ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 1 of 49
RFP 19021 ANNEX C-1
MUHAMMAD KHAIL - SCHOOL NO 13
BILL OF QUANTITIES
S.NO DESCRIPTION NO LENGTH WIDTH H/D QUANTITY UoM UNIT RATE TOTAL AMOUNT
White Wash All School
1 White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
Rooms 2.0 30 10 600
"
2.0 20 10 400
Bounday wall 2.0 300 8 4800
5800 Sft
2 Painting with paint mixed at site using ingredients and pigment to produce required texture and shade in two or more coats on wood work over and including the cost of priming coat, surface preparation, rubbing down smooth, knotted, filling cracks, holes and joints in ground floor or basement.
Door
2 3 7 42
windows
4 5 4 80
Gate
1 8 8 64
186 Sft
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 2 of 49
3 Supply and Changing of Steel Girder 3 KG per rft NSR 1.0 20 20.00 Rft
4 Good quality plastic sheeting NSR 2.0 30 20 1200.00 Sft
1200.00 Sft
5 Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
2.0 30 20 1200.00
Front wall
1.0 60 9 540.00
1740.00 Cft
Total -
RFP 19021 ANNEX C-2
MUHAMMAD KHAIL - SCHOOL NO 14
BILL OF QUANTITIES
S.NO DESCRIPTION NO LENGTH WIDTH H/D QUANTITY UoM UNIT RATE TOTAL AMOUNT
1 White Wash All School
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
Rooms
2.0 30 10 600
" 2.0 20 10 400
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 3 of 49
Bounday wall
2.0 300 8 4800
5800 Sft
Painting with paint mixed at site using ingredients and pigment to produce required texture and shade in two or more coats on wood work over and including the cost of priming coat, surface preparation, rubbing down smooth, knotted, filling cracks, holes and joints in ground floor or basement.
Door 2 3 7 42
windows 4 5 4 80
Gate 1 8 8 64
186 Sft
2 Roof covering materials For Toilet Roof replacement.
Supplying bamboos.11.5 ft. (3.5 m.) long and 3" (75 mm) dia 20.0 1.0 20.00
Chick over bamboos NSR 5.0 14.0 7 490.00
Total 490.00 Sft
Good quality plastic sheeting NSR 5.0 14.0 7 490.00
Total 490.00 Sft
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster
5.0 14.0 7 490.00
Total 490.00 Cft
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 4 of 49
3 Repair of winodows Frame and Glass 3 mm and color NSR 4.0 5 4 80.00 Sft
4 Roof Mud Layer
Good quality plastic sheeting NSR 2.0 30 20 1200.00 Sft
1200.00 Sft
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
2.0 30 20 1200.00
Front wall
1.0 60 9 540.00
1740.00 Cft
Total -
RFP 19021 ANNEX C-3
CHAGHI - SCHOOL NO 40
BILL OF QUANTITIES
S.NO DESCRIPTION NO LENGTH WIDTH H/D QUANTITY UoM UNIT RATE TOTAL AMOUNT
A Verandah
1 Supplying bamboos.11.5 ft. (3.5 m.) long and 3" (75 mm) dia 70.0 1 70.00 No
2
Chick over bamboos NSR 1.0 70 10 700.00 Sft
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 5 of 49
3
Good quality plastic sheeting NSR 1.0 70 10 700.00 Sft
4 Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster 1.0 70 10 700.00 Cft
B Roof Mud Layer
Good quality plastic sheeting 1.0 100 25 2500.00 Sft
"
1.0 105 25 2625.00
"
1.0 100 25 2500.00
7625.00 Sft
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
1.0 100 25 2500.00
"
1.0 105 25 2625.00
"
1.0 100 25 2500.00
7625.00 Sft
Total -
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 6 of 49
RFP 19021 ANNEX C-4
CHAGHI - SCHOOL NO 41
BILL OF QUANTITIES
S.NO DESCRIPTION NO LENGTH WIDTH H/D QUANTITY UoM UNIT RATE TOTAL AMOUNT
1 Supplying bamboos.11.5 ft. (3.5 m.) long and 3" (75 mm) dia 70.0 1.0 70.00
2 Supplying bamboos.16.5 ft. (5 m.) long and 3.5" to 4" (87.5 mm to 100 mm 80.0 1 80.00
Total 150.00 Rft
3 Chick over bamboos NSR 1.0 70.0 10 700.00
1.0 80 15 1200.00
Total 1900.00 Sft
4 Good quality plastic sheeting NSR 1.0 70.0 10 700.00
1.0 80 15 1200.00
Total 1900.00 Sft
5 Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer 1.0 70.0 10 700.00
1.0 80 15 1200.00
Total 1900.00 Cft
Roof Mud Layer
6 Good quality plastic sheeting NSR 2.0 20 15 600.00 Sft
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 7 of 49
600.00 Sft
