QUA(AMCAPR Achiof Cwith NetsCA 621-
Prepa MEDAAsso
Plot 386,Dar es ST: +255 (F: +255 (E: meda@
ARTERLCC 7) IL – JUN
evemenCompre
Long L in Tanz-A-00-10-000
ared By:
A Econociates
, Toure Drive, alaam, P.O. B(22) 260 1822(22) 260 [email protected]
LY REPO
NE 2011
nt and MehensiveLasting zania (A005-00
mic Deve
Masaki
Box 10817 2, 1830, 1843
g
ORT 28
1
Maintene CoveInsecti
AMCC)
elopmen
nance erage icidal
nt
QUARTERLY REPORT 28 (AMCC 7) APRIL-JUNE 2011
TABLE OF CONTENTS
EXECUTIVE SUMMARY ........................................................................................................ 1
MANAGERIAL CONCERNS AND WAY FORWARD ............................................................ 2
BACKGROUND AND RATIONALE ....................................................................................... 3
STRATEGIES ......................................................................................................................... 5
Strategy 1: Contribute to Efficient and Effective LLIN Distribution Campaigns ............. 5 1.1 Universal Coverage Campaign (UCC) ........................................................... 5
1.1.1 UCC Activity Summary .................................................................................. 5
1.1.2 LLIN Issuing ................................................................................................... 5
1.1.3 Challenges and Actions Taken ...................................................................... 5
Strategy 2: Contribute to Effective and Efficient Initiatives That Ensure Ongoing and More Sustainable Distribution of LLINs .............................................................................. 7
2.1 Infant Voucher (IV) .......................................................................................... 7
2.1.1 Infant Voucher Activity Summary ................................................................... 7
2.1.2 IV Procured .................................................................................................... 7
2.1.3 IV Distributed to Districts ................................................................................ 7
2.1.4 IV Returned .................................................................................................... 9
2.1.5 IV Redemption Rate ..................................................................................... 10
2.2 Voucher Distribution Network ..................................................................... 12
2.2.1 Clinic Involvement in TNVS ......................................................................... 12
2.2.2 District Government Involvement in TNVS .................................................. 12
2.2.3 Managing Voucher Stock Levels ................................................................. 13
2. 3 Expanding and Strengthening the Commercial Supply Chain ................. 13
2.3.1 Retailer Recruitment .................................................................................... 13
2.3.2 Retailer Strengthening ................................................................................. 15
2.3.3 Managing LLIN stocks in Retail Outlets ....................................................... 16
2.3.4 Challenges and Actions Taken .................................................................... 17
Strategy 3: Support the Development of Improved Systems for Management, Training and Monitoring & Evaluation ............................................................................................. 19
3.1 Human Resources ........................................................................................ 19
3.1.1 Training ........................................................................................................ 19
3.1.2 Employee Recruitment ................................................................................. 19
3.1.3 Special Events and Visitors ......................................................................... 20
3.2 Risk Management for Minimizing Fraud ..................................................... 20
3.3 Monitoring and Evaluation ........................................................................... 21
3.4 Voucher Tracking System (VTS) ................................................................. 22
3.5 Information Technology ............................................................................... 22
3.5.1 GPS/GIS Data .............................................................................................. 22
3.5.2 Mobile and Web Reporting .......................................................................... 22
3.5.3 E-voucher ........................................................................................................ 22
3.5.4 IT Upgrades .................................................................................................... 23
3.6 Fleet Management ......................................................................................... 23
3.6.1 Procurement of Services .............................................................................. 23
3.6.2 PowerTrack Reporting ................................................................................. 23
APPENDIX A: PMI DATA TABLES APPENDIX B: UCC REGISTRATION AND ISSUING SUMMARIES APPENDIX C: DISTRICTS REPORTING TNVS FUNDING
LIST OF ACRONYMS
AMCC Achievement and Maintenance of Comprehensive Coverage
ANC Antenatal Care
AOTR Agreement Officer Technical Representative
A-Z A-Z Textile Mills Limited
BCC Behaviour Change Communication
CCA Community Change Agent
COMMIT Communication and Malaria Initiative in Tanzania
DFID Department for International Development (UK)
DMO District Medical Officer
GFATM Global Fund for AIDS, Tuberculosis and Malaria
GPS Global Positioning System
HP Hati Punguzo
IHI Ifakara Health Institute
IRK Insecticide Re-treatment Kits
ITN Insecticidal Treated Net
IV Infant Voucher
JHU Johns Hopkins University
KPI Key Performance Indicator
LLIN Long Lasting Insecticidal Net
M&E Monitoring & Evaluation
MEDA MEDA Economic Development Associates
MoHSW Ministry of Health and Social Welfare
NMCP National Malaria Control Programme
PMI President’s Malaria Initiative
PSI Population Services International
PWV Pregnant Woman Voucher
RCH Reproductive and Child Health
RM Regional Manager
RMO Regional Medical Officer
SMT Senior Management Team
TNVS Tanzania National Voucher Scheme
U5CC Under Five Catch-up Campaign
UCC Universal Coverage Campaign
UCRC Universal Coverage Registration Card
USAID United States Agency for International Development
VEO Village Executive Officer
VTS Voucher Tracking System
WEO Ward Executive Officer
WVT World Vision Tanzania
LIST OF TABLES AND CHARTS
Table 1: UCC Activity Summary as of June 30th, 2011 ........................................................... 5 Table 2: IV Activity Summary .................................................................................................. 7 Chart 1: IV Distributed to District Medical Officers Cumulatively ............................................ 8 Chart 2: IV Distributed to District Medical Officers Quarterly .................................................. 8 Chart 3: IV Returned to MEDA Cumulatively .......................................................................... 9 Chart 4: IV Returned to MEDA by Quarter .............................................................................. 9 Chart 5: IV Returned to MEDA by Subsidy Type .................................................................. 10 Chart 6: IV Quarterly and Accumulated Redemption Rates ................................................. 10 Chat 7: IV LLIN Batch Tracking: Infant Vouchers Dispatched in Q4 2009 ............................ 11 Table 3: Faith-Based and Private Sector RCH Clinics Participating in TNVS....................... 12 Table 4: Clinics Including TNVS in Outreach Services ......................................................... 12 Table 5: ITN Activities in District Budgets ............................................................................. 13 Chart 8: Regional Distribution of Retailers and Clinics ......................................................... 14 Table 6: Clinic to Retailer Ratio per Region .......................................................................... 14 Chart 9: LLIN Sales (Voucher Nets) Monthly and Cumulative .............................................. 16 Chart 10: LLIN Sales (Voucher Nets) per Region since October 2009 ................................. 17
QUARTERLY REPORT 28 (AMCC 7) APRIL - JUNE 2011
EXECUTIVE SUMMARY
Almost 11.9 million LLINs issued through Universal Coverage Campaign (UCC) The total number of LLINs issued to the first five of seven zones is 11,880,974. The beginning of the quarter was marked with issuing in Lake Zone (Mwanza, Kagera and Mara) where a total of 2,967,324 LLINs were issued to the target group. The final total of uncovered sleeping spaces registered nationwide in the UCC is 26,723,480. A final delivery figure of 18,204,040 LLINs is expected at the end of the campaign. The UCC activities are currently on hold pending the MoHSW approval of the remaining orders for the last two zones (Coast and Northern), scheduled to be implemented in the next four months. Voucher dispatching continues and meets pending requests MEDA continued to dispatch IVs to DMO offices as per voucher requests received. Large quantities of vouchers (392,850 IVs) were distributed this quarter as MEDA worked through a backlog of pending requests. Vouchers available for dispatch are determined through calculation of voucher liability which is based on both ageing and historical return formulas. Since the LLIN voucher launch in September 2009, 2,067,150 LLIN IVs have been distributed. Since LLIN voucher upgrade, over 0.9 million LLIN vouchers have been redeemed LLIN voucher redemptions since the voucher upgrade in September 2009 stand at 910,439 IVs. During the 28th quarter, 123,524 IV were redeemed for LLINs. To date, a total of 7,434,616 vouchers have been redeemed, of which 2,278,132 for infants’ beneficiaries. The cumulative redemption rate is 61.2% for IV. Total of 5,424 LLIN retailers verified by MEDA and entered into TNVS Mobile system A total of 5,424 private-sector retailers have been confirmed participating in the TNVS. These retailer contracts have been verified and have been locked into the online retailer database. Net sales to these retailers show a slight slowdown from earlier quarter of 300,191 to 268,830 LLINs but still higher than the quarterly average of 182,015 LLINs. Since September 2009, a cumulative of 2,002,166 LLINs have been sold to retailers. USAID/PMI-TNVS Cooperative Agreement closes out MEDA spent much of the end of May and early June 2011 planning for the close-out of the USAID/PMI-TNVS Cooperative Agreement, with the close-out plan submitted to USAID on June 10, 2011. From June 12th, 2011 onwards, no additional charges have been made to TNVS Cooperative Agreement. The unspent difference between obligated amount under this Cooperative Agreement and any expenses incurred up to June 11th, 2011 will be returned to USAID. The MEDA Tanzania rightsizing process completed As part of MEDA’s plan to right size the operational structure to match available funding, MEDA underwent an internal restructuring process and staff applied for the posted positions. All field staff returned to the Dar es Salaam office on June 21st, 2011 and the last two weeks of June were spent completing administrative tasks necessary for the handing over processes and exit procedures for the departing staff. During the same period, the Finance Manager and Acting Operations Manager tendered their resignations. MEDA Tanzania and MEDA HQ in Waterloo are in the recruitment processes for their replacements.
MANAG
MEDA organizaddress UCC AcThis quUCC dHowevethe UCgrant, wJuly 3131st, 20remaini PMI-TNUSAID/quarterAgreemAgreemMEDA insteadAgreem Global With thVoucheearly Juallowed2011, Dof two yit is stillcommoare to b MEDA As partsignificareducedorganizensure the depTNVS/A .
Quarterl
GERIAL CO
Tanzania wzational chasing these c
ctions Delauarter the Loata and aser, MEDA’s
CC, expires which includ
st, 2011. M011 togetheng zones (C
NVS Coope/PMI-TNVS . From Jun
ment. The ment and an
will not acc, all infant v
ment at a va
Fund Suppe finalizatio
er funding wuly 2011 dud the redemDFID informyears, and al not known
odities whichbe expected
Right-Sizint of MEDA’sant downsizd staff level
zational strucompliance
parting staffAMCC prog
ly Report 28, A
ONCERNS
would like toanges whicchallenges a
ayed ocal Fund As a result ts contract fo
on June 3des the PW
MEDA has rer with funCoast and N
erative AgreCooperati
ne 12th 201unspent d
ny expensecrue any liavouchers realue of $5.90
port Endinon of the RCwill come toue to the oumption of PWmed the MoHappropriaten when thesh may be id.
ng Processs plan to rigzing of stals from 92 t
ucture took ae within Tanf. MEDA isram going f
April-June 201
AND WAY
o acknowledch took plaas outlined
Agent of thethe Global or Global Fu30, 2011.
WV and operrequested ands for opeNorthern zo
eement Enve Agreem1 onwards
difference bes incurred ability for theceived afte0 for each v
g Soon CC contraco an end. tstanding li
W vouchersHSW of the steps havese funds winvolved. A
s ght size the
affing levelsto 42 full-tima great deanzanian laws confident forward.
11
FORWARD
dge the maace in thisbelow.
e Global FuFund apprund Round The contrarations costan extensioerational coones).
ded June 1ment close
no chargesbetween ob
up to Junehe commodr this date w
voucher rec
ct on July 3Issuance oability of vo
s as long aseir decision e been undell be availa
As such, sto
e operationas was undeme staff. Thal of staff timw and take p
in the abili
D
ajor challengs quarter.
und completroved the c
8, which isact for the ts for both Ton of the Rosts to imp
11th, 2011 out plan w
s have beebligated ame 11th, 201ity money lwill be char
ceived.
31st, 2011, tof these vououchers alres funding isto finance
ertaken to sble for disbock outs of
al structure ertaken in the exercise me and eneplace in a wty of the ne
ges facing t We are f
ted the vericontinuations for LogistiRolling CoTNVS and Uound 8 conplement the
was submitn made to
mount unde11 will be rleft as at Juged to the A
the GFATMuchers will eady in the s still availathe PW vo
secure thesbursement a
PWVs in t
to match athis quarterto transition
ergy throughway that wasew structure
the programfully comm
ification exen of the caics Managentinuation CUCC, will entract until e UCC in
tted to USATNVS Coo
er this Cooreturned to une 11th, 20AMCC Coo
M Pregnant come to anfield. MoHble. On Juuchers for a
se funds. Hand any tenthe coming
available fur. MEDA Tn into MEDh-out the qus compassioe to implem
page 2
m due to mitted to
ercise of mpaign.
ement of Channel xpire on October the two
AID this operative perative USAID.
