San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach January 7 & 8, 2003. SFOBB New East Span January 2003 Business Enterprise Outreach. Welcome - my name is Sarah Picker Purpose : networking for business relationships to construct SFOBB East Span Agenda - PowerPoint PPT Presentation
65
San Francisco-Oakland Bay San Francisco-Oakland Bay Bridge Bridge East Span Seismic Safety East Span Seismic Safety Project Contractor Outreach Project Contractor Outreach January 7 & 8, 2003 January 7 & 8, 2003
Transcript
Page 1: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

San Francisco-Oakland Bay BridgeSan Francisco-Oakland Bay BridgeEast Span Seismic Safety Project East Span Seismic Safety Project

Contractor OutreachContractor Outreach

January 7 & 8, 2003January 7 & 8, 2003

Page 2: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

SFOBB New East SpanSFOBB New East Span January 2003 Business Enterprise Outreach January 2003 Business Enterprise Outreach

Welcome - my name is Sarah PickerWelcome - my name is Sarah Picker Purpose : networking for business Purpose : networking for business

relationships to construct SFOBB East relationships to construct SFOBB East SpanSpan

AgendaAgenda Sign-In PleaseSign-In Please Survey - day or night meetingsSurvey - day or night meetings

Page 3: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Show of handsShow of hands

How did you find out about the outreach?How did you find out about the outreach?

Newspaper, letter?Newspaper, letter?

Page 4: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

WelcomeWelcome

Dan McElhinney, District 4 Chief Dan McElhinney, District 4 Chief Deputy Toll Bridge ProgramDeputy Toll Bridge Program

Opening RemarksOpening Remarks

Page 5: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Project LimitsProject LimitsProject LimitsProject Limits

Project LimitsProject Limits

Oakland

San Francisco

Page 6: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

YBI SAS SKYWAY OAKLANDTOUCHDOWN

Existing Bridge

Page 7: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Yerba Buena Island

T1/E2 foundations (04-0120E4)

T1

E2

W2 foundation (04-0120C4)

Building demolition (04A1701)

YBI/SAS Contracts

Transition structure (04-0120H4)

SAS superstructure (04-0120F4)

Retrofit/Substation (04-0120G4)

Page 8: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

YBI Building Demolition(R/W) 04A1701YBI Building Demolition(R/W) 04A1701a contract to remove three USCG buildings and

one state building executed as a right-of-way service contract

Page 9: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

YBI Substation & Viaduct Retrofit 04-YBI Substation & Viaduct Retrofit 04-0120G40120G4 a contract to construct a replacement electrical substation

on YBI near the westbound on-ramp and complete relatively simple bridge retrofit work near the YBI tunnel (this work is combined due to the close proximity of the work)

Page 10: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

SAS E2/T1 Structures 04-0120E4SAS E2/T1 Structures 04-0120E4a contract to construct the Self-Anchored

Suspension bridge in-bay foundations, the main tower (T1) and pier E2 just to the east of YBI

Page 11: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

SAS Superstructures 04-0120F4SAS Superstructures 04-0120F4a contract to construct the tower and

superstructure of the Self-Anchored Suspension bridge

Page 12: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

YBI Structures 04-0120H4YBI Structures 04-0120H4a contract to construct the temporary

detour and permanent bridges on YBI

Page 13: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Yerba Buena Island

T1/E2 foundations (04-0120E4)

T1

E2

W2 foundation (04-0120C4)

Building demolition (04A1701)

YBI/SAS Contracts

Transition structure (04-0120H4)

SAS superstructure (04-0120F4)

Retrofit/Substation (04-0120G4)

Page 14: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Recap of SFOBB East Span Recap of SFOBB East Span Seismic Safety ProjectSeismic Safety Project

already awardedalready awardedPIDP 04-012084Skyway 04-012024Geofill 04-012054Archeological Excavation and

Midden Site 04-012074

Page 15: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Recap of SFOBB East Span Recap of SFOBB East Span Seismic Safety ProjectSeismic Safety Project

YBI Building Demolition(R/W)YBI Building Demolition(R/W) SAS W2 Structures 04-0120C4SAS W2 Structures 04-0120C4 YBI Substation & Viaduct Retrofit 04-0120G4YBI Substation & Viaduct Retrofit 04-0120G4 SAS E2/T1 Structures 04-0120E4SAS E2/T1 Structures 04-0120E4 SAS Superstructures 04-0120F4SAS Superstructures 04-0120F4 YBI Structures 04-0120H4YBI Structures 04-0120H4

Page 16: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Recap of SFOBB East Span Recap of SFOBB East Span Seismic Safety ProjectSeismic Safety Project

Oakland Touchdown Oakland Touchdown 04-01204404-012044

Existing Bridge Existing Bridge Demolition 04-012094Demolition 04-012094

Page 17: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

SFOBB East SpanSFOBB East Span

Tonight’s discussions relate to the YBI Tonight’s discussions relate to the YBI Substation and Viaduct Retrofit Substation and Viaduct Retrofit construction contract we advertised for construction contract we advertised for bid December 2002bid December 2002

bid opens February 25, 2003bid opens February 25, 2003

Page 18: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

What is the schedule?What is the schedule?

