RFB No. 2019-046 Addendum No. 3 00 91 13 - 1 ADDENDUM NO. 3 CITY OF WACO RIVERSIDE WATER TREATMENT PLANT HIGH SERVICE PUMP STATION IMPROVEMENTS RFB NO. 2019-046 DATE OF ADDENDUM: OCTOBER 17, 2019 BID OPENING DATE: OCTOBER 24, 2019 This Addendum forms a part of Contract and clarifies, corrects or modifies the original Request for Bids, dated September 12, 2019. Acknowledge receipt of this addendum in space provided on Bid Form. Failure to do so may subject bidder to disqualification. Questions and Clarifications 1) Sheet C105. Please clarify callouts utilizing the symbol for fencing detail A1/C114 in the area around the 54-inch suction line (north of the pump station) and the backwash meter vault (adjacent to Colcord Ave.). a) The fence callout for both of these locations is for reference when re-installing fencing after construction of the 54-inch suction line and the 24-inch backwash line. These locations do not require new fencing if the existing fencing can be re-installed to pre-construction conditions. New fencing will be required if the existing fencing is damaged. 2) Sheet C105. Please clarify the note regarding the relocation of the existing sliding pedestrian walk through gate near the existing surge valve. a) The existing sliding walk-through gate is located approximately in line with the existing surge valve hot box and shall be moved approximately 10-15 feet closer to Colcord as shown on Sheet C105. 3) Sheet C105 – Callout - Approximate Limits of Class A HMAC Pavement. A lot of the existing paving is going to be damaged beyond repair. This area is surrounding the Pump Station, Electrical Building, All Misc. Transformers, HVAC Pads, Sidewalks, etc. Will Asphalt Paving be installed in this entire area? If so, please clarify what pavement section is required. a) All utility trench cuts shall be repaired with the appropriate surface replacements as shown on detail A1/D104. Pavement damage to the area around the pump station, electrical building, etc. (approximate limits of pavement repair) shall be repaired with 8-inches of TY-A Grade 1- 2 Flexible Base per TxDOT Item 247 (with prime coat & tack coat) and 2-inches of D-GR HMAC TY-C SAC-B PG 64-22 per TxDOT Item 340. All subgrade, base, and surface course shall be properly compacted per the specifications. 4) Sheet S103. There are only two steel columns shown for the electrical building at Gridline B. Are those the only two columns in the building? a) Yes, this is a wood frame building and these are the only two columns. 5) Sheet S104, S105, S106. Is metal decking intended to go in the electrical building? It is referenced as key note 5.2. a) Metal decking is not required for the electrical building. Delete key note 5.2 on Sheet S104, S105, & S106.
Transcript
Page 1: RFB-2019-046-Addendum No. 3-Draft · 2019. 10. 17. · RFB No. 2019-046 Addendum No. 3 00 91 13 - 2 6) Can Boesch Vertical Turbine Pumps be added as an approved manufacturer of Vertical

RFB No. 2019-046 Addendum No. 3 00 91 13 - 1

ADDENDUM NO. 3

CITY OF WACO

RIVERSIDE WATER TREATMENT PLANT HIGH SERVICE PUMP STATION IMPROVEMENTS

RFB NO. 2019-046

DATE OF ADDENDUM: OCTOBER 17, 2019

BID OPENING DATE: OCTOBER 24, 2019

This Addendum forms a part of Contract and clarifies, corrects or modifies the original Request for Bids, dated September 12, 2019. Acknowledge receipt of this addendum in space provided on Bid Form. Failure to do so may subject bidder to disqualification. Questions and Clarifications

1) Sheet C105. Please clarify callouts utilizing the symbol for fencing detail A1/C114 in the area around the 54-inch suction line (north of the pump station) and the backwash meter vault (adjacent to Colcord Ave.). a) The fence callout for both of these locations is for reference when re-installing fencing after

construction of the 54-inch suction line and the 24-inch backwash line. These locations do not require new fencing if the existing fencing can be re-installed to pre-construction conditions. New fencing will be required if the existing fencing is damaged.

2) Sheet C105. Please clarify the note regarding the relocation of the existing sliding pedestrian

walk through gate near the existing surge valve. a) The existing sliding walk-through gate is located approximately in line with the existing surge

valve hot box and shall be moved approximately 10-15 feet closer to Colcord as shown on Sheet C105.