011 and perative
Woman n end in SW has
une 10th, a period
However, nders for
months
nding, a Tanzania
A’s new uarter to onate to
ment the
BACKG
In OctoMinistrythe avathrough PregnaPregnainfectiomaternaand low(www.rochildren MalariameasurstrategymosquiabortionITNs cause of Ito boos TNVS mvoucheThe vouITNs th MEDA availabhas stashops, unfoldinclosely clinic st MEDA extendsare to: 1)
2)
As part vulneramorbidiUniverscampaiU5CC tcountry
Quarterl
GROUND A
ober 2004, y of Health ailability of inh the Tanza
nt women ncy reducen and increal malaria w birth weigollbackmalan in Africa.
a is both pres have by for prottoes. Resens and stillban also redITNs revea
st coverage
makes ITNrs that subsucher systerough a pub
is responsility, access
aff membersrecruit and
ng of TNVSwith progra
taff and the
and its pas and enha
Increase thnet bundle(LLIN) that Increase thpaid by the
of scaling able groups
ty and mortsal Coveraggn is to prthrough a m
ywide. In ad
ly Report 28, A
AND RATIO
MEDA andand Social nsecticide tnia Nationa
and childres a womaeasing the rincreases tght - a leadaria.org), m
preventablebeen develtecting preearch showbirths in wouce overall l low coverarates amon
s widely avsidize the cem targets blic-private
sible for thsibility and s in each r register ad
S on the gram stakehoprivate sec
rtners havences the cu
he quality od with an icomes pre-
he affordabe recipient to
up for maxi would nottality in shoge Campaigrovide LLINmass distribdition to this
April-June 201
ONALE
d the donoWelfare (M
treated netsal Voucher S
ren under an’s immurisk of illnesthe risk of ding cause
malaria kills
e and treatoped; how
egnant womws that ITN
men living child morta
age rates ong pregnant
vailable to cost of nets sustainabilipartnership
he logisticaaffordability
region who dditional shround on aolders, incluctor.
e rolled outurrent TNV
of bed nets nsecticide -treated, lasility of treato a fixed TZ
imum impact be adequort time framgn (UCC) in
Ns for all slebution appros it will crea
11
or communiMoHSW), las (ITNs) to Scheme (TN
the age onity to ma
ss, severe aspontaneou
e of child ms a child in
table. To dwever, sleepmen and s reduce pin malaria aality by 20 of around 5 t women an
pregnant wat appointeity and accp of clinics,
al coordinay of vouchemonitor vo
hops into thn ongoing
uding local g
t an upgraS program.
by switchinre-treatmensts longer, ated bed ne
ZS 500.
ct, MoHSWate to mee
me. Therefn which MEeeping spaoach resultate the mark
ty, under taunched a cpregnant wNVS).
of five are alaria, makianaemia anus abortion
mortality. Acn the world
date, effecping under their new
placental maffected regper cent. Mpercent ac
nd infants in
women anded TNVS reessibility bywholesalers
ation of theers and ITNoucher active program basis. To agovernmen
ded Hati P. The purpo
ng from an nt kit, to a and does no
ets by reduc
W decided thet targets infore, MoHSWEDA plays aaces which ting in high ket for a sus
the auspicecollaborativ
women and
most vulning her mod death. Fo, stillbirth,
ccording to d every 30
ctive prevenr ITNs remborns from
malaria, lowgions of AfriMost recent cross Africa Tanzania.
d infants inetailers throuy facilitatings and retaile
e program Ns across tvity at healtand share
accomplish nt officials, l
Punguzo (Hoses of the
ITN that coLong Lastiot require recing the to
hat achievinn reductionW has begua major rolewere not cITN owner
stainable TN
es of the Te effort to iinfants in T
nerable to ore suscepor the unbopremature Roll Back
0 seconds,
ntive and mains an imm malaria-w birth weigica. Sleepindata on ho. TNVS is a
Tanzania ughout the g the distribers.
and for ethe countryth clinics aninformationthis, MEDAocal organi
HP) voucheupgraded
onsists of png Insecticetreatment.p-up amou
ng coverage of malariaun the rolloe. The goacovered durship and cNVS.
page 3
Tanzania ncrease
Tanzania
malaria. ptible to orn child,
delivery Malaria
, mostly
curative mportant -carrying ght, and ng under ousehold an effort
through country.
bution of
ensuring y. MEDA nd retail n on the A works izations,
r, which voucher
polyester cidal Net nt to be
e among a-related ut of the al of the
uring the overage
This rep 1.
2.
3.
This quwhich d
Quarterl
port has bee
Contributespecifically Coverage C
ContributesustainablWoman Vothe private
Support thmonitoringResources
uarterly repodata tables a
ly Report 28, A
en structure
e to efficrefers to
Campaign (
e to effectile distributouchers (PWsector base
he developg & eval, Informatio
ort includesare provide
April-June 201
ed into three
cient and the logistic
(UCC);
ve and efftion of LLWV), Infanted voucher
pment of imuation: Ad
on Technolo
informationd in Append
11
e strategies
effective cs of regis
ficient initiINs: TNVSt Vouchers redemption
mproved sddress cro
ogy, Fraud C
n on both Tdix A of this
s:
LLIN disstration and
atives thatS, and inclu
(IV), the von chain;
ystems foross-cutting Control, and
TNVS and As report.
stribution d LLIN iss
t ensure oudes informoucher dist
r managemsystems
d Monitoring
AMCC PMI
campaignssuing for U
ongoing anmation on Ptribution cha
ment, trainisuch as
g & Evaluat
funded act
page 4
s: This Universal
nd more Pregnant ain, and
ing and Human
tion;
ivities of
STRAT
Strateg
1.1
1.1.1
Table 1
SoutheSoutheCentraWest LLake ZCoast NortheTotal tGrand
1.1.2
Issuing The issfrom ingroups A-Z hasLLINs foearly nereceivehave cremainithe quApproxcontrac The seldone bJune 20permissproceedbuffer L
1.1.3
UncertaIssuing previoupartnersdates hstakehoafter be
Quarterl
TEGIES
gy 1: Contr
Universal C
UCC Activ
1: UCC Act
Location
ern Zone ern Highlanal Zone Lake Zone Zone
ern Zone this quarte
d Total
LLIN Issui
of LLINs wsuing exercidividual vilin this zone
s received aor Coast anext quarter.d updates
completed ng at their santities thaimately 1.0
cted transpo
lection of thy soliciting 011, a negosion from Md with contLLINs.
Challenges
ainty of UCdates for Csly. Initiallys and stakehave changolders. Neeing confirm
ly Report 28, A
ribute to Ef
Coverage C
vity Summa
tivity Summ
SleeReg
nds
er
ng
was compleise took plalage issuin
e.
an amendmnd Northern This quarteregarding tissuing. Thstores, the qat can be
02 million Lortation com
he transportquotations
otiation meeMoHSW in tracting the
s and Actio
CC Issuing Coast and Ny the issuingeholders. Dged causin
ew dates wmed by NMC
April-June 201
fficient And
Campaign
ary
mary as of J
eping Sistered
2,082,262,142,373,013,021,82
16,72
eted in Lakeace from Apng reports,
ment to thein zones thiser, MEDA cthe excess he DMO oquantities to
e collectedLLINs will bmpany.
ter for the rs from threeeting was hewriting to c
e transporte
ons Taken
dates Northern zog dates for ue to the reg uncertain
will be commCP- MoHSW
11
d Effective
(UCC)
June 30th,
paces L
82,20062,44044,76070,24011,60023,68028,560
-23,480
e Zone (Mwpril 1st to 3rd
a total of
r contract f quarter. In
conducted abuffer stoc
offices provo be used to and allocbe collected
remaining Ue well knoweld with thecollect theser and com
nes are notboth zones
ecently finisnty in planmunicated
W.
LLIN Distr
2011
LINs OrderBuffer Sto
2,532,742,602,703,432,711,464,18
18,20
wanza Kaged, 2011. Bas2,967,324
for LLIN supspections oa data collecks from alvided MEDo meet unmcated to Cd and deliv
UCC nets frown transpo
e most compe nets (exp
mmencing t
t yet confirms were planshed GF venning exercto all partn
ribution Ca
r Incl. ock
L
30,16047,24005,88004,20036,20017,84062,52080,36004,040
era and Mased on the LLINs wer
pply and stof these netection exercl DMOs in
DA with themet needs inCoast andvered to is
om all comort companipetitive biddpected earlthe collectio
med due to nned and coerification excises and cners/stakeho
mpaigns
LLINs IssueTarget Gro
2,132,252,192,322,96
2,9611,88
ara) in this numbers o
re issued to
arted produs will be co
cise in whichthe district
e number n their distri
d Northern ssuing place
pleted distres in Tanzder. Upon rey July), MEon exercise
the issues ommunicatexercise, theconfusion aolders imm
page 5
ed to oup 33,90155,62194,88529,24367,324
--
67,32480,974
quarter. of LLLNs o target
uction of onducted h MEDA ts which of nets
icts, and zones.
es by a
ricts was zania. In eceiving EDA will e of the
outlined ed to all
e issuing amongst
mediately
UCRC sUCRC sconditioNCR scthe secThese ochallenganticipachallengday. Bnegativ
MEDA acontinuactivitie
Quarterl
scanning sscanning re
on of the cacanning macond machioccurrencege in the sated scannige of poor
Besides theely impacte
• Some iscase it
• Many c/ soiled
• Some cmakes
• Some c
also evaluaed viability.
es for the tim
ly Report 28, A
slower thanequires subards returniachines of wine is works have causorting and ng at leastcard condit
ese hardwaed the sortin
ssuing recois impossib
cards are in . cards are fothese cards
cards have
ated the UC. Based on me being un
April-June 201
n expectedstantially hiing from thewhich one t
king but conused an acc
scanning t 190,000 ction has broare challenng and scan
ords were dle to scan tvery bad s
ound with ts not scan-abeen torn a
RC scanninthese chal
ntil further d
11
d gher than ee field. Frototally stopntinued to fcumulation of UCRCs
cards a dayought the nunges , thenning of UC
one on paphe papers ihape and c
he net barcable. apart and ca
ng and datalenges, it wirection on
estimated rem the begiped workinface regulaof UCRC bin a timely
y based onumber dowe following
CRCs resulti
pers insteadnto the data
can’t be sca
code on top
an’t be coun
a quality recwas decidedthis activity
esources annning the Ug due to du
ar downtimebacklog, why manner. n machine cn to approx
issues/prong in a slow
d of the UCabase. anned since
p of the ca
nted or scan
ceived as a d to suspeny.
nd time dueUCC has uust from cae for mainthich has beMEDA hadcapabilities ximately 37,oblems havw pace of w
RC cards,
e they are v
rd’s barcod
nned
whole to dend UCRC s
page 6
e to poor sed two
ards and tenance. ecome a d initially
but the ,000 per ve also
work;
in which
ery dirty
de which
etermine scanning
StrategMore S
2.1
2.1.1
Table 2cumula Table 2
Qu
Cum
2.1.2
Total nu4,975,0quarter
2.1.3
Vouchewith clinare req50%. Distributhis qua194,625began (figurescumula Chart 1since th
Quarterl
gy 2: ContrSustainable
Infant Vou
Infant Vou
2 summaritively.
2: IV Activit
arter 28
mulative
IV Procure
umber of nu000 vouche. Of this tota
IV Distribu
er books arnic staff reguired by th
ution of infanarter. In t5 in April, 1in Septemb
s including tive total of
and Chart heir introduc
ly Report 28, A
ribute to Ee Distributio
cher (IV)
cher Activ
zes IV pro
ty Summar
ITN LLIN All IV ITN LLIN All IV
ed
umber IVs pers. This is al, 2,500,00
uted to Dist
e continualgularly collee programm
nt voucherstotal, 392,8153,000 in ber 2009, c10,000 LL4,826,950
2 illustrate ction IV vou
April-June 201
Effective anon of LLIN
ity Summa
ocurement,
ry
Pro
2,42,54,9
procured cubecause n
00 are LLIN
tricts
ly replenishcting new bme to perfo
s through su50 LLIN IVMay and 4cumulative LIN IVs disincluding IT
the actual uchers into t
11
nd Efficiens
ary
distribution
ocured
000
475,000500,000975,000
umulatively no procure IVs.
hed at distrbooks in exorm this exc
upport from Vs were dis45,225 in Ju
total of 2,0stributed uTN vouchers
number of the TNVS in
t Initiatives
n and rede
Distributed
0392,850392,850
2,759,8002,067,1504,826,950
from the prment or de
rict level anchange for change whe
the USAIDstributed toune. Since 067,150 LLnder Malars.
IVs distribun July 2006
s That Ens
emption fo
Returne
00 123,520 123,520 1,327,580 950,540 2,278,13
rogram still eliveries we
nd subsequstubs of usen stocks a
D/PMI fundino districts indispatch of
LIN IV haveria No Mo
ted cumula.
sure Ongo
or the quar
ed Redemra
0 24 24 85 48 32
stands at aere comple
uently at RCsed voucheat clinic leve
ng continuen the 28th f the LLIN e been disre funding)
tively and q
page 7
ing and
rter and
mption te
0%14%13%58%75%61%
a total of eted this
CH level rs. They el reach
d during quarter: voucher patched ) and a
quarterly
Chart 1
Chart 2
250 500 750
1,000 1,250 1,500 1,750 2,000 2,250 2,500 2,750 3,000 3,250 3,500 3,750 4,000 4,250 4,500 4,750 5,000
100
200
300
400
500
600
Quarterl
1: IV Distrib
2: IV Distrib
‐0,0000,0000,0000,0000,0000,0000,0000,0000,0000,0000,0000,0000,0000,0000,0000,0000,0000,0000,0000,000
Q9 Q
‐
0,000
0,000
0,000
0,000
0,000
0,000
Q9 Q
LLIN
ITN
ly Report 28, A
buted to Di
buted to Di
Q10 Q11 Q12 Q
ITN Issued C
LLIN Issued
Total Issued
Q10 Q11 Q12 Q
N Issued Quart
Issued Quarte
April-June 201
istrict Medi
istrict Medi
Q13 Q14 Q15
IV Cumulative
Cumulative
d Cumulative
Q13 Q14 Q15 Q
IV terly
erly
11
ical Officer
ical Officer
Q16 Q17 Q18
Issued C
Q16 Q17 Q18
Issued Q
rs Cumulat
rs Quarterl
8 Q19 Q20 Q21
Cumulat
Q19 Q20 Q21
Quarter
tively
ly
1 Q22 Q23 Q2
tive
Q22 Q23 Q24
ly
24 Q25 Q26 Q2
4 Q25 Q26 Q27
page 8
27 Q28
7 Q28
2.1.4
A total voucheApril, 3quarter been re Chart 3voucheincludin Chart 3
Chart 4
50
100
150
200
250
300
350
Quarterl
IV Returne
of 123,524rs funded u
31,237 in Mof 41,175.
eturned.
