Technical Support Document, Permit Action Number: 06300025-005 Page 1 of 33 TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO. 06300025-005 This technical support document (TSD) is intended for all parties interested in the draft/proposed permit and to meet the requirements that have been set forth by the federal and state regulations (40 CFR § 70.7(a)(5) and Minn. R. 7007.0850, subp. 1). The purpose of this document is to provide the legal and factual justification for each applicable requirement or policy decision considered in the preliminary determination to issue the draft/proposed permit. 1. General Information 1.1 Applicant and Stationary Source Location: Table 1. Applicant and Source Address Applicant and Stationary Source Address (SIC Code: 2869) Heron Lake BioEnergy, LLC 91246 390 th Ave Heron Lake, Jackson County, Minnesota 56137-0198 Contact: Mindy Eidhammer Environmental, Health & Safety Manger Phone: 507-793-0077 Email: [email protected] 1.2 Facility Description Heron Lake BioEnergy is a dry mill corn ethanol production facility. Permit No. 06300025-004 authorizes the facility to produce 59.9 million gallons annually of 200-proof ethanol (actual production capacity is believed to be 65 to 67 million gallons per year of 200-proof ethanol based on operating experience). In addition to ethanol, the facility produces dried distillers grains with solubles (DDGS) and corn oil. Pollutants emitted are volatile organic compounds (VOC), particulate matter (PM), particulate matter smaller than 10 microns (PM 10 ), particulate matter smaller than 2.5 microns (PM 2.5 ), nitrogen oxides (NO X ), sulfur dioxide (SO 2 ), carbon monoxide (CO), hazardous air pollutants (HAP), and greenhouse gases (GHG; primarily CO 2 ). Facility emission sources are grain receiving, handling, and milling; fermentation and distillation; DDGS production, storage, and handling; natural gas and propane combustion; product and denaturant storage and loadout; and equipment leaks (valves, flanges, etc.), emergency engines, and cooling towers. The facility employs a Regenerative Thermal Oxidizer (RTO) to control VOC and HAP emissions from DDGS drying and distillation processes. A wet (also known as a ‘CO 2 ’) scrubber controls VOC and HAP emissions from the fermentation process. The facility employs several baghouses to control particulate matter emissions. The (formerly coal) natural gas-burning boiler provides process steam. The large denaturant and product storage tanks are equipped with internal floating roofs to control
Transcript
Page 1: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 1 of 33

TECHNICAL SUPPORT DOCUMENT For

DRAFT/PROPOSED AIR EMISSION PERMIT NO. 06300025-005 This technical support document (TSD) is intended for all parties interested in the draft/proposed permit and to meet the requirements that have been set forth by the federal and state regulations (40 CFR § 70.7(a)(5) and Minn. R. 7007.0850, subp. 1). The purpose of this document is to provide the legal and factual justification for each applicable requirement or policy decision considered in the preliminary determination to issue the draft/proposed permit. 1. General Information 1.1 Applicant and Stationary Source Location:

Table 1. Applicant and Source Address

Applicant and Stationary Source Address (SIC Code: 2869)

Heron Lake BioEnergy, LLC 91246 390th Ave Heron Lake, Jackson County, Minnesota 56137-0198 Contact: Mindy Eidhammer Environmental, Health & Safety Manger Phone: 507-793-0077 Email: [email protected]

1.2 Facility Description

Heron Lake BioEnergy is a dry mill corn ethanol production facility. Permit No. 06300025-004 authorizes the facility to produce 59.9 million gallons annually of 200-proof ethanol (actual production capacity is believed to be 65 to 67 million gallons per year of 200-proof ethanol based on operating experience). In addition to ethanol, the facility produces dried distillers grains with solubles (DDGS) and corn oil.

Pollutants emitted are volatile organic compounds (VOC), particulate matter (PM), particulate matter smaller than 10 microns (PM10), particulate matter smaller than 2.5 microns (PM2.5), nitrogen oxides (NOX), sulfur dioxide (SO2), carbon monoxide (CO), hazardous air pollutants (HAP), and greenhouse gases (GHG; primarily CO2).

Facility emission sources are grain receiving, handling, and milling; fermentation and distillation; DDGS production, storage, and handling; natural gas and propane combustion; product and denaturant storage and loadout; and equipment leaks (valves, flanges, etc.), emergency engines, and cooling towers.

The facility employs a Regenerative Thermal Oxidizer (RTO) to control VOC and HAP emissions from DDGS drying and distillation processes. A wet (also known as a ‘CO2’) scrubber controls VOC and HAP emissions from the fermentation process. The facility employs several baghouses to control particulate matter emissions. The (formerly coal) natural gas-burning boiler provides process steam. The large denaturant and product storage tanks are equipped with internal floating roofs to control

Page 2: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 2 of 33

VOC and HAP emissions from evaporative losses. The ethanol loadout rack for trucks is equipped with a flare to control VOCs, and ethanol transported by rail loadout is restricted to dedicated ethanol rail cars. Emissions from equipment leaks are controlled through an inspection and maintenance program.

1.3 Description of the Activities Allowed by this Permit Action

This permit action is a Major Amendment (DQ 4640) and authorizes and/or makes the following changes:

a. The Total Facility permitted annual 200-proof ethanol production limit is increased from 59.9 million gallons per year to 72.25 million gallons per year (12-month rolling sum).

b. Total Facility modeling requirements were revised based on the current modeling requirements template language and results of modeling conducted for permit No. 06300025-005. The revised requirements are located in the Total Facility and FS 001 subject items. Refer to the discussion at Section 3.2 in this document.

c. Construction is authorized through equipment flexibility requirements for various facility processes. As part of providing equipment flexibility, process throughput capacities were added to each of these processes, to verify if stack testing is conducted at worst case conditions (as defined at Minn. R. 7017.2005, subp. 8). The following is a list of processes provided equipment flexibility, along with the corresponding process capacity:

i. SV 001 grain receiving – 416.67 tph

ii. SV 002 hammer milling – 109.2 tph

iii. SV 003 fermentation – 1050 gallons per minute from a liquefaction tank into any fermenter

iv. SV 008 DDGS handling and loadout – 400 tph

In addition, lb/hr PM, PM10, and PM2.5 SV 001, SV 002, and SV 008 lb/hr Title I limits were added for each stack/vent, based on the 0.004 gr/dscf limits and rated airflow capacity of each stack. These limits are necessary to restrict facility emissions of these pollutants to avoid PSD and are necessary because the permit allows equipment flexibility. The lb/hr limits ensure the addition, replacement, or modification of equipment venting through these stack/vents doesn’t cause the facility to become a major PSD source.

Individual lb/hr HAP (acetaldehyde, acrolein, formaldehyde, and methanol) limits and stack testing were added to SV 003, SV 004, SV 007, and EU 035, and HAP control efficiency requirements were added to HAP control equipment (CE 003, CE 005, and CE 028) to ensure the facility remains a minor source under 40 CFR pt. 63.

The SV 003, SV 004, and SV 007 HAP limits are derived from actual stack test results plus a 50% margin of error. The EU 035 HAP limits are based on uncontrolled lb HAP/ton DDGS emission factors furnished by the facility designer, ICM, Inc., and assumed control efficiencies of 98%.

HAP control efficiencies were estimated to be the same as the 98% VOC control efficiency.

The permit also authorizes use of limited liquid feedstocks (liquid molasses and off-specification liquid sugar) and grain (in addition to corn) in the fermentation process. Emissions from the use

Page 3: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 3 of 33

of grain are worst case compared to liquid feedstocks because liquid feedstock receiving does not generate particulate matter emissions produced by grain receiving.

c. Various emission limits have been increased to accommodate the ethanol production increase. These limits are:

i. SV 003 VOC limit increased from 5.0 lb/hr to 6.0 lb/hr as total mass VOC; ii. SV 004 PM, PM10, and PM2.5 increased limits from 2.65 lb/hr to 3.25 lb/hr for each

pollutant; SO2 limit increased from 6.3 lb/hr to 7.73 lb/hr; NOX limit increased from 1.9 lb/hr to 2.33 lb/hr; VOC limit increased from 7.0 lb/hr to 8.59 lb/hr; and CO limit increased from 9.42 lb/hr to 11.56 lb/hr;

iii. SV 007 VOC limit increased from 11.0 lb/hr to 13.27 lb/hr.

These limits were cited as ‘Title I Condition: 40 CFR § 52.21 BACT-equivalent’ limits in permit No. 06300025-004, however, the citations have been revised to ‘Title I Condition: 1990 CAAA; Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000’ (refer to discussion under ‘Other Changes’ in Section 1.3). The increase of these limits is permissible because the facility is a non-major PSD source, however, the processes subject to the increased limits have not been changed and therefore, the (formerly cited as) BACT-equivalent limits remain applicable. To preserve these (formerly cited as) BACT-equivalent limits while allowing these limit increases, the (formerly cited as) BACT-equivalent limits were converted from lb/hr limits to lb/process rate (e.g., lb VOC/ton DDGS produced) limits. As stated above, the lb/process rate limits are now cited as ‘Title I Condition: 1990 CAAA; Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000’, and the new lb/hr limits are cited as Title I Conditions to avoid the major source threshold at § 52.21(b).

d. SO2 SV 004 testing and test frequency plan submittal requirements were added. PER 004 did not require SV 004 SO2 testing. A 2008 test showed compliance at 0.103 lb SO2/hr. However, PER 005 allows an increase in ethanol and DDGS production, and increases the SV 004 SO2 limit from 6.3 lb/hr to 7.73 lb/hr. Therefore, testing is warranted.

e. A change in the method of operation of EU 035 is permitted by authorizing the Permittee to combust natural gas in EU 035 and use EU 035 as an alternate emission control device (direct flame afterburner; also referred to as CE 028) for processes controlled by the RTO (CE 005). Natural gas burners were installed in EU 035 in 2011 during a planned shutdown, and coal combustion support equipment was retired so that EU 035 can no longer combust coal. A Title I Condition restricting permitted fuels to natural gas and propane was added to prohibit coal combustion. There are requested emission limit increases for the boiler for when the boiler operates as both a steam generator and a control device. These limits were ‘Title I BACT-equivalent’ limits in permit No. 06300025-004, but increasing the limits does not require re-opening the original BACT analysis because:

i. The proposed limit increases are due to the requested change in the method of operation of EU 035 (from a coal-fired steam generator to a natural gas-fired steam generator and a direct flame afterburner),

ii. The proposed change in the method of EU 035 operation is not in the scope of the backward-looking Prevention of Significant Deterioration (PSD) permitting process (based on the August 2007 PSD permit application for the December 2010 permit No. 06300025-004 when coal was a permitted boiler fuel),

Page 4: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 4 of 33

iii. The facility is currently a non-major PSD source, and the change in the method of EU 035 operation occurred while the source was a non-major PSD source.

In addition, all EU 035 Title I BACT-equivalent limits have been replaced by Title I limits to avoid PSD applicable when EU 035 is not also operating as a control device. The elimination of the EU 035 BACT-equivalent conditions is appropriate because the boiler has been physically changed (by the installation of natural gas burners) and therefore the BACT-equivalent limits based on coal combustion are no longer applicable. Also, because the physical change is made while the facility is a non-major PSD source, retention of BACT-equivalent limits is not warranted. MR 006 has been added to the permit and it contains requirements applicable to the EU 035/CE 028 firebox temperature monitor.

f. The Methanator (EU 036) and Methanator flare (CE 008) are removed.

g. All requirements pertaining to coal combustion and ash handling are removed because the Permittee converted the bubbling bed boiler (EU 035) from a coal-fired boiler to a natural gas/LPG-fired boiler circa November 2011. These requirements were for emission sources, CEMS, and control equipment.

EU 035 40 CFR pt. 60, subp. Db requirements were revised accordingly due to the use of NG and elimination of coal as fuel. The opacity limit was removed, 40 CFR pt. 60, subp. Db was removed from the PM limit citation, and the NOX limit was revised accordingly. The 0.20 lb/mmBtu SO2 limit from 40 CFR § 60.42b(k)(1) does not apply based on the provision at 40 CFR § 60.42b(k)(2).

h. The 40 CFR pt. 60, subp. Db requirement from 40 CFR § 60.48b(f) was added to EU 035. This requirement specifies that during NOX CEMS breakdown, emissions data can be obtained by standby monitoring systems, Reference Methods 7 or 7A, or other approved reference method.

i. The EU 035 mercury emission limit and mercury control requirements were removed because coal is no longer a fuel option.

j. EU 035 CO and PM testing required no later than December 31, 2011, have been removed because these requirements were completed.

k. CE 028 requirements were added for when the NG boiler (EU 035) is operated as a direct flame afterburner to control sources currently controlled by the CE 005 RTO. These requirements mimic the requirements for the RTO.

l. FS 001 name was changed to ‘Facility Road Requirements’ to better reflect the requirements in this subject item. The requirements were updated based on modeling results for permit No. 06300025-005, and the May 2011 Paved Road Fugitive Emissions policy memorandum (modeling results and permitted operating conditions resulted in imposing the tier 3 paved road dust control requirements from the May 2011 memorandum). In addition, the daily grain receiving tonnage limits were moved to GP 001 because that is a more appropriate location in the permit for these requirements.

Included or Closed Actions and Descriptions

DQ 3380 (Received January 31, 2011) – Administrative Amendment for 120 day test deadline extension for SV 004 (RTO VOC), SV 005 (EU 035 boiler PM10 and PM2.5), and SV 007 (DDGS Cooler VOC). The tests were due 90 days after the December 16, 2010 issuance date of permit No. 06300025-004; the Permittee requested a 120-day extension so the deadline is 210 days after issuance of permit No.

Page 5: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 5 of 33

06300025-004, so that the revised deadline was July 14, 2011. This testing was completed in June 2011 and compliance was demonstrated for SV 004 and SV 007. The SV 005 PM10 and PM2.5 tests were noncompliant but retesting in 2012 demonstrated compliance after the fuel switch from coal to natural gas, so all of these Table C testing requirements were removed from the permit. Requirements for future testing for these same pollutants was added to the permit, at test frequencies based on the MPCA test frequency guidance. (Included)

DQ 3528 (Received June 2, 2011) – Administrative Amendment for a 365-day extension of the completion deadline for the Building Capture Efficiency Study from June 30, 2011 to June 30, 2012. The study was submitted in September 2011. (Included)

DQ 3694 (Received October 11, 2011) – Administrative Amendment to clarify requirements of boiler (EU 035) SO2, opacity, and ammonia flowrate monitoring so it is clear these requirements only apply when coal is combusted in the boiler. (Included)

DQ 3771 (Received December 12, 2011) – Administrative Amendment for a 120-day extension of the fence installation due date. The original due date was 365 days after the December 16, 2010 issuance date of permit No. 06300025-004 and an additional 120 days would make the new due date at April 14, 2012. The fence is installed based on MPCA staff observation during a June 4, 2013 MPCA air quality inspection. In addition, note the cover page of the application indicated the Permittee initiated natural gas firing in the boiler on November 7, 2011. (Included)

DQ 3837 – Revised Modeling Pre-application received February 8, 2012. (Included)

DQ 4399 – Re-opening for updating SV 003/CE 003 operating parameters based on January 2012 stack testing. Parameter revisions are pressure drop >2.0 and <28.0 inches w.c., liquid flow rate >50.0 gpm, and scrubber additive rate >4.0 gph. Refer to DQ 4907 information below. Note the additive flow rate was again updated by the May 2014 SV 003 test (DQ 4907). (Included but note DQ 4907 revises the additive flow rate again)

DQ 4508 – Revised/updated Modeling Pre-application received August 26, 2013. (Included)

DQ 4907 – August 12, 2014 NOC for May 2014 SV 003 testing that revised the CE 003 additive flow rate to >5.7 gph. (Included)

Other Changes

All citations of Title I Condition: 40 CFR § 52.21 BACT-equivalent Limit and Minn. R. 7007.3000 were revised to Title I Condition: 1990 CAAA; Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000. This revision was necessary because ‘BACT-equivalent’ is a term from a November 1998 EPA memorandum that provides guidance for enforcement action against sources that violated new source review (NSR) permitting requirements. ‘BACT-equivalent’ is used in the memorandum discussion regarding sources whose actual emissions never exceeded the NSR major source threshold. The term ‘BACT-equivalent’ is not defined under NSR regulations, and therefore use of the term is inappropriate in a Title I Condition citation.

Emission unit and fugitive emission source names were revised to allow the transfer of data for this facility during the upcoming transition from the MPCA Delta permitting database to a new permitting system known as TEMPO 360. This transition should occur during the first half of 2015.

Additional requirement language was added to all required stack tests to ensure testing is conducted at worst case conditions including short-term process throughput limits (SV 001, SV 002, SV 003, SV 004,

Page 6: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 6 of 33

and EU 035). Also added language to allow testing to occur during a 60 day window prior to the test due date without resetting the test due date.

Total Facility: Removed 40 CFR § 52.21(r)(6) reasonable possibility language because the facility is not a PSD major source (in part due to the June 23, 2014 Supreme Court decision on regulation of greenhouse gas emissions under the PSD program).

The building capture efficiency study (BCES) requirements were removed because the study was submitted. Although the MPCA never formally accepted the results of the study due to measured uncontrolled emission factors being several fold greater than comparable emission factors in AP-42 ch. 9.9.1, the Permittee used a relatively 95% capture efficiency in all calculations of uncaptured grain receiving and DDGS loadout for permit action 005. This 95% capture efficiency was notably lower than the capture efficiency values (of >99% for PM10 and > 98% for PM2.5) measured by the study.

Three requirements related to emission rate and stack parameter changes for state-only air emissions risk assessment (AERA) modeling requirements were removed because the facility no longer uses coal for boiler fuel, and coal was the only reason that an AERA was conducted. Appendix II that contained the pollutant emission rates that were evaluated by the AERA process, was also removed.

Removed the recordkeeping requirement for daily ethanol production and daily purchases of coal, propane, and natural gas (note the daily ethanol production recordkeeping requirement was duplicative with another ethanol production recordkeeping requirement in the permit, so the removal of this requirement does not eliminate the requirement for daily (and monthly) ethanol production recordkeeping). These are vestigial requirements from the first permit (No. 06300025-001) issued in 2005 that was supposed to be a state permit that limited emissions below pt. 70 and PSD major source thresholds. The facility is currently a Pt. 70 source, but a non-major PSD and pt. 63 source, and other (Title I) requirements in the permit are used to verify the facility is maintaining this status.

Removed the 3-hour rolling average beer production rate recordkeeping requirement. This requirement was vestigial from the first permit, and was used to show compliance with a beer production limit that was used to restrict facility emissions to less than pt. 70 and PSD major source thresholds. The beer production limit was removed by PER 004, but the recordkeeping requirement was retained and the citation was revised to Title I Condition: to avoid 40 CFR pt. 63 major source thresholds. The current draft permit addresses the lack of limits to avoid 40 CFR pt. 63 by imposing lb/hr HAP limits under SV 003, SV 004, SV 007, and EU 035, as well as HAP control efficiencies under CE 003, CE 005, and CE 028 to maintain non-major source status under 40 CFR pt. 63.

The ethanol production limit and daily recordkeeping requirement citations were revised from ‘Title I to avoid major source classification under 40 CFR § 63.2’, to ‘Title I Condition: To avoid major source threshold under 40 CFR § 52.21(b) and Minn. R. 7007.3000; Title I Condition: To avoid major source threshold under 40 CFR § 63.2 and Minn. R. 7011.7000’. The monthly ethanol production recordkeeping requirement citation was changed from a Title I Condition to Minn. R. 7007.0800, subps. 4 and 5 because only the daily ethanol production recordkeeping requirement needs to be a Title I Condition.

Stack test report submittal requirements were revised to reflect up-coming revisions to the Minn. Rule requirements for report submittal. The changes allow several options for electronic submittal of the test report.

GP 001: Removed the requirement to keep doors closed on the grain receiving building during grain receiving and DDGS loadout, due to the completion of the Building Capture Efficiency Study. Added 95% capture efficiency requirements for EU 001, EU 002, and EU 038 (Truck Receiving Pits 1 and 2, and DDGS

Page 7: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 7 of 33

Loadout Spout, respectively) because this value was used in calculating PM10 and PM2.5 emissions used in modeling and PM, PM10, and PM2.5 emission calculations.

GP 002: Removed GP 002 for fabric filters. Other than a reference to the CE identification numbers for the location in the permit of applicable requirements, there were no requirements in GP 002. All references in the permit to GP 002 were replaced with a reference to the applicable CE identification number.

GP 004: The 3,905,000 gallon total fermentation tank volume limit was removed. This limit was in the initial permit and cited as Minn. R. ch. 4410. This chapter is the Minnesota Environmental Review rules chapter. When the initial permit was issued in 2005, Minnesota environmental review rules contained a 5,000,000 gallon per year ethanol production increase threshold for environmental review. However, that rule-based threshold was superseded in 2010 when Minn. Stat. 116D, subd. 2a(a) was promulgated. The statute exempts ethanol plant production increases from being subject to the requirement to prepare an environmental assessment worksheet (EAW) due to the increased ethanol production, providing no other EAW trigger applies. Due to the statute superseding the rule, it is reasonable to remove the fermentation tankage volume limit.

GP 006: Removed the notification requirement for installation of controls that accompanies the initial startup notification because the notification was made in September 2007.

GP 007: Moved the GP 007 flare requirements to CE 010 (that were derived from 40 CFR 40 CFR § 60.18) because CE 010 is now the only flare at the facility. GP 007 steam-assisted flare requirements were not moved to CE 010 because CE 010 is an air-assisted flare. Also, some of the requirements language was revised to remove erroneous references to 40 CFR pt. 60, subp. A (because CE 010 is not subject to 40 CFR pt. 60). As part of the revisions, the requirement to use Method 9 for determining opacity was removed because 40 CFR § 60.18 does not require the determination of flare emissions opacity, but the requirement to use Method 22 for determining the presence of visible emissions, was retained.

GP 009: Was deleted because it was just a reference for the location of SO2 limits located at SV 004 and EU 035. This group was established by PER 001 and it contained a limit and recordkeeping requirements to avoid the pt. 70 and PSD permitting 100 tpy threshold in effect when PER 001 was issued. The facility is now a pt. 70 source and PSD non-major source, and no longer burns coal in EU 035. The limited SO2 PTE is well below the 250 tpy PSD threshold. Therefore there is no need to limit and track 12-month SO2 emissions.

GP 010 Fuel Limited Group: This group established by PER 001 contained three requirements to limit emissions from the total facility to less than 40 CFR pt. 63 major source thresholds. These requirements were removed because they were no longer necessary due to the addition of lb/hr HAP limits under SV 003, SV 004, SV 007, and EU 035, as well as HAP control efficiencies under CE 003, CE 005, and CE 028 to maintain non-major source status under 40 CFR pt. 63.

GP 011 Coal Group: This group contained two requirements limiting the quantity of coal combusted. Coal is no longer a permitted fuel so the requirements were removed and the group was retired.

GP 012 GHG Group: This group contained a requirement that the Permittee must meet the renewable fuels requirements in 40 CFR pt. 80 if the Permittee desires to obtain renewable identification numbers (RIN) for ethanol production in excess of 55 million gallons per year. The MPCA is not authorized to implement this part, and this requirement does not belong in a 40 CFR pt. 70 operating permit. The single requirement in this group was removed and GP 012 was retired.

Page 8: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 8 of 33

SV 001: SV 001 (EU 001 and EU 002) grain receiving is limited to 12 hours per day due to using this assumption in PM10 and PM2.5 modeling. The 416.67 tph grain receiving process throughput limit is the value used to calculate uncaptured PM10 and PM2.5 emissions used in modeling even though receiving capacity is slightly higher at 420 tph. Therefore, the permit prohibits increasing this limit unless PM10 and PM2.5 remodeling is conducted. The PM, PM10, and PM2.5 testing trigger date was revised based on the most recent test date of June 1, 2011. Permit 004 required testing at 60-month intervals based on a trigger date of August 6, 2008. However, the Permittee tested SV 001 on June 1, 2011, and therefore the testing trigger date is reset to June 1, 2011. The 60-month test interval does not change based on the results of the 2011 testing.

SV 002: The PM, PM10, and PM2.5 testing trigger dates were revised for the same reason and in the same manner as descried above for SV 001.

SV 003 VOC test frequency was revised based on the results of the May 13, 2014 stack test. The measured VOC emission rate was 3.16 lb/hr which is 63% of the 5.0 lb/hr emission limit. The test frequency was revised from a 60-month interval to a 36-month interval.

SV 004: SV 004 VOC test Table C requirement were moved to Table A because re-test demonstrated compliance, and test results indicated a 60-month test frequency interval. SV 004 PM10 and PM2.5 testing requirements were changed from a one-time test due one year after issuance of permit No. 06300025-004 (issued in December 2010), to annual testing based on June 2011 test results that were greater than 90% of limit. SV 004 CO and PM test interval start date was reset from 8/1/2008 to 6/9/11 due to compliant 6/9/11 SV 004 CO and PM tests with test results that support a 60-month test interval.

Added SV 004 and EU 035 process throughput limits to verify if stack testing is conducted at worst case operating conditions. For SV 004 and EU 035, these limits are for the beer flow in gallons per minute from the beer well (EU 017) to the beer column (EU 026), and for DDGS output from DDGS Dryer B (EU 034). Both of these process throughputs directly impact emissions vented to the RTO (CE 005)/NG-fired boiler/direct flame afterburner (EU 035/CE 028), and the emissions from the RTO stack/vent SV 004.

A 425˚F DDGS dryer exhaust temperature limit was added to the permit under each dryer emission unit (EU 018 and EU 034). This limit was added because the facility uses H2SO4 for DDGS pH control as well as for equipment cleaning. H2SO4 is added to the DDGS process as needed, eventually leaving the facility via the feed products. A small fraction of H2SO4 is converted to SO2 by the DDGS drying process. The rate of conversion of H2SO4 to SO2 is affected by dryer temperature, hence the inclusion of the dryer exhaust temperature limits at EU 018 and EU 034.

SV 007 – The Table C VOC retest requirement was removed and a VOC testing requirement at 60-month intervals was added to Table A because the June 2011 SV 007 VOC retest demonstrated compliance with the SV 007 VOC limit. The PM10 testing requirement was revised to testing at 60-month intervals starting June 1, 2011, which is the date of the test that measured PM10 emissions at less than 60% of the applicable limit. The PM and PM2.5 tests trigger date was revised to June 1, 2011 because these pollutants were last tested on that date (although these tests weren’t due until August 2013). A SV 007 process throughput limit to verify if stack testing is conducted at worst case operating conditions was added. The process limit is a DDGS input to EU 037 from DDGS Dryer B (EU 034) limit because the process throughput directly impacts emissions vented to the DDGS cooler fabric filter CE 027 and the emissions from the cooler stack/vent SV 007.

SV 008 - SV 008 (EU 038) DDGS loadout is now limited to the 12-hour period of 6 AM to 6 PM each day due to use of this operating assumption in PM10 and PM2.5 modeling. The 400 tph DDGS loading process

Page 9: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 9 of 33

throughput limit is the value used to calculate uncaptured PM10 and PM2.5 emissions used in modeling and therefore, the permit prohibits increasing this limit unless PM10 and PM2.5 remodeling is conducted. Permit 004 required testing at 60-month intervals based on a trigger date of August 6, 2008. However, the Permittee tested SV 008 on June 1, 2011, and therefore the testing trigger date is reset to June 1, 2011. The 60-month test interval is also changed due to the 2011 test results. PM emissions were measured at 0.0031 gr/dscf which is 77.5% of the 0.0040 gr/dscf limit and therefore subject to a 36-month test interval, and PM10 and PM2.5 emissions were measured at 0.0037 gr/dscf which is 92.5% of the 0.0040 gr/dscf limit, and therefore subject to a 12-month test interval.

SV 009 – The SV 009 (EU 040) NOX emission calculations annual PTE is based on 2700 hr/yr operation but EU 040 modeled NOX emissions for the annual NOx NAAQS are based on emissions from 8760 hr/yr of operation so there is no need for a 2700 hr/yr modeling-based operating limit for SV 009.

EU 018 and EU 034 DDGS Dryers - Revised the requirement regarding wet cake feed to dryers and control equipment breakdown (RTO - CE 005). The revisions incorporated CE 028/EU 035 (boiler) as a permitted control option and added language stating wet cake feed to dryers can resume after either control device resumes operation.

EU 035 – Stack testing requirements were revised due to the change of permitted fuel (from coal to natural gas) and the change in the method of operation (from a natural gas-fired boiler to both a boiler and a direct flame afterburner). The testing requirements are changed as follows:

PM10 and PM2.5 Table C re-test requirements were removed because in 2012 the Permittee demonstrated compliance with applicable limits in permit No. 06300025-004 by ceasing coal combustion and re-testing while combusting natural gas.

Removed the notification requirement to the Supervisor of the Risk Evaluation and Air Modeling unit regarding the results of performance tests. This requirement is no longer warranted due to elimination of coal as boiler fuel.

Removed the requirements to test no later than 12/31/2011 for PM and CO emissions (while combusting coal). These requirements were completed and test results were compliant, and repeat testing for these pollutants while the boiler combusts natural gas is not warranted.

Added testing requirements for when EU 035 is operating as a direct flame afterburner (CE 028). The required tests mimic those required under SV 004 for the CE 005 thermal oxidizer. No testing is required for any other pollutants when EU 035 is not operating as CE 028, because EU 035 is natural gas-fired, and NOX is measured by a CEMS (MR 001).

EU 037 – The CE 027 fabric filter requirements were removed from EU 037 because they were also present under subject item CE 027.

EU 048, EU 053, and EU 054 – PER 004 imposed identical requirements for raising the stack heights for these emergency engines to 30 feet above grade, unless modeling was submitted demonstrating a shorter stack would not cause or contribute to an exceedance of any relevant ambient air quality standard (AAQS). The stack extensions were subject to a June 2011 completion date, and if the Permittee elected to employ stacks less than 30 feet above grade, modeling was due in March 2011.

The Permittee did not increase these stack heights because it intended to submit modeling by the applicable deadline. However, the Permittee requested input from the MPCA regarding how to include these emergency engines in the model, and did not receive a final reply from the MPCA until well past the modeling submittal deadline. Regardless, modeling submitted in 2013 for PER 005 showed

Page 10: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 10 of 33

compliance with applicable AAQS, so these stack height/modeling requirements were removed from EU 048, EU 053, and EU 054.

EU 048, EU 053, and EU 054 – Added requirement from 40 CFR pt. 63, subp. ZZZZ at 40 CFR § 63.6590(a)(1)(iii) that specifies these engines are existing affected sources located at an area source. However, no additional requirements from pt. 63, subp. ZZZZ (or 40 CFR pt. 60, subps. IIII or JJJJ) were added to the permit for these sources because these engines are not in the scope of this major amendment, and addition of such requirements is not required by Minn. R. 7007.1600, subp. 1(A) because the remaining permit term is less than three years (based on the issuance date of December 16, 2010 of the pt. 70 operating permit No. 06300025-004).

EU 048 and EU 053 – PER 004 provided flexibility for replacement of each engine with an engine of same or lesser emissions, or, an engine with higher emissions if the Permittee obtains the appropriate permit amendment. This requirement was removed because the engines are NO2 emission sources and have short stacks, the total facility NO2 ambient impacts are high based on 2013 modeling for PER 005 (refer to Section 3.2 and Table 6 of this technical support document), and the Total Facility section of permit No. 06300025-005 contains remodeling requirements for changes to modeled parameters for any modeled NO2 emission source at the facility.

EU 052 and EU 055 – These are DDGS storage silos. This equipment was previously classified as insignificant. However, the silos are vented to the DDGS handling fabric filter that is vented to the atmosphere, and therefore, these silos do not qualify as insignificant activities or conditionally insignificant activities and have been added to the permit.

CE 001 Collection Efficiencies, and CE 002, CE 009, and CE 027 Control Efficiencies – The PM, PM10, and PM2.5 collection/control efficiencies were revised to reflect the 99.0% value used in emission calculations. All revised values are equal to or higher than values in PER 004, except for CE 009 PM which changed from 99.3% to 99.0%. It was determined by MPCA staff that revision to the original BACT analysis that produced these values was not warranted because efficiencies (except for CE 009 PM) were increased or remained the same, and the marginal decrease for CE 009 PM control efficiency was insignificant.

CE 003 -Added a requirement for minimum scrubber additive flowrate (5.7 gph) because this plays a role in HAP capture efficiency, along with associated monitoring and recordkeeping. Added control efficiency values for acetaldehyde, acrolein, formaldehyde, and methanol based on values used in emission calculations for these HAPs.

CE 005 – Added a PM2.5 control efficiency requirement equivalent to the value used in emissions calculations. Permit No. 06300025-004 added a SV 004 PM2.5 (BACT-equivalent) emission limit so it appears the CE 005 PM2.5 control efficiency requirement was overlooked during drafting of permit No. 06300025-004. In addition, all control efficiencies were revised to reflect control efficiency values used in emission calculations. All values were increased except PM decreased marginally from 95.4% to 95.0%; it was determined by MPCA staff that revision to the original BACT analysis that produced these values was not warranted because efficiencies (except for PM) were increased, and the marginal decrease for PM control efficiency was insignificant.

CE 027 – Added a PM2.5 control efficiency requirement. Permit No. 06300025-004 added a SV 007 PM2.5 (BACT-equivalent) emission limit so it appears the CE 027 PM2.5 control efficiency requirement was overlooked during drafting of permit No. 06300025-004. The PM2.5 control efficiency value was assumed to be the same as the (99%) PM10 efficiency, and matched the values used n emission calculations.

Page 11: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 11 of 33

Fugitive Emissions: FS 001 was renamed from ‘Truck Traffic’ to ‘Paved Road Requirements’ to more accurately reflect the nature of FS 001 requirements. In addition, for this permit action the Permittee re-modeled PM10 and PM2.5 emissions but did not include paved road fugitive PM10 and PM2.5 emissions in the modeling as allowed by the MPCA May 2011 Paved Road Fugitive Particulate Matter modeling memorandum (refer to Attachment 6). The memorandum specifies when fugitive particulate matter emissions can be excluded from modeling, as well as four requirement tiers for facilities that qualify for this exclusion. The facility qualified for the exclusion because it has both an enforceable fugitive dust control plan, and PM10 and PM2.5 impacts were less than the 60%/80% thresholds, respectively. Under the exemption, the facility is subject to the requirements of Tier 3 because the number of daily trucks is at least 200 (assuming all DDGS is shipped out by the same trucks that deliver grain to the facility; if this is not the case then the trucks per day value will be higher than 200), based on the emission calculations information in the ‘Grain & DDGS (Daily-Model)’ worksheet cell C12 (over two hundred grain trucks per day). The FS 001 paved road fugitive dust requirements were updated to reflect the May 2011 memorandum requirements for when fugitive dust from paved roads were not included in modeling. The permit also requires revision of the fugitive dust plan (Appendix IV) so that the plan does not conflict with the revised FS 001 requirements.

