March 6, 2020 QUESTIONS & ANSWERS T-2020-16 LED Retrofit - Group 1 (7 School Locations) NOTE: The closing date has been extended to March 13, 2020 @ 2:00PM Question 1: Please confirm if the fire-rated boxes are required for all the 2’x2’; 2’x4’; 1’x4’ and downlight fixtures in all the schools in Group 1 and Group 2? This fire-rated boxes are expensive and will affect the overall project cost. Answer 1: Fire rated boxes are required for all the proposed lighting fixtures including the down lights. Question 2: Is it possible to see the pictures of the existing fire-rated boxes? Answer 2: We don’t have pictures of the existing fire rated boxes. Question 3: Please advise if the supply and installation of fire-rated boxes are under the scope of the electrical contractor. Answer 3: Electrical contractor shall supply and install the fire rated boxes, all required fire stopping work shall be done by the General Contractor. Question 4: If possible, can you please provide us with a picture of the existing fire-rated covers that have to be removed and disposed of (according to demolition note-9 / drawings E2.1 & E2.2)? Answer 4: We don’t have the pictures of the existing fire rated covers.
Transcript
Page 1: QUESTIONS & ANSWERS T-2020-16 LED Retrofit - Group 1 (7 ... · new led lighting design. 5.electrical contractor shall carefully remove the existing lighting fixtures without disturbing

March 6, 2020

QUESTIONS & ANSWERS T-2020-16 LED Retrofit - Group 1 (7 School Locations)

NOTE: The closing date has been extended to March 13, 2020 @ 2:00PM

Question 1:

Please confirm if the fire-rated boxes are required for all the 2’x2’; 2’x4’; 1’x4’ and downlight fixtures in all the schools in Group 1 and Group 2? This fire-rated boxes are expensive and will affect the overall project cost.

Answer 1: Fire rated boxes are required for all the proposed lighting fixtures including the down lights.

Question 2:

Is it possible to see the pictures of the existing fire-rated boxes?

Answer 2: We don’t have pictures of the existing fire rated boxes.

Question 3:

Please advise if the supply and installation of fire-rated boxes are under the scope of the electrical contractor.

Answer 3: Electrical contractor shall supply and install the fire rated boxes, all required fire stopping work shall be done by the General Contractor.

Question 4:

If possible, can you please provide us with a picture of the existing fire-rated covers that have to be removed and disposed of (according to demolition note-9 / drawings E2.1 & E2.2)?

Answer 4: We don’t have the pictures of the existing fire rated covers.

Page 2: QUESTIONS & ANSWERS T-2020-16 LED Retrofit - Group 1 (7 ... · new led lighting design. 5.electrical contractor shall carefully remove the existing lighting fixtures without disturbing

Question 5:

Please clarify if Fire-rated boxes are required to replace the existing of the 2’x2’; 2’x4’;1’x4’ and downlight fixtures in the schools in Group 1 and Group 2? If it's required; Who will carry the cost of supply and installing the fire-rated boxes – General contractor or Electrical sub-contractor?

Answer 5: See Above answers.

REVISED

Mandatory/General Requirements Checklist – General Requirement #19

Please be advised that DPCDSB will limit award of projects to any qualified bidder (Prequalified General Contractor (VOR) and Electrical Subcontractor) to a maximum of 1 group of projects. The Electrical subcontractor will be displayed at the time of award.

ADDITIONAL DOCUMENTS

Addendum E-1 – Attachment to follow.

Page 3: QUESTIONS & ANSWERS T-2020-16 LED Retrofit - Group 1 (7 ... · new led lighting design. 5.electrical contractor shall carefully remove the existing lighting fixtures without disturbing

ADDENDUM E-1 Page 1 March 5, 2020 LED Lighting Retrofit Project Group -1 2020 This addendum forms part of the contract documents and amends the original bidding requirements, drawings and specifications, as noted below.