3 and Chart r type was
ng PMI-LLIN
3: IV Return
4: IV Return
‐
0,000
0,000
0,000
0,000
0,000
0,000
0,000
Q10 Q
ITN RLLIN Tota
ly Report 28, A
ed
4 infant vounder Mala
May and 58. Cumulativ
4 show theintroduced
N IV, MNM-
ned to MED
ned to MED
Q11 Q12 Q13
Returned QuartReturned Quarl Returned Qua
April-June 201
uchers weraria No Mo8,271 in Juvely since t
e number ofto TNVS. CLLIN IV and
DA Cumula
DA by Quar
Q14 Q15 Q16
IV Rterlyrterlyarterly
11
re returnedre (MNM) ane. This rehe IV prog
f IVs returnChart 5 showd Hybrid IV.
atively
rter
6 Q17 Q18 Q1
Returned
d this quartand only o
esults in anram started
ed quarterlyws infant vo.
19 Q20 Q21 Q
Quarte
ter, this figuone hybrid vn average md in 2006,
y and cumuoucher retur
Q22 Q23 Q24
rly
ure includevoucher: 44monthly ret2,278,132
ulatively sinrns by subs
Q25 Q26 Q27
page 9
es 1,252 4,602 in turn this IV have
ce each sidy type
7
Chart 5
2.1.5
Chart 6the PWaccumu Chart 6
The nu51,175 this qu
‐
20,000
40,000
60,000
80,000
100,000
120,000
Quarterl
5: IV Return
IV Redemp
6 shows botWV redemptulated redem
6: IV Quarte
mber of IV vouchers harter, 41,3
0
0
0
0
0
0
October‐09
November‐…
b
325
IV H
PMI
NM
IV Quarterly RR
IV Acumulated R
40%
45%
50%
55%
60%
65%
70%
75%
80%
85%
90%
ly Report 28, A
ned to MED
ption Rate
th quarterly tion rates, wmption rate
erly and Ac
stub bookhaving been14 have b
December‐…
January‐10
February‐10
Mh10
IV Re
0 IV
Hybrid
I LLIN IV
N LLIN IV
Apr ‐Jun2007
Jul ‐Sep2007
OD2
64% 63% 6
R 64% 64% 6
IV
IV Qua
IV Acum
April-June 201
DA by Subs
and accumwhile quartremained c
ccumulated
s collected n issued to tbeen match
March‐10
April‐10
May‐10
J10
edemptio
Oct ‐Dec2007
Jan ‐Mar2008
Apr ‐Jun2008
65% 68% 62%
64% 65% 65%
Accumulat
rterly RR
mulated RR
11
sidy Type
mulated redeerly redemconstant at
d Redempt
this quartethe target ghed with th
June‐10
July‐10
August‐10
St
b
ons per
Jul ‐Sep2008
Oct ‐Dec2008
JaM20
58% 55% 53
63% 62% 60
ted and Qu
emption ratption rate d61%.
tion Rates
er equalled roup. Of the
heir corresp
September…
October‐10
November‐…
December
Subsidy
an ‐Mar009
Apr‐Jun2009
July‐Sept2009
3% 59% 48%
0% 60% 58%
uarterly Red
es. Similar decreased
2,047, whie 51,175 IVponding stu
December‐…
January‐11
February‐11
March
11
y Type
Oct‐Dec2009
Jan‐Mar2010
ApJu201
71% 51% 66
58% 57% 58
demption
to the behafrom 84%
ich is equivV vouchers rubs, resulti
March‐11
April‐11
May‐11
June11
pr‐n10
Jul‐Sep2010
Oct‐Dec2010
% 68% 81%
% 58% 60%
Rate
page 10
aviour of to 81%,
valent to returned ng in a
June‐11
Jan‐Mar2011
Apr‐Jun2011
84% 81%
61% 61%
quarterthe enda total total 2,3resultin As was LLIN IVDecemreturnedPWVs, monitorrelated vouchediminishtime weassumerate for 62% of for LLIMEDA vouchebatch chave cduring Chart proportthe mon Chat 7:
5
10
15
20
25
30
35
40
45
50
Number of LLIN IVs Received
Quarterl
ly redemptiod of the cumof 2,358,16358,164 retg in an effe
done with Vs were disber 31st, 20d to MEDAwe will co
r the monthto this
rs until thh monthly e will be able a final rethe batch. vouchers (Ns and rewithin 12 r dispatchcan be ascovered theinitial infan
7 shoion of LLIN nth in which
: IV LLIN B
0
5000
0000
5000
0000
5000
0000
5000
0000
5000
0000
Nov‐09
Dec09
Batch
ly Report 28, A
on rate of 8mulative rep64 IV vouchturned IVs
ective accum
the PWVs, spatched to009. As ofA. As with ontinue to hly returns
batch of he returns
at which e to safely edemption More than
(redeemed eturned to months of ) in this
ssumed to e children cy period.
ows the IVs dispatc
h those vouc
atch Track
Dec‐09
Jan‐10
Feb‐10
h Tracking
April-June 201
81%, lower tporting periohers were rhave been
mulated red
MEDA cono clinics throf June 30th,
ched in Quachers were
king: Infant
Mar‐10
Apr‐10
May‐10
for 459,82
11
than last quod (30th Junreceived fro matched wemption rat
ducted batcoughout the 2011, 316
arter 4 of 20returned to
t Vouchers
Jun‐10
Jul‐10
Aug‐10
25 LLIN IV
uarter’s redene 2011), 94om the DMwith their cote of 61%.
ch tracking e country o
6,227 (repre
009 which ho MEDA.
Dispatche
Sep‐10
Oct‐10
Nov‐10
Vs Dispatch
emption rat4,327 stub
MOs. In totaorrespondin
analysis onover the peesenting 68
have been
ed in Q4 20
Dec‐10
Jan‐11
Feb‐11
hed Oct‐09
e figure of 8books repre
al, 1,443,75ng stubs at
n LLIN IVs. 4eriod Octob8.8%) were
returned so
009 Feb11
Mar‐11
Apr‐11
May
11
9
page 11
84%. By esenting 6 of the t MEDA,
459,825 er 1st to already
o far and
May‐11
Jun‐11
2.2
2.2.1
RCH clit is impand faitproport Table 3
Oct 20– Sept2010 D
InformathroughTNVS. shared unless MEDA remotesTNVS (improveThe info Table 4
Oct 20Sept 2Data (
Of the clinics tTNVS a
2.2.2
In paracollectequarter mainlandistrict data haimplemincludin
Quarterl
Voucher D
Clinic Invo
inics participortant that th-based facion of faith-
3: Faith-Bas
A
All RCClinic
(n)
009 t Data
4,89
ation on fah to SeptemWhen MEDwith the rehe/she has
also collecst areas an(i.e. issue ved system formation is
4: Clinics In
009 – 2010 (n=4,428)
4,428 clinicthat do conactivities du
District Go
llel to the ded data per
25, nationwnd. Of the health bud
as been coenting UCC
ng ITN relate
ly Report 28, A
Distribution
olvement in
ipating in thnot only gocilities are ibased and
sed and Pr
All RCH clinics
CH cs
Partici- pating in
TNVS
91 4,428(91%)
ith-based amber 2010 (qDA identifieelevant Dist
reasons fo
cts data ond the propovouchers tofor collectingshown in T
ncluding TN
TNVS Clnot condu
outrea
cs participanduct outrering these s
overnment
ata collectiortaining to wide data o131 districgets. Tablellected sinc
C activities. ed activities
April-June 201
n Network
n TNVS
he voucher overnment hnvolved in tprivate sec
rivate Sect
Faith RC
Faith Based RCH
(n)
)
492
and privatequarter 25)
es a clinic trict Medicar excluding
n the numbortion of thoo the targeg this data a
Table 4.
TNVS in Ou
inics ucting ach
Tc
1,598
ting in TNVach, totallinservices.
Involveme
on on faith-district gov
on district bucts, 62 distre 5 summace quarter 2A complete
s in their bu
11
program arhealth facilitthe programtor RCH pa
tor RCH Cli
Based CH
Partici-pating in
TNVS
434 (88%)
e sector cli. 608 of thethat is not pl Officer. Ththe said cli
ber of clinicose clinics cet group) inand this qua
treach Ser
TNVS Clinicconducting
outreach
2,8
VS, 1,598 dng 2,830, 7
ent in TNVS
-based andvernment inudget inclusricts, or 47
arizes this d25 as TNVe list of distdgets can b
re recordedties are issum as well. Tarticipating i
inics Partic
Private SRCH
Private Sector
RCH (n)
299
inics was e total 791 (participatinghe DMO winic.
cs that provconducting n their outrearter data is
rvices
cs g
Cincludin ou
830
do not cond74% (or 2,0
S
private secnvolvementsion was co% include
data collectVS teams ha
ricts which be found in
and categouing vouche
Table 3 shown TNVS.
cipating in
Sector H
Partici-pating in
TNVS
AP
174(58%)
obtained fr(77%) are cg in TNVS,ll include th
vide outreaoutreach seeach. MEDs available f
Clinics ding TNVS
utreach (n)
2,084
duct outreac084 clinics)
ctor inclusiot in TNVS. ompleted foITN related
ted up to qave been ohave and tAppendix C
orized. Speers, but thaws the num
TNVS
Totals
All FB and Private (n)
Ppa
791
rom Octobecurrently en this informhe clinic int
ach serviceservices thatA implemefrom all 21
S Clini
includTNVS
outreac4
ch servicesreported in
on in TNVSUp to the
r all districtd activities uarter 25.
out of their hose which
C.
page 12
ecifically, t private
mber and
s
Partici-ating in TNVS
608 (77%)
er 2009 rolled in
mation is to TNVS
s to the t include
ented an regions.
ics ding S in ch (%)
74%
s. Of the ncluding
S, MEDA e end of s on the in their
No new regions
h are not
Table 5
Oct Sept Data
2.2.3
As the voucheexpectequarter MEDA statistica full nelectrontechnolscheme
2.3
2.3.1
As of JuTNVS receiveSeptemmoved and MEvillagescompar
Quarterl
5: ITN Activ
2009 – 2010
Managing
past quartrs – almost
ed that the .
is currentlycally relevanational pict
nic voucheogically and
e and would
Expanding
Retailer Re
une 30th, 2retailers’ dd 5,478 p
mber 2009. the focus to
EDA have as serviced bred to the n
ly Report 28, A
vities in Dis
Samp(districts
13
Voucher S
ter has seet all vouchecurrent DM
y implemennt sample oture on a qr which wid financiallyd alleviate th
g and Stren
ecruitment
011, the nudatabase ahysical conThe pace oo bring bacalso launchby a TNVS umber of pa
April-June 201
strict Budg
le Size surveyed)31
Stock Level
en fewer cr requests r
MO and clini
nting a newof clinic vouquarterly baill be pilotey viable it che voucher
ngthening t
t
umber of regand Managntracts fromof new retak a higher ped a joint fretail outletarticipating
11
gets
DistrictsITN
6
ls
cases of exreceived hac voucher l
w M&E datcher stock
asis. MEDAed in threean be scalestock-out is
the Comme
gistered anement Info
m A-Z sincailers recruitpercentagefocus this qt. Total LLINRCH clinics
s not includN activities69 (53%)
xternal issuave been dilevels shou
ta collectionlevels on a
A is also ine districts. ed up to thessue.
ercial Supp
d verified reormation Sce the launted has slo of the outs
quarter on oN retailers as is shown i
ding Dis
ues preventspatched to
uld be suffic
n system wa monthly ba the procesIf the e-V
e larger por
ply Chain
etailers enteystem is 5nch of the
owed in recstanding retobtaining thare distribuin Chart 8 b
stricts inclITN activit
62 (47%
ting the isso the field. Icient for the
which will gasis. This wss of desig
Voucher conrtion of the
ered into th5,424. ME LLIN progent monthstailer contrahe target of ted by regio
below.
page 13
uding ties )
suing of It is thus coming
gather a will allow gning an ncept is voucher
e online DA has gram in s as A-Z acts. A-Z f 90% of ons and
Chart 8
One waretailers2011 th5,424. Rukwa Kigomalower reday-to-dalso be Table 6vouche Table 6 Regio
ArushaDar es
Dodom
Iringa
19
1
Quarterl
8: Regional
ay of determs. The numhe total LLTherefore and Dar e
a have loweetailer-clinicday basis tnefiting gre
6 shows thrs and lastly
6: Clinic to
n
a s Salaam
ma
92
140
258
29
160
214
325
ly Report 28, A
l Distributi
mining focusmber of clin
IN retailersthe ratio stoes salaam er ratios (bec ratios will to increase
eatly from th
he number y, the ratio
Retailer Ra
C
98
222
190
2
322
286
176
TNVS R
R
April-June 201
on of Retai
s areas for ics particip
s accordingood at 1.2 are leading
elow 1), but continue to retailer re
he implemen
of clinics, of clinics to
atio per Re
Clinics
192140
258
298
247
171
107
275
237
140
Retailers
RCH Clinics
11
ilers and C
immediate ating in TN
g MEDA’s Tretailers forg with this still above
o work collacruitment antation of th
the numbeo LLIN retail
egion
Verified ReContracts in MIS
185
281
245
0
243
338
31
s and Cl
Verified R
Clinics
action is toNVS is 4,42TNVS onlinr every clini
ratio abov0.5. MEDA
aboratively and LLIN dhe retailer st
er of retailers as of Ju
etailer Received
1621
32
32
5
158
303
17
12
210
299
2
inics by
Retailer Contra
examine th28 and as one retailer c on a nati
ve 1.5. AruA Field Office
with A-Z reistribution. tabilization
ers recruiteune 30th, 20
Ratio:to Clin
6014
25
22
77 185
210
2
230
313
186
y Region
acts
he ratio of cof the end database sonal level.
usha, Ruvuers for regio
epresentativThese registock schem
ed to acce011.
LLIN Renics
78
158
188
2
353
300
257
n
page 14
clinics to of June
stood at Singida, ma and ons with ves on a ions are mes.
ept LLIN
tailers
0.81.5
1.3
1.1
235248
Regio
Kagera
Kigom
Kiliman
Lindi
Manya
Mara
Mbeya
Morog
Mtwara
Mwanz
Pwani
Rukwa
Ruvum
Shinya
Singid
Tabora
Tanga
TOTAL As of JThese rlist beicontracadditionarea. Dcollectiorepresefunctionrecord begun ybe ablefuture qverified
2.3.2
Since Qafford tstarted retailersZ) whegestureto rema By the e3,747 re
Quarterl
n
a
a
njaro
ara
a
oro
a
za
a
ma
anga
a
a
L
une 30th, 2retailers serng used in
cted definitinal adjacenData collecon in Marchentation asnality is nowthe additionyet which ise to continuquarterly rep.