FS 002 and FS 003: Uncaptured grain and DDGS handling emissions were traditionally referred to as fugitive emissions. However, these emissions are not fugitive emissions because they can reasonably be captured and vented to a control device. These emission sources are still listed as ‘FS’ sources in the permit (FS 002 and FS 003) but the source description was modified to indicate the emissions are uncaptured and not fugitive.

These grain and DDGS uncaptured emission are included in the facility emission calculations for permitting purposes. Also, although Minn. R. 7011.1005, subp. 3 refers to these uncaptured emissions as fugitive emissions and limits opacity of these fugitive emissions, the uncaptured emissions do not meet the definition of fugitive emissions (at Minn. R. 7005.0100, subp. 11c), however, these uncaptured emissions remain subject to the opacity limits in Minn. R. 7011.1005, subp. 3.

Added requirements in the permit to vent emissions from processes that are controlled, to the associated air pollution control device (except ethanol loadout/CE 010 because this requirement was already in the permit).

The FS 004 equipment in VOC service equipment count was revised, which in turn changed FS 004 emissions data. The Permittee indicated the original permit FS 004 equipment count was an estimate from the building contractor. This estimate was revised when additional equipment was installed due to the permit No. 06300025-004 production increase (from 55 mmgal/yr to 59.9 mmgal/yr). That earlier revised equipment count was determined by the ratio of the increased to existing production limits applied to the number of valves. For the current permit (No. 06300025-005) the available LDAR report was used for calculating the number of each equipment type. The result was an increase in the total component count from 870 to 2340 with the greatest increases attributable to flanges (from 500 to 1777) and light liquid valves (from 300 to 526).

MR 001 – Removed the requirement for notification of MR 001 installation, and requirements for CEMS certification because these have been completed. Also, additional subp. Db NOX CEMS requirements were added, primarily referenced alternate requirements from pt. 75 appendices.

Page 12: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 12 of 33

MR 005 was added to the permit and it contains CE 005 RTO combustion chamber temperature monitor requirements.

Finally, the Permittee provided the following description of their corn oil extraction process:

‘The Valicor corn oil extraction system at HLBE separates corn oil from the partially evaporated thin stillage (syrup) that exits the plant's evaporators using disk stack centrifuge technology. The recovered corn oil is then piped to storage. From storage, the corn oil is then loaded to trucks by direct connection. The system has the capability to extract up to 3.117 million gallons of corn oil per year. There may be emissions associated with the corn oil extraction system itself since the system vents (indoors) to prevent pressure build up issues. We consider any emissions to be insignificant because corn oil has a negligible chemical component (non-hazardous, low vapor pressure) and the temperature of the oil is around 200°F or less. For conservatism, tank losses from the fixed roof corn oil storage tank were quantified using the chemical properties of the compound furfural. There are also particulate emissions associated with corn oil tanker truck traffic on haul roads. These emissions were included in the permit application along with emissions from other truck traffic.

Page 13: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 13 of 33

1.4 Facility Emissions:

Table 2. Title I Emissions Summary

Pollutant

Unlimited Potential Emissions from the

Modification (tpy)

Limited Potential Emissions from

the Modification (tpy)

NSR/112(g) Threshold for New Major Source

(tpy)

NSR/112(g) Review Required? (Yes/No)

PM 42.3 42.3 250 NoPM10 40.9 40.9 250 NoPM2.5 40.6 40.6 250 NoNOX 104.0 104.0 250 NoSO2 34.5 34.5 250 NoCO 123.5 123.5 250 NoOzone (VOC) 139.8 139.8 250 NoCO2e* 337,881 337,881 75,000 No** Single HAP/ total HAPs

7.50/13.79 7.50/13.79 10/25 No/No

*Carbon dioxide equivalents as defined in Minn. R. 7007.0100;**CO2e is regulated under the NSR program only if the existing minor source makes a modification causing a CO2e emission increase exceeding 75,000 tpy and an emission increase of one or more non-CO2e pollutants exceeding the NSR threshold shown above for non-CO2e pollutants.

Table 3. Total Facility Potential to Emit Summary

PM tpy

PM10 tpy

PM2.5 tpy

SO2 tpy

NOx tpy

CO Tpy

VOC tpy

CO2e tpy

SingleHAP tpy

AllHAPs tpy

Total Facility Limited Potential Emissions

42.3 40.9 40.6 34.5 104.0 123.5 139.8 337,881 7.50 13.79

Total Facility Actual Emissions (2012)

26.10 20.24 19.04 0.91 26.50 25.65 39.80 * *

* Not reported in MN emission inventory.

Table 4. Facility Classification

Classification Major Synthetic Minor/Area Minor/AreaPSD XPart 70 Permit Program XPart 63 NESHAP X

2. Regulatory and/or Statutory Basis

New Source Review

The facility is an existing synthetic minor source under New Source Review regulations. Changes authorized by this permit do not change this status.

Page 14: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 14 of 33

Greenhouse gas (GHG) emissions are not subject to regulation for the current permit action (permit No. 06300025-005) because none of the non-GHG pollutant increases exceed the NSR major source threshold. This is based on EPA’s July 24, 2014 memorandum for implementing the June 23, 2014 Supreme Court decision in the Utility Air Regulatory Group v. Environmental Protection Agency case. Part 70 Permit Program

The facility is and remains a major source under the Part 70 permit program. New Source Performance Standards (NSPS)

The natural gas boiler EU 035 is subject to NSPS subp. Db ‘Standards of Performance for Industrial-Commercial-Institutional Steam Generating Units’. The boiler has a low heat release of 4,949 Btu/hr-ft3 and construction of the boiler commenced January 8, 2007.

Equipment in VOC service is subject to NSPS subp. VV ‘Standards of Performance for Equipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for which Construction, Reconstruction, or Modification Commenced After January 5, 1981, and on or Before November 7, 2006’.

Volatile organic liquid storage tanks are subject to the requirements of NSPS subp. Kb. National Emission Standards for Hazardous Air Pollutants (NESHAP)

The facility has accepted HAP emission limits so that it is a non-major source under 40 CFR pt. 63. Therefore, no major source NESHAPs apply. Emergency engines are subject to 40 CFR pt. 63, subp. ZZZZ. The natural gas-fired boiler (EU 035) is not subject to 40 CFR pt. 63, subp. JJJJJJ because EU 035 meets the definition of a gas-fired boiler at § 63.11237 and § 63.11195(e) states that a gas-fired boiler is not subject to subp. JJJJJJ. Compliance Assurance Monitoring (CAM)

The changes authorized by this permit action do not trigger CAM. This is because the allowed change only involves Other PSEUs, and according to 40 CFR § 64.5(b), CAM applies to Other PSEUs only at Pt. 70 permit reissuance. Environmental Review & Air Emissions Risk Analysis (AERA)

The changes authorized by this permit action do not trigger requirements for environmental review or an AERA. Existing AERA requirements based on EU 035 coal combustion, have been removed or revised accordingly because EU 035 is no longer permitted to combust coal. Environmental Justice

Environmental Justice (EJ) is the fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income with respect to the development, implementation, and enforcement of environmental laws, regulations, and policies. EPA has this goal for all communities and persons across the U.S.A. It will be achieved when everyone enjoys the same degree of protection from environmental and health hazards and equal access to the decision-making process to have a healthy environment in which to live, learn, and work.

Page 15: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 15 of 33

As part of the permitting process, the MPCA contacts US E.P.A. Region 5 staff to verify if there are any possible EJ issues for facility location that need to be addressed in the permit action. For this project, MPCA staff contacted EPA Region 5 staff who used the draft Environmental Justice Strategic Enforcement Assessment Tool (EJSEAT) to determine EJ is not a concern (04/3/2014 email from Rachel Rineheart; see Attachment 7).

Minnesota State Rules

Portions of the facility are subject to the following Minnesota Standards of Performance:

• Minn. R. 7011.0150 Preventing Particulate Matter from becoming Airborne

• Minn. R. 7011.0610 Standards of Performance for Fossil-Fuel-Burning Direct Heating Equipment

• Minn. R. 7011.0715 Standards of Performance for Post-1969 Industrial Process Equipment

• Minn. R. 7011.1005 Standards of Performance for Bulk Agricultural Commodity Facilities

• Minn. R. 7011.2300 Standards of Performance for Stationary Internal Combustion Engines

Table 5. Regulatory Overview of Units Affected by the Modification/Permit Amendment

Subject Item* Applicable Regulations Discussion

Total Facility

Title I Condition: To avoid major source threshold under 40 CFR § 52.21(b) and Minn. R. 7007.3000; Title I Condition: To avoid major source threshold under 40 CFR § 63.2 and Minn. R. 7011.7000

Title I Condition: 40 CFR § 52.21(k)

72.25 million gallon per year undenatured ethanol production limit; Flexible permit conditions

Modeling requirements GP 005 Units vented to RTO or the NG-fired boiler

Title I Condition: 1990 CAAA; Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000; Title I Condition: To avoid major source threshold under 40 CFR § 63.2 and Minn. R. 7011.7000

Revised requirement to vent emissions to the thermal oxidizer (CE 005) or the NG-fired boiler/direct flame afterburner (EU 035/CE 028)

SV 001, SV 002, SV 008

Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000

Equipment flexibility provisions

Page 16: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 16 of 33

Subject Item* Applicable Regulations Discussion

SV 003 Fermen-tation CO2 Scrubber

Title I Condition: To avoid major source threshold at 40 CFR § 52.21(b) and Minn. R. 7007.3000;

Title I Condition: To avoid major source threshold at 40 CFR § 63.2 and Minn. R. 7011.7000

Equipment flexibility provisions

lb/hr HAP limits

SV 004 RTO

Title I Conditions: 1990 CAAA, and to avoid major source threshold at 40 CFR § 52.21(b) and Minn. R. 7007.3000;

Title I Condition: To avoid major source threshold at 40 CFR § 63.2 and Minn. R. 7011.7000

Title I 1990 CAAA (formerly cited as ‘BACT-equivalent’) lb/process rate limits and revised lb/hr limits to avoid 40 CFR § 52.21 major source threshold

lb/hr HAP limits

SV 007 DDGS cooler

Title I Condition: To avoid major source threshold at 40 CFR § 63.2 and Minn. R. 7011.7000

Lb/hr HAP limits

EU 035 NG-fired boiler

Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. 7007.3000; Title I Condition: To avoid major source threshold under 40 CFR § 63.2 40 CFR pt. 60, subp. Db

Limits for PM, PM10, PM2.5, SO2, NOX, VOC, and CO (avoid 40 CFR § 52.21), and HAPs (avoid 40 CFR § 63.2) NSPS subp. Db requirements including the NOX limit, and monitoring, recordkeeping, and reporting. Boiler rated heat input on natural gas is 210 mmBtu/hr; construction commenced November 2005.

EU 048 Fire pump

40 CFR pt. 60, subp. IIII Title I Condition: 40 CFR § 52.21(k) Minn. R. 7011.2300

NSPS, compression ignition engines; specifies limits for hydrocarbons, NOX, and CO; fuel sulfur content; operating hours records The unit is permitted to operate outside the testing timeframe (noon to 4 pm) only in the event of an emergency. Opacity limit

Page 17: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 17 of 33

Subject Item* Applicable Regulations Discussion

EU 053 Admin. Emer. Gen.

40 CFR pt. 60, subp. IIII Title I Condition: 40 CFR § 52.21(k) Minn. R. 7011.2300

NSPS, compression ignition engines; specifies limits for hydrocarbons, NOx, and CO; fuel sulfur content; operating hours records The unit is permitted to operate outside the testing timeframe (noon to 4 pm) only in the event of an emergency. Opacity limit

EU 054 Emer. Boiler Water pump

Minn. R. 7011.2300 Title I Condition: 40 CFR § 52.21(k) Minn. R. 7011.2300

Natural gas/propane-fueled spark ignition engine The unit is permitted to operate outside the testing timeframe (noon to 4 pm) only in the event of an emergency. Opacity limit

CE 001 Filter

Title I Condition: 1990 CAAA; Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000

Required 99% PM, PM10, and PM2.5 collection efficiencies; pressure drop 0.25 to 8.0 inches w.c.

CE 002 Filter

Title I Condition: 1990 CAAA; Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000

Required 99% PM, PM10, and PM2.5 control efficiencies; pressure drop 0.25 to 8.0 inches w.c.

CE 003 Scrubber

Title I Condition: 1990 CAAA; Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000

Title I Condition: To avoid major source threshold under 40 CFR § 63.2 and Minn. R. 7011.7000

98% VOC and HAP control efficiencies; water flow rate, scrubber additive flow rate, and pressure drop requirements to support control efficiency and emission limits

CE 005 Thermal oxidizer

Title I Condition: 1990 CAAA; Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000

Title I Condition: To avoid

Control efficiencies: PM, PM10, and PM2.5: 95% CO, VOC, and HAP species: 98% Minimum temperature: 1400˚F Continuous temperature reading and recording required; O&M requirements

Page 18: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 18 of 33

Subject Item* Applicable Regulations Discussion

major source threshold under 40 CFR § 63.2 and Minn. R. 7011.7000

CE 028 Title I Conditions: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000

Title I Condition: To avoid major source threshold under 40 CFR § 63.2 and Minn. R. 7011.7000

Control efficiencies: PM, PM10, and PM2.5: 95% CO, VOC, and HAP species: 98% Minimum temperature: 1575˚F Continuous temperature reading and recording required; O&M requirements

MR 005

Title I Condition: 1990 CAAA; Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000; Title I Condition: To avoid major source threshold under 40 CFR § 63.2 and Minn. R. 7011.7000; Minn. R. 7007.0800, subp. 4(B)

CE 005 RTO firebox temperature monitors

MR 006 Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000Title I Condition: To avoid major source threshold under 40 CFR § 63.2 and Minn. R. 7011.7000; Minn. R. 7007.0800, subp. 4(B)

CE 028 Direct Flame Afterburner firebox temperature monitor

*Location of the requirement in the permit (e.g., EU, SV, GP, etc.). 3. Technical Information 3.1 Potential to Emit Calculations and Emissions Increase Analysis

Attachment 1 to this TSD contains the emission calculations spreadsheet submitted by the Permittee and reviewed and revised by the MPCA. Delta emissions data is revised based on these calculations.

SV 004 and EU 035 Emissions: It is important to note the summary pages in the spreadsheet account for worst case emissions from SV 004 and SV 005/EU 035/CE 028 and do not double count SV 004 and SV 005/EU 035/CE 028 emissions when worst case operating scenario is SV 005/EU 035 operating as CE 028, and CE 005 is not operating. Several pollutants (SO2, CO, VOC, and all single HAPs excluding acetaldehyde, acrolein, and methanol) are worst case in the ‘SV 004 is operating and is EU 035 not

Page 19: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 19 of 33

operating as CE 028’ scenario, and the spreadsheet summary page accounts for this scenario. However, Delta does not have the ability to avoid double counting SV 004 and EU 035 emissions, resulting in the Delta facility totals for each pollutant not matching the spreadsheet totals for each pollutant.

SV 009 Flare Emissions: Although though the permit doesn’t restrict flare operation to 2700 hours per year, SV 009 flare emissions were calculated at annual flare operations of 2700 hours (and pilot operation of 6060 hours/year). This is reasonable because at the loading rack capacity of 5600 gallons per minute, the entire permitted 72.25 mmgal/year annual ethanol production denatured with 5% gasoline (75,862,500 gallons per year) could be loaded in approximately 226 hours based on the following:

75,862,500 gals/yr * minute/5600 gals * hr/60 minutes = 225.78 hr/yr In addition, at the actual loading rate of approximately 500 gallons/minute, loading of annual permitted production would take about 2529 hours based on the following:

75,862,500 gals/yr * minute/500 gals * hr/60 minutes = 2528.75 hr/yr 3.2 Dispersion Modeling

Permit No. 06300025-004 required re-modeling of emissions under certain circumstances. Specifically, if the Permittee desired to change any of the modeled PM2.5 or NOX emission sources, the requirement to re-model is triggered. Permit No. 06300025-005 changes some modeled parameters and to comply with the re-modeling requirements, the Permittee made a decision to re-model for all pollutants as part of the permit issuance process.

The modeled emission rates for uncaptured DDGS loadout emissions are based on AP-42 Table 9.9.1-2 feed shipping PM10 emission factor and 95% collection efficiency. The resulting g/s emission rate is conservative (higher) compared to the emission rate measured by the BCES (which resulted in the BCES determined capture efficiency >95%). Due to MPCA concerns about the BCES determination of uncontrolled emission factor, the Permittee elected to take this conservative approach in determining the modeled emission rate for the uncaptured DDGS loadout emissions. Uncaptured PM10 and PM2.5 emissions from DDGS piling (FS 006) in the DDGS storage building were not modeled because these emissions are less than the modeling insignificant activities thresholds in the most current MPCA Air Dispersion Modeling Guidance (July 2014), and according to the July 2014 guidance can be ignored for Title V modeling purposes (modeling conducted for permit No. 06300025-005 is considered Title V modeling under the July 2014 guidance).

Results of the modeling were substantially different than results from the permit No. 06300025-004 modeling, primarily due to the elimination of coal as boiler fuel and removal or shutdown of all coal- and ash-related emission sources. Overall ambient impacts from PM10 and PM2.5 were substantially lower in the modeling for permit No. 06300025-005 compared to those for permit No. 06300025-004. Most notably, the PM2.5 24-hour total impact (from the facility, nearby sources, and background was 34.3 µg/m3 compared to the 35.0 µg/m3 24-hr NAAQS) decreased from 98% of the 24-hr PM2.5 NAAQS to (26.8 µg/m3) 76.6% of the 24-hr PM2.5 NAAQS. However, due to the use of the exclusion allowed by the May 2011 Paved Road Modeling memorandum, revisions were made to the FS 001 requirements and the Permittee is required to update the Appendix IV Fugitive Emissions Control Plan so that it does not conflict with the revised FS 001 requirements. The permit also states that the FS 001 requirements supersede the Appendix IV requirements until the Appendix IV plan is updated.

Page 20: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 20 of 33

Requirements for weekly road sweeping and recordkeeping were revised to requirements for daily inspection, and sweeping whenever fugitive dust is observed. The 250 trucks-per-day limit was removed, the daily grain receiving limit was increased from 3888 tons per day (tpd) to 5000 tpd, the straight truck grain delivery limit was increased from 756 tpd to 1000 tpd, and these receiving limits were moved from FS 001 to GP 001 because the limits are to restrict uncaptured emissions from grain receiving and not fugitive dust emissions from paved roads.

Table 6. Modeled Concentrations*

Pollutant Averaging Period

NAAQS/ Increment µg/m3

MAAQS µg/m3

Total Modeled Concentration (with background and nearby sources)

Percent of Standard

Remodeling Tier

NAAQS/ Increment MAAQS

CO 1-hour 40,000 35,000 1225 3.1% 3.5% 1 8-hour 10,000 10,000 314 3.1% 3.1% 1

NO2 1-hour 188 ---- 183 97.3% ---- 4 Annual 100 100 8.7 8.7% 8.7% 1

SO2

1-hour 196 1300 41.6 21.2% 3.2% 1 3-hour ---- 1300 33.5 ---- 2.6% 1 24-hour 365 365 15.0 4.1% 4.1% 1 Annual 80 60 11.0 13.8% 18.3% 1

PM10 24-hour 150 150 86.9 57.9% 57.9% 1 Annual ---- 50 27.6 ---- 55.2% 1

PM10

24-hr increment

30 ---- 18.4 61.3% ----

Annual increment

17 ---- 2.0 11.7% ----

PM2.5 24-hour 35 65 26.8 76.6% 41.2% 2 Annual 12 15 9.2 76.7% 61.3% 2

*Modeling data from ADQM06 11/22/2013 Section 3 Table 1 and Section 4 Table 3 3.3 Revisions to Existing PSD-based Permit Requirements

Permit No. 06300025-004 contained numerous Title I BACT-equivalent limits and requirements based on an August 2007 Prevention of Significant Deterioration (PSD) permit application (that was the basis for the December 2010 permit No. 06300025-004) to address and resolve backward-looking PSD issues. Many of these limits were originally written as lb/hr limits. As part of this permit action, the Permittee requested increases to some of these lb/hr limits.

To accommodate this request, the relevant lb/hr limits were converted to comparable lb/process unit limits, and the Title I BACT-equivalent citations were revised as described above in Section 1.3 ‘Other Changes’. The original lb/hr limits were increased as requested and the citation for the increased limits is ‘Title I Condition to avoid major source status under 40 CFR § 52.21 and Minn. R. 7007.3000’. This approach is acceptable because the facility changes prompting the limit increase are unrelated to the original changes/construction (that was subject subsequently to backward-looking PSD permitting), the changes will occur when the facility is a PSD non-major source (after the facility was subject to

Page 21: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 21 of 33

backward-looking PSD permitting), and, the (converted BACT-equivalent) limits are retained in the permit. 3.4 Monitoring

In accordance with the Clean Air Act, it is the responsibility of the owner or operator of a facility to have sufficient knowledge of the facility to certify that the facility is in compliance with all applicable requirements.

In evaluating the monitoring included in the permit, the MPCA considered the following: • the likelihood of the facility violating the applicable requirements; • whether add-on controls are necessary to meet the emission limits; • the variability of emissions over time; • the type of monitoring, process, maintenance, or control equipment data already available for

the emission unit; • the technical and economic feasibility of possible periodic monitoring methods; and • the type of monitoring found on similar units elsewhere.

The table below summarizes the monitoring requirements associated with this amendment.

Table 7. Monitoring

Subject Item*

Requirement (rule basis) Monitoring Discussion

Total Facility

Equipment Inventory: Maintain and update a written inventory of all emission units and control equipment that vent through SV 001, SV 002, SV 003, and SV 008. (Minn. R. 7007.0800, subp. 2)

Equipment inventory update on an as-needed basis, and annual reporting of equipment changes

These requirements track pre-authorized equipment changes allowed under SV 001, SV 002, SV 003, and SV 008 and play a role in verification that the facility has not become a major source under New Source Review or 40 CFR pt. 63.

GP 001 Grain unloading and DDGS loading operations restricted to 6 AM and 6 PM daily (Title I Condition: 40 CFR § 52.21(k) and Minn. R. 7007.3000; Minn. R. 7007.0800, subp. 4 & 5)

Recording and maintaining a log of the clock time completion of all grain truck deliveries and all DDGS loadouts

The daily delivery and loadout time period limit is based on modeling assumptions and recording the finish times of each grain receiving and DDGS loadout provides a direct determination of compliance with this requirement.

Page 22: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 22 of 33

Table 7. Monitoring

Subject Item*

Requirement (rule basis) Monitoring Discussion

SV 001 SV 002 SV 008

PM, PM10, and PM2.5 emissions testing (Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000; Minn. R. 7017.2020, subp. 1)

PM, PM10, and PM2.5

emissions stack testing due 90 days after any pre-authorized equipment change

Stack testing is necessary and a valid method for verifying compliance with PM, PM10, and PM2.5 emission limits after making a pre-authorized equipment change. Notification is required upon completion of pre-authorized changes to trigger the stack testing requirements.

SV 003 VOC and HAP emissions stack testing (Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000; Title I condition: To avoid major source threshold under 40 CFR § 63.2 and Minn. R. 7011.7000; Minn. R. 7017.2020, subp. 1)

VOC and HAPemissions stack testing due 90 days after any pre-authorized equipment installation

Stack testing is necessary and a valid method for verifying compliance with VOC and HAP emission limits after making a pre-authorized equipment change. Notification is required upon completion of pre-authorized changes to trigger the stack testing requirements.

SV 003 SV 004 SV 007 EU 035/ CE 028

HAP emissions testing (Title I Condition: To avoid major source threshold under 40 CFR § 63.2 and 7011.7000; Minn. R. 7017.2020, subp. 1)

Routine periodic HAP emissions stack testing currently at 36-month intervals

Routine periodic testing is necessary and the preferable method for determining compliance with single HAP (acetaldehyde, acrolein, formaldehyde, and methanol) limits.

CE 003 CO2 Fermenta-tion Scrubber

Scrubber Additive Flow Rate: Greater than or equal to 5.7 gph; Acetaldehyde, Acrolein, Formaldehyde, and Methanol: > 98% control efficiency (Title I Condition: to avoid major source threshold under 40 CFR § 63.2 and Minn. R. 7011.7000)

Daily monitoring and recordkeeping of additive flow rate

The scrubber liquid additive (sodium bisulfite) enhances HAPs collection efficiency. Therefore monitoring the additive injection rate to the scrubber water provides an indication of compliance for HAP emissions.

Page 23: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 23 of 33

Table 7. Monitoring

Subject Item*

Requirement (rule basis) Monitoring Discussion

CE 005 (Regener-ative Thermal Oxidizer (RTO))

VOC and CO: Control Efficiency of >98% and PM, PM10, and PM2.5: Control Efficiency >95% (Title I Condition: 1990 CAAA; Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000)

HAP: Control Efficiency of >98% (Title I Condition: To avoid major source threshold under 40 CFR § 63.2 and Minn. R. 7011.7000)

Firebox Temperature ≥ 1400 °F at the combustion chamber (Title I Condition: 1990 CAAA; Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000; Title I Condition: To avoid major source threshold under 63.2 and Minn. R. 7011.7000)

Continuous temperature monitoring (MR 005), RTO equipment O&M, inspections, annual temperature monitor calibration

RTO combustion chamber temperature is a direct indicator of RTO control efficiency for these pollutants. The firebox minimum temperature value may be revised based on the temperatures recorded during a performance test that demonstrated compliance for any pollutant controlled by the RTO.

Page 24: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 24 of 33

Table 7. Monitoring

Subject Item*

Requirement (rule basis) Monitoring Discussion

CE 028 (Direct Flame After-burner)

VOC and CO: Control Efficiency of >98% and PM, PM10, and PM2.5: Control Efficiency >95% (Title I Condition: 1990 CAAA; Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000)

HAP: Control Efficiency of >98% (Title I Condition: To avoid major source threshold under 40 CFR § 63.2 and Minn. R. 7011.7000)

Firebox Temperature ≥ 1575 °F at the combustion chamber (Title I Condition: To avoid major source threshold under 40 CFR § 52.21 and Minn. R. 7007.3000; Title I Condition: To avoid major source threshold under 63.2 and Minn. R. 7011.7000)

Continuous temperature monitoring (MR 006), RTO equipment O&M, inspections, annual temperature monitor calibration

Direct flame afterburner combustion chamber temperature is a direct indicator of direct flame afterburner control efficiency for these pollutants. The firebox minimum temperature value may be revised based on the temperatures recorded during a performance test that demonstrated compliance for any pollutant controlled by the direct flame afterburner.

*Location of the requirement in the permit (e.g., EU, SV, GP, etc.). 3.5 Insignificant Activities

Heron Lake BioEnergy, LLC has several operations which are classified as insignificant activities under the MPCA’s permitting rules. These are listed in Appendix III to the permit. No new insignificant activities are associated with this permit amendment. 3.6 Permit Organization

In general, the permit meets the MPCA Delta Guidance for ordering and grouping of requirements. One area where this permit deviates slightly from Delta guidance is in the use of appendices. While appendices are fully enforceable parts of the permit, in general, any requirement that the MPCA thinks

Page 25: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 25 of 33

should be electronically tracked (e.g., limits, submittals, etc.), should be in Table A or B of the permit. The main reason is that the appendices are word processing documents and are not part of the electronic tracking system. Violation of the appendices can be enforced, but the computer system will not automatically generate the necessary enforcement notices or documents. Staff must generate these.

Another area that deviates from the guidance is in the use of groups where the requirements in the group apply to the members of the group individually. This was done in order to shorten the permit and where no testing or tracking specific to a unit is in the permit (thereby reducing the likelihood that there where will be further unit-specific requirements later). This is the case for the requirements at GP 001 (Grain Receiving and DDGS Loadout). 3.7 Comments Received

Public Notice Period: <start date> - <end date> EPA 45-day Review Period: <start date> - <end date> 4. Permit Fee Assessment

Attachment 3 to this TSD contains the MPCA assessment of Application and Additional Points used to determine the permit application fee for this permit action as required by Minn. R. 7002.0019. The permit action includes one major amendment permit application (4640), and four administrative amendment applications (3380, 3528, 3694, 3771) all received after the effective date of the fee rule (July 1, 2009).

Additional points apply to the major amendment changes due to: 1) establishment of HAP limits and requirements to avoid the pt. 63 major source threshold; 2) revision of the ethanol production limit (which is used to avoid NSR and pt. 63 major source status); and, 3) revision of NSPS subp. Db applicable requirements due to the boiler fuel change. Additional point fees do not apply to the administrative amendment changes. This permit action also includes two re-openings (4399 and 4907) for CE 003 operating parameters based on 2012 and 2014 stack testing that do not incur additional point fees. 5. Conclusion

Based on the information provided by Heron Lake BioEnergy, LLC, the MPCA has reasonable assurance that the proposed operation of the emission facility, as described in the Air Emission Permit No. 06300025-005 and this TSD, will not cause or contribute to a violation of applicable federal regulations and Minnesota Rules. Staff Members on Permit Team: Marshall Cole (permit engineer)

Cory Boeck (enforcement) Curt Stock (compliance) Tarik Hanafy (peer reviewer) Dennis Becker (modeling review) Steve Irwin (modeling review) Beckie Olson (permit writing assistant) Laurie O’Brien (administrative support)

AQ File No. 4212; DQ 4640 (primary), 3380, 3528, 3694, 3771, 3837, 4399, 4508, and 4907.

