    Sea Water Cooling System For Jubail 2

    December 2007

    ROYAL COMMISSION FOR JUBAIL & YANBU

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    2/37

    Content

    RC Mission and Achievements

    Project Management Tools

    Sea Water Cooling in Jubail 1

    Jubail 2 Sea Water Cooling

    - Feasibility & Concept

    - System Overview

    - Project Status.

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    3/37

    Strategic Master Planning of the development and thefuture growth

    Provide land and utilities for industrial development.

    Promote industrial, residential and commercial

    investment.

    Develop , operate and maintain public facilities and

    services.

    Comprehensive Management of the two cities.

    Royal Commission Mission

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    4/37

    Produces 7% of the worlds petrochemicals.

    Contributes 11.5% of the Kingdoms non-oil GDP.

    Creates 70% of the Kingdoms non-oil exports.

    Annual growth is sustained at 6%.

    Jubail has attracted over 50% of the Kingdoms totalforeign investment.

    Achievements ( In Jubail )

    Jubail is the Best City in attracting foreign investment,

    award by Financial Times , 2005

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    5/37

    1 : 4 1 : 15Industrial Capital Invest.

    240

    16

    RC Capital Invest.

    n us r a ec or ap a Investment( SR Billion)

    JUBAIL 2JUBAIL 1

    193

    47

    Industrial Capital Invest.

    RC Capital Invest.

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    6/37

    STAGE 1 STAGE 2 STAGE 3 STAGE 4 STAGE 5 STAGE 6

    2 W 2 W 24 W 16 W 4 W 104 W

    CONCEPT PLAN COMTT DESIGN CONTRACTING APPROVALS EXCUTION

    PROJECT SPONSOR PROJECT SPONSOR PROJECT SPONSOR PROCURMT- DEPT PROCURMT DEPT CONST/ENG

    DDG

    GATEKEEPER

    BREIF SCOPE

    ROUGH COST

    WHY DO WE NEED

    THE PROJECT

    BREIF SCOPE

    COST +- 25 %

    BUDGET VERIFICATION

    PROCESS CICLE

    (STGs (3-6))

    PROJECT NEED

    SCHEMATIC DEWG

    PROJECT TITLE

    DISCUSS A/E

    30% DESIGN

    VE+ DEPTS REV

    2 W

    4 W

    2 W

    90% DESIGN 12 W

    DEPTS REVIEW +

    2 W

    100 % DESIGN 2 W

    TRANSLATION

    RFP

    ISSUE FOR BIDS+

    RC EST

    EVALUATION+RECOMMO

    NDATION

    2 W

    8 W

    3 W

    DG APPROVAL

    2 D

    NEGT BIDDER 3 W

    PLANNING PHASE PROCESS PHASE IMPL - PHASE

    CHAIRMAN

    MOF

    BOARD

    2 W

    COM

    2 W

    PARALELL

    2 W

    4 W

    1 - 3 W 1 - 3 W 16 - 48 W 12 - 24 W 2 - 12 W 52 - 208 W

    TO BE PREPARED BY

    REQUESTER THRU

    AFORMAT

    AFORM -

    TO BE PREPARED BY

    REQUESTER THRU

    POWER POINT

    PRESENTATION

    FORM -B

    REVISED

    CFRREVISED

    CFRREVISED

    CFR

    CONST/ENG

    CUSTUDY

    DE

    SCRIPTION

    IMPL- TOOL

    O&M

    GATEKEEPER

    MOF

    GATEKEEPER

    PROC

    GATEKEEPER

    P & B

    GATEKEEPER

    PLAN

    COMMT

    GATEKEEPER

    1 2 3 4 5 6

    AVG-DURATION

    RANGE

    STAGES

    STG-NAME

    TURN-OVER &

    ACCEPTANCE

    AW

    ARD & NTP

    SCHEDULE

    MILESTONS

    TURN OVER

    PHASES

    1HOLD

    GO

    CANCELGATEKEEPER

    Project Life(Gate Process)

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    7/37

    CFR Report

    STAGE 1 STAGE 2 STAGE 3Complete Complete Tech

    Tech 30% 90% Specs

    Category/Contract No./ Description Specs Package Package 100%

    Initiated Review Review to Proc't

    (1) (30) (90) (3)

    standard days 56 98 14

    COMMUNITY

    JUBAIL 1

    TECHNICAL

    1-06-092-T26 1-Oct-06 P 26-Nov-06 P 10-Dec-06 P 7-Jan-07 P N/A P 10-Jun-07 P 6-Aug-07 P

    Engineering Design for Roads 1-Oct-06 A 26-Nov-06 A 10-Dec-06 A 7-Jan-07 A N/A F 10-Jun-07 F 6-Aug-07 F

    1-99-101-T15 12-Aug-06 P 7-Oct-06 P 21-Oct-06 P 18-Nov-06 P 13-Jan-07 P 21-Apr-07 P 26-May-07 P

    Study and Design of City Center 12-Aug-06 A 7-Oct-06 A 21-Oct-06 A 18-Nov-06 A 13-Jan-07 A 21-Apr-07 F 26-May-07 F