7 Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
2.0 20 12 480.00 Cft
480.00 Cft
Total -
RFP 19021 ANNEX C-5
CHAGHI - SCHOOL NO 42 - Lejay
BILL OF QUANTITIES
S.NO DESCRIPTION NO LENGTH WIDTH H/D QUANTITY UoM UNIT RATE TOTAL AMOUNT
1 Repair of Roof Mud Layer & Plastic sheet ,
Good quality plastic sheeting 1.0 80 25 2000.00
NSR
1.0 80 25 2000.00
1.0 40 25 1000.00
Total 5000.00 Sft
2 Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
1.0 80.0 25.0 2000.00
1.0 80.0 25.0 2000.00
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 8 of 49
1.0 40.0 25.0 1000.00
Total 5000.0 Cft
3 Providing and laying sundried clay bricks set in mud mortar including scaffolding in ground floor superstructure Above 4.5" (115mm) nominal thick brickwor
1.0 70.0 9.0 0.8 472.5 CFT
Total -
RFP 19021 ANNEX C-6
CHAGHI - SCHOOL NO 43
BILL OF QUANTITIES
S.NO DESCRIPTION NO LENGTH WIDTH H/D QUANTITY UoM UNIT RATE TOTAL AMOUNT
1 Excavation in foundation of buildings,bridges and other structures, depth upt 4 meters including dag bellings dressing,refilling around structures with excavated earth, watering and ramming lead upto 30 m lift up to 1.5 m.
S.i.No 3-21-A-II 1 36 1 1 36 Cft
Borrow pit excavation depth upto 10 ft. (3 m) undressed lead upto 100 ft. (30m)
3-4/D 2 3 3 15 270 CFT
2 Providing and laying cement concrete thick and down 1:4:8 ratio using gauge in foundation including levelling compacting and curing. Extra if crushed stone 19mm (3/4”) and down gauge is used in place of shingle or bajri
S.i.No 5-4-b 1 36 1 0.3 9 Cft
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 9 of 49
3 Providing and laying first class solid burnt brick masonry including scaffolding, raking out joints and curing in ground floor superstructure with ratio 1:4.
11-19-b-iv 1 36 1 1 36
1 36 0.75 7 189
225 Cft
Providing and fixing fully glazed steel door with frame single leaf with M.S bottom or kick rail 6" (150mm) wide and top rail of 4" (100mm) wide painted with two coats of red oxide paint, brass oxidized fittings of lugs, cutting holed, and making good the damages to walls.
S.No 28-3-1 2 2.5 7 35
2 2 1.5 6
Total 41 Sft
6 Roof covering materials
Fabrication of heavy steel work with angle, tees, flat iron, round iron and sheet iron for making trusses, girders, tanks etc. including cutting, drilling riveting, handling, assembling and fixing but excluding erection
S.i.No 28-45-1
Steel Girders beam (size 3" x 7" x 6.5') at 2 kg
2 6 24
T. Iron at 1 kg 8 13 104
Total 128 rft/kg
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 10 of 49
Providing and laying roof insulation comprising single layer of first class burnt brick tile 12"x6"x1.25" laid with 1:6 cement sand mortar and grouted with 1:3 cement sand mortar laid over 4inches (100mm) thick earth and 1inch (25mm) thick gobri leaping over two coats of hot bitumen @ 34 lbs. per 100 Sq.ft.(1.65 Kg/Sq.m) sand blended covered
13-1-a 2 5.75 5.75 66.125 SFT
Providing and laying 1:2:4 cement concrete using approved coarse sand and crushed aggregate 3/4" (19mm) and down gauge in beams,lintels and cantilevers of required shape or section including formwork and its removal compacting and curing in basement and ground floor.
5-16-a 2 6 6 0.3 18 CFT
13 mm (1/2") thick cement plaster on walls and columns in basement, plinth and ground floor including making edges, corners and curing. The mix ratio is 1:4 cement sand.
15-1-a-ii 2 6 7 84
2 5 7 70
154 SFT
Providing, laying, cutting, jointing, testing and disinfecting PPRC pipes confirming to ISO 4427, PN-20, complete in all respects with specials and valves etc. including all fittings, connnections and jointing material.exust pipe 4"
27-47-a-IX 2 8 16 RFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 11 of 49
Providing and laying 1:2:4 cement concrete using approved coarse sand and crushed aggregate 3/4" (19mm) and down gauge in beams,lintels and cantilevers of required shape or section including formwork and its removal compacting and curing in basement and ground floor.