Page 26: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Technical Support Document, Permit Action Number: 06300025-005 Page 26 of 33

Attachments: 1. Emission Calculations

2. Facility Description and CD-01 Forms 3. Points Calculator 4. February 2012 AERA Revision Not Required Email 5. Modeling Data 6. May 2011 MPCA Paved Road Modeling Policy Memorandum 7. EPA Environmental Justice Screening Email

Page 27: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Attachment 1 - Emissions Calculations

Page 28: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC Permit No. 6300025-005

Major Air Permit Amendment 100% DDGS CapabilityMajor Air Permit Amendment 779,774 tons/yr grain72.25MM gallons/year Anhydrous Ethanol 246,125 tons/yr DDGS23-Sep-14 Revised by MPCA staff SV 004 & EU 035/CE 028 emissions are not double counted when worst case is not both SV 004 and EU 035 operating

Stack ID Emission Source PM (tpy) PM10 (tpy) PM2.5 (tpy) SO2 (tpy) NOx (tpy) CO (tpy) VOC (tpy) Single HAP (Acetaldehyde) (tpy) Total HAP (tpy) CO2 (tpy) CH4 (tpy) N2O (tpy) CO2e (tpy)

SV 001 Grain Unloading Baghouse 5.86 5.86 5.86

SV 002 Hammermilling Baghouse 4.13 4.13 4.13

SV 003 Fermentation (CO2) Scrubber 0.18 0.18 0.18 26.42 4.80 4.95 227,226.25 227,226

SV 004 Dryers & RTO System 14.25 14.25 14.25 33.87 10.22 50.65 37.64 0.66 1.53 11,216.79 0.42 0.08 11,251SV 005

(EU 035) Combustor (Natural Gas) w/ DDGS Dryers and Distillation 24.37 24.37 24.37 33.84 91.98 115.47 41.93 0.69 3.59 107,594.59 2.03 0.20 107,706

SV 007 DDGS Cooling System w/ Baghouse 4.20 4.20 4.20 58.11 0.66 1.31

SV 008 DDGS Loadout Baghouse 1.58 1.58 1.58

SV 009 Ethanol Loadout Flare (truck/rail) 1.18 6.22 0.87 5.35E-04 5.61E-04 3,020 0.14 0.028 3,074

SV 017 Emergency Fire Pump (IC Engine) 0.01 0.01 0.01 0.03 0.19 0.09 0.06 17.12 0.0007 0.00014 17.18

SV 020 Emergency Admin Bldg Generator (IC Engine) 0.03 0.03 0.03 0.03 0.42 0.09 0.03 15.29 0.0006 0.00012 15.35

EU 054 Emergency Boiler Feed Water Pump Generator (IC Engine) 0.002 0.002 0.002 0.06 0.75 0.02 7.28 0.0003 0.00007 7.31

TOTALS: 40.37 40.37 40.37 34.48 104.04 123.49 128.12 6.14 10.33 337,881 2.17 0.23 338,046

Fug Source ID

Fugitive/Uncaptured Emission Source PM (tpy) PM10 (tpy) PM2.5 (tpy) SO2 (tpy) NOx (tpy) CO (tpy) VOC (tpy) Single HAP (Acetaldehyde) (tpy) Total HAP (tpy) CO2 (tpy) CH4 (tpy) N2O (tpy) CO2e (tpy)

FS 001 Truck Traffic 13.14 2.63 0.65

FS 002 Uncaptured Grain Handling 1.25 0.35 0.06

FS 003 Uncaptured DDGS Handling 0.02 0.005 0.005

FS 004 Equipment Leaks 8.78 1.36 1.53

GP 006 Storage Tanks 2.93 2.41E-04 0.34

FS 005 Cooling Towers (4-Cells) 1.64 1.64 1.64

FS 006 Uncaptured DDGS Building Storage Pile Emissions 0.64 0.15 0.15

FS 007 Ethanol Loadout (truck and rail) 4.88 4.75E-05 1.58

FS 011 Wet-cake Storage (not in TOTALS; worst case is all DDGS) 2.62 0.21 0.29

TOTALS, with Fugitives, as applicable 42.27 40.88 40.58 34.48 104.04 123.49 139.83 7.50 13.79 337881 2.17 0.23 338,046

Notes: Major Amendment PTE Comparison (TPY; NOT A PSD APPLICABILITY ANALYSIS):

- Since natural fermentation ethanol production plants are no longer included in the EPA 28-source categories list, Current Major

criteria pollutant fugitive emissions do not count towards PTE permitting threshold determinations. Permit* Amend*

unless regulated by a post 8/7/80 NSPS (FS 004 subject to subp. VV and GP 006 subject to subp. Kb). PM 57.2 42.3 -14.93

- CO2e emissions based on global warming potentials from 40 CFR pt. 98. PM10 238.6 40.9 -197.72

PM2.5 238.6 40.6 -198.02SO2 220.4 34.5 -185.92NOx 233.8 104.0 -129.76CO 177.2 123.5 -53.71VOC 107.2 139.8 32.63CO2 412,201 337,881 -74,320CH4 24.14 2.17 -21.97N2O 3.55 0.23 -3.32CO2e 413,904 338,046 -75,858Single HAP 7.40 7.50 0.10Total HAP 17.13 13.79 -3.34Note: * Fugitive emissions not included except for HAPs

Difference

Page 29: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

HLBE - Hazardous Air Pollutant (HAP) Emissions SummaryMajor Air Permit AmendmentCompound CO2 RTO Nat Gas DDGS Cooling Loadout Component Storage Truck & Railcar

Scrubber (tpy) (tpy) Combustor (tpy) System (tpy) Flare Leaks (tpy) Tanks (tpy) Loading (tpy) TOTAL

SV 003 SV 004 EU 035/SV 005 SV 007 SV 009 FS 004 FS 005 FS 007

2-Methylnaphthale 1.86E-06 2.16E-05 7.13E-09 2.35E-05Acetaldehyde 4.80E+00 6.57E-01 6.89E-01 6.57E-01 1.36E+00 2.41E-04 4.75E-05 7.50E+00Acrolein 2.63E-02 6.57E-02 1.62E-01 1.31E-01 3.95E-02 3.60E-01Arsenic 1.55E-05 1.80E-04 5.94E-08 1.96E-04Benzene 1.62E-04 1.89E-03 6.24E-07 2.52E-03 1.20E-01 1.24E-01Cadmium 8.50E-05 9.92E-04 3.27E-07 1.08E-03Carbon disulfide 2.70E-05 2.70E-05Chromium 1.08E-04 1.26E-03 4.16E-07 1.37E-03Cobalt 6.49E-06 7.57E-05 2.50E-08 8.23E-05Cumene 1.35E-04 4.88E-02 4.89E-02Dichlorobenzene 9.28E-05 1.08E-03 3.56E-07 1.18E-03Ethylbenzene 7.96E-03 9.75E-02 1.05E-01Fluoranthene 2.32E-07 2.71E-06 8.91E-10 2.94E-06Fluorene 2.16E-07 2.52E-06 8.32E-10 2.74E-06Formaldehyde 6.57E-02 3.34E-01 8.31E-01 2.63E-01 2.23E-05 1.48E-03 1.49E+00Hexane 1.39E-01 1.62E+00 5.35E-04 5.01E-02 2.14E-03 1.82E+00Maganese 2.94E-05 3.43E-04 1.13E-07 3.72E-04Mercury 2.01E-05 2.34E-04 7.72E-08 2.55E-04Methanol 6.57E-02 3.29E-01 2.71E-01 2.63E-01 1.32E-01 1.98E-01 4.75E-05 9.29E-01Naphthalene 4.71E-05 5.50E-04 1.81E-07 5.97E-04Nickel 1.62E-04 1.89E-03 6.24E-07 2.06E-03Phenanthrene 1.31E-06 1.53E-05 5.05E-09 1.66E-05Pyrene 3.86E-07 4.51E-06 1.49E-09 4.90E-06Toluene 2.63E-04 3.07E-03 1.01E-06 6.75E-03 7.31E-01 7.41E-01Xylenes 7.96E-02 5.85E-01 6.65E-013-methylchloranthrene 1.39E-07 1.62E-06 5.35E-10 1.76E-067,12-dimethylbenz(a)anthracene 1.24E-06 1.44E-05 4.75E-09 1.57E-05acenaphthene 1.39E-07 1.62E-06 5.35E-10 1.76E-06acenaphthylene 1.39E-07 1.62E-06 5.35E-10 1.76E-06benz(a)anthracene 1.39E-07 1.62E-06 5.35E-10 1.76E-06benzo(a)pyrene 9.28E-08 1.08E-06 3.56E-10 1.18E-06benzo(b)fluoranthene 1.39E-07 1.62E-06 5.35E-10 1.76E-06benzo(g,h,i)perylene 9.28E-08 1.08E-06 3.56E-10 1.18E-06benzo(k)fluoranthene 1.39E-07 1.62E-06 5.35E-10 1.76E-06beryllium 9.28E-07 1.08E-05 3.56E-09 1.18E-05chrysene 1.39E-07 1.62E-06 5.35E-10 1.76E-06dibenzo(a,h)anthracene 9.28E-08 1.08E-06 3.56E-10 1.18E-06indeno(1,2,3-cd)pyrene 1.39E-07 1.62E-06 5.35E-10 1.76E-06lead 3.86E-05 4.51E-04 1.49E-07 4.90E-04selenium 1.86E-06 2.16E-05 7.13E-09 2.35E-05

Total: 4.95 1.53 3.59 1.31 5.61E-04 1.53 0.34 1.58 13.79

Page 30: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

GHG Emissions - Change in PTE SummaryMajor Air Permit AmendmentHeron Lake Bioenergy, LLC, Heron Lake, MN72.25MM gallons/year Anhydrous Ethanol(No adjustment made to prevent double counting SV 004 and SV 005 GHG emissions)

Current Limited Potential Emissions Limited Potential Emissions from Proposed Modification Operations

CO2 (tpy) CH4 (tpy) N2O (tpy) Mass Basis (tpy) CO2e (tpy) CO2 (tpy) CH4 (tpy) N2O (tpy) Mass Basis (tpy) CO2e (tpy)

SV003Fermentation

Scrubber 188,386 --- --- 188,386 188,386 227,226 --- --- 227,226 227,226 38,840.75SV004 RTO 11,167 0.44 0.08 11,168 11,203 11,217 0.42 0.08 11,217 11,251 47.65

SV005

BFB Combustor/Natural

Gas Combustor 206,423 23.37 3.40 206,450 208,020 107,595 2.03 0.20 107,597 107,706 -100,314.71SV006 Methanator Flare 3,285 0.1965 0.0387 3,285 3,301 UNIT NO LONGER IN OPERATION -3,301.10

SV009 Ethanol Loadout Flare 2,901 0.1362 0.0272 2,943 2,954 3,020 0.14 0.0284 3,062 3,074 120.17SV017 Firewater Pump 17.12 0.0006944 0.000139 17.12 17.18 17.12 0.00069445 0.00014 17.12 17.18 0.00

SV020Admin Emergency

Generator 15.29 0.0006204 0.000124 15.30 15.35 15.29 0.00062037 0.00012 15.30 15.35 0.00

SV022Emergency Boiler Water Feed Pump 7.28 0.00035 0.00007 7.28 7.31 7.28 0.00034722 0.00007 7.28 7.31 0.00

TOTAL 412,270.88 413,904.33 349,142.48 349,297.09 39,008.56

Stack ID Emission Source INCREASES ONLY (tpy)

Page 31: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Grain & DDGS Handling Emissions:Major Air Permit Amendment FS002, FS003

Emission Factor Basis: - Baghouse PM/PM10/PM2.5 emission factor of 0.004 grains/scf based on current permit limit

- Uncontrolled baghouse emissions assume 99% baghouse control for PM/PM10/PM2.5. - 'Fugitive' (uncaptured) emissions based on AP-42 Section 9.9 - Particulate Emission Factors for Grain Elevators. - 95% capture efficiency assumed for both grain unloading and DDGS loading from all control equipment combined

Grain & DDGS Handling Baghouses:PM,PM10 & PM2.5 Emissions:

ID Emission SourceBaghouse

Airflow(acfm)

Emission Factor (gr/scf)

Hours of Operation

(hrs/yr)

Controlled PM/PM10/PM2.5 Emissions (lbs/hr)

Controlled PM/PM10/PM2.5

Emissions (tons/yr)

Uncontrolled PM/PM10/PM2.5

Emissions (tons/yr)

SV001 Unloading Baghouse 39,000 0.004 8,760 1.34 5.86 585.67SV002 Hammermill Baghouse 27,500 0.004 8,760 0.94 4.13 412.97SV007 DDGS Cooling System 28,000 0.004 8,760 0.96 4.20 420.48SV008 DDGS Loadout Baghouse 10,500 0.004 8,760 0.36 1.58 157.68

PTE (lb/hr) = Baghouse airflow (acfm) x EF (gr/scf) x 60 min/hr ÷ 7,000 lbs/grPTE (tpy) = lb/hr Emissions x Operation Time (hrs/yr )÷ 2,000 lbs/ton

Uncontrolled PTE (tpy) = Controlled PTE ÷ (1- Control Efficiency (percent))

Grain & DDGS Handling Uncaptured (aka Fugitive) Emissions:PM Emissions:

Model ID Emission Source Throughput (tpy)

PM Emission Factor (lb/ton)

Potential Uncontrolled

PM (tpy)

Capture Efficiency (%)

Limited Potential Uncaptured PM (tpy)

Fugitives Receiving (Hopper Truck) 623,820 0.035 10.9 95 0.55Fugitives Receiving (Straight Truck) 155,955 0.18 14.0 95 0.70

FS002 Grain Unloading Tota 1.25FS003 DDGS Loading 246,125 0.0033 0.4 95 0.02

Grain & DDGS Handling Uncaptured (aka Fugitive) Emissions:PM10 Emissions:

Model ID Emission Source Throughput (tpy)

PM10 Emission Factor (lb/ton)

Potential Uncontrolled PM10 (tpy)

Capture Efficiency (%)

Limited Potential Uncaptured PM10 (tpy)

Fugitives Receiving (Hopper Truck) 623,820 0.0078 2.4 95 0.12Fugitives Receiving (Straight Truck) 155,955 0.059 4.6 95 0.23

FS002 Grain Unloading Tota 0.35FS003 DDGS Loading 246,125 0.0008 0.1 95 0.005

Grain & DDGS Handling Uncaptured (aka Fugitive) Emissions:PM2.5 Emissions:

Model ID Emission Source Throughput (tpy)

PM2.5 Emission Factor (lb/ton)

Potential Uncontrolled PM2.5 (tpy)

Capture Efficiency (%)

Limited Potential Uncaptured PM2.5 (tpy)

Fugitives Receiving (Hopper Truck) 623,820 0.0013 0.4 95 0.02Fugitives Receiving (Straight Truck) 155,955 0.01 0.8 95 0.04

FS002 Grain Unloading Tota 0.059FS003 DDGS Loading 246,125 0.0008 0.1 95 0.005

Notes: - 'Fugitives' are uncaptured PM/PM10/PM2.5 - Assumes ethanol plant receives all grain by truck/railcar - Assumes additional control of 'fugitives' (~95%) by enclosed system - Uncaptured lb/hr emissions are uncaptured tpy converted to lb/hr at 12 hr/day operation

PTE Uncontrolled (tpy) = Throughput (tph) x AP-42 EF (lb/ton) ÷ 2,000 lb/tonPTE Controlled (tpy) = Uncontrolled PTE (tpy) ÷ (1- Control Efficiency (percent))

Page 32: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Grain & DDGS Handling Emissions (24-Hour Maximum - For Air Modeling Only)Major Air Permit Amendment FS002, FS003

Emission Factor Basis: - Baghouse PM10/PM2.5 emission factor of 0.004 grains/scf based on current permit limit. - Fugitive emissions based on AP-42 Section 9.9 - Particulate Emission Factors for Grain Elevators.

- 95% capture efficiency assumed for both grain unloading and DDGS loading from all control equipment combined. - Unloading/loading operations will only occur from 6:00 AM to 6:00 PM, 7 days per week. - Maximum hourly emissions are based on maximum truck/rail unloading and loading rates or maximum equipment capacity as follows:

Grain Unloadin 416.67 Tons per hour of grain via truck based on 200 grain trucks per day max, 25 ton per load and 12-hour delivery schedule (5,000 tons/day).DDGS Loading 400 Tons per hour based on maximum DDGS loadout equipment capacity.

Grain & DDGS Handling Baghouses:PM10 & PM2.5 Emissions:

ID Emission SourceBaghouse

Airflow(acfm)

Emission Factor (gr/scf)

Hours of Operation(hrs/yr)

Controlled PM/PM10/PM2.5 Emissions (lbs/hr)

Controlled PM/PM10/PM2.5

Emissions (tons/yr)SV001 Unloading Baghouse 39,000 0.004 8,760 1.34 5.86SV002 Hammermill Baghouse 27,500 0.004 8,760 0.94 4.13SV007 DDGS Cooling System 28,000 0.004 8,760 0.96 4.20SV008 DDGS Loadout Baghouse 10,500 0.004 8,760 0.36 1.58

PTE (lb/hr) = Baghouse airflow (acfm) x EF (gr/scf) x 60 min/hr ÷ 7,000 lbs/grPTE (tpy) = lb/hr Emissions x Operation Time (hrs/yr )÷ 2,000 lbs/ton

Grain & DDGS Handling Fugitive Emissions:PM10 Emissions:

Model ID Emission Source Throughput (tph) PM10 Emission Factor (lb/ton)

Potential Uncaptured PM10 (g/s) Capture Efficiency (%)

Total PM10 Uncaptured

Emissions (g/s)

Per Volume Source (g/s)

Fugitives Receiving (Hopper Truck) 333.3 0.0078 3.28E-01 95 1.64E-02 ---Fugitives Receiving (Straight Truck) 83.3 0.059 6.20E-01 95 3.10E-02 ---

HLBFS02N/S Grain Unloading Total 4.74E-02 2.37E-02 Divide by 2HLBFS03N/S DDGS Loading 400 0.0008 4.03E-02 95 2.02E-03 1.01E-03 Divide by 2

PM2.5 Emissions:

Model ID Emission Source Throughput (tph) PM2.5 Emission Factor (lb/ton)

Potential Uncaptured PM2.5 (g/s) Capture Efficiency (%)

Total PM2.5 Uncaptured

Emissions (g/s)

Per Volume Source (g/s)

Fugitives Receiving (Hopper Truck) 333 0.0013 5.46E-02 95 2.73E-03 ---Fugitives Receiving (Straight Truck) 83 0.01 1.05E-01 95 5.25E-03 ---

HLBFS02N/S Grain Unloading Total 7.98E-03 3.99E-03 Divide by 2HLBFS03N/S DDGS Loading 400 0.0008 4.03E-02 95 2.02E-03 1.01E-03 Divide by 2

PTE Uncaptured (g/s) = Throughput (tph) x AP-42 EF (lb/ton) x 453.59 g/lb ÷ (60 mins/hr x 60 s/min)PTE Fugitive (g/s) = Uncaptured PTE (g/s) ÷ (1- Control Efficiency (percent))

Uncaptured Emissions

pollutant FS 002 lb/hr FS 003 lb/hrFS 002 unrestricted

tpyFS 003

unrestricted tpyPM 1.33 0.066 5.84 0.29PM10 0.38 0.016 1.65 0.07PM2.5 0.063 0.016 0.28 0.07

Page 33: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Major Air Permit Amendment

Max Hourly Capacity (tons/hr)

PM Emission Factor (lb/ton)

PM10 Emission

Factor (lb/ton)

PM2.5 Emission

Factor (lb/ton)

Potential Uncontrolled

PM (lb/hr)

Potential Uncontrolled PM10 (lb/hr)

Potential Uncontrolled PM2.5 (lb/hr)

Capture Efficiency

(%)

Potential Controlled PM (lb/hr)

Potential Controlled

PM10 (lb/hr)

Potential Controlled

PM2.5 (lb/hr)

Potential Controlled PM (tpy)

Potential Controlled PM10 (tpy)

Potential Controlled

PM2.5 (tpy)

DDGS Storage Building - Dr 22 0.0033 0.0008 0.0008 0.07 0.02 0.02 0% 0.073 0.018 0.018 0.318 0.077 0.077DDGS Storage Building - Mo 22 0.0033 0.0008 0.0008 0.07 0.02 0.02 0% 0.073 0.018 0.018 0.318 0.077 0.077

Total: 0.145 0.035 0.035 0.636 0.154 0.154Basis: ‐ Emission factor from AP‐42, Section 9.9 Feed Shipping.  PM2.5 factor is assumed equal to PM10 factor. 4.44E‐03 g/s for PM10 and PM2.5 each

 ‐ Emissions are based on 22 tons/hr dropping into the building and all 22 tons being moved to the storage silo conveyor.

Page 34: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Fermentation (CO2) Scrubber Outlet:Major Air Permit Amendment

Emission Factor Basis: - PM/PM10/PM2.5 based on current permit PM limit. - VOC emissions based on current permit limit of 5.0 lb/hr and adjusted based on an increased undenatured ethanol production rate of 72.25 MMGal/yr.

- HAP emissions based on June 2011 stack testing plus a 50% margin of safety for increased ethanol production rate. - Uncontrolled VOC emisisons were calculated based on the permitted control efficiency of 98%. Uncontrolled HAP emissions also assumed a control efficiency of 98%, although HAP control efficiency is not a permit requirement.

Pollutant Hours of Operation Current Permit Limit (lb/hr)

Controlled PTE (lb/hr)

Controlled PTE (tons/yr)

Uncontrolled PTE (tons/yr)

VOC 8,760 5.0 6.0 26.42 1,320.76PM/PM10/PM2.5 8,760 0.04 0.04 0.18 0.18HAPs:Acetylaldehyde 8,760 N/A 1.10 4.80 239.81Acrolein 8,760 N/A 0.006 0.026 1.31Methanol 8,760 N/A 0.015 0.066 3.29Formaldehyde 8,760 N/A 0.015 0.066 3.29

Total HAPs: 1.13 4.95 247.69Corrected EF-VOCs (lb/hr)= Current Permit Limit (lb/hr) x (72.25/59.9)Corrected EF-HAPs (lb/hr)= Most recent Stack test (lb/hr) x 50% Margin of safety

PTE (tpy) = lb/hr Emission Rate x Operating Time ÷ 2,000 lbs/tonUncontrolled PTE (tpy) = Controlled PTE ÷ (1- Control Efficiency (percent))

Basis: 5 lb/hr * 8760 / 59.9 MMGPY = 731.22 lb VOC/million gallons of ethanol (annually)

Production Emission Factor Controlled VOCMMGPY lb VOC /MMGPY TPY

59.9 731.22 21.9072.25 731.22 26.42

ProductionCurrent Permitted Rate

Proposed Permitted Rate

Page 35: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Emissions from the Fermentation Scrubber (Biogenic):Major Air Permit Amendment

Basis: - Emissions are based on current and proposed permitted ethanol production rates. - CO2 EF from EPA Draft December 2010 document - Greenhouse Gas Emissions Estimation Methodologies for Biogenic Emissions from Selected Source Categories: Solid Waste Disposal, Wastewater Treatment, Ethanol Fermentation

CO2 Current Potential Emissions:

Pollutant E Factor ETOH throughput PTE PTElb/gal ETOH gal/yr lb/hr tpy

CO2 6.29 59,900,000 43,010.4 188,385.5Mass Basis Total (tpy) 188,385.50

Total CO2e (tpy) 188,385.50

CO2 Potential Emissions from Proposed Modification Operations:

Pollutant E Factor ETOH throughput PTE PTElb/gal ETOH gal/yr lb/hr tpy

CO2 6.29 72,250,000 51,878.1 227,226.3Mass Basis Total (tpy) 227,226.25

Total CO2e (tpy) 227,226.25

Page 36: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Emissions from the RTO System (Nat Gas Combustion, Dryers, Distillation Process Vents):Major Air Permit Amendment

Emission Factor Basis: - RTO can combust natural gas or propane and is used as the VOC/HAP control device for DDGS drying and distillation processes if SV 005 is not being used as the control device. - PM10 and PM2.5 assumed to equal PM.

- PM/PM10/PM2.5 emission rates include condensibles. - Emissions for criteria pollutants are based on current permit limits, however, they have been adjusted based on an increased undenatured ethanol production rate of 72.25 MMGal/yr. - Uncontrolled VOC and CO emisisons are based on a control efficiency of 98%. - Uncontrolled PM/PM10/PM2.5 emissions are based on a control efficiency of 95%. - RTO Maximum design rate: 18 MMBtu/hr - BTU content of natural gas: 1,020 Btu/scf - Assumed operation time: 8,760 hrs/yr

Pollutant E Factors Current Permit Controlled PTE Controlled PTE Uncontrolled PTElb/MMBtu Limit (lb/hr) lb/hr tpy tpy

NOx --- 1.9 2.33 10.22 10.22SO2 --- 6.3 7.73 33.87 33.87CO --- 9.42 11.56 50.65 2,532.39VOC --- 7.0 8.59 37.64 1,881.82PM/PM10/PM2.5 --- 2.65 3.25 14.25 284.96

Corrected EF (NO x , SO 2 , CO, VOC, PM/PM 10 /PM 2.5 ) (tpy) = Current Permit Limit (lb/hr) x (72.25/59.9)PTE (CO 2 /CH 4 /N 2 O) (lb/hr)= lb/MMBtu factor x MMBtu/hr design rate

PTE (CO 2 /CH 4 /N 2 O) (tpy)= lb/hr Emission Rate x Operating Time ÷ 2,000 lbs/tonPTE (NO x , SO 2 , CO, VOC, PM/PM 10 /PM 2.5 ) (tpy) = lb/hr Emission Factor x Operation Time (hrs/yr)

Uncontrolled PTE (tpy) = Controlled PTE ÷ (1- Control Efficiency (percent))

Emission Factor Basis = current permit limit * 8760 / 200,503 tons current DDGS, rounded to nearest 0.00Current DDGS 200,503 tpyProposed DDGS 246,125 tpy

Pollutant E Factor Estimated E Factor Controlled PTE Controlled PTElb/MMBtu lb/ton DDGS lb/ton DDGS lb/hr TPY

NOx 0.1 0.083 --- 2.33 10.22SO2 --- 0.275 0.280 7.73 33.87CO --- 0.412 0.410 11.56 50.65VOC --- 0.306 0.300 8.59 37.64PM/PM10/PM2.5 --- 0.116 0.120 3.25 14.25

Page 37: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Major Air Permit Amendment

Emission Factor Basis: - HAP emission factors are for natural gas and are from AP-42, Table 1.4-3 and 1.4-4 since there are no HAP emission factors for propane. - Emissions factors in AP-42 marked as "less than" are omitted as emissions are considered negligible. - Butane, ethane, propane and pentane are assumed to be combusted and therefore negligible. - Process HAP emissions based on June 2011 stack testing plus a 50% margin of safety. - Uncontrolled process HAP emissions are based on an assumed control efficiency of 98%

RTO Maximum Heat Rating = 18 MMBtu/hr1020 BTU/scf

17,647 scf/hr155 MMscf/yr

Operating Hours: 8,760 hr/yr

Natural Gas Combustion:Uncontrolled Uncontrolled Uncontrolled

Emission Factor PTE PTE PTEHAP (lb/million ft3) (lb/yr) (tpy) (lb/hr)

Hexane 1.8 278.3 1.39E-01 3.18E-02Formaldehyde 7.50E-02 11.6 5.80E-03 1.32E-03Toluene 3.40E-03 0.53 2.63E-04 6.00E-05Benzene 2.10E-03 0.32 1.62E-04 3.71E-05Nickel 2.10E-03 0.32 1.62E-04 3.71E-05Chromium 1.40E-03 0.22 1.08E-04 2.47E-05Dichlorobenzene 1.20E-03 0.19 9.28E-05 2.12E-05Cadmium 1.10E-03 0.17 8.50E-05 1.94E-05Naphthalene 6.10E-04 0.09 4.71E-05 1.08E-05Manganese 3.80E-04 0.06 2.94E-05 6.71E-06Mercury 2.60E-04 0.04 2.01E-05 4.59E-06Arsenic 2.00E-04 0.03 1.55E-05 3.53E-06Cobalt 8.40E-05 0.01 6.49E-06 1.48E-062-Methylnaphthalene 2.40E-05 0.004 1.86E-06 4.24E-07Phenanthrene 1.70E-05 0.003 1.31E-06 3.00E-07Pyrene 5.00E-06 0.001 3.86E-07 8.82E-08Fluoranthene 3.00E-06 0.0005 2.32E-07 5.29E-08Fluorene 2.80E-06 0.0004 2.16E-07 4.94E-083-methylchloranthrene 1.80E-06 0.0003 1.39E-07 3.18E-087,12-dimethylbenz(a)anthracene 1.60E-05 0.0025 1.24E-06 2.82E-07acenaphthene 1.80E-06 0.0003 1.39E-07 3.18E-08acenaphthylene 1.80E-06 0.0003 1.39E-07 3.18E-08benz(a)anthracene 1.80E-06 0.0003 1.39E-07 3.18E-08benzo(a)pyrene 1.20E-06 0.0002 9.28E-08 2.12E-08benzo(b)fluoranthene 1.80E-06 0.0003 1.39E-07 3.18E-08benzo(g,h,i)perylene 1.20E-06 0.0002 9.28E-08 2.12E-08benzo(k)fluoranthene 1.80E-06 0.0003 1.39E-07 3.18E-08beryllium 1.20E-05 0.0019 9.28E-07 2.12E-07chrysene 1.80E-06 0.0003 1.39E-07 3.18E-08dibenzo(a,h)anthracene 1.20E-06 0.0002 9.28E-08 2.12E-08indeno(1,2,3-cd)pyrene 1.80E-06 0.0003 1.39E-07 3.18E-08lead 5.00E-04 0.0773 3.86E-05 8.82E-06selenium 2.40E-05 0.0037 1.86E-06 4.24E-07Total HAPs from Combustion: 291.93 0.146 3.33E-02

PTE (lb/yr) = AP-42 lb/MMscf factor x MMscf/yrPTE (tpy) = lb/yr PTE ÷ 2,000 lbs/ton

Process Emissions (only if SV 004 used as control device):Controlled Controlled Controlled Uncontrolled

Emission Factor PTE PTE PTEHAP (lb/hr) (lb/yr) (tpy) (tpy)

Formaldehyde 0.075 657.00 0.33 16.43Acetaldehyde 0.150 1,314.00 0.66 32.85Acrolein 0.015 131.40 0.07 3.29Methanol 0.075 657.00 0.33 16.43

Total HAPs from RTO :(only if SV 004 is used as control device)

Corrected EF-Process HAPs (lb/hr)= Most recent Stack test (lb/hr) x 50% Margin of safetyControlled HAP (lb/yr) = Emission Factor (lb/hr) x 8760 hr/yr

Controlled HAP (tpy) = Controlled HAP lb/yr * ton/2000 lbUncontrolled HAP (tpy) = Controlled HAP tpy/(1-HAP Control Efficiency)

RTO HAP Emissions:

3,051.33 1.526 69.130.348

Page 38: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Emissions from the RTO:Major Air Permit Amendment

Basis: - CO2, N2O & CH4 factors from 40 CFR Part 98 Tables C-1 and C-2 for ethanol vapor and propane. - Assumed to operate at maximum fuel input capacity: 18 MMBtu/hr - Assumed operation time: 8,760 hours per year - Potential MMBtu/yr: 157,680

- Emissions are based on ethanol vapor and propane combustion. - Ethanol vapor deducted from total unit heat capacity with remaining heat input assumed to be propane in order to provide a conservative emissions estimate. - Amount of ethanol vapor combusted based on VOCs generated during DDGS drying process. - Ethanol density factor from ethanol.org

GHG Current Potential Emissions:

Ethanol Vapor Thoughput:Uncontrolled DDGS drying VOC ER (PTE lb/yr): 3,066,000 - Based on Current permit VOC limit (7.0 lb/hr) and 98% destruction efficiency.Density of ethanol (lb/gal): 6.59Ethanol vapor combusted (gal/yr): 465,250Ethanol vapor HHV (MMBtu/gal): 0.084Ethanol vapor heat input (MMBtu/yr): 39,081

Propane Thoughput:Propane heat input (MMBtu/yr): 118,599

Pollutant Biogas EF Propane EF Biogas EF Propane EF PTE (w/o Biogenic) PTE (Biogenic* Only) PTE (All)(kg/MMBtu) (kg/MMBtu) (lb/MMBtu) (lb/MMBtu) (TPY) (TPY) (TPY)

CO2 68.44 62.87 150.88 138.60 8,219.10 2,948.33 11,167.43CH4 0.0011 0.003 0.0024 0.0066 0.39 0.05 0.44N2O 0.00011 0.0006 0.0002 0.0013 0.08 0.00 0.08

Mass Basis Total (tpy) 8,219.57 2,948.38 11,167.95Total CO2e (tpy) 8,252.28 2,950.93 11,203.20

GHG Potential Emissions from Proposed Modification Operations:

Ethanol Vapor Thoughput:Uncontrolled DDGS drying VOC ER (PTE lb/yr): 3,696,720 - Based on Proposed permit VOC limit (8.44 lb/hr) and 98% destruction efficiency.Density of ethanol (lb/gal): 6.59Ethanol vapor combusted (gal/yr): 560,959Ethanol vapor HHV (MMBtu/gal): 0.084Ethanol vapor heat input (MMBtu/yr): 47,121

Propane Thoughput:Propane heat input (MMBtu/yr): 110,559

Pollutant Ethanol EF Propane EF Ethanol EF Propane EF PTE (w/o Ethanol) PTE (Ethanol* Only) PTE (All)(kg/MMBtu) (kg/MMBtu) (lb/MMBtu) (lb/MMBtu) (TPY) (TPY) (TPY) lb/hr

CO2 68.44 62.87 150.88 138.60 7,661.95 3,554.84 11,216.79 2561CH4 0.0011 0.003 0.0024 0.0066 0.37 0.06 0.42 0.10N2O 0.00011 0.0006 0.0002 0.0013 0.07 0.01 0.08 0.02

Mass Basis Total (tpy) 7,662.39 3,554.90 11,217.29 2561Total CO2e (tpy) 7,692.88 3,557.97 11,250.85 2569

Page 39: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Emissions from the Combustor, distillation and DDGS dryers:Major Air Permit Amendment

Emission Factor Basis: - The combustor will burn natural gas only. - The combustor may be the air pollution control device (thermal oxidation) for emissions from distillation and DDGS drying in lieu of the RTO (SV 004). As such, the same emissions as SV 004

are included from SV 005, however, they should not be double counted for total facility emissions and permitting applicability. - Natural gas combustion CO emission factor based on manufacturer's guarantee (see attached). - Natural gas combustion NOx emission factor based on 40 CFR 60 (NSPS) Subpart Db. - Natural gas combustion SO2, VOC, PM, PM10, and PM2.5 emissions from AP-42 Section 1.4. - PM/PM10/PM2.5 emission rates include condensable and conservatively assumed to be the same. - Uncontrolled DDGS drying and distillation VOC and CO emissions are based on a control efficiency of 98%. - Uncontrolled DDGS drying and distillation PM/PM10/PM2.5 emissions are based on a control efficiency of 95%. - Combustor Maximum design rate: 210 MMBtu/hr - BTU content of natural gas: 1,020 Btu/scf - Assumed operation time: 8,760 hrs/yr

Natural Gas Combustion (total emissions if SV 004 used to control process emissions):Pollutant E Factors PTE PTE

lb/MMBtu lb/hr tpyNOx 0.1 21.00 91.98SO2 0.0006 0.13 0.55CO --- 15.00 65.70VOC 0.0054 1.13 4.97PM/PM10/PM2.5 0.00745 1.56 6.85

PTE (lb/hr) = lb/MMBtu factor x MMBtu/hr design ratePTE (tpy) = lb/hr PTE x Operation Time (hrs/yr) ÷ 2,000 lbs/ton

Process Emissions (if SV 004 not used):Pollutant Controlled PTE Controlled PTE Uncontrolled PTE

lb/hr tpy tpySO2 7.60 33.3 33.3CO 11.36 49.8 2,488.3 VOC 8.44 37.0 1,848.4PM/PM10/PM2.5 4.00 17.5 350.4

olled PTE (tpy) = lb/hr Emission Factor x Operation Time (hrs/yr) ÷ 2,000 lbs/tonolled PTE (tpy) = Controlled PTE ÷ (1- Control Efficiency (percent))

Total Emissions from distillation, DDGS dryers and combustor if SV 004 is not used:Pollutant Controlled PTE Controlled PTE Uncontrolled PTE

lb/hr tpy tpyNOx 21.00 91.98 91.98SO2 7.73 33.84 33.84CO 26.36 115.47 2,553.98VOC 9.57 41.93 1,853.33PM/PM10/PM2 5.56 24.37 357.25

Page 40: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Major Air Permit Amendment

Emission Factor Basis: - Natural Gas emission factors from AP-42, Table 1.4-3 and 1.4-4. - Emissions factors in AP-42 marked as "less than" are omitted as emissions are considered negligible. - Butane, ethane, propane and pentane are assumed to be combusted and therefore negligible.

- The following metals are not HAPs; barium, copper, molybdenum, vanadium, and zinc. - Uncontrolled process HAP emissions are based on an assumed control efficiency of 98% although there is no HAP control efficiency permit requirement. - Process HAP emissions based on DDGS production and assumed same as RTO control efficiency.