REGAL CONSULTING ENGINEERS INC. 2359 Royal Windsor Drive, Suite 201

Mississauga, ON L5J 4S9 Phone: 905-855-3010

St. John The Baptist CES: ELECTRICAL

1. Find attached electrical sketch E1.0-A-1 with changes as shown clouded. St. Maria Goretti CES: ELECTRICAL

1. Find attached electrical sketch E1.0-A-1 with changes as shown clouded. 2. Find attached electrical sketch E2.0-A-1 with changes as shown clouded. 3. Find attached electrical sketch E3.0-A-1 with changes as shown clouded. 4. Find attached electrical sketch E3.1-A-1 with changes as shown clouded.

Lighting Controls Contractor for LED Lighting Retrofit Project – Group 1

1. All rooms that come with digital switches call for diming, contractor to run 0-10V low voltage wiring for diming the LED lighting fixtures.

END OF ADDENDUM E-1

Page 4: QUESTIONS & ANSWERS T-2020-16 LED Retrofit - Group 1 (7 ... · new led lighting design. 5.electrical contractor shall carefully remove the existing lighting fixtures without disturbing

St. John The Baptist ES

PROPOSED LIGHTING FIXTURE SCHEDULE PROPOSED LIGHTING FIXTURE SCHEDULE

TYPE WATT QTY. TOTALWATTS TYPE WATT QTY. TOTAL

WATTSA 96 341 32736 A 30 63 1890A1 96 80 7680 A1 30 84 2520A2 96 18 1728 B 40 132 5280B 64 256 16384 S 19 6 114C1 64 6 384 D 177 48 8496D 64 80 5120 D1 59 8 472G 64 8 512 F 10 55 550J 128 96 12288 M 22 0 0K 32 2 64 M1 22 8 176N 52 53 2756 M2 34 0 0R 100 6 600 R 15 4 60S5 100 5 500 Q 40 75 3000S3 250 6 1500 Q1 50 396 19800

S4 150 5 750 Z 40 18 720

S2 70 8 560 MA 40 13 520

MB 55 5 275

PA 110 6 660G 19 6 114

970 83562 927 44647Savings

Qty. Watts4.43% 46.57%

ELECTRICAL DRAWING LIST

NETWORK CABLE

GENERAL NOTES

LIGHTING CONTROL SYSTEM NOTES:

VOLT

LAMP

MOUNT REMARKS

WATT TYPE

LEGEND

CONTROL SETTING

NOTES

VOLT LUMENS

MOUNTREMARKS

DLC PRODUCT ID #

WATT TYPE COL.

NEW LIGHTING FIXTURES IN DRYWALL CEILING

WARRANTY LETTER

PROJECT NO: DRAWING NO:

ASSOCIATES

Project ManagersEngineers

(905) 666-5256(905) 666-5252Tel:

Fax:

Suite 201

e-mail:

Architects

[email protected]

BARRY BRYAN

Whitby, OntarioDATE:

FILE:

SCALE:

CHECKED BY:

DRAWN BY:

DESIGN BY:

BY

PROJECT:

DRAWING:

NO. REVISIONS DATE

BY

ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THECOPYRIGHT PROPERTY OF THE CONSULTANT AND MUST BE RETURNEDUPON REQUEST. REPRODUCTION OF DRAWINGS IN PART OR WHOLE

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNTIL SIGNEDAND SEALED BY THE CONSULTANT.

NO.

CHECK AND VERIFY ALL DIMENSIONS AT THE SITE.

WITHOUT THE PERMISSION OF THE CONSULTANT IS FORBIDDEN.

ISSUES DATE

250 Water Street

L1N 0G5

2359 Royal Windsor Drive, Suite 201 Mississauga, ON L5J 4S9

PHONE: (905)829-3010

www.regal-eng.com

RCEI

REGAL CONSULTING ENGINEERS INC.

CONSULTING MECHANICAL & ELECTRICAL ENGINEER S

LED RETROFIT FOR

ST. JOHN THE BAPTIST ES

299 LANDSBRIDGE ST

BOLTON, ONTARIO

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

MB

MB

MA

February 19, 2019

2019-290-1 E1.0-A-1

ELECTRICAL LEAD SHEET

N.T.S.

