+ All Categories
Home > Documents > RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System...

RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System...

Date post: 16-Mar-2018
Category:
Upload: lytram
View: 231 times
Download: 5 times
Share this document with a friend
117
RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 1| Page INFORMATION TECHNOLOGY ELECTRONICS & COMMUNICATION DEPARTMENT GOVERNMENT OF ANDHRA PRADESH HYDERABAD REQUEST FOR PROPOSAL FOR SELECTION OF SYSTEM INTEGRATOR for Primary Sector Package - e-Pragati in ANDHRA PRADESH STATE Volume II Andhra Pradesh Technology Services Limited 4 th Floor, B-Block, BRKR Bhavan Tankbund Road, Hyderabad – 500 063.
Transcript
Page 1: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 1 | P a g e  

 

INFORMATION TECHNOLOGY ELECTRONICS & COMMUNICATION DEPARTMENT   

GOVERNMENT OF ANDHRA PRADESH HYDERABAD 

 

REQUEST FOR PROPOSAL FOR

SELECTION OF SYSTEM INTEGRATOR for

Primary Sector Package - e-Pragati in ANDHRA PRADESH STATE Volume II

Andhra Pradesh Technology Services Limited 4th Floor, B-Block, BRKR Bhavan 

Tankbund Road, Hyderabad – 500 063.       

Page 2: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 2 | P a g e  

 

  

RFP Structure  This  RFP  is meant to  invite  proposals  from interested companies capable of  delivering the services described herein. The content of this RFP has been documented as a set of three volumes explained below:  Volume I: Functional, Technical and Operational Requirements (Multiple sub-volumes) Volume I of RFP  intends  to bring out all  the details with respect to solution and other requirements  that  ITE&C  department  deems  necessary  to  share  with  the  potential bidders.  The  information  set  out  in  this  volume  has  been  broadly  categorized  as Functional, Technical, and Operational covering multiple aspects of the requirements.  Volume II: ITB, Scope of Work and Financial and Bidding Terms & Forms  Volume  II  of  RFP    details  out  all  that  may  be  needed  by  the  potential  bidders  to understand the Terms & Conditions, project  implementation approach,  financial  terms and bidding process details.  Volume III: Contractual and Legal Specifications Volume  III  of  RFP    explains  the  contractual  terms  that  ITE&C  department  wishes  to specify at this stage. It also includes a draft of Master Services Agreement.  This volume is Volume II.  Kindly note that all three volumes of the RFP have to be read in conjunction as there are cross  references  on  sections  in  these  volumes.  The  selected  System  Integrator  will  be solely  responsible  for  any  gaps  in  scope  coverage  caused  by  not  referring  to  all  three volumes. 

Page 3: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 3 | P a g e  

 

 Table of Contents

 1  Request for Proposal Datasheet .................................................................................... 11 

2  Introduction to Bidding Process .................................................................................... 15 

3  Project Background Information ................................................................................... 16 

3.1  Overview of e-Pragati ................................................................................................ 16 

3.2  Vision ......................................................................................................................... 16 

4  Implementation Framework for e-Pragati ..................................................................... 17 

4.1  e-Pragati Business Architecture .................................................................................. 17 

4.2  ePRAGATI Rollout Model ........................................................................................... 18 

4.3  Primary Sector Package .............................................................................................. 19 

4.4  Departments / Commissionerate/ Agencies for primary sector package ..................... 19 

5  Scope of work for SI - e-Pragati Primary Sector Modules ................................................ 19 

5.1  e-Pragati Primary Sector Application- Generic requirements ...................................... 22 

5.1.1  Authentication Mechanism................................................................................. 22 

5.1.2  Support for PKI based Authentication and Authorization .................................... 22 

5.1.3  Interoperability Standards .................................................................................. 23 

5.1.4  Security .............................................................................................................. 23 

5.1.5  Application Architecture ..................................................................................... 24 

5.1.6  Requirement on Adherence to Standards ............................................................ 24 

5.1.7  Knowledge Transfer............................................................................................ 24 

5.1.8  Third party Audit ................................................................................................ 24 

5.2  Scope of Services – Project Implementation Phase..................................................... 26 

5.2.1  Project Planning and Management .................................................................... 26 

5.2.2  Project Deliverables & Timelines ......................................................................... 26 

5.2.3  Preparation of e-Pragati Primary Sector Project Implementation and Roll-out Plan

  32 

5.2.4  Project Sign off Deliverable/ Exit Criteria ............................................................ 33 

5.2.5  Manpower requirements- Central Location (State HQ)........................................ 34 

5.2.6  Business Continuity Planning .............................................................................. 34 

5.3  Exit Management (on Termination or at the end of the Contract) .............................. 36 

5.3.1  Purpose .............................................................................................................. 36 

Page 4: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 4 | P a g e  

 

5.3.2  Transfer of Assets ............................................................................................... 36 

5.3.3  Cooperation and Provision of Information .......................................................... 36 

5.3.4  Confidential Information, Security and Data ....................................................... 37 

5.3.5  Employees .......................................................................................................... 38 

5.3.6  Transfer of Certain Agreements .......................................................................... 38 

5.3.7  Rights of Access to Premises ............................................................................... 38 

5.3.8  General Obligations of the SI-‘System integrator’ ............................................... 39 

5.3.9  Exit Management Plan ....................................................................................... 39 

5.3.10  Exit Management – Parallel-run ......................................................................... 40 

5.3.1  Exit Management Process .................................................................................. 40 

6  Business Model ............................................................................................................ 43 

6.1.1  Agri Management System : ................................................................................ 43 

6.1.2  Fisheries Management ....................................................................................... 43 

6.1.3  e-Mandi (e-Market) ............................................................................................ 43 

6.1.4  Animal Husbandry : ............................................................................................ 43 

6.1.5  Cane Management ............................................................................................. 44 

7  Governance structure for e-Pragati project .................................................................... 45 

7.1.1  e-Pragati   Governance Structure ........................................................................ 45 

7.1.2  EA Design Group consists of: .............................................................................. 45 

7.1.3  EA Support Group consists of: ............................................................................ 46 

7.1.4  Coordination committees with existing service providers : ................................. 46 

7.1.5  Place of Work: .................................................................................................... 46 

8  Instructions to the Bidders ............................................................................................ 47 

8.1  General ...................................................................................................................... 47 

8.2  Bidding Schedule ....................................................................................................... 47 

8.3  Compliant Proposals/ Completeness of Response ...................................................... 47 

8.4  Pre-Bid Meeting & Clarifications ................................................................................ 48 

8.4.1  Pre-bid Conference ............................................................................................ 48 

8.4.2  Responses to Pre-Bid Queries and Issue of Corrigendum .................................... 49 

8.5  Key Requirements of the Bid ...................................................................................... 49 

8.5.1  Right to Terminate the Process........................................................................... 49 

8.5.2  RFP Document Fees ............................................................................................ 49 

Page 5: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 5 | P a g e  

 

8.5.3  Earnest Money Deposit (EMD) ........................................................................... 49 

8.5.4  Submission of Proposals ..................................................................................... 50 

8.5.5  Authentication of Bids ........................................................................................ 51 

8.6  Preparation and Submission of Proposal .................................................................... 51 

8.6.1  Proposal Preparation Costs ................................................................................ 51 

8.6.2  Language ............................................................................................................ 51 

8.6.3  Venue & Deadline for Submission of Proposals................................................... 52 

8.6.4  Late Bids ............................................................................................................ 52 

8.7  Evaluation Process ..................................................................................................... 52 

8.7.1  Tender Opening ................................................................................................. 52 

8.7.2  Tender Validity ................................................................................................... 53 

8.7.3  Tender Evaluation .............................................................................................. 53 

9  Criteria for Evaluation ................................................................................................... 53 

9.1  Pre-Qualification Criteria ........................................................................................... 55 

9.2  Technical Qualification Criteria .................................................................................. 57 

9.3  Technical resources scoring pattern ........................................................................... 62 

9.4  Commercial Bid Evaluation ........................................................................................ 70 

10  Appointment of System Integrator ................................................................................ 71 

10.1  Award Criteria ............................................................................................................ 71 

10.2  Right to Accept Any Proposal and To Reject Any or All Proposal(s) ............................. 71 

10.3  Notification of Award ................................................................................................. 71 

10.4  Contract Finalization and Award ................................................................................ 71 

10.5  Performance Guarantee ............................................................................................ 71 

10.6  Signing of Contract ..................................................................................................... 72 

10.7  Failure to Agree with the Terms and Conditions of the RFP ........................................ 72 

11  Project Annexures ........................................................................................................ 73 

Bid Processes Annexures ....................................................................................................... 73 

Annexure I: TECHNICAL BID TEMPLATES ............................................................................... 73 

Form 1: Undertaking on Total Responsibility ......................................................................... 74 

Form 2: Particulars of the Bidder ........................................................................................... 75 

Form 3:  Bank Guarantee for Earnest Money Deposit ............................................................ 76 

Form 4A: Compliance Sheet for Pre-Qualification Proposal ................................................... 78 

Page 6: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 6 | P a g e  

 

Form 4B: Compliance Sheet for Technical Proposal ............................................................... 81 

Form 5: Letter of Proposal .................................................................................................... 85 

Form 6: Project Citation Format ............................................................................................ 87 

Form 7: Proposed Solution ................................................................................................ 88 

Form 7A: Functional Requirements Compliance .................................................................... 89 

Form 8: Proposed Work Plan ................................................................................................. 90 

Form 9: Team Composition ................................................................................................... 91 

Form 10: Curriculum Vitae (CV) of Key Personnel .................................................................. 92 

Form 11: Deployment of Personnel ....................................................................................... 94 

Form 12: Deviations .............................................................................................................. 95 

Form 13: Declaration on Source Code and Intellectual Property Rights ................................. 96 

Form 14: Undertaking on Patent Rights ................................................................................. 97 

Form 15: Undertaking on Compliance and Sizing of Infrastructure ........................................ 98 

Form 16: Undertaking on Service Level Compliance .............................................................. 99 

Form 17: Undertaking on Deliverables ................................................................................ 100 

Form 18: Undertaking on Support to Third Party Solution acceptance and certification ...... 101 

Form 19: Undertaking on Exit Management and Transition ................................................. 102 

Form 20: Declaration that the bidder has not been blacklisted ............................................ 103 

ANNEXURE II: FINANCIAL PROPOSAL TEMPLATE ................................................................. 104 

Form 1: Covering Letter ...................................................................................................... 104 

Form 2: Financial Proposal .................................................................................................. 106 

Form 2 A: Consolidated Cost sheet ...................................................................................... 106 

Form 2 B: Development Cost............................................................................................... 107 

Form 2 B: Development Cost............................................................................................... 108 

Form 2 C: Training & Change management Cost .................................................................. 109 

Form 2 D: OPEX Cost ........................................................................................................... 110 

Form 2 E: Additional Manpower cost Table ......................................................................... 111 

Form 2 F: Revenue Model .................................................................................................. 112 

ANNEXURE III: Template for PBG & CCN .............................................................................. 113 

Form 1: Performance Bank Guarantee ................................................................................ 113 

Form 2: Change Control Notice (CCN) Format ..................................................................... 115 

12  MASTER SERVICES AGREEMENT (In volume III) .......................................................... 117 

Page 7: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 7 | P a g e  

 

13  SERVICE LEVEL AGREEMENT - (In volume III) ................................................................ 117 

14  NON-DISCLOSURE AGREEMENT (In volume II) ............................................................. 117 

15  Format Rate Contract Details (In volume II) ............................................................... 117 

16  ROLES and RESPONSIBILITIES OF THE PARTIES (Volume II ) .......................................... 117 

17  Scope of the Project - (In volume I) ............................................................................. 117 

 

Page 8: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 8 | P a g e  

 

GLOSSARY OF TERMS

The definitions of various terms that have been used in this RFP are as follows: 

“Request for Proposal (RFP)”  means  the  Volume  and  its  annexure  and  any  other documents provided along with this RFP or issued during the course of the selection of bidder, seeking a set of solution(s), services(s), materials and/or any combination of them.  

“Contract/ Agreement/ Contract Agreement/ Master Service Agreement”  means the  Agreement  to  be  signed  between  the  successful  bidder  and  ITE&C / APTS, including  all  attachments,  appendices,  all  documents  incorporated  by  reference thereto  together  with  any  subsequent  modifications,  the  RFP,  the  bid  offer,  the acceptance and all related correspondences, clarifications, presentations.  

“Bidder”  means  any  firm  offering  the  solution(s),  service(s)  and/or  materials  as required  in  the RFP. The word Bidder when used  in the pre-award period shall be synonymous  with  parties  bidding  against  this  RFP,  and  when  used  after  award  of the Contract shall mean the successful party with whom the agreement is signed for rendering of services for implementation of this project.  

“Proposal/ Bid” means the Pre-Qualification, Technical and Financial bids submitted for this project against this RFP. 

Page 9: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 9 | P a g e  

 

 

ACRONYM FULL FORM

AG   Accountant General  

AMC   Annual Maintenance Contract  

APGLI   Andhra Pradesh Government Life Insurance  

API   Application Programming Interface  

BCP  Business Continuity Plan 

BE   Budget Estimate  

BOM   Bill of Material  

CCN   Change Control Note  

CFMS   Comprehensive Financial Management System  

CGA   Controller General of Accounts  

CO   Controlling Officer  

COTS   Commercial Off The Shelf  

DC   Data Centre  

DDO   Drawing and Disbursing Officers  

DFD   Data Flow Diagram  

DMS   Date-wise Monthly Statement  

DoI   Directorate of Insurance  

DR   Disaster Recovery  

DRC   Disaster Recovery Centre  

DSA   Directorate of State Audit  

DSC   Digital Signature Certificate  

DTA   Directorate of Treasuries and Accounts  

DTO   District Treasury Office/ Officer  

ECS   Electronic Clearance System  

EMS   Enterprise Management Solution  

EPRS  e-Pragati Requirements Specifications 

FD   Finance Department  

FIFO   First In First Out  

FRS  Functional Requirement Specifications  

GoAP   Government of Andhra Pradesh  

GPF   General Provident Fund  

HOD   Head of Department  

HOO   Head of the Office  

HRMS   Human Resource Management System  

ICT   Information and Communications Technology  

INR   Indian Rupee  

ISO   International Organization for Standardization  

IT   Information Technology  

LAN   Local Area Network  

Page 10: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 10 | P a g e  

 

LOC   Letter of Credit  

MIS   Management Information System  

MoF   Ministry of Finance  

NDA   Non-Disclosure Agreement  

NDR   Near Disaster Recovery  

OEM   Original Equipment Manufacturer  

RE   Revised Estimate  

RFP   Request for Proposal  

RTM   Requirements Traceability Matrix  

SAN   Storage Area Network  

SDDO   Self-Drawing and Disbursing Officer  

SDLC   Systems Development Life Cycle  

SI   System Integrator  

SLA   Service Level Agreement  

SMS   Short Messaging Service  

SNMP   Simple Network Management Protocol  

SOP   Standard Operating Procedure  

SQL   Structured Query Language  

SRS   System Requirement Specifications  

STO   Sub-Treasury Officer/ Officer  

SWAN   State Wide Area Network  

TB   Tera Byte  

UAT   User Acceptance Testing  

UC   Utilization Certificate  

VLC   Voucher Level Computerization  

VPN   Virtual Private Network  

W&P   Works & Projects  

XML   Extensible Mark-up Language  

 

Page 11: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 11 | P a g e  

 

 

1 Request for Proposal Datasheet

S. No Information Details

1. RFP  reference  No and Date 

APTS/CS/ePragati/12/Primary/2015 

2. Non  Refundable Tender Cost 

Rs.50,000/-  (DD  in  the  name  of  MD,  APTS  payable  at Hyderabad.  

3. Earnest  Money Deposit  (EMD/  Bid Security) 

Rs.1,00,00,000/-  (DD  or  BG  in  the  name  of  MD,  APTS payable  at  Hyderabad.  BG  shall  be  in  the  prescribed format only.  

4. EMD - Note:

Scanned copy of EMD document should be uploaded on e-Procurement  website.  The  Original  Copy  of  EMD should be submitted to APTS before opening of PQ bid. 

5. Last  date  and  time for  submission  of queries  for clarifications 

28.12.2015, 11.00AM to the email id 

6. Date,  time  and venue  of  pre-bid conference 

28.12.2015, 10.00AM at APTS 

7. Release  of  response to pre bid queries 

0401.2016 

8. Last  date,  time (deadline) and venue for  receipt  of proposals  in response  to  RFP notice 

21.01.2016, 3.00pm on  e – procurement platform 

9. Date,  time    and venue for Opening of the proposals  

21.01.2016, 3.30pm at APTS 

10. Date,  time  and venue  of  opening  of Technical  Proposals received  in  response to the RFP notice 

Will be informed to the Pre-Qualified qualified bidders. 

11. Place,  time  and  date  Will be informed to the Pre-Qualified bidders. 

Page 12: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 12 | P a g e  

 

of  Technical Presentations  by  the bidders 

12. Place,  time  and  date of  opening  of Financial  Proposals received  in  response to the RFP notice 

Will be informed to the Technically Qualified bidders. 

13. Contact  person  for queries 

Ms  K  Indira,  Joint  Director  (e-pragati),  ITE&C  dept.  [email protected] , Mr  PPV  Satyanarayana,  Manager  (APTS)  [email protected]  Dr . Jacob, GM, [email protected]  

14. Contract period   2  years  from  the  date  of  Go-Live    for  the  outright modules and  3 years for the BOOT/ BOMT models.  

14 Transaction Fee  Transaction fee: All the participating bidders who submit the  bids  have  to  pay  an amount @  0.03%  of  their  final bid  value  online  with  a  cap  of  Rs.10,000/-  for  quoted value  of  purchase  up  to  Rs.50  crores  and  Rs.25000/-  if the  purchase  value  is  above  Rs.50  crores  &  service  tax applicable  or  as  levied  by  Govt.  of  India  on  transaction fee  through  online  in  favour  of  MD,  APTS.  The  amount payable to APTS is non refundable. Corpus Fund: Successful bidder has to pay an amount of 0.04% on quoted value through demand draft  in favour of Managing Director, APTS, Hyderabad towards corpus fund at the time of concluding agreement. 

15 Bid submission  On Line – www.eprocurement.gov.in  Bidders  are  requested  to  submit  the  bids  after  issue  of minutes  of  the  pre  bid  meeting  duly  considering  the changes  made  if  any,  during  the  pre-bid  meeting. Bidders  are  totally  responsible  for  incorporating/ complying  the  changes/  amendments  issued  if  any during  pre-bid  meeting  in  their  bid.    However,  hard copies  of  PQ&  TQ  bids  to  be  submitted  to  APTS  in separate sealed covers with proper titles on the next day of Bid Submission Date.    

16 Procedure  for  Bid  Bids  shall  be  submitted  online  on 

Page 13: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 13 | P a g e  

 

Submission  www.eprocurement.gov.in  platform 1. The participating bidders in the tender should register themselves  at  their  own    cost  on  e-procurement platform in the website www.eprocurement.gov.in  2.  Bidders  can  log-in  to  e-procurement  platform  in Secure mode only by signing with the Digital certificates. 3.  The  bidders  who  are  desirous  of  participating  in  e-procurement shall submit their technical bids, price bids as per the formats given. 4.  The  bidders  should  scan  and  upload  the  respective documents  in  Pre-Qualification  and  Technical  bid documentation  as  detailed  in  the  RFP  including  EMD. The bidders shall sign on all the statements, documents certificates uploaded by them, owning responsibility for their correctness/ authenticity. 5.  The  Financial  proposal  should  be  submitted  online only 

17 Other conditions  1. After  uploading  the  documents,  the  copies  of  the uploaded statements, certificates, documents (except the  Price  bid/  offer/  break-up  of  taxes)  are  to  be submitted  by  the  bidder  to  the  O/o  The  Managing Director, APTS, BRKR Bhavan, Hyderabad. 

Failure  to  furnish  any  of  the  uploaded  documents, certificates, will entitled in rejection of the bid. The APTS shall  not  hold  any  risk  on  account  of  postal  delay. Similarly,  if  any  of  the  certificates,  documents,  etc., furnished  by  the  Bidder  are  found  to  be  false/ fabricated/  bogus,  the  bidder  will  be  disqualified, blacklisted, action will be initiated as deemed fit and the Bid Security will be forfeited. 2.  APTS  will  not  hold  any  risk  and  responsibility regulating  non-visibility  of  the  scanned  and  uploaded documents. 3.  The  Documents  that  are  uploaded  online  on  e-procurement  platform  will  only  be  considered  for  Bid Evaluation. 4.  Important  Notice  to  Contractors,  Suppliers  and Department users (i)In  the  endeavour  to  bring  total  automation  of processes in e-Procurement, the Govt. has issued orders vide  G.O.Ms.No.  13  dated.  5.7.2006  permitting integration  of  electronic  Payment  Gateway  of  ICICI/ 

Page 14: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 14 | P a g e  

 

HDFC/  Axis  Banks  with  e-Procurement  platform,  which provides a facility to participating suppliers/ contractors to  electronically  pay  the  transaction  fee  online  using their credit cards. 5.  The  prime  bidder  shall  purchase  the  bid  document. The bid can be filed with user ID of bidder. 