Combustor Maximum Heat Rating = 210 MMBtu/hr1020 BTU/scf

scf/hr= MMBtu/hr x 1000000Btu/MMBtu ÷ Btu/scf 205,882 scf/hrMMscf/yr= scf/hr x Operating Hours/yr ÷ 1,000,000 1,804 MMscf/yrOperating Hours: 8,760 hr/yrAnnual DDGS Production: 246,125 tons/yrCombustor Control Efficiency: 98 %

Natural Gas Combustion:Uncontrolled Uncontrolled Uncontrolled

Emission Factor PTE PTE PTEHAP (lb/million ft3) (lb/yr) (tpy) (lb/hr)

Hexane 1.8 3,246.4 1.623 0.37Formaldehyde 7.50E-02 135.3 0.07 0.015Toluene 3.40E-03 6.13 0.0031 7.00E-04Benzene 2.10E-03 3.79 0.0019 4.32E-04Nickel 2.10E-03 3.79 0.0019 4.32E-04Chromium 1.40E-03 2.52 0.0013 2.88E-041,4-Dichlorobenzene 1.20E-03 2.16 0.0011 2.47E-04Cadmium 1.10E-03 1.98 0.0010 2.26E-04Naphthalene 6.10E-04 1.10 0.00055 1.26E-04Manganese 3.80E-04 0.69 0.00034 7.82E-05Mercury 2.60E-04 0.47 0.00023 5.35E-05Arsenic 2.00E-04 0.36 0.00018 4.12E-05Cobalt 8.40E-05 0.15 0.00008 1.73E-052-Methylnaphthalene 2.40E-05 0.043 0.000022 4.94E-06Phenanthrene 1.70E-05 0.031 0.000015 3.50E-06Pyrene 5.00E-06 0.009 0.0000045 1.03E-06Fluoranthene 3.00E-06 0.0054 0.0000027 6.18E-07Fluorene 2.80E-06 0.0050 0.0000025 5.76E-073-methylchloranthrene 1.80E-06 0.0032 0.0000016 3.71E-077,12-dimethylbenz(a)anthracene 1.60E-05 0.0289 0.0000144 3.29E-06acenaphthene 1.80E-06 0.0032 0.0000016 3.71E-07acenaphthylene 1.80E-06 0.0032 0.0000016 3.71E-07anthracene 2.40E-06 0.0043 0.0000022 4.94E-07benz(a)anthracene 1.80E-06 0.0032 0.0000016 3.71E-07benzo(a)pyrene 1.20E-06 0.0022 0.0000011 2.47E-07benzo(b)fluoranthene 1.80E-06 0.0032 0.0000016 3.71E-07benzo(g,h,i)perylene 1.20E-06 0.0022 0.0000011 2.47E-07benzo(k)fluoranthene 1.80E-06 0.0032 0.0000016 3.71E-07beryllium 1.20E-05 0.0216 0.0000108 2.47E-06chrysene 1.80E-06 0.0032 0.0000016 3.71E-07dibenzo(a,h)anthracene 1.20E-06 0.0022 0.0000011 2.47E-07indeno(1,2,3-cd)pyrene 1.80E-06 0.0032 0.0000016 3.71E-07lead 5.00E-04 0.9018 0.0004509 1.03E-04selenium 2.40E-05 0.0433 0.0000216 4.94E-06Total HAPs from Combustion: 3,405.9 1.70 0.39

PTE (lb/yr) = AP-42 lb/MMscf factor x MMscf/yrPTE (tpy) = lb/yr PTE ÷ 2,000 lbs/ton

Process (only if SV 005 is used to control process emissions):Controlled Controlled Uncontrolled Controlled

Uncontrolled Emission Factor PTE PTE PTE PTE

HAP (lb/ton DDGS)* (lb/yr) (tpy) (tpy) (lb/hr)Formaldehyde 3.10E-01 1,526.0 0.76 38.15 0.174Acetaldehyde 2.80E-01 1,378.3 0.69 34.46 0.157Acrolein 6.60E-02 324.9 0.16 8.12 0.037Methanol 1.10E-01 541.5 0.27 13.54 0.062

Total HAPs from Combustor:(only if SV 005 controls process emisisons)

*Factors from ICM, Inc. Facility DesignerControlled HAP (lb/yr) = Uncontrolled Emission Factor (lb/ton) x DDGS Produced (tons) x Combustor Control Efficiency

Controlled HAP (tpy) = lbs/yr HAPs ÷ 2,000 lbs/tonUncontrolled HAP (tpy) = Controlled Emissions (tpy) x 1/(1-Control Efficiency)

Combustor HAP Emissions:

7,041.26 3.52 95.90 0.804

Page 41: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Emissions from the BFB Boiler:Major Air Permit Amendment

GHG Current Potential Emissions:

Basis: - CO2, N2O & CH4 factors derived from 40 CFR Part 98 Tables C-1 and C-2 for subbituminous coal. - Assumed to operate at maximum fuel input capacity: 220 MMBtu/hr

- Assumed operation time: 8,760 hours per year

Pollutant E Factors E Factors PTE PTEkg/MMBtu lb/MMBtu lb/hr tpy

CO2 97.17 214.22 47,128.6 206,423.3CH4 0.011 0.0243 5.34 23.37N2O 0.0016 0.00353 0.776 3.40

Mass Basis Total (tpy) 206,450.11Total CO2e (tpy) 208,020.43

GHG Potential Emissions from Proposed Modification Operations:

Basis: - CO2, N2O & CH4 emission factors from 40 CFR Part 98 Tables C-1 and C-2 for natural gas. - Assumed to operate at maximum fuel input capacity: 210 MMBtu/hr - Assumed operation time: 8,760 hours per year

Pollutant E Factors E Factors PTE PTEkg/MMBtu lb/MMBtu lb/hr tpy

CO2 53.06 116.98 24,565.0 107,594.6CH4 0.001 0.0022 0.46 2.03N2O 0.0001 0.00022 0.046 0.20

Mass Basis Total (tpy) 107,596.83Total CO2e (tpy) 24,590 107,705.72

Page 42: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

DDGS Cooling System Emissions (VOC/HAPs only):Major Air Permit Amendment

Emission Factor Basis: - PM/PM10/PM2.5 emissions are provided with the other baghouses. - Assuming all DDGS produced are cooled and 8,760 hours of operation per year. - VOC emission rate based on current permit limit of 11.0 lb/hr, however, has been adjusted

based on an increased undenatured ethanol production rate of 72.25 Mmgal/yr. - HAP emission factors based June 2011 stack testing plus a 50% margin of safety.

Pollutant Current Permit PTE PTELimit (lb/hr) (lb/hr) (tons/yr)

VOC 11.0 13.27 58.11

Acetaldehyde N/A 0.150 0.66Acrolein N/A 0.030 0.13Methanol N/A 0.060 0.26Formaldehyde N/A 0.060 0.26

Total HAPs: 0.30 1.31EF-VOCs (lb/hr)= Current Permit Limit (lb/hr) x (72.25/59.9)EF-HAPs (lb/hr)= Most recent Stack test (lb/hr) x 50% Margin of safety

PTE (tpy) = lb/hr Emission Factor x Operation Time (hrs/yr) ÷ 2,000 lbs/ton

Basis: 11 lb/hr * 8760 / 200,503 = 0.4806 lb VOC/ton

Permitted DDGS

Production Rate

Production DDGS TPY

Emission Factor lb VOC/ton

Controlled VOC TPY

Current Rate 200,503 0.4806 48.18Proposed Rate 241,842 0.4806 58.11

Page 43: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Truck & Rail Product Loading Emissions (flare):Major Air Permit Amendment

Emission Factor Basis: - Flare operates only during loading and unloading activities, but emissions based on 8,760 hours because permit doesn’t impose this as a limit. (Expected operations are 2700 hr/yr per year (for truck and rail combined)). Pilot operates continuously (8,760 hr/yr). - Waste gas emission factors for NO x CO & VOC are based AP-42, Table 13.5-1. VOC emission

factor based on total HC minus methane and ethane (37% of total HC is VOC). - Pilot emission factors based on liquid propane combustion (AP-42 Section 1.5 Industrial Boilers). - PM/PM10/PM2.5 is negligible based on smokeless design. - SO2 and HAP waste gas emissions negligible.

Flare and Fuel Specifics:Rate 12.4 MMBtu/hrHeating Value 850 Btu/scfOperating time 2700 hr/yrPilot 0.1 MMBtu/hrPilot Operating Time 6060 hr/yr

Emission FactorPollutants (lb/MMBTU) (lb/hr) (tons/yr)

Flaring Emissions:NOx 0.068 0.84 1.14CO 0.37 4.59 6.19VOC 0.052 0.64 0.87Pilot Emissions:NOx 0.142 0.014 0.04CO 0.082 0.008 0.02VOC 0.011 0.0011 0.003Totals: (lb/hr) (tons/yr)NOx 0.86 1.18CO 4.60 6.22VOC 0.65 0.87

PTE (lb/hr) = AP-42 lb/MMBtu factor x MMBtu/hrPTE (tpy) = lb/hr Emission Rate x Operating Time ÷ 2,000 lbs/ton

Emission Rate

Page 44: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

HAP Calculations for Loading Flare April 2015Heron Lake BioEnergy, LLC Major Modification

Emission Factor Basis: - HAP emission factors are from AP-42 Section 1.4 since there are no HAP emission factors listed within Industrial Flares (AP-42 Section 13.5) or for liquid propane (AP-42 Section 1.5). - Emissions factors in AP-42 marked as "less than" are omitted as emissions are considered negligible. - Butane, ethane, propane and pentane are assumed to be combusted and therefore negligible.

Flare Maximum Heat Rating = Pilot 0.1 MMBtu/hr1020 BTU/scf

98 scf/hr0.6 MMscf/yr

Operating Hours: 6,060 hr/yr

Natural Gas Combustion:Uncontrolled Uncontrolled

Emission Factor PTE PTEHAP (lb/million ft3) (lb/yr) (tpy) lb/hr

Hexane 1.8 1.1 5.35E-04 1.765E-04Formaldehyde 7.50E-02 0.04 2.23E-05Toluene 3.40E-03 0.002 1.01E-06Benzene 2.10E-03 0.001 6.24E-07Nickel 2.10E-03 0.001 6.24E-07Chromium 1.40E-03 0.001 4.16E-07Dichlorobenzene 1.20E-03 0.001 3.56E-07Cadmium 1.10E-03 0.001 3.27E-07Naphthalene 6.10E-04 0.000 1.81E-07Manganese 3.80E-04 0.0002 1.13E-07Mercury 2.60E-04 0.0002 7.72E-08Arsenic 2.00E-04 0.0001 5.94E-08Cobalt 8.40E-05 0.0000 2.50E-082-Methylnaphthalene 2.40E-05 0.000014 7.13E-09Phenanthrene 1.70E-05 0.000010 5.05E-09Pyrene 5.00E-06 0.000003 1.49E-09Fluoranthene 3.00E-06 0.000002 8.91E-10Fluorene 2.80E-06 0.000002 8.32E-103-methylchloranthrene 1.80E-06 0.000001 5.35E-107,12-dimethylbenz(a)anthracene 1.60E-05 0.000010 4.75E-09acenaphthene 1.80E-06 0.000001 5.35E-10acenaphthylene 1.80E-06 0.000001 5.35E-10benz(a)anthracene 1.80E-06 0.000001 5.35E-10benzo(a)pyrene 1.20E-06 0.000001 3.56E-10benzo(b)fluoranthene 1.80E-06 0.000001 5.35E-10benzo(g,h,i)perylene 1.20E-06 0.000001 3.56E-10benzo(k)fluoranthene 1.80E-06 0.000001 5.35E-10beryllium 1.20E-05 0.000007 3.56E-09chrysene 1.80E-06 0.000001 5.35E-10dibenzo(a,h)anthracene 1.20E-06 0.000001 3.56E-10indeno(1,2,3-cd)pyrene 1.80E-06 0.000001 5.35E-10lead 5.00E-04 0.0003 1.49E-07selenium 2.40E-05 0.00001 7.13E-09Total HAPs from Combustion: 1.1 5.61E-04 1.851E-04

Page 45: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC Permit No. 6300025-005

GHG Emissions from Ethanol Loadout Flare:Major Air Permit Amendment

Basis: - Emissions are based on the ethanol vapor, natural gasoline and propane potential combustion. - CO2, N2O & CH4 emission factors from 40 CFR Part 98 Tables C-1 and C-2 for all fuels.- CO2e is based on global warming factor of 25 for CH4 and 298 for N2O per MPCA request.- Emissions are based on combustion of loading waste gas and propane and are likely overestimated.

- Ethanol density factor from ethanol.org.- Denaturant density from facility MSDS. - HHV from 40 CFR 98.30 Table C-1 for all fuels.- Amount of ethanol vapor and denaturant vapor (natural gasoline) based on VOCs generated from rail (dedicated ethanol) and truck (assumed dedicated denaturant) loading. - Both rail and truck loading calculations are provided for review; however, worst-case emissions are associated with truck loading. - Truck Loading Losses based on Gasoline (denaturant) vapor. - Truck and rail loading vapors are controlled by a flare. Flaring emissions provided below. - Railcar Loadout losses based on denatured ethanol vapor (dedicated railcars).

GHG Current Potential Emissions:

Truck Loading Losses (assumed denaturant):Loading Operations Basis: Calculated from AP-42, Section 5.2.2 - Loading Losses

Equation: 12.46*S*P*M/Twhere: S 1 Saturation factor (submerged)

From TANKS 4.09d P 3.96 Vapor pressure (psia)From TANKS 4.09d M 66 Molar Mass (lb/lb-mole)From TANKS 4.09d, average temp T 507.17 Product Temp (deg R)

AP-42 Factor: 6.43 lb/1000 gal

Losses calculated using this factor multiplied by loading rates:Gasoline vapor emission rate (denatured ethanol loadout) : 62,895,000 gal/yrVOC Loading losses 404,176 lb/yr, uncontrolledControlled by flare 4.04 tpy, @ 98% Destr Eff

Rail Loading Losses (dedicated railcars):Loading Operations Basis: Calculated from AP-42, Section 5.2.2 - Loading Losses

Equation: 12.46*S*P*M/Twhere: S 0.6 Saturation factor

From TANKS 4.09d P 0.444 Vapor pressure (psia)From TANKS 4.09d M 47.870 Molar Mass (lb/lb-mole)From TANKS 4.09d, average temp T 507.17 Product Temp (deg R)

AP-42 Factor: 0.31 lb/1000 gal

Losses calculated using this factor multiplied by loading rates:Gasoline vapor emission rate (denatured ethanol loadout): 62,895,000 gal/yrVOC Loading losses 19,705 lb/yrDedicated railcars, VOCs 0.20 tpy, @ 98% Destr Eff

Ethanol Vapor Thoughput:Annual Flaring hours of operation: 2,700 Uncontrolled Rail loading VOC ER (lb/yr): 19,705Maximum rated heat input capacity (MMBtu/hr): 12.4 Density of ethanol (lb/gal): 6.59Annual heat input (MMBtu): 33,480 Ethanol vapor combusted (gal/yr): 2,990heat input from ethanol combustion (MMBtu/yr): 251.2 Ethanol vapor HHV (MMBtu/gal): 0.084heat input from natural gasoline combustion (MMBtu/yr): 7,615.5 Ethanol vapor heat input (MMBtu/yr): 251heat input from propane combustion (MMBtu/yr): 33,480.0Pilot (MMBtu/hr) 0.1 Natural Gasoline Vapor Thoughput:Pilot Operating Time (hr/yr) 6060.0 Uncontrolled waste gas VOC ER (lb/yr): 404,176

Density of natural gasoline (lb/gal): 5.84Nat Gas vapor combusted (gal/yr): 69,232Nat Gas vapor HHV (MMBtu/gal): 0.11Nat Gas vapor heat input (MMBtu/yr): 7,616

Pollutant Ethanol EF Nat Gasoline EF Propane EF Ethanol EF Nat Gasoline EF Propane EF PTE (w/o Biogenic) PTE (Biogenic* Only) PTE (All)(kg/MMBtu) (kg/MMBtu) (kg/MMBtu) (lb/MMBtu) (lb/MMBtu) (lb/MMBtu) (TPY) (TPY) (TPY)

CO2 flare 68.44 66.88 62.87 150.88 147.44 138.60 2,881.6 18.9 2,900.6CH4 flare 0.0011 0.003 0.003 0.0024 0.0066 0.0066 0.14 0.00 0.14N2O flare 0.00011 0.0006 0.0006 0.0002 0.0013 0.0013 0.03 0.000 0.03CO2 pilot 62.87 138.6032 42.00 42.00CH4 pilot 0.003 0.0066 0.002 0.002N2O pilot 0.0006 0.0013 0.0004 0.0004

Mass Basis Total (tpy) 2,881.8 18.9 2,942.8Total CO2e (tpy) 2,893.1 19.0 2,954.3

Page 46: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC Permit No. 6300025-005

GHG Emissions from Ethanol Loadout Flare (cont.):Emission ID: SV009

GHG Potential Emissions from Proposed Modification Operations:

Truck Loading Losses (assumed denaturant):Loading Operations Basis: Calculated from AP-42, Section 5.2.2 - Loading Losses

Equation: 12.46*S*P*M/Twhere: S 1 Saturation factor (submerged)

From TANKS 4.09d P 3.96 Vapor pressure (psia)From TANKS 4.09d M 66 Molar Mass (lb/lb-mole)From TANKS 4.09d, average temp T 507.17 Product Temp (deg R)

AP-42 Factor: 6.43 lb/1000 gal

Losses calculated using this factor multiplied by loading rates:Gasoline vapor emission rate (denatured ethanol loadout) : 75,862,500 gal/yrVOC Loading losses 487,508 lb/yr, uncontrolledControlled by flare 4.88 tpy, @ 98% Destr Eff

Rail Loading Losses (dedicated railcars):Loading Operations Basis: Calculated from AP-42, Section 5.2.2 - Loading Losses

Equation: 12.46*S*P*M/Twhere: S 0.6 Saturation factor

From TANKS 4.09d P 0.444 Vapor pressure (psia)From TANKS 4.09d M 47.87 Molar Mass (lb/lb-mole)From TANKS 4.09d, average temp T 507.17 Product Temp (deg R)

AP-42 Factor: 0.31 lb/1000 gal

Losses calculated using this factor multiplied by loading rates:Gasoline vapor emission rate (denatured ethanol loadout): 75,862,500 gal/yrVOC Loading losses 23,768 lb/yrDedicated railcars, VOCs 0.24 tpy, @ 98% Destr Eff

Ethanol Vapor Thoughput:Annual Flaring hours of operation: 2,700 Uncontrolled Rail loading VOC ER (lb/yr): 23,768Maximum rated heat input capacity (MMBtu/hr): 12.4 Density of ethanol (lb/gal): 6.59Annual heat input (MMBtu): 33,480 Ethanol vapor combusted (gal/yr): 3,607heat input from ethanol combustion (MMBtu/yr): 303.0 Ethanol vapor HHV (MMBtu/gal): 0.084heat input from natural gasoline combustion (MMBtu/yr): 9,185.7 Ethanol vapor heat input (MMBtu/yr): 303heat input from propane combustion (MMBtu/yr): 33,480.0Pilot (MMBtu/hr) 0.1 Natural Gasoline Vapor Thoughput:Pilot Operating Time (hr/yr) 6060.0 Uncontrolled waste gas VOC ER (lb/yr): 487,508

Density of natural gasoline (lb/gal): 5.84Nat Gas vapor combusted (gal/yr): 83,506Nat Gas vapor HHV (MMBtu/gal): 0.11Nat Gas vapor heat input (MMBtu/yr): 9,186

Pollutant Ethanol EF Nat Gasoline EF Propane EF Ethanol EF Nat Gasoline EF Propane EF PTE (w/o Biogenic) PTE (Biogenic* Only) PTE (All) PTE (All)(kg/MMBtu) (kg/MMBtu) (kg/MMBtu) (lb/MMBtu) (lb/MMBtu) (lb/MMBtu) (TPY) (TPY) (TPY) (lb/hr)

CO2 flare 68.44 66.88 62.87 150.88 147.44 138.60 2,997.4 22.9 3,020.3 689.6CH4 flare 0.003 0.003 0.003 0.0066 0.0066 0.0066 0.14 0.001 0.14 0.03N2O flare 0.0006 0.0006 0.0006 0.0013 0.0013 0.0013 0.03 0.000 0.03 0.01CO2 pilot 62.87 138.60 42.00 42.00 9.59CH4 pilot 0.003 0.0066 0.0020 0.002 0.0005N2O pilot 0.0006 0.0013 0.0004 0.0004 0.0001

Mass Basis Total (tpy) 2,997.6 22.9 3,062.4 699.2Total CO2e (tpy) 3,009.3 22.9 3,074.4 701.9

Page 47: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Truck & Rail Product Loading Emissions (fugitive VOCs):Major Air Permit Amendment

Truck Loading Fugitive Losses:Loading Operations Calculated from AP-42, Section 5.2.2 - Loading LossesBasis: Equation: 12.46*S*P*M/TAP-42 Table 5.2-1 where: S 1 Saturation factor (submerged)

From Tanks 4.09d P 3.96 Vapor pressure (psia)M 66 Molar Mass (lb/lb-mole)

From Tanks 4.09d, average temp T 507.17 Product Temp (deg R)

AP-42 Factor: 6.43 lb/1000 gal

Losses calculated using this factor multiplied by loading rates:Gasoline vapor emission rate: 75,862,500 gal/yrUncontrolled VOC Loading losses 487,508 lb/yr

243.8 tpyAssuming 98% captured and sent to flare (controlled): 4.88 tpy

1.11lb/hr (annual average)

Rail Loading Fugitive Losses:Loading Operations Calculated from AP-42, Section 5.2.2 - Loading LossesBasis: Equation: 12.46*S*P*M/TAP-42 Table 5.2-1 where: S 0.6 Saturation factorFrom Tanks 4.09d P 0.444 Vapor pressure (psia)

M 47.87 Molar Mass (lb/lb-mole)From Tanks 4.09d, average temp T 507.17 Product Temp (deg R)

AP-42 Factor: 0.31 lb/1000 gal

Losses calculated using this factor multiplied by loading rates:Denatured ethanol vapor emission rate: 75,862,500 gal/yrUncontrolled VOC Loading losses 23,768 lb/yrUncontrolled VOCs 11.88 tpy

11.88 tpyAssuming 98% captured and sent to flare (controlled): 0.24 tpy

Uncontrolled VOC (lb/yr) = Denatured ETOH vapor emission rate (gal/yr) x Calculated AP-42 Factor (lb/1,000 gal) ÷ 1,000Uncontrolled VOC (tpy) = Total lbs Uncontrolled VOC Loading Losses ÷ 2,000 lbs/ton

Controlled VOC (tpy) = Total tons Uncontrolled VOC Loading Losses x 98% control

Note: - VOC emissions estimates are conservative assuming all truck loading/unloading emissions possess denaturant vapor characteristics. - Emissions are shown at 100% from both rail and truck loading scenarios in order to demonstrate emissions from both scenarios. However, truck loading is considered worst-case and is used to represent emissions from this source in order to avoid double-counting.

Page 48: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

TRUCK and RAIL LOADING HAP LOSSES:Major Air Permit Amendment

Emission Factor Basis: - HAP emissions based on mass fraction of total VOC emissions (see previous page). - Truck HAPs based on typical MSDS for unleaded gasoline (mid points used). Only listed MSDS HAPs are included.

- Truck HAP calculation assumes that trucks that load ethanol previously contained gasoline and gasoline vapors will be sent to flare for control during ethanol loading.

Uncontrolled HAP (tpy)= Uncontrolled VOC (tpy) x Corresponding HAP Mass Fraction (%/100)Controlled HAP (tpy)= Controlled VOC (tpy) x Corresponding HAP Mass Fraction (%/100)

Rail HAP Losses:

Compound Fraction (%/100)Uncontrolled

VOC (tpy)Uncontrolled

HAP (tpy)Controlled VOC (tpy)

Controlled HAP (tpy)

Controlled (lb/hr annual

average)Benzene 0.00046 11.88 0.005 0.24 0.0001 2.50E-05Hexane 0.009 11.88 0.107 0.24 0.0021 4.88E-04Acetaldehyde 0.0002 11.88 0.002 0.24 4.75E-05 1.09E-05Methanol 0.0002 11.88 0.002 0.24 4.75E-05 1.09E-05

Total: 0.12 0.002 5.35E-04

Truck HAP Losses:

Compound Fraction (%/100)Uncontrolled

VOC (tpy)Uncontrolled

HAP (tpy)Controlled VOC (tpy)

Controlled HAP (tpy)

Controlled (lb/hr annual

average)Benzene 0.0245 243.75 5.97 4.88 0.12 0.027Ethylbenzene 0.02 243.75 4.88 4.88 0.10 0.022Cumene 0.01 243.75 2.44 4.88 0.05 0.011Xylenes 0.12 243.75 29.25 4.88 0.59 0.134Toluene 0.15 243.75 36.56 4.88 0.73 0.167

Total: 79.10 1.58 0.361

Rail and Truck HAP loss totals (tpy): 79.22 Uncontrolled tpy1.5842 Controlled tpy0.3617 controlled lb/hr

Page 49: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Emergency Firewater Pump IC Engine:Major Air Permit Amendment

Emission Factor Basis: - Engine is diesel fueled. - NOx, CO, VOC and PM Emission factors based on NSPS Subpart IIII, Table 4 for a 300 HP engine. - Emission Factor for PM10 and PM2.5 assumed to be all PM emissions.

- Potential restricted emissions based on 100 non-emergency hours of annual operation. - Engine will only operate from 12:00 PM to 4:00 PM (non-emergency), 7 days a week. - VOC emission factor considered conservative as it includes total organic compounds (TOC). - HAPs assumed to be negligible. - NOx emissions were calculated by multiplying the "NMHC+NOx" emission factor by 76% based upon the linear relationship of NOx to NMHC from Table 1 of Subpart IIII, Table 1 from 40 CFR 89.112, to Tables 4, 5, and 6 from 40 CFR 1039.102. - Similar to NOx emissions, VOC emissions were determined by multiplying the "NMHC+NOx" factor by 24%. This emission factor is considered conservative since it includes total non-methane hydrocarbons.

Pollutant Unit Size Operation E Factors Resticted PTE Restricted PTE Unrestricted PTE(Hp) hr/yr (lb/hp-hr) (lb/hr) (TPY) (TPY)

NOx 0.0128 3.84 0.19 16.80SO2 0.00200 0.60 0.03 2.63CO 0.0057 1.72 0.09 7.53VOC 0.0041 1.24 0.06 5.42PM/PM10/PM2.5 0.00088 0.26 0.01 1.16

Efactor ( CO, PM/PM 10 /PM 2.5 )= NSPS g/hp-hr factor ÷ 453.59 Efactor (NO x )= (g/hp-hr factor x 76%) ÷ 453.59Efactor (VOC )= (g/hp-hr factor x 24%) ÷ 453.59

Restricted PTE (lb/hr)= Unit size (hp) x Efactor (lb/hp-hr)Restricted PTE (tpy)= Restricted PTE (lb/hr) x Hours per year ÷ 2,000 lb/ton

300 100

Page 50: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Administration Building Emergency Generator:Major Air Permit Amendment

Emission Factor Basis: - Engine is diesel fueled. - Emission factors based on AP-42 Table 3.3-1. - Emission Factor for PM10 and PM2.5 assumed to be all PM emissions.

- Potential restricted emissions based on 100 non-emergency hours of annual operation. - Engine will only operate from 12:00 PM to 4:00 PM (non-emergency), 7 days a week. - VOC emission factor considered conservative as it includes total organic compounds (TOC). - HAPs assumed to be negligible. - Unrestricted emissions based on 8,760 hours of operation per year.

Pollutant Unit Size Operation E Factors Resticted PTE Restricted PTE Unrestricted PTE(Hp) hr/yr (lb/hp-hr) (lb/hr) (TPY) (TPY)

NOx 0.0310 8.31 0.42 36.39SO2 0.0020 0.54 0.03 2.35CO 0.0067 1.79 0.09 7.84VOC 0.0025 0.67 0.03 2.92PM/PM10/PM2 0.0022 0.59 0.03 2.58

Restricted PTE (lb/hr)= Unit size (hp) x Efactor (lb/hp-hr)Restricted PTE (tpy)= Restricted PTE (lb/hr) x Hours per year ÷ 2,000 lb/ton

268 100

Page 51: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Boiler Feed Water Pump Emergency Generator:Major Air Permit Amendment

Emission Factor Basis: - Engine is fueled by propane. - PM/PM10/PM2.5 emisison factors are based on AP-42, Table 3.2-3 (natural gas combustion). - PM10/PM2.5 assumed to be equal to PM.

- SO2 emissions are neglible due to lack of sulfur in propane. - Equipment for Emergency Purposes, maximum of non-emergency operations assumed. - Potential restricted emissions based on 100 non-emergency hours of annual operation. - Engine will only operate from 12:00 PM to 4:00 PM (non-emergency), 7 days a week. - HAPs assumed to be negligible. - CO, VOC (as THC) and NOx emission facors based on manufacturers data (8.1L model). The mid-range values were used. Grams/hp-hr were converted to lb/hp-hr by diving by 453.59. - Emission factor for PM was converted from lb/MMBtu to lb/hp-hr using a maximum fuel consumption rate of 602 cf/hr of propane (manufacturer's specifications) and a propane heating value of 2,500 Btu/cf (15,050 Btu/hp-hr). - Unrestricted emissions based on 8,760 hours of operation per year.

Pollutant Unit Size Operation E Factors Resticted PTE Restricted PTE Unrestricted PTE(hp) (hr/yr) (lb/hp-hr) (lb/hr) (TPY) (TPY)

NOx 0.0076 1.14 0.06 4.99CO 0.1000 15.00 0.75 65.70VOC 0.0029 0.44 0.02 1.91PM/PM10/PM2.5 0.0003 0.04 0.002 0.19

Efactor (PM/PM 10 /PM 2.5 /CO 2 )= AP-42 lb/MMBtu factor ÷ 1,000,000 Btu/Mmbtu x (602 cf/hr x 2,500 Btu/cf ÷ 100 hrs/yr)Efactor (NO x , CO, VOC)= Manufacturer's g/hp-hr factor ÷ 453.59

Restricted PTE (lb/hr)= Unit size (hp) x Efactor (lb/hp-hr)Restricted PTE (tpy)= Restricted PTE (lb/hr) x Hours per year ÷ 2,000 lb/ton

150 100

Page 52: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC Permit No. 6300025-005

GHG EMISSONS FROM EMERGENCY EQUIPMENTMajor Air Permit AmendmentEmissions from Firewater Pump (IC Engine):Emission ID: SV017

Basis: - CO2, N2O & CH4 emission factors from 40 CFR Part 98 Tables C-1 and C-2 for diesel. Emission factors converted from lb/MMBtu to lb/hp-hr using an average brake-specific fuel consumption (BSFC) of 7,000 Btu/hp-hr.

- Emissions based on limit of emergency hours of annual operation. - CO2e includes global warming factor of 25 for CH4 and 298 for N2O.

GHG Current Potential Emissions:

Pollutant Unit Size Operation E Factors E Factors E Factors PTE PTE Unltd PTE(Hp) hr/yr kg/MMBtu lb/MMBtu (lb/hp-hr) (lb/hr) (TPY) (TPY)

CO2 73.96 163.05 1.14 342.41 17.12 1499.75CH4 0.003 0.0066 0.000046 0.014 0.0007 0.06N2O 0.0006 0.0013 0.0000093 0.0028 0.00014 0.01

Mass Basis Total (tpy) 17.12 1,499.83Total CO2e (tpy) 17.18 1,504.90

GHG Potential Emissions from Proposed Modification Operations:

Pollutant Unit Size Operation E Factors E Factors E Factors PTE PTE Unltd PTE(Hp) hr/yr kg/MMBtu lb/MMBtu (lb/hp-hr) (lb/hr) (TPY) (TPY)

CO2 73.96 163.05 1.14 342.41 17.12 1499.75CH4 0.003 0.0066 0.000046 0.014 0.0007 0.06N2O 0.0006 0.0013 0.0000093 0.0028 0.00014 0.01

Mass Basis Total (tpy) 17.12 1,499.83Total CO2e (tpy) 343.6 17.18 1,504.90

Emissions from Admin Emergency Generator (IC Engine):Emission ID: SV020

Basis: - CO2, N2O & CH4 emission factors from 40 CFR Part 98 Tables C-1 and C-2 for diesel. Emission factors converted from lb/MMBtu to lb/hp-hr using an average brake-specific fuel consumption (BSFC) of 7,000 Btu/hp-hr. - Emissions based on limit of emergency hours of annual operation. - CO2e includes global warming factor of 25 for CH4 and 298 for N2O per MPCA request.

GHG Current Potential Emissions:

Pollutant Unit Size Operation E Factors E Factors E Factors PTE PTE Unltd PTE(Hp) hr/yr kg/MMBtu lb/MMBtu (lb/hp-hr) (lb/hr) (TPY) (TPY)

CO2 73.96 163.05 1.14 305.89 15.29 1339.78CH4 0.003 0.0066 0.000046 0.012 0.0006 0.05N2O 0.0006 0.0013 0.0000093 0.0025 0.00012 0.01

Mass Basis Total (tpy) 15.30 1,339.85Total CO2e (tpy) 15.35 1,344.38

GHG Potential Emissions from Proposed Modification Operations:

Pollutant Unit Size Operation E Factors E Factors E Factors PTE PTE Unltd PTE(Hp) hr/yr kg/MMBtu lb/MMBtu (lb/hp-hr) (lb/hr) (TPY) (TPY)

CO2 73.96 163.05 1.14 305.89 15.29 1339.78CH4 0.003 0.0066 0.000046 0.012 0.0006 0.05N2O 0.0006 0.0013 0.0000093 0.0025 0.00012 0.01

Mass Basis Total (tpy) 15.30 1,339.85Total CO2e (tpy) 306.9 15.35 1,344.38

Emissions from Emergency Boiler Feed Pump (IC Engine):Emission ID: SV022

Basis: - CO2, N2O & CH4 emission factors from 40 CFR Part 98 Tables C-1 and C-2 for propane. Emission factors converted from lb/MMBtu to lb/hp-hr using a maximum fuel consumption rate of 602 cf/hr of propane (manufacturer's specifications) and a propane heating value of 2,500 Btu/cf (15,050 Btu/hp-hr). - Emissions based on limit of emergency hours of annual operation. - CO2e includes global warming factor of 25 for CH4 and 298 for N2O as per MPCA request.

GHG Current Potential Emissions:

Pollutant Unit Size Operation E Factors E Factors E Factors PTE PTE Unltd PTE(Hp) hr/yr kg/MMBtu lb/MMBtu (lb/hp-hr) (lb/hr) (TPY) (TPY)

CO2 62.87 138.60 0.97 145.53 7.28 637.44CH4 0.003 0.0066 0.000046 0.007 0.0003 0.03N2O 0.0006 0.0013 0.0000093 0.0014 0.00007 0.006

Mass Basis Total (tpy) 7.28 637.47Total CO2e (tpy) 146.12 7.31 640.01

GHG Potential Emissions from Proposed Modification Operations:

Pollutant Unit Size Operation E Factors E Factors E Factors PTE PTE Unltd PTE(Hp) hr/yr kg/MMBtu lb/MMBtu (lb/hp-hr) (lb/hr) (TPY) (TPY)

CO2 62.87 138.60 0.97 145.53 7.28 637.44CH4 0.003 0.0066 0.000046 0.007 0.0003 0.03N2O 0.0006 0.0013 0.0000093 0.0014 0.00007 0.006

Mass Basis Total (tpy) 7.28 637.47Total CO2e (tpy) 146.12 7.31 640.01

300 100

300 100

268 100

268 100

150 100

150 100

Page 53: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Paved Haul Roads:Major Air Permit Amendment

Emission Factor Basis: - PM/PM10/PM2.5 emission factors based on AP-42 Section 13.2.1 (January 2011). - PM/PM10/PM2.5 calculations assume 100% of all materials are transported by truck. However, HLBE uses rail service for grain, DDGS, & ethanol. - Calculations are based on 100% of DGS being shipped wet, which requires more trucks to transport (based on weight).

- Grain density = 56 lb/bushel. - Vehicles travel approximately 1/2 full and 1/2 empty. - Vehicle miles traveled (VMT) is dependent on material delivered or shipped. - Additional traffic from employee and visitor vehicles were estimated at less than 0.1%, and therefore emissions are considered negligible and not included.

AP-42 13.2.1.3 Predictive Emission Factor Equation:

E = k (sL) 0.91 x (W) 1.02

Where:k PM 0.011 particle size multiplier (dimensionless)

k PM10 0.0022 particle size multiplier (dimensionless)k PM2.5 0.00054 particle size multiplier (dimensionless)

sL 1 Road surface silt loading (g/m2)W 27.5 Average truck weight (tons) - 40 tons full/15 tons empty.