    SITE DEVELOPMENT

    1-91-709-C12 8-Apr-07 P 3-Jun-07 P 17-Jun-07 P 15-Jul-07 P 28-Oct-07 P 27-Jan-08 P 6-Apr-08 P

    Construction of International Residential Area (Phase I) 8-Apr-07 A 3-Jun-07 A 17-Jun-07 A 15-Jul-07 F 28-Oct-07 F 27-Jan-08 F 6-Apr-08 F

    1-91-709-C13 9-May-07 P 4-Jul-07 P 18-Jul-07 P 15-Aug-07 P 28-Nov-07 P 27-Feb-08 P 7-May-08 P

    Site Development Works in Community Area (Farouk North Area) 9-May-07 A 4-Jul-07 A 18-Jul-07 A 15-Aug-07 F 28-Nov-07 F 27-Feb-08 F 7-May-08 F

    1-91-740-C03 9-Aug-07 P 4-Oct-07 P 18-Oct-07 P 15-Nov-07 P 21-Feb-08 P 11-May-08 P 20-Jul-08 P

    Rehab and Improvement of Shorelines in all existing Community ar 9-Aug-07 A 4-Oct-07 A 18-Oct-07 A 15-Nov-07 F 21-Feb-08 F 11-May-08 F 20-Jul-08 F

    IRRIGATION1-59-575-C27 4-Mar-07 P 29-Apr-07 P 13-May-07 P 10-Jun-07 P 15-Sep-07 P 22-Dec-07 P 17-Feb-08 P

    Reinforcement of Community Irrigation System 4-Mar-07 A 29-Apr-07 A 13-May-07 A 10-Jun-07 F 15-Sep-07 F 22-Dec-07 F 17-Feb-08 F

    (ABC)

    Planning

    Committee

    Approval

    (Start of Eng)

    Planning

    Committee

    Presentation

    (PC)

    Contract

    Initiating

    Meeting

    (0)

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    8/37

    Sea Water Cooling Need

    Heat rejection from industries.

    Cooling media is required to absorb heat

    The System provide Sea Water to be the coolingmedia to absorb heat from industries and dissipate

    into the Sea.

    The System provides as a proper environmentalcontrol for industries discharge

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    9/37

    Feasibility of SWC of Jubail 1

    Looking atJ 1, Canal System was Selected

    because:

    Favorable site locationnear Gulf

    Level topography permitting canals

    Ideal arrangement of Industrial Port

    Causeway to separate intake from outfall.

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    10/37

    SWC System in Jubail 1 ( 1 m m3/hr )

    Sea Water Intake Channel

    Canal System

    Outfall Structure

    Industries Off-Take Structures and Laterals Pipes

    Inverted Siphons between canals segments

    3 Canals segments with 3 Compartments ( Supply ,

    Supply / Return , Return )

    Pump Station

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    11/37

    Intake Channel & Pump Station

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    12/37

    Canal System

    Canal 1

    Canal 3

    Canal 2

    Pump

    Station

    Outfall

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    13/37

    SUPPLY

    STRUCTURE

    RETURN

    STRUCTUREFLOW MEASUREMENT

    CHAMBER

    LATERAL PIPELINESEAWATER TO

    USER INDUSTRY

    ACCESS

    BRIDGE

    S S/R R

    Off-Take Structure

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    14/37

    Outfall

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    15/37

    Click to edit Master title style

    -----194TH Planning Stage

    PRODUCTION

    CAPACITY

    (KTPY)

    NO. OF

    INDUSTRIES

    Lots

    COMPLETION

    DATE

    PRIVATE

    INVESTMENT

    (SR BILLION)

    GOVERNMENT

    INVESTMENT

    (SR BILLION)

    AREA

    (KM2)STAGES

    49,0001424016.081TOTAL

    24,00072009825.0191ST

    13,00032011806.3202ND

    12,00042013784.7233RD

    JUBAIL 2

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    16/37

    Feasibility of Jubail 2

    ForJ 2many option were studies

    Cooling Ponds required large space.

    Canal for once through found not feasible due

    to location and crossing KRT and topography

    ( + 7 m E-W , + 3 N-S )

    Dry cooling , High cost and not in large scale.

    Make Up water for Cooling Towers found most

    feasible.