Page 15: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 15 | P a g e  

 

 

2 Introduction to Bidding Process

APTS ,the State Nodal Agency for Andhra Pradesh on behalf of ITE&C invites the eligible parties (hereafter referred as “Bidder”) for appointment as System Integrator for  Implementing Primary Sector Modules for e-Pragati programme of the State of Andhra Pradesh.   Bidders are advised to study this RFP document  including all attachments, appendices, all  documents  incorporated  by  reference  thereto  together  with  any  subsequent modifications  carefully  before  submitting  their  proposals  in  response  to  this  Notice. Submission of a proposal in response to this notice shall be deemed to have been done after  careful  study  and  examination  of  this  document  with  full  understanding  of  its terms,  conditions  and  implications.  Failure  to  furnish  all  information  required  as mentioned  in  the  RFP  documents  or  submission  of  a  proposal  not  substantially responsive to the RFP documents  in every respect will be at  the Bidder's risk and may result in rejection of the proposal.  All proposals submitted  in response to the RFP document must be accompanied by an EMD of the specified amount in the form of a bank guarantee or DD as per the format prescribed  in  this  RFP  document.  Bids  submitted  without  adequate  EMD  will  be rejected.  Proposals must be received not  later  than the time, date and venue mentioned  in the Data Sheet in Section 1. Proposals that are received after the time and date WILL NOT be considered. 

Page 16: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 16 | P a g e  

 

 

3 Project Background Information

3.1 Overview of e-Pragati

Use  of  information  technology  to  automate  and  digitize  government  activities  and services is not new to India. The latest manifestation being launched by the Government of  India  under  the  umbrella  term  of  “Digital  India”  aims  to  propel  the  country  to  the next  level of e-Governance maturity. Envisaged  to be a programme to transform India into a digitally empowered society and knowledge economy,  this  sets  the  long  term direction.  Similarly, states  have  their  respective  e-governance  initiatives.  Collectively, there  is no dearth of programmes and projects  to  implement this vision. The question that emerges  is  with  so  many  things  happening,  what should  bind  them  together  in  a holistic approach, such that there is convergence and coherence.     e-Pragati, the Andhra Pradesh State Enterprise Architecture, is this new paradigm. It is a Whole-of-Government  framework  and  adopts  a  mission-centric  approach  to implementation.  e-Pragati  seeks  to  help  realize  the  vision  of  Sunrise  AP  2022  by enabling  design  and  delivery  of  services  in  a  coordinated,  integrated,  efficient,  and equitable way that citizens and businesses deserve. 

3.2 Vision

e-Pragati  is  a  large  Program,  with  a  long  term  vision  for  creating  a  sustainable  eco-system of e-Governance, attempted on scale  like this by very few Governments  in  the world like Korea, Estonia and Singapore. The Vision of e-Pragati is stated below:   "e-Pragati is a new paradigm in governance based on a Whole-of-Government framework, transcending the departmental boundaries. It adopts a Mission-centric approach in its design and implementation and seeks to realize the Vision of Sunrise AP 2022, by delivering citizen-centric services in a coordinated, integrated efficient and equitable manner." e-Pragati is a framework the tool to provide integrated services to citizens through a free flow of information, and to usher in an era of good governance, characterized by efficiency, effectiveness, transparency, and foresight.  

Page 17: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 17 | P a g e  

 

4 Implementation Framework for e-Pragati

4.1 e-Pragati Business Architecture

 

 Exhibit 1–Business Architecture 

The above business architecture defines: 

Service portfolio for the whole of government 

Game changers that have transformational potential across departments 

Inter-relationship and dependencies between departments 

Primary Sector Mission

This  RFP  focuses  on  the  Primary  sector.  The  objective  of  Primary  Sector  Mission  is  to 

make  agriculture  and  allied  activities  profitable  and  sustainable,  mitigate  drought 

through water conservation, manage post-harvest activities effectively, enhance storage 

processing  and  value  addition.  In  order  to  achieve  this  mission,  a  set  of  applications 

Page 18: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 18 | P a g e  

 

have  been  identified  across  the  various  departments  of  the  primary  sector.  The 

applications  are  identified  in  the  Tier  3  Common  Modules  and  Tier  4  Departmental 

Modules  listed  in  Section 5.1  of  Volume  1  of  the  RFP  (ePRS).  The  same  is  reproduced 

below for easy reference. 

 

4.2 ePRAGATI Rollout Model

 

  

The ePragati program is planned to be implemented in waves as indicated in the above 

diagram. 

Wave 1 include the core, education and primary sector packages. The core is the basic 

package  required  as  an  enabler  for  all  other  packages  and  is  yet  to  be  implemented. 

Therefore, this RFP envisages the primary sector package to be standalone till the core 

package is implemented.  

 

Page 19: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 19 | P a g e  

 

4.3 Primary Sector Package

 

The  Primary  sector  package  being  of  prime  importance  to  the  Government  of  Andhra 

Pradesh,  will  be  implemented  in  Wave  1.  However,  as  the  core  package  is  being 

developed  concurrently,  the  Primary  Sector  package  applications  will  be  initially 

developed  as  a  stand-alone  package  and  integrated  with  the  existing  applications 

covering the functional requirements as per the Volume I  Annexure 2 of ePRS. 

 

Upon  completion  of  the  core  e-Pragati  package,  the  primary  sector  package  will 

integrate to the core package through the e-Highway to facilitate sharing of data with 

other applications and services. User will  then log on to the core e-Pragati portal from 

the  People  Hub  SSO  and  be  redirected  to  various  applications  under  the  respective 

departments. 

4.4 Departments / Commissionerate/ Agencies for primary sector package

The  applications  developed/integrated  as part  of  the  primary  sector package will  cater  to  the 

following departments / Commissionerate / agencies: 

 

Agriculture 

Horticulture 

Animal Husbandry 

Sericulture 

Fisheries 

Cane 

Support Departments

Marketing 

Cooperation 

  

5 Scope of work for SI - e-Pragati Primary Sector Modules

 

The Scope of Work of the System Integrator is provided in the Volume 1 of the RFP. The below  scope  is  only  an  overview of  the  scope  for  the  completeness of  the document. Kindly note that all three volumes of the RFP have to be read in conjunction as there are cross  references  on  sections  in  these  volumes.  The  selected  System  Integrator  will  be solely  responsible  for  any  gaps  in  scope  coverage  caused  by  not  referring  to  all  three volumes: 

  The  SI  will  develop  the  Primary  Sector  Package  as  a  standalone  application  with  its 

own portal. 

Page 20: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 20 | P a g e  

 

The SI will develop the Tier 3 Common Modules and Tier 4 Departmental Modules listed  in  Section  5.1  of  Volume  1  of  the  RFP  (ePRS).  The  services  envisaged  under these modules are listed in Section 5.4 of Volume 1 of the RFP. 

The  SI  will  integrate  the  existing  primary  sector  applications  listed  in  Volume  I  Annexure  2  of  ePRS  with  the  newly  developed  primary  sector  package.  Existing primary sector applications have been detailed in Annexure 2 of Volume 1 of the RFP (ePRS). These applications have been divided into 3 categories based on the current level of implementation of services within the same as follows:  Category  A  –  These  applications  may  be  retained  as  they  are  or  with  minor 

modifications.   Category  B  –  These  applications  may  be  retained  with  major  modifications  to 

functionality, architecture and standards.  Category C – These applications cannot be retained because of their low volume 

and  nonstandard  development.  These  should  be  replaced  with common,  group or cross cutting applications or with commercial off the shelf applications. 

Any  modifications  in  functionality,  standards,  architecture  upgrade  of  existing applications  will  be  undertaken  by  the  SI  owning  /  operating  the  respective applications. This includes the integration with the new primary sector package. 

The SI will integrate the existing primary sector applications into the primary sector package with the necessary modifications in collaboration with the existing SI.  

The  SI  will  define  the  data  standards  required  to  facilitate  the  sharing  of  data between the primary sector package and other applications. 

The  SI  will  develop  an  authentication  mechanism  which  will  uniquely  identify  the user and allow the user to access all the services of the primary sector package. The authentication mechanism should  follow the e-Pragati  standards  and  the SI  should devise  a  mechanism  to  uniquely  identify  the  users’  based  on  the  parameters mentioned  in  the  People  Hub  until  the  implementation  of  the  core  e-Pragati package.  Once  the  core  package  is  implemented  and  live,  the  authentication mechanism of the primary package will be mapped to and integrated with the core e-Pragati Single Sign On. 

The SI will develop web services  that allow connectivity and data transfer between the  newly  developed  applications  of  the  primary  sector  package  with  the  existing primary sector applications, applications of other departments that are mandatorily required for the new packages. Once the e-Pragati core package is implemented and live,  the same web services would be directed to the e-Highway for   connecting to the various departments. 

The  SI  will  host  the  primary  sector  package  on  a  public  cloud.  The  SI  will  be responsible for providing a link between this public cloud and the State Data Center, NIC and data centers of private vendors where the existing applications are currently being hosted. The link will have a bandwidth of 10 MBPS that will be scalable upto 1 GBPS and the link will be VPN enabled. 

The SI will deploy a scalable pilot  for one of the new modules with  full  integration with existing departmental applications as required. The scope of the pilot would be selected by SI keeping in mind the following: 

Page 21: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 21 | P a g e  

 

Primary Sector Portal on Cloud

Tier 3 Applications

Tier 4 Applications

Users through Internet and Mobile

Citizens and Farmers

Business Users

10 MBPS Link Scalable to 1 GBPS on demand

Web Services

SWAN

SRDHPrimary Sector

Other Govt. Depts.

People Land

STATE DATA CENTER

Applications Hubs

Primary Sector

Other Govt. Depts.

Applications

Primary Sector

Other Govt. Depts.

DATA CENTERS/CLOUD OF PRIVATE VENDORS

Applications

Department Users

CSCs

The Primary sector portal should be ready  Any  one  module  with  full  function  shall  be  developed  and  deployed  on  the 

cloud test environment  User access (as per  the requirements – citizens, business, and departmental 

users as may be) and authentication from the portal should be enabled.  The VPN enabled connectivity from cloud to SDC and web services connecting 

to various primary and other departmental applications shall be ready.  The required number of people / load testing need to be completed  The services should be rolled out to all users identified in the package module  A  system  log  on  usage,  bandwidth  scaling,  cloud  system  performance  etc 

need to be provided  Successful UAT and completion of a Third Party Audit need to be undertaken. 

The package may be revised and changes may be made as necessitated by the learnings in the pilot phase.  

The logical architecture for the two scenarios is depicted below: 

Scenario 1: Primary sector package is developed as a stand-alone till the core package is ready 

 

Scenario 2: When the core packages are ready: 

Page 22: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 22 | P a g e  

 

Primary Sector Portal on Cloud

Tier 3 Applications

Tier 4 Applications

Users through Internet and Mobile

Department Users

CSCs

SWAN

SRDHPrimary Sector

Other Govt. Depts.

People Land

STATE DATA CENTER

Applications Hubs

Primary Sector

Other Govt. Depts.

Applications

Primary Sector

Other Govt. Depts.

DATA CENTERS/CLOUD OF PRIVATE VENDORS

Applications

E-Highway

10 MBPS Link Scalable to 1 GBPS on demand

Citizens and Farmers

Business Users

E-pragati Portal

 

5.1 e-Pragati Primary Sector Application- Generic requirements

 

5.1.1 Authentication Mechanism

The  application  should  provide  an  authentication  mechanism  so  that  any  user  once authenticated  and  authorized  by  system  is  not  required  to  be  re-authorized  for completing any of  the services  in  the same session. For employees of  the  department concerned,  the  browser  based  application  accessed  on  the  intranet,  through  the authentication  mechanism,  will  provide  access  to  all  the  services  of  the  departments concerned (based on their roles and responsibilities), Help module, basic and advanced reporting  etc.  Similarly,  for  external  users  (citizens,  etc),  based  on  their  profile  and registration, the system shall enable an authentication  mechanism to apply for various services,  make  payments,  submit  queries/complaints  and  check  status  of  their applications. The authentication mechanism of the primary sector application will  later be mapped to and integrated with the core e-Pragati application’s single sign on (SSO).  The  SI  will  also  design  a  method  to  uniquely  identify  a  user  based  on  the  parameters mentioned in the People Hub FRS until the core package of e-Pragati is developed. 

5.1.2 Support for PKI based Authentication and Authorization

The  solution  shall  support  PKI  based  Authentication  and  Authorization,  in  accordance with  IT  Act2010,  using  the Digital  Certificates  issued  by  the Certifying  Authorities  (CA) such  as  MTNL  or  NIC.  In  particular,  3  factor  authentications  (login  id  &  password, biometric  and  digital  signature)  shall  be  implemented  by  the  selected  Bidder  for 

Page 23: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 23 | P a g e  

 

officials/employees  involved  in  processing  citizen  services  as  per  the  Functional requirement specification of the e-Pragati Primary Sector services. 

5.1.3 Interoperability Standards

Keeping in view the evolving needs of interoperability, especially the possibility that the solution shall become the focal point of delivery of services, and may also involve cross-functionality  with  the  e-Government  projects  of  other  departments/  businesses  in future,  the  solution  should  be  built  on  Open  Standards.  The  SI  shall  ensure  that  the application developed is easily integrated with the existing applications.  The  SI  shall  ensure  to  interact  with  all  departments  for  which  the  primary  sector package  is  being  developed  to  identify  the  data  elements  that  are  being  used  by  the application and the rules of the same. Definition and approval of data standards shall be done by the e-Pragati committee.  The  SI  shall  develop  all  associated  web  services  of  the  primary  sector  package  to  be consumed by applications of other e-Pragati packages through the e-Highway.  Every care shall be taken to ensure that the code does not build a dependency on any proprietary  software,  particularly,  through  the  use  of  proprietary  ‘stored  procedures’ belonging to a specific database product. 

5.1.4 Security

The  systems  implemented  for  project  should  be  highly  secure,  considering  that  it  is intended to handle sensitive data relating to the citizens of the state. The overarching security considerations are described below. 

I. The  security  services  used  to  protect  the  solution  shall  include:  Identification, Authentication,  Access  Control,  Administration  and  Audit  and  support  for industry standard protocols. 

II. The  solution  shall  support  advanced  user  authentication  mechanisms  including digital certificates and biometric authentication. 

III. Security design should provide for a well-designed identity management system, security of  physical and digital  assets, data and network security, backup and recovery and disaster recovery system. 

IV. The solution should provide for maintaining an audit trail of all the transactions and should also ensure the non-repudiation of audit trail without impacting the overall performance of the system. 

V. The overarching requirement is the need to comply with ISO 27001 standards of security. 

VI. The  application  design  and  development  should  comply  with  OWASP  top  10 principles 

Page 24: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 24 | P a g e  

 

5.1.5 Application Architecture

I. It  has  been  proposed  that  the  applications  designed  and  developed  for  the departments  concerned  must  follow  some  best  practice  and  industry standards. In order to achieve the high level of stability and robustness of the application,  the  system  development  life  cycle  must  be carried  out  using  the industry  standard  best  practices  and  adopting  the  security  constraints  for access  and  control  rights.  The  various  modules/  application  should  have  a common  Exception  Manager  to  handle  any  kind  of  exception  arising  due  to internal/ external factors.  

 II. Similarly the modules of the application are to be supported by the Session and 

Transaction Manager for the completeness of the request and response of the client  request.  The  system  should  have  a  module  exclusively  to  record  the activities/ create the log of activities happening within the system/ application to avoid any kind of irregularities within the system by any User/ Application.  

5.1.6 Requirement on Adherence to Standards

 e-Pragati Primary Sector application must be designed following open standards, to the extent feasible and in line with overall system requirements set out in this RFP, in order to provide for good inter-operability with multiple platforms and avoid any technology or technology provider lock-in.  

5.1.7 Knowledge Transfer

A. At  the  end  of  the  Contract  period,  the  selected  SI  will  be  required  to  provide necessary  handholding  and  transition  support  to  designated  staff  or  any  other agency  that  is  selected  for  maintaining  the  system  post  the  Contract  with  the selected  Bidder.  The  handholding  support  will  include  but  not  be  limited  to, conducting  detailed  walkthrough  and  demonstrations  for  the  e-Pragati Primary Sector Application,  handing  over  all  relevant  documentation,  addressing  the queries/clarifications of the new agency with respect to the working/ performance levels  of  the  e-Pragati Primary Sector Application,  conducting  training  sessions etc. 

B. Knowledge Transfer is an integral part of the scope of work of the selected Bidder. This  will  have  to  be  done  even  in  case  the  Contract  with  the  Bidder  ends  or  is terminated before the planned timelines.  Please  note that  this  is only an  indicative  list.  Any  other activity, over and above these, as may be deemed necessary by the selected SI to meet the service levels 

5.1.8 Third party Audit

Government  of  Andhra  Pradesh  will  arrange  for  the  Third  Party  Audit  for  the 

applications developed under  this package. The cost for the audit will be borne by the 

Government  of  Andhra  Pradesh.  The  SI  shall  provide  all  the  required  support  for  the 

Page 25: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 25 | P a g e  

 

audit  process.  The  application  GO-live  will  be  permitted  in  production  systems  only 

when it is certified from a third party agency and after successful completion of CERT-IN 

certified TPA certification.  

SI shall ensure the following points are duly addressed for successful completion of third party audit: 

I. Successful completion of Application Audit. Application audit will include: A. Functionality  audit  that  will  map  the  functionality  delivered  to  the  FRS 

agreed upon during development phase. B. Identify  the  nature  and  type  of  transactions  being  processed  by  the 

application systems. C. Determine systematic measures implemented to control and secure access 

to  the  application  programs  and  data  including  password  controls,  user authentications,  roles  and  responsibilities,  audit  trails  and  reporting, configuration and interface controls, etc. 

D. Review of database structure including: 1. Classification of data in terms of sensitivity & levels of access 2. Security  measures  over  database  installation,  password 

policies and user roles and privileges 3. Access control on database objects – tables, views, triggers, 

synonyms, etc.  4. Database restoration and recoverability 5. Audit trails configuration and monitoring process 6. Network connections to database 

E. Review of Network and Website will include: 1. Penetration and vulnerability testing 2. Security exposures to internal and external stakeholders 

F. Definition  and  Implementation  of  Security  Policies  and  Controls  will include: 

1. Define  and  implement  backup  process,  including  schedule, storage, archival and decommissioning of media 

2. Define  physical  access  controls  review  (over  DC  and  other critical area) 

3. Define  IT  Change  Management  process,  Incident Management  process  –  covering  identification,  response, escalation mechanisms 

4. Define  and  implement  Anti-virus  (malware)  controls  – patching,  virus  definition  file  update  and  requirements specified in this Contract are also required to be performed by the selected SI at no additional cost. 

Page 26: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 26 | P a g e  

 

5.2 Scope of Services – Project Implementation Phase

5.2.1 Project Planning and Management

 e-Pragati Primary Sector Project  is a geographically spread  initiative  involving multiple stakeholders.  Successful  implementation  and  state-wide  roll  out  of  the  project ultimately  depends  on  all  its  stakeholders  which  makes  the  role  of  the  SI    extremely critical.  Hence  SI  is  required  to  design  and  implement  a  comprehensive  and  effective project  planning  and  management  methodology  together  with  efficient  and  reliable tools. Project planning exercise shall essentially commence with the start of the project, and shall continue till the O&M Phase of the project.  

5.2.2 Project Deliverables & Timelines

This section of the RFP details the key project milestones, deliverables to be submitted by the Supplier at each milestone and timelines of completion of each milestones.   

Sl No

Phase Milestone Deliverables Timeline

1  Project Planning and 

Analysis 

Signing  of  the contract 

Performance Bank Guarantee for 10 % of total contract value. 

Effective Date  of the Contract (T) 

Submission  of Project  Work Plan documents  

Detailed Project Plan for Design, Development & Implementation of Primary Sector System 

Comprehensive project risk management plan Data Assessment Report which should include Data quality, availability of all Data elements required for PS Package Applications 

Data Access Requirements Report which will specify what level of access is required for which users on which data elements.  

Data Security Requirements Report which will describe how Data Security Standards and Requirements will be met. 

Data Migration Strategy 

Data Digitization Strategy 

Data Cleansing and Standardization Strategy 

Data and Application Integration Strategy  (shall be SOA based) 

Identification and listing of all Sources of Data 

Legacy Application and Data management Strategy 

Application decommissioning or retirement Strategy 

Change Management and Training Strategy 

Change Communication Strategy and Impact Analysis Report 

T  +  2 weeks 

Page 27: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 27 | P a g e  

 

2  Systems Study, 

Architecture and Design 

Completion  of Systems Study 

Updated Functional Requirements for Primary Sector Package 

T  +  1 Month 

Submission  of Solution Architecture Documents 

System Requirement Specifications (SRS) Document 

Technical Architecture Document 

High-level Software Application Logic 

Application Workflow 

Wireframes and User Interface Screens 

Data and Application Integration design and specifications 

Database Architecture, including defining data structure, data dictionary 

Design documents for all Application Modules and Sub-modules for PS Applications 

Solution Architecture – Final Software specifications for Applications, Database, Web services etc. 