5-16-a
Slab pit 1 5 5 0.33 8.333 Sft
Total
-
RFP 19021 ANNEX C-7
CHAGHI - SCHOOL NO 46 - Posti
BILL OF QUANTITIES
S.NO DESCRIPTION NO LENGTH WIDTH H/D QUANTITY UoM UNIT RATE TOTAL AMOUNT
Roof Mud Layer
1 Good quality plastic sheeting NSR 1.0 70 25 1750.00 Sft
"
1.0 40 25 1000.00
"
1.0 70 25 1750.00
4500.00 Sft
2 Repair of mud wall by mud bricks and plaster with mud.
2.0 30 8 480.00 Sft
3 White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
10.0 20 14 10 6800.00 Sft
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 12 of 49
4 Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
1.0 70 25 1750.00
"
1.0 40 25 1000.00
"
1.0 70 25 1750.00
4500.00 Sft
Total -
RFP 19021 ANNEX C-8
MALGAGI RV - SCHOOL NO 24
BILL OF QUANTITIES
S.NO DESCRIPTION NO LENGTH WIDTH H/D QUANTITY UoM UNIT RATE TOTAL AMOUNT
1 Repair of Roof Mud Layer & Plastic sheet ,
Good quality plastic sheeting 7.0 22.0 18.0 2772.00
1.0 110.0 10.0 1100.00
Total 3872.00 Sft
2 Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
7.0 22.0 18.0 2772.00
1.0 110.0 10.0 1100.00
Total 3872.0 Cft
3 Providing and laying sundried clay bricks set in mud mortar including scaffolding in
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 13 of 49
ground floor superstructure Above 4.5" (115mm) nominal thick brickwor
1.0 25.0 8.0 0.8 150.0
1.0 50.0 2.5 0.8 93.8
1.0 154.0 1.0 0.8 115.5
359.3 CFT
3 White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
7.0 22 15 10 5180.00 Sft
4 Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
2.0 25.0 8.0 400.00
2.0 50.0 2.5 250.00
650.0 CFT
Total -
RFP 19021 ANNEX C-9
MALGAGAI RV - SCHOOL NO 25
BILL OF QUANTITIES 6 toilets, verdanh pcc and roof mud plaster
Based on CSR 2018 S.NO DESCRIPTION NO LENGTH WIDTH H/D QUANTITY UoM UNIT RATE TOTAL AMOUNT
1 Excavation in foundation of buildings,bridges and other structures, depth upt 4 meters including dag bellings dressing,refilling around structures with excavated earth, watering and ramming lead upto 30 m lift up to 1.5 m.
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 14 of 49
S.i.No 3-21-A-II 1 106.75 1 1 106.75 Cft
2 Borrow pit excavation depth upto 10 ft. (3 m) undressed lead upto 100 ft. (30m)
3-4/D 6 3 3 15 810 CFT
3 Providing and laying cement concrete thick and down 1:4:8 ratio using gauge in foundation including levelling compacting and curing. Extra if crushed stone 19mm (3/4”) and down gauge is used in place of shingle or bajri
S.i.No 5-4-b 1 106.75 1 0.25 26.6875 Cft
4 Providing and laying first class solid burnt brick masonry including scaffolding, raking out joints and curing in ground floor superstructure with ratio 1:4.
11-19-b-iv 1 106.75 1 1 106.75
9 inch wall 1 82.25 0.75 7 431.8125
3 inch wall 1 23 0.375 7 60.375
Total 598.9375 Cft
5 Providing and fixing fully glazed steel door with frame single leaf with M.S bottom or kick rail 6" (150mm) wide and top rail of 4" (100mm) wide painted with two coats of red oxide paint, brass oxidized fittings of lugs, cutting holed, and making good the damages to walls.
S.No 28-3-1 6 2.5 7 105
6 2 1.5 18
Total 123 Sft
Roof covering materials
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 15 of 49
6 Fabrication of heavy steel work with angle, tees, flat iron, round iron and sheet iron for making trusses, girders, tanks etc. including cutting, drilling riveting, handling, assembling and fixing but excluding erection
S.i.No 28-45-1
Steel Girders beam (size 3" x 7" x 6.5') at 2 kg
2 22 88
T. Iron at 1 kg 15 12 180
Total 268 Rft
7 Providing and laying roof insulation comprising single layer of first class burnt brick tile 12"x6"x1.25" laid with 1:6 cement sand mortar and grouted with 1:3 cement sand mortar laid over 4inches (100mm) thick earth and 1inch (25mm) thick gobri leaping over two coats of hot bitumen @ 34 lbs. per 100 Sq.ft.(1.65 Kg/Sq.m) sand blended covered
13-1-a 1 22 15 330 SFT
8 Providing and laying 1:2:4 cement concrete using approved coarse sand and crushed aggregate 3/4" (19mm) and down gauge in beams,lintels and cantilevers of required shape or section including formwork and its removal compacting and curing in basement and ground floor.