Product/Material

PM Emission

Factor (lb/VMT)

PM 10 Emission

Factor (lb/VMT)

PM 2.5 Emission

Factor (lb/VMT) VMT

PM Emissions (tons/yr)

PM10 Emissions (tons/yr)

PM2.5 Emissions (tons/yr)

Ethanol 10,115 1.63 0.33 0.08Denaturant 482 0.08 0.02 0.004Syrup 2,400 0.39 0.08 0.02Grain 36,182 5.85 1.17 0.29Wet DGS 29,259 4.73 0.95 0.23Corn Oil 557 0.09 0.02 0.004Other trucks an 2,320 0.37 0.07 0.02

PTE (tpy)= E x VMT ÷ 2,000 lbs/ton Total: 13.14 2.63 0.65

VMT Calculati Load Size Units Amount/yr Units # of Trips VMT per Trip VMTDenatured Eth 7500 gal 75,862,500 gal 10,115 1.00 10,115Denaturant 7500 gal 3,612,500 gal 482 1.00 482Syrup 25 tons 60,000 tons 2,400 1.00 2,400Grain 25 tons 779,774 tons 31,191 1.16 36,182Wet DGS 25 tons 630,589 tons 25,224 1.16 29,259Corn Oil 25 tons 12,000 tons 480 1.16 557Dried DGSOther trucks and deliveries 2,000 1.16 2,320

Total Truck VMT: 78,994Notes: - Most trucks that load ethanol, first unload denaturant. As such, denaturant VMT is overestimated.

Number of trips= Total amount of material per year (gal or tons) ÷ Total load size (gal or ton)VMT= VMT per trip x Number of trips

0.32 0.06 0.02

Page 54: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Component Leaks (fugitives):Major Air Permit Amendment

Emission Factor Basis: - Leak Rate (SOCMI average) multiplied by no. of components. - Leak Rates and VOC control from: Protocol for Leak Emission Rates EPA-453/R-95-017, November 1995 (provided in Attachment A).

- Components in vacuum service are not inventoried and not to be inspected due to leak free nature. - Components with >20% VOC by volume or >10% by weight are part of the LDAR program except for valves and pumps, non-welded components and fittings treated as "flanges" for LDAR.

Uncontrolled VOCs (lb/hr)= (Leak rate (kg/hr/source) x 1,000 g/kg ÷ 453.59 (g/lb) x Number of componentsUncontrolled VOCs (tpy)= Total tons Uncontrolled VOCs x LDAR Control percentage

Controlled VOCs (tpy)= Total lbs/hr Uncontrolled VOCs x 8,760 hrs/yr ÷ 2,000 lbs/ton

Equipment # Leak Rate Uncontrolled VOC Uncontrolled VOCLDAR

ControlControlled

VOC Controlled VOC(kg/hr/source) (lb/hr) (tpy) (percent) (tpy) (lb/hr)

Light Liquid Valves 526 0.00403 4.67 20.47 84.00 3.28 0.75Light Liquid Pumps 22 0.0199 0.97 4.23 69.00 1.31 0.30Gas Valves 15 0.00597 0.20 0.86 87.00 0.11 0.03Flanges (connectors) 1777 0.00183 7.17 31.40 87.00 4.08 0.93Total Fugitive Components 2340 Total: 56.96 8.78 2.00HAP portion of VOCs:

Mass Fraction Uncontrolled VOC Uncontrolled HAP

Controlled VOC

Controlled HAP Controlled HAP

(tpy) (tpy) (tpy) (tpy) (lb/hr)Formaldehyde 0.000169 56.96 0.010 8.78 0.0015 0.0003Acetaldehyde 0.155 56.96 8.83 8.78 1.36 0.31Methanol 0.015 56.96 0.85 8.78 0.13 0.03Acrolein 0.0045 56.96 0.26 8.78 0.04 0.009

Total: 9.95 1.53 0.35Uncontrolled HAP (tpy) = Total tons Uncontrolled VOCs x HAP Mass Fraction

Controlled HAP (tpy) = Total tons Controlled VOCs x HAP Mass Fraction

Page 55: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Storage Vessel VOC and HAP Emissions:Major Air Permit Amendment

Emission Factor Basis: - VOC emissions from EPA Tanks 4.09d software. Tanks model output provided in Attachment. - HAP emissions calculations based on VOC (tpy) x corresponding HAP Mass Fraction (%/100). - Mass Fractions are based on facility MSDS and general ethanol properties.

Stored Tanks Model VOC VOCAcet-

aldehyde Methanol Benzene Hexane Toluene Xylene CumeneEthylben-

zeneCarbon

disulfide Total HAPLiquid ID (lbs) (tpy) (tpy) (tpy) (tpy) (tpy) (tpy) (tpy) (tpy) (tpy) (tpy) (tpy)

190 Proof Etha HLBE TK1 782.73 0.391 7.83E-05 7.83E-05 1.57E-04200 Proof Etha HLBE TK2 782.73 0.391 7.83E-05 7.83E-05 1.57E-04Denatured Eth HLBE TK3 424.56 0.212 4.25E-05 4.25E-05 1.06E-04 1.91E-03 1.06E-03 1.06E-04 2.12E-05 1.06E-05 4.25E-06 3.31E-03Denatured Eth HLBE TK4 424.56 0.212 4.25E-05 4.25E-05 1.06E-04 1.91E-03 1.06E-03 1.06E-04 2.12E-05 1.06E-05 4.25E-06 3.31E-03Denaturant HLBE TK5 1849.79 0.925 2.31E-03 4.62E-02 4.62E-03 4.62E-04 9.25E-05 4.62E-05 1.85E-05 5.38E-02Corrosion Inhib HLBE TK6 1578.86 0.789 1.97E-01 7.89E-02 7.89E-03 2.84E-01Corn Oil HLBE TK7 18.14 0.009 Negligible HAPs 0.00E+00Total VOCs 5861 2.93 0.00E+00Total Single HAP 2.41E-04 1.98E-01 2.52E-03 5.01E-02 6.75E-03 7.96E-02 1.35E-04 7.96E-03 2.70E-05

Mass Fractions(%/100)

Acetaldehyde 0.0002 etoh (190/200/denatured etoh)Methanol 0.0002 etoh (190/200/denatured etoh)Methanol 0.25 Corrosion InhibitorBenzene (den) 0.0005Hexane (den) 0.009Hexane (ng) 0.05 denaturant, natural gasolineToluene 0.005 denaturant, natural gasolineBenzene (ng) 0.0025 denaturant, natural gasolineXylenes 0.0005 denaturant, natural gasolineXylenes 0.1 Corrosion InhibitorCumene 0.0001 denaturant, natural gasolineEthylbenzene 0.00005 denaturant, natural gasolineEthylbenzene 0.01 Corrosion InhibitorCarbon 0.00002 denaturant, natural gasoline

HAP Product

denatured etohdenatured etoh

Page 56: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Cooling Tower Emissions:Major Air Permit Amendment

Emission Factor Basis: - Mass balance based on circulation rates, TDS and Drift Loss. - Water density 8.34 lb/gal. - Based on manufacturer's guarantee of 0.001% drift loss.

- All PM is conservatively assumed to be PM10 and PM2.5.

PTE (tpy) = Hourly circulation rate x water density x TDS content ÷ 1,000,000 x Drift Loss ÷ 100 x Hours of operation ÷ lbs per tonPTE (tpy)= 1,500,000 gal/hr x 8.34 lb/gal x 3,000 ppm ÷ 1,000,000 x 0.001% ÷ 100 x 8,760 hrs/yr ÷ 2,000 lbs/ton

Emission Source

Circulation rate (gal/hr)

TDS content (avg ppm)

Drift Loss (percent)

Operating hours

(hrs/yr)

PM/PM10/PM2.5 PTE

(tons/yr)

PM/PM10/PM2.5 PTE

(lb/hr)

Cooling Tower 1,500,000 3000 0.001 8760 1.64 0.38

Page 57: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Heron Lake BioEnergy LLC  Permit No. 6300025‐005

Wet DGS (wet cake):Major Air Permit Amendment

Emission Factor Basis: - VOC & HAP Emission factors based on November 2004 Denco ethanol plant (Morris, MN) emission testing of wet cake handling, storage and loadout. - Potential emissions assume all DGS will not be dried.

PTE (tpy)= tons of Wet DGS x EF (lb/ton) ÷ 2000 lbs/tonVOC Emissions: Total Wet DGS Emission Factor PTE

(tons) lb/ton wet DGS) (tons/yr)630,859 0.0083 2.62

HAP Emissions:Acetaldehyde 0.0001 0.032Acrolein 0.000017 0.005Formaldehyde 0.00067 0.211Methanol 0.00014 0.044

Page 58: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Attachment 2 - Facility Description and CD-01 Forms

Page 59: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

Show:Action:AQD Facility ID:Facility Name:

Active and Pending RecordsPER 00506300025Heron Lake BioEnergy LLC

FACILITY DESCRIPTION: GROUPS (GP)

1 May, 2015 15:40

ID No. AddedBy

(Action)

RetiredBy

(Action)

Includein EI

OperatorID

for Item

Group Description Group ItemsGroupStatus

1 GP 001 PER 003 Dry Bulk Commodity Facility CE 001, CE 002, CE 009, EU 001, EU 002, EU 003, EU 004, EU 005, EU 006,EU 007, EU 008, EU 009, EU 010, EU 011, EU 012, EU 038, EU 039, EU 052,EU 055

Active

2 GP 001 PER 005 Grain Receiving, Handling, & Storage; DDGS Handling & Loadout CE 001, CE 009, EU 001, EU 002, EU 003, EU 004, EU 005, EU 006, EU 007,EU 008, EU 009, EU 010, EU 038, EU 039, EU 052, EU 055, FS 002, FS 003

Active

3 GP 002 PER 003 Coal / Ash / Lime Handling and Storage EU 044, EU 045, EU 046, EU 047, EU 050, EU 051Active

4 GP 002 PER 005 Coal / Ash / Lime Handling and Storage EU 045, EU 046, EU 047, EU 050, EU 051Removed

5 GP 003 PER 004 Low-Temperature Baghouses CE 001, CE 002, CE 009, CE 014, CE 015, CE 016, CE 017, CE 024, CE 025Active

6 GP 003 PER 005 Low-Temperature Baghouses CE 001, CE 002, CE 009Removed

7 GP 004 PER 003 Fermentation Units Vented to Scrubber CE 003, EU 013, EU 014, EU 015, EU 016, EU 017Active

8 GP 004 PER 005 Fermentation Units Vented to Scrubber (SV 003/CE 003) CE 003, EU 013, EU 014, EU 015, EU 016, EU 017, EU 058, EU 059Active

9 GP 005 PER 004 Distillation and Units Vented to Regenerative Thermal Oxidizer CE 005, EU 018, EU 019, EU 020, EU 021, EU 022, EU 023, EU 024, EU 025,EU 026, EU 027, EU 028, EU 029, EU 030, EU 031, EU 032, EU 033, EU 034

Active

10 GP 005 PER 005 Process Units Vented to Boiler or Regenerative Thermal Oxidizer CE 005, CE 028, EU 018, EU 019, EU 020, EU 021, EU 022, EU 023, EU 024,EU 025, EU 026, EU 027, EU 028, EU 029, EU 030, EU 031, EU 032, EU 033,EU 034, EU 035, SV 004, SV 005

Active

11 GP 006 PER 001 Tanks TK 001, TK 002, TK 003, TK 004, TK 005Active

12 GP 007 PER 001 Flares CE 008, CE 010Active

13 GP 007 PER 005 Flares CE 010Removed

14 GP 009 PER 004 Sulfur Dioxide Group EU 018, EU 034, EU 035, EU 049, SV 004, SV 005, SV 006Active

15 GP 009 PER 005 Sulfur Dioxide Group EU 034, EU 035, EU 049, SV 004, SV 005, SV 006Removed

16 GP 010 PER 004 Fuel-Limited Group EU 035Active

17 GP 010 PER 005 Fuel-Limited Group EU 035Removed

18 GP 011 PER 004 Coal Group EU 035, EU 041, EU 042, EU 044, EU 045, EU 046, EU 047, EU 050, EU 051Active

19 GP 011 PER 005 Coal Group EU 041, EU 042, EU 044, EU 045, EU 046, EU 047, EU 050, EU 051Removed

20 GP 012 PER 004 Greenhouse Gas Group EU 018, EU 034, EU 035, EU 049Active

21 GP 012 PER 005 Greenhouse Gas Group EU 034, EU 035, EU 049Removed

Page 1 of 1

Page 60: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name: Heron Lake BioEnergy LLC

1 May, 2015 15:40

FACILITY DESCRIPTION: STACK/VENTS (SV)

ID No. Discharge DirectionFlow Rate/Temperature

Information Source

Exit GasTemperature

at Top(ºF)

DesignFlow Rate

at Top(ACFM)

Width(feet)

Diameteror Length

(feet)

Inside DimensionsHeight ofOpening

FromGround(feet)

AddedBy

(Action)

RetiredBy

(Action)

OperatorID

for Item

Operators DescriptionStack/Vent

Status

1 SV 001 Up, No CapEstimate68390003.5160PER 004 SV010 Grain Baghouse Stack (CE001)Active

2 SV 001 Up, No CapEstimate68390003.67160PER 005 SV010 Grain Receiving & Handling Baghouse Stack (CE 001)Active

3 SV 002 Up, No CapEstimate68275002.7160PER 004 SV020 Hammermilling Stack (CE002)Active

4 SV 002 Up, No CapEstimate68275003.17160PER 005 SV020 Hammermilling Stack (CE 002)Active

5 SV 003 Up, No CapEstimate6860002.0104PER 004 SV030 Fermentation (CO2) Scrubber Stack (CE003)Active

6 SV 003 Up, No CapEstimate6860002.0104PER 005 SV030 Fermentation (CO2) Scrubber Stack (CE 003)Active

7 SV 004 Up, No CapEstimate425162002.67125PER 003 SV040 Regenerative Thermal Oxidizer (CE005)Active

8 SV 004 Up, No CapEstimate425720004.33125PER 005 SV040 Regenerative Thermal Oxidizer (CE 005)Active

9 SV 005 Up, No CapEstimate4251650006150PER 003 SV041 Bubbling Fluidized Bed Boiler w/ BaghouseActive

10 SV 005 Up, No CapEstimate4252250008.25150PER 005 SV041 NG-Fired Boiler (CE 028)Active

11 SV 006 Up, No CapEstimate183264402.030PER 003 SV050 Methanater Flare StackActive

12 SV 006 Up, No CapEstimate183264402.030PER 005 SV050 Methanater Flare StackRemoved

13 SV 007 Up, No CapEstimate70280003.0135PER 004 SV060 DDGS Cooler w/ Baghouse (CE027)Active

14 SV 007 Up, No CapEstimate68280003.0135PER 005 SV060 DDGS Cooler (EU 037) w/fabric filter (CE 027)Active

15 SV 008 Up, No CapEstimate70105001.1740PER 003 SV070 DDGS Baghouse (CE009)Active

16 SV 008 Up, No CapEstimate68105003.040PER 005 SV070 DDGS Handling & Loadout Baghouse (CE 009)Active

17 SV 009 Up, No CapEstimate183264408.035PER 003 SV080 Ethanol Loading Rack Flare (CE010)Active

18 SV 009 Up, No CapEstimate1287350007.535PER 005 SV080 Ethanol Loading Rack Flare (CE 010)Active

19 SV 013 Up, No CapEstimate7014800.92104PER 003 SV090 Coal Handling Baghouse (CE014)Active

20 SV 013 Up, No CapEstimate7014800.92104PER 005 SV090 Coal Handling Baghouse (CE014)Removed

21 SV 014 Up, No CapEstimate7015000.830.6733PER 003 SV100 Flyash Filter Receiver (CE015)Active

22 SV 014 Up, No CapEstimate7015000.830.6733PER 005 SV100 Flyash Filter Receiver (CE015)Removed

23 SV 015 Up, No CapEstimate6817340.7674PER 004 SV101 Flyash Storage Baghouse (CE016)Active

24 SV 015 Up, No CapEstimate6817340.7674PER 005 SV101 Flyash Storage Baghouse (CE016)Removed

25 SV 016 Up, No CapEstimate7015800.67100PER 004 SV150 Coal Storage Bin Vent (CE017)Active

26 SV 016 Up, No CapEstimate7015800.67100PER 005 SV150 Coal Storage Bin Vent (CE017)Removed

27 SV 017 Up, No CapEstimate77017400.258PER 004 SV160 Fire Pump (less than 500 hrs)Active

Page 1 of 2

Page 61: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name: Heron Lake BioEnergy LLC

1 May, 2015 15:40

FACILITY DESCRIPTION: STACK/VENTS (SV)

ID No. Discharge DirectionFlow Rate/Temperature

Information Source

Exit GasTemperature

at Top(ºF)

DesignFlow Rate

at Top(ACFM)

Width(feet)

Diameteror Length

(feet)

Inside DimensionsHeight ofOpening

FromGround(feet)

AddedBy

(Action)

RetiredBy

(Action)

OperatorID

for Item

Operators DescriptionStack/Vent

Status

28 SV 017 Up, No CapEstimate77017400.4178PER 005 SV160 Fire PumpActive

29 SV 018 HorizontalEstimate50120PER 002 DDGS storage siloActive

30 SV 018 HorizontalEstimate50120PER 005 DDGS storage siloRemoved

31 SV 019 Up, No CapEstimate707300.544PER 003 SV110 Limestone Baghouse (CE024)Active

32 SV 019 Up, No CapEstimate707300.544PER 005 SV110 Limestone Baghouse (CE024)Removed

33 SV 020 Up, No CapEstimate86519160.429PER 004 SV140 Admin. Bldg. Emergency GeneratorActive

34 SV 020 Up, No CapEstimate86519150.4179PER 005 SV140 Admin. Bldg. Emergency GeneratorActive

35 SV 021 Up, No CapEstimate707300.710.7145PER 004 Dry sorbent storage silo bin vent/baghouse (CE025)Active

36 SV 021 Up, No CapEstimate707300.710.7145PER 005 Dry sorbent storage silo bin vent/baghouse (CE025)Removed

37 SV 022 Up, No CapEstimate12107350.55PER 005 Emergency Boiler Water PumpActive

Page 2 of 2

Page 62: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name: Heron Lake BioEnergy LLC

1 May, 2015 15:40

FACILITY DESCRIPTION: CONTROL EQUIPMENT (CE)

ID No. AddedBy

(Action)

RetiredBy

(Action)

OperatorID

for Item

Control

Equip.Type

Control Equipment Description ModelControlEquip.Status

Manufacturer PollutantsControlled

AfterburnerCombustionParameters

CaptureEfficiency

(%)

Destruction/CollectionEfficiency

(%)

1 CE 001 PER 004 CE010 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDActive TBD PM2.5PM10PM

959595

80.096.698.7

2 CE 001 PER 005 CE010 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F 10SWF368Active Camcorp PM2.5PM2.5PM10PM10PMPM

959595959595

80.099

96.699

98.799

3 CE 002 PER 004 CE020 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDActive TBD PM2.5PM10PM

100100100

939399

4 CE 002 PER 005 CE020 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F 10SWF312Active Camcorp PM2.5PM2.5PM10PM10PM

100100100100100

9399939999

5 CE 003 PER 004 CE030 050 Packed-Gas Adsorption Column TBDActive TBD VOC 100 98.0

6 CE 003 PER 005 CE030 050 Packed-Gas Adsorption Column S/N 60957601Active A&B Process AcetaldyhyAcroleinFormaldehyMethanolVOC

100100100100100

98989898

98.0

7 CE 004 PER 003 CE040 099 FBB - no longer used as control TBDActive Energy Products ofIdaho

PMVOC

100100

9595

8 CE 004 PER 005 CE040 099 FBB - no longer used as control TBDRetired Energy Products ofIdaho

PMVOC

100100

9595

9 CE 005 PER 004 CE041 099 Thermal Oxidizer - Regenerative TBDActive TBD COPM10PMVOC

100100100100

9078.595.497.3

10 CE 005 PER 005 CE041 099 Thermal Oxidizer - Regenerative VRTO-CActive Eisenmann AcetaldyhyAcroleinCOCOFormaldehyMethanolPM2.5PM10PM10PMPMVOCVOC

100100100100100100100100100100100100100

98989098989895

78.595

95.495

97.398

Page 1 of 4

Page 63: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name: Heron Lake BioEnergy LLC

1 May, 2015 15:40

FACILITY DESCRIPTION: CONTROL EQUIPMENT (CE)

ID No. AddedBy

(Action)

RetiredBy

(Action)

OperatorID

for Item

Control

Equip.Type

Control Equipment Description ModelControlEquip.Status

Manufacturer PollutantsControlled

AfterburnerCombustionParameters

CaptureEfficiency

(%)

Destruction/CollectionEfficiency

(%)

11 CE 006 PER 004 CE050 076 Multiple Cyclone w/o Fly Ash Reinjection - MostMulticlones

TBDActive TBD PM10PM

100100

7290

12 CE 006 PER 005 CE050 076 Multiple Cyclone w/o Fly Ash Reinjection - MostMulticlones

EU018Active ICM PM2.5PM10PM10PM

100100100100

90729090

13 CE 007 PER 004 CE060 076 Multiple Cyclone w/o Fly Ash Reinjection - MostMulticlones

TBDActive TBD PM10PM

100100

7290

14 CE 007 PER 005 CE060 076 Multiple Cyclone w/o Fly Ash Reinjection - MostMulticlones

EU034Active ICM PM2.5PM10PM10PM

100100100100

90729090

15 CE 008 PER 004 CE070 023 Flaring TBDActive TBD VOC 100 90

16 CE 008 PER 005 CE070 023 Flaring TBDRemoved TBD VOC 100 90

17 CE 009 PER 004 CE080 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDActive TBD PM2.5PM10PM

959595

90.798.499.3

18 CE 009 PER 005 CE080 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F 10SWF112Active Camcorp PM2.5PM2.5PM10PM10PMPM

959595959595

90.799

98.499

99.399

19 CE 010 PER 004 CE090 023 Flaring TBDActive TBD VOC 100 98

20 CE 010 PER 005 CE090 023 Flaring ZCT-3-8-35-X-2/8-3/8Active John Zink Co VOC 100 98

21 CE 014 PER 004 CE103 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDActive TBD PM10PM

100100

98.799.3

22 CE 014 PER 005 CE103 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDRemoved TBD PM10PM

100100

98.799.3

23 CE 015 PER 004 CE104 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDActive TBD PM2.5PM10PM

100100100

999999

24 CE 015 PER 005 CE104 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDRemoved TBD PM2.5PM10PM

100100100

999999

25 CE 016 PER 004 CE105 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDActive TBD PM2.5PM10PM

100100100

999999

26 CE 016 PER 005 CE105 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDRemoved TBD PM2.5PM10PM

100100100

999999

Page 2 of 4

Page 64: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name: Heron Lake BioEnergy LLC

1 May, 2015 15:40

FACILITY DESCRIPTION: CONTROL EQUIPMENT (CE)

ID No. AddedBy

(Action)

RetiredBy

(Action)

OperatorID

for Item

Control

Equip.Type

Control Equipment Description ModelControlEquip.Status

Manufacturer PollutantsControlled

AfterburnerCombustionParameters

CaptureEfficiency

(%)

Destruction/CollectionEfficiency

(%)

27 CE 017 PER 004 CE106 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDActive TBD PM2.5PM10PM

100100100

999999

28 CE 017 PER 005 CE106 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDRemoved TBD PM2.5PM10PM

100100100

999999

29 CE 018 PER 004 CE110 041 Dry Limestone Injection TBDActive TBD SO2 100 75

30 CE 018 PER 005 CE110 041 Dry Limestone Injection TBDRemoved TBD SO2 100 75

31 CE 019 PER 004 CE111 107 Selective Noncatalytic Reduction for NOX TBDActive TBD NOx 100 75.6

32 CE 019 PER 005 CE111 107 Selective Noncatalytic Reduction for NOX TBDRemoved TBD NOx 100 75.6

33 CE 020 PER 004 CE112 016 Fabric Filter - High Temperature, i.e., T>250 Degrees F TBDActive TBD PM2.5LeadPM10PM

100100100100

98.299.4

9999

34 CE 020 PER 005 CE112 016 Fabric Filter - High Temperature, i.e., T>250 Degrees F TBDRemoved TBD PM2.5LeadPM10PM

100100100100

98.299.4

9999

35 CE 021 PER 001 CE107 013 Gas Scrubber (General, Not Classified) TBDActive TBD H2S 100 98

36 CE 021 PER 005 CE107 013 Gas Scrubber (General, Not Classified) TBDRemoved TBD H2S 100 98

37 CE 022 PER 004 099 Atomized Water Spray TBDActive TBD PM10PM

100100

5050

38 CE 022 PER 005 099 Atomized Water Spray TBDRemoved TBD PM10PM

100100

5050

39 CE 023 PER 003 CE113 099 Not InstalledActive

40 CE 023 PER 005 CE113 099 Not InstalledRetired

41 CE 024 PER 004 CE100 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDActive TBD PM2.5PM10PM

100100100

85.797.698.6

42 CE 024 PER 005 CE100 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDRemoved TBD PM2.5PM10PM

100100100

85.797.698.6

43 CE 025 PER 004 107 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDActive TBD PM10PM

100100

9999

44 CE 025 PER 005 107 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F TBDRemoved TBD PM10PM

100100

9999

Page 3 of 4

Page 65: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name: Heron Lake BioEnergy LLC

1 May, 2015 15:40

FACILITY DESCRIPTION: CONTROL EQUIPMENT (CE)

ID No. AddedBy

(Action)

RetiredBy

(Action)

OperatorID

for Item

Control

Equip.Type

Control Equipment Description ModelControlEquip.Status

Manufacturer PollutantsControlled

AfterburnerCombustionParameters

CaptureEfficiency

(%)

Destruction/CollectionEfficiency

(%)

45 CE 026 PER 004 206 Dry Sorbent InjectionActive MercuryNOxSO2

100100100

505050

46 CE 026 PER 005 206 Dry Sorbent InjectionRemoved MercuryNOxSO2

100100100

505050

47 CE 027 PER 004 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees FActive PM2.5PM10PM

100100100

939399

48 CE 027 PER 005 018 Fabric Filter - Low Temperature, i.e., T<180 Degrees F 10SWF432Active Camcorp PM2.5PM2.5PM10PM10PMPM

100100100100100100

939993999999

49 CE 028 PER 005 021 Direct Flame Afterburner 1486Active Energy Products ofIdaho

AcetaldyhyAcroleinCOFormaldehyMethanolPM2.5PM10PMVOC

100100100100100100100100100

989898989895959598

Page 4 of 4

Page 66: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

ST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name:

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROAD

1 May, 2015 15:41

FACILITY DESCRIPTION: EMISSION UNIT (EU)

MaxFuelInput

(mil Btu)

Heron Lake BioEnergy LLC

RetiredBy

(Action)

Operator DescriptionID No. EmissionUnit

Status

AddedBy

(Action)

ControlEquip.

ID No(s).

Stack/Vent

ID No(s).

OperatorID

for Item

Insignif-icant

Activity

SICManufacturer ModelNumber

Max.Design

Capacity

MaximumDesign

Capacity

Materials Units n Units d

1 Truck Receiving 1EU 001 Active PER 004 CE 001SV 001 (M) Hr 2869TBD TBD 7500 Bushel

2 Truck Receiving 1 -Loading-Unloading Equipment

EU 001 Active PER 005 CE 001SV 001 (M) Hr Grain2869Schlagel Inc S/N 158514-1 7500 Bushel

3 Truck Receiving 2EU 002 Active PER 004 CE 001SV 001 (M) Hr 2869TBD TBD 7500 Bushel

4 Truck Receiving 2 -Loading-Unloading Equipment

EU 002 Active PER 005 CE 001SV 001 (M) Hr Grain2869Schlagel Inc S/N 158513-1 7500 Bushel

5 Grain Elevator 1EU 003 Active PER 004 CE 001SV 001 (M) Hr 2869TBD TBD 15000 Bushel

6 Grain Elevator 1 - ElevatorEU 003 Active PER 005 CE 001SV 001 (M) Hr Grain2869Schlagel Inc 42208 15000 Bushel

7 ConveyorEU 004 Active PER 004 CE 001SV 001 (M) Hr 2869TBD TBD 15000 Bushel

8 ConveyorEU 004 Active PER 005 CE 001SV 001 (M) Hr Grain2869Schlagel Inc 1214 15000 Bushel

9 Grain Bin 1EU 005 Active PER 001 CE 001SV 001 (M) 2869TBD TBD 250000 Bushel

10 Grain Bin 1 - Silo/BinEU 005 Active PER 005 CE 001SV 001 (M) Grain2869McCormick Constructio Custom 250000 Bushel

11 Grain Bin 2EU 006 Active PER 001 CE 001SV 001 (M) 2869TBD TBD 250000 Bushel

12 Grain Bin 2 - Silo/BinEU 006 Active PER 005 CE 001SV 001 (M) Grain2869McCormick Constructio Custom 250000 Bushel

13 Grain Day Bin (scalping bin)EU 007 Active PER 003 CE 001SV 001 (M) 2869TBD TBD 250000 Bushel

14 Grain Day Bin (scalping bin) -Silo/Bin

EU 007 Active PER 005 CE 001SV 001 (M) Grain2869McCormick Constructio Custom 20000 Bushel

15 Grain Elevator 2EU 008 Active PER 001 CE 001SV 001 (M) Hr 2869TBD TBD 5000 Bushel

16 Grain Elevator 2 - ElevatorEU 008 Active PER 005 CE 001SV 001 (M) Hr Grain2869Schlagel Inc 42208 15000 Bushel

17 Grain Day Bin (grinding bin)EU 009 Active PER 003 CE 002SV 001 (M) 2869TBD TBD 5000 Bushel

18 Grain Day Bin (grinding bin) -Silo/Bin

EU 009 Active PER 005 CE 001SV 001 (M) Grain2869McCormick Constructio Custom 5000 Bushel

19 Hammermill Feed ConveyorEU 010 Active PER 001 CE 001SV 001 (M) Hr 2869TBD TBD 5000 Bushel

20 Hammermill Feed Conveyors -Conveyor

EU 010 Active PER 005 CE 001SV 001 (M) Hr Grain2869Schlagel Inc 1214 15000 Bushel

21 Hammermill 1EU 011 Active PER 004 CE 002SV 002 (M) Hr Corn2869TBD TBD 6000 Bushel

22 Hammermill 1 - MillingEquipment

EU 011 Active PER 005 CE 002SV 002 (M) Hr Grain2869Champion HRF48 1300 Bushel

23 Hammermill 2EU 012 Active PER 004 CE 002SV 002 (M) Hr Corn2869TBD TBD 6000 Bushel

24 Hammermill 2 - MillingEquipment

EU 012 Active PER 005 CE 002SV 002 (M) Hr Grain2869Champion HRF48 1300 Bushel

Page 1 of 6 (a)

Page 67: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

1 May, 2015 15:41

FACILITY DESCRIPTION: EMISSION UNIT (EU)

ID No. ElevatorType

BottleneckPct.Fuel/

SpaceHeat

Firing MethodAddedBy

(Action)

RemovalDate

InitialStartup

Date

Comm-ence

Const.Date

EmissionUnit

Status

1 EU 001 PER 004 03/01/200510/01/2004Active

2 EU 001 PER 005 09/21/200710/01/2005Active

3 EU 002 PER 004 03/01/200510/01/2004Active

4 EU 002 PER 005 09/21/200710/01/2005Active

5 EU 003 PER 004 03/01/200510/01/2004Active

6 EU 003 PER 005 09/21/200710/01/2005Active

7 EU 004 PER 004 03/01/200510/01/2004Active

8 EU 004 PER 005 09/21/200710/01/2005Active

9 EU 005 PER 001 03/01/200510/01/2004Active

10 EU 005 PER 005 09/21/200710/01/2005Active

11 EU 006 PER 001 03/01/200510/01/2004Active

12 EU 006 PER 005 09/21/200710/01/2005Active

13 EU 007 PER 003 03/01/200510/01/2004Active

14 EU 007 PER 005 09/21/200710/01/2005Active

15 EU 008 PER 001 03/01/200510/01/2004Active

16 EU 008 PER 005 09/21/200710/01/2005Active

17 EU 009 PER 003 03/01/200510/01/2004Active

18 EU 009 PER 005 09/21/200710/01/2005Active

19 EU 010 PER 001 03/01/200510/01/2004Active

20 EU 010 PER 005 09/21/200710/01/2005Active

21 EU 011 PER 004 03/01/200510/01/2004Active

22 EU 011 PER 005 09/21/200710/01/2005Active

23 EU 012 PER 004 03/01/200510/01/2004Active

24 EU 012 PER 005 09/21/200710/01/2005Active

Page 1 of 6 (b)

Page 68: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

ST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name:

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROAD

1 May, 2015 15:41

FACILITY DESCRIPTION: EMISSION UNIT (EU)

MaxFuelInput

(mil Btu)

Heron Lake BioEnergy LLC

RetiredBy

(Action)

Operator DescriptionID No. EmissionUnit

Status

AddedBy

(Action)

ControlEquip.

ID No(s).

Stack/Vent

ID No(s).