IT Infrastructure solution encompassing Network, Servers, Storage, System Software 

Requirement Traceability Matrix 

T  +  1.5 Months 

Submission  of Systems  Design Documents 

Technical/ Solution Design Documents including but not limited to: 

Design of the detailed application system, including modular structure, usage of third party API, 

User interface designs 

Database structures including ER, Data Dictionaries   and DFD diagrams, if any. 

Security architecture & policies subject to e-Highway, SDC, APSWAN, IT security policy 

Network architecture 

Data backup & recovery strategy 

Integration/ interface design mechanism with other Departments 

Integration with e-mail, help desk Services of Govt. of AP. 

Software/ Hardware deployment model 

Software/ Hardware configuration management 

Database backup and management policies 

Quality Assurance Plan 

Testing Plan/ Strategy and test cases 

T  +  2.5 Months 

Cloud Infrastructure Setup 

Cloud Infrastructure Set Up  T  +  3 months 

Page 28: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 28 | P a g e  

 

3  Development and 

Integration Testing of Solution  

Submission  of Development Plan 

Development, Testing, and Deployment Plan which should at minimum contain the following 

Breakdown of total scope into phases or iterations 

 Phase or Iteration-wise Identification of requirements for Software development 

Phase-wise Testing and Deployment Strategy 

Phase-wise User Sign-off Strategy  

T  +  4 months 

Completion  of development of the solution 

A. Application Readiness Report, Development completion report including minimum following: 

Source code(soft copy)  

Report formats (soft copy)  

Test script (soft copy)  

Database (soft copy)  

Data digitized and Migrated (soft copy)  

Executable file(soft copy)  

Product CDs  

Others relevant documents deemed necessary. 

Functional Requirement Traceability Report 

Technical documentation to explain Source Code and solution design Maintenance manuals for Data Center, Software, Networks, server and other hardware.  

T  +  7 months 

Data Digitization  & Migration 

Data digitization and migration strategy report.    T  +  6 Months 

Completion  of testing  of  the solution. 

System Testing Results 

Integration Testing Results 

User Sign off 

Deployment plan 

Back-out or Rollback plan 

Contingency plan 

Updated Risk Plan 

T  +  7 months 

Page 29: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 29 | P a g e  

 

Submission  of Project Documentation  

Standard Operating Procedures 

Maintenance Manuals for Administration and Maintenance of Primary Sector System 

SLA Monitoring & Measurement system using EMS 

Call Center Operations along with the Automated solution for Call center operations 

Documentation w.r.t. ISO 9001, ISO20000 and ISO 27001, 27002, 27005 and other relevant standards that are in scope of the work 

Technical, Operational and User Manuals for operation of the deployed solution including.  

User Manual 

Training Manual  

Operations Manual 

Administrator Manual,  

Security Policy, etc.  

Network Diagrams for Data Center and Networks. 

Documentation of IP and Subnet Addressing Scheme, Routing  

Tables and ACL deployed for Intranet.  

T  +  7 months 

4  User Acceptance Testing and Third Party 

Audit 

Completion  of User Acceptance Testing 

UAT Reports for Phase I including  

Various Tests performed  

Test results  

Resolution reports for the issues identified during Testing 

T  +  8 Months 

Completion  of Third  Party Audit 

Audit Compliance Report and Audit Certification  T  +  9 Months 

5  Enterprise Change Management and Training 

Completion  of Training 

Report on completion of training for all the identified users in terms of:  

Application administration training. 

Pilot Phase Functional User Training (On Job training/ Pilot locations) etc. 

Training and change management report on user feedback and duly filled in User Feedback form.  

T  +  9 Months 

6  Deployment  Pilot Implementation Phase 

Pilot Implementation Report  T + 10 

Operational Acceptance  by Purchases 

Operational Acceptance Certificate  

Deployment Checklist 

Fully Updated Master-data and Metadata repository 

T + 10 

Go-Live  Go Live Certificate  T + 11.5 

Page 30: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 30 | P a g e  

 

7  Post Deployment 

Operation  and Maintenance 

Quarterly Report for Operations and Maintenance Activities carried out during the quarter, including: 

Post Implementation Support to Purchaser. 

Software change logs, etc.  

Annual Certification stating all patches/ upgrades/ service releases have been properly installed  

Other Reports as mentioned in the Scope of work.  

Date  of Go  Live +  24 months or T + 36 months - whichever  is earlier 

                

Page 31: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 31 | P a g e  

 

T+1 T+2 T+3 T+4 T+5 T+6 T+7 T+8 T+9 T+10 T+11 T+12 T+36

1 Signing of the Contract (T)

2

Submission of Project Work Plan 

document (T+2 weekS)

3

Completion of Systems Study and 

Submission of updated FRS

4

Submission of Solution Architecture 

Documents

5

Submission of Systems Design 

Documents

6 Cloud Infrastructure Setup

7 Submission of Development Plan

7 Development of Solution 

8 Data Digitization & Migration

9 Solution Testing  and Modification 

10 Submission of Project Documentation 

11

User Acceptance Testing by Dept / 

ePragati / APTS

12 3rd party security Audit

13 Compliance with 3rd party security Audit

14 Training and Capacity Building

15 Pilot Implementation

16

Operational Acceptance Certificate from 

the Purchaser

17 Go-Live

18

Quarterly Operations & Maintenance 

Support. 

Timeline in MonthsMilestoneS. No

PROJECT PLANNING AND ANALYSIS

POST DEPLOYMENT

DEVELOPMENT AND INTEGRATION TESTING OF THE SOLUTION

DEPLOYMENT

SYSTEMS STUDY, ARCHITECTURE AND DESIGN

USER ACCEPTANCE TESTING AND THIRD PARTY AUDIT

ENTERPRISE CHANGE MANAGEMENT AND CAPACITY BUILDING

Timelines and milestones

Page 32: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 32 | P a g e  

 

5.2.3 Preparation of e-Pragati Primary Sector Project Implementation and Roll-out Plan

The  SI  shall  prepare  a  comprehensive  e-Pragati  Primary  Sector  implementation  and deployment plan in consultation with APTS/ITE&C / APTS (ITE&C / APTS).  Further,  SI  will  also  prepare  a  detailed  work  plan  and  estimate  the  timelines  and resources  required  for  configuration,  customization,  extension,  integration,  and commissioning  of  the    e-Pragati  Primary  Sector  software  as  per  the  DeitY  GoI/  State requirements. All  the plans and frameworks prepared by SI during the duration of the Contract shall be required to seek approval from APTS/ITE&C / APTS.  The SI can design a cost-effective solution by proposing to use open source products or components to the extent permissible by the basic principles of e-Pragati.   SI  shall  also  prepare  a  detailed  roll-out plan for each of the modules / geographies (districts) in the phase and get the same approved by the ITE&C / APTS/APTS/e-Pragati Enterprise  Architecture  Design  Group  (EADG).  SI  is  also  responsible  for  conducting workshops for the key officers (State Mission Team, District Mission Team, and District Core  Team,  NIC,  e-Pragati  Enterprise  Architecture  Design  Group  (EADG),  ITE&C  / APTS/APTS,  State  DIT)  of  the  Districts/  State  for  presenting  the  District-Wise  roll-out plan and getting the approval of the same.  To have an effective project management system in place,  it  is necessary  for the SI  to use a Project Management Information System (PMIS) to monitor the Project Progress. The SI shall address at the minimum the following using PMIS: 

I. Create an organized set of activities for the project. II. Establish and measure resource assignments and responsibilities. 

III. Construct a project plan schedule including milestones. IV. Measure project deadlines, budget figures, and performance objectives. V. Communicate the project plan to stakeholders with meaningful reports. 

VI. Provide facility for detecting problems and inconsistencies in the plan  

During  the  project  implementation  the  SI  shall  report  to  the  State  Nodal  Officer/e-Pragati Enterprise Architecture Design Group (EADG) on following items: 

I. Results accomplished during the reporting period; II. Cumulative  deviations  to  date  from  schedule  of  progress  on  milestones  as 

specified in this RFP with the agreed and finalized Project Plan; III. Corrective actions to be taken to return to planned schedule of progress;  IV. Proposed revision to planned schedule provided such revision is necessitated by 

reasons beyond the control of the SI;  V. Other issues and outstanding problems, and actions proposed to be taken;  

VI. Interventions which the SI expects to be made by the State Nodal Officer and/ or actions to be taken by the State Nodal Officer before the next reporting period.  

Page 33: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 33 | P a g e  

 

VII.  Issue Management to help identify and track the issues that need attention and resolution from the State. 

VIII. Scope  Management  to  manage  the  scope  and  changes  through  a  formal management and approval process. 

IX. Risk Management to  identify and manage  the risks  that can hinder  the project progress. 

 SI will  closely work with and send  the  reports  to  the  e-Pragati  Enterprise  Architecture Design  Group  (EADG)(EADG)  as  well.  e-Pragati  enterprise  architecture  design  group (EADG)(EADG)  will  assist  Nodal  Officer  in  acceptance  of  the  report/  document  and suggest the action plan to the Nodal Officer. The Project plan prepared by the SI at the initial  stage  of  the  project  shall  be  reviewed  by  the  <e-Pragati  Enterprise  Architecture Support Group (EADG)(EADG) >/ by the Apex/ Empowered Committee on the advice of the  State  Mission  Team  and  e-Pragati  enterprise  architecture  design  group (EADG)(EADG) .  The  SI  shall  update  and  maintain  the  Project  Plan  throughout  the  duration  of  the engagement. All changes are to be reviewed and approved by the <Nodal agency name> or appointed representatives. 

5.2.4 Project Sign off Deliverable/ Exit Criteria

The  SI  shall  submit  a  list  of  deliverables  that  they  shall  submit  based  on  the methodology they propose. The SI shall prepare the formats/templates for each of the deliverables upfront based upon industry standards and the same will be approved by ITE&C / APTS/APTS prior to its use for deliverables. 

 Requirements Traceability Matrix: The SI shall ensure that developed e-Pragati Primary Sector application is  fully compliant with the requirements and specifications provided in the RFP such as functional, non-functional and technical requirements. For ensuring this, the SI shall prepare a Requirements Traceability Matrix on the basis of Functional Requirements  Specifications  (FRS),  Non  Functional  Requirements  Specification,  and Technical  Requirements  provided  by  State  (updated,  expanded  and  fine-tuned  by  the SI).  Project Documentation: The SI shall create and maintain all project documents that shall be  passed  on  to  the  State  as  deliverables  as  per  the  agreed  project  timelines.  The documents created by the SI will be reviewed and approved by the e-Pragati Enterprise Architecture  Design Group (EADG)  & State Nodal Agency.  All project documents are to be kept up-to-date during the course of the project. The SI shall maintain a log of the internal review of all the deliverables submitted. Soft copy of logs shall be submitted to State Nodal Officer on regular basis.   

Page 34: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 34 | P a g e  

 

5.2.5 Manpower requirements- Central Location (State HQ)

The Indicative Roles envisaged for this project are as follows.  

S # Position

1 Project Director / Manager 

2 Project coordinator  

3 Support Engineers  

  An  indicative  list  of  activities  to  be  performed  by  the  deployed  resources  for  existing system support is: 

I. Project Manager shall be the SPOC to the ITE&C / APTS/e-Pragati Enterprise Architecture    Design  Group  (EADG)  / Department  for  the  implementation of the project. 

II. The other staff  shall  function based  on  the scope of work of  the RFP  and contract signed between SI and ITE&C / APTS. 

III. If  required,  SI  shall  provide  additional  manpower  to  complete  the work/task  within  timelines.  during  the  tenure  of  the  project  the APTS/ITE&C can instruct SI to change the manpower at any location as per the requirements of ITE&C / APTS/Department. 

IV. SI will provide the projected list as well as actual list of deployed manpower on monthly basis.   

V. The  qualification  and  experience  requirements  of  these  resource  persons are mentioned in the Form 9 and 10 of the Bid Process Annexure.  

VI. SI  will  ensure  that  all  the  resources  deployed  at  any  location  are  easily approachable over mobile phones. SI will provide the contact details of the manpower at the time of commencement of operations.  SI will also ensure that  the  proposed  resources  will  not  be  changed  during  project implementation without explicit approval of the ITE&C / APTS. 

VII. The  APTS/ITE&C  reserves  the  right  to  evaluate  the  performance  of  the resource  persons  deployed  on  the  project  by  SI  and  ask  for  a  suitable replacement in case of unsatisfactory performance by any of the resource persons deployed to support the project. 

5.2.6 Business Continuity Planning

The  selected  SI  is  expected  to  develop  a  Business  Continuity  Plan  (BCP)  and  Disaster Recovery Plan (DRP) for the operations carried out by the selected Bidder. An indicative list of activities to be performed by the selected Bidder is mentioned below: 

I. Designing  and  implementing  adequate  data  backup,  business  continuity  and restoration  procedures  for  the    e-Pragati  Primary  Sector  application  data (including  but  not  limited  to  the  database,  attachments  and  all  other  data elements created in and generated by the system and users)  

Page 35: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 35 | P a g e  

 

II. Ensuring that there is no single point of failure and adequate level of redundancy is  built  in  to  meet  the  uptime  and  other  requirements  of  this  RFP.  While building redundancies, it should be ensured that failure of a single component of communication link does not result in failure of primary as well as secondary connectivity. Hence primary and secondary connectivity should be taken from 2 separate  communication  link  providers  and  both  links  should  not  have  any single  point of  failure.  Preferably,  all  the  redundancy will  be  in  auto  fail over mode so that if primary component fails, secondary component automatically takes over. 

III. Ensuring data backup till  the  last  transaction  occurring  in  the system  to ensure enhanced service levels and following RPO and RTO objectives: 

A. Peak hours: Zero RPO and Zero RTO B. Non-Peak Hours: Zero RPO and RTO <= 60 minutes

IV. Any storage space/ media required to maintain backups and other requirements of the RFP should be provisioned for by the selected Bidder in his Bid.  

V. Designing  and  implementing  data  synchronization  procedures  for  the  DR  Site. Periodic  testing  may  be  done  to  ensure  that  all  replication  and  data synchronization procedures are in place all the time. Replication between Data Centre and DR Site as well as change-over during disaster should be automatic and real-time for minimal impact on user experience. 

Page 36: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 36 | P a g e  

 

5.3 Exit Management (on Termination or at the end of the Contract)

5.3.1 Purpose

I. This sets out the provisions, which will apply on expiry or termination of the MSA, the Project Implementation, Operation and Management SLA.  

II. In  the  case  of  termination  of  the  Project  Implementation  and/or  Operation  and Management, the Parties shall agree at  that time whether, and if so during what period, the provisions of this Schedule shall apply. 

III. The  Parties  shall  ensure  that  their  respective  associated  entities  carry  out  their respective obligations set out in this Exit Management Schedule. 

5.3.2 Transfer of Assets

I. APTS/ITE&C / APTS shall be entitled to serve notice in writing on the SI at any time during  the  exit  management  period  as  detailed  hereinabove  requiring  the  SI and/or  its sub-contractors to provide the APTS/ITE&C with a complete and up to date  list  of  the  Assets  within  30  days  of  such  notice.  APTS/ITE&C  shall  then  be entitled to serve notice in writing on the SI at any time prior to the date that is 30 days prior  to  the  end of  the  exit  management  period  requiring  the SI  to  sell  the Assets, if any, to be transferred to APTS/ITE&C / APTS or its nominated agencies at book  value  as  determined  as  of  the  date  of  such  notice  in  accordance  with  the provisions of relevant laws. 

II. In case of contract being terminated by APTS/ITE&C, APTS/ITE&C reserves the right to ask SI to continue running the project operations for a period of 6 months after termination orders are issued.  

III. Upon service of a notice under this Article the following provisions shall apply: A. APTS/ITE&C  /  APTS  shall  pay  to  the  SI  on  the  last  day  of  the  exit 

management  period  to  the  tune  of  last  set  of  completed  services/ deliverables,  subject  to  SLA  requirements.  All  relevant  Assets  (S/W Application source code, docs etc.) to be transferred as stated in the Terms of Payment Schedule. 

B. The  outgoing  SI  will  pass  on  to  APTS/ITE&C  /  APTS  and/or  to  the Replacement  SI,  the  subsisting  rights  in  any  leased  properties/  licensed products on terms not less favourable to APTS/ITE&C / APTS/ Replacement SI, than that enjoyed by the outgoing SI. 

5.3.3 Cooperation and Provision of Information

During the exit management period: I. The  SI-‘System  integrator’  will  allow  the  APTS/ITE&C  /  APTS  or  its 

nominated agency access to information reasonably required to define the then  current  mode  of  operation  associated  with  the  provision  of  the 

Page 37: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 37 | P a g e  

 

services  to  enable  the  APTS/ITE&C  /  APTS  to  assess  the  existing  services being delivered; 

II. promptly  on  reasonable  request  by  the  APTS/ITE&C,  the  SI  shall  provide access  to  and  copies  of  all  information  held  or  controlled  by  them  which they  have  prepared  or  maintained  in  accordance  with  this  agreement relating to any material aspect of the services (whether provided by the SI-‘System  integrator’  or  sub-contractors  appointed  by  the  SI-‘System integrator’.  The  APTS/ITE&C  shall  be  entitled  to  copy  of  all  such information.  Such  information  shall  include  details  pertaining  to  the services rendered and other performance data. The SI-‘System integrator’ shall permit the APTS/ITE&C or its nominated agencies to have reasonable access  to  its  employees  and  facilities  as  reasonably  required  by  the Chairman,  PIU  to  understand  the  methods  of  delivery  of  the  services employed  by  the  SI-‘System  integrator’  and  to  assist  appropriate knowledge transfer. 

5.3.4 Confidential Information, Security and Data

I. The SI-‘System integrator’ will promptly on the commencement of the exit management period supply to the APTS/ITE&C or its nominated agency the following: 

A. information relating  to  the current  services rendered and customer and performance data relating to the performance of sub-contractors in relation to the services; 

B. documentation  relating  to  Computerization  Project’s  Intellectual Property Rights; 

C. documentation relating to sub-contractors; D. all current and updated data as is reasonably required for purposes 

of  APTS/ITE&C  /  APTS  or  its  nominated  agencies  transitioning  the services  to  its  Replacement  SI  in  a  readily  available  format nominated by the APTS/ITE&C, its nominated agency; 

E. all  other  information  (including  but  not  limited  to  documents, records  and  agreements)  relating  to  the  services  reasonably necessary  to  enable  APTS/ITE&C  or  its  nominated  agencies,  or  its Replacement  SI-‘System integrator’  to  carry  out  due  diligence  in order to  transition the provision of the Services  to APTS/ITE&C / or its nominated agencies, or its Replacement SI- (as the case may be). 

II. Before the expiry of the exit management period, the SI-‘System integrator’ shall  deliver  to  the  APTS/ITE&C  or  its  nominated  agency  all  new  or  up-dated materials from the categories set out in Schedule above and shall not retain  any  copies  thereof,  except  that  the  SI-‘System  integrator’  shall  be permitted to retain one copy of such materials for archival purposes only. 

III. Before  the  expiry  of  the  exit  management  period,  unless  otherwise provided  under  the  MSA,  the  APTS/ITE&C  or  its  nominated  agency  shall deliver  to  the  SI-‘System  integrator’  all  forms  of  SI-‘System  integrator’ 

Page 38: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 38 | P a g e  

 

confidential  information,  which  is  in  the  possession  or  control  of Chairperson, PIU or its users. 

5.3.5 Employees

I. Promptly on  reasonable  request  at any  time during  the  exit management period,  the  SI-‘System  integrator’  shall,  subject  to  applicable  laws, restraints and regulations (including in particular those relating to privacy) provide to the APTS/ITE&C or  its nominated agency a list of all employees (with  job  titles)  of  the  SI-‘System  integrator’  dedicated  to  providing  the services at the commencement of the exit management period. 

II. Where any national, regional law or regulation relating to the mandatory or automatic  transfer  of  the  contracts  of  employment  from  the  SI-‘System integrator’  to the APTS/ITE&C or  its nominated agency, or  a Replacement SI-‘System  integrator’  ("Transfer  Regulation")  applies  to  any  or  all  of  the employees of the SI-‘System integrator’, then the Parties shall comply with their respective obligations under such Transfer Regulations. 

III. To the extent that any Transfer Regulation does not apply to any employee of  the  SI-‘System  integrator’,  department,  or  its  Replacement  SI-‘System integrator’  may  make  an  offer  of  employment  or  contract  for  services  to such employee of the SI-‘System integrator’ and the SI-‘System integrator’ shall not  enforce or  impose any contractual provision  that would prevent any  such  employee  from  being  hired  by  the  Chairperson,  PIU  or  any Replacement SI-‘System integrator’. 

5.3.6 Transfer of Certain Agreements

On request by the APTS/ITE&C or its nominated agency the SI-‘System integrator’ shall effect  such  assignments,  transfers,  licences  and  sub-licences  as  the  Chairperson,  PIU may require in favour of the Chairperson, PIU, or its Replacement SI-‘System integrator’ in  relation  to  any  equipment  lease,  maintenance  or  service  provision  agreement between SI-‘System integrator’ and third party lessors, vendors, and which are related to the  services  and  reasonably  necessary  for  the  carrying  out  of  replacement  services  by the APTS/ITE&C or its nominated agency or its Replacement SI-‘System integrator’. 