SAS E2/T1 04-0120E4 will advertise SAS E2/T1 04-0120E4 will advertise January 21, 2003 January 21, 2003 bids open May 20, 2003bids open May 20, 2003

SAS Superstructures 04-0120F4 will SAS Superstructures 04-0120F4 will advertise February 3, 2003 advertise February 3, 2003 bids open July 9, 2003bids open July 9, 2003

YBI Superstructure advertise TBAYBI Superstructure advertise TBA

Page 19: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Other IntroductionsOther Introductions

Will the Potential Prime Contractors in the Will the Potential Prime Contractors in the room volunteer to raise their hands?room volunteer to raise their hands?

Would the DBE certified businesses raise Would the DBE certified businesses raise their hands?their hands?

Would the potential DBE or small Would the potential DBE or small businesses raise their hands?businesses raise their hands?

Page 20: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

San Francisco-Oakland Bay BridgeSan Francisco-Oakland Bay BridgeEast Span Seismic Safety ProjectEast Span Seismic Safety Project

Page 21: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Bob Zandipour

Branch Chief, Toll Bridge Program

Roadway Items

Page 22: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Yerba Buena Island

T1/E2 foundations (04-0120E4)

T1

E2

W2 foundation (04-0120C4)

Building demolition (04A1701)

YBI/SAS Contracts

Transition structure (04-0120H4)

SAS superstructure (04-0120F4)

Retrofit/Substation (04-0120G4)

Page 23: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Yerba Buena IslandYerba Buena Island

Varied topography -- 60 meter elevation change

Steep slopes

Narrow winding roads

USCG base for 24 hour Search and Rescue unit

Lots of underground utilities

Page 24: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Environmental Constraints at YBIEnvironmental Constraints at YBI

USCG Facilities

Historic Structures

W2 foundation contractW2 foundation contract

Page 25: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Special Aquatic Site - Yerba Buena Island

Yerba Buena Island

Page 26: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Retrofit/Substation ScopeRetrofit/Substation Scope

Construct New YBI SubstationConstruct New YBI Substation West Bound On Ramp Roadway WorkWest Bound On Ramp Roadway Work Demolish Existing Substation and Maintenance GarageDemolish Existing Substation and Maintenance Garage Viaduct Retrofit WorkViaduct Retrofit Work

Page 27: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Yerba Buena IslandYerba Buena Island

New Substation

Page 28: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Environmental Constraints at YBIEnvironmental Constraints at YBI

USCG Facilities

Historic Structures

Substation contract

Page 29: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

SubstationSubstation

MECHANICAL ROOM

ELECTRICAL ROOM OFFICE

CONTROL / COMPUTER

GARAGE

PARKING LOT

Page 30: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

SubstationSubstation One story 468 square meter structure includingOne story 468 square meter structure including

Mechanical Room • major equipment – 2 air compressors

Electrical Room • major equipment – 14.47 kV metal clad switchgear, 1000 kV power

transformer

Control/Computer Room Office Bathroom Break Room Garage Battery Room

Page 31: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Utility WorkUtility Work

Relocate the following utilitiesRelocate the following utilities

Compressed AirOverhead ElectricalUnderground ElectricalSanitary SewerWaterDrainage

Page 32: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

TEMPORARY ITEMS

ITEM DESCRIPTION UNIT QTY TEMPORARY SOIL STABILIZER M2 484 TEMPORARY COVER M2 250 TEMPORARY FENCE (TYPE CL-1.8) M 115 TEMPORARY GATE (TYPE CL-1.8) EA 2 TEMPORARY RAILING (TYPE K) M 115 TEMPORARY CRASH CUSHION MODULE EA 22 TEMPORARY CRASH CUSHION (TYPE TS14) EA 10 TEMPORARY SILT FENCE M 161