Page 5: QUESTIONS & ANSWERS T-2020-16 LED Retrofit - Group 1 (7 ... · new led lighting design. 5.electrical contractor shall carefully remove the existing lighting fixtures without disturbing

St. Maria Goretti ES

EXISITING LIGHTING FIXTURE SCHEDULE PROPOSED LIGHTING FIXTURE SCHEDULE

TYPE WATT QTY. TOTALWATTS TYPE WATT QTY. TOTAL

WATTSA 96 408 39168 A 30 26 780A1 96 6 576 A1 30 40 1200A3 96 15 1440 D 177 48 8496B 64 14 896 F 10 23 230BB 64 53 3392 F1 10 5 50BD 64 2 128 U1 22 23 506BE 32 2 64 DA 40 6 240BF 64 6 384 M1 22 26 572B3 64 64 4096 M2 34 6 204DA 64 6 384 MB 35 2 70DD 64 23 1472 Q 40 62 2480DF 64 28 1792 Q1 50 211 10550I 32 6 192 Q3 40 4 160M 64 26 1664 Z 50 15 750

R 15 6 90

EX 40 73 2920

659 55648 576 26288Savings

Qty. Watts12.59% 52.76%

ELECTRICAL DRAWING LIST

NETWORK CABLE

GENERAL NOTES

LIGHTING CONTROL SYSTEM NOTES:

VOLT

LAMP

MOUNT REMARKS

WATT TYPE

LEGEND

CONTROL SETTING

NOTES

VOLT LUMENS

MOUNTREMARKS

DLC PRODUCT ID #

WATT TYPE COL.

NEW LIGHTING FIXTURES IN DRYWALL CEILING

WARRANTY LETTER

PROJECT NO: DRAWING NO:

ASSOCIATES

Project ManagersEngineers

(905) 666-5256(905) 666-5252Tel:

Fax:

Suite 201

e-mail:

Architects

[email protected]

BARRY BRYAN

Whitby, OntarioDATE:

FILE:

SCALE:

CHECKED BY:

DRAWN BY:

DESIGN BY:

BY

PROJECT:

DRAWING:

NO. REVISIONS DATE

BY

ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THECOPYRIGHT PROPERTY OF THE CONSULTANT AND MUST BE RETURNEDUPON REQUEST. REPRODUCTION OF DRAWINGS IN PART OR WHOLE

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNTIL SIGNEDAND SEALED BY THE CONSULTANT.

NO.

CHECK AND VERIFY ALL DIMENSIONS AT THE SITE.

WITHOUT THE PERMISSION OF THE CONSULTANT IS FORBIDDEN.

ISSUES DATE

250 Water Street

L1N 0G5

2359 Royal Windsor Drive, Suite 201 Mississauga, ON L5J 4S9

PHONE: (905)829-3010

www.regal-eng.com

RCEI

REGAL CONSULTING ENGINEERS INC.

CONSULTING MECHANICAL & ELECTRICAL ENGINEER S

LED RETROFIT FOR

ST. MARIA GORETTI E.S.

121 ROYAL ORCHARD DRIVE

BRAMPTON, ONTARIO

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

MB

MB

MA

February 19, 2019

2019-290-2 E1.0-A-1

ELECTRICAL LEAD SHEET

N.T.S.

Page 6: QUESTIONS & ANSWERS T-2020-16 LED Retrofit - Group 1 (7 ... · new led lighting design. 5.electrical contractor shall carefully remove the existing lighting fixtures without disturbing

DEMOLITION NOTES:

1. ALL EXISTING DEVICES AND EQUIPMENT MAY NOT BE SHOWN

ON DRAWINGS. ELECTRICAL CONTRACTOR TO VERIFY

QUANTITIES PRIOR TO SUBMITTING PRICING.

2. ELECTRICAL CONTRACTOR TO DISCONNECT AND REMOVE ALL

LIGHTING FIXTURES, SWITCHES & CONTROL DEVICES IN THE

AREAS AS SHOWN.

3. DISCONNECT ALL WIRING TO LIGHTING FIXTURES BEING

DEMOLISHED BACK TO SOURCE,

4. MARK CIRCUITS FOR RE-ALLOCATING TO NEW CIRCUITS IN THE

NEW LED LIGHTING DESIGN.