5.3.7 Rights of Access to Premises

I. At any time during the exit management period, where Assets are located at the SI –“System Integrator’s” premises, the SI-‘System integrator’ will be obliged to give reasonable rights of access to (or,  in the case of Assets  located on a third party's premises, procure reasonable rights of access to) the APTS/ITE&C or its nominated agency  and/or  any  Replacement  SI-‘System integrator’  in  order  to  make  an inventory of the Assets. 

II. The SI-‘System integrator’ shall also give the APTS/ITE&C or  its nominated agency or  its  nominated  agencies,  or  any  Replacement  SI-‘System integrator’  right  of reasonable access to the  Implementation  Partner's  premises  and  shall  procure  

Page 39: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 39 | P a g e  

 

the APTS/ITE&C / APTS or its nominated agency or its nominated agencies and any Replacement  SI-‘System integrator’  rights  of  access  to  relevant  third  party premises during the exit management period and for such period of time following termination or expiry of the MSA as is reasonably necessary to migrate the services to  the  APTS/ITE&C  or  its  nominated  agency,  or  a  Replacement  SI-‘System integrator’. 

5.3.8 General Obligations of the SI-‘System integrator’

I. The SI-‘System integrator’ shall provide all such information as may reasonably be necessary to effect as seamless a handover as practicable in the circumstances to the APTS/ITE&C or its nominated agency or its Replacement SI-‘System integrator and  which  the  SI-‘System integrator’  has  in  its  possession  or  control  at  any  time during the exit management period. 

II. For the purposes of this Schedule, anything in the possession or control of any SI-‘System integrator’,  associated  entity,  or  sub-contractor  is  deemed  to  be  in  the possession or control of the SI-System integrator’. 

III. The  SI-‘System integrator’  shall  commit  adequate  resources  to  comply  with  its obligations under this Exit Management Schedule. 

5.3.9 Exit Management Plan

I. The SI-‘System  integrator’  shall  provide  the  APTS/ITE&C  or  its  nominated  agency with a recommended exit management plan ("Exit Management Plan") which shall deal with at least the following aspects of exit management in relation to the MSA as a whole and in relation to the Project  Implementation, and the Operation and Management SLA. 

A. A  detailed  program  of  the  transfer  process  that  could  be  used  in conjunction with a  Replacement SI-‘System integrator’  including details  of the  means  to  be  used  to  ensure  continuing  provision  of  the  services throughout the transfer process or until the cessation of the services and of the management structure to be used during the transfer;  

B. plans for the communication with such of the SI-‘System integrator's' sub- contractors,  staff,  suppliers,  customers  and  any  related  third  party  as  are necessary  to  avoid  any  material  detrimental  impact  on  the  APTS/ITE&C  operations as a result of undertaking the transfer; 

C. Plans for provision of contingent support to APTS-ITE&C and Replacement SI-‘System integrator’ for a reasonable period after transfer. 

II. The  ‘System  Integrator  (SI)’  shall  re-draft  the  Exit  Management  Plan  annually thereafter to ensure that it is kept relevant and up to date. 

III. Each Exit Management Plan shall be presented by the ‘’System Integrator’’ to and approved by the ITE&C / APTS or its nominated agencies. 

IV. The  terms  of  payment  as  stated  in  the  Terms  of  Payment  Schedule  include  the costs  of  the  ‘System  integrator’  SI  complying  with  its  obligations  under  this Schedule. 

Page 40: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 40 | P a g e  

 

V. In  the  event  of  termination  or  expiry  of  MSA,  and  Project  Implementation,  each Party shall comply with the Exit Management Plan. 

VI. During  the  exit  management  period,  the  System  Integrator  (SI)  shall  use  its  best efforts to deliver the services. 

VII. Payments  during  the  Exit  Management  period  shall  be  made  in  accordance  with the Terms of Payment Schedule. 

VIII. This Exit Management plan shall be furnished in writing to the ITE&C / APTS/APTS or  its  nominated  agencies  within  90  days  from  the  Effective  Date  of  this Agreement. 

 

5.3.10 Exit Management – Parallel-run

a. For  taking  over  and  handing  over  by  the  SI,  the  process  will  have  a parallel run of 30 calendar days. 

b. During the parallel period the KT and asset transfer shall be completed. 

c. The parallel run shall start 30 days prior to the expiry of the contract.  

 

5.3.1 Exit Management Process

1. Upon completion of the contract period or upon termination of the agreement for any reasons, the SI shall comply with the following: 

a. Deliver forthwith actual or constructive possession of the Primary Sector Package Project free and clear of all Encumbrances and execute such deeds, writings and documents as may be required by the APTS for fully and effectively divesting the SI of all of  the rights,  title and  interest of  the SI  in  the Primary Sector Package   Project and conveying the Primary Sector Package Project. 

b. Comply with the Divestment Requirements set out except in case if Termination of this Agreement is due to APTS Event of Default. In case of Termination due to APTS Event of Default, the SI shall have implemented the maintenance schedule as  well  as  any  repairs  pointed  out  by  the  Independent  Consultant  in  its Operations  &  Maintenance  Inspection  Report  prior  to  date  of  Termination Notice.  In  case  of  Termination  due  to  Force  Majeure  Event,  the  Divestment Requirements  shall  be  agreed  between  APTS  and  the  Primary  Sector  Package Operator. 

c. Pay  all  transfer  costs  and  stamp  duty  applicable  on  hand  back  of  project  assets except  in case the Project  is being  transferred due to APTS event of default or expiry of contract period, where APTS shall be responsible for transfer costs and stamp duty, if any. For clarification of doubt, transfer costs in this Clause relate to  taxes  and duties  applicable  at  transfer  of  Primary Sector  Package  Project,  if any. 

Page 41: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 41 | P a g e  

 

2. Subject to clause 1 of exit management, upon completion of the contract period or upon  termination  of  the  agreement,  the  SI  shall  comply  and  conform  to  the following  Divestment  Requirements  in  respect  of  the  Primary  Sector  Package Project: 

a. All  Project  Assets  including  the  hardware,  software,  documentation  and  any other  infrastructure  shall  have  been  renewed and  cured  of  all  defects  and deficiencies as necessary so that the Primary Sector Package Project is compliant with  the  Specifications and Standards set  forth  in  the  RFP, Agreement  and  any other amendments made during the contract period. 

b. The  SI  delivers  relevant  records  and  reports  pertaining  to  the  Primary  Sector Package  Project  and  its  design,  engineering,  operation,  and  maintenance including all operation and maintenance records and manuals pertaining thereto and complete as on the Divestment Date. 

c.   The  SI    executes  such  deeds  of  conveyance,  documents  and  other  writings  as the APTS may reasonably require to convey, divest and assign all the rights, title and  interest  of  the  SI  in  the  Primary  Sector  Package  Project  free  from  all Encumbrances  absolutely  and  free  of  any  charge  or  tax  unto  the  APTS  or  its Nominee. 

d. The  SI  complies  with  all  other  requirements  as  may  be  prescribed  under Applicable  Laws  to  complete  the  divestment  and  assignment  of  all  the  rights, title  and  interest  of  the  SI  in  the  Primary  Sector  Package  Project  free  from  all Encumbrances absolutely and free of any charge or tax to APTS or its nominee. 

3. Not earlier than 3  (three) months before the expiry of  the contract Period but not later than 30 (thirty) days before such expiry,  or in the event of earlier Termination of the contract, immediately upon but not later than 15 (fifteen) days from the date of  issue  of  Termination  Notice,  the  Independent  Consultant  as  nominated  by  the APTS/IT&C(GoAP)  shall  verify,  in  the  presence  of  a  representative  of  the  Primary Sector Package Operator,  compliance  by  the SI with  the Divestment  Requirements set  forth  in  relation  to  the  Primary  Sector  Package  Project  and,  if  required,  cause appropriate tests to be carried out at the Primary Sector Package Operator’s cost for determining  the  compliance  therewith.  If  any  shortcomings  in  the  Divestment Requirements are found by either Party, it shall notify the other of the same and the SI shall rectify the same at its cost. 

Upon  the  conforming  to  all  Divestment  Requirements  and  handing  over  actual  or 

constructive  possession  of  the  Primary  Sector  Package  Project  to  APTS  or  a  person 

nominated by APTS in this regard, APTS shall issue a certificate substantially, which will 

have the effect of constituting evidence of divestment of all rights, title and lien in the 

Primary  Sector  Package  Project  by  the  SI  and  their  vesting  in  Primary  Sector  Package 

Page 42: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 42 | P a g e  

 

Project pursuant hereto. Issue of such certificate shall not be unreasonably withheld by 

APTS. The divestment  of all  rights,  title and  lien  in  the  Primary Sector Package Project 

shall  be  deemed  to  be  complete  on  the  date  when  all  the  Divestment  Requirements 

have  been  fulfilled  or  the  Certificate  has  been  issued,  whichever  is  earlier,  it  being 

expressly agreed that any defect or deficiency in any Divestment Requirement shall not 

in any manner be construed  or  interpreted  as  restricting  the  exercise  of  any  rights  by 

State Government or its nominee on or in respect of the Primary Sector Package Project 

on  the  footing  as  if  all  Divestment  Requirements  have  been  complied  with  by  the 

Concessionaire. 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 43: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 43 | P a g e  

 

6 Business Model

There are seven departments  in  the Primary Sector Package. The business models  are 

proposed differently for each department 

6.1.1 Agri Management System :

a. The system provides a range of services to the farmers. A subscription model to be implemented for interested (large) farmers. 

b. SI has to design specialized services, which shall be targeted to a minimum 10% coverage of farmers. 

c. The existing applications shall be leveraged. d. SI shall propose a public-cloud-based solution. e. The project to be implemented on a BOOT Model over 3 years.  f. The income from transaction charges proposed by the bidder will be paid as 

incentive   

6.1.2 Fisheries Management

a. The  SI  has  to  design  value-added  services  to  the  progressive  clients  (farmers/ fisherman).  

b. SI shall propose a public-cloud-based solution. c. The project to be implemented on a BOOT Model over 3 years.  d. The income from transaction charges proposed by the bidder will be paid as 

incentive   

6.1.3 e-Mandi (e-Market)

a) eMarket  is  funded  by  the  Agricultural  Market  Committees  (AMCs).    The  AMCs stand to gain from integration with ePragati, through access to applications like the DataLytics, Works Management, People Hub and the Agri Package. 

b) The SI has to design transaction model with Value added services and subscription-based revenue model. 

c) The project to be implemented on a BOOT Model over 3 years.  

d) The income from transaction charges proposed by the bidder will be paid as incentive   

6.1.4 Animal Husbandry : 

The  program  is  to  benefit  small  farmers  of  weaker  sections,  it  is  felt  that  no revenue model would be possible. It can be a public-cloud-based solution. 

a) The SI has to design transaction model with Value added services and subscription-based revenue model. 

b) The models will be on a bought-out model, with payments to SI deferred over 3 years 

c) The income from transaction charges proposed by the bidder will be paid as incentive   

Page 44: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 44 | P a g e  

 

6.1.5 Cane Management

a) The SI has to design transaction model with Value added services and subscription-based revenue model. 

b) The models will be on a bought-out model, with payments to SI deferred over 3 years 

c) The income from transaction charges proposed by the bidder will be paid as incentive  

 The detailed revenue model for the project is proposed in Volume I section 3.5 of 

the RFP.  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 45: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 45 | P a g e  

 

 

7 Governance structure for e-Pragati project

7.1.1 e-Pragati Governance Structure

The  entire  e-Pragati      Governance  Structure  consists  of  three  layers  which  are  given below:  

  i. High level committee on APSEA headed by Hon’ble  CM ii. EA Design group headed by IT Advisor iii. EA support group headed by Secretary ITE&C  The above three committees will be supported by   E-Pragati Academy  E-Governance Authority  APTS  EA Working Group 

7.1.2 EA Design Group consists of:

1. IT advisor 2. Principal Secretaries 3. Commissioner 4. CEO e-Gov Audit 5. MD, APTS 6. SIO,NIC 7. Representatives 8. Joint Director( APSEA)/ ePragati  9. Secretary ITE&C 

Page 46: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 46 | P a g e  

 

7.1.3 EA Support Group consists of:

1. Secretary ITE&C 2. Head SOA 3. PD MeeSeva  4. Director, IT Finance 5. PD,CMRO Revenue 6. Manager APTS 7. PD Suvidha MA,UD 8. Sr Tech Director NIC 9. Sr. Consultant SeMT 10. Consultant SeMT 

7.1.4 Coordination committees with existing service providers :

1. Head Of the Department (Chairman) 2. Joint Director( APSEA)/ e-Pragati  3. PM of Existing Service Provider 4. PM/PL of SI 5. Consultant – ePragati 6. Representative of APTS 7. IT coordinator of the Department – Convener 

7.1.5 Place of Work:

1. At present the Government operates from Hyderabad. 2. In the event the departments move to the new capital OR any location identified 

by the Govt., the SI has to coordinate with departments from the new location. 3. The SI is proposed to operate from his development centre. 4. SI need to set up a local project office in AP. 5. The coordination team should work with the departments 

Page 47: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 47 | P a g e  

 

8 Instructions to the Bidders

8.1 General

While every effort has been made to provide comprehensive and accurate background information  and  requirements  and  specifications,  Bidders  must  form  their  own conclusions  about  the  solution  needed  to  meet  the  requirements.  Bidders  and recipients of this RFP may wish to consult their own legal advisers in relation to this RFP.  All  information  supplied  by  Bidders  may  be  treated  as  contractually  binding  on  the Bidders, on successful award of the assignment by the APTS/ITE&C on the basis of this RFP.  No  commitment  of  any  kind,  contractual  or  otherwise  shall  exist  unless  and  until  a formal written contract has been executed by or on behalf of the APTS. Any notification of  preferred  bidder  status  by  the  APTS/ITE&C  shall  not  give  rise  to  any  enforceable rights by  the Bidder. The APTS/ITE&C may cancel  this  public procurement at any  time prior to a formal written contract being executed by or on behalf of the APTS.   This  RFP  supersedes  and  replaces  any  previous  public  documentation  & communications, and Bidders should place no reliance on such communications.  

8.2 Bidding Schedule

The following table lists important bidding process milestones and time for completion 

S. 

No  Milestone Time for 

Completion 

1.  Release of Request For Proposal (RFP)  14/12/2015 2.  Last date for Submission of Written Questions by bidders  21/12/2015 3.  Pre- Bid Conference  28/12/2015 4.  Response to bidder Questions  04/01/2016 5.  Last Date for Submission of bids  25/01/2016 6.  Date of opening the Pre-qualification bids  01/02/2016 7.  Date of opening the Technical bids  08/02/2016 8.  Technical Presentations & Demonstration  15/02/2016 9.  Date of opening theFinancial bids  22/02/2016 

10.  Contract Finalization and Award  29/02/2016 

8.3 Compliant Proposals/ Completeness of Response

Bidders  are  advised  to  study  all  instructions,  forms,  terms,  requirements  and  other information in the RFP documents carefully. Submission of the bid shall be deemed to have  been  done  after  careful  study  and  examination  of  the  RFP  document  with  full understanding of its implications.  

Page 48: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 48 | P a g e  

 

Failure to comply with the requirements of this paragraph may render the Proposal non-compliant and the Proposal may be rejected. Bidders must:  

Include all documentation specified in this RFP; 

Follow the format of this RFP and respond to each element in the order as set out in this RFP 

Comply with all requirements as set out within this RFP. 

8.4 Pre-Bid Meeting & Clarifications

8.4.1 Pre-bid Conference

APTS/ITE&C  shall  hold  a  pre-bid  meeting  with  the  prospective  bidders  on  the  28th  of December 2015, at 10.00 AM at office of APTS office or any other venue as intimated. Only those bidders who have purchased the bid shall be allowed to represent in the pre-bid  meeting.  A  bidder  shall  represent  with  a  maximum  of  2  persons  for  the  pre-bid meeting.  The Bidders will have  to ensure that  their queries for Pre-Bid meeting should reach to Name, Address, Fax and email  id of the Nodal Officer by post, facsimile or email on or before 27th December 2015, 11:30 AM.  The queries should necessarily be submitted in the following format:  Bidder’s Request for Clarification 

Name  and  Address  of  the 

Organization  submitting 

request 

Name  and  Position  of 

Person submitting request 

Contact  Details  of  the 

Organization  /  Authorized 

Representative 

 

 

 

 

  Tel: 

Fax: 

Email: 

S. No  RFP Reference(s) 

(Section, Page) 

Content of RFP requiring 

clarification 

Points  of  clarification 

required 

1       

2       

  

 APTS/ITE&C  shall  not  be  responsible  for  ensuring  that  the  bidders’  queries  have  been received by them. Any requests for clarifications after the indicated date and time may not be entertained by the APTS. 

Page 49: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 49 | P a g e  

 

8.4.2 Responses to Pre-Bid Queries and Issue of Corrigendum

The Nodal Officer notified by the APTS/ITE&C will endeavour to provide timely response to  all  queries.  However,  APTS/ITE&C  makes  no  representation  or  warranty  as  to  the completeness  or  accuracy  of  any  response;  neither  response  nor  does  APTS/ITE&C undertake to answer all the queries that have been posed by the bidders. The responses to the queries from all bidders will be distributed to all.  At any time prior  to the  last date for receipt of bids, APTS/ITE&C may, for any reason, whether at its own initiative or in response to a clarification requested by a prospective Bidder, modify the RFP Document by a corrigendum.  The Corrigendum (if any) & clarifications to the queries from all bidders will be posted on the eprocurement portal (http://www.eprocurement.gov.in/).  Any such corrigendum shall be deemed to be incorporated into this RFP. In order to provide prospective Bidders reasonable time for taking the corrigendum into account,  APTS/ITE&C  may,  at  its  discretion,  extend  the  last  date  for  the  receipt  of Proposals. 

8.5 Key Requirements of the Bid

8.5.1 Right to Terminate the Process

APTS/ITE&C  may  terminate  the  RFP  process  at  any  time  and  without  assigning  any reason. APTS/ITE&C makes no commitments, express or  implied,  that  this process  will result in a business transaction with anyone.  This RFP does not constitute an offer by APTS. The bidder's participation in this process may  result  in  APTS/ITE&C  selecting  a  bidder  to  engage  towards  execution  of  the contract. 

 

8.5.2 RFP Document Fees

All the participating bidders who submit the bids have to pay an amount @ 0.03% of  their  final  bid  value  online  with  a  cap  of  Rs.10,000/-  for  quoted  value  of purchase  up  to  Rs.50 crores  and Rs.25000/-  if  the  purchase  value  is above Rs.50 crores  &  service  tax  applicable  or  as  levied  by  Govt.  of  India  on  transaction  fee through  online  in  favour  of  MD,  APTS.  The  amount  payable  to  APTS  is  non refundable 

8.5.3 Earnest Money Deposit (EMD)

a) Bidders shall submit, along with their Bids, EMD of INR 1,00,00,000 only (Rupees One  Crore  Only),  in  the  form  of  a  Demand  Draft  OR  Bank  Guarantee  (in  the format specified in Annexure I: Form 3) issued by any Scheduled bank in favour 

Page 50: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 50 | P a g e  

 

of  Managing  Director,  APTS,  payable  at  Hyderabad,  and  should  be  valid  for  a period of 6 months from the due date of the tender/ RFP.  

b) EMD  of  all  unsuccessful  bidders  would  be  refunded  by  APTS/ITE&C  within  two months  of  the  bidder  being  notified  as  being  unsuccessful.  The  EMD,  for  the amount  mentioned  above,  of  successful  bidder  would  be  returned  upon submission  of  Performance  Bank  Guarantee  as  per  the  format  provided  in Annexure III: Form 1. 

c) The  EMD  amount  is  interest  free  and  will  be  refundable  to  the  unsuccessful bidders without any accrued interest on it. 

d) The  bid/  proposal  submitted  without  EMD,  mentioned  above,  will  be  summarily rejected. 

e) The EMD may be forfeited: A. If a bidder withdraws its bid during the period of bid validity. B. In  case  of  a  successful  bidder,  if  the  bidder  fails  to  sign  the  contract  in 

accordance with this RFP f) Scanned copy of EMD document should be uploaded on e-Procurement website. 

The Original Copy of EMD should be submitted to APTS before opening of PQ bid. 

8.5.4 Submission of Proposals

a) Bidders  are  requested  to submit  the  bids  after  issue  of  minutes  of  the  pre  bid meeting duly considering the changes made if any, during the pre-bid meeting. Bidders  are  totally  responsible  for  incorporating/  complying  the  changes/ amendments  issued  if  any  during  pre-bid  meeting  in  their bid.    However,  hard copies of PQ& TQ bids  to be submitted to APTS  in separate sealed covers with proper titles on the next day of Bid Submission Date.    

b) Bids shall be submitted online on www.eprocurement.gov.in platform. 

The  participating  bidders  in  the  tender  should  register  themselves  free  of cost on e-procurement platform in the website www.eprocurement.gov.in. 

Bidders can log-in to e-procurement platform in Secure mode only by signing with the Digital certificates. 

The bidders who are desirous of participating in e-procurement shall submit their technical bids, price bids as per the formats given. 