Items of Work

Page 33: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Items of Work

WATER POLLUTION CONTROL MEASURES ITEM DESCRIPTION UNIT QTY

FIBER (EROSION CONTROL) KG 31 EROSION CONTROL (NETTING) M2 484 FIBER ROLLS M 35 COMPOST (EROSION CONTROL) KG 94 PURE LIVE SEED (EROSION CONTROL) KG 6 STABILIZING EMULSION (EROSION CONTROL) KG 9 MOVE IN/MOVE OUT (EROSION CONTROL) EA 1

ROCK SLOPE PROTECTION FABRIC M2 103

Page 34: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

ROADWAY ITEM DESCRIPTION UNIT QUANTITY ELECTRONIC MOBILE DAILY DAIRY LS LUMPSUM

COMPUTER SYSTEM DATA DELIVERY

CONSTRUCTION AREA SIGNS LS LUMPSUM CLEARING AND GRUBBING HA .05 TRAFFIC CONTROL SYSTEM LS LUMPSUM

Items of Work

Page 35: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

ROADWAY ITEM DESCRIPTION UNIT QUANTITY CHANNELIZER (SURFACE MOUNTED) EA 53

REMOVE BASE AND SURFACING M3 69 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 1244 REMOVE THERMOPLASTIC TRAFFIC MARKER M2 6 REMOVE PAVEMENT MARKER EA 299 RESET ROADSIDE SIGN EA 4 COLD PLANE ASPHALT CONCRETE M2 30 REMOVE CONCRETE CURB M 91

Items of Work

Page 36: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

ROADWAY ITEM DESCRIPTION UNIT QUANTITY REMOVE SIDEWALK M2 24

REMOVE CONCRETE (MISC) M2 281 ROADWAY EXCAVATION M3 2944 CLASS 3 AGGREGATE BASE M3 414 ASPHALT TREATED PERMEABLE BASE EA 57 ASPHALT CONCRETE (TYPE A) TONNE 312 ASPHALT CONCRETE (OPEN GRADED) TONNE 55 MINOR CONCRETE (CURB) M3 18

Items of Work

Page 37: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

ROADWAY ITEM DESCRIPTION UNIT QUANTITY CHAIN LINK FENCE (CL-1.8 EXT. ARM) M 77

CHAIN LINK GATE (CL-1.8 EXT. ARM) EA 2 DELINEATOR (SPECIAL) EA 2 DELINEATOR (CLASS 1) EA 351 100 MM THERMOPLASTICTRAFFIC STRIPE M 172 PAVEMENT MARKER (RETROREFLECTIVE) EA 12

Items of Work

Page 38: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

ELECTRICAL

ITEM DESCRIPTION UNIT QUANTITY

EXISTING WEST AND EASTBOUND SPAN LS LUMP SUM YBI SUBSTATION LS LUMP SUM

YBI VIADUCT MODIFICATIONS LS LUMP SUM SCADA REMOTE TERMINAL UNIT SYSTEM LS LUMP SUM CALL BOX SYSTEM LS LUMP SUM ELECTRICAL UTILITY RELOCATIONS LS LUMP SUM TRAFFIC OPERATIONS SYSTEM LS LUMP SUM

Items of Work

Page 39: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

UTILITY ITEM DESCRIPTION UNIT QUANTITY 40 MM WATER DIP M 5

200 MM WATER DIP M 125 75 MM WATER LINE M 83 150 MM COMPRESSED AIR EA 351

Items of Work

Page 40: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

DRAINAGE / HYDRAULICS ITEM DESCRIPTION UNIT QTY

ABANDON PIPE M 10 REMOVE PIPE M 9 REMOVE INLET EA 2 REMOVE MANHOLE EA 1 375 MM REINFORCED CONCRETE PIPE M 57 450 MM REINFORCED CONCRETE PIPE M 10 525 MM REINFORCED CONCRETE PIPE M 35 INLET AND GRATE EA 3 CLASS A CONCRETE (MINOR STRUCTURE) M3 54

Items of Work

Page 41: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

San Francisco-Oakland Bay BridgeSan Francisco-Oakland Bay BridgeEast Span Seismic Safety ProjectEast Span Seismic Safety Project

Page 42: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Glenn Fleming

Mechanical Engineer Structural Design,

Toll Bridge Program

Structure Items

Page 43: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Introduction to YBI Viaduct Structure Introduction to YBI Viaduct Structure Retrofit Retrofit