5. ELECTRICAL CONTRACTOR SHALL CAREFULLY REMOVE THE

EXISTING LIGHTING FIXTURES WITHOUT DISTURBING THE

EXISTING LIFE SAFETY DEVICES IN THE EXISTING CEILING. IF

BY MISTAKE EXISTING LIFE SAFETY DEVICES ARE DAMAGED,

THEN CONTRACTOR TO REPLACE AND ALLOW FOR

VERIFICATION OF THE SAME.

6. EXISTING LED LIGHTING FIXTURES IN CHANGE ROOM TO

REMAIN

7. ELECTRICAL CONTRACTOR TO REMOVE EXISTING GYM

DOWNLIGHT. REMOVE WIRING AND CONDUIT BACK TO

SOURCE.

8. DELETE SWITCHES AND PROVIDE AND INSTALL STAINLESS

STEEL COVER PLATES.

9. CONTRACTOR TO ALLOW FOR REMOVING THE EXISTING FIRE

RATED COVERS ON THE EXISTING FIXTURES AND DISPOSE OFF

SITE.

CUTTING, PATCHING AND PAINTING BY GC

1. CUTTING AND PATCHING OF THE DRYWALL BY THE GC IS

INCLUDED IN THE SCOPE OF WORK. GC TO CAREFULLY

EXAMINE ALL THE LIGHTING FLOOR PLAN TO ALLOW FOR

COMPLETE CUTTING PATCHING AND PAINTING WORK. FOR THE

LIGHTING RETROFIT SCOPE .

2. GENERAL CONTRACTOR TO PATCH UP THE PAINT OF THE

(TRUSS/STEEL) WHERE THE LIGHTING FIXTURE S REMOVED TO

MATCH THE EXISTING COLOR.

3. WHEN REPLACING EXISTING (1X4) LIGHTING FIXTURES

RECESSED IN THE 'T' BAR CEILING WITH (2X4) NEW LIGHTING

FIXTURE, CONTRACTOR TO ALLOW FOR REMOVING PART OF

THE DROP CEILING GRID.

$$

$$

$$

$$

$$

$$

$$

$

3

$

3

$

$

$

$

$

$

$$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

3

$

$

$

3

$

3

$

3

$

$

$

$

$

$

$

$

$

$

$

$$

PROJECT NO: DRAWING NO:

ASSOCIATES

Project ManagersEngineers

(905) 666-5256(905) 666-5252Tel:

Fax:

Suite 201

e-mail:

Architects

[email protected]

BARRY BRYAN

Whitby, OntarioDATE:

FILE:

SCALE:

CHECKED BY:

DRAWN BY:

DESIGN BY:

BY

PROJECT:

DRAWING:

NO. REVISIONS DATE

BY

ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THECOPYRIGHT PROPERTY OF THE CONSULTANT AND MUST BE RETURNEDUPON REQUEST. REPRODUCTION OF DRAWINGS IN PART OR WHOLE

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNTIL SIGNEDAND SEALED BY THE CONSULTANT.

NO.

CHECK AND VERIFY ALL DIMENSIONS AT THE SITE.

WITHOUT THE PERMISSION OF THE CONSULTANT IS FORBIDDEN.

ISSUES DATE

250 Water Street

L1N 0G5

2359 Royal Windsor Drive, Suite 201 Mississauga, ON L5J 4S9

PHONE: (905)829-3010

www.regal-eng.com

RCEI

REGAL CONSULTING ENGINEERS INC.

CONSULTING MECHANICAL & ELECTRICAL ENGINEER S

LED RETROFIT FOR

ST. MARIA GORETTI E.S.

121 ROYAL ORCHARD DRIVE

BRAMPTON, ONTARIO

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

MB

MB

MA

February 19, 2019

2019-290-2 E2.0-A-1

DEMOLITION LIGHTING

FIRST FLOOR PLAN

1:100

Page 7: QUESTIONS & ANSWERS T-2020-16 LED Retrofit - Group 1 (7 ... · new led lighting design. 5.electrical contractor shall carefully remove the existing lighting fixtures without disturbing