Retailer St
Quarter 23, he cost of tprovision o
s in the formen the retaie is helping ain committe
end of this eported agr
ly Report 28, A
C
2011, the Mrve a total on this progon of a ‘s
nt villages ation for the
h 2011. It is it is not
w in place wnal villagess reflected ue to proviports as this
trengthenin
in responstransitioningof a one-timm of an initiiler purchasto maintain
ed to a prog
quarter A-Zreements, M
April-June 201
Clinics
222
190
247
171
107
185
281
245
158
303
177
185
210
278
158
188
235
4,428
MIS recordedof 3,787 unigram, makserviced villas most reese additiothus imporincluding
within the MIs serviced bin the stagnde regular s new data
ng
se to retaileg to the newe retailer stial stock of ses 5 addin a strong agram that re
Z reported hMEDA has r
11
Verified ReContracts in MIS
d 5,424 veque villagesing the culage’ notes
etailers redeonal villagertant to note
any ‘additIS and is reby each retnant numbeupdates ois collected
ers’ capacityw LLINs, Mtabilization ten free LLtional nets and sustainelies on them
having issuereceived 3,7
etailer Received
28
17
27
23
14
24
33
31
21
29
23
31
18
35
30
25
24
5,42
rified and us of the 13,
urrent perces that a reeem vouch
es serviced e that this petional villag
eady to be ptailer. Unforer of uniquen the perced and existi
y challengeEDA, throustock. This
LINs (5 provwith their
nable retail m for both v
ed 3,747 se713 retailer
Ratio:to Clin
86
76
75
37
40
43
38
12
10
99
30
13
86
53
00
57
48
24
unique retai139 total vientage ser
etailer can hers from a
per retaileercentage sges servicepopulated byrtunately the villages sentage of vng data is f
e and to hegh funding has been p
vided by PMown capita
chain and evoucher and
eed capital astabilizatio
LLIN Renics
ilers in the llages in therviced 28.8service up
a wide surrer has justserviced is aed’. This sy A-Z staffsis process erviced. MEvillages covfurther clea
lp existing from PMI a
provided to MI and 5 thral. This imencourage d full price s
agreementson agreeme
page 15
tailers
1.3
0.9
1.1
1.4
1.3
1.3
1.2
1.3
1.3
1.0
1.3
1.7
0.9
1.3
1.9
1.4
1.1
1.2
system. e official
8%. The p to two rounding t begun an initial software s as they
has not EDA will vered in ned and
retailers and A-Z, existing
rough A-mportant vendors sales.
s. Of the nts from
A-Z whverified
2.3.3
The secolour. specificA-Z proLLINs isince th2,002,3demandtheir sa Chart 9
A-Z repthe net Salaamnets suA-Z to b A focusregionsareas idmade b
Quarterl
ich are verretailers ha
Managing
lected LLIN It cannot b
cally to be reovides datan April werehe LLIN vou366 broken d for LLINs
ales supply c
9: LLIN Sale
ports on thesales are s
m and Mwanch as Iringa
better match
s continuess which havdentified asbetween Oc
ly Report 28, A
rified beforeave receive
LLIN stock
N for the upbe purchaseedeemed fo
a on the nue 113,263, ucher introd
down by ms amongst Tchain than a
es (Vouche
e monthly sstill highest nza. LLINs a and Arush their sales
s to be plae a high ra underservitober 1, 200
April-June 201
e payment id the retaile
ks in Retail
pgraded TNed at full prior a voucheumber of th
May, 73,73duction in Omonth in CTNVS retailare being p
er Nets) Mo
sales by regin the areassales were
sha. MEDA s distributio
aced on entio of vouchiced. The re09 and June
11
is made to er strengthe
l Outlets
NVS is an ice as it haser and a tophese nets s36 LLINs, a
October 200Chart 9. A-Zlers as theyurchased b
onthly and
gional and s where pope lowest in has increas
on to the dis
ncouraging hers issuedegional distre 30th 2011
A-Z. This sening stabili
Olyset© sizs special pap up of TZSsold to retaand June re09, A-Z has Z has verby are releas
by retailers.
Cumulativ
district locapulation denregions witsed its colla
stricts which
A-Z to incd compared ribution of t is provided
shows that ization stoc
zed 5x6x7,ackaging id
S 500. In theailers. Montecorded 82,
reported nbally reportesing many
ve
ation as wensity is highh less histoaborative p
h MEDA rele
crease resowith Olyse
he cumulatd in Chart 1
68.5% of ck agreemen
blue and entifying it eir monthly thly sales o,031 sales. et sales to ed a slow-dmore nets
ell. Not surphest such asorical usagelanning effoeases vouc
ources allocet sales andive TNVS n0 below.
page 16
currently nts.
white in as a net reports,
of TNVS In total, totalling down in through
prisingly, s Dar es e of bed orts with hers.
cated to d remote net sales
Chart 1
2. 3.4
MEDA wishingvouchewholesaremain to be futhe priv Prelimingrowingorderingthe fMEDA partner proper conductrainingorderingand procedutrainingproducedistribunew dispatc Programremain
Quarterl
10: LLIN Sa
Challenges
continues tg to divest rs instead aler requesoutstanding
ully measurevate sector r
nary resultsg challengeg procedurefuture quand its trawill work
way ting refres in voug proced
isures. One sheet has ed and ted along
vouched.
m funding la signif
ly Report 28, A
ales (Vouch
s and Actio
o receive resome of thof more
sts were prg. The full eed; howevereacts to the
s from an e is the laces. In arter,
aining out a
of esher ucher dures suing page been
is with
chers
evels ficant
April-June 201
her Nets) p
ons Taken
equests froheir capital LLINs duerocessed beffects on ther the prograe effects of
Ifakara Heck of awar
11
per Region
m program in the TN
e to lower y MEDA a
he TNVS ofam must bethe mass d
alth Institutreness amo
since Octo
wholesalerNVS progra
voucher sand A-Z in f the mass de ready for distribution c
te househoongst clinic
ober 2009
rs and majom and recesales levelsthis quarte
distribution such requecampaigns
old survey c staff of p
or retailers weive cash fs. Three oer and threecampaign h
ests in the fon the mar
show that proper vouc
page 17
who are for their
of these e cases have yet uture as ket.
another cher re-
challengclinics. fundingvouche The onavailabis proviand Fiemeet mprogram
Quarterl
ge to the TNMEDA me
level uncer issuing.
ngoing issueility, redemding additio
eld Officersmonthly durimme.
ly Report 28, A
NVS and Measures theertainty and
e of large ption levelsonal analyss to improving the qua
April-June 201
MEDA’s abilie outstandid availabilit
variances s, retailer cosis of perforve targeted arter to stra
11
ity to dispating vouchety continue
in regional overage) rermance by areas. ME
ategize on
tch voucherer liability oe to period
and districemain a cha
location brEDA and Ahow to ove
rs to fulfill aon a montically caus
ct performaallenge to theakdown in-Z manage
ercome the
ll requests fhly basis he the stop
ance (vouchhe programn order to hement conti
challenges
page 18
from the however page of
her/LLIN m. MEDA help A-Z nued to
s on the
Strategand Mo
3.1
3.1.1
This quintroducGoing fM&E astrainingofficers World Vtrainingpart of the aremessagcomplethe RC(NIMR) whole TThrouglocationidentifieto estabfacilitiessampleShinyan
3.1.2
The rigour curprocessin scope
Announmembefollowedfacilitatefield sannounplacem54% dereductioM&E ba
Quarterl
gy 3: Suppoonitoring &
Human Re
Training
uarter, trainiced to the forward M&ssociate in organised to attend th
Vision Intern needs asstheir planneas of highe
ging providted it will beH staff retracarried out
TNVS progh consultat
n, 35 poorlyed gaps. Thblish the pes. In totald and visitenga Urban,
Employee
htsizing exerrent fundings began in me and budg
Genera Election
process Contrac
ncement of ers the 1st wd by staff ined by an outaff memb
ncements went and noecrease).Thon) hence tased implem
ly Report 28, A
ort the Dev& Evaluatio
esources
ng was botnew opera
&E will be athe new MEby the Un
he next rou
national (Wessment foed training est need ofded by thee followed baining activt the detaileramme areions with My performinhe needs aserformance , four poor
ed by the coMufindi (Iri
Recruitme
ercise to shg level wasmid-March et as stated
al plans andn of staff cas; and ct notices se
new structweek of Aprnterviews wutside HR Cbers) werewere announ-placemen
he major rethe new envmentation m
April-June 201
velopment n
th out-sourcation of the
a requiremeEDA operativersity of Dnd of the tra
WVI), MEDA’r identificatactivities. T
f training toe RCH clinby a planni
vities. Consed assessmeas, with paMEDA and ang districts ssessment level of the
rly performionsultants. Tnga region)
ent
hape MEDAs completed2011 involv
d with the fo
d timeline weategory rep
erved (31st
ture and poril, 2011. T
which took Consultant. e effected unced Maynts. We haveduction bevisaged mo
model.
11
of Improv
ced and done TNVS M
ent for our etional structDar es salaaining as it
’s training sion of poor
The results o improve vnics. Once ng meetingultants from
ment and idearticular attea review ofwere identinvolved bo voucher prng districtsThese samp) and Mond
A into the od at June 3ving sound ollowing act
ere developpresentative
March 2011
osition vacahe applicatplace betwBilateral intto validat
y 15th, 201ve generallyeing in the fode of work
ed System
ne in-houseMobile Manaentire field ture attendeaam. We eis schedule
sub-contracknowledgeof this exe
voucher ordthe final
g with TNVSm National Ientification oention to thf monthly vtified and aoth review orogramme is from bothpled districtuli (Arusha
operational 30th 2011. Fgeneral aw
tion plans.
ped and comes and clari
1).
ancies wastion processeen April 1terviews ante interest1, followedy reduced sfield level s
k, which has
ms for Mana
e. Various sagement Instaff. Threed a one wxpect the r
ed.
tor under A areas amorcise will al
dering, distrneeds ass
S partners aInstitute forof non-perfohe infant vooucher red
assessed foof reports, dn sampled
h uplands ats were Bahregion).
structure wFormal com
wareness of
mmunicatedfication of
s posted ans was close5th and 30t
nd phone set and appd by formastaffing levestaffing froms been des
agement, T
staff membenformation ee field officweek intensiremaining fo
AMCC, condongst RCH slow WVI to
ribution, andsessment reand a time tr Medical Rorming areaoucher comemption repor retrainingdata and fiedistricts an
and lowlandhi (Dodoma
which matchmmencemenf program re
d; information
nd open to ed April 10t
th 2011. Tessions (for plications. al letters inels from 90 m 58 to 16 signed using
page 19
Training
ers were System.
cers and ve M&E our field
ducted a staffs as
o identify d health eport is table for
Research as in the
mponent. ports by g of the eld visits d health ds were region),
hes with nt of the eduction
n on the
all staff th, 2011,
This was most of Staffing
ndicating to 42 (a (a 72%
g a very
A sociain orderoutgoin
Almost below;
A farewManageissued C
3.1.3
MEDA Linkagevisit waPMI MOoffice foimplemGingricweeks distribucommecame mplanninprogramobjectivnew op This quStakehovarious monthlyoverall
3.2
Five ke
Quarterl
al plan was pr to ensure g staff mem CV prep Career MEDA T Job pla
half of June Comple Equipm Retiring Process
leave e
well ceremoer, Ann GoCertificates
Special Ev
Tanzania hes was in Das general mOP 2012. Lor one weeentation of h, a professfrom early tion campa
ercial and smid-May 201g for the pi
m managerve was to perational pl
uarter, MEDolders Mee
Malaria-foy PMI partnstatus on va
Risk Mana
y strategies
Use of LLINthat an actuInvolvementheft; Disciplinaryor forged voPerformingactually rec
ly Report 28, A
put in placesmooth de
mbers: paration, IncounsellingTanzania acement adv
e 2011 was
eting work ament clearang of Staff IDsing of staftc.)
ony took pordon, froms of Recogn
vents and V
hosted seveDar es SalamanagemeLeah Katerbek in mid-M
new M&E sor of econMay 2011.
aigns (U5Csubsidized 11 for the ploting of the
r for Tanzaparticipate inans were u
DA COP andetings desigocused progners meetinarious mala
agement fo
s continue to
N barcode iual net was nt of police
y action takouchers – e random s
ceived and
April-June 201
e for outgoinparture and
terview traig and guidalumni site overts in-hou
s devoted in
assignmentsnce and sett
D’s, Medical ff terminal b
place on Jum MEDA Hition on beh
Visitors
eral visitorsaam for twont supervisberg, Progr
May 2011. Hsystem give
nomics from His main a
CC and UCnet sales.
purpose of we e-Voucheania team vn the finaliznderway an
d Deputy Ogned to infgrams cougs, MEDA
aria interven
r Minimizin
o be emplo
n the net baexchangeddetectives
ken by DMOe.g. some sspot-checksredeemed t
11
ng staff memd sustainab
ning providnce provide
on LinkedIn use
nto staff adm
s and handotlements of cards and
benefits and
une 30th 20Head Quartehalf of MED
s this quarto weeks in sion of the pram ManagHer main oben the chan
m East Menactivity wasCC) on the Nick Ram
working on er under thevisited in la
zation of rignd overall p
perations Mform stakentrywide. Iwas well pr
ntions.
ng Fraud
yed to mini
ag for the nd for the vouupon ident
Os and DEDtaffs have lo
s at benefictheir vouche
mbers in foule relations
ed; ed; launched; a
ministrative
overs; f work and pexit intervied document
011, which ers in Wat
DA Presiden
er. Tim Pipmid-May 20program acer Monitoribjective wanging structnonite in Us research e participat
msing, Projethe requirem
e AMCC funate June toht sizing ofrogram ma
Manager attholders regn several resented, a
mize fraud
ew LLIN voucher at a rtification by
Ds against ost their jobciaries homer; and
ur major arehip betwee
and
procedures
personal adews; and tation (seve
involved aterloo, Can
nt, Allan Sau
per, Directo011. The mctivities andng and Evas to backstture of MEDSA was in on the effetion of privect Managements, desnding. Ann o early Julf the progranagement s
tended sevegarding theother mee
as they prov
and are as
ouchers, whretail shop;y MEDA of
staff confirmbs; mesteads to
eas outlinedn MEDA an
s as per the
vances;
erance, outs
all staff. Pnada attenduder.
or of Healthmain purposd attendancaluation vistop the desDA Tanzanithe country
ects of LLINvate sectorer-Market Lign and opeGordon, anly 2011. Ham, ensure support. .
eral routinee current stings such
vide insights
follows:
hich helps to
suspected
med to hav
o ascertain
page 20
d below, nd these
e outline
standing
Program ded and
h Market se of his ce at the sited our sign and ia. Chris y for five Ns mass r in the Linkages erational n overall er main that the
Malaria status of
as the s on the
o assure
fraud or
ve stolen
n if they
In this qidentify manufavouchefraud, a In earlythat theway to voucheas assdelivere MEDA store kegood safrom theat unravMtwaraMtwaraobtaine In the Ruvumaregionawere irr(fraud dbooks rvouchenotified
3.3
The wefully funquerieswith a chas plato compis awaitdatabas As we M&E dvarious collectioSignificuploadeMEDA module
Quarterl
Physical avouchers rcompletene
quarter, MEsuspected
acturer, the rs redeeme
as per statis
y April MEDeir truck whArusha. Dur books) ouumed stoleed to DMO s
followed upeeper for Damaritan wee DMO storvelling a lar
a visited MEa Rural disted.
past quartea and repor
al manager regularities departmentreported strs will be .