5-16-a 1 22 15 0.25 82.5 CFT
9 13 mm (1/2") thick cement plaster on walls and columns in basement, plinth and ground floor including making edges, corners and curing. The mix ratio is 1:4 cement sand.
15-1-a-ii 6 6 7 252
6 5 7 210
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 16 of 49
2 22 8 352
Total 814 SFT
10 Providing, laying, cutting, jointing, testing and disinfecting PPRC pipes confirming to ISO 4427, PN-20, complete in all respects with specials and valves etc. including all fittings, connnections and jointing material.exust pipe 4"
27-47-a-IX 6 8 48 RFT
11 Providing and laying 1:2:4 cement concrete using approved coarse sand and crushed aggregate 3/4" (19mm) and down gauge in beams,lintels and cantilevers of required shape or section including formwork and its removal compacting and curing in basement and ground floor.
5-16-a
Slab pit 6 6 5 0.333 60 Sft
12 Repair of Roof Mud Layer & Plastic sheet ,
Good quality plastic sheeting 2 20 16 640
NSR Total 640 Sft
13 Providing and laying 1:2:4 cement concrete using approved coarse sand and crushed aggregate 3/4" (19mm) and down gauge in beams,lintels and cantilevers of required shape or section including formwork and its removal compacting and curing in basement and ground floor.
5-16-a 1 65 8 0.25 130 CFT
14 Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
roof 2 20 16
640
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 17 of 49
wall 2 200 8
3200
Total 3840 Cft
15 White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
7 20 16
4536
2 200 8
3200
Total 7736 Cft
Total -
RFP 19021 ANNEX C-10
MALGAGAI - SCHOOL NO 26
BILL OF QUANTITIES
S.NO DESCRIPTION NO LENGTH WIDTH H/D QUANTITY UoM UNIT RATE TOTAL AMOUNT
1 Repair of Roof Mud Layer & Plastic sheet ,
Good quality plastic sheeting
NSR Total 4071 Sft
2 White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
total quantitiy 10420 sft
3 Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 18 of 49
1 28 16
448
Class Rooms 1 10 10
100
Class Rooms 1 22 30
660
Class Rooms 1 22 15
330
Class Rooms 1 48 22
1056
Class Rooms 1 13 22
286
Class Rooms 1 22 18
396
Class Rooms 1 26 18
468
Class Rooms 1 25 18
450
Class Rooms 1 26 10
260
Total 4454 Cft
Total -
RFP 19021 ANNEX C-11
LORALAI - BOYS HIGH SCHOOL 29
BILL OF QUANTITIES
S. No DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
ROOF PLASTER
ROOF 1 1 200.00 15.00 3000.00 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 19 of 49
TOTAL QUANTITY A-B 3000.00 SFT
4
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF
PLASTER
3000.00 3000.00 SFT
TOTAL QUANTITY Total 3000.00 SFT
Total
-
RFP 19021 ANNEX C-12
LORALAI - Girls Primary School No 30
BILL OF QUANTITIES
S. No
DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTALAMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF PLASTER
ROOF 1 1 300.00 22.00 0.33 2178.00 SFT
TOTAL QUANTITY A-B 2178.00 SFT
4 Supplying bamboos.11.5 ft. (3.5 m.) long and 3" (75 mm) dia
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 20 of 49
NSR
Bam Bo 5" Dia 10 1 10.00 Rft
Total 10.00 Rft
5
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF PLASTER 3000.00 3000.00 SFT
TOTAL QUANTITY Total 3000.00 SFT
Total -
RFP 19021 ANNEX C-13
LORALAI - BOYS HIGH SCHOOL NO 31
BILL OF QUANTITIES
S. No DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
1
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF PLASTER
ROOF 1 1 600.00 25.00 0.33 4950.00 SFT
TOTAL QUANTITY A-B 4950.00 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 21 of 49
2
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF PLASTER 4950.00 2.00 9900.00 SFT
TOTAL QUANTITY Total 9900.00 SFT
3
Construction of mud wall with mud brick work in mud motor and plaster on both sides as per instruction of engineer
NSR
Boundary wall 1 110 0.75 8.00 660.00