OperatorID

for Item

Insignif-icant

Activity

SICManufacturer ModelNumber

Max.Design

Capacity

MaximumDesign

Capacity

Materials Units n Units d

25 Fermenter 1EU 013 Active PER 001 CE 003SV 003 (M) 2869TBD TBD 730000 Gal

26 Fermenter 1; 730,000 gallons -Fermentation Equipment

EU 013 Active PER 005 CE 003SV 003 (M) Material2869WINBCO S/N 06998C 730000 Gal

27 Fermenter 2EU 014 Active PER 001 CE 003SV 003 (M) 2869TBD TBD 730000 Gal

28 Fermenter 2; 730,000 gallons -Fermentation Equipment

EU 014 Active PER 005 CE 003SV 003 (M) Material2869WINBCO S/N 06998D 730000 Gal

29 Fermenter 3EU 015 Active PER 001 CE 003SV 003 (M) 2869TBD TBD 730000 Gal

30 Fermenter 3; 730,000 gallons -Fermentation Equipment

EU 015 Active PER 005 CE 003SV 003 (M) Material2869WINBCO S/N 06998A 730000 Gal

31 Fermenter 4EU 016 Active PER 001 CE 003SV 003 (M) 2869TBD TBD 730000 Gal

32 Fermenter 4; 730,000 gallons -Fermentation Equipment

EU 016 Active PER 005 CE 003SV 003 (M) Material2869WINBCO S/N 06998B 730000 Gal

33 BeerwellEU 017 Active PER 001 CE 003SV 003 (M) 2869TBD TBD 985000 Gal

34 Beerwell; 985,000 gallons -Fermentation Equipment

EU 017 Active PER 005 CE 003SV 003 (M) Material2869WINBCO S/N 06999 985000 Gal

635 DDGS Dryer A (steam)EU 018 Active PER 004 CE 005CE 006

SV 004 (M) Hr DDGS 2869TBD TBD 22 Ton

36 DDGS Dryer A (CE 006 & CE005/SV 004 or CE 006 & CE028/SV 005) - Dehydrator

EU 018 Active PER 005 CE 005CE 006CE 028

SV 004 (O)SV 005 (O)

Hr DDGS 2869Davenport Dryer 11.75 X 70 RSTD 22 Ton

37 MixerEU 019 Active PER 003 CE 005SV 004 (M) Hr 2869TBD TBD 2000 Bushel

38 Mixer (CE 005/SV 004 or CE028/SV 005) - DistillationEquipment

EU 019 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Hr Grain2869ICM EU019 2000 Bushel

39 Slurry TankEU 020 Active PER 003 CE 005SV 004 (M) 2869TBD TBD 16000 Gal

40 Slurry Tank (CE 005/SV 004or CE 028/SV 005) -Distillation Equipment

EU 020 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Material2869WINBCO S/N 06996A 16295 Gal

41 Cook TubeEU 021 Active PER 003 CE 005SV 004 (M) Hr 2869TBD TBD 2000 Bushel

42 Cook Tube (CE 005/SV 004 orCE 028/SV 005) - DistillationEquipment

EU 021 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Material2869Mason MFG 1150 5000 Gal

43 Flash VesselEU 022 Active PER 003 CE 005SV 004 (M) 2869TBD TBD 2000 Gal

44 Flash Tank (CE 005/SV 004 orCE 028/SV 005) - DistillationEquipment

EU 022 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Material2869A&B Process Systems S/N 60957301 2400 Gal

Page 2 of 6 (a)

Page 69: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

1 May, 2015 15:41

FACILITY DESCRIPTION: EMISSION UNIT (EU)

ID No. ElevatorType

BottleneckPct.Fuel/

SpaceHeat

Firing MethodAddedBy

(Action)

RemovalDate

InitialStartup

Date

Comm-ence

Const.Date

EmissionUnit

Status

25 EU 013 PER 001 03/01/200510/01/2004Active

26 EU 013 PER 005 09/21/200710/01/2005Active

27 EU 014 PER 001 03/01/200510/01/2004Active

28 EU 014 PER 005 09/21/200710/01/2005Active

29 EU 015 PER 001 03/01/200510/01/2004Active

30 EU 015 PER 005 09/21/200710/01/2005Active

31 EU 016 PER 001 03/01/200510/01/2004Active

32 EU 016 PER 005 09/21/200710/01/2005Active

33 EU 017 PER 001 03/01/200510/01/2004Active

34 EU 017 PER 005 09/21/200710/01/2005Active

35 EU 018 PER 004 03/01/200510/01/2004Active

36 EU 018 PER 005 09/21/200710/01/2005Active

37 EU 019 PER 003 03/01/200510/01/2004Active

38 EU 019 PER 005 09/21/200710/01/2005Active

39 EU 020 PER 003 03/01/200510/01/2004Active

40 EU 020 PER 005 09/21/200710/01/2005Active

41 EU 021 PER 003 03/01/200510/01/2004Active

42 EU 021 PER 005 09/21/200710/01/2005Active

43 EU 022 PER 003 03/01/200510/01/2004Active

44 EU 022 PER 005 09/21/200710/01/2005Active

Page 2 of 6 (b)

Page 70: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

ST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name:

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROAD

1 May, 2015 15:41

FACILITY DESCRIPTION: EMISSION UNIT (EU)

MaxFuelInput

(mil Btu)

Heron Lake BioEnergy LLC

RetiredBy

(Action)

Operator DescriptionID No. EmissionUnit

Status

AddedBy

(Action)

ControlEquip.

ID No(s).

Stack/Vent

ID No(s).

OperatorID

for Item

Insignif-icant

Activity

SICManufacturer ModelNumber

Max.Design

Capacity

MaximumDesign

Capacity

Materials Units n Units d

45 Liquefaction Tank 1EU 023 Active PER 003 CE 005SV 004 (M) 2869TBD TBD Gal

46 Liquefaction Tank 1 (CE005/SV 004 or CE 028/SV005) - Liquefaction Equipment

EU 023 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Material2869WINBCO S/N 06997A 64,716 Gal

47 Liquefaction Tank 2EU 024 Active PER 003 CE 005SV 004 (M) 2869TBD TBD Gal

48 Liquefaction Tank 2 (CE005/SV 004 or CE 028/SV005) - Liquefaction Equipment

EU 024 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Material2869WINBCO S/N 06997B 64,716 Gal

49 Yeast TankEU 025 Active PER 003 CE 005SV 004 (M) 2869TBD TBD 6000 Gal

50 Yeast Tank (CE 005/SV 004 orCE 028/SV 005) - DistillationEquipment

EU 025 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Material2869Mueller CAL-F 6000 Gal

51 Beer ColumnEU 026 Active PER 003 CE 005SV 004 (M) Yr 2869TBD TBD 55 Mgal

52 Beer Column (CE 005/SV 004or CE 028/SV 005) -Distillation Equipment

EU 026 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Material2869A&B Process Systems S/N 60957602 55 Gal

53 Side StripperEU 027 Active PER 003 CE 005SV 004 (M) Yr 2869TBD TBD 55 Mgal

54 Side Stripper (CE 005/SV 004or CE 028/SV 005) -Distillation Equipment

EU 027 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Ethanol2869A&B Process Systems S/N 60957603 55 Gal

55 Rectifier ColumnEU 028 Active PER 003 CE 005SV 004 (M) Yr 2869TBD TBD 55 Mgal

56 Rectifier Column (CE 005/SV004 or CE 028/SV 005) -Distillation Equipment

EU 028 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Ethanol2869A&B Process Systems S/N 60957604 55 Gal

57 190 Proof CondenserEU 029 Active PER 003 CE 005SV 004 (M) Yr 2869TBD TBD 55 Mgal

58 190 Proof Condenser (CE005/SV 004 or CE 028/SV005) - Distillation Equipment

EU 029 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Ethanol2869Mason MFG S/N 06-4595 55 Gal

59 Molecular SieveEU 030 Active PER 003 CE 005SV 004 (M) Yr 2869TBD TBD 55 Mgal

60 Molecular Sieve (CE 005/SV004 or CE 028/SV 005) -Distillation Equipment

EU 030 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Ethanol2869Midwest Tank Co 17806 55 Gal

61 200 Proof CondenserEU 031 Active PER 003 CE 005SV 004 (M) Yr 2869TBD TBD 55 Mgal

62 200 Proof Condenser (CE005/SV 004 or CE 028/SV005) - Distillation Equipment

EU 031 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Ethanol2869Midwest Tank Co S/N 17806-1 55 Gal

Page 3 of 6 (a)

Page 71: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

1 May, 2015 15:41

FACILITY DESCRIPTION: EMISSION UNIT (EU)

ID No. ElevatorType

BottleneckPct.Fuel/

SpaceHeat

Firing MethodAddedBy

(Action)

RemovalDate

InitialStartup

Date

Comm-ence

Const.Date

EmissionUnit

Status

45 EU 023 PER 003 03/01/200510/01/2004Active

46 EU 023 PER 005 09/21/200710/01/2005Active

47 EU 024 PER 003 03/01/200510/01/2004Active

48 EU 024 PER 005 09/21/200710/01/2005Active

49 EU 025 PER 003 03/01/200510/01/2004Active

50 EU 025 PER 005 09/21/200710/01/2005Active

51 EU 026 PER 003 03/01/200510/01/2004Active

52 EU 026 PER 005 09/21/200710/01/2005Active

53 EU 027 PER 003 03/01/200510/01/2004Active

54 EU 027 PER 005 09/21/200710/01/2005Active

55 EU 028 PER 003 03/01/200510/01/2004Active

56 EU 028 PER 005 09/21/200710/01/2005Active

57 EU 029 PER 003 03/01/200510/01/2004Active

58 EU 029 PER 005 09/21/200710/01/2005Active

59 EU 030 PER 003 03/01/200510/01/2004Active

60 EU 030 PER 005 09/21/200710/01/2005Active

61 EU 031 PER 003 03/01/200510/01/2004Active

62 EU 031 PER 005 09/21/200710/01/2005Active

Page 3 of 6 (b)

Page 72: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

ST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name:

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROAD

1 May, 2015 15:41

FACILITY DESCRIPTION: EMISSION UNIT (EU)

MaxFuelInput

(mil Btu)

Heron Lake BioEnergy LLC

RetiredBy

(Action)

Operator DescriptionID No. EmissionUnit

Status

AddedBy

(Action)

ControlEquip.

ID No(s).

Stack/Vent

ID No(s).

OperatorID

for Item

Insignif-icant

Activity

SICManufacturer ModelNumber

Max.Design

Capacity

MaximumDesign

Capacity

Materials Units n Units d

63 CentrifugesEU 032 Active PER 003 CE 005SV 004 (M) Hr DDGS 2869TBD TBD 22 Ton

64 Centrifuges (CE 005/SV 004or CE 028/SV 005) -Distillation Equipment

EU 032 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Hr DDGS 2869Flottweg Z6E-4/454 22 Ton

65 EvaporatorsEU 033 Active PER 003 CE 005SV 004 (M) Hr DDGS 2869TBD TBD 22 Ton

66 Evaporators (CE 005/SV 004or CE 028/SV 005) -Distillation Equipment

EU 033 Active PER 005 CE 005CE 028

SV 004 (M)SV 005 (O)

Hr DDGS 2869APACHE 10954 22 Ton

4067 DDGS Dryer B (steam)EU 034 Active PER 004 CE 005CE 007

SV 004 (M) Hr DDGS 2869TBD TBD 22 Ton

68 DDGS Dryer B (CE 007 & CE005/SV 004 or CE 007 & CE028/SV 005) - Dehydrator

EU 034 Active PER 005 CE 005CE 007CE 028

SV 004 (O)SV 005 (O)

Hr DDGS 2869Davenport Dryers 11.75 X 70 RSTD 22 Ton

22069 Coal Fired Boiler BubblingFluidized Bed Combustor

EU 035 Active PER 004 CE 018CE 019CE 020CE 026

SV 005 (M) Hr Heat2869TBD TBD 220 Mmbtu

21070 NG-Fired Boiler (Direct FlameAfterburner CE 028) - Boiler

EU 035 Active PER 005 SV 005 (M) Hr Heat2869Energy Products of Ida Custom 210 Mmbtu

71 MethanatorEU 036 Active PER 004 CE 008SV 004 (M)SV 006 (B)

Day Methane2869TBD TBD 12600 Ft

72 MethanatorEU 036 Removed PER 005 SV 004 (M)SV 006 (B)

Day Methane2869TBD TBD 12600 Ft

73 Cooling CycloneEU 037 Active PER 004 CE 027SV 007 (M) Hr 2869TBD TBD 22 Ton

74 Cooling Cyclone w/fabric filter(CE 027) - Cooler

EU 037 Active PER 005 CE 027SV 007 (M) Hr DDGS 2869Camcorp 10SWF432 22 Ton

75 Truck Load Spout (DDGS)EU 038 Active PER 003 CE 009SV 008 (M) Hr 2869TBD TBD 20,000 Bushel

76 Truck Load Spout (DDGS) -Loading-Unloading Equipment

EU 038 Active PER 005 CE 009SV 008 (M) Hr Grain2869T&G Products S/N XR255 20,000 Bushel

77 DDGS Dump Pit/AugerEU 039 Active PER 001 CE 009SV 008 (M) Hr DDGS 2869TBD TBD 22 Ton

78 DDGS Dump Pit/Auger -Material Handling Equipment

EU 039 Active PER 005 CE 009SV 008 (M) Hr DDGS 2869Schlagel Inc 2020 22 Ton

79 Ethanol Loading RackEU 040 Active PER 003 CE 010SV 009 (O) 2869TBD TBD 5600

80 Ethanol Loading Rack -Loading-Unloading Equipment

EU 040 Active PER 005 CE 010SV 009 (O) Min Ethanol2869Determan Brownie Inc 090610687 5600 Gal

81 Coal and Limestone ReceivingEU 041 Active PER 004 CE 022 2869TBD TBD

Page 4 of 6 (a)

Page 73: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

1 May, 2015 15:41

FACILITY DESCRIPTION: EMISSION UNIT (EU)

ID No. ElevatorType

BottleneckPct.Fuel/

SpaceHeat

Firing MethodAddedBy

(Action)

RemovalDate

InitialStartup

Date

Comm-ence

Const.Date

EmissionUnit

Status

63 EU 032 PER 003 03/01/200510/01/2004Active

64 EU 032 PER 005 09/21/200710/01/2005Active

65 EU 033 PER 003 03/01/200510/01/2004Active

66 EU 033 PER 005 09/21/200710/01/2005Active

67 EU 034 PER 004 03/01/200510/01/2004Active

68 EU 034 PER 005 09/21/200710/01/2005Active

69 EU 035 PER 004 03/01/200510/01/2004Active

70 EU 035 PER 005 09/21/200710/01/2005Active

71 EU 036 PER 004 03/01/200510/01/2004Active

72 EU 036 PER 005 03/01/200510/01/2004Removed

73 EU 037 PER 004 03/01/200510/01/2004Active

74 EU 037 PER 005 09/21/200710/01/2005Active

75 EU 038 PER 003 03/01/200510/01/2004Active

76 EU 038 PER 005 09/21/200710/01/2005Active

77 EU 039 PER 001 03/01/200510/01/2004Active

78 EU 039 PER 005 09/21/200710/01/2005Active

79 EU 040 PER 003 03/01/200510/01/2004Active

80 EU 040 PER 005 09/21/200710/01/2005Active

81 EU 041 PER 004 03/01/200510/01/2004Active

Page 4 of 6 (b)

Page 74: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

ST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name:

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROAD

1 May, 2015 15:41

FACILITY DESCRIPTION: EMISSION UNIT (EU)

MaxFuelInput

(mil Btu)

Heron Lake BioEnergy LLC

RetiredBy

(Action)

Operator DescriptionID No. EmissionUnit

Status

AddedBy

(Action)

ControlEquip.

ID No(s).

Stack/Vent

ID No(s).

OperatorID

for Item

Insignif-icant

Activity

SICManufacturer ModelNumber

Max.Design

Capacity

MaximumDesign

Capacity

Materials Units n Units d

82 Coal and Limestone ReceivingEU 041 Removed PER 005 2869TBD TBD

83 Coal Storage SilosEU 042 Active PER 003 CE 017SV 013 (M) 2869TBD TBD

84 Coal Storage SilosEU 042 Removed PER 005 2869TBD TBD

85 Coal HandlingEU 044 Active PER 003 CE 014SV 013 (M) 2869TBD TBD

86 Coal HandlingEU 044 Removed PER 005 SV 013 (M) 2869TBD TBD

87 Flyash Filter ReceiverEU 045 Active PER 003 CE 015SV 014 (M) 2869TBD TBD

88 Flyash Filter ReceiverEU 045 Removed PER 005 SV 014 (M) 2869TBD TBD

89 Flyash StorageEU 046 Active PER 003 CE 016SV 015 (M) 2869TBD TBD

90 Flyash StorageEU 046 Removed PER 005 SV 015 (M) 2869TBD TBD

91 Coal Storage Bin VentEU 047 Active PER 003 CE 017SV 016 (M) 2869TBD TBD

92 Coal Storage Bin VentEU 047 Removed PER 005 SV 016 (M) 2869TBD TBD

93 Fire PumpEU 048 Active PER 001 SV 017 (M) 2869TBD TBD

94 Fire Pump 300 Hp CI 2005 -Reciprocating IC Engine

EU 048 Active PER 005 SV 017 (M) Hr Energy2869John Deere S/N RG6081H179216 300 Hp

695 Regenerative ThermalOxidizer (RTO)

EU 049 Active PER 004 SV 004 (M) Hr Heat2869TBD TBD 18 Mmbtu

1896 Regenerative ThermalOxidizer (RTO) - ThermalProcess Equipment

EU 049 Active PER 005 CE 005SV 004 (M) Hr Heat2869EISENMANN VRTO-C 18 Mmbtu

97 Limestone Storage SiloEU 050 Active PER 004 CE 024SV 019 (M) 2869TBD TBD

98 Limestone Storage SiloEU 050 Removed PER 005 CE 024SV 019 (M) 2869TBD TBD

99 Limestone Storage & HandlingEU 051 Active PER 004 CE 024SV 019 (M) Hr 2869TBD TBD 1 Ton

100 Limestone Storage & HandlingEU 051 Removed PER 005 CE 024SV 019 (M) Hr 2869TBD TBD 1 Ton

101 DDGS storage siloEU 052 Active PER 003 2869TBD TBD 4000 Ton

102 DDGS storage silo - Silo/BinEU 052 Active PER 005 CE 009SV 008 (M) DDGS 2869McCormick Constructio Custom 4000 Ton

103 Admin. Bldg. EmergencyGenerator

EU 053 Active PER 003 SV 020 (M) 2869

104 Admin Bldg EmergencyGenerator 268 Hp CI 2005 -Reciprocating IC Engine

EU 053 Active PER 005 SV 020 (M) Energy2869Cummins NT-855BG335 268 Hp

Page 5 of 6 (a)

Page 75: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

1 May, 2015 15:41

FACILITY DESCRIPTION: EMISSION UNIT (EU)

ID No. ElevatorType

BottleneckPct.Fuel/

SpaceHeat

Firing MethodAddedBy

(Action)

RemovalDate

InitialStartup

Date

Comm-ence

Const.Date

EmissionUnit

Status

82 EU 041 PER 005 03/01/200510/01/2004Removed

83 EU 042 PER 003 03/01/200510/01/2004Active

84 EU 042 PER 005 03/01/200510/01/2004Removed

85 EU 044 PER 003 03/01/200510/01/2004Active

86 EU 044 PER 005 11/07/201103/01/200510/01/2004Removed

87 EU 045 PER 003 03/01/200510/01/2004Active

88 EU 045 PER 005 11/07/201103/01/200510/01/2004Removed

89 EU 046 PER 003 03/01/200510/01/2004Active

90 EU 046 PER 005 11/07/201103/01/200510/01/2004Removed

91 EU 047 PER 003 03/01/200510/01/2004Active

92 EU 047 PER 005 11/07/201103/01/200510/01/2004Removed

93 EU 048 PER 001 03/01/200510/01/2004Active

94 EU 048 PER 005 09/21/200710/01/2005Active

95 EU 049 PER 004 03/01/200510/01/2004Active

96 EU 049 PER 005 09/21/200710/01/2005Active

97 EU 050 PER 004 03/01/200510/01/2004Active

98 EU 050 PER 005 11/07/201103/01/200510/01/2004Removed

99 EU 051 PER 004 10/01/2004Active

100 EU 051 PER 005 11/07/201110/01/2004Removed

101 EU 052 PER 003 10/01/200610/01/2005Active

102 EU 052 PER 005 10/01/200610/01/2005Active

103 EU 053 PER 003Active

104 EU 053 PER 005 09/21/200710/01/2005Active

Page 5 of 6 (b)

Page 76: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

ST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name:

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROAD

1 May, 2015 15:41

FACILITY DESCRIPTION: EMISSION UNIT (EU)

MaxFuelInput

(mil Btu)

Heron Lake BioEnergy LLC

RetiredBy

(Action)

Operator DescriptionID No. EmissionUnit

Status

AddedBy

(Action)

ControlEquip.

ID No(s).

Stack/Vent

ID No(s).

OperatorID

for Item

Insignif-icant

Activity

SICManufacturer ModelNumber

Max.Design

Capacity

MaximumDesign

Capacity

Materials Units n Units d

105 Boiler Feedwater EmergencyGenerator

EU 054 Active PER 003 2869

106 Boiler Feedwater EmergencyGenerator 150 Hp SI 2005 -Reciprocating IC Engine

EU 054 Active PER 005 SV 022 (M) Energy2869MTU Detroit Diesel Pow100PGS6NL (8.1 L) 150 Hp

107 DDGS storage siloEU 055 Active PER 003 2869

108 DDGS storage silo 2 - Silo/BinEU 055 Active PER 005 CE 009SV 008 (M) DDGS 2869McCormick Constructio Custom 4000 Ton

109 Dry sorbent storage siloEU 056 Active PER 004 CE 025SV 021 (M) 2869

110 Dry sorbent storage siloEU 056 Removed PER 005 SV 021 (M) 2869

111 Hammermill 3 - MillingEquipment

EU 057 Active PER 005 CE 002SV 002 (M) Grain2869TBD TBD 1300 Bushel

112 Fermenter 5; 730,000 gallons -Fermentation Equipment

EU 058 Active PER 005 CE 003SV 003 (M) Material2869TBD TBD 730,000 Gal

113 Fermenter 6; 730,000 gallons -Fermentation Equipment

EU 059 Active PER 005 CE 003SV 003 (M) Material2869TBD TBD 730,000 Gal

114 Molecular Sieve (CE 005/SV004 or CE 028/SV 005) -Distillation Equipment

EU 060 Active PER 005 CE 005CE 028

SV 004 (O)SV 005 (O)

Ethanol2869TBD TBD 7900 Gal

12.8115 Loading Rack Flare (CE 010;air assisted) - ThermalProcess Equipment

EU 061 Active PER 005 CE 010SV 009 Hr Heat2869John Zink Co ZCT-3-8-35-X-2/8-3/8 12.8 Mmbtu

Page 6 of 6 (a)

Page 77: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

1 May, 2015 15:41

FACILITY DESCRIPTION: EMISSION UNIT (EU)

ID No. ElevatorType

BottleneckPct.Fuel/

SpaceHeat

Firing MethodAddedBy

(Action)

RemovalDate

InitialStartup

Date

Comm-ence

Const.Date

EmissionUnit

Status

105 EU 054 PER 003Active

106 EU 054 PER 005 09/21/200710/01/2005Active

107 EU 055 PER 003Active

108 EU 055 PER 005 09/21/200710/01/2005Active

109 EU 056 PER 004Active

110 EU 056 PER 005Removed

111 EU 057 PER 005Active

112 EU 058 PER 005Active

113 EU 059 PER 005Active

114 EU 060 PER 005Active

115 EU 061 PER 005 09/21/200710/01/2005Active

Page 6 of 6 (b)

Page 78: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name: Heron Lake BioEnergy LLC

1 May, 2015 15:41

FACILITY DESCRIPTION: CONTINUOUS MONITORS (MR)

ParametersMonitored

Serial NumberID No. Model NumberManufacturerOperatorID

for Item

MonitoredItem

(ID No(s).)

RetiredBy

(Action)

AddedBy

(Action)

Monitor DescriptionMonitorStatus

1 NOxMR 001 TBDEU 035PER 004 NOxActive

2 NOxT09022MR 001 California AnalyticalCalifornia AnalyticalEU 035PER 005 NOxActive

3 SO2MR 002 TBDEU 035PER 004 SO2Active

4 SO2MR 002 TBDPER 005 SO2Removed

5 OpacityMR 003 TBDEU 035PER 004 OpacityActive

6 OpacityMR 003 TBDPER 005 OpacityRemoved

7 AmmoniaMR 004 TBDEU 035PER 004 AmmoniaActive

8 AmmoniaMR 004 TBDPER 005 AmmoniaRemoved

9 TempMR 005 CE 005PER 005 RTO TemperatureActive

10 TempMR 006 CE 028PER 005 Direct Flame Afterburner TemperatureActive

Page 1 of 1 (a)

Page 79: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

1 May, 2015 15:41

FACILITY DESCRIPTION: CONTINUOUS MONITORS (MR)

ID No. AddedBy

(Action)

SpanValue

SystemFull-

ScaleValue

BypassCapa-bility?

RemovalDate

InstallationDate

OpticalPath

LengthRatio

MonitorStatus

1 MR 001 PER 004 1000 1000 NoActive

2 MR 001 PER 005 1000 1000 NoActive

3 MR 002 PER 004 20 200 NoActive

4 MR 002 PER 005 20 200 NoRemoved

5 MR 003 PER 004 60 60 NoActive

6 MR 003 PER 005 60 60 NoRemoved

7 MR 004 PER 004Active

8 MR 004 PER 005Removed

9 MR 005 PER 005Active

10 MR 006 PER 005Active

Page 1 of 1 (b)

Page 80: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name: Heron Lake BioEnergy LLC

1 May, 2015 15:41

FACILITY DESCRIPTION: FUGITIVE SOURCES (FS)

ID No. Fugitive Source Description YearInstalled

YearRemoved

AddedBy

(Action)

RetiredBy

(Action)

Insignif-icant

Activity

OperatorID

for Item

Pollutant(s)Emitted

ControlEquip.

ID No(s).

FugitiveSourceStatus

1 FS 001 PER 004 FS010 PMPM10PM2.5

Truck TrafficActive

2 FS 001 PER 005 FS010 PMPM10PM2.5

Paved Road RequirementsActive

3 FS 002 PER 004 FS020 PMPM10PM2.5

Uncaptured Grain Handling EmissionsActive

4 FS 002 PER 005 FS020 PMPM10PM2.5

Uncaptured Grain Handling Emissions - Material Handling/Transfer/StorageActive

5 FS 003 PER 004 FS030 PM10PMPM2.5

Uncaptured DDGS Handling EmissionsActive

6 FS 003 PER 005 FS030 PM10PMPM2.5

Uncaptured DDGS Handling Emissions - Material Handling/Transfer/StorageActive

7 FS 004 PER 001 FS040 VOC Equipment LeaksActive

8 FS 005 PER 003 FS050 PMPM10

Cooling Towers (1,500,000 gph)Active

9 FS 006 PER 004 FS060 PMPM10PM2.5

DDGS Storage PileActive

10 FS 006 PER 005 FS060 PMPM10PM2.5

DDGS Storage Pile - Material Handling/Transfer/StorageActive

11 FS 007 PER 001 FS070 VOC Ethanol Loadout (Rail)Active

12 FS 007 PER 005 FS070 VOC Ethanol Loadout (Rail) - Material Handling/Transfer/StorageActive

13 FS 008 PER 004 FS080 PMPM10PM2.5

Coal/Limestone ReceivingActive

14 FS 008 PER 005 FS080 PMPM10PM2.5

Coal/Limestone ReceivingRemoved

15 FS 009 PER 004 FS090 PM10PMPM2.5

Flyash LoadoutActive

16 FS 009 PER 005 FS090 PM10PMPM2.5

Flyash LoadoutRemoved

Page 1 of 2

Page 81: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

Show: Active and Pending RecordsAction: PER 005AQD Facility ID: 06300025Facility Name: Heron Lake BioEnergy LLC

1 May, 2015 15:41

FACILITY DESCRIPTION: FUGITIVE SOURCES (FS)

ID No. Fugitive Source Description YearInstalled

YearRemoved

AddedBy

(Action)

RetiredBy

(Action)

Insignif-icant

Activity

OperatorID

for Item

Pollutant(s)Emitted

ControlEquip.

ID No(s).

FugitiveSourceStatus

17 FS 010 2007PER 003 FS100 PMPM10

BFB bed sand storageActive

18 FS 010 2007PER 005 FS100 PMPM10

BFB bed sand storageRemoved

19 FS 011 2007PER 004 FS110 PM Coal Diverter ChuteRetired

20 FS 011 2007PER 005 FS110 PM Coal Diverter ChuteRemoved

21 FS 012 2007PER 004 FS120 PM10 Temporary Grain StorageRetired

22 FS 012 2007PER 005 FS120 PM10 Temporary Grain StorageRemoved

23 FS 013 2009PER 004 FS140 PM10PM

Emergency coal storage pileActive

24 FS 013 2009PER 005 FS140 PM10PM

Emergency coal storage pileRemoved

Page 2 of 2

Page 82: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

EU 054

Carbon Dioxide Equivalent PER 005 7.31E+001.46E+02 6.40E+02Methane PER 005 3.00E-047.00E-03 3.00E-02Carbon Monoxide PER 004 1.60E-01 4.00E-023.10E+00 1.36E+01Carbon Monoxide PER 005 7.50E-011.50E+01 6.57E+01Carbon Dioxide PER 005 7.28E+001.46E+02 6.37E+02Nitrous Oxide PER 005 7.00E-051.40E-03 6.00E-03Nitrogen Oxides PER 004 1.00E-01 2.00E-022.00E+00 8.76E+00Nitrogen Oxides PER 005 6.00E-021.14E+00 4.49E+00PM < 2.5 micron PER 004 1.00E-02 1.00E-022.00E-01 1.80E-01PM < 2.5 micron PER 005 2.00E-034.00E-02 1.90E-01PM < 10 micron PER 004 1.00E-02 1.00E-024.00E-02 1.80E-01PM < 10 micron PER 005 2.00E-034.00E-02 1.90E-01Total Particulate Matter PER 004 1.00E-02 1.00E-022.10E-01 9.20E-01Total Particulate Matter PER 005 2.00E-034.00E-02 1.90E-01Volatile Organic Compounds PER 004 2.00E-02 1.00E-028.00E-02 3.50E-01Volatile Organic Compounds PER 005 2.00E-024.40E-01 1.91E+00

FS 001

PM < 2.5 micron PER 004 8.00E-02 8.00E-015.30E-02 8.00E-01PM < 2.5 micron PER 005 6.50E-011.50E-01 6.50E-01PM < 10 micron PER 004 7.30E-01 5.00E-014.00E-01 7.30E+00PM < 10 micron PER 005 2.63E+006.00E-01 2.63E+00Total Particulate Matter PER 004 2.75E+01 2.28E+012.89E+00 5.50E+01Total Particulate Matter PER 005 1.31E+013.00E+00 1.31E+01

FS 002

PM < 2.5 micron PER 004 1.80E-01 1.50E-011.00E-01 7.60E-01PM < 2.5 micron PER 005 5.90E-026.30E-02 2.80E-01PM < 10 micron PER 004 1.14E+00 1.00E+006.30E-01 1.10E+01PM < 10 micron PER 005 3.50E-013.80E-01 1.65E+00Total Particulate Matter PER 004 2.62E+00 2.00E+002.40E-01Total Particulate Matter PER 005 1.25E+001.33E+00 5.84E+00

FS 003

PM < 2.5 micron PER 004 4.00E-03 4.00E-031.00E-02 2.00E-02PM < 2.5 micron PER 005 5.00E-031.60E-02 7.00E-02PM < 10 micron PER 004 4.00E-03 6.00E-021.60E-02 2.00E-02PM < 10 micron PER 005 5.00E-031.60E-02 7.00E-02Total Particulate Matter PER 004 2.00E-02 2.00E-026.00E-02Total Particulate Matter PER 005 2.00E-026.60E-02 2.90E-01

FS 004

Acetaldehyde PER 004 8.00E-01 7.00E-011.80E-01Acetaldehyde PER 005 1.36E+00 1.36E+003.10E-01 8.83E+00Acrolein PER 004 2.00E-02 2.00E-024.60E-03Acrolein PER 005 4.00E-02 4.00E-029.00E-03 2.60E-01Formaldehyde PER 004 9.00E-04 9.00E-04Formaldehyde PER 005 1.50E-03 1.50E-033.00E-04 1.00E-02Methanol PER 004 8.00E-021.80E-02Methanol PER 005 1.30E-01 1.30E-013.00E-02 8.50E-01

Page 1 of 13

Page 83: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

FS 004

HAPs - Total PER 004 9.00E-01 9.00E-012.10E-01HAPs - Total PER 005 1.53E+00 1.53E+003.50E-01 9.95E+00Volatile Organic Compounds PER 004 5.16E+00 5.00E+001.20E+00 1.00E+01Volatile Organic Compounds PER 005 8.78E+00 8.78E+002.00E+00 5.70E+01

FS 005

PM < 2.5 micron PER 004 1.37E+00 1.30E+003.10E-01 1.37E+00PM < 2.5 micron PER 005 1.64E+00 1.64E+003.80E-01 1.64E+00PM < 10 micron PER 004 1.37E+00 1.00E+003.10E-01 2.70E+01PM < 10 micron PER 005 1.64E+00 1.64E+003.80E-01 1.64E+00Total Particulate Matter PER 004 1.37E+00 6.00E+001.56E+00 6.85E+00Total Particulate Matter PER 005 1.64E+00 1.64E+003.80E-01 1.64E+00

FS 006

PM < 2.5 micron PER 004 4.00E-02 4.00E-029.10E-03 1.00E-01PM < 2.5 micron PER 005 1.54E-013.50E-02 1.54E-01PM < 10 micron PER 004 4.00E-02 4.00E-029.11E-03 1.00E-01PM < 10 micron PER 005 1.54E-013.50E-02 1.54E-01Total Particulate Matter PER 004 2.10E-02Total Particulate Matter PER 005 6.36E-011.45E-01 6.36E-01

FS 007

Acetaldehyde PER 005 4.75E-051.09E-05 2.00E-03Benzene PER 004 1.00E-01 1.00E-012.30E-02Benzene PER 005 1.20E-012.70E-02 5.97E+00Cumene PER 004 4.00E-02 4.00E-021.00E-02Cumene PER 005 5.00E-021.10E-02 2.44E+00Ethylbenzene PER 004 8.00E-02 1.00E-021.80E-02Ethylbenzene PER 005 1.00E-012.20E-02 4.88E+00Hexane PER 004 2.10E-03 2.00E-037.10E-02Hexane PER 005 2.10E-034.88E-04 1.07E-01Methanol PER 005 4.75E-051.09E-05 2.00E-03HAPs - Total PER 004 1.62E+00 4.50E-011.00E-01HAPs - Total PER 005 1.58E+003.62E-01 7.92E+01Toluene PER 004 6.10E-01 6.00E-011.10E-02Toluene PER 005 7.30E-011.67E-01 3.66E+01Xylenes (mixed isomers) PER 004 4.90E-01 4.90E-011.10E-01Xylenes (mixed isomers) PER 005 5.90E-011.34E-01 2.93E+01Methyl tert butyl ether PER 004 3.00E-01 3.00E-016.80E-02Methyl tert butyl ether PER 005HAP-Single PER 001 3.10E-01 3.10E-017.10E-02HAP-Single PER 005Volatile Organic Compounds PER 004 4.28E+00 4.00E+009.80E-01 2.00E+01Volatile Organic Compounds PER 005 4.88E+001.11E+00 2.44E+02

FS 008

PM < 2.5 micron PER 004 2.00E-02 2.00E-021.00E-02 1.00E+00PM < 2.5 micron PER 005PM < 10 micron PER 004 1.87E+00 1.50E+001.03E+00 9.35E+00PM < 10 micron PER 005

