*reentative o( t!e com*an&.
%= Correcti!e Actions
'or eac! critical control *oint corrective action i *lanned in advance b&
t!e
%"CC team) o t!at t!e& can be ta-en 4it!out !eitation 4!en monitoring
indicate
a deviation (rom t!e critical limit.
Suc! corrective action 4ill include:
< Identi$cation o( t!e *eron+, re*onible (or t!e im*lementation o( t!e
corrective action)
< Decri*tion o( mean and action required to correct t!e oberved
deviation)
< "ction to be ta-en 4it! regard to *roduct t!at !ave been manu(actured
during t!e
*eriod 4!en t!e *roce 4a out o( control)
< Written record o( meaure ta-en indicating all relevant in(ormation +(ore5am*le:
date) time) t&*e o( action) actor and ubequent veri$cation c!ec-,.
Monitoring 4ill indicate t!at *reventive meaure +c!ec-ing equi*ment)
c!ec-ing t!e
*eron !andling t!e (ood *ac-aging material) c!ec-ing t!e e=cac& o(
*reviou
corrective meaure) etc., !ould !ave to be ta-en i( corrective action (or
t!e ame
*rocedure !ave to be ta-en re*eatedl&.
%,0 $eri4cation Procedures
T!e %"CC team !ould *eci(& t!e met!od and *rocedure to be ued (or
Page 7of 25
8/9/2019 Procedure for HACCP Plan
8/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
determining i( t!e %"CC *lan i 4or-ing correctl&. Met!od (or veri$cation
ma&
include in *articular random am*ling and anal&i) rein(orced anal&i or
tet
at elected critical *oint) inteni$ed anal&i o( intermediate or $nal
*roduct)
urve& on actual condition during torage.
T!e (requenc& o( veri$cation !ould be u=cient to con$rm t!at %"CC
*lan i
4or-ing e9ectivel&. T!e (requenc& o( veri$cation !all de*end on t!e
c!aracteritico( t!e buine ) t!e monitoring (requenc&) t!e accuracie o( t!e
em*lo&ee) t!e
number o( deviation detected over time and t!e !azard involved.
3eri$cation *rocedure include:
< "udit o( %"CC and it record)
< In*ection o( o*eration)
< Con$rmation t!at CC are -e*t under control)
< 3alidation o( critical limit)
< Revie4 o( deviation and *roduct di*oition> corrective action ta-en
4it! regard to t!e *roduct.
T!e (requenc& o( veri$cation 4ill greatl& in7uence t!e amount o( rec!ec- or
recall
required in cae a deviation e5ceeding t!e critical limit !a been detected.
3eri$cation
!all com*rie all o( t!e (ollo4ing element) but not necearil& all at t!e
ame time:
< C!ec- on t!e correctne o( t!e record and anal&i o( deviation
< C!ec- on t!e *eron monitoring *roceing) torage andor tran*ort
activitie
< !&ical c!ec- on t!e *roce being monitored
Page 8of 25
8/9/2019 Procedure for HACCP Plan
9/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
< Calibration o( intrument ued (or monitoring.
3eri$cation i carried out b& Management Re*reentative omeone ot!er
t!an t!e *eron 4!o i re*onible (or *er(orming t!e monitoring and
corrective action.
W!ere *oible) validation activitie !ould include action to con$rm t!e
e=cac& o( all element o( t!e %"CC *lan. In cae o( c!ange) it i necear&
to
revie4 t!e &tem) to enure t!at it i or 4ill be till valid.
;5am*le o( c!ange include:
< c!ange in ra4 material or in *roduct) *roceing condition +(actor& la&out
andenvironment) *roce equi*ment) cleaning and diin(ection *rogram,)
< c!ange in *ac-aging) torage or ditribution condition)
< c!ange in conumer ue)
< recei*t o( an& in(ormation on a ne4 !azard aociated 4it! t!e *roduct.
W!ere necear&) uc! a revie4 mut reult in t!e amendment o( t!e
*rocedure laid
do4n. T!e c!ange !ould be (ull& incor*orated into t!e documentation and
record-ee*ing &tem in order to enure t!at accurate u*8to8date
in(ormation i available.
%,, Documentation and ecord >eeping
%"CC *rocedure !ould be documented. Documentation and record
-ee*ing !ould be a**ro*riate to t!e nature and ize o( t!e o*eration and
u=cient to ait t!e buine to veri(& t!at t!e %"CC control are in
*lace and being maintained. Document and record !ould be -e*t (or a
u=cient time to allo4 t!e com*etent aut!orit& to audit t!e %"CC &tem.