Total 660.00 Cft
Total -
RFP 19021 ANNEX C-14
LORALAI - BOYS HIGH SCHOOL NO 33
BILL OF QUANTITIES
S. No DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 22 of 49
ROOF PLASTER
ROOF 1 1 250.00 15.00 0.25 937.50 SFT
TOTAL QUANTITY A-B 937.50 SFT
5
Construction of mud wall with mud brick work in mud motor and plaster on both sides as per instruction of engineer
NSR
Boundary wall 1 50 0.75 7.00 262.50
Total 262.50 Cft
Total
-
RFP 19021 ANNEX C-15
LORALAI - BOYS HIGH SCHOOL NO 34
BILL OF QUANTITIES
S. No DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
1
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF PLASTER
ROOF 1 1 130.00 30.00 0.33 1287.00 SFT
19 mm THICK PLASTER ON WALL
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 23 of 49
CLASS ROOM 1 1 19.00 12.00 10.00 310.00 SFT
CLASS ROOM 1 1 19.00 12.00 10.00 310.00 SFT
CLASS ROOM 1 1 19.00 12.00 10.00 310.00 SFT
CLASS ROOM 1 1 19.00 12.00 10.00 310.00 SFT
CLASS ROOM 1 1 19.00 12.00 10.00 310.00 SFT
CLASS ROOM 1 1 19.00 12.00 10.00 310.00 SFT
BATH ROOM 1 2 7.00 5.00 10.00 240.00 SFT
19 mm THICK PLASTER ON WALL
FRONT WALLS 1 1 100.00 7.00 700.00 SFT
RIGHT SIDE WALLS 1 1 80.00 7.00 560.00 SFT
BACK WALLS 1 1 100.00 7.00 700.00 SFT
LEFT SIDE WALLS 1 1 80.00 7.00 560.00 SFT
TOTAL 5907.00 SFT
sub total A 5907.00 SFT
DEDUCTION DOOR/WINDOW
Ded: Doors D1 7 1 3.00 6.00 18.00 CFT
Ded: Win: W1 14 1 4.00 5.00 20.00 CFT
sub total B 38.00
TOTAL QUANTITY A-B 5869.00 SFT
Total
-
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 24 of 49
RFP 19021 ANNEX C-16
LORALAI - SCHOOL NO 35
BILL OF QUANTITIES
S. No
DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF PLASTER
ROOF 1 1 200.00 20.00 0.33 1320.00 SFT
TOTAL QUANTITY A-B 1320.00 SFT
4 Providing and laying of instllation of BamBo with complet all work
NSR
Bam Bo 5" Dia 1 25 25.00
Total 25.00
Providing layer of mud on bounadary wall and mud brick work where requried as per instruction of engineer
NSR
Boundary wall 1 550 0.75 8.00 4400.00
Total 4400.00 Cft
Total -
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 25 of 49
RFP 19021 ANNEX C-17
SURKHAB - MIDDLE SCHOOL NO 1
BILL OF QUANTITIES
S. No
DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF 1 1 180.00 15.00 0.33 891.00 CFT
BATH ROOM 1 4 7.00 5.00 10.00 480.00 SFT
TOTAL QUANTITY A 1371.00 SFT
4
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF PLASTER
3000.00 1.00 1.00 1.00 3000.00 SFT
TOTAL QUANTITY Total 3000.00 SFT
5
construction of mud on bounadary wall and mud brick work where requried as per instruction of engineer
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 26 of 49
NSR
BOUNDARY WALL 1 150 1.00 1.00 8.00 1200.00
Total 1200.00 Cft
6
Construction of mud wall with mud brick work in mud motor and plaster on both sides as per instruction of engineer
NSR
CLASS ROOM 1 1 5.00 0.75 12.00 45.00
BAT ROOM 1 2 5.00 0.75 7.00 52.50
Total 97.50 Cft
Total -
RFP 19021 ANNEX C-18
SURKHAB - MIDDLE SCHOOL NO 2
BILL OF QUANTITIES
S. No
DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF 1 1 230.00 0.33 13.00 986.70 CFT
TOTAL QUANTITY A 986.70 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 27 of 49
4
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF
PLASTER
3500.00 1.00 1.00 1.00 3500.00 SFT
TOTAL QUANTITY Total 3500.00 SFT
Total -
RFP 19021 ANNEX C-19
SURKHAB - BOYS SCHOOL NO 5
BILL OF QUANTITIES
S. No
DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF 1 1 100.00 0.33 22.00 726.00 CFT
19 mm THICK PLASTER ON WALL
FRONT WALLS 1 1 100.00 1.00 12.00 1200.00 SFT
RIGHT SIDE WALLS 1 1 60.00 1.00 12.00 720.00 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 28 of 49
BACK WALLS 1 1 100.00 1.00 12.00 1200.00 SFT
LEFT SIDE WALLS 1 1 60.00 1.00 12.00 720.00 SFT
TOTAL 4566.00 SFT
sub total A 4566.00 SFT