Monitoring
eb-based renctional withs as may becomprehen
ayed a key rpile a compting the finase.
enter into tepartment designs fo
ons namelyant Changed into the HQ about th
es for Field
ly Report 28, A
nalysis undreturned byess written
EDA continud / frauduledatabase id
ed, i.e. 25 vstically signi
DA received ich was caruring this aut of three ven. Fortunastore keepe
p on a rumMO Kinonde managedre. The susrger circle oEDA HQ atrict. Findin
er, the IHI rted this to for Ruvumin the issui
t in Ruvumtolen in earpaid as the
g and Evalu
etailers’ datah 5,424 LL
e required. Rsive TNVS role in the N
prehensive dal clinic data
the new strin collabor
or M&E tooy DMO HP e Stories (tablet com
he various fOfficers ha
April-June 201
dertaken ofy the Supinformation
ued with thent vouchedentifies vovouchers redficant varia
a letter frorrying vouchccident a r
voucher parately all voer for Kiteto
mour / hearsdoni district d to capturespect is undof those inv
and later togs on this
monitoringMEDA. Th
ma for following of vouch
ma for furthrlier Quarteey were im
uation
abase (TNVIN retailers Related to tclinic data
NIMR GIS mdatabase aabase relea
ructure of oration with ols to be uchecklist, R
(MSCSs) hmputers whfield data isave been d
11
f a statisticpplier for p, percentag
e voucher rs. For eacuchers whideemed at nces.
m our courher parcelsobbery tookrcels for Kit
ouchers boo district.
say that IV in Dar es S
e a suspect der the policvolved in voo A-Z to inv
case will
g team discis incident ww-up. The Mher books.er investiga
erly Reportsmmediately
VS Mobile Min the syst
this is the fubase for mmapping ta
and GIS maase from NI
operation, Mthe M&E
sed from JRCH HP chave been ich are exp
ssues on readeveloped w
cally relevapayment. Age of full vou
tracking sych batch och are redethe same t
ier service , amongst ok place whteto district oks were f
voucher boSalaam. In c
with 12 IV ce custody oucher misuvestigate thbe shared
covered vowas immedMEDA RM This will beation. Thes have stillvoided and
Managementem, verifiedurther needonitoring anskforce effo
ap of all heaMR in orde
M&E has feManager (
July onwardhecklist, LLdeveloped.pected to oal time basiwhich will b
ant sample Analysis of ucher books
ystem that uof voucherseemed as ptime may be
provider-EMother thingsere one pain Manyarafound and
ooks are bcollaboratiovoucher bofor further i
use. The Pohe stolen vas soon a
ucher issuiiately commfor Ruvum
e forwardedSumbawan
l not been d Hati Pun
nt Informatid and well
d to link the nd reportingort which haalth clinics ier to comple
eatured very(Leah Kateds. Four MLIN retailer The first operate onis. M&E wobe working
of each bbarcode s
s
uses a datas submittedpart of a full e a sign of
MS notifyings, overturnearcel (contaa region we
were succ
eing misuson with policooks illegallinvestigatioolice detectvoucher caas they hav
ing irregulamunicated toma found th
to detectivnga Rural recovered,
nguzo stake
ion Systemlocated forretailers’ d
g purposesas been attn Tanzaniaete our TNV
y prominenerberg) wor&E and auchecklist anthree toolsline thus in
ork flow andtools for th
page 21
batch of stickers,
abase to d by the
book of voucher
g MEDA ed on its ining 94
ere listed cessfully
sed by a ce and a ly stolen n aimed ive from se from ve been
arities in o MEDA at there
ve police voucher , but no eholders
) is now r various atabase
s. MEDA tempting a. MEDA VS clinic
ntly. The rked out udit data nd Most
s will be nforming training he M&E
AssociaOfficers
3.4
All voucfor voucstaffing stock ovacuumdown a MEDA the e-Vthe databeing tincreas
3.5
3.5.1
The GISwith all date onthis casequippe
3.5.2
In this qfull depregisterWith thTanzanand GPquarterour orgevaluat
3.5.3
The e-VsoftwarworkflowconducpositivechallengRSR anrequireddelayed The firson an itthe eleTemeke
Quarterl
ate who wils will fully ut
Voucher T
cher trackincher issuinglevels. VTS
outs and hm cleaner to
nd are now
has implemVoucher andabase into tested for red system
Informatio
GPS/GIS D
S mapping the partner
n data collese, for MoHed with GPS
Mobile and
quarter, TNVployment. Ar new retaile exception
nia has a traPS handhe, for both M
ganizations ion, oversig
E-voucher
Voucher tere contractow is completed field vi
e response ge is the cond retailer wd much add some poin
st version ofterative bas
ectronic chae (Dar es S
ly Report 28, A
ll act as thetilize the ne
Tracking Sy
ng activitiesg, scanningS implemenave receive
o reduce duw being serv
mented a stad TNVS Moa reporting
reliability bereliability, s
on Technolo
Data
task force irs soon. Thection activitHSW, is to S units to m
d Web Rep
VS mobile, A-Z Regionlers and upn of Pwani ained A-Z Rld) in repo
MEDA and to fully uti
ght, and per
r
am, which ors made sete and a fuisits to tes
and feedbomplexity inwork within dditional dents of the sc
f the SMS asis as the teannels in talaam), Me
April-June 201
e intermediew way of da
ystem (VTS
s continued g, and physinted prioritied the camust accumuviced by loca
aging databobile messag database efore it’s fupeed, and n
ogy
is still prepae task forceties and to
maintain amap and rep
orting
an SMS-banal Sales pdate GPS
and Lindi RSRs who
orting TNVSA-Z is devlize the TNrformance.
involves Msignificant punctional apt the technback used
nvolved in ma complete
esign and chedule.
and databasechnology he majority
eru (Arusha)
11
iate data cata collectio
S)
as scheduical analysissed dispatcmpaign netlation from al authorize
base platforaging requiand an op
ully operatinew capabi
aring the hee is a way foidentify are
a national Gport the rem
ased platforRepresentadata in regregions (awis able to u
S retailer dveloping staNVS Mobile
MEDA Tanzprogress thipplication is nology with
to improvmaking the vely paperlesoftware c
se technoloprogressesy of all clin), and Mvum
ustodian. Oon methods
led this quas are greatlches to thosts some timthe cards,
ed support d
rm, as a parements. Teration dataional, at wlities.
ealth facilityor organiza
eas for collaGIS databaaining unm
rm moved fatives (RSRgions acroswaiting for fuse the dat
data in realandard opee Platform t
zania staff, is quarter. deployed o
h clinics anve the desivoucher-forss e-Vouch
changes to
ogy will be ds. The evennics and remero (Moro
Over the cos.
arter, althouly reduced se areas mme ago. Dthe two NC
dealership.
rt of data chis platformabase. This
which time
y master listations to keeaboration. Tase for heaapped TNV
from the devRs) now ress Tanzaniafield traininta collection-time. The rating proceto improve
MEDA ProThe design
on a MEDA nd retailersign. A signr-net re-stocher model. T
the origina
deployed in tual goal re
etailers withgoro).
oming quart
ugh capacitdue to the
most affectedespite procCR scanner
leaning prom has partias setup is cMEDA can
t that will beep each othThe ultimatealth. A-Z RSVS retailer o
velopment eport LLINsa via this pg), every ren tools (Blafocus of t
edures thatTNVS mo
oject Manan of the e-Vserver. ME while recenificant unfck between This challeal model a
the comingemains to fuhin the dis
page 22
ter Field
ty levels reduced d by the curing a rs broke
ocess for ally split currently n expect
e shared her up to e goal in SRs are outlets.
stage to s sales, platform. egion in
ackBerry the next t enable
onitoring,
ger and Voucher DA staff eiving a foreseen
the A-Z nge has and has
g quarter ully pilot
stricts of
3.5.4
MEDA Vouchethese twPowerEis provid
3.6
Towardback toof 34 vunderwregistra
3.6.1
During be the have recontinu
3.6.2
PowerTbehaviothe onbhours. Acalibratcorrectl
Quarterl
IT Upgrade
upgraded aer server. Mwo systems
Edge memoding higher
Fleet Mana
ds the end o the MEDA vehicles are
way to haveation numbe
Procureme
the quartertwo primaremained toed to be se
PowerTrac
Track is a veour, includinboard compAs of the eions probley. Other PT Allocation specific vehCreation ofbasis; Driver’s detthe driver’sVehicles deavailable o
ly Report 28, A
es
an earlier mMEDA also p
s run in onory has beer speeds an
agement
of June 201HQ offices
e all parkee valuation er plates.
ent of Serv
r Automech y garages
o be the serviced at TO
ck Reportin
ehicle-baseng marking puter is theend of this ems. This aT tasks acc
of Drivers hicles at evef driver perf
tails can nos licence; anetails like inn Power-tra
April-June 201
model of Deplans to mene reliable en upgradedd enhancem
11 vehicles s following Med at the Hwhich will d
vices
Garage LTfor head of
same. SomOYOTA Tan
ng
ed computerthe vehicle
en transmittquarter all
anomaly in complished
ID burtonsery point in formances
ow be availand surance, ro
ack software
11
ell PowerEderge the MIhardware rd from the pments to the
from 21 reMEDA staff HQ (i.e. incdetermine
TD and Easffice. Also,
me other venzania sinc
r which mone’s GPS poted via a mvehicles infuel calibraduring the q
s (pre-starttime) has breport whic
able on the
oad licencese.
dge 1420 SS and e-Vo
resource byprevious 51e MIS and e
egions of mright sizing
cluding admmarket valu
st Africa Pumall other pr
ehicles (in e they are s
nitors operaosition evermobile link stalled with
ation was requarter incl
t keys whicbeen enablech will to id
Power-trac
s and maint
SC to poseoucher systy close the12 MB to 4Ge-Voucher f
mainland Ta into the ne
ministration ue for all v
mp Servicerimary garathe last p
still under s
ations of thery 10 seconto the hea
h Power Traectified andude the follo
ch identifieed; entify best
ck software
tenance dat
e as the outems so as
e next quartGB memoryfunctionalitie
nzania werew structure
vehicles). ehicles with
s LTD contages in the procurementervice guar
e vehicle annds. The daad office evack and ha
d are now uowing;
s the drive
drivers on
e.g. expiry
tes are now
page 23
tright e-to have ter. The y, which es.
e driven e. A total
Plan is h yellow
inued to regions
t batch) rantee.