$

LV

5

$

LV5

$

LV2/3

$

LV

2/3

$

LV2

$

LV2

$

LV

3

$

L

V

2

$

L

V

5

$

L

V

2

$

L

V

2

$

L

V

5

/

3

$

LV

2

$

LV2

$

LV

2

$

LV2

$

L

V

2

$

L

V

2

$

L

V

2

$

L

V

2

$

L

V

5

/

3

$

L

V

2

$

L

V

2

$

LV5

$

LV2

$

LV2

$

LV

5$

LV

5

$

LV

5

$

LV

3

$

LV

2/3

$

LV2/3

$

LV

5

$

LV

2

$

L

V

5

$

L

V

5

$

L

V

5

$

L

V

2

$

L

V

5

$

LV5/3

$

LV5/3

$

L

V

2

$

$

LV

2/3

$

LV

2/3

$

LV

4

$

LV

2

$

$

$

LV2

$

LV2

$

LV

2

$

LV

2

$

LV

5/3

$

LV

5/3

$

$

$

NOTES:

1. RE-UTILIZE EXISTING LIGHTING CIRCUITS UNLESS NOTED

OTHERWISE. ELECTRICAL CONTRACTOR TO VERIFY CAPACITY

OF EXISTING LIGHTING CIRCUIT PRIOR TO INSTALLATION.

2. PROVIDE NEW SWITCHING LEGS AS INDICATED.

3. OFF-DELAY TIME OF OCCUPANCY SENSORS TO BE THIRTY

MINUTES.

4. OCCUPANCY SENSORS TO BE DUAL TECHNOLOGY PIR AND

ULTRASONIC TYPE. ACCEPTABLE MANUFACTURER'S

WATTSTOPPER, ACUITY AND LUTRON

5. ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

20A BREAKER IN EXISTING ELECTRICAL PANEL AS SHOWN.

EXTEND POWER INTO THE CEILING SPACE FOR DIGITAL

LIGHTING CONTROL SYSTEM. ALL LOW VOLTAGE

TRANSFORMERS REQUIRED FOR DIGITAL LIGHTING CONTROL

SYSTEM TO BE PROVIDED AND INSTALLED.

6. ELECTRICAL CONTRACTOR TO CO-ORDINATE WITH GC FOR

THE SUPPLY AND INSTALLATION OF CEILING TILES IN PLACE

WHERE THE LIGHTING FIXTURES ARE REMOVED. GC TO ALLOW

FOR PROVIDING ACOUSTIC CEILING TILES AS REQUIRED.

ACCEPTABLE ACOUSTIC CEILING TILE IS ARMSTRONG FINE

FISSURED "SQ LAY IN FIRMGUARD HUMIGUARD PLUS BP 1830"

NO ALTERNATE ALLOWED.

7. CONTRACTOR TO ALLOW FOR SCISSOR LIFT OR ANY OTHER

APPLICABLE LIFT TO WORK AT THE FIXTURE AT HIGHER

ELEVATIONS. ELECTRICIANS WORKING AT HEIGHT TO BE

CERTIFIED "WORKING AT HEIGHTS" AND TO HAVE ALL THE

APPROVED EQUIPMENT.

ELECTRICAL CONTRACTOR TO ALLOW FOR BUILDING OF

RAMPS ETC IN ORDER TO BRING THE POWER LIFT ETC INSIDE

THE SCHOOL PREMISES. NO EXTRA WILL BE ENTERTAINED FOR

TEMPORARY RAMPS THAT MAY REQUIRED TO BRING HEAVY

LIFT EQUIPMENT.

8. ELECTRICAL CONTRACTOR TO ALLOW FOR REPLACING THE

EXISTING BULB WITH LED BULB SUITABLE TO FIT IN EXISTING

FIXTURE.

9. ELECTRICAL CONTRACTOR TO ALLOW FOR DISCONNECTING

THE OLD FIXTURE AND CONNECT THE NEW LIGHTING FIXTURE

WITH EXISTING CIRCUIT AND SWITCH.

10. ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL PLEXI

GLASS COVER WITH LOCK & KEY TO PROTECT THE DIGITAL

SWITCH FROM DAMAGE.

11. GROUP A TO BE THE FIRST ROW PARALLEL TO THE WHITE

BOARD IN ALL ROOMS WITH WHITE BOARDS.

12. CONTRACTOR TO PROVIDE AND INSTALL RED STICKER 1/2" DIA.

ON THE T-FRAME TO IDENTIFY THE EMERGENCY LIGHITNS.