3) Sheet C105 – Callout - Approximate Limits of Class A HMAC Pavement. A lot of the existing

paving is going to be damaged beyond repair. This area is surrounding the Pump Station, Electrical Building, All Misc. Transformers, HVAC Pads, Sidewalks, etc. Will Asphalt Paving be installed in this entire area? If so, please clarify what pavement section is required. a) All utility trench cuts shall be repaired with the appropriate surface replacements as shown on

detail A1/D104. Pavement damage to the area around the pump station, electrical building, etc. (approximate limits of pavement repair) shall be repaired with 8-inches of TY-A Grade 1-2 Flexible Base per TxDOT Item 247 (with prime coat & tack coat) and 2-inches of D-GR HMAC TY-C SAC-B PG 64-22 per TxDOT Item 340. All subgrade, base, and surface course shall be properly compacted per the specifications.

4) Sheet S103. There are only two steel columns shown for the electrical building at Gridline B. Are

those the only two columns in the building? a) Yes, this is a wood frame building and these are the only two columns.

5) Sheet S104, S105, S106. Is metal decking intended to go in the electrical building? It is

referenced as key note 5.2. a) Metal decking is not required for the electrical building. Delete key note 5.2 on Sheet S104,

S105, & S106.

Page 2: RFB-2019-046-Addendum No. 3-Draft · 2019. 10. 17. · RFB No. 2019-046 Addendum No. 3 00 91 13 - 2 6) Can Boesch Vertical Turbine Pumps be added as an approved manufacturer of Vertical

RFB No. 2019-046 Addendum No. 3 00 91 13 - 2

6) Can Boesch Vertical Turbine Pumps be added as an approved manufacturer of Vertical Turbine Pumps (Section 43 23 31) for this project? a) Approved manufacturers shown within Section 43 23 31 – 2.1.A will not be changed.

7) Section 07 21 19. This section calls for Polyurethane Spray Foam Insulation, where is this to be

utilized? a) As shown on Sheet S104 key notes 7.1 & 7.2, contractor may utilize either batt insulation or

spray-foam insulation under the roof.

8) Section 09 90 00 – 1.1.C.4. This section calls for protective coatings to floor surface of chlorine building, where is this to be utilized? a) Delete this reference. There is not a chlorine building within this project.

9) Sheet E101. There is a Pad Mounted Metering Unit and a Utility Transformer each on concrete

pads. Per note # 1, it says to reference specification 26 02 10 but this specification is not included. Please clarify and provide details for these pads a) Specification 26 02 10 is included. The Oncor Appendix with details and requirements is

located after Section 26 03 90 – SCADA but before Section 26 22 31 – Electric Induction Motors. Additional electrical concrete details are included on Sheets S112 & S113. Oncor is only furnishing and installing the primary conductors, the transformer, the metering cabinet and the conductors between the transformer and the metering cabinet. The contractor is responsible for all the underground conduits, which include the 5 kV primary conduits, the 4160-volt secondary conduits, the transformer pad and the metering cabinet pad.

10) Sheet M100 & Detail A11/M108. Please clarify what is required for the 3 - 30" flexible

connections adjacent to the discharge header gallery (30” to Gholson, 30” to PP1, 30” to Hillcrest) a) These three flexible couplings shall be Victaulic Style W77 AGS (or approved equal) with

fusion bonded epoxy coating and stainless-steel bolts, nuts, and washers.

11) Sheet S102 & M100. There is a concrete slab/pad on the south side of the pump station for the surge valve piping, please provide additional detail on this slab. a) See attached revised drawings and attached new Sheet S111A for additional detail.

12) Sheet S102. Please provide a structural section view cutting through all pump cans.

a) See attached revised drawings and attached new Sheet S111B for additional detail.

13) Section 40 20 14 – C200 Steel Pipe – 2.1.E.19.a - Coating. Current specifications require Cement Mortar coatings per AWWA C205, can AWWA C210 Epoxy coatings be considered for Pump Station Piping and AWWA C222 Polyurethane coatings be considered for the Yard Piping? a) Epoxy Coating per AWWA C210 for Pump Station Piping and Polyurethane Coating per

AWWA C222 for Yard Piping are acceptable alternatives to Cement Mortar Coating per AWWA C205.

