HEAVY MACHINERY ERECTION & MOVERS DISMENTLING, ERECTION, COMISSIONING OF FORGING, STEEL, POWER, AUTOMOBILE MACHINERY. PLANT RELOCATORS & HEAVY PROJECTS.
Popular Tags:
66
ENGINEERING SERVICES PVT. LTD. HEAVY CARGO LIFTERS MOVERS & ERECTION Handling of Heavy Projects Works, Dismantling & Erection of Forging Press & Hammers, Stamping Press erection & Commissioning specialists . Store handling systems, Transportation & Industrial Manpower & Rigging work. Sangameshwar
Transcript
Page 1: Ses presentation

ENGINEERING SERVICES PVT. LTD.

HEAVY CARGO LIFTERS MOVERS & ERECTION

Handling of Heavy Projects Works, Dismantling & Erection of Forging Press

& Hammers, Stamping Press erection & Commissioning specialists . Store

handling systems, Transportation & Industrial Manpower & Rigging work.

Sangameshwar

Page 2: Ses presentation

We undertakes the following work:

• Handling of Heavy Machinery.

• Heavy Power & Forgings Project works.

• Dismantling, Erection & Assembly of Heavy

Machinery, Packers & Plant Movers .

• Loading And Unloading of Heavy Machinery.

• Store Handling System & Managements.

• Forging & Stamping Press Erection &

Commissioning.

• We have a specialty in Forging & Stamping Sectors

regarding handling their heavy press & hammers

for new Installation or maintenance.

• Mechanical & Hydraulic Crane & Trailors Suppliers.

Page 3: Ses presentation

HAVE A LOOK AT OUR GREAT ACHIEVEMENTS

ALL WORK DONE MANUALLY.

ALL THE JOBS ARE HEAVY CARGO.

Page 4: Ses presentation

In 2012

Poshs Metal Industries Pvt. Ltd.

(Karandi, Shikrapur)

Erection & commissioning of 1000 T Sheet metal Press

Page 5: Ses presentation

Installation of 1000 T

Sheetmetal Press.

Total Assembled Weight: 240

MT

Bed: 46 MT

Column: 17 Mt each (2 Nos.)

Tierods: 3 MT each (4 nos.)

Ram: 32 MT

Crown: 55 MT

Other Accessories : 50 MT

Page 6: Ses presentation

Shifting of Bed & Crown From U/L Point to Foundation.

Page 7: Ses presentation
Page 8: Ses presentation
Page 9: Ses presentation
Page 10: Ses presentation

In 2011

VARROC ENGGINEERING PVT LTD. (PLANT VIII)

Walunj MIDC Aurangabad

Erection & commissioning of 8000 T forging Press.

Page 11: Ses presentation

Installation of 8000 T ATO

forging press at “ varroc

engg. Pvt. Ltd. (Aurangabad)”

Total Assembled Weight: 850

MT

Bed: 110 MT

Column: 60 Mt each (2 Nos.)

Tierods: 17 MT each (4 nos.)

Ram: 75 MT

Tie Plate: 45 MT

Crank Shaft: 38 MT

Fly Wheel: 36 MT

Page 12: Ses presentation

Shifting & Tossing & erection of bed on foundation.

Page 13: Ses presentation
Page 14: Ses presentation

We use 150MT capacity crane for Installation of Tierods (4 nos.),

columns (2nos.), Ram

Page 15: Ses presentation
Page 16: Ses presentation
Page 17: Ses presentation

ATO 8000 T Forging

press ready for

electrical work.

Page 18: Ses presentation

In 1993,

Unloading, shifting. Erection & Complete Installation of

2500 T Russian Forging Press

2500 T German Forging Press

1250 T Russian Forging Press

1600 T Sharing Machine

6 T Russian numatic Hammer

At Pradip Metal Ltd.

Navi Mumbai

Page 19: Ses presentation
Page 20: Ses presentation

2500 T Russian Forging Press 400 T Trimming Press

Page 21: Ses presentation

M/s Paramount Forge 32/11,32/5,32/4b,

Village Bhamni, Talika Khalapur,

Raigad Dist. Maharashtra India.

Page 22: Ses presentation

Installation of 3500 T Forging Hydraulic press at PARAMOUNT FORGE Khopoli. (2010)

Its Total Weight is 500 MT .

Bed: 110 MT

Crown: 145 MT (With Pistons 4Nos.

Moving Ram: 80 MT

Columns: 27 Mt Each ( 2 nos. )

Tie Rods: 14 MT. each (4 Nos.)

Pipeline & other Accessories weighted 50 MT

Page 23: Ses presentation

Crown (without pistons wt: 105MT)

was easy because pistons were not

installed . But it has to be lifted 18

feet up for installation of tie rods &

pistons.