ALSO PROVIDE AND INSTALL 1" DIA. RED STICKER ONTHE TOP

OF THE FIXTURE.

13. IDENTIFY THE CIRCUITS FEEDING PANEL AND PROVIDE NEW

LABELS FOR CIRCUITS.

14. PROVIDE AND INSTALL LAMACOID (1/2"X6") TO IDENTIFY THE

CONTROLLERS INSTALLED.

15. OCCUPANCY SENSORS IN GYM AND WORKSHOPS TO COME

WITH WIRE GUARDS.

16. ELECTRICAL CONTRACTOR TO INSTALL LIGHTING

CONTROLLER RELAYS ETC. FOR THE NEW LIGHTING FIXTURES

OF THE GYM IN THE CEILING SPACE OF THE STORAGE ROOM

AS SHOWN ON THE FLOOR PLAN.

17. CONTRACTOR TO RELOCATE EXISTING CEILING TILES WITH

SECURITY MOTION SENSORS IN ORDER TO INSTALL

PROPOSED LIGHTING FIXTURES.

18. EXISTING LIGHTING CONTROLS SHALL BE DISCONNECTED.

CUTTING, PATCHING AND PAINTING BY GC

16. CUTTING AND PATCHING OF THE DRYWALL BY THE GC IS

INCLUDED IN THE SCOPE OF WORK. GC TO CAREFULLY

EXAMINE ALL THE LIGHTING FLOOR PLAN TO ALLOW FOR

COMPLETE CUTTING PATCHING AND PAINTING WORK. FOR THE

LIGHTING RETROFIT SCOPE .

FIRE RATED COVER FOR NEW LIGHTING FIXTURE:

1. CONTRACTOR TO PROVIDE AND INSTALL 1 HOUR FIRE RATED

COVER ON ALL NEW NEW PROPOSED LIGHTING FIXTURES.

2. FIRE RATED COVERS FOR THE PROPOSED NEW LIGHTING

FIXTURES SHALL BE FROM TENMAT MODEL 'FF 130 - 2' X 2' FF

130 - 2' X 4' 1 HOUR FIRE RATED TROFFER COVERS'.

3. ALL NEW DOWNLIGHTS & NEW 1' X 4' LIGHTING FIXTURES TO

HAVE 1 HOUR FIRE RATED ENCLOSURES FROM TENMAT OR 1

HOUR FIRE RATED DRYWALL ENCLOSURE BUILT UP ON SITE BY

THE CONTRACTOR.

4. APPROVED EQUALS ARE ACCEPTABLE AS LONG AS THE FIRE

RATED COVERS ARE RATED FOR 1 HOUR AND ULC LISTED.

PROJECT NO: DRAWING NO:

ASSOCIATES

Project ManagersEngineers

(905) 666-5256(905) 666-5252Tel:

Fax:

Suite 201

e-mail:

Architects

[email protected]

BARRY BRYAN

Whitby, OntarioDATE:

FILE:

SCALE:

CHECKED BY:

DRAWN BY:

DESIGN BY:

BY

PROJECT:

DRAWING:

NO. REVISIONS DATE

BY

ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THECOPYRIGHT PROPERTY OF THE CONSULTANT AND MUST BE RETURNEDUPON REQUEST. REPRODUCTION OF DRAWINGS IN PART OR WHOLE

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNTIL SIGNEDAND SEALED BY THE CONSULTANT.

NO.

CHECK AND VERIFY ALL DIMENSIONS AT THE SITE.

WITHOUT THE PERMISSION OF THE CONSULTANT IS FORBIDDEN.

ISSUES DATE

250 Water Street

L1N 0G5

2359 Royal Windsor Drive, Suite 201 Mississauga, ON L5J 4S9

PHONE: (905)829-3010

www.regal-eng.com

RCEI

REGAL CONSULTING ENGINEERS INC.

CONSULTING MECHANICAL & ELECTRICAL ENGINEER S

LED RETROFIT FOR

ST. MARIA GORETTI E.S.