14) Section 40 20 14 – C200 Steel Pipe – 2.1.E.19.b - Lining. Current specifications require Cement

Mortar linings per AWWA C205, can AWWA C210 Epoxy linings be considered for Pump Station Piping? a) Epoxy Lining per AWWA C210 is an acceptable alternative to Cement Mortar Lining per

AWWA C205.

15) Will there be an instrumentation schedule provided with Tag names? a) No.

16) Sheet E117 & M100. Please confirm that a pressure transmitter and pressure gauge is to be

provided for each pump typical of 7? a) Yes, drawings show this correctly.

Page 3: RFB-2019-046-Addendum No. 3-Draft · 2019. 10. 17. · RFB No. 2019-046 Addendum No. 3 00 91 13 - 2 6) Can Boesch Vertical Turbine Pumps be added as an approved manufacturer of Vertical

RFB No. 2019-046 Addendum No. 3 00 91 13 - 3

17) Sheet E117 & M100. Please confirm the location of the 4 pressure transmitters shown on the

discharge header? a) Drawings show this correctly. One transmitter on 30” line to Hillcrest, one transmitter on 30”

line to PP1, one transmitter on 30” line to Gholson, one transmitter on 24” line for Backwash.

18) Sheet M113. Pressure Sustaining Valve Piping. Please confirm line size for insertion flow meter a) Drawings show this correctly. Line size through vault is 16” diameter.

19) Sheet M112 & M110. Please confirm that an insertion mag meter is to be installed.

a) Drawings show this correctly.

20) Sheet PID 1. Please confirm that flow meters for all pumps are shown correctly. a) Drawings show this correctly.

21) Sheet E123. Please confirm if float switches or electrodes are to be installed at storage tank.

a) Electrodes are to be provided.

22) For PLC panel Riverside HSPS in the Electrical building, is there an Ethernet switch specification along with panel detail of HMI? a) Provide Allen-Bradley #1783-MS10T with type SC connect.

23) Where is the GST Control Panel to be located?

a) As shown on Sheet E113, GST Control Panel is next to the PLC.

24) Is there a fiber optic specification? a) Section 26 01 30.

25) Is programming software using existing?

a) All PLC programming for the City shall be by Control Panels USA.

26) Sheet M112 – Detail H1. Please confirm the plan view dimensions of the meter vault. a) 10’-0” long by 10’-0” wide.

27) Sheet C112. Do you have further information regarding existing buried pipe? 24" new valve in the

middle of the road, 24" Venturi meters (2 ea.) very close to existing building, 30" tee removal very close to clear well and fence? a) The City of Waco has provided the below depth information based on their knowledge of the

existing piping shown on Sheet C112. Contractor will be responsible for verifying exact depth of existing piping. Existing 24-inch piping on southwest side of existing clearwell has approximately 24-

inches of cover from ground to top of pipe. Existing 24-inch piping on southeast side of existing clearwell is shallow as the top of the

existing gate valves are visible sticking up above ground. Existing 30-inch piping on north side of existing clearwell where tee (from pump) is to be

removed is approximately 5-feet deep from ground to top of pipe.

28) Sheet C112. Can the power lines above the work area be de-energized during a plant shutdown? a) The City is willing to consider working with the contractor and Oncor to accommodate de-

energizing the overhead electric lines in this area for weekend and/or after-hours work. No coordination with Oncor has been conducted to date by the City regarding the feasibility of de-energizing these lines.

29) Sheet S106. Please clarify note 9.1 regarding exterior cementer plaster wall finish.

a) Note 9.1 can be deleted and is not required.

Page 4: RFB-2019-046-Addendum No. 3-Draft · 2019. 10. 17. · RFB No. 2019-046 Addendum No. 3 00 91 13 - 2 6) Can Boesch Vertical Turbine Pumps be added as an approved manufacturer of Vertical
Page 5: RFB-2019-046-Addendum No. 3-Draft · 2019. 10. 17. · RFB No. 2019-046 Addendum No. 3 00 91 13 - 2 6) Can Boesch Vertical Turbine Pumps be added as an approved manufacturer of Vertical

RIVERSIDE WTPHIGH SERVICE PUMP STATION

IMPROVEMENTS

REV. DESCRIPTION DATE

1 2 3 4 5 6 7 8 9 10 11 12 13 14

A

B

C

D

E

F

G

H

I

J

K

L

1 2 3 4 5 6 7 8 9 10 11 12 13 14

DRAWING NO.

