direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne SESAR THE EUROPEAN ATM PROGRAMME GNSS for surveillance and Navigation in ATM ENAC: May, 31 st 2013 Yves BONNEFOUS European Projects and Partnerships
Transcript
Page 1: Sesar   the european atm programme mai 2013 bonnefous

direction générale

de l’Aviation civile

direction de la

Technique et de

l’Innovation

direction des services

de la Navigation

aérienne

SESAR

THE EUROPEAN ATM

PROGRAMME

GNSS for surveillance and Navigation in ATM

ENAC: May, 31st 2013

Yves BONNEFOUS

European Projects and Partnerships

Page 2: Sesar   the european atm programme mai 2013 bonnefous

- 2 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

SESAR-The European ATM programme

• Introduction

• The Sesar’s Objectives

• The three major phases

• The development phase – The SESAR Joint Undertaking (SJU)

• DSNA and the SESAR programme

• Conclusions

Page 3: Sesar   the european atm programme mai 2013 bonnefous

- 3 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Page 4: Sesar   the european atm programme mai 2013 bonnefous

- 4 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Context elements

Page 5: Sesar   the european atm programme mai 2013 bonnefous

- 5 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Page 6: Sesar   the european atm programme mai 2013 bonnefous

- 6 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Page 7: Sesar   the european atm programme mai 2013 bonnefous

- 7 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Page 8: Sesar   the european atm programme mai 2013 bonnefous

- 8 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Page 9: Sesar   the european atm programme mai 2013 bonnefous

- 9 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Page 10: Sesar   the european atm programme mai 2013 bonnefous

- 10 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

SESAR 'S OBJECTIVES

Page 11: Sesar   the european atm programme mai 2013 bonnefous

- 11 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Page 12: Sesar   the european atm programme mai 2013 bonnefous

- 12 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

The SESAR Programme

Three Major phases

Page 13: Sesar   the european atm programme mai 2013 bonnefous

SESAR IS ORGANISED IN THREE PHASES

Definition phase

Resulted in the European ATM Master Plan

2006-2008 2008-2014

Implements the results of the development phase, delivers the performance increase foreseen in the ATM Master Plan

Deployment phase

2015-2025

Development phase

Based on the Master Plan, results in standards, new operational procedures, new technologies and pre-industrial components

Managed by the SESAR Joint Undertaking

Page 14: Sesar   the european atm programme mai 2013 bonnefous

- 14 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

The Definition phase

Page 15: Sesar   the european atm programme mai 2013 bonnefous

- 15 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Page 16: Sesar   the european atm programme mai 2013 bonnefous

- 16 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Page 17: Sesar   the european atm programme mai 2013 bonnefous

- 17 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

The Definition phase

• Main deliverables: – D1 Air transport framework : the current situation

– D2 Air transport framework : the performance target

– D3 The ATM target concept

– D4 The deployment sequence

– D5 The ATM Master Plan

– D6 Work Programme for 2008-2013

These documents may be downloaded on the SESAR JU website:

www.sesarju.eu

Page 18: Sesar   the european atm programme mai 2013 bonnefous

- 18 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

The Definition phase

• The ATM MASTER PLAN : www.atmmasterplan.eu

Page 19: Sesar   the european atm programme mai 2013 bonnefous

- 19 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

What about the Definition Phase

• Building and delivering on time the ATM Master Plan, with the « buy

in » of all the Stakeholders, was a true challenge

• The Master Plan reaches DSNA global expectations and constitute a

solid base for our futur technological choices (4-Flight programme).

• This challenge has been reached despite a very tight planning and

even if some objectives have not been described at the right level of

details.