The  bidders  should  scan  and  upload  the  respective  documents  in  Pre-Qualification  and  Technical  bid  documentation  as  detailed  in  the  RFP including  EMD.  The  bidders  shall  sign  on  all  the  statements,  documents certificates  uploaded  by  them,  owning  responsibility  for  their  correctness/ authenticity. 

The rates should be quoted in online only  

c) After  uploading  the  documents,  the  copies  of  the  uploaded  statements, certificates, documents (except the Price bid/ offer/ break-up of taxes) are to be submitted by the bidder to the O/o The Managing Director, APTS, BRKR Bhavan, Hyderabad. 

Page 51: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 51 | P a g e  

 

d) Failure  to  furnish  any  of  the  uploaded  documents,  certificates,  will  entitled  in rejection of the bid. The APTS shall not hold any risk on account of postal delay. Similarly, if any of the certificates, documents, etc., furnished by the Bidder are found to be false/ fabricated/ bogus, the bidder will be disqualified, blacklisted, action will be initiated as deemed fit and the Bid Security will be forfeited. 

e) APTS  will  not  hold  any  risk  and  responsibility  regulating  non-visibility  of  the scanned and uploaded documents. 

f) The Documents that are uploaded online on e-procurement platform will only be considered for Bid Evaluation. 

g) Important Notice to Contractors, Suppliers and Department users (i)In the endeavor to bring total automation of processes in e-Procurement, the Govt.  has  issued  orders  vide  G.O.Ms.No.  13  dated.  5.7.2006  permitting integration  of  electronic  Payment  Gateway  of  ICICI/  HDFC/  Axis  Banks  with  e-Procurement  platform,  which  provides  a  facility  to  participating  suppliers/ contractors  to  electronically  pay  the  transaction  fee  online  using  their  credit cards. 

h) The prime bidder shall purchase the bid document. The bid can be filed with user ID of bidder. 

8.5.5 Authentication of Bids

The  Proposal  should  be  accompanied  by  a  power-of-attorney  in  the  name  of  the signatory  of  the  Proposal.  A  scanned  copy  of  the  power-of-attorney  should  also  be uploaded on the e-Procurement portal along with the other documents. 

8.6 Preparation and Submission of Proposal

8.6.1 Proposal Preparation Costs

a) The  bidder  shall  be  responsible  for  all  costs  incurred  in  connection  with participation  in  the  RFP  process,  including,  but  not  limited  to,  costs  incurred  in conduct  of  informative  and  other  diligence  activities,  participation  in meetings/discussions/presentations,  preparation  of  proposal,  in  providing  any additional information required by APTS/ITE&C to facilitate the evaluation process, and  in  negotiating  a  definitive  contract  or  all  such  activities  related  to  the  bid process. 

b) APTS/ITE&C will  in  no case  be  responsible  or  liable  for  those costs,  regardless of the conduct or outcome of the bidding process. 

8.6.2 Language

a) The  Proposal  should  be  filled  by  the  Bidder  in  English  language  only.  If  any supporting  documents  submitted  are  in  any  language  other  than  English, translation of  the same  in English  language  is  to be duly attested by the Bidders. For purposes of interpretation of the Proposal, the English translation shall govern. 

Page 52: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 52 | P a g e  

 

8.6.3 Venue & Deadline for Submission of Proposals

a) Proposals,  in  its  complete  form  in  all  respects  as  specified  in  the  RFP,  must be submitted to APTS/ITE&C online  in the procurement portal before the deadline as indicated in Bidding Schedule in Section 1.2. 

8.6.4 Late Bids

a) Bids  received  after  the  due  date  and  the  specified  time  (including  the  extended period  if  any)  for  any  reason  whatsoever,  shall  not  be  entertained  and  shall  be returned unopened. 

b) The  bids  submitted  by  telex/telegram/fax/e-mail/hard  copies  etc.  shall  not  be considered. No correspondence will be entertained on this matter. 

c) APTS/ITE&C  shall  not  be  responsible  for  any  postal  delay  or  non-receipt/  non-delivery  of  the  documents.  No  further  correspondence  on  the  subject  will  be entertained.  

d) APTS/ITE&C reserves the right  to modify and amend any  of  the  above-stipulated condition/criterion  depending  upon  project  priorities  vis-à-vis  urgent commitments.  

8.7 Evaluation Process

a) APTS/ITE&C  will  constitute  a  Proposal  Evaluation  Committee  to  evaluate  the responses of the bidders  

b) The Proposal Evaluation Committee constituted by the APTS/ITE&C shall evaluate the  responses  to  the RFP  and  all  supporting  documents/  documentary  evidence. Inability  to  submit  requisite  supporting  documents/  documentary  evidence,  may lead to rejection. 

c) The decision of the Proposal Evaluation Committee in the evaluation of responses to  the  RFP  shall  be  final.  No  correspondence  will  be  entertained  outside  the process of negotiation/ discussion with the Committee. 

d) The Proposal Evaluation Committee may ask for meetings with the Bidders to seek clarifications on their proposals 

e) The Proposal Evaluation Committee reserves the right to reject any or all proposals on the basis of any deviations.  

f) Each  of  the  responses  shall  be  evaluated  as  per  the  criteria  and  requirements specified in this RFP. 

8.7.1 Tender Opening

The Proposals submitted up to the Time and Date specified will be opened at the Time and Date as specified in section 1.2. Bids will be opened by any officer authorized by APTS,  in  the presence  of such of  those Bidders  or  their  representatives  who may be present at the time of opening.   

Page 53: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 53 | P a g e  

 

The representatives  of  the  bidders  should  be  advised  to  carry  the  identity card  or  a letter of authority from the tendering firms to identify their bona-fides for attending the opening of the proposal. 

8.7.2 Tender Validity

The  offer  submitted  by  the  Bidders  should  be  valid  for  minimum  period  of  180  days from the date of submission of Tender. 

8.7.3 Tender Evaluation

I. Initial  Bid  scrutiny  will  be  held  and  incomplete  details  as  given  below  will  be treated as non-responsive, if Proposals : 

A. Are not submitted in as specified in the RFP document B. Received without the Letter of Authorization (Power of Attorney) C. Are found with suppression of details D. With  incomplete  information,  subjective,  conditional  offers  and  partial 

offers submitted  E. Submitted without the documents requested in the checklist F. Have non-compliance of any of the clauses stipulated in the RFP G. With lesser validity period 

 II. All responsive Bids will be considered for further processing as below. 

A. APTS/ITE&C will prepare a  list of responsive bidders, who comply with all  the Terms  and  Conditions  of  the  Tender.  All  eligible  bids  will  be  considered  for further evaluation by a Committee according to the Evaluation process define in  this  RFP  document.  The  decision  of  the  Committee  will  be  final  in  this regard. 

9 Criteria for Evaluation

I. The  overall  objective  of  this  evaluation  process  is  to  select  the  capable  and qualified  firm  in  the  business  domain  of  developing  and  rolling  out  a  Portal,    e-Pragati Primary Sector Application, providing associated capacity building, training and  handholding  support  as  well  as  associated  managed  services  and  who  will provide a comprehensive solution towards Deployment, Deployment, Integration, Commissioning, Operation & Management of  e-Pragati Primary Sector Application in Andhra Pradesh state. 

II. First the Pre-Qualification Proposal will be evaluated and only those bidders who qualify  the  requirements  will  be  eligible  for  next  set  of  evaluations.  Technical Proposal andFinancial Proposal of Bidders who do not meet the Pre-Qualification criteria will not be evaluated. 

III. The  technical  score  of  all  the  eligible  bidders  (who  have  met  pre-qualification criteria) would be calculated as per the criteria mentioned below. All  the bidders who achieve at least 70 marks in the technical evaluation would be eligible for the next stage, i.e. Financial Bid opening. 

Page 54: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 54 | P a g e  

 

IV. Proposals  of  Companies  would  be  evaluated  as  per  Technical  Evaluation  Criteria (Section  6.2).Agencies/  firms  should  clearly  indicate,  giving  explicit  supporting documentary  evidence,  with  respect  to  the  above,  in  absence  of  which  their proposals will be rejected summarily at the qualification stage itself. 

V. The  bidder  with  the  lowest  financial  quote  (L1)  among  the  technically  qualified bidders’ would be considered as the most responsive bid. 

VI. In  the  event  that  there  are  2  or  more  bidders  having  the  same  value  in  the financial bid, the bidder securing the highest technical score will be adjudicated as the “Best responsive bid” for award of the Project.   

Page 55: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 55 | P a g e  

 

 

9.1 Pre-Qualification Criteria

 

S No  Qualification Criteria  Documents/ Information to be provided in 

the submitted proposal 

1   Legal  Entity:  all  the  Companies  comprising 

the consortium should be registered under 

Companies  Act,  1956  /  Partnership  firms 

and  should  have  been  in  the  business  at 

least for 5 years as on 31st

 March 2015.  

Quote  the  number  of  Certificate  of 

Incorporation  issued  by MCA, GoI  

2   The  Net  Worth  of  each  of  the  Consortium 

members  must  be  positive  as  on 

31/03/2015.  

Extracts from the audited Balance sheet 

and Profit & Loss, accompanied by a 

certificate of  Statutory Auditor for the  

Net worth  

3   The members of  the consortium should be 

certified  for  ISO  9001:2008  and      CMMi5 

and ISO/IEC 20000-1: 2011.  

Copy of certification which is valid on date 

of submission. 

4   Constitution of Consortium  Not  more  than 5  members  (Prime bidder 

+ 4 members) 

One  of  the  consortium  member  must  be 

an  SME/start-up  empanelled  with  APTS/ 

ITE&C  Dept.  and  eligible  for  PMA  as  per 

GO MS 22 dated 28.11.2015  

 

S No   Parameter   Qualification Criteria  

5   Prime Bidder   - Prime bidder Shall be the  SI - Prime bidder shall be responsible for discharging the 

responsibilities as per contractual obligations.  - Prime Bidder shall submit the bid which is complete in all 

aspects on behalf of the consortium.  - Payments will be released to Prime bidder only.  

6   Prime  Bidder and Consortium Members 

- The Prime Bidder  and Consortium Partner should be      i) System integrator (SI) or      ii) Authorized Representative of a Manufacturer /OEM or      iii) Product developer or  

Page 56: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 56 | P a g e  

 

    iv) A Software development / services company.     v) PMA eligible company  -  The authorized representatives should submit the latest authorization from manufacturer’s / OEM / Product developer.  

7.    Development Centre in AP    

The  Consortium  Partner  in  the  role  of  SI  should  have  a  development center in AP or eligible for PMA as per the GO MS 22 dated 28.11.2015 issued by ITE&C dept. 

 

 

S. No  Requirement   Criteria   Documents Required  

8   Prime bidder: Average  Annual  Sales Turnover  generated  from  system Integration  (SI)  services  related  during  the last five (5) for financial years (FY 14-15,  FY 13-14, FY 12-13, FY 11-12 and FY 10-11).  

Rs.  500  Cr.  or more  

Extracts  from  the  audited Profit & Loss statements;  

OR  

Certificate  from  the  statutory auditor.  

9   The Consortium members (Partners) Should have minimum average annual turnover of Rs. 5 Cr. in the areas as specified in S.No 6 above, during the financial years (2010-11, 2011-12, 2012-13, 2013-14 or 2014-15).  For PMA eligible consortium member this criteria is not applicable  

Rs.  5.0  Cr.  or more  

Extracts  from  the  audited Profit & Loss statements;  

OR  

Certificate  from  the statutory auditor.  

10   Prime Bidder experience in implementation of  integrated  turnkey  projects  around application  development  as  a  System Integrator  in  India  with  One  40  Cr.  ProjectOR  Two  20  Cr.  Projects

 

OR  Three  16  Cr. Project, which have gone  live  in  the past 5 years (FY 14-15,  FY 13-14, FY 12-13, FY 11-12 and FY 10-11).  

 (Specifically  each  project  should  have components  of  Hardware,  Networking, Helpdesk  and  Application  related  training necessary for this project).  

One  40  Cr. Projects  

OR  Two 20 Cr. Projects  OR  Three 16 Cr. Projects  

Details  of  Experience  of responding  firm/  Project Citation  for  3  projects supported  with  Work  order and  Proof  of  Go-live/  Project completion  certificates  from client  

Page 57: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 57 | P a g e  

 

11 The responding firm/ agency  

(a)  Should  have  made  a  payment  for  the RFP document (b) Should have submitted a EMD  

   Details of  the payment made online  on  the  eProcurement Portal 

EMD  to  be  submitted  along with the bid. 

12 The  responding  firm  shall  not  be  under  a declaration  of  ineligibility  for  corrupt  or fraudulent practices.  

  A  self-certified  letter  by  the designated  official  of  the responding firm – Form 20. 

 

 

9.2 Technical Qualification Criteria

I. Technical proposal of the bidders will be opened and evaluated who meets all the prequalification criteria. 

II. The evaluation committee will evaluate the Technical Proposals on the basis of the technical evaluation criterion as provided below.    

S No

Criteria Max Criteria/ Sub Criteria Marks

1 Past Experience of the responding firm  30 

2 Solution proposed for the  e-Pragati Primary Sector Project by the responding firm 

40 

3 Project Management and Work Plan  10 

4 Adequacy  and  Quality  of  Resources  proposed  for Deployment 

20 

Total Points 100 

     

Page 58: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 58 | P a g e  

 

S No

Criteria/Sub

Criteria Description Point System

Max Points

Form to be used

1 Past Experience of the responding firm 30

a.

System Integration projects

Client references for implementation of an integrated turnkey project around a) network solution and b) software development c) Hardware commissioning and d) O&M phase for maintaining all of the above in the last 5 years (FY 10-11 to FY 14-15) 

    

2 projects of INR 40 Crores each  = 5 points each;  4 projects >INR 20 Crores but less than INR 40 Crores= 2.5 points each; 5 projects >INR 16 Crores but less than INR 20 Crores= 2 points each;  

10  

Form 6, supported by documentary evidence 

b.

Software Solutions

At least TWO completed/ ongoing software development projects each having a minimum value of INR 5 Crores – for software development component only). The project should have some or all of the following components : 

– Portal – Web based 

Application Server – Electronic Forms 

 

> 4  Projects – 10 points; 

4 Projects - 8 points; 3 Projects - 5 points; 2 Projects - 2 points; else 0.   

10

Form 6, supported by documentary evidence

Page 59: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 59 | P a g e  

 

C Maintenance Services and Helpdesk in the State

Providing Maintenance Services/ Helpdesk services in the field of IT services with a minimum order size of INR 2 Crores in the State 

In case of any one project done for the following locations : 

a) covers  multiple locations  or 

b) covers  all districts in the State  

5

Form 6, supported by documentary evidence

D Projects in India

SI Projects undertaken in India involving at least 6 locations with a value of more than INR 2 Crores per project   

  

> =9  Projects – 5 points; 

6  projects - 3 point 3 Project - 1 points; else 0 However if any one of the projects undertaken has a value more than INR 20 Crores – 5 points   

5

Form 6, supported by documentary evidence

Note :

1. For all the above, the Completion Certificate of the projects completed in the last 5 years (as on 14/12/2015) need to be provided (issued to the responding firm by the respective customers) 

2. The value of the projects considered in the above criterion would be based on the Purchase Order or the LOI issued to the responding firm. In absence of the supporting documents, the 

projects would not be considered for evaluation

Page 60: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 60 | P a g e  

 

 

S No

Criteria/ Sub Criteria Description Point

System Forms

2 Solution proposed 40

a.

Proposed solution

Requirements addressed as mentioned in different parts of the RFP and the quality of the solution 

Evaluation Committee will evaluate whether all the points/ requirements mentioned in the RFQ are addressed well and award points accordingly, the important parameters being:-  

– Solution Architecture conceptualized for this project. –  5 points 

– Security Architecture- 2 points  – Application deployment and 

testing Strategy  -3 points – Quality Control Procedures 

suggested by responding firm -  1 points  

– Cloud infrastructure proposed to meet SLA- 4 (Separate installation for Development / Test / Production) 

15 -

b.

Implementation methodology

 Evaluation Committee will evaluate whether the implementation methodology is in line with the requirement. The important parameters being:- 

- Plan for meeting the SLA norms. 

- Redundancy and failover options.  

In this section, the responding firm should:  

– Explain the understanding of the project requirements, highlight the expected support from the State, approach to the services, SLA management methodology, methodology for carrying out the activities for expected output - 4 points 

– Highlight the associated risks/ problems and plans for mitigation and explain the technical approach it would adopt to address them – 2 points 

– Explain the methodologies the responding firm proposes to adopt and highlight the compatibility of those methodologies with the proposed 

10 Form 7

Page 61: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 61 | P a g e  

 

approach – – 2 points – Planning and Building 

Infrastructure (assessment, design, integration/ migration of existing Portal infrastructure) –  2 points 

C Training

Proposed Training and Change Management plan description to be looked into 

The Evaluation will  be based  on: 

– Proposed Training Schedule – 1 point 

– Plan to develop Training Manuals – 1 point 

– Areas/domains covered – 1 point 

– Number & Quality of personnel to be deployed for training at the site of Implementation of the Project.- 2 points 

5

D

Formation/Location of Helpdesk & other manpower support

Proposed methodology of formation of the manpower support team. 

Operating and Maintaining Infrastructure  

The Evaluation  will be based on   

– Proposed Staff details – Call centre s/w used and the 

ability to log the calls and measure SLA 

– Areas/domains covered  

10 -

3 Project Management and Work Plan 10

a. Project Management

The overall approach to be looked into 

The overall project management approach adopted by the responding firm to implement the project to meet the timelines. 

5 -

b. Detailed Work Plan

The description and quality of the work plan to be looked into. 

Evaluation will be based on the detailed Project Plan including day wise, week wise activities with Work Breakdown Structures, Project estimates, milestones etc. 

5 Form 8 

4 Resource Deployment (Refer Section 2.3 below for Scoring Pattern)

20 Form 10

& 11

Total Points 100

Page 62: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 62 | P a g e  

 

  

9.3 Technical resources scoring pattern

 

E-Pragati  Core  managed  services  team,  under  leadership  of  Director  /  Head,  shall 

have following key roles who will in turn lead the respective teams; 

Separate  resources  shall  be  proposed  for  each  of  the  key  proposed  positions  and 

only one profile shall be evaluated for each position. Each resource will be evaluated 

50%  for  EQ  (Educational  Qualification)  and  50%  for  Experience.  A  resource  profile 

meeting the required  EQ will be given full marks and not  meeting the required EQ 

will be given no marks. A resource profile meeting the required Experience criteria 

will  be  given  full  marks  and  not  meeting  the  required  Experience  criteria  will  be 

given no marks. 

 

S No

Designated Role / Title

Score

1.   Project Director / Head (E-Pragati)  14 

2.   Project Manager(e-Pragati)   9 

3.   Team Leaders  25 

4.   Domain Expert  (SME)   4 

5.   Delivery and Integration Lead   4 

6.   Security Lead    4 

7.   Infrastructure and Data Centre Lead   4 

8.   Capacity building(Training) Change Management Lead  4 

9.   Networking Lead   4 

10.   Quality Assurance Lead   4 

11.   System Administrator  4 

12.   Database Administrator   4 

13.   Development  /   customization team & others   4 

14.   Helpdesk Lead    4 

15.   Testing Team  4 

16.   Helpdesk Team  4 

  Total   100 

The  marks  obtained  for  total  of  100  marks  will  be  scaled  down  to  20  for  the 

Technical evaluation purpose. The team requirements and qualification  is provided 

below: 

Page 63: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 63 | P a g e  

 

 

 

Designated Role / Title

Job Responsibility Profile Eligibility Details

Project Director / 

Head (E-Pragati) 

Ensure  IT  Services  Delivery  for  E-Pragati core components  

Interface  with  E-Pragati  teams  to obtain business requirements 

SPOC  for  escalations  coming  from  E-Pragati business 

Interface  with  E-Pragati  team  for  day to  day  operations  and  new  activities like product launch etc 

 

Any graduate / Post graduate with IT Qualification (B.Tech/ BE / M.Tech, MCA / BCA, M.Sc / B. Sc, Com. Sc. etc) 

Minimum 15 years of IT Service management in leading organizations 

Minimum 8 years of experience in handling service delivery or/and practice groups or/and solution architecture or/and Transition & Transformation management in IMS domain, Service Management, Operations Management 

Minimum 5 years of experience in Govt Projects  

PMP/equivalent certification 

Project Manager 

(E-PRAGATI) 

Ensure  IT  Services  Delivery  for  E-PRAGATI for End 2 End Delivery.  

Interface  with  E-Pragati  teams  to obtain business requirements 

SPOC  for  escalations  coming  from  E-PRAGATI business 

Interface  with  E-Pragati  team  for  day to  day  operations  and  new  activities like product launch etc 

Good knowledge of IT infrastructure and working in a high-value production environment.  