Document !ould be igned b& Management Re*reentative o( t!e
com*an&.
Documentation e5am*le are:
Page 9of 25
8/9/2019 Procedure for HACCP Plan
10/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
< %azard anal&i>
< CC determination>
< Critical limit determination>
< Modi$cation to t!e %"CC &tem.
Record e5am*le are:
< CC monitoring activitie>
< Deviation and aociated corrective action>
< 3eri$cation activitie.
%, Training
T!e Management re*reentative and (ood a(et& team leader !all ma-e
ure t!at all
*eronnel are a4are o( t!e !azard identi$ed +i( an&,) t!e critical *oint in
t!e
*roduction) torage) tran*ort andor ditribution *roce and t!e corrective
meaure) t!e *reventive meaure and documentation *rocedure
a**licable in
t!e o*eration o( t!e com*an&.
%, elated Documents
%"CC Mater lan
%"CC lan 3alidationReaement C!ec-lit
Corrective ? reventive "ction 'orm
Page 10of 25
8/9/2019 Procedure for HACCP Plan
11/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
Page 11of 25
8/9/2019 Procedure for HACCP Plan
12/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
Figure 1. CCP Decision Tree- Flow Diagram
Page 12of 25
8/9/2019 Procedure for HACCP Plan
13/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
Figure 2. Manufacturing Process Flow Diagram
Appendix I: Establishing a HACCP ea!
Page 13of 25
8/9/2019 Procedure for HACCP Plan
14/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
HACCP Team
*acility Name : S*rintec! ac-aging Date :Se*tember 12 ) 1@0A
Team +ember PositionHACCP Team
oleSignatur
e
S&ed Mujtaba "li roduction Member"dvior
Waqa %aanManagement
Re*reentative"dvior
Bman S!au-at ".M roduction Member
air ilalInc!arge E"
roduct Sa(et& Team /eader
Imran "meerrinting
Su*erviorMember
Tariq %uain/aminationSu*ervior
Member
Ir(an S!ei-!/aminationSu*ervior
Member
F!alid ImtiazSlitting
Su*erviorMember
Mu!ammad %uain
ag Ma-ing
Su*ervior Member
Waqa GunaidSleeve Ma-ing
Su*erviorMember
Haveed F!alidWare!oue
Inc!argeMember
Hadeem "!madDi*atc!"itant
Member
Fa!i( Me!moodMaintenance
;ngineerMember
S&ed Eaim Raza
urc!ae
;5ecutive Member
Page 14of 25
8/9/2019 Procedure for HACCP Plan
15/25
8/9/2019 Procedure for HACCP Plan
16/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
Appendix II: P"#d$%t &es%"ipti#n '#"!at
P"#d$%t &es%"ipti#n ( Intended )se*e%ti#n: &ate:
P"#d$%t Categ#"+ ,a!e
P"#d$%t des%"ipti#n:
-i#l#gi%al. Che!i%al and Ph+si%al
Cha"a%te"isti%s
Intended *hel/ i/e ( *t#"age C#nditi#ns
Pa%aging e$i"e!ents
abeling e$i"e!ents
eth#d #/ &ist"ib$ti#n
Intended )se
Page 16of 25
8/9/2019 Procedure for HACCP Plan
17/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
Appendix III: HACCP alidati#neassess!ent Che%list
HACCP $alidation/eassessment Ceclistlant Hame : roduct Date Conducted :
Conducted b& :
$alidation Type
Initial Validation ( within 12 months of implementation)
Validation (Reassessment) due to changes in the raw materials or source of raw materials , product formulation ,
processing method or system , including computer and their softwares, packaging , finished product distriution
systems or the intended use or the intended consumers of the finished product or type of consumer complaints!