Bed Erection was Little bit risky

110 MT has to be placed on

foundation which was deep around

3mtr.

Page 24: Ses presentation

Tie rods (14 Mt each ) were

installed for to maintained the

load balance.

Lifting of crown started

with 5 hydraulic jacks

(cap. 50 T). In 7 days the

desired height (18 ft.)

reach. But we want to

installed pistons at

(15ft.).

Page 25: Ses presentation

4 Nos. of pistons were installed at the height of 15 ft. Each wt. 11 MT.

After installing the pistons cown will be weighted 145 MT.

Page 26: Ses presentation

Erection of ram (80 MT) should be placed between crown and bed.

Page 27: Ses presentation

Tie rods should be lifted up at 33 meter height to install columns. And

again downed to connect columns', bed & crown together.

Page 28: Ses presentation
Page 29: Ses presentation

Installation of 3500 T Chinese hydraulic prees completed in

60 days.

Page 30: Ses presentation

Installation of D-53K 3500 CNC Ring Rolling Machine

Page 31: Ses presentation
Page 32: Ses presentation
Page 33: Ses presentation

MAHINDRA UGINE STEEL CO. LTD.

Village Kanhe, Pune-Mumbai Road, Tal: Maval

Dist: Pune Maharashtra India.

Page 34: Ses presentation

• Installation of 1000 T Russian press at Mahindra Stampings (Kanhe ). (2010)

• Its weighted 475 MT .

• Bed: 85 MT

• Crown: 130 MT (With Gears 4 Nos.)

• Moving Ram: 80 MT

• Columns: 25 Mt Each ( 2 nos. )

• Tie Rods: 6 MT. each (4 Nos.)

• Pipeline & other Accessories weighted 60 MT

Page 35: Ses presentation

Crown (without gear wt: 90 MT) After fixing gears with the crown its wt. will be 130 MT. And it has to be lifted 22 Ft. upward to install columns.

•Bed Erection was easy 85 MT has to be placed on foundation which was deep around 4 mtr.

Page 36: Ses presentation
Page 37: Ses presentation

• 4 nos of gears to be installed with the crown and lifted 22

ft. up for erection of columns.

Page 38: Ses presentation
Page 39: Ses presentation

•Crown lifted 22 ft height

within 6 days by our

Hydraulic jacking system

Page 40: Ses presentation
Page 41: Ses presentation

•Columns erection donenow its time to fixed them with crown and bed by tie rods.

Page 42: Ses presentation

•Tie rod erection with

column, bed & crown

Page 43: Ses presentation

• Erection of column. Bed, crown

& tie rod completed.

Page 44: Ses presentation

Moving Ram Installation with 1000 T press.

Page 45: Ses presentation

Installation of 1000 T

Russian mechanical

stamping press

erection/Installation

done within 30 days.

Page 46: Ses presentation

Shree Ganesh Forging Ltd.T.T.C. Indl. Area Navi Mumbai.

Smeral Forging press line Erection.

Page 47: Ses presentation

Press shop erection at Shree Ganesh Forgings Ltd.

Navi Mumbai.

Page 48: Ses presentation
Page 49: Ses presentation

Smeral 4000 T & Smeral

2500 Forging press

installation at Shree

Ganesh Forgings Ltd.

Navi Mumbai.

Page 50: Ses presentation
Page 51: Ses presentation

50 meter. Shifting of a Pier Leg

Of A Goliath Crane At Pipavav

Shipyard Pipavav, Gujarat.

(2010)

Its Size Details:

Length: 78 MTR.

Width: 50 MTR.

Weight: 750 Metric

Ton

i.e 7,50,000 KG

Page 52: Ses presentation
Page 53: Ses presentation
Page 54: Ses presentation

At

Page 55: Ses presentation
Page 56: Ses presentation
Page 57: Ses presentation
Page 58: Ses presentation

Press removed out of

foundation in 3 days &

Installed on Foundation

in 3 days.

Page 59: Ses presentation

We also work in Electricity & power project with

reputed & famous Govt. & Pvt. Companies

Page 60: Ses presentation
Page 61: Ses presentation
Page 62: Ses presentation
Page 63: Ses presentation
Page 64: Ses presentation
Page 65: Ses presentation

All the achivements were not possible without our

workmen & foreman.

Page 66: Ses presentation

For Any Enquiry please contact

SangameshwarEngineering Services Pvt. Ltd

Chinchwad Pune

Mr. B.S.Muley +919960866234

Mr. P.B.Muley +919860099326

Email: [email protected]

Web Site: www.ses-pune.com