Page 2 of 13

Page 84: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

FS 008

Total Particulate Matter PER 004 3.72E+00 3.00E+001.00E+00Total Particulate Matter PER 005

FS 009

PM < 2.5 micron PER 004 1.14E+00 1.00E+006.40E-01 2.00E+00PM < 2.5 micron PER 005PM < 10 micron PER 004 1.14E+00 1.00E+006.40E-01 2.00E+00PM < 10 micron PER 005Total Particulate Matter PER 004 1.14E+00 1.00E+006.40E-01Total Particulate Matter PER 005

FS 012

PM < 10 micron PER 004Total Particulate Matter PER 004

FS 013

PM < 10 micron PER 004Total Particulate Matter PER 004

SV 001

PM < 2.5 micron PER 004 5.86E+00 5.00E+001.34E+00 5.86E+02PM < 10 micron PER 004 5.86E+00 1.17E+001.34E+00 5.86E+02Total Particulate Matter PER 004 5.86E+00 1.17E+001.34E+00 5.86E+02

SV 002

PM < 2.5 micron PER 004 4.13E+00 4.00E+009.40E-01 4.13E+02PM < 2.5 micron PER 005 4.13E+00 4.00E+009.43E-01 4.13E+02PM < 10 micron PER 004 4.13E+00 2.64E+009.41E-01 4.13E+02PM < 10 micron PER 005 4.13E+00 2.64E+009.43E-01 4.13E+02Total Particulate Matter PER 004 4.13E+00 2.64E+009.41E-01 4.13E+02Total Particulate Matter PER 005 4.13E+00 2.64E+009.43E-01 4.13E+02

SV 003

Acetaldehyde PER 004 5.90E+00 5.00E+001.35E+00 1.18E+02Acetaldehyde PER 005 4.80E+001.10E+00 2.40E+02Acrolein PER 004 3.00E-02 2.10E-026.80E-03 6.00E-01Acrolein PER 005 2.60E-026.00E-03 1.31E+00Carbon Dioxide Equivalent PER 005 2.27E+055.19E+04 2.27E+05Carbon Dioxide PER 005 2.27E+055.19E+04 2.27E+05Formaldehyde PER 004 3.00E-02 1.80E-026.80E-03 6.00E-01Formaldehyde PER 005 6.60E-021.50E-02 3.29E+00Methanol PER 004 4.00E-02 1.80E-029.10E-03 8.00E-01Methanol PER 005 6.70E-021.50E-02 3.35E+00HAPs - Total PER 004 5.98E+00 5.00E+001.37E+00HAPs - Total PER 005 4.96E+001.13E+00 2.48E+02PM < 2.5 micron PER 004 1.70E-01 1.00E-014.00E-02 1.70E+01PM < 2.5 micron PER 005 1.75E-014.00E-02 1.75E-01PM < 10 micron PER 004 1.70E-01 1.00E-014.00E-02 1.70E+01PM < 10 micron PER 005 1.75E-014.00E-02 1.75E-01Total Particulate Matter PER 005 1.75E-014.00E-02 1.75E-01HAP-Single PER 004 5.90E+00 5.00E+001.35E+00 1.18E+02

Page 3 of 13

Page 85: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

SV 003

HAP-Single PER 005Volatile Organic Compounds PER 004 2.19E+01 2.00E+015.00E+00 4.38E+02Volatile Organic Compounds PER 005 2.64E+016.00E+00 1.32E+03

SV 004

Acetaldehyde PER 004 8.57E-01 7.10E-012.00E-01Acetaldehyde PER 005 6.60E-011.50E-01 3.29E+01Acrolein PER 004 2.02E-01 1.05E-014.60E-02Acrolein PER 005 7.00E-021.50E-02 3.29E+00Benzene PER 001 5.30E-05 5.30E-051.20E-05Benzene PER 005 1.62E-043.71E-05 1.62E-04Carbon Dioxide Equivalent PER 005 1.13E+042.57E+03 1.13E+04Methane PER 005 4.20E-011.00E-01 4.20E-01Carbon Monoxide PER 004 4.13E+01 4.00E+019.42E+00 4.12E+02Carbon Monoxide PER 005 5.07E+011.16E+01 2.53E+03Carbon Dioxide PER 005 1.12E+042.56E+03 1.12E+04Formaldehyde PER 004 9.55E-01 9.00E-012.20E-01Formaldehyde PER 005 3.30E-017.50E-02 1.64E+01Hexane PER 004 1.42E-01 1.40E-013.20E-02Hexane PER 005 1.39E-013.18E-02 1.39E-01Methanol PER 004 3.37E-01 3.30E-017.70E-02Methanol PER 005 3.30E-017.50E-02 1.64E+01HAPs - Total PER 004 2.49E+00 2.00E+003.70E-01HAPs - Total PER 005 1.53E+003.48E-01 6.91E+01Toluene PER 004 3.00E-04 3.00E-047.00E-05Toluene PER 005 2.63E-046.00E-05 2.63E-04Nitrous Oxide PER 005 8.00E-022.00E-02 8.00E-02Nickel compounds PER 001 5.30E-05 5.30E-051.20E-05Nickel compounds PER 005 1.62E-043.71E-05 1.62E-04Nitrogen Oxides PER 004 8.32E+00 8.00E+001.90E+00 8.32E+00Nitrogen Oxides PER 005 1.01E+012.31E+00 1.01E+01PM < 2.5 micron PER 004 1.16E+01 1.00E+012.65E+00 5.60E+01PM < 2.5 micron PER 005 1.43E+013.25E+00 2.85E+02PM < 10 micron PER 004 1.16E+01 5.00E+002.65E+00 1.16E+02PM < 10 micron PER 005 1.43E+013.25E+00 2.85E+02Total Particulate Matter PER 004 1.16E+01 5.00E+002.65E+00 1.16E+02Total Particulate Matter PER 005 1.43E+013.25E+00 2.85E+02HAP-Single PER 001 7.10E-01 7.10E-011.62E-01HAP-Single PER 005Sulfur Dioxide PER 004 2.76E+01 2.00E+016.30E+00 2.76E+01Sulfur Dioxide PER 005 3.39E+017.73E+00 3.39E+01Volatile Organic Compounds PER 004 3.07E+01 3.00E+017.00E+00 6.13E+02Volatile Organic Compounds PER 005 3.76E+018.59E+00 1.88E+03

SV 005

Acetaldehyde PER 004 3.12E-02 3.00E-027.10E-03Acetaldehyde PER 005 6.90E-011.57E-01 3.45E+01Acetophenone PER 001 8.20E-04 8.20E-041.90E-04

Page 4 of 13

Page 86: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

SV 005

Acetophenone PER 005Acrolein PER 004 1.59E-02 1.50E-023.60E-03Acrolein PER 005 1.60E-013.70E-02 8.12E+00Benzene PER 004 9.64E-02 7.12E-022.20E-02Benzene PER 005 1.90E-034.32E-04 1.90E-03Arsenic compounds PER 001 2.24E-02 2.24E-025.13E-03Arsenic compounds PER 005 1.80E-044.12E-05 1.80E-04Benzyl chloride PER 001 4.00E-02 4.00E-021.00E-02Benzyl chloride PER 005Biphenyl PER 001Bis(2-ethylhexyl) phthalate PER 001 4.00E-03 4.00E-039.13E-04Bis(2-ethylhexyl) phthalate PER 005Bromoform PER 001 2.14E-03 2.14E-034.88E-04Bromoform PER 005Bromomethane PER 001 8.76E-03 8.76E-032.00E-03Bromomethane PER 005Beryllium PER 001 1.15E-03 1.15E-032.63E-04Beryllium PER 005 1.08E-052.47E-06 1.08E-05Carbon disulfide PER 001 4.16E-02 4.16E-029.50E-03Carbon disulfide PER 005Carbon Dioxide Equivalent PER 005 1.08E+052.46E+04 1.08E+05Chlorine PER 004 3.85E-01 3.80E-018.80E-02 4.00E-01Chlorine PER 0052-Chloroacetophenone PER 001 3.83E-04 3.83E-042-Chloroacetophenone PER 005Chlorobenzene PER 001 1.20E-03 1.20E-032.75E-04Chlorobenzene PER 005Chloroethane PER 001 2.30E-03 2.30E-035.25E-04Chloroethane PER 005Chloroform PER 001 3.23E-03 3.23E-037.38E-04Chloroform PER 005Cadmium compounds PER 001 3.00E-03 3.00E-036.80E-04Cadmium compounds PER 005 1.00E-032.26E-04 1.00E-03Methane PER 005 2.03E+004.60E-01 2.03E+00Cyanide compounds PER 001 1.37E-01 1.37E-013.13E-02Cyanide compounds PER 005Carbon Monoxide PER 004 1.05E+02 1.00E+022.40E+01 4.95E+02Carbon Monoxide PER 005 1.15E+022.64E+01 2.55E+03Carbon Dioxide PER 005 1.08E+052.46E+04 1.08E+05Cobalt compounds PER 001 5.48E-03 5.48E-031.25E-03Cobalt compounds PER 005 8.00E-051.73E-05 8.00E-05Chromium compounds PER 001 1.88E-02 1.88E-024.28E-03Chromium compounds PER 005 1.30E-032.88E-04 1.30E-03Cumene PER 001 2.90E-04 2.90E-04Cumene PER 005Dibenzofuran PER 001

Page 5 of 13

Page 87: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

SV 005

1,4-Dichlorobenzene PER 001 2.00E-04 2.00E-041,4-Dichlorobenzene PER 005 1.10E-032.47E-04 1.10E-031,2-Dichloroethane PER 001 2.19E-03 2.19E-035.00E-041,2-Dichloroethane PER 005Dimethyl sulfate PER 001 2.63E-03 2.63E-036.00E-04Dimethyl sulfate PER 0052,4-Dinitrotoluene PER 001Ethylbenzene PER 001 5.15E-03 5.15E-031.18E-03Ethylbenzene PER 005Formaldehyde PER 004 1.31E-02 1.00E-023.00E-03Formaldehyde PER 005 7.60E-011.74E-01 3.82E+01Hexane PER 004 3.06E-016.90E-02Hexane PER 005 1.62E+003.70E-01 1.62E+00Hydrogen fluoride PER 004 1.93E+00 1.10E+004.40E-01 1.93E+01Hydrogen fluoride PER 005Methanol PER 004 7.71E-01 7.70E-011.80E-01Methanol PER 005 2.70E-016.20E-02 1.35E+01Methyl ethyl ketone (MEK) PER 001 2.14E-02 2.14E-024.88E-03Methyl ethyl ketone (MEK) PER 005Methylhydrazine PER 004 9.30E-03 9.00E-032.13E-03Methylhydrazine PER 005Naphthalene PER 001 8.15E-04 8.15E-041.86E-04Naphthalene PER 005 5.50E-041.26E-04 5.50E-04HAPs - Total PER 004 7.32E+00 7.00E+008.80E-01HAPs - Total PER 005 3.52E+008.04E-01 9.59E+01Mercury PER 004 2.90E-03 2.90E-036.60E-04 1.45E-02Mercury PER 005 2.30E-045.35E-05 2.30E-04Phenol PER 001 8.76E-04 8.76E-032.00E-04Phenol PER 005Styrene PER 001 1.37E-03 1.37E-033.13E-04Styrene PER 0052,3,7,8-TCDD (dioxin) PER 001Tetrachloroethylene PER 001 2.35E-03 2.35E-035.38E-04Tetrachloroethylene PER 005Toluene PER 004 1.31E-02 1.00E-023.00E-03Toluene PER 005 3.10E-037.00E-04 3.10E-031,1,1-Trichloroethane PER 001 1.10E-03 1.10E-032.50E-041,1,1-Trichloroethane PER 005Vinyl acetate PER 001 4.16E-04 4.16E-04Vinyl acetate PER 005Xylenes (mixed isomers) PER 001 2.03E-03 2.03E-034.63E-04Hydrochloric acid PER 004 3.85E+00 3.00E+008.80E-01 3.85E+01Hydrochloric acid PER 0057,12-Dimethylbenz(a)anthracene PER 005 1.44E-053.29E-06 1.44E-053-Methylchloranthrene PER 005 1.60E-063.71E-07 1.60E-062-Methylnaphthalene PER 005 2.20E-054.94E-06 2.20E-05

Page 6 of 13

Page 88: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

SV 005

Manganese compounds PER 001 2.68E-02 2.68E-026.13E-03Manganese compounds PER 005 3.40E-047.82E-05 3.40E-04Acenaphthene PER 001Acenaphthene PER 005 1.60E-063.71E-07 1.60E-06Acenaphthylene PER 005 1.60E-063.71E-07 1.60E-06Anthracene PER 001Anthracene PER 005 2.20E-064.94E-07 2.20E-06Benz(a)anthracene PER 001Benz(a)anthracene PER 005 1.60E-063.71E-07 1.60E-06Benzo(a)pyrene PER 001Benzo(a)pyrene PER 005 1.10E-062.47E-07 1.10E-06Benzo(b)fluoranthene PER 005 1.60E-063.71E-07 1.60E-06Benzo(ghi)perylene PER 001Benzo(ghi)perylene PER 005 1.10E-062.47E-07 1.10E-06Benzo(k)fluoranthene PER 001Benzo(k)fluoranthene PER 005 1.60E-063.71E-07 1.60E-06Chrysene PER 001Chrysene PER 005 1.60E-063.71E-07 1.60E-06Dibenz(a,h)anthracene PER 005 1.10E-062.47E-07 1.10E-06Ethylene dibromide (dibromoeth PER 001Fluoranthene PER 005 2.70E-066.18E-07 2.70E-06Fluorene PER 005 2.50E-065.76E-07 2.50E-06Nitrous Oxide PER 005 2.00E-014.60E-02 2.00E-01Indeno(1,2,3-cd)pyrene PER 001Indeno(1,2,3-cd)pyrene PER 005 1.60E-063.71E-07 1.60E-06Isophorone PER 001 3.18E-02 3.18E-027.25E-03Isophorone PER 005Lead Compounds PER 004 2.90E-03 2.00E-036.60E-04 2.90E-01Lead Compounds PER 005Methyl chloride (chloromethane PER 004 2.90E-02 2.00E-026.60E-03Methyl chloride (chloromethane PER 005Methyl tert butyl ether PER 001 1.92E-03 1.92E-034.38E-04Methyl tert butyl ether PER 005Methylene chloride (dichlorome PER 001 1.59E-02 1.59E-023.63E-03Methylene chloride (dichlorome PER 005Phenanthrene PER 001 1.48E-04 1.48E-04Phenanthrene PER 005 1.50E-053.50E-06 1.50E-05Propionaldehyde PER 001 2.00E-02 2.00E-024.75E-03Propionaldehyde PER 005Pyrene PER 001Pyrene PER 005 4.50E-061.03E-06 4.50E-06Nickel compounds PER 001 1.57E-02 1.57E-023.58E-03Nickel compounds PER 005 1.90E-034.32E-04 1.90E-03Nitrogen Oxides PER 004 2.19E+02 1.50E+025.00E+01 8.76E+02Nitrogen Oxides PER 005 9.20E+012.10E+01 9.20E+01PM < 2.5 micron PER 004 2.10E+02 2.00E+024.80E+01 4.00E+02

Page 7 of 13

Page 89: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

SV 005

PM < 2.5 micron PER 005 2.44E+015.56E+00 3.57E+02Lead PER 001 2.30E-02 2.30E-025.25E-03Lead PER 005 4.51E-041.03E-04 4.51E-04PM < 10 micron PER 004 2.10E+02 1.00E+024.80E+01 5.00E+02PM < 10 micron PER 005 2.44E+015.56E+00 3.57E+02Total Particulate Matter PER 004 2.89E+01 2.00E+016.60E+00 2.89E+03Total Particulate Matter PER 005 2.44E+015.56E+00 3.57E+02Antimony compounds PER 001 9.90E-04 9.90E-042.30E-04Selenium compounds PER 001 7.12E-02 7.12E-021.63E-02Selenium compounds PER 005 2.16E-054.94E-06 2.16E-05HAP-Single PER 001 1.10E+00 1.10E+002.50E-01HAP-Single PER 005Sulfur Dioxide PER 004 1.93E+02 1.50E+024.40E+01 4.00E+02Sulfur Dioxide PER 005 3.38E+017.73E+00 3.38E+01Volatile Organic Compounds PER 004 2.76E+00 2.50E+006.30E-01 2.76E+00Volatile Organic Compounds PER 005 4.19E+019.57E+00 1.85E+03

SV 006

Carbon Monoxide PER 004 1.04E+01 5.00E+002.37E+00 1.04E+01Carbon Monoxide PER 005Nitrogen Oxides PER 004 2.00E+00 1.00E+004.56E-01 2.00E+00Nitrogen Oxides PER 005PM < 10 micron PER 004 2.55E-05 2.55E-055.82E-06 2.55E-05PM < 10 micron PER 005Total Particulate Matter PER 004 2.55E-05 2.55E-055.82E-06Total Particulate Matter PER 005Sulfur Dioxide PER 004 4.00E-04 4.00E-041.00E-04 4.00E-04Sulfur Dioxide PER 005Volatile Organic Compounds PER 004 2.90E-01 1.00E-014.00E-02 8.76E+00Volatile Organic Compounds PER 005

SV 007

Acetaldehyde PER 004 6.10E-01 3.01E-011.40E-01Acetaldehyde PER 005 6.60E-011.50E-01 6.60E-01Acrolein PER 004 3.10E-01 3.00E-017.00E-02Acrolein PER 005 1.30E-013.00E-02 1.30E-01Formaldehyde PER 004 1.10E-01 1.00E-012.30E-02Formaldehyde PER 005 2.60E-016.00E-01 2.60E-01Methanol PER 004 3.10E-01 3.00E-017.10E-02Methanol PER 005 2.60E-016.00E-01 2.60E-01HAPs - Total PER 004 1.33E+00 1.00E+001.14E-01HAPs - Total PER 005 1.31E+003.00E-01 1.31E+00PM < 2.5 micron PER 004 4.20E+00 4.00E+009.60E-01 4.20E+02PM < 2.5 micron PER 005 4.20E+009.60E-01 4.20E+02PM < 10 micron PER 004 4.20E+00 2.20E+009.61E-01 4.20E+02PM < 10 micron PER 005 4.20E+009.60E-01 4.20E+02Total Particulate Matter PER 004 4.20E+00 2.20E+009.61E-01 4.20E+02Total Particulate Matter PER 005 4.20E+009.60E-01 4.20E+02

Page 8 of 13

Page 90: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

SV 007

HAP-Single PER 001 3.01E-01 3.01E-017.10E-02HAP-Single PER 005Volatile Organic Compounds PER 004 4.82E+01 4.00E+011.10E+01 4.82E+01Volatile Organic Compounds PER 005 5.81E+011.33E+01 5.81E+01

SV 008

PM < 2.5 micron PER 004 1.58E+00 1.00E+003.60E-01 1.58E+02PM < 10 micron PER 004 1.58E+00 1.60E-013.61E-01 1.58E+02PM < 10 micron PER 005 1.58E+00 1.60E-013.60E-01 1.58E+02Total Particulate Matter PER 004 1.58E+00 1.60E-013.61E-01 1.58E+02Total Particulate Matter PER 005 1.58E+00 1.60E-013.60E-01 1.58E+02

SV 009

Carbon Dioxide Equivalent PER 005 3.07E+037.02E+02 3.07E+03Methane PER 005 1.40E-013.00E-02 1.40E-01Carbon Monoxide PER 004 2.01E+01 1.00E+014.59E+00 2.01E+01Carbon Monoxide PER 005 6.22E+004.59E+00 6.22E+00Carbon Dioxide PER 005 3.06E+036.99E+02 3.06E+03Hexane PER 005 5.35E-041.76E-04 5.35E-04HAPs - Total PER 005 5.61E-041.85E-04 5.61E-04Nitrous Oxide PER 005 3.00E-021.00E-02 3.00E-02Nitrogen Oxides PER 004 3.79E+00 1.50E+008.64E-01 3.79E+00Nitrogen Oxides PER 005 3.79E+008.64E-01 3.79E+00Volatile Organic Compounds PER 004 7.10E-01 6.00E-016.50E-01 1.42E+02Volatile Organic Compounds PER 005 8.70E-016.50E-01 8.70E-01

SV 013

PM < 2.5 micron PER 004 1.50E-01 1.00E-013.50E-02 1.50E+01PM < 2.5 micron PER 005PM < 10 micron PER 004 1.50E-01 2.00E-013.51E-02 1.50E+01PM < 10 micron PER 005Total Particulate Matter PER 004 1.50E-01 2.20E-013.51E-02 1.50E+01Total Particulate Matter PER 005

SV 014

PM < 2.5 micron PER 004 1.00E-01 1.00E-014.60E-02 1.00E+01PM < 2.5 micron PER 005PM < 10 micron PER 004 1.00E-01 2.30E-014.61E-02 1.00E+01PM < 10 micron PER 005Total Particulate Matter PER 004 1.00E-01 2.30E-014.61E-02 1.00E+01Total Particulate Matter PER 005

SV 015

PM < 2.5 micron PER 004 1.10E-01 1.00E-015.50E-02 1.10E+01PM < 2.5 micron PER 005PM < 10 micron PER 004 1.10E-015.50E-02 1.20E+01PM < 10 micron PER 005Total Particulate Matter PER 004 1.20E-015.50E-02 1.10E+01Total Particulate Matter PER 005

Page 9 of 13

Page 91: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

SV 016

PM < 2.5 micron PER 004 2.20E-01 2.00E-015.10E-02 2.20E+01PM < 2.5 micron PER 005PM < 10 micron PER 004 2.20E-015.11E-02 2.20E+01PM < 10 micron PER 005Total Particulate Matter PER 004 2.20E-015.11E-02 2.20E+01Total Particulate Matter PER 005

SV 017

Carbon Dioxide Equivalent PER 005 1.72E+013.44E+02 1.50E+03Methane PER 005 7.00E-041.40E-02 6.00E-02Carbon Monoxide PER 004 9.00E-02 4.00E-021.71E+00 7.49E+00Carbon Monoxide PER 005 9.00E-021.72E+00 7.53E+00Carbon Dioxide PER 005 1.71E+013.42E+02 1.50E+03Nitrous Oxide PER 005 1.40E-042.80E-03 1.00E-02Nitrogen Oxides PER 004 1.90E-01 1.00E-013.84E+00 1.68E+01Nitrogen Oxides PER 005 1.90E-013.84E+00 1.68E+01PM < 2.5 micron PER 004 1.00E-022.60E-01 1.80E-01PM < 2.5 micron PER 005 1.00E-022.60E-01 1.16E+00PM < 10 micron PER 004 1.00E-02 1.00E-024.00E-02 1.70E-01PM < 10 micron PER 005 1.00E-022.60E-01 1.16E+00Total Particulate Matter PER 004 1.00E-02 1.70E-014.00E-02 1.70E-01Total Particulate Matter PER 005 1.00E-022.60E-01 1.16E+00Sulfur Dioxide PER 004 1.00E-01 5.00E-023.90E-01 1.70E+00Sulfur Dioxide PER 005 3.00E-026.00E-01 2.63E+00Volatile Organic Compounds PER 004 7.00E-02 2.00E-024.00E-03 6.10E+00Volatile Organic Compounds PER 005 6.00E-021.24E+00 5.42E+00

SV 019

PM < 2.5 micron PER 004 1.10E-01 1.00E-013.00E-02 1.10E+01PM < 2.5 micron PER 005PM < 10 micron PER 004 1.10E-01 1.00E-012.10E-02 1.10E+01PM < 10 micron PER 005Total Particulate Matter PER 004 1.10E-01 1.00E-012.10E-02 1.10E+01Total Particulate Matter PER 005

SV 020

Carbon Dioxide Equivalent PER 005 1.54E+013.07E+02 1.34E+03Methane PER 005 6.00E-041.20E-02 5.00E-02Carbon Monoxide PER 004 9.00E-02 5.00E-021.80E+00 7.86E+00Carbon Monoxide PER 005 9.00E-02 5.00E-021.79E+00 7.84E+00Carbon Dioxide PER 005 1.53E+013.06E+02 1.34E+03Nitrous Oxide PER 005 1.20E-042.50E-03 1.00E-02Nitrogen Oxides PER 004 4.20E-01 1.00E-018.30E+00 3.64E+01Nitrogen Oxides PER 005 4.20E-01 1.00E-018.31E+00 3.64E+01PM < 2.5 micron PER 004 3.00E-024.00E-01 3.50E-01PM < 2.5 micron PER 005 3.00E-025.90E-01 2.58E+00PM < 10 micron PER 004 3.00E-02 1.00E-024.21E-01 1.84E+00PM < 10 micron PER 005 3.00E-02 1.00E-025.90E-01 2.58E+00Total Particulate Matter PER 004 3.00E-02 1.00E-024.21E-01 1.84E+00

Page 10 of 13

Page 92: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

SV 020

Total Particulate Matter PER 005 3.00E-02 1.00E-025.90E-01 2.58E+00Sulfur Dioxide PER 004 3.00E-02 1.00E-025.40E-01 2.37E+00Sulfur Dioxide PER 005 3.00E-02 1.00E-025.40E-01 2.35E+00Volatile Organic Compounds PER 004 3.00E-02 1.50E-026.00E-01 2.63E+00Volatile Organic Compounds PER 005 3.00E-02 1.50E-026.70E-01 2.92E+00

SV 021

PM < 2.5 micron PER 004 1.10E-01 1.00E-013.00E-02 1.10E+01PM < 2.5 micron PER 005PM < 10 micron PER 004 1.10E-01 1.00E-012.50E-02 1.10E+01PM < 10 micron PER 005Total Particulate Matter PER 004 1.10E-01 1.00E-012.50E-02 1.10E+01Total Particulate Matter PER 005

TK 001

Acetaldehyde PER 005 7.83E-05 7.83E-05Benzene PER 004 5.00E-031.10E-03Benzene PER 005Ethylbenzene PER 001 3.00E-03 3.00E-037.00E-04Ethylbenzene PER 005Hexane PER 004 6.00E-021.00E-02Hexane PER 005Methanol PER 005 7.83E-05 7.83E-05HAPs - Total PER 004 2.10E-02HAPs - Total PER 005 1.57E-04 1.57E-04Toluene PER 004 9.00E-032.00E-03Toluene PER 005Xylenes (mixed isomers) PER 001 9.00E-03 9.00E-032.00E-03Xylenes (mixed isomers) PER 005HAP-Single PER 001 6.00E-02 6.00E-021.00E-02HAP-Single PER 005Volatile Organic Compounds PER 004 3.30E-01 3.30E-018.00E-02 6.60E+00Volatile Organic Compounds PER 005 3.91E-01 3.91E-01

TK 002

Acetaldehyde PER 005 7.83E-05 7.83E-05Benzene PER 004 5.00E-031.00E-03Benzene PER 005Ethylbenzene PER 001 3.00E-03 3.00E-037.00E-04Ethylbenzene PER 005Hexane PER 004 6.00E-021.00E-02Hexane PER 005Methanol PER 005 7.83E-05 7.83E-05HAPs - Total PER 004 2.10E-02HAPs - Total PER 005 1.57E-04 1.57E-04Toluene PER 004 9.00E-032.00E-03Toluene PER 005Xylenes (mixed isomers) PER 001 9.00E-03 9.00E-032.00E-03Xylenes (mixed isomers) PER 005

Page 11 of 13

Page 93: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

TK 002

HAP-Single PER 001 6.00E-02 6.00E-021.00E-02HAP-Single PER 005Volatile Organic Compounds PER 004 3.30E-01 3.30E-018.00E-02 6.60E+00Volatile Organic Compounds PER 005 3.91E-01 3.91E-01

TK 003

Acetaldehyde PER 005 4.25E-05 4.25E-05Benzene PER 004 2.00E-025.00E-03Benzene PER 005 1.06E-04 1.06E-04Carbon disulfide PER 005 4.25E-06 4.25E-06Cumene PER 005 2.12E-05 2.12E-05Ethylbenzene PER 001 1.00E-02 1.00E-023.00E-03Ethylbenzene PER 005 1.06E-05 1.06E-05Hexane PER 004 3.00E-016.00E-02Hexane PER 005 1.91E-03 1.91E-03Methanol PER 005 4.25E-05 4.25E-05HAPs - Total PER 004 3.70E-018.40E-02HAPs - Total PER 005 3.31E-03 3.31E-03Toluene PER 004 4.00E-029.00E-03Toluene PER 005 1.06E-03 1.06E-03Xylenes (mixed isomers) PER 001 4.00E-02 4.00E-029.00E-03Xylenes (mixed isomers) PER 005 1.06E-04 1.06E-04HAP-Single PER 001 3.00E-01 3.00E-016.00E-02HAP-Single PER 005Volatile Organic Compounds PER 004 9.20E-01 9.00E-013.20E-01 2.00E+01Volatile Organic Compounds PER 005 2.12E-01 2.12E-01

TK 004

Acetaldehyde PER 005 4.25E-05 4.25E-05Benzene PER 004 4.00E-038.00E-04Benzene PER 005 1.06E-04 1.06E-04Carbon disulfide PER 005 4.25E-06 4.25E-06Cumene PER 005 2.12E-05 2.12E-05Ethylbenzene PER 001 2.00E-03 2.00E-035.00E-04Ethylbenzene PER 005 1.06E-05 1.06E-05Hexane PER 004 4.00E-021.00E-02Hexane PER 005 1.91E-03 1.91E-03Methanol PER 005 4.25E-05 4.25E-05HAPs - Total PER 004 6.20E-021.40E-02HAPs - Total PER 005 3.31E-03 3.31E-03Toluene PER 004 6.00E-031.00E-03Toluene PER 005 1.06E-03 1.06E-03Xylenes (mixed isomers) PER 001 6.00E-03 6.00E-031.00E-03Xylenes (mixed isomers) PER 005 1.06E-04 1.06E-04HAP-Single PER 001 4.00E-01 4.00E-011.00E-02HAP-Single PER 005Volatile Organic Compounds PER 004 2.00E-01 2.00E-015.00E-02 4.00E+00Volatile Organic Compounds PER 005 2.12E-01 2.12E-01

Page 12 of 13

Page 94: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194

1 May, 2015 15:42

FACILITY DESCRIPTION: Potential-to-emit (by item)

Show: Active and Pending RecordsAQD Facility ID:Facility Name:

06300025Heron Lake BioEnergy LLC

Item UnrestrictedPotential

(tons per yr)

LimitedPotential

(tons per yr)

ActualEmissions

(tons per yr)

Pollutant AddedBy

(Action)

RetiredBy

(Action)

HourlyPotential

(lbs per hr)

TK 005

Benzene PER 004 4.00E-038.00E-04Benzene PER 005 2.31E-03 2.31E-03Carbon disulfide PER 005 1.85E-05 1.85E-05Cumene PER 005 9.25E-05 9.25E-05Ethylbenzene PER 001 2.00E-03 2.00E-035.00E-04Ethylbenzene PER 005 4.62E-05 4.62E-05Hexane PER 004 4.00E-021.00E-02Hexane PER 005 4.62E-02 4.62E-02HAPs - Total PER 004 6.20E-021.40E-02HAPs - Total PER 005 5.38E-02 5.38E-02Toluene PER 004 6.00E-031.00E-03Toluene PER 005 4.62E-03 4.62E-03Xylenes (mixed isomers) PER 001 6.00E-03 6.00E-031.00E-02Xylenes (mixed isomers) PER 005 4.62E-04 4.62E-04HAP-Single PER 001 4.00E-02 4.00E-021.00E-02HAP-Single PER 005Volatile Organic Compounds PER 004 2.00E-01 2.00E-015.00E-02 4.00E+00Volatile Organic Compounds PER 005 9.25E-01 9.25E-01

TK 006

Benzene PER 004 2.30E-03 1.00E-023.00E-03Benzene PER 005Ethylbenzene PER 001 7.00E-03 7.00E-032.00E-03Ethylbenzene PER 005 7.89E-03 7.89E-03Hexane PER 004 4.61E-02 1.00E-013.00E-02Hexane PER 005Methanol PER 005 1.97E-01 1.97E-01HAPs - Total PER 004 5.40E-02 5.00E-024.80E-02HAPs - Total PER 005 2.84E-01 2.84E-01Toluene PER 004 2.00E-025.00E-03Toluene PER 005Xylenes (mixed isomers) PER 001 2.00E-02 2.00E-025.00E-03Xylenes (mixed isomers) PER 005 7.89E-02 7.89E-02HAP-Single PER 001 1.00E-01 1.00E-013.00E-02HAP-Single PER 005Volatile Organic Compounds PER 004 7.90E-01 7.00E-011.80E-01 1.60E+01Volatile Organic Compounds PER 005 7.89E-01 7.89E-01

Page 13 of 13

Page 95: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 1 of 76

Subject Item: Total Facility

NC/CA

Type Citation Requirement

CD hdr SOURCE-SPECIFIC REQUIREMENTS1.0

CD Minn. R. 7007.0800, subp. 2 Permit Appendices: This permit contains appendices as listed in the permit Table ofContents. The Permittee shall comply with all requirements contained in AppendixIV (Dust Control Plan), Appendix V (HAP species testing), Appendix VI (DieselIdling Emission Prevention Plan), and Appendix VII (Stack Test Methods andParameter Recording Requirements).

Changes to the parameters documented in Appendix I (Modeling Data) aregoverened by the permit conditions under PARAMETERS USED IN MODELING -PM10, PM2.5, SO2, NOx, and CO in the Total Facility subject item of this permit.

Changes to the insignificant activities listed in Appendix III (Insignificant Activities)are governed by Minn. Rs. 7007.1250 and 7007.1300.

The Permittee shall use Appendix VIII (Equipment Inventory) to document allpre-authorized equipment changes as allowed under subject items SV 001, SV002, SV 003, and SV 008.

2.0

CD hdr OPERATIONAL REQUIREMENTS3.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21(b) and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2 andMinn. R. 7011.7000

Production: less than or equal to 72.25 million gallons/year using 12-month RollingSum of ethanol (200 proof prior to addition of denaturant).

4.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Fence: The Permittee shall maintain a fence to restrict public access to the facilityas shown in Appendix I Figure 2, Fence Diagram.

In areas where fencing is not permissible by setbacks, right-of-ways, safetyconcerns, or clearances, the Permittee will install signs and conduct patrols toprevent public access to the property.

5.0

CD Minn. Stat. Section 116.07, subds.4a & 9; Minn. R. 7007.0100, subp.7(A), 7(L), & 7(M); Minn. R.7007.0800, subps. 1, 2 & 4; Minn.R. 7009.0010-7009.0080

The Permittee shall comply with National Primary and Secondary Ambient AirQuality Standards, 40 CFR pt. 50, and the Minnesota Ambient Air QualityStandards, Minn. R. 7009.0010 to 7009.0080. Compliance shall be demonstratedupon written request by the MPCA.