3 Frames of Bridge Construction

•Frames 1 & 2 - West Segment Retrofit•Frame 3 - WB On Ramp Approach Retrofit

Page 44: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

YBI Viaduct - General PlanYBI Viaduct - General PlanFrame 1 & 2 - Construct West Segment RetrofitFrame 1 & 2 - Construct West Segment Retrofit Frame 3 - Construct WB On Ramp Approach RetrofitFrame 3 - Construct WB On Ramp Approach Retrofit

Frame 1 Frame 2 Frame 3

Exp JT

Bent 31

34 35 38 39 42 43

33m 33m 33m

WB on-ramp

SF

WB off-ramp

Tunnel

Page 45: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

• Construct Concrete Seat Extensions, drill and bond dowels

Typical Section Near Bent 33

Frame 1 - Frame 1 - Typical SectionTypical Section

Wall,typ

Design Note:Floor beams are simply supported by continuous retaining wallswith partial height counterfort walls. Analysis has determined floorbeams are vulnerability to unseating.

Page 46: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Top of Wall

•Construct Concrete Collars at counterforts and short columns •Construct Seat Extensions

Frame 2 - Frame 2 - Typical SectionTypical Section

Typical Section Near Bent 37

Design Note:Counterforts support short columns along the north edge of deck. Analysis has determined inadequate shear capacity of the short columns. Additionally, floor beams are vulnerability to unseating.

Page 47: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Strengthen Counterfort and Strengthen Counterfort and Short Column - Short Column - Frame 2Frame 2

Construct counterfort & short column concrete collars Construct counterfort & short column concrete collars

Drill & pressure groutDrill & pressure grout

Page 48: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Frame 3 - Typical Section

Typical Section Bent 39

1. Strengthen (encase) north-side viaduct bent caps. 2. Strengthen (encase) columns located beneath ramp.3. Strengthen (encase) longitudinal girder beneath ramp.4. Strengthen (encase) and tie-down, ramp column footings.5. Construct seat extension and bolster at ramp abutment diaphram.6. Extend bent caps to ramp columns.7. Construct shear wall and retaining walls.•Demo and widen deck from bent 41 to just beyond bent 42 (not shown).

1

2

6

4

5 3

7

Design Note:Analysis has identified that the caps and girders are not capable of resisting the column plastic moment.

Page 49: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Remove existing Caltrans electrical Remove existing Caltrans electrical substation and garage, and reconstruct substation and garage, and reconstruct substationsubstation

Substation RelocationSubstation Relocation

WB On-rampto SF

Bent 47

•Note proximity to WB ramp

Page 50: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Retrofit Contract Retrofit Contract Item List & QuantitiesItem List & Quantities

Temporary Railing (Type K) 19 MBridge Removal (Portion) Lump SumStructure Exacavation (Bridge) 145 M3Structure Exacavation (Type H) (S) 70 M3Structure Exacavation (Rock) 10 M3Structure Backfill (Bridge) 110 M3Tiedown Anchor (S) 32 EAStructural Concrete , Bridge Footing YBI 80 M3Structural Concrete , Bridge YBI 285 M3Drill and Pressure Grout Dowel (S) 600 MDrill and Bond Dowel 405 MDrill and Bond Dowel Epoxy Cartirge (S) 640 EARefinish Bridge Deck (S) 30 M2Bar Reinforcing Steel (Bridge) (YBI) (S) 68000 KGCable Railing 15 MConcrete Barrier (Type 60SE MOD) 28 M

Page 51: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

San Francisco-Oakland Bay BridgeSan Francisco-Oakland Bay BridgeEast Span Seismic Safety ProjectEast Span Seismic Safety Project

Business Enterprise Outreach ProgramBusiness Enterprise Outreach Program20032003

Page 52: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Phyllis Thompson

San Francisco Oakland Bay Bridge

Business Enterprise Coordinator

Civil Rights

Page 53: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Civil Rights

for information about

•Doing Business with Caltrans Disadvantaged Business Enterprise (DBE) Program

•Small Business Services

Business Enterprise Programcall (916) 324-1700 or access http://www.dot.ca.gov/hq/bep

Small Business/Disabled Veteran Business Enterprise Servicescall (916) 324-8401 or access http://www/dot.ca.gov/bep/smallbusiness.htm

Page 54: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

SFOBB East Span Replacement SFOBB East Span Replacement Contracts Advertising &Contracts Advertising &Award Process OverviewAward Process Overview

Presented byPresented by

Jeff Reeds & Christine InouyeJeff Reeds & Christine Inouye

January 7 & 8, 2003January 7 & 8, 2003

Page 55: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Purpose of this PresentationPurpose of this Presentation