Proven ability to plan and execute workload in a highly demanding & dynamic environment 

Able to work with suppliers and stake holders to achieve the best solution for the customer 

B. Tech / BE/ MBA / MCA / MSc / BCA 

Minimum 10 years of IT Service management in leading organizations 

Minimum 2 year of experience in managing large enterprise IT infrastructure, team of 20+, in Government related IT/eGovernance projects 

PMP/equivalent certification 

Team  Ensure to deliver committed services  B. Tech / BE/ MBA / MCA / MSc 

Page 64: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 64 | P a g e  

 

Leaders(7)   

and service levels to internal & external Govt dept customers 

Ensure efficient Service Management (Cost, Time, and Resource management)  

Coordinate end-to-end delivery of complex customer engagements involving multiple projects  

Ensure that systems, organization processes, &unit practices adhere to quality policies 

Effective management of clients, management, and team expectations 

Conduct periodic reviews with customer(s), management, and the team 

/ BSc / BCA 

Minimum 6 to 8 years of IT Service management/delivery in leading organizations 

Minimum 1 years of experience in managing large enterprise IT infrastructure, managing team of 20 members 

Relevant certifications for the technology platforms proposed in the solution – Enterprise Architect Certifications 

 

Domain Expert  - SMEs, Analytics Experts and Business Analysts 

 

Data  Center  Operational,  Data Analytics  responsibility  of  business process deliverables 

Escalation  point  for  all  incidents  not resolved by Help Desk,   all  teams and also  any  potential  issues  which  may lead to critical incidents 

Engage  with  relevant  stakeholders on forums  (major  incidents/key changes/key  problems/release  AIS), providing  appropriate  support  to support teams 

Provide  guidance  and  initiate  various SIP  (Service  Improvement  Plans) processes  towards  continuous improvements  in  service  (e.g.  CSIPs (Continuous  Service  Improvement Plans),  PoR  (Prevention  of Reoccurrence)) 

Contribute and own maintaining the Product and Circuit list/ log for the Product families as required ensuring up to date product data is used while dealing with the reports/ analysis. 

Contribute to RCA, Quality Gate review ,evidence pack activity, lessons learnt activity. 

Requirements gathering, requirement analysis, mock-up design of systems, 

B. Tech / BE/ MBA / MCA / MSc / BSc / BCA 

Minimum 5-7 Years of experience in Analytics (Domain Expert) 

Minimum 2 Years of experience as Analytics lead 

CAP Certification 

Page 65: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 65 | P a g e  

 

preparation of System Requirement Specifications (SRS), as-is to-be process modelling. 

Preparation of wireframes and UI mock up 

Analyze change requests and modify requirements without affecting scope. 

Business process flow analysis and documentation.  

Delivery and Integration Lead  

 

Set  up  a  e-Pragati  E2E  Delivery, integration  environment  between Data  base  Server  and  e-Pragati sandbox,  including  setting  up  e-Pragati, creating data connections and installing database drivers etc.  

Work  with  the  business  analyst  and understand  about  twenty  data  feeds into  and  out  of  the  multiple  existing CRM  systems;  create  field  dictionary for  all  data  feeds  for  the  e-Pragati core modules.  

Work  with  the  Govt  team  lead  to develop custom objects in e-Pragati to store the Govt related data;  

Transform the data feed from various source  databases  and  store  them  in the landing tables in the dev database, including : o  Client Data o  Security Data o  People / User Data  o  Contact Data o  Trading related data etc..  

Build  up  data  sync  and  integration script to sync 

B. Tech / BE/ MCA 

Minimum 5 years of experience implementing enterprise level IT solution  

Minimum 2 years of experience in Team Lead roles 

Relevant certifications in the technology platforms proposed –Oracle Certified Professional/Microsoft certified Professional etc. 

Security Lead   

 

Tracking / Solving of security incidents  Security  Audits  and  designing 

information  Security  policies  and procedures. 

Ensure security posture compliance  Conduct  Information  Security 

Awareness  Programs  at  regular 

B. Tech / BE/ MCA / MSc / BSc /BCA 

Minimum  5  -  7  Years’ experience  in  Information Security  network  and systems  security  ,  other best  practices  and 

Page 66: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 66 | P a g e  

 

interval  Internal/external teams to understand 

the  security  audit  requirements  and deliver against project plans. 

experience  in  designing information  Security policies and procedures 

Minimum  1-2  years’ Experience  in  compliance initiatives  at  function  and organizational  levels  in areas  of  Information security,  Business Continuity/  Disaster Recovery,  IT  Service Management and Quality. 

Well  conversant  with Management Standards/Best  Practices like  ISO  27001:  2005,  ISO 20000, and BS 25999. 

Infrastructure and Data Centre Lead  

 

Own  the  technical  data  center architecture  for  business  applications / tools 

Provide  architectural  inputs  to  IT Infrastrure roadmaps for E-PRAGATI 

Generation of technical concepts  Application  related  design  and 

documentation  of  processes  and functions. 

Adherence  to  Data  centers    norms concerning,  DC  Monitoring  Tools  application  support  /development, release planning  

Ensure  high  availability  of  the application as per the SLA  

B. Tech / BE/ MCA / MSc / BSc /BCA 

Minimum 5 - 7 Years’ experience in Data Centre strategy covering strategic partnerships, co-create and build models.           Hosting and Colocation   Infrastructure as a Services (IaaS),   Platform as a Service (PaaS) 

Minimum 1-2 years of experience as Infrastructure Lead 

Should demonstrate expertise in similar environments. 

 

Capacity building(Training) Change Management Lead 

Strong IT skills and Work experience in government,  especially  at  the  state level,  and  civil  society  organization specifically  in  managing  training programmes.  Identify  training requirements-both  for  fresh  trainees and  refresher  courses  at  all  levels  for 

M.Tech/MBA + B. Tech / BE/ MCA / MSc / BSc /BCA 

Minimum 5 - 7 Years’ experience in identifying the training needs and coordinate activities for the development of 

Page 67: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 67 | P a g e  

 

various functionaries.  Provide technical support in reviewing 

and  designing  curriculum  for  training manuals. 

Help  maintain  a  database  of  trainers and other resource persons 

Develop training sections on website, to allow easy access to information, materials and guidance on different packages. 

Perform any other tasks related to capacity building, planning and implementation. 

Manage  roster  of  trainers,  trainees and system for nomination of officers for  facilitation  of  regular  training programmes. 

institutional and managerial capacities of government, communities and institutions. 

Minimum 1 year of experience in a Government organization/Public Sector undertaking in a Change Management Role 

Networking Lead  

 

Provide round the clock monitoring of the  enterprise  network  and  network, SAN,  NAS,  F5  Load  balancer,  network security devices for E-PRAGATI 

Configuration  &  Maintenance  of  the network  and  security  devices,  VLANs as specified by E-PRAGATI 

Coordinate  hardware  and  software upgrades  and  /or  maintenance    for the  network  equipments  with respective OEM / vendors 

Performing regular Audit of enterprise network with tools provided 

Problem  identification  and troubleshooting  of  issues  related  to LAN and WAN. 

Active Directory Tools, Objects (Policy, Trust,  FSMO),  DNS,  DHCP,  Windows Group  Policy  and  Exchange  mail server configuration. 

B. Tech / BE/ MCA / MSc / BSc /BCA 

5 - 7 Years’ experience in Network Administration  

Minimum 1-2 Years of experience as a Lead 

CCNA or equivalent certification 

Quality Assurance Lead  

 

Test  framework  designed  and implemented  a  test  strategy  for  a product  or  an  independent  e-Pragati project.  Develop  test  strategy  from scratch. 

Continuous  integration  test  bed environment 

B. Tech / BE/ MCA / MSc / BSc /BCA 

Minimum 5 - 7 Years’ experience in Testing lifecycle 

Minimum 1-2 years’ experience as a QA lead 

Page 68: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 68 | P a g e  

 

Experience in best practices in testing and  QA  either  in  CMM/ISO  cos  or MNCs like Microsoft, Oracle, IBM. 

Automation tools such Selenium,  HP's  Quality  Center,  Mobile  Platform, Azure  Cloud  based  SaaS  app  nice  to have. 

Design  and  architect  tools  and frameworks  for  automated  testing. Develop  functional  and  performance test  plans  and  cases  for  complex applications and services. 

Create  and  develop  all  quality  gates, ensure compliance 

Analyze requirement for testing and provide initial estimate to Delivery 

Prepare and maintain Test Scope, Strategy and Approach slide pack (draft documents to be provided with draft design document and issue version after HLD sign off). 

Prepare test environment support - requirement slide pack including support required. 

CSQA/ ISTQB equivalent certification 

System Administrator 

Governance  of  entire  E-Pragati Systems Administration. 

Experience  of  System  administration on the latest platforms as indicated in the solution architecture.  

Domain Controller, DNS Servers, DHCP Servers, File Server Exchange creating and manage  

RAID  Configurations  and  Disk management utilities tools 

Maintenance of Hardware Monitoring Agents 

Backup  configuration  and management,  Management  of  file system,  Administrative  User  Account Reviews. 

B. Tech / BE / MCA / MSc / BSc /BCA 

Minimum 5 - 7 Years’ experience in OS Software installation, configuration and troubleshooting. 

Minimum 1 Year of experience in a large IT Project. 

 

Database Administrator   

Undertake  end-to-end  management of  database  on  an  on-going  basis  to facilitate  smooth  functioning  and optimum utilization  

B. Tech / BE/ MCA / MSc / BSc /BCA 

Minimum 5 - 7 Years’ experience in databases 

Page 69: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 69 | P a g e  

 

Regular  database  backup  and periodical testing of backup data  

Conducting  configuration  review  to tune database 

Maintaining the necessary documentation and  managing  schemes  to  database schema,  disk  space,  user  roles,  and storage. 

that are relevant to the Technology Solution being proposed. 

Minimum 1 year of experience as a Database Admin. 

Development  /   

customization team & others  

 

Write  clean,  well-engineered  code that comply with accepted standards, and  test  web  applications  and  Cloud based Application developments 

Build  quality  applications  and  portals with  structure  of  modern  enterprise Web  applications:  the  user  interface, application server, and database.  

Clarity  of  Interfaces,  Constructors, Polymorphism, Static methods. 

B. Tech / BE/ MCA / MSc / BSc /BCA 

Minimum  3  -  5  Years’ experience  in  Designing, developing  Web applications  and  Client-Server  based  applications in  the  platforms  which  are part  of  the  solution proposed by the bidder. 

Experience  in  web  service development,  HTML, Javascript,  Ajax,  Angular  JS & other scripting languages for web development. 

Helpdesk Lead  

  

L1 Team should Lead and provide the quality of help desk support.  

Track and report service performance metrics 

Lead  continuous  improvement program 

Coordinate  Service  Improvement Plans to execution 

Team Roster plans and 24/7/365 support  

Provide  training  to  new  help  desk team members 

B. Tech / BE/ MCA / MSc / BSc /BCA 

Minimum 5 - 7 Years’ experience in the role of managing the operations of call center/  helpdesk.  

Minimum 1-2 years of experience as a Helpdesk Lead 

Testing Team Members 

Preparation of test cases, test scripts  Execution of test scripts  Preparation of Test Plan  Able to identify and develop test cases 

for smoke test and regression test  Reporting  compliance  to  the  test 

scenarios  Work  closely  with  the  Quality 

Assurance Lead 

B. Tech / BE/ MCA / MSc / BSc /BCA 

Minimum 2 years of experience in Quality Assurance Teams, writing test cases, preparation of test scripts, use of Tools indicated in the Solution proposed by the bidder 

Page 70: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 70 | P a g e  

 

Helpdesk Team Members 

Answer calls and respond to emails   handle customer inquiries both 

telephonically and by email  manage and resolve customer 

complaints   provide customers with product and 

service information   enter new/update existing customer 

information   identify and escalate priority issues   follow up customer calls where 

necessary   document all call information 

according to standard operating procedures  

complete call logs , produce call reports 

B. Tech / BE/ MCA / MSc / BSc /BCA 

Fluency in Telugu/English  Minimum 1 year of 

experience in a call center environment 

 

9.4 Commercial Bid Evaluation

1. The Financial Bids of technically qualified bidders  (i.e. above 70 marks) will be opened on the prescribed date in the presence of bidder representatives.   

2. For any additional scope / Services apart from the identified  services shall be priced as per the unit rate quoted. 

3. The  bid  price  will  include  all  taxes  and  levies  and  shall  be  in  Indian  Rupees  and mentioned separately.  

4. Any conditional bid would be rejected. 5. Errors  &  Rectification:  Arithmetical  errors  will  be  rectified  on  the  following  basis:  “If 

there  is a discrepancy between the unit price and the  total price that  is obtained by multiplying the unit price and quantity, the unit price shall prevail and the total price shall be corrected. If there is a discrepancy between words and figures, the amount in words will prevail”.  

6. If  there  is no  price  quoted  for certain material or service,  the bid  shall  be declared  as disqualified. 

7. In the event that there are 2 or more bidders having the same value in the financial bid, the  bidder  securing  the  highest  technical  score  will  be  adjudicated  as  the  “Best responsive bid” for award of the Project.  

8. The financial bid cost would be considered from the Form 2A of the Financial Proposal  

   

Page 71: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 71 | P a g e  

 

 

10 Appointment of System Integrator

10.1 Award Criteria

APTS/ITE&C will award the Contract to the successful bidder whose financial proposal is the lowest and would consider it as substantially responsive as per the process outlined above. 

10.2 Right to Accept Any Proposal and To Reject Any or All Proposal(s)

APTS/ITE&C  reserves  the  right  to  accept  or  reject  any  proposal,  and  to  annul  the tendering process/ Public procurement process and reject all proposals at any time prior to  award  of  contract,  without  thereby  incurring  any  liability  to  the  affected  bidder  or bidders  or  any  obligation  to  inform  the  affected  bidder  or  bidders  of  the  grounds  for APTS/ITE&C action. 

10.3 Notification of Award

I. Prior to the expiration of the validity period, APTS/ITE&C will notify the successful bidder  in writing  or  by  fax or email,  that  its  proposal has been accepted.  In case the tendering process/ public procurement process has not been completed within the stipulated period, APTS may request the bidders to extend the validity period of the bid. 

II. The notification of award will constitute the formation of  the contract. Upon the successful  bidder's  furnishing  of  Performance  Bank  Guarantee,  APTS/ITE&C  will notify each unsuccessful bidder and return their EMD. 

10.4 Contract Finalization and Award

I. The  APTS/ITE&C  shall  reserve  the  right  to  negotiate  with  the  bidder(s)  whose proposal  has  been  most  responsive.  On  this  basis  the  draft  contract  agreement would be finalized for award & signing. 

II. APTS/ITE&C may also like to reduce or increase the Scope of Work defined in the RFP. Accordingly total contract value may change on the basis of the rates defined in the financial proposal. 

10.5 Performance Guarantee

I. APTS/ITE&C  will  require  the  selected  bidder  to  provide  a  Performance  Bank Guarantee, within 15 days from the Notification of award, for a value equivalent to <10%> of the Total Value of the Contract. The Performance Guarantee should be valid  for  a  period  of  <6  months>  beyond  the  contract  period.  The  Performance Guarantee shall be kept valid  till completion of  the project and Warranty period. The Performance Guarantee shall contain a claim period of three months from the last  date  of  validity.  The  selected  bidder  shall  be  responsible  for  extending  the validity date and claim period of the Performance Guarantee as and when it is due on  account  of  non-completion  of  the  project  and  Warranty  period.  In  case  the 

Page 72: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 72 | P a g e  

 

selected bidder fails to submit performance guarantee within the time stipulated, the  APTS/ITE&C  at  its  discretion  may  cancel  the  order  placed  on  the  selected bidder  without  giving  any  notice.  APTS/ITE&C  shall  invoke  the  performance guarantee  in  case  the  selected  Vendor  fails  to  discharge  their  contractual obligations  during  the  period  or  APTS/ITE&C  incurs  any  loss  due  to  Vendor’s negligence  in carrying out the project  implementation as per the agreed terms & conditions. 

10.6 Signing of Contract

I. After  the  APTS/ITE&C  notifies  the  successful  bidder  that  its  proposal  has  been accepted,  APTS/ITE&C  shall  enter  into  a  contract  with  the  successful  bidder, incorporating  all  clauses,  pre-bid  clarifications,  Corrigendum  and  the  proposal  of the bidder. The Draft Legal Agreement is provided in Volume III of this RFP. 

10.7 Failure to Agree with the Terms and Conditions of the RFP

I. Failure of the successful bidder to agree with the Draft Legal Agreement and Terms &  Conditions  of  the  RFP  shall  constitute  sufficient  grounds  for  the  annulment  of the  award,  in  which  event  APTS/ITE&C  may  award  the contract  to  the  next  best value bidder or call for new proposals from the interested bidders. 

II. In  such  a  case,  the  APTS/ITE&C  shall  invoke  the  EMD  of  the  most  responsive bidder.    

Page 73: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 73 | P a g e  

 

11 Project Annexures

 

Bid Processes Annexures

Annexure I: TECHNICAL BID TEMPLATES

The bidders are expected to respond to the RFP using the forms given in this section and all documents supporting Technical Evaluation Criteria. Technical Proposal shall comprise of following forms: Form 1: Undertaking on Total Responsibility Form 2: Particulars of the Bidder Form 3:  Bank Guarantee for Earnest Money Deposit Form 4: Compliance Sheet for Technical Proposal  Form 5: Letter of Proposal Form 6: Project Citation Format  Form 7: Proposed Solution  Form 7A: FRS compliance sheet Form 8: Proposed Work Plan Form 9: Team Composition  Form 10: Curriculum Vitae (CV) of Key Personnel  Form 11: Deployment of Personnel Form 12: Deviations Form 13: Declaration on Source Code and Intellectual Property Rights Form 14: Undertaking on Patent Rights Form 15: Undertaking on Compliance to Standards mentioned in the RFP  Form 16: Undertaking on Service Level Compliance Form 17: Undertaking on Deliverables Form 18: Undertaking on Support to Third Party Solution acceptance and certification Form 19: Undertaking on Exit Management and Transition Form 20: Declaration that the bidder has not been blacklisted Form 21: Consortium Agreement     

Page 74: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 74 | P a g e  

 

Form 1: Undertaking on Total Responsibility

 No. Date: To:   Dear Sir,   Sub: Self certificate regarding Total Responsibility  This is to certify that we undertake total responsibility for the successful and defect free operation of the proposed Project solution, as per the requirements of the RFP for   e-Pragati Primary Sector Project.  Thanking you, Yours faithfully    (Signature of the Authorized signatory of the Bidding Organisation)   Name    : Designation  : Date    : Time    : Seal    : Business Address: 

Page 75: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 75 | P a g e  

 

Form 2: Particulars of the Bidder

 

SI No. 

Information Sought   Details to be Furnished 

A Name and address of the bidding Company 

B Incorporation status of the firm (public limited/ private limited, etc.)

C Year of Establishment

D Date of registration 

E ROC Reference No. 

F Details of company registration 

G Details of registration with appropriate authorities for service tax 

H Name, Address, email, Phone nos. and Mobile Number of Contact Person 

   

Page 76: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 76 | P a g e  

 

 Form 3: Bank Guarantee for Earnest Money Deposit

 To,  <Name> <Designation> <Address> <Phone Nos.> <Fax Nos.> <Email id>  Whereas <Name of the bidder>  (hereinafter called  'the Bidder') has submitted the bid for  Submission  of  RFP  #  <RFP  Number>  dated  <Date>  for  <Name  of  the  assignment> (hereinafter called "the Bid") to APTS  Know all Men by these presents that we <> having our office at <Address> (hereinafter called "the Bank") are bound unto the APTS/ITE&C (hereinafter called "the Purchaser") in  the  sum  of  Rs.  <Amount  in  figures>  (Rupees  <Amount  in  words>  only)  for  which payment  well  and  truly  to  be  made  to  the  said  Purchaser,  the  Bank  binds  itself,  its successors and assigns by these presents. Sealed with the Common Seal of the said Bank this <Date>  The conditions of this obligation are:  

1. If  the  Bidder having  its  bid withdrawn during  the period  of bid validity  specified by the Bidder on the Bid Form; or 

 2. If  the  Bidder,  having  been  notified  of  the  acceptance  of  its  bid  by  the  Purchaser 

during the period of validity of bid  

(a)  Withdraws  his  participation  from  the  bid  during  the  period  of  validity  of  bid document; or  (b)  Fails  or  refuses  to  participate  in  the  subsequent  Tender  process  after  having been short listed; 

 We undertake to pay to the Purchaser up to the above amount upon receipt of its first written  demand,  without  the  Purchaser  having  to  substantiate  its  demand,  provided that  in  its  demand  the  Purchaser  will  note  that  the  amount  claimed  by  it  is  due  to  it owing to the occurrence of one or both of the  two conditions, specifying the occurred condition or conditions.  

Page 77: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 77 | P a g e  

 

This guarantee will remain  in force up to <insert date> and  including <extra time over and above mandated in  the RFP> from the last date of submission and any demand in respect thereof should reach the Bank not later than the above date.  NOTHWITHSTANDING ANYTHING CONTAINED HEREIN: I. Our  liability under  this  Bank Guarantee shall  not exceed Rs.  <Amount  in  figures> 

(Rupees <Amount in words> only) II. This Bank Guarantee shall be valid upto<insert date>) 

III. It  is condition  of our  liability  for payment  of  the guaranteed amount or any part thereof arising under  this Bank Guarantee that  we receive  a valid written claim or demand for payment under this Bank Guarantee on or before <insert date>)  failing which our liability under the guarantee will automatically cease. 

