Project Execution Tender to Design to Fabrication Brief Overview of the Main Activities from Tender stage to Fabrication of ASME VIII Vessel Presented By: HS Compression & Process Pte Ltd (Member of Hiap Seng Group of Companies) HL Tan/ SL Yap
Transcript
Page 1: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Project ExecutionTender to Design to Fabrication

Brief Overview of the Main Activities from

Tender stage to Fabrication of ASME VIII Vessel

Presented By:HS Compression & Process Pte Ltd(Member of Hiap Seng Group of Companies)

HL Tan/ SL Yap

Page 2: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Pressure Vessels – Section VIII Division 1Basic CoverageThis Division of Section VIII provides requirements applicable to the design, fabrication, inspection, testing, and certification of pressure vessels operating at either internal or external pressures exceeding 15 psig. Such pressure vessels may be fired or unfired. Specific requirements apply to several classes of material used in pressure vessel construction, and also to fabrication methods such as welding, forging and brazing. It contains mandatory and nonmandatory appendices detailing supplementary design criteria, nondestructive examination and inspection acceptance standards. Rules pertaining to the use of the U, UM and UV Code symbol stamps are also included.

Contents Scope & Service Restrictions; General Requirements; Requirements for Fabrication by Welding, Forging, or Brazing; Requirements Pertaining to Classes of Materials for Carbon & Low Alloy Steel;Nonferrous Materials; High Alloy Steel; Cast Iron; Clad & Lined Vessels; Cast Ductile Iron Vessels; Ferritic Steels with Tensile Properties Enhanced by Heat Treatment; Layered Construction; High Stresses at Low Temperatures.

Page 3: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Section VIII Division 2 Alternative RulesBasic CoverageThis Division of Section VIII provides requirements applicable to the design, fabrication, inspection, testing, and certification of pressure vessels operating at either internal or external pressures exceeding 15 psig. Such vessels may be fired or unfired. This pressure may be obtained from an external source or by the application of heat from a direct or indirect source, or any combination thereof. These rules provide an alternative to the minimum requirements for pressure vessels under Division 1 rules. In comparison the Division 1, Division 2 requirements on materials, design, and nondestructive examination are more rigorous; however, higher design stress intensity values are permitted. Division 2 rules cover only vessels to be installed in a fixed location for a specific service where operation and maintenance control is retained during the useful life of the vessel by the user who prepares or causes to be prepared the design specifications. These rules may also apply to human occupancy pressure vessels typically in the diving industry. Rules pertaining to the use of the U2 and UV Code symbol stamps are also included.

ContentsGeneral Requirements; Material Requirements; Design Requirements; Fabrication Requirements; Pressure Relief Devices; Inspection inRadiography; Testing; Marking; Stamping; Reports & Records.

Page 4: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

ASME VIII Division 3 High Pressure VesselsBasic CoverageThis Division of Section VIII provides requirements applicable to the design, fabrication, inspection, testing, and certification of pressure vessels operating at either internal or external pressures generally above 10,000 psi. Such vessels may be fired or unfired. This pressure may be obtained from an external source, a process reaction, by the application of heat from a direct or indirect source, or any combination thereof. Division 3 rules cover vessels intended for a specific service and installed in a fixed location or relocated from work site to work site between pressurizations. The operation and maintenance control is retained during the useful life of the vessel by the user who prepares or causes to be prepared the design specifications. Division 3 does not establish maximum pressure limits for either Section VIII, Divisions 1 or 2, nor minimum pressure limits for this Division. Rules pertaining to the use of the UV3 Code symbol stamps are also included.

ContentsGeneral Requirements; Material Requirements; Design Requirements; Fabrication Requirements; Pressure Relief Devices; Examination Requirements; Testing; Marking; Stamping; Reports & Records.

Page 5: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 6: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 7: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Mandatory Appendix 13Vessels of Noncircular Cross Section

Page 8: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 9: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 10: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

I Tender Stage

• Review Client Data sheet• Client Spec• ASME Codes’ Compliance• U-stamp? or• Third Party Inspection?