Page 20: Sesar   the european atm programme mai 2013 bonnefous

- 20 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

The development Phase

Page 21: Sesar   the european atm programme mai 2013 bonnefous

- 21 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Page 22: Sesar   the european atm programme mai 2013 bonnefous

- 22 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Page 23: Sesar   the european atm programme mai 2013 bonnefous

UNIQUE PUBLIC-PRIVATE PARTNERSHIP

Founding members

Members

Page 24: Sesar   the european atm programme mai 2013 bonnefous

UNIQUE PUBLIC-PRIVATE PARTNERSHIP

New associate partners since July 2010

Page 25: Sesar   the european atm programme mai 2013 bonnefous

A Multi-Stakeholders approach at the heart of our way of working

Airports

Ground

Industry Airborne

Industry

National

Authorities

R&D

community

Staff

associations

Air

Navigation

Service

Providers

Airspace

users

SJU INVOLVES ALL ACTORS

Page 26: Sesar   the european atm programme mai 2013 bonnefous

OPERATIONAL EXPERTISE

Airspace users:

• Major airlines, Business & General

Aviation, Associations (IAOPA, IATA)

The Military

• Military airspace user, regulator and

service provider

Staff associations

• Expertise sought regarding issues such as: Safety, Security, Human Factor aspects

R&D community

• Academia & Research Establishments forming networks of excellence

Page 27: Sesar   the european atm programme mai 2013 bonnefous

27 27

2

7 Séminaire "Plan de vol pour SESAR" - 8 septembre 2010

DSNA contributes to 79 projects,

2

7

16-Transversal Areas

2-R&D Overall Consistency

A-WP Management

C-Master Plan Maintenance

13-Network

10-ATC

11-AOC

12-Airport

14-SWIM

9-Aircraft

5-TMA Operations

4-En Route Operations

6-Airport Operations

7-Network Operations

8- InformationManagemen

t

15-CNS

3-Validation Infrastructure

SJU

B-Target Concept &

Architecture

ATM Network R&D

Programme

E-LT & innovative Research

SESAR WBS

leads WP4 En Route,

leads 13 projects

Page 28: Sesar   the european atm programme mai 2013 bonnefous

THE SESAR “FACTORY” IS IN PLACE

SWIM

WP 8&14

TMA

WP5&10

CONOPS &

ARCHITECTURE

WP B

Aircraft & CNS

WP 9&15

En-Route WP 4&10

VALIDATION

INFRASTRUCTURE

WP3

ToD ToC

Airport

WP 6&12

Airport

WP 6&12

Network WP 7&13

TMA

WP5&10

METHODES & CASES

WP 16

Airlines/Mil.

Operations

Centers

WP 11

Airlines/Mil.

Operations

Centers

WP 11

MASTER PLAN

MAINTENANCE

WP C

Page 29: Sesar   the european atm programme mai 2013 bonnefous

WP-E in a nutshell

• WP-E is the SESAR workpackage for long-term and innovative

research

• Lead by EUROCONTROL-EEC (WP and SWP leaders)

• Total co-financing for research activities: 23 M€

• Networks, which are groupings of researchers that share common

interest and expertise in a particular field of ATM and lead PhDs

• Projects, which are well bounded pieces of research that may be

classed as long-term or innovative

• Four research themes have been defined in collaboration with

partners including the Scientific Committee:

• Legal aspects of paradigm shift

• Towards higher levels of automation in ATM

• Mastering complex systems safely

• Economics and performance

Page 30: Sesar   the european atm programme mai 2013 bonnefous

30

• Enabling EU skies to

handle 3 times more

traffic

• Improving safety by a

factor 10

• Reducing the

environmental impact

per flight by 10% (CO2)

• Cutting ATM costs by

50%

16 Work Packages

1 single concept

300 projects

~2000 contributions

and people

16 Members,

different backgrounds

Result Driven: One single body to deliver the expected System

Need for System Engineering (SE) Facts: complexity of SESAR

ToD ToC

CTA

WP3

WPA/B/C

WP15 WP16

WP9/11

WP7/13

WP4/10

WP8/14

WP5/10 WP5/10

WP6/11/12

An ambitious programme

with Challenging

Performance Targets:

1

Page 31: Sesar   the european atm programme mai 2013 bonnefous

31

Step 1

Baseline = ATM System “As is”

Step 3 Step 2

SESAR Performance

Partners sharing

information

The 4D trajectory Time as the first D of the

4D trajectory

Moving from an Airspace based to a Trajectory based business

Time Based

Operations

2013 2017 2020

Trajectory Based

Operations

Performance Based

Operations

SE Key Concepts Story Board Steps

2

Page 32: Sesar   the european atm programme mai 2013 bonnefous

32

Need for System Engineering (SE) SESAR Road map activities

The System Engineering activities are :

organized per OFA (Operational Focus Area)

supported by and synchronised through Releases:

• SESAR Release embeds groups of projects delivering, in a determined

timeframe, R&D results that will support decision to move related

activities to the industrialisation stage (end of V3)

1

Page 33: Sesar   the european atm programme mai 2013 bonnefous

SESAR DELIVERY APPROACH R

&D

PR

OJ

EC

TS

M

AS

TE

R P

LA

N

PR

OG

RA

MM

E

• Concept • Requirements • Prototype • Validation • SC, BC…

• Concept • Requirements • Prototype • Validation • SC, BC…

1. Definition

2. Preparation

3. Validation

STEP 1

STEP 2

Page 34: Sesar   the european atm programme mai 2013 bonnefous

SESAR DELIVERY APPROACH

Page 35: Sesar   the european atm programme mai 2013 bonnefous

- 35 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

DSNA participation in the SJU

• DSNA is actively involved in the SESAR JU and will bring all its R&D capacity with its long experience as a Service Provider.

• 62 full time equivalent over 7 years

• Participation to 79 projects (budget: over 67 Meuros)

• 3 « affiliates »:

– ENAC

– Météo-France

– ONERA

• Partnerships

– 16% of the effort will be sub-contracted

• A close collaboration with ENAV : through the 4-Flight programme

• 4 associates : Belgocontrol, LVNL-NLR, ONDA, Skyguide

Page 36: Sesar   the european atm programme mai 2013 bonnefous

- 36 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

DSNA participation in the SJU

• DSNA mainly works within the operational WP : – WP 4 (en route ATC operations)

• WP Leader and a leading role on « Trajectory & Separation Management » and

« Safety Nets »

– WP 5 (TMA operations)

• Key role in « Queue Management »

– WP 6 (Airport operations) :

• Project on Surface Management

• Project on Controller Working Position

– Participation within the transverse WP (WP B, 3 et 16)

• Active participation in the Concept refinements

– Participation within WP C, 7, 8, 10, 12, 15 and 16.

Page 37: Sesar   the european atm programme mai 2013 bonnefous

- 37 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Page 38: Sesar   the european atm programme mai 2013 bonnefous

- 38 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

First Results

Thess documents are available on the SESAR JU internet site:

http://www.sesarju.eu/sites/default/files/documents/reports/SESAR_Release_2012_0.pdf?issuusl=ignore

Page 39: Sesar   the european atm programme mai 2013 bonnefous

- 39 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

First results:

Page 40: Sesar   the european atm programme mai 2013 bonnefous

- 40 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

First results:

Page 41: Sesar   the european atm programme mai 2013 bonnefous

- 41 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

First results:

• Point Merge in CDG

• http://www.sesarju.eu/news-press/news/dsna-video-demonstrates-

live-experiment-point-merge-concept-paris-1253

Page 42: Sesar   the european atm programme mai 2013 bonnefous

- 42 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

What will be next ?

•Achieve the development phase

•Prepare the deployment phase

• Over 30 billions euros required for implementing

SESAR technical solutions

Page 43: Sesar   the european atm programme mai 2013 bonnefous

- 43 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Achieve the development phase

•Specifics calls: –Demonstration Flight trials

–RPAS: Remotely Piloted Air System

demonstration activities • Demonstrate how to integrate RPAS into non-segregated airspace in a

multi-aircraft and manned flight environment, in order to explore the

feasibility of integration with the wider aviation community by 2016

– …

•SESAR 2 …

Page 45: Sesar   the european atm programme mai 2013 bonnefous

- 45 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation

Prepare the deployment phase

- SJU Works on a Pilot Common Project including the

methodology to move from the implementation view in the

ATM Master Plan to a business view

- Once adopted, it will constitute the main basis for inviting the

industry to submit proposals for the selection of the

deployment manager, which will be entrusted to carry out

the deployment of the first common project, by defining the

detailed deployment programme and the related

implementation projects

Page 46: Sesar   the european atm programme mai 2013 bonnefous

- 46 -

[Indiquez la date]

direction générale

de l’Aviation civile

direction des services de

la Navigation aérienne

direction de la Technique

et de l’Innovation