KDSPM

JFWTFG, ARC

JFWCHECKED

DRAFTED

DESIGNED

CITY OF WACO

G:\PRO

JECTS\1-02114\2 D

ESIG

N\2.0 CAD

\5 RIVERSID

E PS\1-02114 SH

EET IN

DEX.D

WG

, C000 SH

EET IN

DEX, 10/16/2019 11:49:25 AM

, achilds

WP PROJECT NO. 1-02114.04

T.B.P.E. Registration No. 8053

COW PROJECT NO. 60WTR01612

JOHN F. WINKLERDATE08/28/2019

SHEET INDEX

C000

CITY OF WACO STANDARD DETAILS

D100-D105 CITY OF WACO STANDARD DETAILS

COVER SHEET

GENERAL

C001 PROJECT NOTES

C003 ABBREVIATIONS & LEGENDS

C004 PROCESS INSTRUMENTATION AND CONTROL LEGEND

C005 PROCESS MECHANICAL LEGEND AND SYMBOLOGY

C002 PROJECT NOTES

CIVIL

C100 SITE PLAN

C101

54 INCH SUCTION PROFILE

C102

MISCELLANEOUS PROFILES

C103

30 INCH WL TO HILLCREST PLAN & PROFILE

C104

PARTIAL YARD PIPING PLAN

C105

CIVIL DETAILS I

STRUCTURAL

S100

PUMP STATION FOUNDATION PLAN

S103 ELECTRICAL ROOM FLOOR PLAN

S104

STRUCTURAL DETAILS I

MECHANICAL

M100 PUMP STATION MECHANICAL PLAN

M101 MECHANICAL SECTIONS I

M102 MECHANICAL SECTIONS II

M103

MECHANICAL DETAILS IM106

MECHANICAL DETAILS IIM107

MECHANICAL DETAILS IIIM108

M109 MECHANICAL DETAILS IV

M110 MECHANICAL DETAILS V

INSTRUMENTATION

PID1

STRUCTURAL NOTES AND LEGEND

S101

S105

ELECTRICAL ROOM DOOR & WINDOW SCHEDULES

S106

SITE DEMOLITION PLAN

PUMP DEMOLITION PLAN & PHOTOS

CONTRACTOR LAYDOWN & LIMITS OF CONSTRUCTION

EROSION & SEDIMENTATION CONTROL PLAN

YARD PIPING PLANC106

C107

C108

C109

C110

ELECTRICAL ROOM FRAMING PLAN

S107

ELECTRICAL ROOM DETAILSS108

STRUCTURAL DETAILS II

S109

ELECTRICAL ROOM ROOF PLAN

S110

ELECTRICAL ROOM ELEVATIONS

S111

MECHANICAL PROCESS AND INSTRUMENTATION DIAGRAM

MECHANICAL SECTIONS III

M111

S102

ELECTRICAL ROOM FOUNDATION PLAN

STRUCTURAL DETAILS III

PUMP MODIFICATION PLAN & DETAILS

C111 PROFILE

C112

CIVIL DETAILS II

C113

M104 MECHANICAL SECTIONS IV

M105 MECHANICAL SECTIONS V

SITE MODIFICATION PLAN

C114

C000 SHEET INDEX

METER VAULT PLAN AND SECTIONM112

PSV VAULTM113

MECHANICAL DETAILS VI

ELECTRICAL

E100 LEGENDS & ABBREVIATIONS

E101 SITE PLAN I - PUMP STATION

E102 SITE PLAN II - PUMP STATION

E103

480 VOLT ONE LINE DIAGRAM

E106 CONTROL SCHEMATICS I

E107 CONTROL SCHEMATICS II

E108

E109

CONTROL SCHEMATICS III

E110 SCHEDULES I

SITE PLAN - ONCOR SERVICE

E111

E104

E105

4160 VOLT ONE LINE DIAGRAM II

EQUIPMENT ELEVATIONSE112

ELECTRICAL BUILDING ELECTRICAL PLANE113

SCHEDULES I

E114 ELECTRICAL BUILDING LIGHTING PLAN

E115 ELECTRICAL BUILDING CABLE TRAY PLAN

E116

E119

E120

E121

E122

ELECTRICAL BUILDING GROUNDING PLAN

E117 PUMP STATION ELECTRICAL PLAN

E118 PUMP STATION GROUNDING PLAN

HVAC

H101 HVAC PLAN

H102 HVAC DETAILS

