December 10, 1981
The President and DirectorsWhite Star Copper Mines LimitedSuite 15004 King Street, WestTORONTO, Ontario.M5H 1B6
RECEIVEDDf C 311981
MINING IAN0S SECTION
REPORT - Geophysical Exploration Programme and Follow-Up Diamond Drilling Programme Tully Township Property
.' . Porcupine Mining. Division,. Ontario..
During the months of March and April, 1981, an Electromagnetic Survey was carried out on your Tully Township property located in the Porcupine Mining Division of Ontario,
This programme was subsequently followed up by an approximate 1,365 foot Diamond Drilling programme consisting of four drill holes to test four separate conductors.
Summary of Results of the Exploration' Programme
The Electromagnetic Survey revealed several conductors of possible importance, the conductors representing zones of poor to moderate conductivity and are similar to the response expec ted over zones carrying in the neighbourhood of 57e - 107e sul phides.
In general, the conductors are similar in nature to the gold bearing conductors existing on the Texmont property located immediately to the south-west of this property.
Four drill holes were drilled, one in each of conductors A, B, C and D. All conductors intersected sulphide mineralization as expected. However, detailed sampling and assaying revealed either nil or very minor amounts of gold. No base metals of any apparent significance were present in any of the zones tested. Several other minor conductors exist on the property particularly on the north portion of claim number 501065. These zones were not tested by diamond drilling.
- 2 -
Terms of Reference
This survey was carried out by agreement with White Star Copper Mines Limited.
The area surveyed covered the complete area of the twelve claim group known as claim numbers 501055 to 501065 inclusive and in addition, claim number 515807. The survey was carried out on north-south lines spaced 400 feet apart with a control base line established approximately in the centre of'the claim group. The survey was carried out under the direct field supervision of Mr. Philippe Roby of Senneterre, Quebec and Mr. Paul Perrault of Senneterre, Quebec. .
The total mileage surveyed was approximately 13 line miles and the total mileage line cut was approximately 14 line miles.
The drilling was carried out by Mr. Arthur Dungee of Thunder Bay, Ontario, utilizing AQ wireline equipment and consisted of four holes indicated as D.D.H. l to D.D.H. 4 inclusive. All holes were drilled at 45 angles.
All core was logged by Dr. H.D. Carlson, Consulting Geologist, of Timmins, Ontario.
The direct field supervision of the drilling was done by Mr. Philippe Roby of Senneterre, Quebec. The total footage drilled was l,365 feet.
All assaying was carried out by Swastika Laboratories of Swastika, Ontario.
Methods Used and Presentation bf Results
E lee tromagnetic Survey
The Electromagnetic Survey employed the Sheridan-Kelk Dual Frequency Magniphase Electromagnetic Instrument operated in the horizontal coil configuration with a transmitter-receiver separation of 200 feet. In general, readings of amplitude and phase of the resultant field at the high frequency (2400 cps) were recorded at station intervals of 100 feet.
The results of the survey, as plotted on the accompanying map, show only the profile of the high frequency phase.
In general, in areas considered of interest, the station interval was reduced to 50 feet,
Discussion of Results
The main feature revealed by the survey is a series of con ductors located in the south-west portion of the property. These conductors have been labeled conductors A, B, C and D, These conductors represent zones of sulphide mineralization of poor to moderate conductivity. The responses obtained over these zones are similar to responses which would be ob tained over zones bearing 57o - 157* sulphides over widths of 10 feet - 30 feet. All of these conductors were drilled and significant sulphide mineralization was cut in all drill holes.
Several conductors were indicated which were not tested by diamond drilling. These conductors may warrant further exploration as areal exploration developments in the areaunfold.
In the immediate area of this property and particularly on the Texmont property located immediately to the south-west of this property, some zones similar in nature to the ones tested have been shown to be gold bearing in commercial quantities.
Unfortunately, in the area tested by diamond drilling, no significate values were obtained associated with the sulphides.
Conclusions and Recommendations
It must be concluded that the programme executed has success fully delineated certain areas of sulphide mineralization and that the four conductive zones indicated, namely conductors A, B, C and D and investigated by diamond drilling have been initially determined riot to be gold bearing in sulphides.
