SERT COMPANY LTD. FOR OIL SERVICES
• SERT CO. LTD. For Oil services is a private entity established in Iraq with headquarters in Baghdad and its subsidiaries in UAE –Dubai and in Istanbul – Turkey
• SERT was established with a vision of serving E&P operators as an EPCC contractor
• SERT Delivers a wide range of services, including:
- EPC
- Project Managements Consultancy
- Site surveys
- Procurement
- Installation, Erection and Construction
- Pre-commissioning, testing & commissioning
- HAZOP Studies
- Material Selection report for New Project
1- Background
• Baghdad Head office
AL Watheq Sq. P.O.Box: 3055
AL-Elweya-Baghdad-Iraq
Phone: +964 7830877779
[email protected] , www.sertoil.com
• Basrah Site Camp and Workshops
North Rumaila- Basrah-Iraq
Phone: +964 7830877779
• Missan Site Camp
Halfaya Oil Filed-AL-Kahla- Missan- Iraq
Phone: +964 7830877779
• Missan Site Camp
BUZURGAN Oil Filed-Missan- Iraq
Phone: +964 7830877779
ADD
RESS
Certification SERT has the following Certification
- ISO 9001 :2015(Quality Managements System), QMS is ISOs Standard set for organization management System
- ISO 14001: 2015 ( Environmental Management System), EMS, among other things, enables us to identify and control the environmental impact of our activates.
- OHSAS 18001:2007 (Occupational Health & Safety Managements System) to control occupational health and Safety risks
- ISO/ TS 29001:2010, SOC EPCC for Energy , Natural Gas and Petroleum Facility
2- Details
3-References
SERT works as EPCC contractor with Following companies
SERT works with the following main vendors
• Source water treatment Plant
Complementary basic design and full detail design of SWP in Halfya oil filed (Total Capacity 23,500 M3/d)
consist to the following
- Water Intake System
- Source Water Treated System
- Clean Water Transport System
- Fire Fighting System
- Utility System
- Power Distribution System
- Instrumentation & Control System,
- OCC SCADA System.
- Telecommunication System
4- Completed Sample Projects by SERT
• Central Process Facility Expansion CPF
Complementary basic design and full detail designs of CPF1 Expansion in Halfya oil filed consist to the
following
- Expansion the main Production header
- Installation new 2 multi flow valve selector
- Installation SDV System
- Installation & commissioning Scada and DCS system
• Manufacturing and Erection of Crude oil Tanks
Complementary basic design of 4X5000 m3 and 4x10000 m3 crude oil Tanks in Basra consist to the following
- Manufacturing and Erection
- Installation of gas boot System
- Installation of foam pump
- Installation of spray and foam units
- Installation of LP fuel gas scrubber
- Installation of water draw-off pump
• POWER SUPPLY TO WELL PADS FOR FCP SUSTAINED PROJECT
Complementary detail design of OHTL in Halfya oil filed consist to the following:
- Pre-fabricated outdoor substation (POS)
- Auxiliary facilities
- 33 kV OHTL
- T-off of power line to pad/wellheads
- Power distribution system
- MV/LV Cable system
- Lighting system
• OIL AND GAS TRUNK LINES
Complementary full detail design of 130 KM (24”, 20”, 18” & 12” ) Trunk lines
- Installation launcher & receiver
- Installation Cathodic protection System
- Installation FOC and connecting with RTU
- Nitrogen Injection
- Pigging & Cleaning
SERT STRATEGY AND GOAL
• CONCENTRATE ON THE COMPLETION TARGET DATE
• FOLLOW COMPANY INSTRUCTIONS
• TAKING OFFICE WORK PARALLEL TO PHYSICAL ACTIVITIES
• DEPENDING ON THE WORK INTENSITY, SERT HAS FLEXIBILITY TO INCREASE THE NUMBER OF STAFF AND EQUIPMENTS AS NECESSARY
• SERT IS PLANING AND IMPLEMENTING ACCORDINGLY
• METEOROLOGICAL CONDITION (HEAVY RAIN STORMS), CUSTOM CLEARANCE PROBLEMS, VISA PROBLEMS OF EXPAT WORKERS IS NOT OF ANY CONCERN FOR SERT. ALL THESE PROBLEMS INCLUDED IN THE SERT PLANS