Provide you with information about Provide you with information about Caltrans contract advertising and award Caltrans contract advertising and award process for the Yerba Buena Island process for the Yerba Buena Island Substation and Viaduct Retrofit Contract Substation and Viaduct Retrofit Contract of the San Francisco/Oakland Bay Bridge of the San Francisco/Oakland Bay Bridge East Span Replacement ProjectsEast Span Replacement Projects

Answer your questionsAnswer your questions

Page 56: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Caltrans MissionCaltrans Mission

Our mission is to improve mobility Our mission is to improve mobility across Californiaacross California

The Office Engineer contributes to Caltrans The Office Engineer contributes to Caltrans mission by providing construction contracts mission by providing construction contracts that are:that are: Complete, biddable and buildable Competitively bid Meeting legal requirements Open to all licensed contractors

Page 57: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Contract 04-0120G4 Project GoalsContract 04-0120G4 Project Goals

This is a federally-funded projectThis is a federally-funded project The Disadvantaged Business Enterprise (DBE) The Disadvantaged Business Enterprise (DBE)

goal for this project is 13 %. goal for this project is 13 %. Pre-Bid meeting on February 5thPre-Bid meeting on February 5th

Page 58: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

AwardProcess Award (about 30 days)OpenBids

2/25/03

AdvertisedRelease

Date12/09/02

YBI Substation & Viaduct Retrofit Project YBI Substation & Viaduct Retrofit Project Advertising to Award TimeframeAdvertising to Award Timeframe

4 Weeks Prior to Releasing Bid DocumentsAdvanceAdvertising

Distribute Bid Documents to Bidders (11 weeks)

Page 59: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Public Bid OpeningPublic Bid Opening

Bids for this project will be opened and read in a public Bids for this project will be opened and read in a public forumforum

On Tuesday, February 25 at 2 PM in Sacramento in Room 100 On Tuesday, February 25 at 2 PM in Sacramento in Room 100 at 1120 N Streetat 1120 N Street

Immediately Following Bid Opening:Immediately Following Bid Opening: Bid amounts will be verifiedBid amounts will be verified Preliminary bid results posted at (916) 654-5500 and on the Preliminary bid results posted at (916) 654-5500 and on the

InternetInternet (http://www.dot.ca.gov/hq/esc/oe/bidsopened.html)(http://www.dot.ca.gov/hq/esc/oe/bidsopened.html) Bid summaries will be mailed to all biddersBid summaries will be mailed to all bidders

Page 60: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

This Contract will use A+B BiddingThis Contract will use A+B Bidding

To determine the lowest monetary bidder, To determine the lowest monetary bidder, Caltrans will calculate the bid amount as Caltrans will calculate the bid amount as follows:follows:“A” contract items total

+

“B” number of contract working days bid by contractor multiplied by a dollar amount per day determined by Caltrans

A+B will determine the total bid for A+B will determine the total bid for comparison purposes onlycomparison purposes only

Page 61: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

We anticipate this project will take about 30 days to

award after bid opening Before awarding a contract, we verify:

Bid is responsive and complete Bid security is provided and correct All forms are complete and correct Contractor is properly licensed

Verify Compliance with DBE requirements Receipt of DBE commitment forms by 4th day

All protests addressed

Award Process

Page 62: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Other RequirementsOther Requirements

Escrow of Bid DocumentsEscrow of Bid Documents The 3 low bidders are to escrow their bid

documents on March 4 between 1 and 2 PMSee the Special Provisions for more information

Page 63: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Contract Execution & ApprovalContract Execution & Approval

After Contract AwardAfter Contract AwardContractor has 8 days to sign and return contract

for Caltrans approvalExecuted Documents (returned)

• Contract signature page signed• Payment and Performance bonds included & signed

Signed/Approved by Caltrans

Begin Construction!Begin Construction!

Page 64: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Internet Services ProvidedInternet Services Provided

http://www.dot.ca.gov/hq/http://www.dot.ca.gov/hq/esc/oe/esc/oe/

Information on Projects Information on Projects Released for BidReleased for Bid

Weekly Advertisements for Weekly Advertisements for BidsBids

Electronic copies of project Electronic copies of project plans & specificationsplans & specifications

Bidder AssistanceBidder Assistance

Bid Opening and Award Bid Opening and Award InformationInformation

Page 65: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

ConclusionConclusion

We thank you for We thank you for your time and your time and interest.interest.

If you have any If you have any questions or questions or suggestions, we suggestions, we would like to hear would like to hear themthem

We look forward to doing business with you soon!


Recommended