The property should be maintained in good standing for as long as possible pending further developments in the area.
All of which is respectfully submitted.
J.P. Sheridan, P.Eng,
JPS/jlm
SWASTIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1 TO
TELEPHONE: (705) 642-3244 ANALYTICAL CHEMISTS* ASSAYERS* CONSULTANTS
Qfcrttffrate nf Atralpia
52040Certificate No.,_ ^-^
Received July 31, 1981
Date: August 7, 1981
Samples of Split Core
Submitted by White Star Copper Mines Limited, Toronto
SAMPLE NO
202203204205206207
GOLD Oz/ton
0.005
Nil
N11
Nil
N11
N11
RECEIVEDutU3l198l
MINING LANDS SECTION
G. Lebel, Mana
ESTABLISHED 1 928
SWASTIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO
TELEPHONE: (705) 642-3244 ANALYTICAL CHEMISTS * ASSAYERS * CONSULTANTS
(ferttfinifc of
Certificate No. Date; July 27 1981
Received Jul 16 1&1 6 Samples of splj.t cgye ,
Submitted by WVn t.p St.ar* flopper Mines Lifliifred, Tpronfab,
SAMPLE NO.
130139140141142143144145146147148149150151152153154'155156157158159160161162163164165166167168169
GOLDOz./ton
NILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNILNIL
SAMPLE NO.
170171172173174175176177178179180181182183184185 "186187188189190191192193194195196197198199200201
GOLDOz./ton
NILNILNILNILNILNILNILNILNILNIL0.01NILNILNILNIL
. NILNIL NIL0.002NILNILNILNILNILNILNILNILNILNILNILNILNIL
G . Lebel , ManagerESTABLISHED 1 928
SWASTIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK1TO
TELEPHONE: (705)642-3244 ANALYTICAL CHEMISTS * ASSAYERS * CONSULTANTS
(fcrttRnrt* of Analgala
Certificate No. 51&35 Date: July 17. 1951
Received July 3 , 19&L 10
Submitted bv White Star Copper.
SAMPLE
12S
129
130
131
132
133
134
135
136
137
Samples of split core
Toronto, Ontario
Att: J. P, Sheridan
NO. GOLD Oz./ton
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
rrr
Per.G. Lebel, Manage
ESTABLISHED 1928
Property. Location._
Latitude._..-^- Departure__-o Bearing..._...S.cr
DIAMOND DRILL RECORDDip
Hole l
Elev. Collar....... __.....Datum.___.......- .....
Sheet No_ .
Total Footage....
Date Completed..-.......jnr"Afevj.--'9rDrilledby... Logged by.-
FootageFrom To
Formation Sample Number
Sample Footage
Sample Width
Gold Sample
Gold Sludge Remarks
- -3 A-C,
; jf/yyy; /a?-; tp?\l ' " S '~ f '
•̂t
7
fcdi 3tf ^ 1
Date of Examination..
Property Location..
DIAMOND DRILL RECORDDip
Hole l Sheet No_
Departure.Total Footage.......
Elev. Collar .....^Datum.___... Date Started.......Date Completed Drilled by.—— Logged by.M
Date of Examination...
r .i
Property. Location......
DIAMOND DRILL RECORDDip
Hole Sheet NOI...
Elev. Collar.. Datum. Date Started.
Total Footage.___..
Drilled Logged
FootageFrom To
Formation Sample Number
Sample Footage
Sample Width
Gold Sample
Gold Sludge
Remarks
^1^ ^ . i^, n———M.-/j___ ___ iJ^.ttJcMjJll* .SAAXlsJubMJ(f (AMfiLe. / C - r y Ml\
/w A AA ^
±fis^A t/T, r 40il
V
ftV.- -r? '
i-H/Jt rL^ ftiU
73; -7^^
jfi iVJL "/v /S7s'
J&ftJwLj
^' 4M.rs^ 7f -
Date of Examination....
property ...W7^.i..!t]e-...,^S-t-.ar..DIAMOND DRILL RECORD
Dip
Hole Sheet No.~ lv.BR-
Location.-..^,......L.L P-
Latitude.__V—^t—^-O—-1^ Departure.....^..^^^!....^. Bearing__.^.x^
Elev. Collar_^... Datum.___.._.._ Date Started.........Date Completed Drilled by.™- Logged by...-
Total Footage_____.