  (Authorized Signatory of the Bank)  Seal:    Date: 

Page 78: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 78 | P a g e  

 

 Form 4A: Compliance Sheet for Pre-Qualification Proposal

 

Sr. No

Qualification Criteria Documents/Information to be provided in the submitted proposal

Compliance Reference & Page Number

1. The  responding  firm/ agency  (a)  Should  have  made  a payment  of  Rs. << Enter the amount>> (Rupees <<Enter amount in words>> only)  for  the RFP document (b) Should have submitted a EMD of Rs. << Enter the amount>> (Rupees <<Enter amount in words>> only) 

(a) DD for Rs. << Enter the amount>>  (b)  The  original  bank guarantee    must  be furnished  in  the  format prescribed  in  Annexure  I: Form 3  

Yes/No   

2. Legal Entity 

Company  should  be registered  under Companies Act, 1956 / LLP companies 

Registered  with  the Service  Tax Authorities  

Should  have  been operating for the last Five  years  (FY  11-12, FY  10-11  and  FY  09-10) 

 

Certificate  of Incorporation   Registration Certificate  Service Tax Certificate 

Yes/No   

3. The Firm/ Company should be  in  the  business  as System  Integrator  for  at least  3  years  as  of  31st March 2015 

Annexure  I:  Form  2 Details  of  Responding Firm & Memorandum  &  Articles of  Association  should  be attached,  and  Work orders  confirming  year and Area of activity 

Yes/No   

4. The  responding  firm  shall not be under a declaration 

A  self-certified  letter  by the  designated    official  of 

Yes/No   

Page 79: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 79 | P a g e  

 

Sr. No

Qualification Criteria Documents/Information to be provided in the submitted proposal

Compliance Reference & Page Number

of  ineligibility  for  corrupt or fraudulent practices.  

the  responding  firm  or Annexure I Form 1: Notice of  Intent  to  Submit Proposal  in  Response  to RFP Notice 

5. The  Net  Worth  of  the responding  firm  must  be positive  as  per  the  last audited Balance Sheet.  

Chartered  Accountant Certificate for Net worth  

Yes/No   

6. The  responding  firm should  be  ISO  9001:2008 certified. 

Copy  of  certification which  is  valid  on  date  of submission. 

Yes/No   

7. The  responding  firm should be CMMi Level 5. 

Relevant  certificate  needs to  be  attached  which  is valid  on  date  of submission. 

Yes/No   

8. The  responding  firm should  be  ISO/IEC  20000-1: 2011. 

Relevant  certificate  needs to  be  attached  which  is valid  on  date  of submission. 

Yes/No   

9. Average  Annual  Turnover generated  from  services related  to  System Integration  (SI)  during  the last Five (5) financial years as  per  the  last  published balance sheets 

Extracts  from  the  audited Balance  sheet  and  Profit & Loss; OR  Certificate  from  the statutory auditor. 

Yes/No   

10. Company  experience  in implementation  of integrated  turnkey projects  around application  development as  a  System  Integrator  in India.  (Specifically  each  project should  have  components of  Helpdesk  and Application  related training necessarily for this 

Completed  Annexure  I: Form  6:  Details  of Experience  of  responding firm/ Project Citation for 3 projects  supported  with Work  order  and  Proof  of Go-live/  Project completion  certificates from client 

Yes/No   

Page 80: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 80 | P a g e  

 

Sr. No

Qualification Criteria Documents/Information to be provided in the submitted proposal

Compliance Reference & Page Number

project).  Refer  to  the Important  Note  below  for more details.  Number  of  such Assignments  of  value  (as specified  for  tiers)  which have  gone  live  in  the  past 5  years  (FY  14-15,  FY  13-14, FY 12-13, FY 11-12 and FY 10-11)

11. The  responding  firm  must have  a  minimum  number of  200  IT  Staff  of technically  qualified personnel  in  the  domain of  systems  integration,  as on  31st  July,  2015  on  its roll. 

Certificate  from  HR Department  for  number of  technically  qualified professionals  employed by the company 

Yes/No   

 

Page 81: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 81 | P a g e  

 

Form 4B: Compliance Sheet for Technical Proposal

 The  Technical  proposal  should  comprise  of  the  following  basic  requirements.  The documents mentioned in this compliance sheet along with this form, needs to be a part of the Technical proposal  For Technical Evaluation  

S. No.

Specific Requirements Documents Required Compliance Reference & Page Number

1  Covering Letter for Technical Proposal 

As per Form 5  Yes/ No 

2  System Functionality: Meeting the requirements of module in terms of how close the proposal is to the functional requirements for the solution as have been proposed for module (In case it is COTS, it should be measured by degree of customization required) 

A note containing the Mapping as per information provided in FRS – as per Form 7A 

Yes/ No 

3  Technology: Demonstrated robustness of the technology deployed across other installations around the world, including                               

– Scalability  – Security                                                                                                – Ease of implementation 

A note containing details on  

a) Solution Architecture 

b) Security c) System 

Performance d) Supported Platform 

Operating System e) Cloud Hardware / 

Operating System / system software 

f) Database g) System 

Management h) Web Server Support i) Application Server 

Support j) Single Sign-on 

Yes/ No 

Page 82: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 82 | P a g e  

 

S. No.

Specific Requirements Documents Required Compliance Reference & Page Number

k) Presentation l) Session 

Management m) Integration 

capabilities n) Auditing/ Reporting 

features o) Disaster recovery & 

back-up p) NMS / EMS details q) All reports from 

Cloud service provide (sample) for uptime, bandwidth measurement, all vital statics on usage etc.  

  

4  India Specific Capabilities:  Number of Projects of similar nature in India and size of those projects in the past 5 years 

Completion Certificates from the client; OR  Work Order + Self Certificate of Completion (Certified by the Statutory Auditor); OR  Work Order + Phase Completion Certificate (for on- going projects) from the client  Project citation (Form 6) 

Yes/ No   

5  Industry Specific Capabilities: Past experience of the bidder in executing similar assignments, size of those 

Completion Certificates from the client; OR  

Yes/ No   

Page 83: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 83 | P a g e  

 

S. No.

Specific Requirements Documents Required Compliance Reference & Page Number

assignments in the past five years.  [The definition of “similar” should be such that it focuses on the areas which are “innovative” or where the technical feasibility is a challenge in the context of the project] 

Work Order + Self Certificate of Completion (Certified by the Statutory Auditor); OR  Work Order + Phase Completion Certificate (for on-going projects) from the client

6  Training: Trainings proposed by the vendor and the amount of emphasis laid on Training the employees schedule details, locations, sessions and their description 

A note on training containing 

a) Training model b) Approach c) Deliverables 

Yes/ No 

7  Profile of proposed team members: Relevant assignment experience/ Years of experience/ Number of Certifications in Technology specific to Solution proposed  

Form 9,10 and 11 Yes/ No   

8  Project Methodology, Support and Documentation 

Form 8 & additional notes/document for support & documentation

Yes/ No   

9  Inclusion of MSMEs in Project Delivery 

Letter of evidence and commitment that MSME will be contracted the required value of work

Yes/ No   

10  Tools and Assets As per requirement specified in Technical evaluation 

Tools and Assets which could be leveraged for the assignment [for e.g. 

Yes/ No   

Page 84: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 84 | P a g e  

 

S. No.

Specific Requirements Documents Required Compliance Reference & Page Number

Test Case Builders, Effort Estimators, PMU Tool, Load testing etc., depending on the relevance to the Scope of work]  A note and demonstration of the Tool/Assets 

11  Deviations (if any)  Form 12  Yes/ No   

Page 85: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 85 | P a g e  

 

Form 5: Letter of Proposal

 To:   

<Location, Date>  <Name> <Designation> <Address> <Phone Nos.> <Fax Nos.> <Email id> 

Subject:  Submission  of  the  Technical  bid  for  <Name  of  the  Systems  Implementation 

assignment>  Dear Sir/Madam, 

We, the undersigned, offer to provide Systems Implementation solutions to the APTS/ITE&C on <Name of the Systems Implementation engagement> with your Request  for  Proposal  dated  <insert  date>  and  our  Proposal.    We  are  hereby submitting our Proposal, which includes this Technical bid and the Financial Bid sealed in a separate envelope. 

 We hereby declare that all  the  information and statements made in  this Technical bid are  true  and  accept  that  any  misinterpretation  contained  in  it  may  lead  to  our disqualification.   We undertake, if our Proposal is accepted, to initiate the Implementation services related to the assignment not later than the date indicated in Fact Sheet.  We agree to abide by all the terms and conditions of the RFP document.  We would hold the terms of our bid valid for <90> days as stipulated in the RFP document.  We hereby declare that we are not insolvent, in receivership, bankrupt or being wound up, our affairs are not  being administered by a court or a  judicial officer, our business activities have not been suspended and we are not the subject of legal proceedings for any of the foregoing.  We understand you are not bound to accept any Proposal you receive.  Yours sincerely, Authorized Signature [In full and initials]:     Name and Title of Signatory:     

Page 86: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 86 | P a g e  

 

Name of Firm:     Address:     Location: _____________________________________Date: ___________________________ _____________________________________________________________________________

Page 87: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 87 | P a g e  

 

 Form 6: Project Citation Format

 

Relevant IT project experience (provide no more than 5 projects in the last 5 years) 

General Information 

Name of the project   

Client for which the project was executed   

Name and contact details of the client   

Project Details 

Description of the project   

Scope of services   

Service levels being offered/ Quality of service (QOS) 

 

Technologies used   

Outcomes of the project   

Other Details 

Total cost of the project   

Total cost of the services provided by the respondent 

 

Duration of the project (no. of months, start date, completion date, current status) 

 

Other Relevant Information 

Letter from the client to indicate the successful completion of the projects 

 

Copy of Work Order   

 

Page 88: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 88 | P a g e  

 

Form 7: Proposed Solution

 Technical approach, methodology and work plan are key components of the Technical Proposal.    You  are  suggested  to  present  Approach  and  Methodology  divided  into  the following sections:  

a) Solution Proposed b) Understanding of the project (how the solution proposed is relevant to the 

understanding) c) Technical Approach and Methodology d) Cloud hosting detailed architecture of h/w, s/w including virtualizations, scaling 

mechanism, disaster recovery, BCP, security, network access e) Details on the connectivity with SDC proposed with detailed network architecture 

including the core network components at the cloud, and requirements at SDC to be mentioned. 

  

S.No 

Proposed Solution (Provide the Product Name or fill Custom Built, in case of a new development) 

Version & Year of Release 

OEM  Features & Functionalities 

O&M Support (Warranty/ATS/: as required as per RFP) 

Reference in the Submitted Proposal (Please provide page number/section number/ volume) 

             

             

             

             

             

             

      

Page 89: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 89 | P a g e  

 

Form 7A: Functional Requirements Compliance

Fully

Compliant

Partially Compliant

with Customization

Not Compliant

- To Be

Developed

Component Name : <Component Name>

Component Functionality: <Component

Functionality Description>

<Sub

compon

Sub-Component: <Sub Component Name>

<Requir

ement

<Functional Requirement 1>

<Functional Requirement 2>

<Functional Requirement 'n'>

<Comp

onent

No>

Sl No Functional Requirements Level of Compliance Remarks

  

Page 90: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 90 | P a g e  

 

Form 8: Proposed Work Plan

 

No Activity1 Calendar Months

1 2 3 4 5 6 7 8 9 10 11 12 n

1                             

2                             

3                             

4                             

5                             

                             

                             

                             

                             

                             

                             

                             

                             

                             

                             

                             

                             

                             

N                             

 1  Indicate  all  main  activities  of  the  assignment,  including  delivery  of  reports  (e.g.: 

inception, interim, and final reports), and other benchmarks. For phased assignments indicate activities, delivery of reports, and benchmarks separately for each phase. 

2  Duration of activities shall be indicated in the form of a bar chart. 3    All  activities  should  meet  the  8/80  criteria  i.e.  should  at  least  take  8  hours  and  a 

maximum of 80 hours. 

Page 91: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 91 | P a g e  

 

Form 9: Team Composition

Name of Staff with qualification and experience

Area of Expertise

Position Assigned

Task Assigned

Time committed for the engagement

  

       

  

       

  

       

  

       

 

Page 92: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 92 | P a g e  

 

 Form 10: Curriculum Vitae (CV) of Key Personnel

 

General Information 

Name of the person   

Current Designation/ Job Title   

Current job responsibilities   

Proposed Role in the Project   

Proposed Responsibilities in the Project   

Academic Qualifications: 

Degree 

Academic institution graduated from 

Year of graduation 

Specialization (if any) 

Key achievements and other relevant information (if any) 

 

Professional Certifications (if any)   

Total number of years of experience   

Number of years with the current company   

Summary  of  the  Professional/  Domain Experience 

 

Number  of  complete  life  cycle implementations carried out 

 

The  names  of  customers  (Please  provide the relevant names) 

 

Past assignment details (For each assignment provide details regarding name of organizations worked for, designation, responsibilities, tenure) Prior Professional Experience covering: 

Organizations worked for in the past o Organization name o Duration and dates of entry and 

exit o Designation Location(s) o Key responsibilities 

Prior project experience o Project name o Client o Key project features in brief o Location of the project o Designation o Role 

 

Page 93: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 93 | P a g e  

 

o Responsibilities and activities o Duration of the project 

Please provide only relevant projects. 

Proficient in languages (Against each language listed indicate if speak/read/write) 

 

Page 94: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 94 | P a g e  

 

Form 11: Deployment of Personnel

   

No Name of Staff Staff input in Months (in the form of a bar chart)2

Total staff man-months proposed

1  2  3  4  5  6  7  8  9  10  11  12  n  Total 

1  

                          

2  

                          

3  

                          

N  

                          

                      Total   

  1.     Professional Staff the input should be  indicated individually;  for Support Staff  it should be indicated by category 2  Months are counted from the start of the assignment.                                              Full time input                                      Part time input 

Page 95: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 95 | P a g e  

 

 Form 12: Deviations

[This section should contain any assumption on areas which have not been provided in the RFP OR any changes to the existing provisions of the RFP] A - On the Terms of Reference [Suggest and justify here any modifications or improvement to the Scope of Work you are proposing to improve performance in carrying out the assignment (such as deleting some activity you consider unnecessary, or adding another, or proposing a different phasing of the activities). Such suggestions should be concise and to the point, and incorporated in your Proposal.]  B – Any other areas  

Page 96: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 96 | P a g e  

 

Form 13: Declaration on Source Code and Intellectual Property Rights

 No. Date: To:    Dear Sir, Sub: Self-certificate regarding the source code and Intellectual property rights under this Project  I,  authorized  representative  of  _________________________,  hereby  solemnly  affirm to  the  IPR  and  Source  Code  rights  as  defined  in  Clause  19.2,  19.3  and  19.4  of  the Contract Agreement.  In  the  event  of  any  deviation  from  the  factual  information/  declaration,  <<ITE&C  / APTS>> reserves the right  to  terminate  the Contract without any compensation to the System Integrator.  Thanking you, Yours faithfully   (Signature of the Authorized signatory of the Bidding Organisation)  Name    : Designation  : Date    : Time    : Seal    : Business Address:    

Page 97: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 97 | P a g e  

 

Form 14: Undertaking on Patent Rights

 No. Date: To:  Dear Sir, 

Sub: Undertaking on Patent Rights  1.  I/We  as  System  Integrator  (SI)  do  hereby  undertake  that  none  of  the deliverables  being  provided  by  us  is  infringing  on  any  patent  or  intellectual  and industrial  property  rights  as  per  the  applicable  laws  of  relevant  jurisdictions  having requisite competence. 2.  I/We  also  confirm  that  there  shall  be  no  infringement  of  any  patent  or intellectual  and  industrial  property  rights  as  per  the  applicable  laws  of  relevant jurisdictions  having  requisite competence,  in  respect of  the  equipment’s,  systems  or any  part  thereof  to  be  supplied  by  us.  We  shall  indemnify  APTS/ITE&C  against  all cost/claims/legal  claims/liabilities  arising  from  third  party  claim  in  this  regard  at  any time on account of the infringement or unauthorized use of patent or intellectual  and industrialpropertyrightsofanysuchparties,whethersuchclaimsarisein respectofmanufactureoruse.Withoutprejudicetotheaforesaidindemnity,  the  SI  shall  be responsibleforthecompletionofthesuppliesincludingsparesanduninterrupteduseoftheequipmentand/orsystemoranypartthereof  to  APTS/ITE&C  and  persons  authorized  by APTS,  irrespective  of  the  fact  of  claims  of  infringement  of  any  or  all  the  rights mentioned above. 3.  If it is found that it does infringe on patent rights, I/We absolve APTS/ITE&C of any legal action.  Yours faithfully, (Signature of the Authorized signatory of the Bidding Organisation)  Name    : Designation  : Date    : Time    : Seal    : Business Address: 

Page 98: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 98 | P a g e  

 

Form 15: Undertaking on Compliance and Sizing of Infrastructure

 No. Date: To:  Dear Sir, Sub: Undertaking on Compliance and Sizing of Infrastructure  

1.  I/We as System Integrator do hereby undertake that we have proposed and sized  the    hardware and    all    software    (including    perennial and  enterprise wide  licenses, unless stated otherwise)   based   on    information provided by <<ITE&C  / APTS>>  in  its  RFP document  and  in  accordance with  the    service  level    requirements    and    minimum    specifications    provided    and  assure <<ITE&C / APTS>> that the sizing  is for all  the functionality envisaged  in the RFP document. 

2. Any augmentation of the proposed solution or sizing of any of the  proposed solutions    (including  software  and  hardware)    in    order    to    meet    the  minimum    RFP  requirements    and/or    the    requisite    service    level  requirements    given    by  <<ITE&C  /  APTS>>  will  be    carried  out    at    no  additional cost  to  <<ITE&C / APTS>> during the entire period of Contract. 

 Yours faithfully,   (Signature of the Authorized signatory of the Bidding Organisation)   Name    : Designation  : Date    : Time    : Seal    : Business Address:  

Page 99: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 99 | P a g e  

 

Form 16: Undertaking on Service Level Compliance

 No. Date: To:    Dear Sir, Sub: Undertaking on Service Level Compliance  

1.  I/We  as  System  Integrator  do  here  by  undertake  that  we  shall  monitor, maintain,  and  comply  with  the  service  levels  stated  in  the  RFP  to  provide quality service to<<ITE&C / APTS>>. 

2.  However,  if  the  proposed  resources  and  infrastructure  are  found  to  be insufficient  in  meeting the RFP  and/or  the service  level  requirements  given by <<ITE&C / APTS>>, then we will augment the same without any additional cost to <<ITE&C / APTS>>. 

  Yours faithfully,   (Signature of the Authorized signatory of the Bidding Organisation)   Name    : Designation  : Date    : Time    : Seal    : Business Address: 

Page 100: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 100 | P a g e  

 

Form 17: Undertaking on Deliverables

 No. Date: To:  Dear Sir, Sub: Undertaking on Deliverables   1.  I/We  as  System  Integrator  do  hereby  undertake  that  processes, deliverables/artefacts  submitted  to<<ITE&C  /  APTS>>  will  adhere  to  the  quality  and standards specified in this RFP.  2.  We  also  recognize  and  undertake  that  the  deliverables/artefacts  shall    be presented  and  explained  to<<ITE&C  /  APTS>>  and  other  key  stakeholders  (identified by<<ITE&C  /  APTS>>),  and  also  take  the  responsibility  to  provide  clarifications  as requested by<<ITE&C / APTS>>. 3.  We agree to abide by the procedures laid down for acceptance and review of deliverables/ artefacts by the Department as stated in this RFP or as communicated to us from time-to-time.  4.   We  also  understand  that  the  acceptance,  approval  and  sign-off  of  the deliverables  by<<ITE&C  /  APTS>>  will  be  done  on  the  advice  of  Department  and  any other agency appointed by the Department for the same. We understand that while all efforts  shall  be  made  to  accept  and  convey  the  acceptance  of  each  deliverable  in accordance with the Project schedule, no deliverable will be considered accepted until a specific written communication to that effect is made by<<ITE&C / APTS>>.  Yours faithfully,   (Signature of the Authorized signatory of the Bidding Organisation)  Name    : Designation  : Date    : Time    : Seal    : Business Address: 

Page 101: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 101 | P a g e  

 

Form 18: Undertaking on Support to Third Party Solution acceptance and certification

 No. Date: To:   Dear Sir, Sub: Under taking on Support to Third Party Solution Acceptance and Certification  

1.  I/We understand that the System (including the application and the associated 

IT systems) may be assessed and certified by a 3rd party agency (to be identified by <<ITE&C / APTS>>) before the system is commissioned. 2.  I/We  understand  that  while  the  certification  expenses  will  be  borne  by <<ITE&C  /  APTS>>,  the  responsibility  to  ensure  successful  acceptance  and certification lies with the System Integrator. 3.  I/We  hereby  undertake  that  we  shall  do  all  that  is  required  of  the  System Integrator  to  ensure  that  system  will  meet  all  the  conditions  required  for successful acceptance and certification. 

