+ All Categories
Home > Documents > SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

Date post: 02-Jan-2022
Category:
Upload: others
View: 6 times
Download: 0 times
Share this document with a friend
20
SERT COMPANY LTD. FOR OIL SERVICES
Transcript
Page 1: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

SERT COMPANY LTD. FOR OIL SERVICES

Page 2: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

• SERT CO. LTD. For Oil services is a private entity established in Iraq with headquarters in Baghdad and its subsidiaries in UAE –Dubai and in Istanbul – Turkey

• SERT was established with a vision of serving E&P operators as an EPCC contractor

• SERT Delivers a wide range of services, including:

- EPC

- Project Managements Consultancy

- Site surveys

- Procurement

- Installation, Erection and Construction

- Pre-commissioning, testing & commissioning

- HAZOP Studies

- Material Selection report for New Project

1- Background

Page 3: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

• Baghdad Head office

AL Watheq Sq. P.O.Box: 3055

AL-Elweya-Baghdad-Iraq

Phone: +964 7830877779

[email protected] , www.sertoil.com

• Basrah Site Camp and Workshops

North Rumaila- Basrah-Iraq

Phone: +964 7830877779

• Missan Site Camp

Halfaya Oil Filed-AL-Kahla- Missan- Iraq

Phone: +964 7830877779

• Missan Site Camp

BUZURGAN Oil Filed-Missan- Iraq

Phone: +964 7830877779

ADD

RESS

Page 4: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

Certification SERT has the following Certification

- ISO 9001 :2015(Quality Managements System), QMS is ISOs Standard set for organization management System

- ISO 14001: 2015 ( Environmental Management System), EMS, among other things, enables us to identify and control the environmental impact of our activates.

- OHSAS 18001:2007 (Occupational Health & Safety Managements System) to control occupational health and Safety risks

- ISO/ TS 29001:2010, SOC EPCC for Energy , Natural Gas and Petroleum Facility

2- Details

Page 5: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

3-References

SERT works as EPCC contractor with Following companies

SERT works with the following main vendors

Page 6: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

• Source water treatment Plant

Complementary basic design and full detail design of SWP in Halfya oil filed (Total Capacity 23,500 M3/d)

consist to the following

- Water Intake System

- Source Water Treated System

- Clean Water Transport System

- Fire Fighting System

- Utility System

- Power Distribution System

- Instrumentation & Control System,

- OCC SCADA System.

- Telecommunication System

4- Completed Sample Projects by SERT

Page 7: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT
Page 8: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT
Page 9: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT
Page 10: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT
Page 11: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

• Central Process Facility Expansion CPF

Complementary basic design and full detail designs of CPF1 Expansion in Halfya oil filed consist to the

following

- Expansion the main Production header

- Installation new 2 multi flow valve selector

- Installation SDV System

- Installation & commissioning Scada and DCS system

Page 12: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT
Page 13: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

• Manufacturing and Erection of Crude oil Tanks

Complementary basic design of 4X5000 m3 and 4x10000 m3 crude oil Tanks in Basra consist to the following

- Manufacturing and Erection

- Installation of gas boot System

- Installation of foam pump

- Installation of spray and foam units

- Installation of LP fuel gas scrubber

- Installation of water draw-off pump

Page 14: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT
Page 15: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

• POWER SUPPLY TO WELL PADS FOR FCP SUSTAINED PROJECT

Complementary detail design of OHTL in Halfya oil filed consist to the following:

- Pre-fabricated outdoor substation (POS)

- Auxiliary facilities

- 33 kV OHTL

- T-off of power line to pad/wellheads

- Power distribution system

- MV/LV Cable system

- Lighting system

Page 16: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT
Page 17: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

• OIL AND GAS TRUNK LINES

Complementary full detail design of 130 KM (24”, 20”, 18” & 12” ) Trunk lines

- Installation launcher & receiver

- Installation Cathodic protection System

- Installation FOC and connecting with RTU

- Nitrogen Injection

- Pigging & Cleaning

Page 18: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT
Page 19: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT
Page 20: SERT COMPANY LTD. FOR OIL SERVICES - TEKNO ENT

SERT STRATEGY AND GOAL

• CONCENTRATE ON THE COMPLETION TARGET DATE

• FOLLOW COMPANY INSTRUCTIONS

• TAKING OFFICE WORK PARALLEL TO PHYSICAL ACTIVITIES

• DEPENDING ON THE WORK INTENSITY, SERT HAS FLEXIBILITY TO INCREASE THE NUMBER OF STAFF AND EQUIPMENTS AS NECESSARY

• SERT IS PLANING AND IMPLEMENTING ACCORDINGLY

• METEOROLOGICAL CONDITION (HEAVY RAIN STORMS), CUSTOM CLEARANCE PROBLEMS, VISA PROBLEMS OF EXPAT WORKERS IS NOT OF ANY CONCERN FOR SERT. ALL THESE PROBLEMS INCLUDED IN THE SERT PLANS


Recommended