DEDUCTION DOOR/WINDOW
Ded: Doors D1 4 1 3.00 1.00 6.00 72.00 SFT
Ded: Win: W1 8 1 4.00 1.00 5.00 160.00 SFT
sub total B 232.00 SFT
TOTAL QUANTITY A-B 4334.00 SFT
4
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF
PLASTER
3608.00 1.00 1.00 1.00 3608.00 SFT
TOTAL QUANTITY Total 3608.00 SFT
Total -
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 29 of 49
RFP 19021 ANNEX C-20
SURKHAB - SCHOOL NO 6
BILL OF QUANTITIES
S. No
DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF PLASTER 2170.00 1.00 1.00 1.00 2170.00 SFT
TOTAL QUANTITY Total 2170.00 SFT
3
Providing layer of mud on bounadary wall and mud brick work where requried as per instruction of engineer
NSR
BOUNDARY WALL 1 300 1.00 1.00 7.00 2100.00
Total 2100.00 Cft
Total -
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 30 of 49
RFP 19021 ANNEX C-21
SURKHAB - MIDDLE SCHOOL NO 7
BILL OF QUANTITIES
S. No
DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF 1 1 250.00 22.00 0.33 1815.00 CFT
TOTAL QUANTITY A-B 1815.00 SFT
4
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF PLASTER 5000.00 1.00 1.00 1.00 5000.00 SFT
TOTAL QUANTITY Total 5000.00 SFT
5
Providing layer of mud on bounadary wall and mud brick work where requried as per instruction of engineer
NSR
BOUNDARY WALL 1 300 1.00 1.00 7.00 2100.00
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 31 of 49
Total 2100.00 Cft
6
Construction of mud wall with mud brick work in mud motor and plaster on both sides as per instruction of engineer
NSR
CLASS ROOM 1 1 5.00 12.00 1.00 60.00
Total 60.00 Cft
Total -
RFP 19021 ANNEX C-22
SURKHAB - BOYS MIDDLE SCHOOL NO 8
BILL OF QUANTITIES
GROUND FLOOR ESTIMATE
S. No DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
4
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF
PLASTER
2000.00 2000.00 SFT
TOTAL QUANTITY Total 2000.00 SFT
5 Provding and layin mud plaste on front side of school as per engineer isntruction
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 32 of 49
NSR
BOUNDARY WALL 1 120 1.00 1.00 7.00 840.00
Total 840.00 Cft
Total -
RFP 19021 ANNEX C-23
SURKHAB - MIDDLE SCHOOL NO 9 CO EDUCATION
BILL OF QUANTITIES
S. No DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
BATH ROOM 6 2 7.00 5.00 7.00 1008.00 SFT
TOTAL QUANTITY A-B 1008.00 SFT
4 Providing and laying of instllation of BamBo with complet work
NSR
Bam Bo 5" Dia 25 25.00
Total 25.00 no
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 33 of 49
5
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF
PLASTER
5000.00 5000.00 SFT
TOTAL QUANTITY Total 5000.00 SFT
Construction of two mud stuctre toilets with 20 feet pits and covering material with Bamboo and sheet with mut plaster
NSR
BATH ROOM COMPLET 2 6 5.00 2.00
Total 2.00 Cft
Total -
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 34 of 49
RFP 19021 ANNEX C-24
SURKHAB - PRIMARY SCHOOL NO 10
BILL OF QUANTITIES
GROUND FLOOR ESTIMATE
S. No
DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
1
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF 1 1 130.00 15.00 0.33 643.50 CFT
TOTAL QUANTITY A-B 643.50 SFT
4
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF
PLASTER
3704.00 1.00 1.00 1.00 3704.00 SFT
TOTAL QUANTITY Total 3704.00 SFT
5
Construction of mud wall with mud brick work in mud motor and plaster on both sides as per instruction of engineer
NSR
BOUNDARY WALL 1 35 1.00 1.00 8.00 280.00
Total 280.00 Cft
Total -
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 35 of 49
RFP 19021 ANNEX C-25
SURKHAB - SCHOOL CO EDUCATION NO 11
BILL OF QUANTITIES
S. No DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
1
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF 1 1 80.00 15.00 0.33 396.00 CFT
19 mm THICK PLASTER ON WALL
CLASS ROOM 1 1 19.00 12.00 10.00 310.00 SFT