"nnual Validation (Reassessment ) of the #"$$P Plan including #a%ard "nalysis
#pi% E* ,I/ E*
&es%"ibe
'##d *a/et+
I!pli%ati#n;
A"e !#di/i%ati#ns t# the HACCP
s+ste! "e$i"ed;
1
8/9/2019 Procedure for HACCP Plan
18/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
.ew or emerging ha%ards
Regulatory "gency
recommendation e!g!,
guidance
"ny confirmed food
safety consumer
complaints
3< E=al$ate ade$a%+ #/ CCP>s. %"iti%al li!its. !#nit#"ing. %#""e%ti=e a%ti#n. CCP =e"i/i%ati#n. and "e%#"d eeping
p"#%ed$"es< e=ie? %$""ent CCP %$!entati#n
/o the $$Ps control the
ha%ards'
"re the $PP criticallimits ade+uate'
/o monitoring methods
and fre+uencydemonstrate control'
/o correcti-e actionsproperly address
affected product'
/oes -alidation include
re-iew of consumercomplaints'
Page 18of 25
8/9/2019 Procedure for HACCP Plan
19/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
Appendix I: HACCP Plan eassess!ent Change '#"!
HACCP Plan eassessment Cange *orm
*acility Name:
Person6s7esponsible:
HACCP Plan Name/Number and
/uring the reassessment of this plan, the person(s) responsile listed ao-e hasha-e determined that
$hanges, "dditions, or /eletions were needed! 0hose changes are documented elow! "lso attached is
information used to support modification(s) of this plan!
Cec (ne CHAN'# ADDITI(N D#;#TI(N
Bat speci4cally "ere Canged / Added / Deleted
By "as it Canged / Added / Deleted
Bat is te basis 2or te Cange / Addition / Deletion
Page 19of 25
8/9/2019 Procedure for HACCP Plan
20/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
a" +aterial Ha5ard Analysis
*acility Name : S*rintec! ac-aging Date :Se*tember 12 ) 1@0A
, . 3 9
;ist eac ra"material/ingredient in teprocess
Does tis material/ ingredientINT(D)C# apotential 2oodsa2ety a5ardBat is itC C!emical !&ical iological
Is tis a5ardC(NT(;;#D by aPre-reuisiteProgram orprocess stepI( ;S) indenti(& t!e*rogram or *roce. I( a*re8requiite *rogram or*roce i identi$ed) donot com*lete Column A8J and go to ne5t *rocete*. I( HO) go to columnA.
Is tis a5ard#;I+INAT#D by asubseuentprocess stepI( ;S) t!i te* i HOT aCC. Indenti(& t!eubequent *roce te*in Column K and *roceedto t!e ne5t *roce te*.I( t!e !azard ieliminated at t!i te*)enter HO and go tocolumn J and aign CC#.
Identi2y te lastprocess step tat"ill eliminate tepotential a5ard%
Assign a CCP &"en te ans"erin Column & isN(%(otherwise lea-e lank)
'ilm +;T ) 3C )O) %D;) %T/)O) C) /D; )H/OH ; ,
C Ho
e L 'oreignMaterial
e L ReceivingIn*ection
Ho
"d!eive+!ot melt) rein )
lamination,
C Ho
e L 'oreignMaterial
e L ReceivingIn*ection
e 8 In(etation e L ReceivingIn*ection
In- and c!emical
C e L lant C!emicale L C!emical Control
lan
Ho
Ho
a*er ) leac! oard+variou t&*e andgrade,
C Ho
e L 'oreignMaterial
e L ReceivingIn*ection
e 8 Moulde L ReceivingIn*ection
ac-ing Material C Ho
Ho
e L 'oreignMaterial ?
e L ReceivingIn*ection
Page 20of 25
8/9/2019 Procedure for HACCP Plan
21/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
In(etation
Process Ha5ard Analysis
*acility Name : S*rintec! ac-aging Date :Se*tember 12 ) 1@0A
, . 3 9;ist eac ra"material/ingredient in teprocess
Do tis material /ingredientINT(D)C# apotential 2oodsa2ety a5ardBat is itC C!emical !&ical iological
Is tis a5ardC(NT(;;#D by aPre-reuisiteProgram orprocess stepI( ;S) indenti(& t!e*rogram or *roce. I( a*re8requiite *rogram or*roce i identi$ed) donot com*lete Column A8J and go to ne5t *rocete*. I( HO) go to columnA.
Is tis a5ard#;I+INAT#D by asubseuentprocess stepI( ;S) t!i te* i HOT aCC. Indenti(& t!eubequent *roce te*in Column K and *roceedto t!e ne5t *roce te*.I( t!e !azard ieliminated at t!i te*)enter HO and go tocolumn J and aign CC#.