nd driver ata from very two ad some updating
er using
monthly
date for
w
APPENDIX A: PMI DATA TABLES PMI Quarterly Report - data collection table – MAINLAND Insecticide-Treated Nets: USING PMI FUNDS Implementing Partners: MEDAIndicator FY2010 FY2010 FY2010 FY2010 FY2010 Annual Targets Remarks on FY 10 Annual Target Annual Target Assumptions on targets (Comments)
Oct-Dec Jan–Mar Apr–Jun July-Sept TOTAL FY 10 Oct-Dec 2010 FY11 Jan‐March 2011 April‐June 2011 FY 12
Number of vouchers procured:
Infant vouchers procured - 500,000 500,000 500,000 1,500,000 1,500,000 LLIN IV only ‐ 1,000,000 500,000 ‐ 1,200,000 LLIN IV only AMCC target
Number of vouchers distributed:
(a) To health facilities (RCH) 458,450 440,950 100,150 481,800 1,481,350 1,505,725 LLIN IV via DMOs ‐ 1,000,000 182,950 392,850 1,200,000 LLIN IV via DMOs, AMCC target
(b)Voucher issued to target group (infant) 32,925 194,625 144,901 305,100 677,551 677,551
Equal to the number of stubs
returned ‐ 1,000,000 182,950 392,850 1,200,000
Assuming not all vouchers distributed will
be redeemed
Number of ITNs procured through:
(a) TNVS (Voucher redeemed) 63,336 116,594 299,717 207,130 686,777 686,777 Infant vouchers only 98,843 765,000 175,510 123,524 1,000,000 Infant vouchers only, AMCC target
(b) U5CC - 871,080 - - 871,080 871,080 As per AMCC budget ‐ ‐ ‐ ‐ U5CC completed
(c) Universal coverage - 600 - - 600 600 For the UCC pilot in Mwanza AMCC ‐ 250,000 ‐ ‐ ‐ Not included in the AMCC Year 2 work plan
Number of ITNs distributed:
(a) campaigns – U5CC - 871,080 - 871,080 871,080 As per AMCC budget ‐ ‐ ‐ ‐ U5CC completed
(b) campaigns – Universal coverage - 600 - 600 600 For the UCC pilot in Mwanza AMCC ‐ 250,000 ‐ ‐ Not included in the AMCC Year 2 work plan
(d) private /commercial sector through retail shops (TNVS) 63,336 116,594 299,717 207,130 686,777 686,777 Equal to the number of IV returned 98,843 765,000 175,510 123,524 1,000,000 Infant vouchers only, AMCC target
PMI Quarterly Report - data collection table – MAINLAND Training/Human Capacity Development: USING PMI FUNDS Implementing Partners: World Vision, JHU, PSIWhere a "/" is shown, the data does not pertain to PMI funded activities under AMCC
All numbers are cumulative annual (i.e. since January 1)Indicator Comments
F M F M F M F M F M
• Number of health workers trained in:
(a) ACTs / / / / / / / / / / (b) IPTp / / / / / / / / / / (c) Management of severe malaria / / / / / / / / / / (d) Malaria diagnostics (RDTs or Microscopy) / / / / / / / / / /• Number of persons trained in to deliver:
(a) ITNs 0 0 0 0 0 0 0 0 0 0 World Vision
(b) IRS / / / / / / / / / / (c) Larviciding / / / / / / / / / /• Number of persons trained in:
(a) Malaria Early Epidemic Detection / / / / / / / / / / (b) Sentinel Surveillance / / / / / / / / / / (c) Entomologic Monitoring / / / / / / / / / / (d) Demographic Surveillance Sites (DSS) / / / / / / / / / /
• Number of persons trained to interpersonal communication skills to deliver malaria interventions 0 0 0 0 0 0 0 0 0 0
JHU/PSI
• Number of community change agents trained 0 0 0 0 0 0 0 0 0 0 JHU/PSI
Jan–Mar Apr–Jun Jul–SepOct–Dec Annual Target
APPENDIX B: UCC REGISTRATION AND ISSUING SUMMARIES
Region District Total Number of HH before
registration
No. Of U5's registered
during U5CC
Issuing Points Total Number of HH during Registration
Number of UCRC issued
to VEOs
Sleeping Spaces
Registered (Number of
coupons issued)
5% Village Buffer
Total LLINs including
buffer
Total LLINs Rounded up
Total Bales 23% buffer stock at DMO
office
23% bales at DMO office
Total LLINs for Delivery
Total bales for Delivery
Total LLINs Sent to the
villages (before and
during issuing)
No. of LLINs issued
No. of LLINs still needed
No. of LLINs remained at
Village/Ward Level
No. of LLINs bales
remained at DMOs Level
Number Of LLINs
remained at DMO's Office
District Institutional
Sleeping Space
Hospital Sleeping
Space in the district
Lindi Kilwa 56,364 47,484 142 47,377 105,300 107,830 5,392 113,222 115,080 2,877 24,800 620 139,880 3,497 115,619 112,056 10,053 3,563 355 14,200 1,135 291
Lindi Rural 70,701 46,415 230 66,957 163,244 139,657 6,983 146,640 149,720 3,743 32,120 803 181,840 4,546 151,128 144,861 1,234 3,808 760 30,400 1,586 413
Lindi Urban 11,914 8,506 63 13,378 31,050 30,755 1,538 32,293 33,640 841 7,080 177 40,720 1,018 35,143 34,239 - 866 140 5,600 1,244 198
Ruangwa 44,469 27,512 108 41,982 90,204 87,784 4,389 92,173 93,600 2,340 20,200 505 113,800 2,845 101,726 100,469 2,659 911 283 11,320 80 103
Liwale 20,729 20,768 84 22,711 42,800 40,735 2,037 42,772 43,720 1,093 9,360 234 53,080 1,327 46,260 45,756 4,772 504 110 4,400 502 112
Nachingwea 55,888 30,695 127 51,859 107,150 101,807 5,090 106,897 109,080 2,727 23,400 585 132,480 3,312 113,245 111,450 4,176 1,363 619 24,760 2,542 182
Sub Total 260,065 181,380 754 244,264 539,748 508,568 25,429 533,997 544,840 13,621 116,960 2,924 661,800 16,545 563,121 548,831 22,894 11,015 2,267 90,680 7,089 1,299
Mtwara Mtwara Urban 33,073 18,645 186 30,132 64,633 66,635 3,332 69,967 71,600 1,790 15,320 383 86,920 2,173 85,985 85,561 - 380 16 640 6,010 60
Mtwara rural 67,367 45,126 198 56,273 136,900 137,256 6,863 144,119 147,160 3,679 31,560 789 178,720 4,468 162,607 158,636 1,974 3,222 452 18,080 393 110
Tandahimba 67,268 45,874 187 66,161 157,590 158,363 7,859 165,039 168,240 4,206 36,440 911 204,680 5,117 170,115 166,224 1,309 3,891 858 34,320 435 155
Newala 60,591 38,572 172 58,594 134,577 136,366 6,818 143,184 146,480 3,662 31,360 784 177,840 4,446 147,868 143,889 654 3,979 752 30,080 483
Masasi 124,998 69,420 180 109,475 233,847 213,261 10,663 223,924 226,840 5,671 49,040 1,226 275,880 6,897 229,751 224,896 2,647 3,182 1,170 46,800 3,962 774
Nanyumbu 49,077 35,678 110 41,949 95,450 91,131 4,557 95,688 97,360 2,434 20,960 524 118,320 2,958 100,130 98,741 1,607 1,303 56 2,240 163 80
Sub Total 402,374 253,315 1,033 362,584 822,997 803,012 40,092 841,921 857,680 21,442 184,680 4,617 1,042,360 26,059 896,456 877,947 8,191 15,957 3,304 132,160 11,446 1,179
Ruvuma Songea Urban 41,404 32,429 96 39,769 79,801 86,592 4,330 90,922 92,400 2,310 19,920 498 112,320 2,808 107,609 106,742 1,743 862 178 7,120 5,167 525
Songea Rural 42,740 33,814 112 43,432 91,270 83,787 4,189 87,976 89,520 2,238 19,280 482 108,800 2,720 89,665 89,436 8,584 30 446 17,840 6,716 544
Namtumbo 39,222 43,386 125 35,262 77,199 78,713 3,936 82,649 83,880 2,097 18,120 453 102,000 2,550 85,474 85,214 20,333 38 242 9,680 11,915 157
Tunduru 74,508 69,986 164 74,366 135,054 165,544 8,277 173,821 176,400 4,410 38,080 952 214,480 5,362 187,921 186,562 3,764 1,418 308 12,320 3,263 550
Mbinga 116,364 103,849 384 104,788 210,721 221,464 11,073 232,537 237,480 5,937 50,920 1,273 288,400 7,210 242,975 239,169 9,874 5,391 1,096 43,840 5,313 1,159
Sub Total 314,238 283,464 881 297,617 594,045 636,100 31,805 667,905 679,680 16,992 146,320 3,658 826,000 20,650 713,644 707,123 44,298 7,739 2,270 90,800 32,374 2,935
976,677 718,159 2,668 904,465 1,956,790 1,947,680 97,326 2,043,823 2,082,200 52,055 447,960 11,199 2,530,160 63,254 2,173,221 2,133,901 75,383 34,711 7,841 313,640 50,909 5,413
Southern Zone Registration and Issuing Summary (Zone 1) for the Universal Coverage Campaign (UCC)
Zonal 1 Totals
Region District Total Number of HH before
registration
No. Of U5's registered
during U5CC
Issuing Points Total Number of HH during Registration
Number of UCRC issued
to VEOs
Sleeping Spaces
Registered
5% Village Buffer
Total LLINs including
buffer
Total LLINs Rounded up to approximate of
7% buffer due to bale
rounding up
Total Bales to village
level
23% buffer stock at DMO
office
Total buffer bales to
DMO office
Total LLINs for Delivery
Total bales for Delivery
Total sleeping spaces
registered (before and
during issuing)
Total LLINs received
(before and during issuing)
No. of LLINs issued
No. of LLINs still needed
No. of LLINs
remaining
No. of LLINs bales
remained DMO office
Iringa Iringa rural 66,234 48,721 145 72,760 119,500 100,492 5,025 105,517 107,800 2,695 23,120 578 130,920 3,273 110,939 107,918 106,109 3,021 1,809 45
Iringa Urban 42,656 25,469 157 41,797 74,750 62,930 3,147 66,077 68,880 1,722 14,480 362 83,360 2,084 70,788 69,740 69,595 1,193 145 4
Kilolo 55,838 40,649 162 59,656 117,500 86,232 4,312 90,544 92,480 2,312 19,840 496 112,320 2,808 89,959 92,282 89,959 1,216 2,078 52
Mufindi 77,463 55,639 194 84,589 167,400 123,686 6,184 129,870 132,480 3,312 28,480 712 160,960 4,024 127,706 132,545 127,706 884 4,703 118
Ludewa 33,014 23,516 123 33,508 65,596 50,235 2,512 52,747 54,320 1,358 11,560 289 65,880 1,647 50,711 55,867 53,649 360 2,399 60
Njombe 132,048 80,592 284 132,798 256,398 210,523 10,526 221,049 225,720 5,643 48,440 1,211 274,160 6,854 211,035 226,392 217,890 10,799 8,360 209
Makete 27,983 14,575 100 27,130 54,125 41,715 2,086 43,801 45,640 1,141 9,600 240 55,240 1,381 41,715 46,018 44,144 576 1,856 46
Regional Totals 435,236 289,161 1,165 452,238 855,269 675,813 33,791 709,604 727,320 18,183 155,520 3,888 882,840 22,071 702,853 730,762 709,052 18,049 21,350 534
Mbeya Mbeya Urban 90,466 60,569 180 90,934 152,330 136,018 6,801 142,819 146,400 3,660 31,320 783 177,720 4,443 144,836 148,408 144,160 5,798 4,420 111
Mbeya Rural 67,733 50,143 194 78,839 140,710 116,708 5,835 122,543 125,680 3,142 26,880 672 152,560 3,814 124,184 126,339 123,384 11,761 2,799 70
Mbozi 186,933 139,593 252 191,844 292,288 260,173 13,009 273,182 276,920 6,923 59,840 1,496 336,760 8,419 295,791 297,845 295,831 11,357 1,784 45
Ileje 31,219 18,247 76 32,716 57,598 51,557 2,578 54,135 55,520 1,388 11,880 297 67,400 1,685 56,662 58,089 56,762 809 1,384 35
Chunya 59,480 59,460 155 62,385 103,150 91,055 4,553 95,608 97,160 2,429 20,960 524 118,120 2,953 96,371 98,055 96,424 4,991 1,562 39
Rungwe 80,906 55,455 229 88,456 164,878 137,628 6,881 144,509 148,160 3,704 31,680 792 179,840 4,496 135,200 148,767 145,614 3,513 2,894 72
Kyela 61,828 43,635 135 66,044 110,082 105,644 5,282 110,926 112,920 2,823 24,320 608 137,240 3,431 105,644 114,322 113,444 5,680 340 9
Mbarali 68,399 55,556 152 83,688 128,208 119,794 5,990 125,784 127,880 3,197 27,560 689 155,440 3,886 128,849 129,342 128,693 3,591 589 15
Regional Totals 646,964 482,658 1,373 694,906 1,149,244 1,018,577 50,929 1,069,506 1,090,640 27,266 234,440 5,861 1,325,080 33,127 1,087,537 1,121,167 1,104,312 47,500 15,772 394
Rukwa Sumbawanga urban 40,086 37,683 68 39,684 53,530 51,107 2,555 53,662 56,560 1,414 11,760 294 68,320 1,708 58,837 59,924 58,679 1,895 594 15
Sumbawanga Rural 115,973 136,532 231 104,208 183,617 139,155 6,958 146,113 149,680 3,742 32,040 801 181,720 4,543 151,251 151,146 148,093 7,707 2,746 69
Mpanda 101,794 110,400 188 109,429 179,941 158,051 7,903 165,954 169,360 4,234 36,360 909 205,720 5,143 169,636 171,658 168,005 15,118 3,653 91
Nkasi 57,032 70,360 107 47,371 74,651 63,786 3,189 66,975 68,880 1,722 14,680 367 83,560 2,089 67,480 69,116 67,480 3,067 1,407 35
Regional Totals 314,885 354,975 594 300,692 491,739 412,099 20,605 432,704 444,480 11,112 94,840 2,371 539,320 13,483 447,204 451,844 442,257 27,787 8,400 210
Zonal Grand Totals 1,397,085 1,126,794 3,132 1,447,836 2,496,252 2,106,489 105,325 2,211,814 2,262,440 56,561 484,800 12,120 2,747,240 68,681 2,237,594 2,303,773 2,255,621 93,336 45,522 1,138
Southern Highland Zone Registration and Issuing Summary (Zone 2) for the Universal Coverage Campaign (UCC)
Region District No of U5'S Registered
during U5CC
No of Issuing Points
Total Number of HH before
Registration
Total Number of HH during Registration
Number of UCRC issued
to VEOs
Number of sleeping
spaces registered
5% Villages Buffer
Total LLINs including
buffer
Total LLINs Rounded up to approximate of
7% buffer due to bale
rounding up
Total bales to Village
level
23% DMO buffer stock rounded up due to bale
rounding
Total buffer bales to
DMO office
Total LLINs for Delivery
Total bales for Delivery
Total sleeping spaces
registered (before and
during issuing)
Total LLINs received
(before and during issuing)
No. of LLINs issued
No. of LLINs still needed
No. of LLINs remained at villages/stre
et level
No. of LLINs bales
remained DMO office
MOROGORO KILOMBERO 74,339 183 97,451 124,383 200,585 181,726 9,086 190,812 192,320 4,808 41,800 1,045 234,120 5,853 226,238 226,736 223,138 - 4,498 275
KILOSA 94,885 286 146,237 166,466 267,840 224,291 11,215 235,506 238,960 5,974 51,600 1,290 290,560 7,264 236,407 240,778 236,407 9,143 5,823 1,158
MOROGORO RURAL 22,931 162 82,293 82,542 155,156 115,895 5,795 121,690 124,600 3,115 26,680 667 151,280 3,782 126,179 126,276 132,804 146 1,611 590