Date of Examination-..
.y-Property.....W..O.y.6.e. Location__*.
DIAMOND DRILL RECORDDip
No.
lLatitude.DepartureBearing.
Elev. Collar..........__............Datum....__........._............Date Started....._.Hju-J^.Date Completed.......-.~3Iv-fjCDrilled by....Logged by.-™
Total Footage-
FootageFrom To
Formation Sample Number
Sample Footage
Sample Width
Gold Sample
Gold Sludge Remarks
.SI
- ~ 7?-
/, P5 '.
[^VufSx./^ r'*7
5. 5*.
frUAN.Ml yl^L/k - setea;
-70,7 -
JL2* AL" * ~~
4-'
Date of Examination..
Property.. Locatioa...
' -J— C~ -r~/..Ce.........^.^:^DIAMOND DRILL RECORD
Dip
Hole NoJk^lSLjsZ-JLj t No__/Lit-
7~
Latitude... Departure Bearing...
__ft..
Elev. Collar.. Datum...—~
Drilled by.__.—
Total Footage_____.
Date of Examination ,,
Property..
DIAMOND DRILL RECORDDip
Hole!
Departure _ S-.Jc
Elev. Collar. Datum.___. Date Started... Date Complete Drilled by. Logged by.,
Total Footage.__
Sheet No^
FootageFrom To
Formation Sample Number
Sample Footage
Sample Width
Gold Sample
Gold Sludge Remarks
L/flA
o . , 35,5'- .^ f \ . .Ut J i S oyffSrf A . y /f ALm iJLAJ\ I** ̂ ^7^ ̂ ~
Date of Examination.___
P"
W/820I98I
DIAMOND DRILL RECORD ..- /Hole No. .'.r..Z-? Sheet
Property., Location._
DipBev. Collar..........Datum.___.....
Drilled by.. Logged by..
Total Footage.___
Date of Examination..
Property..* Location...
Departure.__\j
DIAMOND DRILL RECORDDip
Hole No'•-±-Jt
Sheet No.....
l
Etev. Collar... Datum.
Total Footage..
DateDrilled by Logged by..
FootageFrom To
Formation
7^ t J/, 5 .
Sample Number
Sample Footage
Sample Width
Gold Sample
Gold Sludge Remarks
33775"
^fc;?g5- '/^jft'f/o f/-S21.
Sr^ ICT̂Li6|t^
Date of Examinati
5 ga
Ontario
Ministry of Natural Resources
GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT
FUc.
TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORT . FACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT
TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.
Type of Survey(s) Horizon t" a l doll ElectrmnflpnpfHf Survey Township or Area Tully TnwnsMp———————-..—————-—-
ouiJ^ 5K J5..i -r* aU um tt
w go Js g
Claim Hnlder(s) WMf-p Star flnpppr M-inpg
Recorded in name nf .T T P , P.F.ngSurvey fVimpany WfoifrA Star flnpppr M-inpg T.•^Tn^^Af^ Author of Report -T, P, gV>oy^^^fln > P , Fng^^^^^.^ Address of Author—A-Kiag Covering Dates of Survey March
(linecuttirig to Total Miles of Line fiiit 14 m i 1 A.Q
Ap 1*"1 T Ttirig to office)
QS1
SPECIAL PROVISIONSCREDITS REQUESTED
ENTER 40 days (includes line cutting) for first survey.ENTER 20 days for each additional survey using same grid.
Geophysical —Electromagnetic-
—Radiometric-n^-r
GrorhTniral,,,..,,...