Identi2y te lastprocess step tat"ill eliminate tepotential a5ard%
Assign a CCP &"en te ans"erin Column & isN(%(otherwise lea-e lank)
Receiving In*ection
C Ho
e L 'oreignMaterial
e L ReceivingIn*ection
e 8 In(etatione L Receiving
In*ection
Ware!ouing
C Ho
e L 'oreignMaterial
e L ReceivingIn*ection
e 8 In(etatione L Receiving
In*ection
rinting
Ce L IncorrectDeign
e L /ine Clearance
e L Deign c!ec-litHo
.o 3ine $learance
$$P41 Ho
Ho
/aminationSolventle
C e Ho .o 3ine $learance
$$P42 Ho
e L Contamination in(etation
e L eronal %&giene ?%oue-ee*ing *rogram
Page 21of 25
8/9/2019 Procedure for HACCP Plan
22/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
/amination Solventae
C e Ho .o 3ine $learance
$$P45 Ho
e L Contamination in(etation
e L eronal %&giene ?%oue-ee*ing *rogram
SlittingC Ho
Ho
Ho
ag Ma-ing
C Ho .o Visual Inspection
$$P46 Ho
e L Contamination in(etation
e L eronal %&giene ?%oue-ee*ing *rogram
Sleeve ? Tube Ma-ing
C Ho
Ho
e L Contamination in(etation
e L eronal %&giene ?%oue-ee*ing *rogram
ac-aging
Ce L Incorrect*alletizing +allergen,
Ho .o Visual Inspection and
pallet control $$P47 Ho
e L Contamination in(etation
e L eronal %&giene ?%oue-ee*ing *rogram
Ware!ouing
C Ho
Ho
e L Contamination In(etation
e L eronal %&giene ?%oue-ee*ing *rogram
Di*atc!S!i**ing
C Ho
Ho
e L Contamination in(etation e L eronal %&giene ?%oue-ee*ing *rogram
Page 22of 25
8/9/2019 Procedure for HACCP Plan
23/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
HACCP +aster Plan
*acility Name : S*rintec! ac-aging Date :Se*tember 12 ) 1@0A
HACCP Plan 2or +ulti-layer *leEible Pacaging +aterials
CPPNumber
Signi4cantHa5ard
Critical;imit
+onitoring Correcti!eAction
$eri4cation
ecord6s7Bat Ho" *reuency Bo
$$P413ine
$learance
Printed materials
from pre-ious 8os
ha-e not een fully
cleared!
.o materials
from other
8os allowed
in area!
Printing
procedure
perator
remo-es all
materials from
pre-ious order
efore new 8o
starts up!
*ach
work orderperator
perator
remo-es
materials per
critical limits
and re4
inspects line!
Verified y
operator or
other co4
worker
Production
Records
$$P423ine
$learance
3aminated materials
from pre-ious 8os
ha-e not een fully
cleared!
.o materials
from other
8os allowed
in area!
3amination
procedure
perator
remo-es all
materials from
pre-ious order
efore new 8ostarts up!
*ach
work orderperator
perator
remo-es
materials per
critical limits
and re4inspects line!
Verified y
operator or
other co4
worker
Production
Records
$$P453ine
$learance
3aminated materials
from pre-ious 8os
ha-e not een fully
cleared!
.o materials
from other
8os allowed
in area!
3amination
procedure
perator
remo-es all
materials from
pre-ious order
efore new 8o
starts up!
*ach
work orderperator
perator
remo-es
materials per
critical limits
and re4
inspects line!
Verified y
operator or
other co4
worker
Production
Records
$$P46
VisualInspection
Incorrect uniti%ing or
palleti%ing due to
inad-ertent mi9ing of
ags results in
allergen risk due to
mi9ed product types
.o mi9ing of
ags!Visual
Inspection
:ork
instructions for
operators
helpers
*ach
cartonperator
perator
remo-es
materials per
critical limits!
Verified y
operator or
other co4
worker
Production
Records
Page 23of 25
8/9/2019 Procedure for HACCP Plan
24/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00
$$P47Visual
Inspection; Pallet$ontrol
Incorrect uniti%ing or
palleti%ing due to
inad-ertent mi9ing of
ags results in mi9ed
product types
.o mi9ing of
ags!Visual
Inspection
coupled with
pallet
segregation!
:ork
instructions for
operators
helpers
*-ery
palletperator
8/9/2019 Procedure for HACCP Plan
25/25
Organization: SPRINTECH
Doc. Title: HACCP Plan Procedure
Document Code: STP/ISP-0 Rev#:00