MOROGORO URBAN 33,464 277 110,559 107,787 201,327 145,491 7,275 152,766 158,280 3,957 33,480 837 191,760 4,794 161,383 161,533 150,956 - 4,305 915
MVOMERO - 173 77,738 79,670 136,311 110,165 5,508 115,673 117,960 2,949 25,360 634 143,320 3,583 120,030 122,658 120,049 10,164 2,645 503
ULANGA 37,313 186 65,155 70,651 125,120 104,364 5,218 109,582 111,520 2,788 24,040 601 135,560 3,389 113,831 112,001 113,740 - 476 496
REGION TOTAL 262,932 1,267 579,433 631,499 1,086,339 881,932 44,097 926,029 943,640 23,591 202,960 5,074 1,146,600 28,665 984,068 989,982 977,094 19,453 19,358 3,936
DODOMA BAHI 47,542 62 55,639 55,726 102,400 74,540 3,727 78,267 79,400 1,985 17,160 429 96,560 2,414 74,540 80,499 77,951 4,215 1,532 429
CHAMWINO 72,783 119 90,755 84,509 151,580 112,417 5,621 118,038 119,400 2,985 25,880 647 145,280 3,632 112,417 122,190 119,503 4,758 3,254 572
DODOMA URBAN 76,498 166 142,598 109,123 208,348 149,986 7,499 157,485 159,920 3,998 34,520 863 194,440 4,861 149,986 162,085 153,865 6,773 8,057 978
KONDOA 115,523 284 120,274 119,700 187,664 172,232 8,612 180,844 184,440 4,611 39,640 991 224,080 5,602 172,232 184,483 174,699 9,289 8,511 875
KONGWA 59,817 148 80,446 77,866 153,010 103,198 5,160 108,358 110,200 2,755 23,760 594 133,960 3,349 113,655 113,594 112,945 2,204 746 512
MPWAPWA 72,776 172 78,755 73,588 133,806 101,288 5,064 106,352 108,280 2,707 23,320 583 131,600 3,290 109,766 109,866 106,056 2,161 3,190 564
REGION TOTAL 444,939 951 568,467 520,512 936,808 713,661 35,683 749,344 761,640 19,041 164,280 4,107 925,920 23,148 732,596 772,717 745,019 29,400 25,290 3,930
SINGIDA IRAMBA 102,314 253 87,769 82,332 163,346 120,532 6,027 126,559 129,720 3,243 27,400 685 157,120 3,928 142,588 144,011 142,588 3,702 1,394 10,000
MONYONI 73,719 186 65,526 69,733 113,070 99,526 4,976 104,502 106,440 2,661 22,920 573 129,360 3,234 99,526 107,581 117,756 9,569 1,336 552
SINGIDA RURAL 109,891 220 100,327 101,353 170,093 145,594 7,280 152,874 156,320 3,908 33,520 838 189,840 4,746 145,594 168,134 166,398 11,388 1,728 514
SINGIDA URBAN 31,860 76 28,736 31,541 53,700 43,647 2,182 45,829 47,000 1,175 10,040 251 57,040 1,426 43,647 47,189 46,030 346 1,257 248
REGION TOTAL 317,784 735 282,358 284,959 500,209 409,299 20,465 429,764 439,480 10,987 93,880 2,347 533,360 13,334 431,355 466,915 472,772 25,005 5,715 11,314
ZONE GRAND TOTAL 1,025,655 2,953 1,430,258 1,436,970 2,523,356 2,004,892 100,245 2,105,137 2,144,760 53,619 461,120 11,528 2,605,880 65,147 2,148,019 2,229,614 2,194,885 73,858 50,363 19,180
Central Zone Registration and Issuing Summary (Zone 3) for the Universal Coverage Campaign (UCC)
Region District No of U5'S Registered
during U5CC
No of Issuing Points
Total Number of HH before
Registration
Total Number of HH during Registration
Number of UCRC issued
to VEOs
Number of sleeping
spaces registered
5% Villages Buffer
No. of institution
sleeping spaces
registered in the villages &
streets
Total LLINs including
buffer and institution
sleeping spaces.
Total LLINs Rounded up
to approximate of 7% buffer due to bale
rounding up
Total bales to Village level
15% DMO buffer stock rounded up due to bale
rounding *(Including
sleeping spaces in
Total buffer bales to DMO
office + (Hospital and
Health Facility sleeping
space)
Total LLINs for Delivery
Total Bales for delivery
Total sleeping spaces
registered (before and
during issuing)
Total LLINs received
(before and during issuing)
No. of LLINs issued
No. of LLINs still needed
No. of LLINs remained at
villages/street level
No. of LLINs bales
remained DMO office
No. of LLINs remained
DMO office
Tabora Igunga 112,924 148 67,197 65,600 103,184 104,564 5,228 7,915 117,707 119,920 2,998 16,160 404 136,080 3,402 117,692 120,403 118,739 6,575 11,170 392 15680
Nzega 118,656 194 98,222 99,048 152,905 163,740 8,187 3,762 175,689 178,640 4,466 25,200 630 203,840 5,096 172,776 180,793 172,927 1,507 7,274 746 29,840
Sikonge 48,825 93 34,098 31,570 49,660 44,351 2,218 253 46,822 48,200 1,205 7,080 177 55,280 1,382 48,808 49,624 49,188 3,324 550 98 3,920
Tabora U 43,862 174 56,425 59,674 109,092 91,140 4,557 6,488 102,185 105,440 2,636 14,080 352 119,520 2,988 108,451 107,967 108,451 2,137 3,061 301 12,040
Urambo 98,861 187 97,980 103,667 131,975 143,890 7,195 2,664 153,749 156,760 3,919 21,800 545 178,560 4,464 159,548 161,599 161,420 16,235 1,235 - -
Uyui 93,292 205 64,362 67,705 98,810 99,842 4,992 274 105,108 107,520 2,688 15,040 376 122,560 3,064 116,050 116,231 116,050 6,830 238 69 2,760
516,420 1,001 418,284 427,264 645,626 647,527 32,376 21,356 701,259 716,480 17,912 99,360 2,484 815,840 20,396 723,325 736,617 726,775 36,608 23,528 1,606 64,240
Shinyanga Bariadi 205,958 239 114,750 126,124 187,125 188,454 9,423 1,233 199,110 201,520 5,038 28,640 716 230,160 5,754 187,125 201,570 200,796 1,505 874 716 28,640
Bukombe 112,479 201 77,858 79,592 122,439 119,641 5,982 275 125,898 128,480 3,212 18,200 455 146,680 3,667 128,574 129,349 129,289 3,368 60 433 17,320
Kahama 199,811 316 133,721 136,704 206,959 213,641 10,682 3,965 228,288 232,920 5,823 32,120 803 265,040 6,626 243,600 243,600 240,591 12,834 62 595 23,800
Kishapu 71,341 134 47,816 53,443 92,537 87,936 4,397 4,140 96,473 98,480 2,462 13,360 334 111,840 2,796 93,556 98,401 93,414 460 4,853 327 13,080
Maswa 93,088 186 58,607 59,758 91,352 98,984 4,949 1,543 105,476 107,520 2,688 16,480 412 124,000 3,100 98,984 108,495 105,830 1,520 1,346 357 14,280
Meatu 74,048 121 40,247 49,703 77,618 73,203 3,660 170 77,033 78,960 1,974 11,120 278 90,080 2,252 78,316 78,846 78,386 - 66 278 11,120
Shiny R 88,892 143 53,419 62,719 95,539 100,519 5,026 1,015 106,560 109,116 107,834 2,644 1,252 374 14,960
Shiny U 30,824 77 32,338 38,474 69,884 65,751 3,288 3,403 72,442 73,280 1,832 11,040 276 84,320 2,108 67,109 74,000 67,883 2,250 5,997 192 7,680
876,441 1,417 558,756 606,517 943,453 948,129 47,406 15,744 1,011,279 1,029,760 25,744 146,160 3,654 1,175,920 29,398 1,004,847 1,043,377 1,024,023 24,581 14,510 3,272 130,880
Kigoma Kasulu 141,836 229 150,398 152,367 246,317 231,816 11,591 4,539 247,946 249,960 6,249 35,440 886 285,400 7,135 252,540 256,689 252,312 33,046 2,856 - -
Kigoma Rural 123,578 186 122,253 105,352 198,242 161,625 8,081 1,914 171,620 173,120 4,328 24,520 613 197,640 4,941 174,512 174,750 132,742 10,095 1,258 477 19,080
Kigoma Urban 37,744 70 52,594 40,228 102,300 65,519 3,276 1,735 70,530 71,720 1,793 10,320 258 82,040 2,051 70,928 73,179 72,377 318 510 225 9,000
Kibondo 73,566 104 76,092 83,571 130,211 119,808 5,990 1,719 127,517 129,200 3,230 18,160 454 147,360 3,684 121,507 130,689 121,014 10,144 8,878 329 13,160
376,724 589 401,337 381,518 677,070 578,768 28,938 9,907 617,613 624,000 15,600 88,440 2,211 712,440 17,811 619,487 635,307 578,445 53,603 13,502 1,031 41,240
Gradnd Total 1,769,585 3,007 1,378,377 1,415,299 2,266,149 2,174,424 108,720 47,007 2,330,151 2,370,240 59,256 333,960 8,349 2,704,200 67,605 2,347,659 2,415,301 2,329,243 114,792 51,540 5,909 236,360
West Lake Zone Registration and Issuing Summary (Zone 4 for the Universal Coverage Campaign (UCC)
Region District No of U5'S Registered
during U5CC
No of Issuing Points
Total Number of HH before
Registration
Total Number of HH during Registration
Number of UCRC issued
to VEOs
Number of sleeping
spaces registered
5% Villages Buffer
No. of institution
sleeping spaces
registered in the villages &
streets
Total LLINs including
buffer and institution
sleeping spaces.
Total LLINs Rounded up
to approximate of 7% buffer due to bale
rounding up
Total bales to Village level
15% DMO buffer stock rounded up due to bale
rounding *(Including
sleeping spaces in
Hospital and Health
Facility)
Total buffer bales to DMO
office + (Hospital and
Health Facility sleeping
space)
Total LLINs for Delivery
Total Bales for delivery
Total sleeping spaces registered (before and during issuing)
Total LLINs received (before and during issuing)
No. of LLINs issued
No. of LLINs still needed
No of LLINs remained at village/street level
No of LLINs remeined at DMOs level
Total No. of LLINs remaining
Geita 253,164 331 151,172 174,027 306,830 285,600 14,280 631 300,511 304,560 7,614 43,760 1,094 348,320 8,708 299,937 307,743 300,241 9,673 7,652 48,079 55,731 Mwanza Ilemela 39,935 106 124,344 92,262 183,550 140,683 7,034 7,434 155,151 157,280 3,932 21,240 531 178,520 4,463 155,149 160,274 154,427 152,210 3,111 17,080 20,191
Kwimba 82,227 193 60,749 71,886 129,755 122,478 6,124 377 128,979 131,200 3,280 18,760 469 149,960 3,749 129,096 131,234 130,143 1,719 3,126 18,160 21,286 Magu 137,876 268 93,797 101,957 194,093 181,408 9,070 2,164 192,642 195,240 4,881 28,000 700 223,240 5,581 192,742 223,240 192,742 3,839 498 30,000 30,498 Misungwi 59,328 158 48,613 58,759 104,892 109,037 5,452 368 114,857 116,320 2,908 17,080 427 133,400 3,335 108,738 117,511 109,360 10,710 6,914 16,480 23,394 Nyamagana 10,882 150 109,254 105,851 197,664 152,950 7,648 7,157 167,755 169,920 4,248 23,360 584 193,280 4,832 170,251 175,277 167,726 164,764 6,701 17,400 24,101 Sengerema 140,395 257 114,815 123,261 232,479 209,876 10,494 740 221,110 224,080 5,602 32,160 804 256,240 6,406 210,341 226,571 213,588 2,103 12,983 42,652 55,635 Ukerewe 83,395 145 61,369 64,883 138,849 126,994 6,350 1,729 135,073 136,560 3,414 19,280 482 155,840 3,896 138,384 155,840 138,384 1,339 456 17,000 17,456
Total Region 807,202 1,608 764,113 792,886 1,488,112 1,329,026 66,451 20,600 1,416,077 1,435,160 35,879 203,640 5,091 1,638,800 40,970 1,404,638 1,497,690 1,406,611 346,357 41,441 206,851 248,292 Biharamulo 38,934 103 40,737 45,854 81,450 68,832 3,442 1,799 74,073 75,400 1,885 10,600 265 86,000 2,150 73,650 86,608 74,770 1,455 2,212 9,960 12,172 Bukoba Rural 56,394 163 60,764 59,493 123,496 92,232 4,612 5,037 101,881 103,600 2,590 14,040 351 117,640 2,941 97,873 117,640 96,570 ‐ ‐ 21,070 21,070
Kagera Bukoba Urban 23,110 67 30,142 28,275 50,095 44,423 2,221 9,382 56,026 57,320 1,433 7,080 177 64,400 1,610 54,867 60,474 54,991 20 ‐ 8,250 8,250 Chato 61,015 228 57,812 58,173 98,340 83,890 4,516 297 88,703 90,880 2,272 12,680 317 103,560 2,589 92,775 93,324 92,149 755 694 9,440 10,134 Karagwe 108,039 236 109,844 116,588 206,965 187,749 9,387 8,467 205,603 208,000 5,200 28,760 719 236,760 5,919 197,425 202,093 199,158 1,633 2,774 34,160 36,934 Misenyi 37,848 99 40,109 43,955 107,300 68,770 3,439 1,295 73,504 74,920 1,873 11,040 276 85,960 2,149 71,308 75,183 70,992 ‐ ‐ 11,638 11,638 Muleba 78,739 307 99,852 89,476 163,274 128,600 6,430 4,564 138,897 142,120 3,553 19,960 499 162,080 4,052 142,037 144,356 142,037 3,043 3,890 17,665 21,555 Ngara 64,416 127 59,807 60,132 110,550 91,977 4,599 2,112 98,688 100,160 2,504 14,360 359 114,520 2,863 99,703 103,107 99,733 4,051 3,363 11,360 14,723
Total Region 468,495 1,330 499,067 501,946 941,470 766,473 38,645 32,953 837,373 852,400 21,310 118,520 2,963 970,920 24,273 829,638 882,785 830,400 10,957 12,933 123,543 136,476 Bunda 94,712 198 73,860 85,125 133,394 139,633 6,982 1,340 147,955 150,440 3,761 21,400 535 171,840 4,296 152,929 151,512 150,299 ‐ ‐ 30,560 30,560 Musoma Rural 125,330 221 72,569 95,456 152,400 142,972 7,149 409 150,530 152,800 3,820 21,640 541 174,440 4,361 154,984 154,543 155,157 5,681 ‐ 18,360 18,360
Mara Musoma Urban 38,264 86 28,443 35,239 60,112 57,127 2,856 4,277 64,260 65,400 1,635 8,960 224 74,360 1,859 68,656 69,529 69,401 186 ‐ 4,959 4,959 Rorya 83,928 141 66,026 72,844 106,949 110,432 5,522 530 116,484 118,200 2,955 16,960 424 135,160 3,379 110,979 119,504 117,877 2,673 1,392 12,000 13,392 Serengeti 51,079 184 40,821 56,518 76,438 78,733 3,937 964 82,423 84,480 2,112 11,960 299 96,440 2,411 92,396 92,131 96,440 3,349 ‐ ‐ ‐ Tarime 77,597 218 80,386 94,033 133,283 141,049 7,052 2,712 150,813 153,120 3,828 21,520 538 174,640 4,366 137,862 155,733 141,139 17,035 13,731 16,000 29,731
470,910 1,048 362,105 439,215 662,576 669,946 33,497 10,232 712,465 724,440 18,111 102,440 2,561 826,880 20,672 717,806 742,952 730,313 28,924 15,123 81,879 97,002 Total Region
Lake Zone Registration and Issuing Summary (Zone 5 for the Universal Coverage Campaign (UCC)
Region District No of U5'S Registered during U5CC
No of Issuing Points
Total Number of HH before Registration
Total Number of HH during Registration
Number of UCRC issued to VEOs
Number of sleeping spaces registered
5% Villages Buffer
No. of institution sleeping spaces registered in the villages & streets
Total LLINs including buffer and institution sleeping spaces.