Page 11: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Example 1: Dehydration TEG Contactor

Page 12: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Data Sheet’ Cont’d

Page 13: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Data Sheet Cont’d

Page 14: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Data Sheel Cont’d

Need to pay attention on Notes

Page 15: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 16: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Flow Simulation

Page 17: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Example 2: Compressor Suction ScrubberRef: ASME VIII, API 618, Client spec etc

Page 18: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

II Initial Phase- SizingProcess Calculation (Design flow, Pressure, Temp

etc),e.g. using Hysys program, to• Determine Vessel size • Finalize Vessel Main Parameters (Horizontal/

Vertical, materials, impact testing, CS/ SS/ Clad vessel?, 2:1 Ellipsoidal Head etc)

• Numbers of Nozzles/ Sizes required.• Thickness, nozzles ratings , vessel weight can

then be calculatedThen

• Vessel Cost ,delivery etc can now be determined

Page 19: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 20: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

III Engineering Design PhaseUpon Award:• Kick-off meeting to reconfirm Client’s project specifications

requirements• Prepare GA Drawings with details on orientation/ evaluation of

nozzles, perform mechanical calculation etc based on calculated loadings and submit for approval (to Client, Third Party or AI)

• Finalize details on Vessel Internals , Client may have their ownstandard, e.g. Shell DEPs; ExxonMobil Basic Practices.. etc

• Prepare BOM, selection of applicable WPS, determine NDT / PWHT requirements

So enable:• Procurement of materials• Fabrication• Testing (Note: if it will be pneumatically tested in cold country, test

temperature has to be 17 C above min metal design temp, UG-100(b) )

Page 21: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 22: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 23: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 24: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 25: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Inlet Piping Connection

e.g. Ref: Shell DEP 31.22.05.11

Page 26: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 27: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 28: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 29: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 30: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

UG-36 OpeningOpening shall preferably be circular,

elliptical or obroundExample of Compressor Obround Flange

Page 31: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Special Flange Calculation Sheet(Example only)

Page 32: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

FEA Model and Element

Page 33: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

FEA Analysis Result

Page 34: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Obround Flange installed on Compressor

Page 35: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 36: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 37: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Large Nozzle OpeningsUG-36(b)

1. For vessel 1500 mm inside diameter and less, ½ the vessel diameter, but not to exceed 500 mm

2. For vessels over 1500 mm ID, 1/3 the vessel diameter, but not to exceed 1000 mm

3. For nozzle openings exceeding these limits, supplemental rules of 1-7 shall be satisfied in addition to UG-36 through UG-43

Page 38: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Note: It is recommended that special considerations be given to the fabrication details used and inspection employed on large openings; reinforcement often may be advantageously obtained by use of heavier shell plate for a vessel course or inserted locally around the opening, note also to grind the welds to reduce stress concentrations.

Page 39: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

UG-35Quick Opening

Page 40: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Note the Safety Feature

Innovative Design Features

Innovative Design Features

Page 41: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 42: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

IV Fabrication PhaseUse of welded pipe as vessel body ?

Refer: UG-8

Page 43: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 44: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 45: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 46: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 47: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 48: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 49: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 50: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 51: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 52: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 53: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 54: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 55: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

Chinese GB Material (16MnR)Is This Material Acceptable?

Page 56: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .
Page 57: Project Execution - psig.sg · PDF fileProject Execution Tender to Design to ... vessel by the user who prepares or causes to be prepared the design ... Dehydration TEG Contactor .

V Inspection

Inspector shall verify that• Design Calculations are available • Materials used comply with requirements UG-4

through UG-14 (UG-93)• WPS are acceptable (UW-28, UW-47 etc)• Heat treatment are per code requirements (UG-

85, UW-10, UW-40, UW-49 etc)• Visual /NDT and witness hydrotest as per code

(UG-84, UG-93, UG-95, UG-96, UG-97, UG-99, UG-100, UW-50, UW-51, UW-52.. Etc)