+ All Categories
Home > Documents > Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work,...

Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work,...

Date post: 18-Apr-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
15
Sandbukta – Moss – Såstad (SMS) List of assignments in the period 2019 – 2024 2019 04-04 Geir Solvin
Transcript
Page 1: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)List of assignments in the period 2019 – 2024

2019 04-04 Geir Solvin

Page 2: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)2

Sandbukta-Moss-Såstad (SMS)• Main work, operating phase 20.00:• New double track 10.4 km • 2 tunnels totalling approx. 4 km• 3 evacuation tunnels• New Moss station

Page 3: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)3

Sandbukta-Moss-Såstad (SMS) plot image

• Temporary operating phase 10.00 reorganisation of existing track

Page 4: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)4

Investments for railway power supply 960168 Sandbukta-Moss-Såstad 2019-2024

Proj. no. Project name/assignment Line section Contract signing(years)

Construction start(years)

Duration(number of years)

960168 SMS 2B Catenary and track Østfold line, western line

2021 2022 3 years

960168 SMS 2C Electricity and telecoms Østfold line, western line

2021 2022 3 years

Page 5: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)5

SMS 2B Main work, OCL and track works

OCL installation:• OCL installation to be built with AT system on the 10.4 km double track line. 4 tracks

to platform at new Moss station. • 8 AT transformers.

4 at Smørbekk converter station (Km 50.500) 2 at Moss station (Km 60.200) 2 at Km 66.400

• New AT line between Smørbekk converter station (Km 50.500) and plot boundary Sandbukta (Km 56.370).

• 5 km (double track) OCL system 20 (double track).• 5.4 km (double track) OCL system 25.

Page 6: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)6

SMS 2B Main work, OCL and track works (continued)

Track:• 10.4 km double track • 27 point switches with jointed frog• 4 tracks to platform at new Moss station.

Page 7: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)7

SMS Principle catenary installation at station area

Page 8: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)8

SMS Principle catenary installation in tunnel

Page 9: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)9

SMS 2C Main work, Electricity and telecoms

Electricity (22kV and low voltage).• 22kV cable installation inc. cable conduit along 10.4 km new line.

• 22kV cable installation inc. cable conduit on existing sections Kambo – Sandbukta (5 km) and from Såstad to Haug (6.0 km).

• => A total of 21.4 km with 22kV cable installation inc. cable conduit.

• 8 substations with 22kV switchgear and transformer 22kV/0.4kV.

• Substation at Kambo Km 56.650 receives input from network grid owner (HafslundNett), and has transformer 11/22kV with high-voltage metering equipment and interface to network grid owner.

Page 10: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)10

SMS 2C Main work, Electricity and telecoms (continued)

Low voltage installation:

• Substations8 substations for primary distribution, UPS system, remote control (RTU), monitoring, etc.The substations supply technical systems, site lighting, tunnel lighting.emergency lighting, point heaters (27 point switches), telecoms installation, signalling installation, etc.

• Lighting installation:Site lighting (station and point areas).Tunnel lighting for telecoms cubicles, signal cabinets, emergency lighting in tunnels and evacuation tunnels.Lighting in station building and technical buildings.

• Remote control/monitoringRemote control/monitoring of OCL switches and 22 kV switches.Monitoring of technical installations, alarms, status (UPS), etc.

Page 11: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)11

SMS 2C Main work, Electricity and telecoms (continued)

Telecoms system:• SRO system• Fibre: Access and transport fibre + fibre connections up to terminal equipment (group cabinets, telecoms cubicles, etc.)• Access control• Fire alarm• Transmission

Page 12: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)12

SMS power supply installation. Moss-Såstad

Page 13: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)13

SMS power supply installation. Conduits

Page 14: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)14

SMS power supply installation. Sandbukta-Moss

Page 15: Sandbukta – Moss – Såstad (SMS) · 10 Sandbukta – Moss – Såstad (SMS) SMS 2C Main work, Electricity and telecoms (continued) Low voltage installation: • Substations 8

Sandbukta – Moss – Såstad (SMS)15

SMS power supply installation. Moss-Såstad


Recommended