VAULTS PLANS & DETAILS

DETAILS I

DETAILS VE124

E125

E127

E128

E123

DETAILS II

DETAILS IV

DETAILS III

DETAILS VI

PLC I/O LIST SHEET I

E129

SCADA DIAGRAM

PLC I/O LIST SHEET II

CONCRETE DETAILS IS112

S113CONCRETE DETAILS II

CONTROL SCHEMATICS IV

SAMPLE LINE SITE PLAN

DRAIN LINE PLAN AND PROFILE

C115

C116

D200 CIVIL DETAILS

PARKING LOT STRIPING PLANC117

E126DETAILS VII

S111A STRUCTURAL DETAILS IV

10-14-19

C105A GRADING PLAN

S111B STRUCTURAL DETAILS V

Page 6: RFB-2019-046-Addendum No. 3-Draft · 2019. 10. 17. · RFB No. 2019-046 Addendum No. 3 00 91 13 - 2 6) Can Boesch Vertical Turbine Pumps be added as an approved manufacturer of Vertical

A1 NOT USED

MECHANICALSECTIONS IV

M104

FULL SIZE = 1/4"=1'-0" - HALF SIZE = 1/8"=1'-0"

1

SCALE NO. 1

RIVERSIDE WTPHIGH SERVICE PUMP STATION

IMPROVEMENTS

REV. DESCRIPTION DATE

1 2 3 4 5 6 7 8 9 10 11 12 13 14

A

B

C

D

E

F

G

H

I

J

K

L

1 2 3 4 5 6 7 8 9 10 11 12 13 14

DRAWING NO.

KDSPM

JFWTFG, ARC

JFWCHECKED

DRAFTED

DESIGNED

CITY OF WACO

G:\PRO

JECTS\1-02114\2 D

ESIG

N\2.0 CAD

\5 RIVERSID

E PS\1-02114 PU

MP-M

ECH

AN

ICAL PLAN

.D

WG

, M

10X M

ECH

AN

ICAL SECTIO

NS, 10/16/2019 11:50:54 AM

, achilds

WP PROJECT NO. 1-02114.04

T.B.P.E. Registration No. 8053

COW PROJECT NO. 60WTR01612

JOHN F. WINKLERDATE08/28/2019

E1 SECTIONSCALE NO. 1

GENERAL NOTES

10-14-19

Page 7: RFB-2019-046-Addendum No. 3-Draft · 2019. 10. 17. · RFB No. 2019-046 Addendum No. 3 00 91 13 - 2 6) Can Boesch Vertical Turbine Pumps be added as an approved manufacturer of Vertical

A1 NOT USED

MECHANICALSECTIONS V

M105

FULL SIZE = 1/4"=1'-0" - HALF SIZE = 1/8"=1'-0"

1

SCALE NO. 1

RIVERSIDE WTPHIGH SERVICE PUMP STATION

IMPROVEMENTS

REV. DESCRIPTION DATE

1 2 3 4 5 6 7 8 9 10 11 12 13 14

A

B

C

D

E

F

G

H

I

J

K

L

1 2 3 4 5 6 7 8 9 10 11 12 13 14

DRAWING NO.

KDSPM

JFWTFG, ARC

JFWCHECKED

DRAFTED

DESIGNED

CITY OF WACO

G:\PRO

JECTS\1-02114\2 D

ESIG

N\2.0 CAD

\5 RIVERSID

E PS\1-02114 PU

MP-M

ECH

AN

ICAL PLAN

.D

WG

, M

10XX M

ECH

AN

ICAL SECTIO

NS, 10/16/2019 11:51:00 AM

, achilds

WP PROJECT NO. 1-02114.04

T.B.P.E. Registration No. 8053

COW PROJECT NO. 60WTR01612

JOHN F. WINKLERDATE08/28/2019

E1 SECTIONSCALE NO. 1

GENERAL NOTES

10-14-19

Page 8: RFB-2019-046-Addendum No. 3-Draft · 2019. 10. 17. · RFB No. 2019-046 Addendum No. 3 00 91 13 - 2 6) Can Boesch Vertical Turbine Pumps be added as an approved manufacturer of Vertical

RIVERSIDE WTPHIGH SERVICE PUMP STATION

IMPROVEMENTS

REV. DESCRIPTION DATE

1 2 3 4 5 6 7 8 9 10 11 12 13 14

A

B

C

D

E

F

G

H

I

J

K

L

1 2 3 4 5 6 7 8 9 10 11 12 13 14

DRAWING NO.