 Yours faithfully,     (Signature of the Authorized signatory of the Bidding Organisation)   Name    : Designation  : Date    : Time    : Seal    : Business Address: 

Page 102: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 102 | P a g e  

 

Form 19: Undertaking on Exit Management and Transition

 No. Date: To:  Dear Sir, Sub: Undertaking on Exit Management and Transition  

1. I/We here by undertake that at the  time of completion  of  o u r   engagement with  the  Department,  either  at  the  End  of  Contract  or  termination  of  Contract before planned Contract Period for any reason, we shall successfully carry out the exit management and transition of this Project to the <<ITE&C / APTS>> or to an agency  identified  by  <<ITE&C  /  APTS>>  to  the  satisfaction  of  the  Department. I/We further undertake to complete the following as part of the Exit management and transition: 

a. We  undertake  to  complete  the  updation  of  all  Project  documents  and  other artefacts and handover the same to <<ITE&C / APTS>> before transition. 

b. We  undertake  to  design  standard  operating  procedures  to  manage  system (including application and IT systems), document the same and train <<ITE&C / APTS>> personnel on the same. 

c. If  Department  decides  to  take  over  the  operations  and  maintenance  of  the Project  on  its  own  or  identifies  or  selects  any  other  agency  for  providing operations  &  maintenance  services  on  this  Project,  then  we  shall  provide necessary  handholding  and  transition  support,  which  shall  include  but  not  be limited  to,  conducting  detailed  walkthrough  and  demonstrations  for  the  IT Infrastructure,  handing  over  all  relevant  documentation,  addressing  the queries/clarifications  of  the  new  agency  with  respect  to  the  working/ performance levels of the infrastructure, conducting Training sessions etc. 

3.  I/We  also  understand  that  the  Exit  management  and  transition  will  be considered complete on the basis of approval from<<ITE&C / APTS>>. 

 Yours faithfully,   (Signature of the Authorized signatory of the Bidding Organisation)  Name    : Designation  : Date    : Time    : Seal    : Business Address: 

Page 103: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 103 | P a g e  

 

Form 20: Declaration that the bidder has not been blacklisted

 (To be submitted on the Letterhead of the responding agency)  {Place}  {Date}  To,    Ref: RFP Notification no <xxxx> dated <DD/MM/YY>  Subject: Self Declaration of not been blacklisted in response to the RFP for Selection of System Integrator for Statewide Roll-out of e-Pragati Primary Sector File No <xxx>>.   Dear Sir,  We  confirm  that  our  company,  ____________,    is  not  blacklisted  in  any  manner whatsoever by any of the State/UT and/or central government  in  India on  any ground including but not limited to indulgence in corrupt practice, fraudulent practice, coercive practice, undesirable practice or restrictive practice.   Place:  Date:  Bidder’s Company Seal:   Authorized Signatory’s Signature:  Authorized Signatory’s Name and Designation:  Note: The Bidder shall necessarily provide a copy of ‘Power of Attorney’ authorizing the signatory for signing the Bid on behalf of the Bidder in its Pre-Qualification Bid.

Page 104: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 104 | P a g e  

 

ANNEXURE II: FINANCIAL PROPOSAL TEMPLATE

Form 1: Covering Letter

 To:   

<Location, Date> <Name> <Designation> <Address> <Phone Nos.> <Fax Nos.> <Email id> 

Subject:  Submission  of  the  Financial  bid  for  <Provide  Name  of  the  Implementation 

Assignment>  Dear Sir/Madam,   We, the undersigned, offer to provide the Implementation services for <Title of Implementation Services> in accordance with your Request for Proposal dated <Date> and our Proposal (Technical and Financial Proposals).  Our attached Financial Proposal is for the sum of <Amount in words and figures>.  This amount is inclusive of the local taxes.  1. PRICE AND VALIDITY All  the  prices  mentioned  in  our  Tender  are  in  accordance  with  the  terms  as 

specified  in  the RFP documents. All  the prices and other  terms and conditions of this Bid are valid for a period of <days> calendar days from the date of opening of the Bid. 

We  hereby  confirm  that  our  prices  include  all  taxes.  However,  all  the  taxes  are quoted separately under relevant sections. 

We  understand  that  the  actual  payment  would  be  made  as  per  the  existing indirect tax rates during the time of payment. 

2. UNIT RATES We have indicated in the relevant forms enclosed, the unit rates for the purpose of on account of payment as well as for price adjustment in case of any increase to/ decrease from the scope of work under the contract. 3. DEVIATIONS We  declare  that  all  the  services  shall  be  performed  strictly  in  accordance  with  the Tender  documents  except  for  the  variations  and  deviations,  all  of  which  have  been detailed out exhaustively in the following statement, irrespective of whatever has been stated to the contrary anywhere else in our bid. Further  we  agree  that  additional  conditions,  if  any,  found  in  the  Tender  documents, other than those stated in deviation schedule, shall not be given effect to. 

Page 105: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 105 | P a g e  

 

4. TENDER PRICING We  further  confirm  that  the  prices  stated  in  our  bid  are  in  accordance  with  your Instruction to Bidders included in Tender documents. 5. QUALIFYING DATA We confirm having submitted the information as required by you in your Instruction to Bidders.  In  case  you  require  any  other  further  information/documentary  proof  in  this regard before evaluation of  our Tender,  we  agree  to  furnish  the  same  in  time  to your satisfaction. 6. BID PRICE We  declare  that  our  Bid  Price  is  for  the  entire  scope  of  the  work  as  specified  in  the Section No.5. These prices are indicatedFinancial Bid attached with our Tender as part of the Tender. 7. PERFORMANCE BANK GUARANTEE We  hereby  declare  that  in  case  the  contract  is  awarded  .to  us,  we  shall  submit  the Performance Bank Guarantee as specified in the <Annexure III> of this RFP document.  Our  Financial  Proposal  shall  be  binding  upon  us  subject  to  the  modifications  resulting from Contract negotiations, up to expiration of the validity period of the Proposal, i.e., [Date]. We understand you are not bound to accept any Proposal you receive. We hereby declare that our Tender is made in good faith, without collusion or fraud and the  information  contained  in  the  Tender  is  true  and  correct  to  the  best  of  our knowledge and belief. We understand that our Tender is binding on us and that you are not bound to accept a Tender you receive.  Thanking you,  

We remain,  

Yours sincerely,  

Authorized Signature: Name and Title of Signatory: Name of Firm: Address: 

 

Page 106: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 106 | P a g e  

 

Form 2: Financial Proposal

The PS Package will be implemented on a substantially bought out model. The SI will be 

required to invest in the HLL and DLL, develop the package as a mix of components  or 

products  readily  available  in  the  market  or  those  developed  by  the  SI  or  one  of  the 

members of the bidding consortium AND components which are natively developed for 

the  PS  Package.  The  SI  will  execute  the  entire  scope  of  the  project  at  its  cost  and 

investment. The SI Shall also be responsible  for maintaining the application during the 

prescribed  O&M  period.  The  SI  will  be  compensated  as  per  the  Terms  of  Payment 

outlined  in  the  next  sub-section,  but  detailed  in  the  Volume  II  of  the  RFP  relating  to 

Financial  Terms  and  Conditions.  The  SI  will  get  incentives  for  launching  the  Package 

ahead of the scheduled implementation time. 

All costs below should be quoted inclusive of all statutory taxes.  

 

Form 2 A: Consolidated Cost sheet

S.No Component Cost (Rs.)

1 Development Cost

2 Data Migration Cost

3 Training Cost

4 OPEX

5 Minimum Revenue Share to be Proposed 1775000

Total Cost Rs. (1) +(2) + (3) +(4) - (5)  Authorized Signature: Name and Title of Signatory: Name of Firm: Address: 

Page 107: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 107 | P a g e  

 

Form 2 B: Development Cost

S.

No.Item

Effort In Man

Months (T)

Manmonth

cost (INR) (A)

CAPEX Lumpsum

(INR)

(T*A)

A

Primary Sector Portal development payment 

gateway, unique authetication, websrvices to 

connect to all existing department applications

BFor Application Development, Customization and 

GO Live  for Tier 3 Modules

1 Module 1 - Extension Management

2 Module 2 - Loans & Subsidies Management

3 Module 3 - Inputs Management

4 Module 4 -Insurance Management

5 Module 5 - Farm Management

6 Module 6 - Facilities & Assets Management

7 Module 7 - Marketing

8 Module 8 - Reporting & Analysis

CFor Application Development, Customization and 

GO Live  for Tier 4 Modules

1 Module 1 - Agriculture Management

2 Module 2 - Animal Husbandry Management

3 Module 3 - Fisheries Management

4 Module 4 - Cane Management

DIntegration, Functional Enhacement cost for 

existing applications with Tier 1 & Tier 2

1

Online Licence Management System - All the 

payments to the stakeholders for new and 

renewal of licencing and amendment services 

need to integrate with payment gateway / new 

PS portal

2

Fertilizer Management System (FMS - The system 

need to have the inspection report for soli health, 

presently the inspection reports are downloaded, 

manually signed and uploaded back into the 

system. This can be automated by using e-sign for 

digital signatures

3All existing applications to be integrated to the 

PS portal developed by SI

4Development of web services for Integration 

with People HUB 

5All existing applications that require payment to 

integrate with payment gateway

6

All applications to be interated with eSign as 

required for all users as per the business 

requirements

INR.Total (A) + (B) + ( C)+ (D)   

Page 108: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 108 | P a g e  

 

Note: The payment to the SI shall be made upon completion of the various modules.  Authorized Signature: Name and Title of Signatory: Name of Firm: Address: 

 

Form 2 B: Development Cost

 

SL No Item Units (U) 

Record

Unit Cost (INR) ( 

C)

Total INR 

(U*C)

Remarks

1 Data Entry (from Manual to Electronic) 100000 One record contains 

minimum of 100 

words of 10 characters 

each

2 Date Migration (from electronic forms 

(Excel, flat files)

100000 One record as it exists 

in the table

3 Data Migration (from existing DB to 

new DB)

100000 One record as per the 

DB table format

Total   

Note: The above Unit cost would involve the cost of setting up of the data digitisation centres, 

employing adequate systems, connectivity and people along with Data entry / migration tools or 

software, data quality verification and also migration to the required system as necessary by the 

scope of the RFP to enable all modules in full functional mode as the FRS requirements. All costs 

related to the above should be subsumed by SI  in  the unit cost  for  respective  items. The cost 

should also include the data migration, digitisation in bilingual language (English, Telugu) as may 

be necessary. 

Authorized Signature: Name and Title of Signatory: Name of Firm: Address: 

Page 109: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 109 | P a g e  

 

Form 2 C: Training & Change management Cost

S. No. Item

No of

Department

users to be

trained (T)

Cost Per Trainee (INR)

for e-Pragati Primary

Sector Package

Orientation Training

(A)

Cost Per Trainee

(INR) forBasic

Computer Training

(B)

Cost Per Trainee

(INR) for Process

Training (C)

Cost Per Trainee

(INR) e-Pragati

Primary Sector

Applications

Training(D)

Cost Per Trainee

(INR) for

Specialized

Computer

Training (E)

Cost per Trainee

(INR) for Change

Management

Workshops (F)

Total Cost

(INR)

T*(A+B+C+D) +

(T*E) + (T*F)

1 Agriculture Department 1400

2 Horticulture Department 200

3 Sericulture Department 900

4 e-Market Department 500

5 Animal Husbandry 

Department2000

6 Fisheries Department 500

7 Cane Department 100

8 Selected personnel from 

SD, HoD, DC, JC, RDO, 

AO, Mandal and Village 

Offices and other e-

Pragati Primary Sector 

Departments 

500

TOTAL 

 

Note:  It  is  assumed  that  the  ITE&C  would  arrange  3  training  centre  (Vijayawada, 

Vishakhapatnam,  Kurnool  /  Chittoor)  to  accommodate  30-40  people  at  a  time.  The  SI  should 

arrange for the systems, connectivity, necessary trainers, training materials of required nos, and 

other requirements like Projector, PA system, generator etc. at the SI’s cost. The TA/DA and the 

venue charges including the refreshments would be provided by ITE&C 

Authorized Signature: Name and Title of Signatory: Name of Firm: Address: 

Page 110: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 110 | P a g e  

 

Form 2 D: OPEX Cost

S. No. Item Y1 Cost in INR Y2 Cost in INRTotal for 2

years

Operations and Maintenance (Quarterly Expenses for 2  years of 

contract after ‘”Go-Live”) - Amount will be paid in QGR

A Tier 3 Modules

1 Module 1 - Extension Management

2 Module 2 - Loans & Subsidies Management

3 Module 3 - Inputs Management

4 Module 4 -Insurance Management

5 Module 5 - Farm Management

6 Module 6 - Facilities & Assets Management

7 Module 7 - Marketing

8 Module 8 - Reporting & Analysis

B Tier 4 Modules

1 Module 1 - Agriculture Management

2 Module 2 - Animal Husbandry Management

3 Module 3 - Fisheries Management

4 Module 4 - Cane Management

CDedicated Man Power for Operational Support / helpdesk  (Minimum 

dedicated Team requirements)

1 Operational Team Lead (1 Nos)

2 Development Team members (5 Nos)

3 Business Analyst (2 Nos)

4 Software tester (1 Nos)

5 Deployment lead (1 Nos)

6Application Admin (1Nos), Database Admin (1 Nos), Network Admin 

(1Nos)

7 Helpdesk  Manager (1 Nos)

8 Helpdesk Level 1 Team (2 Nos)

9 Helpdesk Level 2 Team (2 Nos)

10 Call centre Team (As required to meet SLAs)

D Cloud Hosting cost

INR.Total (A) + (B) + ( C) + (D)  Note:  The  development  is  expected  to  be  completed  module  wise  and  the  O&M  for  those 

completed modules would start as and when the module goes live until the end of three years 

from  the  start  of  the  contract.  However,  all  modules  shall  be  completed  and  go-live  within  a 

period of 1 year from the date of signing of the contract. The amount would be paid in Quarterly 

instalments after any due deductions basis the SLA performance. If there has been any credits 

accrued  that  would  be  adjusted  and  paid  to  the  credit  of  the  SI.  All  SLA  measurements  and 

adjustments  shall  be  on  a  quarterly  basis  and  the  penalty  /  credits  would  be  settled  in  the 

respective quarter itself.  

Page 111: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 111 | P a g e  

 

Form 2 E: Additional Manpower cost Table

S

No

Designated Role / Title Man Month Rates in INR

1.       Project Director / Head (E-

2.      

 

Project Manager(e-Pragati) 

3.       Team Leaders

4.      

 

Domain Expert  (SME) 

5.      

 

Delivery and Integration Lead 

6.      

 

Security Lead  

7.      

 

Infrastructure and Data Centre

Lead 

8.      

 

Capacity building(Training)

Change Management Lead

9.      

 

Networking Lead 

10.   Quality Assurance Lead 

11.  

 

System Administrator

12.  

 

Database Administrator 

13.  

 

Development / customization

team & others 

14.  

 

Helpdesk Lead  

15.  

 

Testing Team

16.  

 

Helpdesk Team 

 

Note: The  ITE&C / APTS may require the services of any or all  resources mentioned above  for 

any  additional  scope  of  work  and  would  use  the  above  rates  for  the  scope  extension.  These 

rates are considered to be all inclusive of all taxes and shall be fixed for the entire period of the 

contract.  If  the  services  are  required  beyond  the  period  of  the  contract  10%  increase  on  the 

same would be applicable. 

Page 112: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 112 | P a g e  

 

Form 2 F: Revenue Model

S. No. Item

Estimated

users for the

modules

Units Cost per Unit

Revenue

Expected INR

( R)

Revenue

sharing %

per Year

proposed by

SI (S)

Revenue

Sharing in

INR Per Year

( R1 = R*S)

Remarks

A Tier 3 Modules

1 Module 1 - Extension Management

2 Module 2 - Loans & Subsidies Management

3 Module 3 - Inputs Management

4 Module 4 -Insurance Management

5 Module 5 - Farm Management

6 Module 6 - Facilities & Assets Management

7 Module 7 - Marketing 50 YardsPer yard per 

annum; 

5 Lakhs Per Large 

Yard

2 Lakhs per 

Medium Yard

Rs 1 Laks per Small 

Yard

3000000

5% 150000

2 Large Yards

5 Small Yards

10 Small 

Yards

8 Module 8 - Reporting & Analysis

B Tier 4 Modules

1 Module 1 - Agriculture Management 50000Per user Per 

annum100 5000000 5% 250000

2 Module 2 - Animal Husbandry Management 0 0

3 Module 3 - Fisheries Management 25000Per user Per 

annum500 12500000

5%625000

4 Module 4 - Cane Management 300000Per Acre Per 

Annum50

15000000 5%750000

C Value Added services (VAS)

1 Bidder is free to propose any number of VAS

1775000Total (A) + (B)   

 

Note: The Revenue model projected above is for revenue sharing to the selected SI. The revenue 

sharing % projected would be deducted from the Total cost to arrive at the L1 cost of the bidder. 

The  minimum  revenue  share  shall  be  10%.  SI  is  free  to  project  any additional  VAS  as  per  the 

scope of the RFP. The revenue share model may be proposed as per the form above. Revenue 

sharing proposed for VAS shall not be considered for L1. The guiding user database for revenue 

model  is  provided  in  section  3.5  of  Volume  I  of  the  RFP.  If  there  are  more  transactions  and 

hence more revenue is generated the SI would be paid as per the % of revenue projected. 

Page 113: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 113 | P a g e  

 

ANNEXURE III: Template for PBG & CCN

Form 1: Performance Bank Guarantee

 PERFORMANCE SECURITY:  <Name> <Designation> <Address> <Phone Nos.> <Fax Nos.> <Email id>   Whereas,  <name  of  the  supplier  and  address>(hereinafter  called  “the  bidder”)  has undertaken, in pursuance of contract no. <Insert Contract No.> dated. <Date> to provide Implementation  services  for  <name  of  the  assignment>  to  APTS/ITE&C  (hereinafter called “the beneficiary”)  And whereas it has been stipulated by    in the said contract that the bidder shall furnish you  with  a  bank  guarantee  by  a  recognized  bank  for  the  sum  specified  therein  as security for compliance with its obligations in accordance with the contract;  And  whereas  we,  <Name of Bank>  a  banking  company  incorporated  and  having  its head/registered office at <Address of Registered Office> and having one of its office at <Address of Local Office>have agreed to give the supplier such a bank guarantee.  Now,  therefore,  we  hereby  affirm  that  we  are  guarantors  and  responsible  to  you,  on behalf  of  the  supplier,  up  to  a  total  of  Rs.<Insert Value>(Rupees <Insert Value in Words> only) and we undertake to pay you, upon your first written demand declaring the supplier to be in default under the contract and without cavil or argument, any sum or sums within the limits of Rs.<Insert Value>(Rupees<Insert Value in Words> only) as aforesaid,  without  your  needing  to  prove  or  to  show  grounds  or  reasons  for  your demand or the sum specified therein.  We hereby waive the necessity of your demanding the said debt from the bidder before presenting us with the demand.  We further agree that no change or addition to or other modification of the terms of the contract to be performed there under or of any of the contract documents which may be made between you and the Bidder shall in any way release us from any liability under this  guarantee  and  we  hereby  waive  notice  of  any  such  change,  addition  or modification. 

Page 114: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 114 | P a g e  

 

 This Guarantee shall be valid until <Insert Date>)  Notwithstanding anything contained herein:  

I. Our liability under this bank guarantee shall not exceed Rs.<Insert Value>(Rupees <Insert Value in Words> only).

II. This bank guarantee shall be valid up to <Insert Expiry Date>) III. It  is condition  of our  liability  for payment  of  the guaranteed amount or any part 

thereof arising under this bank guarantee that we receive a valid written claim or demand for payment under this bank guarantee on or before <Insert Expiry Date>) failing which our liability under the guarantee will automatically cease. 

 

Page 115: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 115 | P a g e  

 

Form 2: Change Control Notice (CCN) Format

 

Change Control Note  CCN Number: 

Part A: Initiation 

Title:   

Originator: 

Sponsor:   

Date of Initiation: 

Details of Proposed Change 

(To include reason for change and appropriate details/specifications. Identify any attachments as A1, A2, and A3 etc.) 

 

Authorized by :   Date: 

Name:   

Signature:   Received by the IP 

Date: 

Name:   

Signature:   

Change Control Note 

CCN Number: 

Part B : Evaluation 

(Identify any attachments as B1, B2, and B3 etc.) Changes to Services, charging structure, payment profile, documentation, training, service levels and component working arrangements and any other contractual issue. 

Brief Description of Solution: 

Impact: 

Page 116: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 116 | P a g e  

 

Deliverables: 

Timetable: 

Charges for Implementation: (including a schedule of payments) 

Other Relevant Information: (including value-added and acceptance criteria) 

Authorized by the Implementation Partner 

Date: 

Name:   

Signature:   

Page 117: RFP for Selection of System Integrator for Implementation ... 2.pdf · RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II Andhra

RFP for Selection of System Integrator for Implementation e-Pragati Primary Sector Modules Volume II  

 

Andhra Pradesh State-wide rollout of the e-Pragati Primary Sector Vol –II 117 | P a g e  

 

12 MASTER SERVICES AGREEMENT (In volume III)  

13 SERVICE LEVEL AGREEMENT - (In volume III)  

14 NON-DISCLOSURE AGREEMENT (In volume II)  

15 Format Rate Contract Details (In volume II) 16 ROLES and RESPONSIBILITIES OF THE PARTIES (Volume II )

17 Scope of the Project - (In volume I)


Recommended