+ All Categories
Home > Documents > Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external)...

Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external)...

Date post: 13-May-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
17
Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard, Consulting & Integration
Transcript
Page 1: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

Roberto Ceriani and Hubert Kaufmann,

Hewlett-Packard, Consulting & Integration

Page 2: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

� HP Roadmap to MOSS

� How we used SPS 2003

� Consolidation and Migration

MOSS Services� MOSS Services

� Demo

� Intranet

� Collaboration

� Governance

2 25 September 2008

Page 3: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

Architects, designs and implements

technology and industry-specific

solutions

Consulting & Integration (C&I)

Personal

Systems

Imaging &

Printing

Enterprise

• Consolidations & Migrations

• IT Service Management

Key C&I Solutions

Technology Solutions Group

Deploys and maintains optimized

IT infrastructures

solutions

Provides outsourcing services for: IT,

applications, end-user workplaces and

business processing

Outsourcing Services (EDS)

Technology Services

Services

Software

Enterprise

Servers &

Storage• Apps Dev., Integration & Mgmt

• Application Modernization

• Portals & Collaborations

• Business Intelligence/EDW

• Microsoft Solutions

• End-User Workplace Solutions

• Technology Deployment &

Support Services

Page 4: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

� Secure Extranet partner collaboration

� Intranet Presence� Professions (Business departments)

� Team sites (internal collaboration)� Team sites (internal collaboration)

� Internal collaboration� Team site on demand to all employees

� > 200,000 users

� 80,000 concurrent users

� 1200 web sites created a month

� Strategic replacement for other solutions

Page 5: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

eRoom

Groove (limited)Groove

SharePoint (non-KIM)

eRoom (external)

SharePoint V2

FY05 FY06 FY07 FY08

SharePoint 2001

LiveLink

Groove (limited)Groove

SharePoint 2007

Domino

Page 6: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

SharePoint 2003

deployments

NA2 (Houston, USA, EUSM)• Largest deployment• Currently largest deployment• Company wide portals• Local workspaces

JPN (Tokyo, Japan, EUSM)•Deployed in Japanese•Localized Workspaces•Bus. Specific Portals

(in progress)

SNO (Sydney, Australia, EUSM)•Local Workspaces•Bus. Specific Portals (in progress)

Custom solutions (worldwide IPG, migration ongoing)

page 6September 25, 2008

• Local workspaces

NA (Houston, USA, EUSM)• part of NA2 • Local workspaces

EMEA (Swindon, UK, EUSM)•Local Workspaces•Bus. Specific Portals

Owned by EUSM

In partnership (Custom solution)

2 Custom solutionsBangalore, STSD India, GDIC IndiaCustom solution

France, TSG,not EUSM

migration ongoing)- Singapore,- Israel- Barcelona, SP- Vancouver, CAN

Page 7: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

� Upgrade to new SharePoint version

� Consolidation

� Move out of legacy data centers

Improve the service:� Improve the service:

� Improve manage-ability by segmenting the

service

� Improve reliability by reducing customizations

� Eliminate junk sites

� Re-factor some portals and large sites

Page 8: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

MOSS Services

deployments

NA2 (Houston, USA, KIM)• Largest deployment (6 TB)• Local workspaces• Global enterprise wide portals• Local bus. specific Portal

SGP (Singapore, KIM)

EMEA (Swindon, UK, KIM)•Local Workspaces•Bus. Specific Portals

Migration target for• Houston NA farm• eroom• LiveLink (KMS)• IPG farm in Canada• etc

Migration target for• LiveLink (KMS)• IPG farm in Israel and Barcelona• etc

Migration target for• KIM Japan• KIM Sydney • LiveLink (KMS)• LiveLink (Konnect)• Eroom• IPG farm in Singapore• etc

Lotus Notes, Domino, Public Folder)

page 8September 25, 2008

SGP (Singapore, KIM)Localized Workspaces

Bus. Specific Portals

• local Workspaces• Bus. Specific Portals• with WSS Japanese language pack

Owned by EUSM

DC Houston Location code 3 and 4

DC Austin Location code 1 and 2

Details:Houston farm (left):

• local Workspaces• Bus. Specific Portals• HA and BC

Details:Austin farm (right):

• internal mission critical Workspaces and Portals• External Customer and partner Workspaces • HA, BC and DRP

Page 9: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

Prepare

5 weeks

Migrate

3 weeks

Validate

2 weeks

10 Week Cycle

IT:

• Select sites, assign move buckets, load data

into Migration Tool

• Notify site owners

Site owner:

• Deal with ownership changes

• Select a different move bucket

• Apply for Prime or Enhanced if applicable

• Communicate move date to users

• Get users to delete old content

IT:

• Lock old site so it is read-

only

• Migrate data

Site Owner:

• Validate

content of

new site

Page 10: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

Cycles

Approved Prime &

Standard sites

can move to a

different bucket

Each cycle contains

three 1-week buckets

Approved Prime &

Enhanced Sites

can move to

a different cycle

Page 11: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

Old State:

•5 Geographic Farms + 1 Partner farm

•Mixed use cases on every farm

11

Current State (FY08):

Server farms segmented by use case

Internal

Collaboration

Prime

Collaboration

Enhanced

Collaboration

Partner

Collaboration

Page 12: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

• This service replaces the legacy MCMS-based service.

• WPC provides an infrastructure for publishing to the entire company. Includes workflow that supports the process of creating, approving, and publishing web pages.

Web Publishing Center (Intranet)

Internal Collaboration

Web Publishing

Intranet

• Used by teams to collaborate on documents or organize the group’s ongoing activities. Common use cases: 1) a project team collaborating on documents. 2) a work group using the service for group calendars, tasks, etc.

Internal Collaboration

• This service is the same as Internal Team Collaboration, except:

• It’s accessible by credentialed non-HP suppliers, customers, partners

• Global search is disabled

Partner Collaboration

Internal

Collaboration

Partner

Collaboration

Page 13: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

• No management approval required to create new sites.

• 97% uptime objective.

• User interface is the standard “out of the box” SharePoint functionality. Various standard templates are available.

Internal Team Collaboration

functionality. Various standard templates are available.

• Deleted sites can be restored by the help desk within 30 days.

• Fixed quota of 500MB.

• Documents unread for 6+ months are moved to the recycle bin, and a summary email is sent to the site administrator.

Page 14: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

Services built:

• Web Publishing Center

• Internal Collaboration

• Partner Collaboration• Partner Collaboration

• Prime Collaboration

• Enhanced Collaboration

Services planned for FY08-09:

• MySite

• ILM Implementation

• Knowledge Commons (Forums, Wikis, Blogs, Knowledge Briefs)

Page 15: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

� Intranet

� Collaboration

� Governance

Page 16: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

Contact:

[email protected]

Page 17: Roberto Ceriani and Hubert Kaufmann, Hewlett-Packard ... · SharePoint (non-KIM) eRoom (external) SharePoint V2 FY05 FY06 FY07 FY08 SharePoint 2001 LiveLink SharePoint 2007 Domino.

17

25 September

2008


Recommended