KDSPM

JFWTFG, ARC

JFWCHECKED

DRAFTED

DESIGNED

CITY OF WACO

G:\PRO

JECTS\1-02114\2 D

ESIG

N\2.0 CAD

\5 RIVERSID

E PS\1-02114 PU

MP-STRU

CTU

RAL PLAN

.D

WG

, S102 PU

MP STATIO

N FO

UN

DATIO

N PLAN

, 10/16/2019 11:49:49 AM

, achilds

WP PROJECT NO. 1-02114.04

T.B.P.E. Registration No. 8053

COW PROJECT NO. 60WTR01612

JOHN F. WINKLERDATE08/28/2019

A1 STRUCTURAL PLAN

PUMP STATIONFOUNDATION PLAN

S102

FULL SIZE = 1/4"=1'-0" - HALF SIZE = 1/8"=1'-0"

1

SCALE NO. 1

N

S

E

W

10-14-19

Page 9: RFB-2019-046-Addendum No. 3-Draft · 2019. 10. 17. · RFB No. 2019-046 Addendum No. 3 00 91 13 - 2 6) Can Boesch Vertical Turbine Pumps be added as an approved manufacturer of Vertical

RIVERSIDE WTPHIGH SERVICE PUMP STATION

IMPROVEMENTS

REV. DESCRIPTION DATE

1 2 3 4 5 6 7 8 9 10 11 12 13 14

A

B

C

D

E

F

G

H

I

J

K

L

1 2 3 4 5 6 7 8 9 10 11 12 13 14

DRAWING NO.

KDSPM

JFWTFG, ARC

JFWCHECKED

DRAFTED

DESIGNED

CITY OF WACO

G:\PRO

JECTS\1-02114\2 D

ESIG

N\2.0 CAD

\5 RIVERSID

E PS\1-02114 STRU

CTU

RAL D

TL2.D

WG

, S111A STRU

CTU

RAL D

ETAILS IV, 10/16/2019 11:50:17 AM

, achilds

WP PROJECT NO. 1-02114.04

T.B.P.E. Registration No. 8053

COW PROJECT NO. 60WTR01612

JOHN F. WINKLERDATE08/28/2019

A1 SECTION

STRUCTURALDETAILS IV

S111A

FULL SIZE = 1/4"=1'-0" - HALF SIZE = 1/8"=1'-0"

1

SCALE NO. 1

GENERAL NOTES

10-14-19

Page 10: RFB-2019-046-Addendum No. 3-Draft · 2019. 10. 17. · RFB No. 2019-046 Addendum No. 3 00 91 13 - 2 6) Can Boesch Vertical Turbine Pumps be added as an approved manufacturer of Vertical

RIVERSIDE WTPHIGH SERVICE PUMP STATION

IMPROVEMENTS

REV. DESCRIPTION DATE

1 2 3 4 5 6 7 8 9 10 11 12 13 14

A

B

C

D

E

F

G

H

I

J

K

L

1 2 3 4 5 6 7 8 9 10 11 12 13 14

DRAWING NO.

KDSPM

JFWTFG, ARC

JFWCHECKED

DRAFTED

DESIGNED

CITY OF WACO

G:\PRO

JECTS\1-02114\2 D

ESIG

N\2.0 CAD

\5 RIVERSID

E PS\1-02114 STRU

CTU

RAL D

TL2.D

WG

, S111B STRU

CTU

RAL D

ETAILS V, 10/16/2019 11:50:24 AM

, achilds

WP PROJECT NO. 1-02114.04

T.B.P.E. Registration No. 8053

COW PROJECT NO. 60WTR01612

JOHN F. WINKLERDATE08/28/2019

A1 SECTION

STRUCTURALDETAILS V

S111B

FULL SIZE = 1/4"=1'-0" - HALF SIZE = 1/8"=1'-0"

1

SCALE NO. 1

GENERAL NOTES

10-14-19


Recommended