Introduction
• Costs of Power Outages• Literature Review
• South Australia Experience
• Contingency Planning• What is in it
• Limitations
• Stress testing
• Planned vs unplanned events• Hazlewood Tx Failure
• Mining Operation 33kV Tx Failure
• Downer Utilities Vic
Cost of Power Outages
Literature Review:
Researchers grappling with issue
using various research methods
and modelling approaches
Articles as far back as the 1960s
Literature Review
Costs can be direct or indirect
Varies from domestic to C&I
Varies across industry classification
NO AGREEMENT;
• Quantitative methods
• What the true cost is
Literature Review Conclusions:
• “We’ve committed a team of local and international experts, working around the clock for the past month –through holidays and extended hours – both on site in Tasmania and at our technical head support office preparing equipment,” said Aggreko Managing Director George Whyte.
Costs vary by type of consumer
Cost is not your cost of electricity nor
the cost of generation
Know the history
Attention of SA is giving us more
insight$
Contingency Plans
Designed to minimise outage time
Provides clear and accurate communications and requirements
Provide the customer with power or temperature control equipment
in the event of : Unplanned outages, planned outages, breakdowns
Formalises site requirements
What else?
Logistics
• Tanami mine closed for
second time due to no
deliveries for 57 days
• 150 containers shipped to
Tasmania
• Supply Chain
• Can you get night deliveries
Stress Test your Plan
• Wonthaggi Desalination Plant
• Cost of not doing this is missing
water and security payments
• On-site in case repairs take longer
than expected to 220kV GIS
• Undertake a lessons learnt
From this to this
Aged Infrastructure
• A couple of transformer failures
• Cost – a few weeks of reduced
production for a miner
• Black Start Failure for a power
station
Planned Outages
• United Energy aerial bundled cable
replacement program where Aggreko is
working with Downer and Zinfra to
provide generator power so that there is
minimal interruption to the power supply
while this cable is being replaced
In Summary
• Know your costs of an outage
• Direct
• Indirect
• Reputational
• Have a plan
• Engage early with suppliers (not just
technical consultants)
• Plan
• Test
• Refine
• Planned Outages
• Cost savings through collaborative
approaches