CLASS ROOM 1 1 19.00 12.00 10.00 310.00 SFT
CLASS ROOM 1 1 19.00 12.00 10.00 310.00 SFT
CLASS ROOM 1 1 19.00 12.00 1.00 31.00 SFT
CLASS ROOM 1 1 19.00 12.00 10.00 310.00 SFT
CLASS ROOM 1 1 19.00 12.00 10.00 310.00 SFT
CLASS ROOM 1 1 19.00 12.00 10.00 310.00 SFT
BATH ROOM 1 2 7.00 5.00 9.00 216.00 SFT
19 mm THICK PLASTER ON WALL
FRONT WALLS 1 1 90.00 7.00 630.00 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 36 of 49
RIGHT SIDE WALLS 1 1 110.00 7.00 770.00 SFT
BACK WALLS 1 1 90.00 7.00 630.00 SFT
LEFT SIDE WALLS 1 1 110.00 7.00 770.00 SFT
TOTAL 5303.00 SFT
sub total A 5303.00 SFT
DEDUCTION DOOR/WINDOW
Ded: Doors D1 7 1 3.00 6.00 126.00 SFT
Ded: Win: W1 14 1 4.00 5.00 280.00 SFT
sub total B 406.00 SFT
TOTAL QUANTITY A-B 4897.00 SFT
2 Providing and laying of instllation of BamBo with complet work
NSR
Bam Bo 5" Dia 4 4 4.00 Rft
Total 4.00 Rft
3
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF
PLASTER
4897.00 4897.00 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 37 of 49
TOTAL QUANTITY Total 4897.00 SFT
Total
-
RFP 19021 ANNEX C-26
SURKHAB - HIGH SCHOOL NO 49
BILL OF QUANTITIES
GROUND FLOOR ESTIMATE
S. No
DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
1
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF 1 1 130.00 20.00 0.33 858.00 CFT
TOTAL QUANTITY A-B 858.00 SFT
2
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
BOTH SIDES
NSR
White Wash
SAME AS QUANTITY OF
PLASTER
3462.00 1.00 1.00 1.00 3462.00 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 38 of 49
TOTAL QUANTITY Total 3462.00 SFT
3
Providing layer of mud on bounadary wall and mud brick work where requried as per instruction of engineer
NSR
BOUNDARY WALL 1 700 1.00 1.00 7.00 4900.00
Total 4900.00 Cft
Total -
RFP 19021 ANNEX C-27
SARANA - REPAIR OF COEDUCATION HIGH SCHOOL GAZGI NO 12 NEW CAMP OF SRANAN
BILL OF QUANTITIES
S. No DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
Rooof layer 1 1 200.00 20.00 4000.00 SFT
TOTAL QUANTITY A-B 4000.00 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 39 of 49
3
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
NSR
SAME QTY OF PLASTER 3/4" 4000.00 SFT
TOTAL QUANTITY 4000.00 SFT
4 Providing and laying of wood replacement of bamboo incoulding all work
NSR
Bamboo
1 1 25.00 25.00
TOTAL QUANTITY 25.00 NO
Total
-
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 40 of 49
RFP 19021 ANNEX C-28
SARANAN - REPAIR OF GIRLS PRIMARY SCHOOL NO 14 NEW CAMP OF SRANAN
BILL OF QUANTITIES
GROUND FLOOR
S. No
DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF PLASTER
Room No 1 1 1 14.00 20.00 280.00 SFT
Room No 2 1 1 14.00 20.00 280.00 SFT
Room No 3 1 1 14.00 20.00 280.00 SFT
Room No 4 1 1 14.00 20.00 280.00 SFT
Room No 5 1 1 14.00 20.00 280.00 SFT
Room No 6 1 1 14.00 20.00 280.00 SFT
Room No 7 1 1 14.00 20.00 280.00 SFT
Room No 8 1 1 80.00 20.00 1600.00 SFT
TOTAL QUANTITY A-B 3560.00 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 41 of 49
3
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
NSR
SAME QTY OF PLASTER 3/4" 5000.00 SFT
TOTAL QUANTITY 5000.00 SFT
Total -
RFP 19021 ANNEX C-29
SARANAN - REPAIR OF BOYS HIGH SCHOOL NO 15 OLD CAMP OF SRANAN
BILL OF QUANTITIES
GROUND FLOOR
S. No DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
Roof layer 1 1 400.00 20.00 8000.00 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 42 of 49
TOTAL QUANTITY A-B 8000.00 SFT
3
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
NSR
SAME QTY OF PLASTER 3/4" 8000.00 SFT
TOTAL QUANTITY 8000.00 SFT
Total
-
RFP 19021 ANNEX C-30
SARANAN - REPAIR OF BOYS HIGH SCHOOL NO 13 OLD CAMP OF SRANAN
BILL OF QUANTITIES
S. No DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF PLASTER
Room No 1 1 1 14.00 20.00 280.00 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 43 of 49