DAYSper claim
40
AIRBORNE CREDITS (Special provision credit* do not apply to airborne lurveyi)
Magnetometer. .Electromagnetic. .R metnc(enter dayi per claim)
HATE. Dec. 10. 198W.MATHP*.Author of
Res. Geol.. .QualificationsPrevious Surveys
File No. Type Date Claim Holder
MINING CLAIMS TRAVERSED List numerically
501055(number)
.5.0.10.56.......501057
T P
501058
501059t
501060(••••••tt**t****t
501061
I1 j
501064t*i*i***t*f**'***
,,,.,,..?,,,...,..,........,J5.3,5.6Q.7,
TOTAL CLAIMS. 12
83 T te/vg'l
GEOPHYSICAL TECHNICAL DATA•^
GROUND SURVgYS — If more than one survey, specify data for each type of survey
Number nfrfctaH/^ 780 approximately_____Number of Readings 780 approximatelyo ?' - ,-Tnn f r- 5 0 ff" for areas r- - Aon Station mtervalfc&QO ft. - Considered of intei-ell*6sPacm8 4UUProfSe sraie. Oti^ inch - 100 units - 307a_______________.
zoN
32Q a oa
interval U n/a
Instrument —-^^^————— Accuracy — Scale constant.
,. Diurnal correction method.Base Station check-in interval (hours). Base Station location and value —-^—
ELECTROMAGNETKCoil configurator Coil separationArrnrary
Method:Frequency
i Horizontal200 ft.
1 Unit f * l/ ^ r,f 1
CD Fixed transmitter 2400 CPS
Parameters measured Profile Of high
- -
L!l )D Shoot back ffi In line
(specify V.L.F. station)frequency phase plotted.
CD Parallel line
Instrument.Scale constantCorrections made.
O Base station value and location .
Elevation accuracy.
Instrument —-——-Method D Time Domain CD Frequency Domain Parameters - On time __________________________ Frequency —————
-Off time__________________________ Range ———————— Delay time ————————————————————————— Integration time.
Power.array.
Electrode spacing, Type of electrode
l 5TH FLOOR 4 KING ST. WEST, TORONTO
on o/ i/y. f^. ^Jfiendan, P . ENG.
MINING GEOPHYSICIST
December 16, 1981
Ministry of Natural Resources Officer of the Mining Recorder 99 Wellesley Street, West Room 1522 - 1st Floor QUEENS PARK TORONTO, Ontario.
Attn: Mr. Matthews
Dear Mr. Matthews:
Re: Electromagnetic SurveyWhite Star Mines Limited
Please find enclosed herewith two copies of a report on an Electromagnetic Survey for White Star Copper Mines Limited together with a Geophysical- Geological-Geochemical Technical Data Statement, filed in duplicate.
Kindly record the assessment work carried out on these claims.
Yours very truly,
P. Spriel (Miss)
/smk
e 2 01 042.4456
Mining Recorder's Office Ministry of Natural Resources 60 Wilson Avenue, Tirarains, Ontario PAN 2S7
DeB* Sir;
We have received reports and maps for a Geophysical (Electromagnetic) survey submitted under Special Provisions (credit for Performance and Coverage) on mining claims P 501055 dfe al in the Township of Tully.
This material will be examined and assessed and a. statement of assessment work credits will be issued.
Yours very truly
E.F. AnderdonDirectorLand Management Branch
Whitney Block, Roora 6450 Queen's Park Toronto, OntarioM7A 1W3Phone 416/905-1380
J. Skura
cc: White Star Copper Mines Limited Toronto, Ontario
Ministry of Natural Resources
Ontario AM
Report of Work '(Geophysical, Geological, Geochemical and Expenditures)
f-l Instructions: - Please type or print.
— If number of mining claims traversed exceeds space on this form, attach a list.
^ Note: — Only days credits calculated in the J tijj4f/ " Expenditures" section may be entered
**s T TS?W in the "Expend. Days Cr." columns. The Mining Act____ * M ^Si - Do not use shaded areas below.
Type of Survey(s)
HORIZONTAL COIL ELECTROMAGNETIC SURVEY' "" " ^s) ' WHITE ""STAR "COPPER MINES LIMITED
RECORDED IN THE NAME OF.. J . P. SHERIDAN. P. ENGSurvey Company ' ~
--I-ihit e—f!taii. Gopp e r Min e s j A im i t e dName and Address of Author (of Geo-Technical report)
Township or Area
TULLY
Survey Dates (llnecutting to office)
Prospector's Licence No.