121 ROYAL ORCHARD DRIVE

BRAMPTON, ONTARIO

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

MB

MB

MA

February 19, 2019

2019-290-2 E3.0-A-1

PROPOSED LIGHTING

FIRST FLOOR PLAN

1:100

Page 8: QUESTIONS & ANSWERS T-2020-16 LED Retrofit - Group 1 (7 ... · new led lighting design. 5.electrical contractor shall carefully remove the existing lighting fixtures without disturbing

NOTES:

1. RE-UTILIZE EXISTING LIGHTING CIRCUITS UNLESS NOTED

OTHERWISE. ELECTRICAL CONTRACTOR TO VERIFY CAPACITY

OF EXISTING LIGHTING CIRCUIT PRIOR TO INSTALLATION.

2. PROVIDE NEW SWITCHING LEGS AS INDICATED.

3. OFF-DELAY TIME OF OCCUPANCY SENSORS TO BE THIRTY

MINUTES.

4. OCCUPANCY SENSORS TO BE DUAL TECHNOLOGY PIR AND

ULTRASONIC TYPE. ACCEPTABLE MANUFACTURER'S

WATTSTOPPER, ACUITY AND LUTRON

5. ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

20A BREAKER IN EXISTING ELECTRICAL PANEL AS SHOWN.

EXTEND POWER INTO THE CEILING SPACE FOR DIGITAL

LIGHTING CONTROL SYSTEM. ALL LOW VOLTAGE

TRANSFORMERS REQUIRED FOR DIGITAL LIGHTING CONTROL

SYSTEM TO BE PROVIDED AND INSTALLED.

6. ELECTRICAL CONTRACTOR TO CO-ORDINATE WITH GC FOR

THE SUPPLY AND INSTALLATION OF CEILING TILES IN PLACE

WHERE THE LIGHTING FIXTURES ARE REMOVED. GC TO ALLOW

FOR PROVIDING ACOUSTIC CEILING TILES AS REQUIRED.

ACCEPTABLE ACOUSTIC CEILING TILE IS ARMSTRONG FINE

FISSURED "SQ LAY IN FIRMGUARD HUMIGUARD PLUS BP 1830"

NO ALTERNATE ALLOWED.

7. CONTRACTOR TO ALLOW FOR SCISSOR LIFT OR ANY OTHER

APPLICABLE LIFT TO WORK AT THE FIXTURE AT HIGHER

ELEVATIONS. ELECTRICIANS WORKING AT HEIGHT TO BE

CERTIFIED "WORKING AT HEIGHTS" AND TO HAVE ALL THE

APPROVED EQUIPMENT.

ELECTRICAL CONTRACTOR TO ALLOW FOR BUILDING OF

RAMPS ETC IN ORDER TO BRING THE POWER LIFT ETC INSIDE

THE SCHOOL PREMISES. NO EXTRA WILL BE ENTERTAINED FOR

TEMPORARY RAMPS THAT MAY REQUIRED TO BRING HEAVY

LIFT EQUIPMENT.

8. ELECTRICAL CONTRACTOR TO ALLOW FOR REPLACING THE

EXISTING BULB WITH LED BULB SUITABLE TO FIT IN EXISTING

FIXTURE.

9. ELECTRICAL CONTRACTOR TO ALLOW FOR DISCONNECTING

THE OLD FIXTURE AND CONNECT THE NEW LIGHTING FIXTURE

WITH EXISTING CIRCUIT AND SWITCH.

10. ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL PLEXI

GLASS COVER WITH LOCK & KEY TO PROTECT THE DIGITAL

SWITCH FROM DAMAGE.

11. GROUP A TO BE THE FIRST ROW PARALLEL TO THE WHITE

BOARD IN ALL ROOMS WITH WHITE BOARDS.

12. CONTRACTOR TO PROVIDE AND INSTALL RED STICKER 1/2" DIA.

ON THE T-FRAME TO IDENTIFY THE EMERGENCY LIGHITNS.

ALSO PROVIDE AND INSTALL 1" DIA. RED STICKER ONTHE TOP

OF THE FIXTURE.

13. IDENTIFY THE CIRCUITS FEEDING PANEL AND PROVIDE NEW

LABELS FOR CIRCUITS.

14. PROVIDE AND INSTALL LAMACOID (1/2"X6") TO IDENTIFY THE

CONTROLLERS INSTALLED.