Room No 2 1 1 14.00 20.00 280.00 SFT
Room No 3 1 1 14.00 20.00 280.00 SFT
Room No 4 1 1 14.00 20.00 280.00 SFT
Room No 5 1 1 14.00 20.00 280.00 SFT
Room No 6 1 1 14.00 20.00 280.00 SFT
Room No 7 1 1 14.00 20.00 280.00 SFT
TOTAL QUANTITY A-B 1960.00 SFT
3
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
NSR
SAME QTY OF PLASTER 3/4" 5000.00 SFT
TOTAL QUANTITY 5000.00 SFT
Total -
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 44 of 49
RFP 19021 ANNEX C-31
SARANAN - REPAIR OF GIRLS PRIMARY SCHOOL NO 16 NEW CAMP OF SRANAN
BILL OF QUANTITIES
GROUND FLOOR
S. No DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
1
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF PLASTER
Room No 1 1 1 14.00 20.00 280.00 SFT
Room No 2 1 1 14.00 20.00 280.00 SFT
Room No 3 1 1 14.00 20.00 280.00 SFT
Room No 4 1 1 14.00 20.00 280.00 SFT
Room No 5 1 1 14.00 20.00 280.00 SFT
Room No 6 1 1 14.00 20.00 280.00 SFT
Wall palster 1 1 150.00 10.00 1500.00 SFT
TOTAL QUANTITY A-B 3180.00 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 45 of 49
2
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
NSR 0.00
SAME QTY OF PLASTER 3/4" 5000.00 SFT
TOTAL QUANTITY 5000.00 SFT
Total -
RFP 19021 ANNEX C-32
SARANAN - REPAIR OF HIGH SCHOOL NO 23 NEW CAMP OF SRANAN
BILL OF QUANTITIES
S. No DESCRIPTION No MEASUREMENT
QTY UoM UNIT RATE TOTAL AMOUNT L B H/D
2
Providing and filling earth over roof including watering, ramming, mud plastering with gobri leaping 3 inch thick earth filling and mud plaster /Mud Layer
NSR
ROOF PLASTER
Room No 1 1 1 14.00 20.00 280.00 SFT
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 46 of 49
Room No 2 1 1 14.00 20.00 280.00 SFT
Room No 3 1 1 14.00 20.00 280.00 SFT
Room No 4 1 1 14.00 20.00 280.00 SFT
Room No 5 1 1 14.00 20.00 280.00 SFT
Room No 6 1 1 14.00 20.00 280.00 SFT
Room No 7 1 1 14.00 20.00 280.00 SFT
Room No 8 1 1 14.00 20.00 280.00 SFT
Room No 9 1 1 70.00 20.00 1400.00 SFT
TOTAL QUANTITY A-B 3640.00 SFT
3
White washing three coats including dusting, filling the holes, cracks and removing inequalities, if any,windows and ventaltors at any height in any floor
NSR
SAME QTY OF PLASTER 3/4" 3640.00 SFT
TOTAL QUANTITY 3640.00 SFT
Total -
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 47 of 49
RFP SC/ 19/021
Abstract/Summary
S.No DESCRIPTION AMOUNT
MUHAMMAD KHAIL
1 School Number 13
2 School Number 14
CHAGHI
3 School Number 40 Chaghi
4 School Number 41 Chaghi
5 School Number 42 Lejay
6 School Number 43 Chaghi
7 School Number 46 Posti
MALAGAI RV
8 School Number 24
9 School Number 25
10 School Number 26
LORALAI
11 School Number 29
12 School Number 30
13 School Number 31
14 School Number 33
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 48 of 49
15 School Number 34
16 School Number 35
SURKHAB
17 School Number 1
18 School Number 2
19 School Number 5
20 School Number 6
21 School Number 7
22 School Number 8
23 School Number 9
24 School Number 10
25 School Number 11
26 School Number 49
SARANAN
27 School Number 12
28 School Number 14
29 School Number 15
30 School Number 13
31 School Number 16
32 School Number 23
Grand Total
ANNEX C – FINANCIAL OFFER FORM RFP/19/021
Page 49 of 49
Grand Total Amount in Words: _______________________________________________ Payment terms: Acceptance of UN payment terms (i.e. 30 days net from receipt of documents) YES NO Bid Validity: 90 Days YES NO Time required for complete job: _______________ Bidder: __________________________________________________
Date: _____________________________________________________
Name: ____________________________________________________
Signature: _________________________________________________
Designation: _______________________________________________
Official stamp: ________________________________________________