1/22
CHAS MUNICIPALITY
WATER SUPPLY IMPROVEMENTS SCHEME
Design of 1200 KL Caa!i"# C$ea% Wa"e% S&' a" (i$"%a"ion P$an") C*as
Capacity of the Sump = 1200 KL
Inner Dia of Sump = 21.00m
Effective depth of water = 3.0m
S!C of "oi# at propo"ed "ump = 200 K$% S&m
'L = ( 1)0.* +
+,L = ( 1)1.10 +
L,L = ( 1-.)0 +
ree !oard = 0.30 m
Dead Stora/e = 0.1 m
op #eve# of a"e "#a = ( 1-.* +
Side wa## top #eve# aove 'L = (1)1.*0 m
4""umed thic5ne"" of "ide wa## = 0.36 m
4""umed thic5ne"" of ottom a"e "#a = 0.*0 m
Den"ity of 7CC = 2.00 K$% Cum
1
7/24/2019 Sump Design Chas 5.10.09.doc
2/22
ota# hei/ht of "ide wa##
83.0(0.1(0.309 = 3.:%. m
S"%&!"&%a$ Design
'rade of concrete for a## "tructura# memer" = +;20 De"i/n mi = 0.6: R = 1.*3
!a#anced moment of the "ection = R d2% 10) = ).22 K$m
+e = 16.12 !a#anced !+ = ).22
7e&uired 4"t = +2A10)% 10A0.6-Ad = 3- mm2
+in 4"t = 0.22 % 100AAd = 23: mm2
op reinforcementB ?rovide 2 $o" of 12mm or throu/h and 1 $o. of 1)mm or
e
7/24/2019 Sump Design Chas 5.10.09.doc
15/22
= 0.6)0 K$+ Ne = N ( 1.)A% = 3*.* K$
Shear "tre"" tve = NeA1000 % Ad = 0.32 $%mm2
tc ma< = 2.2 $%mm2
4"t provided at face of "upport" = *2- mm2
?rovided pt = 4"t A 100% Ad = 0.3: Corre"pondin/ tc = 0.2-* $%mm2
"in/ 6mm or 2 #e//ed vertica# "tirrup"
4"v = 100.0 mm2 and t"v = 1- $%mm2
he a##owa#e "pacin/ mu"t e minimum of the fo##owin/.
1. Sv = 4"vAt"v%Atve;tc= 12-* mm c%c
4"v = ASv%1Ad11At"v(NASv%2.Ad11At"v
1 = 20*mm d1 = 32* mm
2. Sv = 302 mm c%c
T1 = ;2A20;6 = 22mm U1 = d;2A20;6 = 3-2 mm
3. Sv = Lea"t of T1 or U1 = 22 mm c%c
*. Sv = T1(U1%* = 1) mm c%c
fy = *1 $%mm2
+in 4"v condition Sv = 4"vAfy% 0.*A = 3*- mm c%c
+a< Sv = 1) mm c%c
Sv = 1) mm c%c
herefore provide 6mm or 2 #e//ed vertica# "tirrup" 1*0 mm c%c
S4E
Design of 'i, san se!"ion
15
7/24/2019 Sump Design Chas 5.10.09.doc
16/22
+id "pan !+ = 6.*6 K$+
= 10 $%mm2 c = 10 $%mm2 m = : 5 = 0.3- > = 0.6- R = 1.)*
!a#ance !+ = Rd2= )*.*-3) K$+
7e&uired 4"t = +A10)% 10A0.6-Ad = 1-: mm2
+inimum 4"t = 0.22 of "ection = 2--.2 mm2
-o""o' Reinfo%!e'en"B ?rovide 3 $o" of 12mm or at ottom throu/h
4"t provided at mid "pan at ottom = 33: mm2 S4E
Design of !o$&'ns insi,e "*e Rese%.oi% o%"ionCircu#ar
$o. of co#umn" = 1) $o"J dia = *00 mm
Loa,ing
Load from top rin/ eam = :-1 K$
Se#f wei/ht of a## co#umn" = 6) K$
ota# #oad on 12 co#umn" = 10- K$
Load on each co#umn = 66.0: K$
C#ear #en/th of co#umn L = 3.10 m +in 4" = ) mm2
Lon/itudina# reinf. of ) $o" of 12 or with 6mm or #atera# tie" at 10mm c%c
FK
PeQ min = L % 00 ( D%30 "u>ect to a minimum of 20mm
7eduction factor 7f = 1.2 M L % *6A = 1.03*
Load carryin/ capacity of co#umn
= 7f
7/24/2019 Sump Design Chas 5.10.09.doc
17/22
Fut"ide pro>ection of a"e "#a = *0 mm
ota# dia of a"e "#a = 22.6) mm
Loa,ings
Load from co#umn" = 21:0.00 K$
Load from roof annu#ar "#a on "ide wa## = 1**3.20 K$
pi%*A21.00O2;1*.0O2A-.
DL of cy#indrica# "ide wa## 3.1*2A21.0(0.36A0.36A*.32A2 = 2--.00 K$
,ei/ht of water 0.-6)A21.0O2A3.(0.3A10 = 131)1.60 K$
Se#f wei/ht of ottom #eve# a"e "#a 0.-6)A22.6)O2A0.3A2 = 3:* .00 K$
ota# #oad tan5 fu## = 2
7/24/2019 Sump Design Chas 5.10.09.doc
18/22
Load per metre run from "ide wa## 3:*0 % ?IA21.36 = 6.)) K$
Se#f wei/ht of ottom a"e "#a annu#ar portion 1.*6A0.3A2 = 12 .: K$
ota# per 1 7+ = 33 .** K$
?re""ure on "oi# 33.**% 1.13 = 2:.: K$%m2 2:6.) K$%m2
S4E
$et upward reaction 2*.:)% 1.13 = 22.06: K$%m2
S"%&!"&%a$ ,esign of ann&$a% %af" fo&n,a"ion
pward pre""ure ma
7/24/2019 Sump Design Chas 5.10.09.doc
19/22
+a< !+ = 2.23- K$;m%m
ota# thic5ne"" annu#ar raft "#a = 300 mm
C#ear cover = )0 mm
4""umed +a
7/24/2019 Sump Design Chas 5.10.09.doc
20/22
rom C#. 31).3.1 of ISB*);2000
+a
7/24/2019 Sump Design Chas 5.10.09.doc
21/22
Ci%!&'fe%en"ia$ %einfo%!e'en" ea!* a" "o an, 8o""o'
?rovide 10mm or 200mm c%c a" di"triution reinf.in the form of circumferentia#"
?rovided 4"d = 3:2 mm2%m 3)0 mm2%m
S4E
-ase s$a8 o%"ion o"*e% "*an Ann&$a% %af" s$a8
4""umed thic5ne"" of a"e "#a for the remainin/ portion = 300 mm
+in re&uired 4"t tota# on oth face" in each direction= 63 mm2%m a" per ISB33-0
+in re&uired 4"t on each face in each direction = 2:1. mm2%m
Ci%!&'fe%en"ia$ an, %a,ia$ %einfo%!e'en" ea!* a" "o an, 8o""o'
?rovide 10mm or radia# reinforcement 200 mm c%c a" di"triution reinf. in the form of
circumferentia#" and radia#"
?rovide 4"d = 3:2 mm2%m 2:1. mm2%m
(o&n,a"ion %ing 8ea' !onne!"ing !o$&'ns
?rovide rin/ eam "ame a" that of roof rin/ eam for tran"fer of #oad to foundation" i.e.J
a"e "#a
21
7/24/2019 Sump Design Chas 5.10.09.doc
22/22
22