15. OCCUPANCY SENSORS IN GYM AND WORKSHOPS TO COME

WITH WIRE GUARDS.

16. ELECTRICAL CONTRACTOR TO INSTALL LIGHTING

CONTROLLER RELAYS ETC. FOR THE NEW LIGHTING FIXTURES

OF THE GYM IN THE CEILING SPACE OF THE STORAGE ROOM

AS SHOWN ON THE FLOOR PLAN.

17. CONTRACTOR TO RELOCATE EXISTING CEILING TILES WITH

SECURITY MOTION SENSORS IN ORDER TO INSTALL

PROPOSED LIGHTING FIXTURES.

18. EXISTING LIGHTING CONTROLS SHALL BE DISCONNECTED.

CUTTING, PATCHING AND PAINTING BY GC

16. CUTTING AND PATCHING OF THE DRYWALL BY THE GC IS

INCLUDED IN THE SCOPE OF WORK. GC TO CAREFULLY

EXAMINE ALL THE LIGHTING FLOOR PLAN TO ALLOW FOR

COMPLETE CUTTING PATCHING AND PAINTING WORK. FOR THE

LIGHTING RETROFIT SCOPE .

FIRE RATED COVER FOR NEW LIGHTING FIXTURE:

1. CONTRACTOR TO PROVIDE AND INSTALL 1 HOUR FIRE RATED

COVER ON ALL NEW NEW PROPOSED LIGHTING FIXTURES.

2. FIRE RATED COVERS FOR THE PROPOSED NEW LIGHTING

FIXTURES SHALL BE FROM TENMAT MODEL 'FF 130 - 2' X 2' FF

130 - 2' X 4' 1 HOUR FIRE RATED TROFFER COVERS'.

3. ALL NEW DOWNLIGHTS & NEW 1' X 4' LIGHTING FIXTURES TO

HAVE 1 HOUR FIRE RATED ENCLOSURES FROM TENMAT OR 1

HOUR FIRE RATED DRYWALL ENCLOSURE BUILT UP ON SITE BY

THE CONTRACTOR.

4. APPROVED EQUALS ARE ACCEPTABLE AS LONG AS THE FIRE

RATED COVERS ARE RATED FOR 1 HOUR AND ULC LISTED.

$

L

V

5

$

LV

2

$

LV2

$

LV

2

$

L

V

5

$

L

V

5

$

L

V

5

$

L

V

5

$

LV

2

$

LV

2

$

L

V

5

$

L

V

5

$

L

V

5

$

$

L

V

2

PROJECT NO: DRAWING NO:

ASSOCIATES

Project ManagersEngineers

(905) 666-5256(905) 666-5252Tel:

Fax:

Suite 201

e-mail:

Architects

[email protected]

BARRY BRYAN

Whitby, OntarioDATE:

FILE:

SCALE:

CHECKED BY:

DRAWN BY:

DESIGN BY:

BY

PROJECT:

DRAWING:

NO. REVISIONS DATE

BY

ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THECOPYRIGHT PROPERTY OF THE CONSULTANT AND MUST BE RETURNEDUPON REQUEST. REPRODUCTION OF DRAWINGS IN PART OR WHOLE

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNTIL SIGNEDAND SEALED BY THE CONSULTANT.

NO.

CHECK AND VERIFY ALL DIMENSIONS AT THE SITE.

WITHOUT THE PERMISSION OF THE CONSULTANT IS FORBIDDEN.

ISSUES DATE

250 Water Street

L1N 0G5

2359 Royal Windsor Drive, Suite 201 Mississauga, ON L5J 4S9

PHONE: (905)829-3010

www.regal-eng.com

RCEI

REGAL CONSULTING ENGINEERS INC.

CONSULTING MECHANICAL & ELECTRICAL ENGINEER S

LED RETROFIT FOR

ST. MARIA GORETTI E.S.

121 ROYAL ORCHARD DRIVE

BRAMPTON, ONTARIO

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

MB

MB

MA

February 19, 2019

2019-290-2 E3.1-A-1

PROPOSED LIGHTING

SECOND FLOOR PLAN

1:100


Recommended