Total LLINs Rounded up to approximate of 7% buffer due to bale rounding up
Total bales to Village level
15% DMO buffer stock rounded up due to bale rounding *(Including sleeping spaces in Hospital and Health
Total buffer bales to DMO office + (Hospital and Health Facility sleeping space)
Total LLINs for Delivery
Total Bales for delivery
Tanga City 33,464 191 116,612 90,344 181,733 132,122 6,6 11,635 150,363 153,760 3,844 33,36 834 187,120 4,678
Tanga Mkinga - 105 32,328 33,089 60,722 50,079 2,5 295 52,878 54,520 1,363 7,52 188 62,040 1,551
Pangani - 53 16,849 19,137 34,750 27,914 1,3 70 29,380 30,080 752 4,32 108 34,400 860
Muheza 171 52,145 62,262 101,910 93,257 4,6 1,259 99,179 101,720 2,543 14,40 360 116,120 2,903
Handeni - 162 84,008 85,148 133,290 126,576 6,3 424 133,329 135,400 3,385 19,28 482 154,680 3,867
Kilindi - 162 51,818 57,454 89,450 81,070 4,0 126 85,250 87,400 2,185 12,52 313 99,920 2,498
Lushoto 67,397 249 125,591 124,131 223,728 168,589 8,4 3,889 180,907 185,120 4,628 25,76 644 210,880 5,272
Korogwe - 198 71,533 83,395 139,588 123,290 6,1 194 129,649 132,280 3,307 19,08 477 151,360 3,784
Total Region 100,861 1,291 550,884 554,960 965,171 802,897 40,1 17,892 860,934 880,280 22,007 136,240 3,406 1,016,520 25,413
Kibaha Urban 13,151 62 38,613 39,358 77,364 59,350 2,9 3,374 65,692 66,880 1,672 9,28 232 76,160 1,904
Kibaha Rural 3,943 53 30,169 24,567 53,612 34,335 1,7 2,448 38,500 39,400 985 5,24 131 44,640 1,116
Kisarawe 14,931 106 30,041 31,054 56,245 45,813 2,2 2,831 50,935 52,320 1,308 7,04 176 59,360 1,484
Coast Rufiji 22,083 212 63,795 77,607 118,687 115,477 5,7 2,030 123,281 125,360 3,134 17,76 444 143,120 3,578
Bagamoyo 33,095 183 83,145 88,785 147,339 122,508 6,1 10,410 139,043 141,640 3,541 25,08 627 166,720 4,168
Mafia 5,356 31 13,901 13,958 26,100 18,672 9 180 19,786 20,360 509 2,84 71 23,200 580
Mkuranga 34,892 142 61,731 62,932 115,001 89,402 4,4 5,729 99,601 101,880 2,547 13,56 339 115,440 2,886
Total Region 127,451 789 321,395 338,261 594,348 485,557 24,2 27,002 536,837 547,840 13,696 80,80 2,020 628,640 15,716
Temeke 103,994 300 341,937 318,127 453,430 422,878 21,1 3,453 447,475 451,200 11,280 64,52 1,613 515,720 12,893
Ilala 75,896 212 237,986 246,849 504,809 414,213 20,7 6,543 441,467 443,520 11,088 64,32 1,608 507,840 12,696
DSM Kinondoni 130,189 342 411,236 405,619 626,170 589,033 29,4 33,702 652,187 655,200 16,380 90,08 2,252 745,280 18,632
310,079 854 991,159 970,595 1,584,409 1,426,124 71,3 43,698 1,541,128 1,549,920 38,748 218,920 5,473 1,768,840 44,221
Coast Zone Total 538,391 2,934 1,863,438 1,863,816 3,143,928 2,714,578 135,7 88,592 2,938,899 2,978,040 74,451 435,960 10,899 3,414,000 85,350
Total Region
Coast Zone Registration and Issuing Summary (Zone 6 for the Universal Coverage Campaign (UCC)
Region District No of U5'S Registered during U5CC
No of Issuing Points
Total Number of HH before Registration
Total Number of HH during Registration
Number of UCRC issued to VEOs
Number of sleeping spaces registered
5% Villages Buffer
No. of institution sleeping spaces registered in the villages & streets
Total LLINs including buffer and institution sleeping spaces.
Total LLINs Rounded up to approximate of 7% buffer due to bale rounding up
Total bales to Village level
10% DMO buffer stock rounded up due to bale rounding *(Including sleeping spaces in
Total buffer bales to DMO office + (Hospital and Health Facility sleeping space)
Total LLINs for Delivery
Total Bales for delivery
Babati Urban 18,652 59 17,094 20,799 44,200 31,281 1,564 1,588 34,433 35,360 884 4,96 124 40,320 1,008
Babati Rural 52,722 141 55,304 62,035 109,950 94,574 4,729 1,220 100,523 102,480 2,562 9,92 248 112,400 2,810
MANYARA Simanjiro 23,395 106 58,299 48,570 81,497 63,082 3,154 96 66,332 67,440 1,686 6,40 160 73,840 1,846
Kiteto 18,561 111 52,529 60,634 89,404 79,450 3,973 856 84,279 85,200 2,130 8,20 205 93,400 2,335
Hanang 51,305 115 44,222 48,197 83,250 70,307 3,515 2,331 76,153 77,600 1,940 7,24 181 84,840 2,121
Mbulu 49,214 149 51,419 50,464 89,600 81,910 4,096 2,500 88,506 90,760 2,269 8,96 224 99,720 2,493
Total region 213,849 681 278,867 290,699 497,901 420,604 21,030 8,591 450,225 458,840 11,471 45,68 1,142 504,520 12,613
Arusha Arusha Urban 34,823 142 136,702 131,785 246,350 192,248 9,612 5,738 207,598 210,240 5,256 19,96 499 230,200 5,755
Arusha Council 2,933 125 100,890 83,877 124,532 109,843 5,492 3,176 118,511 120,080 3,002 11,08 277 131,160 3,279
Meru 54,487 108 63,689 65,661 127,600 110,569 5,528 8,098 124,195 125,560 3,139 11,40 285 136,960 3,424
Karatu 33,335 75 40,545 40,145 70,567 62,750 3,138 1,999 67,887 68,800 1,720 6,40 160 75,200 1,880
Monduli 22,453 65 45,404 40,623 68,990 51,057 2,553 8,121 61,731 62,720 1,568 5,36 134 68,080 1,702
Longido 17,028 72 32,099 23,091 34,819 29,425 1,471 6,866 37,762 38,480 962 3,36 84 41,840 1,046
Ngorongoro 27,009 105 51,474 37,491 92,260 51,412 2,571 4,106 58,089 58,960 1,474 5,24 131 64,200 1,605
Total region 192,068 692 470,803 422,673 765,118 607,304 30,365 38,104 675,773 684,840 17,121 62,80 1,570 747,640 18,691
Kilimanjaro Moshi Urban 16,433 73 49,173 54,121 86,404 87,611 4,381 12,803 104,795 105,920 2,648 10,00 250 115,920 2,898
Moshi Rural 50,737 202 100,970 122,586 213,664 189,167 9,458 9,731 208,356 208,800 5,220 19,48 487 228,280 5,707
Hai 17,953 89 47,207 49,248 87,586 79,129 3,956 7,950 91,035 92,520 2,313 8,28 207 100,800 2,520
Siha 10,248 51 22,453 23,808 40,542 35,910 1,796 966 38,672 39,480 987 4,24 106 43,720 1,093
Same 36,344 187 62,578 63,338 142,060 119,365 5,968 7,347 132,680 134,640 3,366 11,96 299 146,600 3,665
Rombo 39,144 117 55,019 61,572 118,711 106,744 5,337 2,871 114,952 116,240 2,906 10,68 267 126,920 3,173
Mwanga 16,308 94 33,332 35,474 84,523 63,111 3,156 7,313 73,580 75,080 1,877 6,32 158 81,400 2,035
Total region 187,167 813 370,732 410,147 773,490 681,037 34,052 48,981 764,070 772,680 19,317 70,96 1,774 843,640 21,091
Total Zone 593,084 2,186 1,120,402 1,123,519 2,036,509 1,708,945 85,447 95,676 1,890,068 1,916,360 47,909 179,440 4,486 2,095,800 52,395
Northern Zone Registration and Issuing Summary (Zone 6 for the Universal Coverage Campaign (UCC)
APPENDIX C: DISTRICTS REPORTING TNVS FUNDING
S/N Districts S/N Districts S/N Districts S/N Districts
1 Kilolo 32 Mbeya Rural 1 Arusha 36 Mtwara Rural2 Ludewa 33 Kilosa 2 Arusha Council 37 Mtwara Urban3 Mufindi 34 Morogoro Rural 3 Karatu 38 Newala4 Biharamulo 35 Morogoro Urban 4 Longido 39 Tandahimba5 Bukoba Rural 36 Mvomero 5 Meru 40 Nanyumbu6 Chato 37 Ulanga 6 Monduli 41 Serengeti7 Karagwe 38 Nkasi 7 Ngorongoro 42 Tarime8 Muleba 39 Sumbawanga Rural 8 Sumbawanga Urban 43 Kibaha Urban 9 Kigoma Urban 40 Manyoni 9 Iramba 44 Kibaha Rural
10 Kigoma Rural 41 Singida Rural 10 Makete 45 Bagamoyo11 Kasulu 42 Singida Urban 11 Mpanda 46 Misungwi12 Kibondo 43 Handeni 12 Njombe 47 Tunduru13 Babati rural 44 Kilindi 13 Iringa Rural 48 Namtumbo14 Hanang 45 Korogwe 14 Iringa Urban 49 Mbinga15 Kiteto 46 Lushoto 15 Igunga 50 Kisarawe16 Mbulu 47 Mkinga 16 Nzega 51 Simanjiro
17 Chunya 48 Muheza 17 Sikonge 52 Lindi Rural
18 Ileje 49 Pangani 18 Tabora Urban 53 Lindi Urban
19 Mbarali 50 Tanga City 19 Urambo 54 Liwale
20 Dodoma Urban 51 Magu 20 Uyui 55 Siha21 Chamwino 52 Kwimba 21 Nachingwea 56 Rombo22 Ilemela 53 Sengerema 22 Ruangwa 57 Ngara23 Nyamagana 54 Bukoba Urban 23 Kilombero 58 Hai24 Mwanga 55 Bahi 24 Kyela 59 Moshi Urban25 Mbeya Urban 56 Ulanga 25 Moshi Rural 60 Ilala26 Rungwe 57 Mkuranga 26 Same 61 Temeke27 Mbozi 58 Kongwa 27 Kilwa 62 Kinondoni28 Misenyi 59 Kahama 28 Rorya 63 Shinyanga Rural29 Kondoa 60 Rufiji 29 Musoma Urban 64 Shinyanga Urban30 Mpwapwa 61 Songea Rural 30 Mafia 65 Kishapu31 Geita 62 Ukerewe 31 Musoma Rural 66 Maswa
32 Songea Urban 67 Meatu33 Babati Urban 68 Bariadi34 Bunda 69 Bukombe35 Masasi
Districts which have included TNVS activities in their budget Districts that do not include TNVS activities in their budget
Response Received