    Advanced technology of using Gases such asAmmonia. Limited to small scale

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    17/37

    Make Up Concept For J 2

    Q m = ( 6 10 % ) Q recIndustries fence

    Hot Process

    Fluid

    Sea Water

    Blow Down

    Q b

    HeatExchanger

    Q m = Q b + Loss

    Cold Process

    Fluid

    Fill

    Sea Water

    Make Up

    Q m

    P

    Air Qrec

    Industries fence

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    18/37

    Cooling Towers

    Fan Assisted Natural Draft

    Mechanical Draft

    20 % Convective Heat

    Transfer

    80 % Evaporative Cooling

    , Mass Transfer ( 1.5 %

    Loss of water )

    Heat rejection device

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    19/37

    Scope ofSWC System for J 2

    200,000 m3/hr Pump station (4 + 2 Pumps)

    50,000 m3/hr each , 23 m head , 4 MW

    5 Pipes configuration ( 2 S , 1 S/R , 2 R )

    Distribution Manifolds

    Headwork and demolish end of canal 2

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    20/37

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    21/37

    Headwork : Cofferdam

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    22/37

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    23/37

    Headwork : Rebuild

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    24/37

    METERING

    CHAMB

    ER

    STAFF/CONTROL

    BUILDING

    GUARD

    HOUSE

    SWITCHGEAR

    BUILDING

    HYPOCHLORITE

    GENERATION BUILDING

    TRANSFORMER

    T-601

    115/13.8kV

    37.5/50MVA

    TRANSFORMER

    T-602

    115/13.8kV

    37.5/50MVA

    FUTURE

    FUTURE

    FUTURE

    FUTURE

    SAMPLING

    BLDG.

    PW/FW TANK FUTURE

    FUTURE

    SEC

    BUILDING

    METERING

    CHAMBER

    J 2 Pump House Layout

    R

    R

    S/R

    S

    S

    S/R

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    25/37

    CUR

    TAINWALL

    FLOW STRAIGHTENING

    INCLINED BAR SCREEN

    L.W.L. (MIN.)

    EL +5.75m RCD

    MOTORIZED

    BUTTERFLY VALVEHYDRAULIC OPERATED

    BUTTERFLY VALVE

    TRAVELINGBRIDGE CRANE

    SWCPUMP

    MOTOR

    H.W.L.EL +8.60m RCD

    15 TON CRANE HOIST

    TRAVELING

    BRIDGE CRANE

    TRAVELINGBRIDGE CRANE

    50 TON CRANE HOIST

    15 TON CRANE HOIST

    TRASH RACK

    J 2 Pump House Section

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    26/37

    J 2 Pump House Construction

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    27/37

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    28/37

    M

    M

    M

    M

    M M

    M

    M

    M

    Stage 1Stage 2

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    MM

    M

    M

    M

    M

    M

    Stage 3

    P S

    End of Canal 2End of Canal 2

    P S

    Piping Configuration

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    29/37

    KRT Area

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    30/37

    Under Aramco Pipes

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    31/37

    At Stage 1 , Air-Vent valve 500mm

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    32/37

    Manifold 3 D

    EN

    Below

    Ground

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

    M

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    33/37

    Manifold

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    34/37

    Trenching Detail

    FINAL SURFACE ELEVATION

    CLASS 1

    BEDDING MATERIAL

    CLASS 1

    BACKFILL MATERIAL

    WARNING

    TAPE (TYP)CLASS 2

    BACKFILL MATERIAL

    TYPICAL TRENCH FOR 5 - DN 4000 SWC PIPES

    UNPAVED AREAS

    4000 3000 4000 3000 4000 3000 4000 3000 4000

    290070007000700070002900

    900

    900

    2350

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    35/37

    Industry Connection

    INDUSTRY

    LIMIT

    RC LIMIT

    SWC RETURN PIPELINE

    SWC SUPPLY PIPELINEFT

    TYPICAL INDUSTRY

    SEA WATER RETURN TANK

    FROM INDUSTRYSEA WATER RETURN

    INDUSTRY CONNECTION DETAIL

    INDUSTRY

    M

    MM

    M M

    M

    M

    M

    SWC SUPPLY/RETURN PIPELINE

    ANALYZERS

    M

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    36/37

    SWC - EPC Schedule

    Start Finish Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q 3 Q4 Q 1 Q2 Q3 Q4 Q1 Q 2 Q3 Q 4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q 1 Q2 Q3 Q4

    Stage 1 - 31 March 2009 Engineering

    136-C01 In frastructure in Zone A for Stage 1 of Juba il 2 10-Nov-03 30- Jan-08Procurement

    262-C02 KRT Crossing: Underground Infrastructure Part 1 24-May-03 12-Dec-07Construction

    065-C45 Inf rastruc ture of Stage 1, P1, J2 (SWC) 04-Aug-05 A 11-Apr-09 Initial Acceptance

    072-C31R SWC Pumping Station in Jubail 1 28-Mar-04 A 25-Jul-09

    Stage 2 - 31 December 2010

    065-C46 Inf rastruc ture of J 2 - S tg2 Ph2 (SWC) 09-Feb-06 A 21-Feb-11

    Stage 3 - 31 December 2012

    065-C48 Inf rastruc ture of Jubai l 2 - Stage 3 SWC 24-Jan-07 A 10-J an-12

    Stage 4

    065-C51 In fra st ructure of Jubai l 2 - S ta ge 4 (SWC) 29-Nov-07 A 20-Jul -13

    Data Date 30Nov07 Stage 1 Stage 2 Stage 3

    Complete

    Demobilization

    Target Target

    2004 2005

    Target

    Jubail 2

    2012 20132008 2009 2010 201120072006

  • 7/27/2019 Sea Water Cooling System for Jubail 2

    37/37

    Thank you