M15350Total Miles of line Cut
14
J.P. SHERIDAN, P, ENG., SUITE 1500, 4 KING ST. W., TORONTO, ONTARIO. M5H IBf
Special Provisions Credits Requestedinstructions
For first survey:
Enter 40 days. (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Days per Claim
40
Vlan DaysInstructions
Complete reverse side and enter total (s) here
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Days per Claim
Airborne Credits
Note: Special provisionscredits do not apply to Airborne Surveys.
Electromagnetic
Magnetometer
Radiometric
Days per Claim
Expenditures (excludes power stripping)Type of Work Performed
Performed on Claim(s)
Calculation of Expenditure Days Credits
Total ExpendituresTotal
Days Credits
SInstructions
Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.
Report Completed,Date of Report
i Dec. 10, 198:Recorded Holder or Agent (Signature)
Certification Verifying Report of Work
Mining Claims Traversed (List in ngrnerical $equence)
Total number of mining claims covered by th
or witnessed same during and/or after its completion and the annexed report is true..Name and Postal Address of Person Certifying
SUITE 1500. 4 KING ST. WEST. TORONTO, ONTARIO
M5H 1B6Date Certified - ,Dec. 10, 1981
Certified by (Signature)
1362 (81/2)
Ministryof GeotechnicalRe'sources R ePort
Ontario ^ Approval
File
Mining Lands Comments
fb: Geophysics .
Comments
[^Approved Q Wish to tea again with correctionsDate
30Signa
To: Geology - Expenditures
Comments
[~| Approved [~] Wish to see again with correctionsData Signature
DTo: Geochemistry
Comments
f~l Approved f~| Wish to see again with correctionsDate Signature
j j To: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)
1693 (81/10)
NOTES
400' surface rights reservation along the shores of all lakes and rivers.
DATE OF ISSUE
DEC - C 1882
Ministry of Nalural ResourcesTORONTO
42A14SE81M 2,4456 TULLY
lO
crLU CO O5o(TQ.
DUFF Tp- M.466
522435,522436
- - - 4 - - p i p522434.522433
GOWAN Tp. M.285
in ro to
Q.I-
LJJ
I-
LEGEND
HIGHWAY AND ROUTE No
OTHER ROADS
TRAILS
SURVEYED LINES:TOWNSHIPS, BASE LINES, ETC. LOTS. MINING CLAIMS, PARCELS, ETC.
UNSURVEYED LINES: LOT LINES PARCEL BOUNDARY MINING CLAIMS ETC
RAILWAY AND RIGHT OF WAY
UTILITY LINES
NON-PERENNIAL STREAM
FLOODING OR FLOODING RIGHTS
SUBDIVISION
ORIGINAL SHORELINE
MARSH OR MUSKEG
MINES
DISPOSITION OF CROWN LANDS
TYPE OF DOCUMENTPATENT. SURFACE A WINING RIGHTS
SURFACE RIGHTS ONLYMINING RIGHTS ONLY
LEASE SURFACE S WINING RIGHTSSURFACE RIGHTS ONLY . .WINING RIGHTS ONLY
LICENCE OF OCCUPATION CROWN LAND SALE ORDER-1N-COUNC1L . . . RESERVATION . ,. ... ... . .CANCELLED . .. . . .SAND A GRAVEL . . . . . ... . .
SYMBOL
•Qm HB
•T ..cs
©
SCALE : 1 INCH 40 CHAINSO 5OO lOOO 2OOO
O ZOO *00 6OO BOO l KM
ACRES HECTARES
TOWNSHIP
TULLYDISTRICT
COCHRANEMINING DIVISION
PORCUPINE
Ministry of Natural Resources
Ontario Surveys and Mapping BranchDate Hov , i97fl
Whitney Dlock Queen's Park, Toronto
Plan No.
M.607