Renewable Energy in Kentucky KENYA STUMP, KENTUCKY ENERGY OFFICE 1
Transcript
Page 1: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

Renewable Energy in KentuckyKENYA  STUMP,  KENTUCKY  ENERGY  OFFICE

1

Page 2: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States
Page 3: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States
Page 4: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

Renewable Energy CertificatesThe environmental attribute of 1 MWh of renewable electricity.

RECs can be separated from the underlying and traded.

RECs allow access to renewable projects where they are cost effective.

RECs are an accepted legal instrument.

Utilities in Kentucky offer REC standard programs ( green energy programs). 

Utilities can enter into REC purchasing agreements for customers

4

Page 5: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

Renewable Energy Fast FactsIn 2016, half of all new hydroelectricity generating capacity brought into service in the United States was located in Kentucky.

The largest source of renewable energy in Kentucky is hydroelectric power, which provides more than 4% of the state's electricity generation.

Biomass accounts for 0.4% of the state's net generation from renewables.

Kentucky has moderate solar potential. 

Solar facilities are by far the largest component of distributed generation in Kentucky.

Utility scale solar is growing with almost all regulated utilities building solar projects. 

Page 6: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States
Page 7: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States
Page 8: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States
Page 9: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States
Page 10: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

3141,152

1,967

155

3,640

9,478

Cumulative Distributed Renewable Interconnections (kW)

Big Rivers Duke EKPC KP LGEKU TVA

Page 11: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

Biomass, 999Hydro, 50

Solar, 15,604

Wind, 52

2016 Cumulative Distributed Renewable Interconnections (kW)

Page 12: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

https://www.lazard.com/media/438038/levelized‐cost‐of‐energy‐v100.pdf

Page 13: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States
Page 14: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States
Page 15: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States
Page 16: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

U.S. Residential Solar Economic Outlook 2016‐2020: Grid Parity, Rate Design and Net Metering Risk

Page 17: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

Distributed Solar Types

Page 18: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

Meter

Excess electricity sent to the grid receives a kilowatt  hour credit on the homeowner’s electricity bill.  

Net Metering (Up to 30 kW)

18

Page 19: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

Meter

Excess electricity sent to the grid is purchased by the utility. The customer receives a monetary “check” for excess production. 

Qualifying Facilities (30 kW < 80MW under PURPA*

Public Utility Regulatory Policies Act (PURPA) of 1978

19

Page 20: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

Meter

All electricity produced is bought by the utility. The customer’s energy usage at their home or business is not offset by the power they produce. 

Meter

Qualifying Facilities (30 kW < 80MW under PURPA*

20

Page 21: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

Load Reduction (No Export)

Generation serves to offset load.

Meter

No excess electricity is sent to the electrical grid.

21

Page 22: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

Grid Isolation\Off‐Grid 

Excess electricity is stored. There is no connection to the electrical grid. 

May 11, 2017 22

Page 23: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

Shared Solar Options

23

Page 24: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

Evaluating SolarDoes solar make sense for your location? PV Watts Calculator

What do you want to achieve with your solar installation?

Ask for references from your installer and work history

Look for a NABCEP solar installer and licensed electrician

Check the Better Business Bureau

Does your installer have appropriate business insurance ( general liability, worker’s compensation, etc.)?

Do they have any safety or health (OSHA) violations? Have they received the proper OSHA training?

Is the installer financially solvent? 

System warranties, etc.?

Best Practices in PV System Installation. Version 1.0 March 2015, NREL’s Solar Access to Public Capital Working Group

Page 25: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States
Page 26: Renewable Energy in Kentucky - Henderson County · Renewable Energy Fast Facts In 2016, half of all new hydroelectricity generating capacity brought into service in the United States

ResourcesPV Watts Calculator

North American Board of Certified Energy Practitioners http://www.nabcep.org/

Best Practices in PV System Installation https://www.nrel.gov/docs/fy15osti/63234.pdf

Current Electric Tariffs https://psc.ky.gov/Home/Library?type=Tariffs&folder=Electric

DOE’s Homeowner’s Guide to Going Solar https://energy.gov/eere/sunshot/homeowner‐s‐guide‐going‐solar

NREL’s Consumer Guide https://www.nrel.gov/docs/fy04osti/35297.pdf

DSIRE State Incentives Database http://www.dsireusa.org

Kentucky Energy Profile http://energy.ky.gov/Pages/Profile.aspx

USDA REAP Program https://www.rd.usda.gov/programs‐services/rural‐energy‐america‐program‐renewable‐energy‐systems‐energy‐efficiency