6.0

CD Minn. R. 7011.1005, subp. 1 Clean up commodities spilled on the driveway and other facility property asrequired to minimize fugitive emissions; maintain air pollution control equipment inproper operating condition and utilize the air pollution control system as designed.

7.0

CD Minn. R. 7011.0020 Circumvention: Do not install or use a device or means that conceals or dilutesemissions, which would otherwise violate a federal or state air pollution control rule,without reducing the total amount of pollutant emitted.

8.0

CD Minn. R. 7007.0800, subps. 14and 16(J)

Air Pollution Control Equipment: Operate all pollution control equipment wheneverthe corresponding process equipment and emission units are operated.

9.0

CD Minn. R. 7007.0800, subps. 2 and14

Operation and Maintenance Plan: Retain at the stationary source an operation andmaintenance plan for all air pollution control equipment. At a minimum, the O & Mplan shall identify all air pollution control equipment and control practices and shallinclude a preventative maintenance program for the equipment and practices, adescription of (the minimum but not necessarily the only) corrective actions to betaken to restore the equipment and practices to proper operation to meet applicablepermit conditions, a description of the employee training program for properoperation and maintenance of the control equipment and practices, and the recordskept to demonstrate plan implementation.

10.0

CD Minn. R. 7019.1000, subp. 4 Operation Changes: In any shutdown, breakdown, or deviation the Permittee shallimmediately take all practical steps to modify operations to reduce the emission ofany regulated air pollutant. The Commissioner may require feasible and practicalmodifications in the operation to reduce emissions of air pollutants. No emissionsunits that have an unreasonable shutdown or breakdown frequency of process orcontrol equipment shall be permitted to operate.

11.0

Page 96: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 2 of 76

CD Minn. R. 7011.0150 Fugitive Emissions: Do not cause or permit the handling, use, transporting, orstorage of any material in a manner which may allow avoidable amounts ofparticulate matter to become airborne. Comply with all other requirements listed inMinn. R. 7011.0150.

12.0

CD Minn. R. 7030.0010 - 7030.0080 Noise: The Permittee shall comply with the noise standards set forth in Minn. R.7030.0010 to 7030.0080 at all times during the operation of any emission units.This is a state only requirement and is not enforceable by the EPA Administrator orcitizens under the Clean Air Act.

13.0

CD Minn. R. 7007.0800, subp. 9(A) Inspections: The Permittee shall comply with the inspection procedures andrequirements as found in Minn. R. 7007.0800, subp. 9(A).

14.0

CD Minn. R. 7007.0800, subp. 16 The Permittee shall comply with the General Conditions listed in Minn. R.7007.0800, subp. 16.

15.0

CD Minn. R. ch. 7009; Minn. R.7011.0150; Minn. R. 7007.0800,subp. 2

Diesel Idling Emission Prevention Plan: The Permittee shall implement the DieselIdling Emission Prevention Plan (Appendix V) to minimize idling of motor vehiclediesel engines at the facility. The Permittee shall maintain a readily available copyof the Plan at the facility.

16.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Grain received by the Heron Lake BioEnergy, LLC facility (ID No. 063000025) shallonly be used for ethanol, wet cake, and distiller�s dried grains (DDGS) productionby the Permittee at the Heron Lake BioEnergy, LLC facility.

17.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Alternative Feedstock Operating Scenario: The Permittee may utilize liquidmolasses and off-specification liquid sugar as alternative fermenation feedstocks,as well as grain as defined by 40 CFR Section 60.301 in the fermentation process.The Permittee may blend up to a maximum of 30 percent by weight of alternativeliquid feedstock with grain.

Daily records of the alternative liquid feedstock usage rate for each liquidalternative feedstock must be maintained at the facility. Alternative feedstockrecords shall identify the type of liquid feedstock, date of usage, the quantity ingallons per day, and the percentage of the liquid feedstock on a percent by weightbasis compared to the total mass of all fermentation feedstock.

18.0

CD Minn. R. 7007.0800, subp. 2Minn. R. ch. 7009

Outdoor handling and storage of dry whole grain and DDGS is prohibited.

Corn and/or any other grain received shall be unloaded only in the grain receivingbuilding and stored in the grain silos (EU 005 and EU 006).

Corn and/or other grains may not be unloaded and stockpiled or stored outdoors onthe ground or any other surface or in any other area of the facility except thedesignated storage silos.

This limitation does not apply to wet cake.

19.0

CD hdr FLEXIBILE PERMIT CONDITIONS20.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2 andMinn. R. 7011.7000

Changes/Modifications That May Trigger New Source Review and/or Part 63 MajorSource Status Prohibited:

This permit contains limits and requirements to keep the facility a minor sourceunder New Source Review and the National Emission Standards for Hazardous AirPollutants (NESHAP) program. The Permittee cannot make any change to thesource that qualify as a Title I modification (as defined at Minn. R. 7007.0100, subp.26), or that would make the source a major source under New Source Review orthe NESHAP program until a permit amendment has been issued. This includeschanges that might otherwise qualify as insignificant modifications, or that couldotherwise be permitted as minor or moderate amendments.

21.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000;Minn. R. 7007.0800, subp. 2

Changes/Modifications That May Affect Modeled Parameters or Processes SubjectTo Limits Based On 40 CFR Section 52.21(k) and Minn. R. 7007.3000:

Except as allowed by this permit, the Permittee can not make any changes toprocess equipment subject to requirements based on 40 CFR Section 52.21(k)without obtaining the appropriate amendment required under Minn. R. ch. 7007.This includes changes that might otherwise qualify as insignificant modifications, orthat could otherwise be permitted as minor or moderate amendments.

22.0

Page 97: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 3 of 76

CD Minn. R. 7007.0800, subp. 2 Equipment Inventory: The Permittee shall maintain a written inventory of allemission units and control equipment that vent through SV 001, SV 002, SV 003,and SV 008. The Permittee shall update the inventory to include any new, modified,or replaced equipment prior to making any permitted changes described in subjectitems SV 001, SV 002, SV 003, and SV 008 of this permit.

The Permittee shall use the tables in Appendix VII to maintain the inventory.Appropriate data shall be entered for all data fields in Appendix VII emission unittables A and B.

Removed equipment shall be shown in the table(s) with equipment data struck-out.Modified equipment shall be shown in the table(s) with current equipment data,and past equipment data struck-out.

23.0

CD Minn. R. 7007.0800, subp. 2 Equipment Labeling: The Permittee shall permanently affix a unique number toeach emission unit for tracking purposes. The numbers shall correlate the unit tothe appropriate EU, SV, CE, and GP numbers used in this permit. The number canbe affixed by placard, stencil, or other means. The number shall be maintained sothat it is readable and visible at all times from a safe distance. If equipment isadded, it shall be given a new unique number; numbers from replaced or removedequipment shall not be reused.

24.0

S/A Minn. R. 7007.0800, subp. 2 Annual Report: due 31 days after end of each year following Permit Issuance.

The Permittee shall submit an annual report by January 31st that describes thechanges made at the facility during the previous calendar year as authorized by thispermit. The report shall be submitted using current MPCA air permit applicationforms. The report shall include the emission unit, stack/vent, group, and controlequipment data for any new, modified, or replaced emission units, and the resultsof any required performance testing due to the new, modifed, or replaced emissionunits. The report shall include the 12-month rolling sum ethanol production for eachmonth in the previous calendar year. This Annual Report shall be submitted withthe annual Compliance Certification listed in Table B.

As part of the Annual Report, the Permittee shall verify and certify that the facilityhas maintained minor source status for New Source Review and 40 CFR pt. 63.

25.0

CD hdr PARAMETERS USED IN MODELING26.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Modeled Parameters: The parameters used in PM10, PM2.5, NO2, SO2, and COmodeling for permit number 06300025-005 are listed in Appendix I of this permit.The parameters describe the operation of the facility at maximum permittedcapacity. The parameters in Appendix I provide a benchmark for future changes tomodeled pollutant parameters.

27.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Changes to Modeled Parameters for PM10, PM2.5, NO2, and/or CO: Any permitamendment that affects any modeled parameter or emission rate for PM10, PM2.5,NO2, and/or CO listed in Appendix I must be a major amendment. Any addition tothe information documented in Appendix I requires a major amendment.

28.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Equivalent or Better Dispersion (EBD) Modeling Triggers (Modeling Required) forPM2.5 and NO2: Changes that affect any modeled parameter or emission ratelisted in Appendix I, or an addition to the information documented in Appendix I,trigger the EBD Modeling Submittal requirement.

29.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

EBD Modeling Submittal for PM2.5 and NO2: For changes meeting the criteria inthe EBD Modeling Triggers (Modeling Required) requirement, the Permittee shallsubmit an EBD modeling submittal in accordance with the current version of theMPCA Air Dispersion Modeling Guidance and shall wait for written approval (in theform of an issued permit amendment) before making such changes.

30.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

EBD Modeling Submittal Content for PM2.5 and NO2: The information submittedmust include, for stack and vent sources, source emission rate, location, height,diameters, exit velocity, exit temperature, discharge direction, use of rain caps orrain hats, and, if applicable, locations and dimensions of nearby buildings. Fornon-stack/vent sources, this includes the source emission rate, location, size andshape, release height, and, if applicable, any emission rate scalars, and the initiallateral dimensions and initial vertical dimensions and adjacent building heights.

31.0

Page 98: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 4 of 76

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Outdated EBD Baseline Modeling for PM2.5 and NO2: Prior to conducting the EBDanalysis, the Permittee shall use the current version of the MPCA Air DispersionModeling Guidance to determine if the Baseline Modeling (the most recent refinedmodeling demonstration) is outdated. If the Baseline Modeling is outdated, thePermittee shall update the Baseline Modeling to be consistent with the currentversion of the MPCA Air Dispersion Modeling Guidance. The updated modeling willbecome the new Baseline Modeling.

This requirement does not require the Permittee to complete a new refinedmodeling demonstration using the revisions made for the EBD demonstration.

32.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

EBD Modeling Results for PM2.5 and NO2: The dispersion characteristics due tothe revisions of the information in Appendix I must be equivalent to or better thanthe dispersion characteristics modeled August 2013 for permit No. 06300025-005.The Permittee shall demonstrate this equivalency in the proposal.

33.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Computer Dispersion Modeling Triggers for PM2.5 and NO2: The Permittee shallconduct a refined remodeling analysis in accordance with the Computer DispersionModeling requirements of this permit and the current version of the MPCA AirDispersion Modeling Guidance if: (1) the results of the EBD modeling analysis donot demonstrate equivalent or better dispersion characteristics; (2) a conclusioncannot readily be made about the dispersion, or (3) the criteria in the EBD ModelingTriggers requirement are met and the Permittee has previously conducted threesuccessive EBD analyses using the same Baseline Modeling.

34.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Computer Dispersion Modeling Protocol: due 180 days after receipt of writtenMPCA request for PM2.5 and NO2 refined modeling. The Permittee shall submit aComputer Dispersion Modeling Protocol that is complete and approvable by MPCAby the deadline in this requirement. This protocol will describe the proposedmodeling methodology and input data, in accordance with the current version of theMPCA Air Dispersion Modeling Guidance. The protocol must be based onprojected operating conditions under the next permit term.

35.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Computer Dispersion Modeling Protocol Revisions: due 60 days after receipt ofwritten MPCA request for revisions to the submitted protocol for PM2.5 and NO2modeling.

36.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Computer Dispersion Modeling Results: due 180 days after receipt of written MPCAapproval of Computer Dispersion Modeling Protocol for PM2.5 and NO2. ThePermittee shall submit a final Computer Dispersion Modeling Report that iscomplete and approvable by MPCA by the deadline in this requirement. Thesubmittal shall adhere to the current version of the MPCA Air Dispersion ModelingGuidance and the approved Computer Dispersion Modeling Protocol.

37.0

CD hdr PERFORMANCE TESTING38.0

CD Minn. R. ch. 7017 Performance Testing: Conduct all performance tests in accordance with Minn. R.ch. 7017 and Appendix VII unless otherwise noted in Tables A or B. The Permitteeshall monitor and record all relevant Appendix VII process operating parametersand control equipment operating parameters during stack testing.

39.0

CD Minn. R. 7017.2018; Minn. R.7017.2030, subps. 1-4, Minn. R.7017.2035, subps. 1-2

Performance Test Notifications and Submittals:

Performance Tests are due as outlined in Table A of the permit.See Table B for additional testing requirements.

Performance Test Notification (written): due 30 days before each Performance TestPerformance Test Plan: due 30 days before each Performance TestPerformance Test Pre-test Meeting: due 7 days before each Performance TestPerformance Test Report: due 45 days after each Performance TestPerformance Test Report - Microfiche Copy: due 105 days after each PerformanceTest

The Notification, Test Plan, and Test Report may be submitted in alternative formatas allowed by Minn. R. 7017.2018.

40.0

Page 99: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 5 of 76

CD Minn. R. 7007.0800, subp. 2 The Permittee may meet the test report submittal requirements of Minn. R.7017.2018 and Minn. R. 7017.2035, subps. 1 and 2 by any of the following:

1. submittal of an emailed pdf copy of the test report;

2. posting of an electronic file on a third party web site and an email notifying suchto the MPCA stack test coordinator; or,

3. hand or mail delivery of a compact disc that contains a copy of the test report.

There are additional requirements for the above-described test report submittalmethods. Please contact your MPCA stack test coordinator for additionalinformation regarding these submittal procedures and requirements.

41.0

CD Minn. R. 7017.2025, subp. 3 Limits set as a result of a performance test (conducted before or after permitissuance) apply until superseded as stated in the MPCA's Notice of Complianceletter granting preliminary approval. Preliminary approval is based on formal reviewof a subsequent performance test on the same unit as specified by Minn. R.7017.2025, subp. 3. The limit is final upon issuance of a permit amendmentincorporating the change.

42.0

CD Minn. R. 7017.2035, subp. 3 The Permittee shall conduct all tests according to the methods specified inAppendix VII and record all process and control equipment operating parametersidentified in Appendix VII during all tests.

43.0

CD hdr MONITORING REQUIREMENTS44.0

CD Minn. R. 7007.0800, subp. 4(D) Monitoring Equipment Calibration - The Permittee shall either:

1. Calibrate or replace required monitoring equipment every 12 months; or2. Calibrate at the frequency stated in the manufacturer's specifications.

For each monitor, the Permittee shall maintain a record of all calibrations, includingthe date conducted, and any corrective action taken. The Permittee shall includethe calibration frequencies, procedures, and manufacturer's specifications (ifapplicable) in the Operations and Maintenance Plan. Any requirements applying tocontinuous emission monitors are listed separately in this permit.

45.0

CD Minn. R. 7007.0800, subp. 4(D) Operation of Monitoring Equipment: Unless otherwise noted in Tables A or B,monitoring a process or control equipment connected to that process is notnecessary during periods when the process is shutdown, or during checks of themonitoring systems, such as calibration checks and zero and span adjustments. Ifmonitoring records are required, they should reflect any such periods of processshutdown or checks of the monitoring system.

46.0

CD hdr RECORDKEEPING47.0

CD Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2 andMinn. R. 7011.7000

Recordkeeping: Once each day record the ethanol production (in gallons) for theprevious calendar day.

48.0

CD Minn. R. 7007.0800, subps. 4 & 5 By the 15th day of each month calculate and record ethanol production for theprevious month and the previous 12-month period.

49.0

CD Minn. R. 7007.0800, subp. 5(C) Recordkeeping: Retain all records at the stationary source, unless otherwisespecified within this permit, for a period of five (5) years from the date of monitoring,sample, measurement, or report. Records which must be retained at this locationinclude all calibration and maintenance records, all original recordings forcontinuous monitoring instrumentation, and copies of all reports required by thepermit. Records must conform to the requirements listed in Minn. R. 7007.0800,subp. 5(A).

50.0

CD Minn. R. 7007.0800, subp. 5(B) Recordkeeping: Maintain records describing any insignificant modifications (asrequired by Minn. R. 7007.1250, subp. 3) or changes contravening permit terms (asrequired by Minn. R. 7007.1350, subp. 2), including records of the emissionsresulting from those changes.

51.0

Page 100: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 6 of 76

CD Minn. R. 7007.1200, subp. 4 If the Permittee determines that no permit amendment or notification is requiredprior to making a change, the Permittee must retain records of all calculationsrequired under Minn. R. 7007.1200. For expiring permits, these records shall bekept for a period of five years from the date the change was made or until permitreissuance, whichever is longer. The records shall be kept at the stationary sourcefor the current calendar year of operation and may be kept at the stationary sourceor office of the stationary source for all other years. The records may be maintainedin either electronic or paper format.

52.0

CD hdr REPORTING/SUBMITTALS53.0

CD Minn. R. 7019.1000, subp. 3 Shutdown Notifications: Notify the Commissioner at least 24 hours in advance of aplanned shutdown of any control equipment or process equipment if the shutdownwould cause any increase in the emissions of any regulated air pollutant. If theowner or operator does not have advance knowledge of the shutdown, notificationshall be made to the Commissioner as soon as possible after the shutdown.However, notification is not required in the circumstances outlined in Items A, B,and C of Minn. R. 7019.1000, subp. 3.

At the time of notification, the owner or operator shall inform the Commissioner ofthe cause of the shutdown and the estimated duration. The owner or operator shallnotify the Commissioner when the shutdown is over.

54.0

CD Minn. R. 7019.1000, subp. 2 Breakdown Notifications: Notify the Commissioner within 24 hours of a breakdownof more than one hour duration of any control equipment or process equipment ifthe breakdown causes any increase in the emissions of any regulated air pollutant.The 24-hour time period starts when the breakdown was discovered or reasonablyshould have been discovered by the owner or operator. However, notification is notrequired in the circumstances outlined in Items A, B, and C of Minn. R. 7019.1000,subp. 2.

At the time of notification or as soon as possible thereafter, the owner or operatorshall inform the Commissioner of the cause of the breakdown and the estimatedduration. The owner or operator shall notify the Commissioner when the breakdownis over.

55.0

CD Minn. R. 7019.1000, subp. 1 Notification of Deviations Endangering Human Health or the Environment: As soonas possible after discovery, notify the Commissioner or the state duty officer, eitherorally or by facsimile, of any deviation from permit conditions which could endangerhuman health or the environment.

56.0

CD Minn. R. 7019.1000, subp. 1 Notification of Deviations Endangering Human Health or the Environment Report:Within 2 working days of discovery, notify the Commissioner in writing of anydeviation from permit conditions which could endanger human health or theenvironment. Include the following information in this written description:

1. the cause of the deviation;2. the exact dates of the period of the deviation, if the deviation has been corrected;3. whether or not the deviation has been corrected;4. the anticipated time by which the deviation is expected to be corrected, if not yetcorrected; and5. steps taken or planned to reduce, eliminate, and prevent reoccurrence of thedeviation.

57.0

S/A Minn. R. 7007.0800, subp. 6(A)(2) Semiannual Deviations Report: due 30 days after end of each calendar half-yearstarting 11/10/2005. The first semiannual report submitted by the Permittee shallcover the calendar half-year in which the permit is issued. The first report of eachcalendar year covers January 1 - June 30. The second report of each calendar yearcovers July 1 - December 31. If no deviations have occured, the Permittee shallsubmit the report stating no deviations.

58.0

CD Minn. R. 7007.1150 - Minn. R.7007.1500

Application for Permit Amendment: If a permit amendment is needed, submit anapplication in accordance with the requirements of Minn. R. 7007.1150 throughMinn. R. 7007.1500. Submittal dates vary, depending on the type of amendmentneeded.

59.0

S/A Minn. R. 7007.0400, subp. 2 Application for Permit Reissuance: due 180 days before expiration of ExistingPermit

60.0

CD Minn. R. 7007.1400, subp. 1(H) Extension Requests: The Permittee may apply for an Administrative Amendment toextend a deadline in a permit by no more than 120 days, provided the proposeddeadline extension meets the requirements of Minn. R. 7007.1400, subp. 1(H).Performance testing deadlines from the General Provisions of 40 CFR pt. 60 andpt. 63 are examples of deadlines for which the MPCA does not have authority togrant extensions and therefore do not meet the requirements of Minn. R.7007.1400, subp. 1(H).

61.0

Page 101: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 7 of 76

S/A Minn. R. 7007.0800, subp. 6(C) Compliance Certification: due 31 days after end of each calendar year starting11/10/2005 (for the previous calendar year). Submit the certification to theCommissioner on a form approved by the Commissioner. This certification coversall deviations experienced during the previous calendar year.

62.0

CD Minn. R. 7019.3000 - Minn. R.7019.3100

Emission Inventory Report: due on or before April 1 of each calendar year followingpermit issuance. The Permittee shall submit the report on a form approved by theCommissioner.

63.0

CD Minn. R. 7002.0005 - Minn. R.7002.0095

Emission Fees: due 30 days after receipt of an MPCA bill.64.0

Page 102: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 8 of 76

Subject Item: GP 001 Grain Receiving, Handling, & Storage; DDGS Handling & Loadout

Associated Items: CE 001 Fabric Filter - Low Temperature, i.e., T<180 Degrees F

CE 009 Fabric Filter - Low Temperature, i.e., T<180 Degrees F

EU 001 Truck Receiving 1 - Loading-Unloading Equipment

EU 002 Truck Receiving 2 - Loading-Unloading Equipment

EU 003 Grain Elevator 1 - Elevator

EU 004 Conveyor

EU 005 Grain Bin 1 - Silo/Bin

EU 006 Grain Bin 2 - Silo/Bin

EU 007 Grain Day Bin (scalping bin) - Silo/Bin

EU 008 Grain Elevator 2 - Elevator

EU 009 Grain Day Bin (grinding bin) - Silo/Bin

EU 010 Hammermill Feed Conveyors - Conveyor

EU 038 Truck Load Spout (DDGS) - Loading-Unloading Equipment

EU 039 DDGS Dump Pit/Auger - Material Handling Equipment

EU 052 DDGS storage silo - Silo/Bin

EU 055 DDGS storage silo 2 - Silo/Bin

FS 002 Uncaptured Grain Handling Emissions - Material Handling/Transfer/Storage

FS 003 Uncaptured DDGS Handling Emissions - Material Handling/Transfer/Storage

NC/CA

Type Citation Requirement

CD hdr EMISSION AND OPERATING LIMITS1.0

LIMIT Minn. R. 7007.0800, subps. 2 &14

The Permittee shall operate and maintain EU 001, EU 002, and EU 038 (TruckReceiving Pits 1 & 2, and DDGS Loadout Spout, respectively) so that eachachieves a capture efficiency for Total Particulate Matter: greater than or equal to95.0 percent capture efficiency

2.0

LIMIT Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000;Minn. R. 7007.0800, subps. 2 &14

The Permittee shall operate and maintain EU 001, EU 002, and EU 038 (TruckReceiving Pits 1 & 2, and DDGS Loadout Spout, respectively) so that eachachieves a capture efficiency for PM < 10 micron: greater than or equal to 95.0percent capture efficiency

3.0

LIMIT Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000;Minn. R. 7007.0800, subps. 2 &14

The Permittee shall operate and maintain EU 001, EU 002, and EU 038 (TruckReceiving Pits 1 & 2, and DDGS Loadout Spout, respectively) so that eachachieves a capture efficiency for PM < 2.5 micron: greater than or equal to 95.0percent capture efficiency

4.0

LIMIT Minn. R. 7011.1005, subp. 3(A) Opacity: less than or equal to 5 percent opacity for uncaptured (also referred to as'fugitive') emissions from any truck unloading station, railcar unloading station,railcar loading station, or handling operation.

5.0

LIMIT Minn. R. 7011.1005, subp. 3(B) Opacity: less than or equal to 10 percent opacity for uncaptured (also referred to as'fugitive') emissions from any truck loading station.

6.0

CD Minn. R. 7011.1005, subp. 1(B) The Permittee shall maintain air pollution control equipment in proper operatingcondition and utilize the air pollution control systems as designed.

7.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000;Minn. R. 7007.0800, subps. 4 & 5

Loading And Unloading Operating Hours: Grain unloading and DDGS loadingoperations are restricted to the hours between 6 AM and 6 PM daily.

Maintain loading and unloading operating hours records as required under subjectitem SV 001.

8.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Daily Grain Receiving Limit: On any calendar day, no more than 5000 tons of grainmay be received by truck (total of hopper and straight truck deliveries).

9.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Straight Truck Daily Grain Receiving Limit: On any calendar day, no more than1000 tons of grain may be received by straight truck delivery.

10.0

Page 103: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 9 of 76

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Vent all captured grain receiving and handling emissions to baghouse CE 001.Vent all captured DDGS handling and loadout emissions to baghouse CE 009.Refer to subject items CE 001 and CE 009 for baghouse operation andmaintenance requirements.

11.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000;Minn. R. 7007.0800, subps. 4 & 5

Daily Grain Receiving Monitoring and Recordkeeping: The Permittee shall monitorand record the tonnage of each grain delivery. Records shall specify delivery date,delivered tonnage, and delivery truck type (straight or hopper) for each delivery.Daily totals for straight truck deliveries as well as for all deliveries (straight truckand hopper truck combined) shall be calculated and recorded for each operatingday.

12.0

Page 104: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 10 of 76

Subject Item: GP 004 Fermentation Units Vented to Scrubber (SV 003/CE 003)

Associated Items: CE 003 Packed-Gas Adsorption Column

EU 013 Fermenter 1; 730,000 gallons - Fermentation Equipment

EU 014 Fermenter 2; 730,000 gallons - Fermentation Equipment

EU 015 Fermenter 3; 730,000 gallons - Fermentation Equipment

EU 016 Fermenter 4; 730,000 gallons - Fermentation Equipment

EU 017 Beerwell; 985,000 gallons - Fermentation Equipment

EU 058 Fermenter 5; 730,000 gallons - Fermentation Equipment

EU 059 Fermenter 6; 730,000 gallons - Fermentation Equipment

NC/CA

Type Citation Requirement

CD hdr POLLUTION CONTROL REQUIREMENTS1.0

CD Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Vent all emissions from emission units in the GP 004 list of Associated Items listedabove to the CE 003 fermentation scrubber.

Refer to Subject Item CE 003 for operation, monitoring, and maintenancerequirements for the fermentation scrubber. Refer to SV 003 for additionalapplicable requirements.

2.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR pt. 63 and Minn. R.7011.7000

All existing, new, replaced, and modified fermentation equipment at the facility shallbe vented to CE 003 at all times that any of the equipment is operating.

3.0

Page 105: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 11 of 76

Subject Item: GP 005 Process Units Vented to Boiler or Regenerative Thermal Oxidizer

Associated Items: CE 005 Thermal Oxidizer - Regenerative

CE 028 Direct Flame Afterburner

EU 018 DDGS Dryer A (CE 006 & CE 005/SV 004 or CE 006 & CE 028/SV 005) - Dehydrator

EU 019 Mixer (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 020 Slurry Tank (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 021 Cook Tube (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 022 Flash Tank (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 023 Liquefaction Tank 1 (CE 005/SV 004 or CE 028/SV 005) - Liquefaction Equipment

EU 024 Liquefaction Tank 2 (CE 005/SV 004 or CE 028/SV 005) - Liquefaction Equipment

EU 025 Yeast Tank (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 026 Beer Column (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 027 Side Stripper (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 028 Rectifier Column (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 029 190 Proof Condenser (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 030 Molecular Sieve (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 031 200 Proof Condenser (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 032 Centrifuges (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 033 Evaporators (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 034 DDGS Dryer B (CE 007 & CE 005/SV 004 or CE 007 & CE 028/SV 005) - Dehydrator

EU 035 NG-Fired Boiler (Direct Flame Afterburner CE 028) - Boiler

SV 004 Regenerative Thermal Oxidizer (CE 005)

SV 005 NG-Fired Boiler (CE 028)

NC/CA

Type Citation Requirement

CD hdr POLLUTION CONTROL REQUIREMENTS1.0

CD Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Vent all emissions from emission units in the list of GP 005 Associated Items aboveto the regenerative thermal oxidizer (CE 005) or the boiler/direct flame afterburner(CE 028/EU 035).

See CE 005 and CE 028 for operation, monitoring, and maintenance requirements.

2.0

Page 106: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 12 of 76

Subject Item: GP 006 Tanks

Associated Items: TK 001 190 Proof Ethanol, 165,000 gallons

TK 002 200 Proof Ethanol, 165,000 gallons

TK 003 Denaturant, 165,000 gallons

TK 004 Denatured Ethanol, 1,200,000 gallons

TK 005 Denatured Ethanol, 1,200,000 gallons

NC/CA

Type Citation Requirement

CD hdr POLLUTION CONTROL REQUIREMENTS1.0

CD 40 CFR Section 60.112b(a);Minn. R. 7011.1520(C)

The storage vessels shall be equipped with a fixed roof in combination with aninternal floating roof meeting the requirements of 40 CFR Section 60.112b(a)(1).

2.0

CD 40 CFR Section 60.112b(a)(1)(ii);Minn. R. 7011.1520(C)

Internal Floating Roof Seal Requirement: Each internal roof shall be equipped withone of the closure devices between the wall of the storage vessel and the edge ofthe internal floating roof as described in 40 CFR Section 60.112b(a)(1)(ii).

3.0

CD hdr MONITORING REQUIREMENTS4.0

CD 40 CFR Section 60.113b(a)(1);Minn. R. 7011.1520(C)

After installing the control equipment required to meet 40 CFR Section60.112b(a)(1) (permanently affixed roof and internal floating roof), the Permitteeshall visually inspect the internal floating roof, the primary seal, and the secondaryseal (if one is in service), prior to filling the storage vessel with volatile organicliquid. If there are holes, tears, or other openings in the primary seal, the secondaryseal, or the seal fabric or defects in the internal floating roof, or both, the Permitteeshall repair the items before filling the storage vessel.

5.0

CD 40 CFR Section 60.113b(a)(2) &(4);Minn. R. 7011.1520(C)

Inspection - Annual: Visually inspect the internal floating roof, the primary seal, andthe secondary seal (if one is in service) through manholes and roof hatches on thefixed roof at least once every twelve (12) months after initial fill as required by 40CFR Section 60.113b(a)(2).

6.0

CD 40 CFR Section 60.113b(a)(4);Minn. R. 7011.1520(C)

Inspection - Tank Empty and Degassed: Visually inspect the internal floating roof,the primary seal, and the secondary seal (if one is in service), gaskets, slottedmembranes and sleeve seals (if any) each time the tank is emptied and degassedas required by 40 CFR Section 60.113b(a)(4). In no event shall inspectionsconducted in accordance with this provision occur at intervals greater than 10years.

7.0

CD hdr RECORDKEEPING REQUIREMENTS8.0

CD 40 CFR Section 60.115b(a)(2);Minn. R. 7011.1520(C)

Keep a record of each inspection performed as required by 40 CFR Section60.113b(a). Each record shall identify the storage vessel on which the inspectionwas performed and shall contain the date the vessel was inspected and theobserved condition of each component of the control equipment (seals, internalfloating roof, and fittings).

9.0

CD 40 CFR Section 60.116b(c);Minn. R. 7011.1520(C)

Recordkeeping: Maintain records showing the dimensions of each tank and ananalysis showing tank capacity.

10.0

CD 40 CFR Section 60.116b(c);Minn. R. 7011.1520(C)

Recordkeeping: Maintain records of the volatile organic liquid (VOL) stored, theperiod of storage, and the maximum true vapor pressure of the VOL during therespective storage period, calculated as described in 40 CFR Section 60.116b(e).

11.0

CD hdr REPORTING REQUIREMENTS:12.0

CD 40 CFR Section 60.113b(a)(5);Minn. R. 7011.1520(C)

Notification: Notify the Commissioner in writing at least 30 days prior to the filling orrefilling of each tank for which an inspection is required by 40 CFR Section60.113b(a)(1) and (a)(4) to afford the Commissioner the opportunity to have anobserver present. If the inspection required by 40 CFR Section 60.113b(a)(4) is notplanned and the Permittee could not have known about the inspection 30 days inadvance of refilling the tank, the Permittee shall notify the Commissioner at least 7days prior to the refilling of the tank. Notification shall be made by telephonefollowed by written documentation demonstrating why the inspection wasunplanned. Alternatively, this notification including the written documentation maybe made in writing and sent by express mail so that it is received by theCommissioner at least 7 days prior to the refilling.

13.0

Page 107: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 13 of 76

CD 40 CFR Section 60.115b(a)(4);Minn. R. 7011.1520(C)

After each inspection required by 40 CFR Section 60.113b(a)(3) that finds holes ortears in the seal or seal fabric, or defects in the internal floating roof, or othercontrol equipment defects listed in 40 CFR Section 60.113b(a)(3)(ii), a report shallbe furnished to the Commissioner within thirty (30) days of the inspection. Thereport shall identify the storage vessel and the reason it did not meet thespecifications of 40 CFR Section 60.112b(a)(1) or 40 CFR Section 60.113b(a)(3)(ii)and list each repair made.

14.0

CD 40 CFR Section 60.113b(a)(3);Minn. R. 7011.1520(C)

Reporting - Annual Inspection Results: If any of the conditions described in 40 CFRSection 60.113b(a)(2) are detected during the annual visual inspection required by40 CFR Section 60.113b(a)(2), a report shall be furnished to the Commissionerwithin 30 days of the inspection. Each report shall identify the tank, the nature ofthe defects, and the date the tank was emptied or the nature of and date the repairwas made.

15.0

Page 108: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 14 of 76

Subject Item: SV 001 Grain Receiving & Handling Baghouse Stack (CE 001)

Associated Items: EU 001 Truck Receiving 1 - Loading-Unloading Equipment

EU 002 Truck Receiving 2 - Loading-Unloading Equipment

EU 003 Grain Elevator 1 - Elevator

EU 004 Conveyor

EU 005 Grain Bin 1 - Silo/Bin

EU 006 Grain Bin 2 - Silo/Bin

EU 007 Grain Day Bin (scalping bin) - Silo/Bin

EU 008 Grain Elevator 2 - Elevator

EU 009 Grain Day Bin (grinding bin) - Silo/Bin

EU 010 Hammermill Feed Conveyors - Conveyor

NC/CA

Type Citation Requirement

CD hdr LIMITS AND OPERATING REQUIREMENTS1.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000

Total Particulate Matter: less than or equal to 0.0040 grains/dry standard cubic footusing 3-hour Average

2.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Total Particulate Matter: less than or equal to 1.34 lbs/hour using 3-hour Average3.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000

PM < 10 micron: less than or equal to 0.0040 grains/dry standard cubic foot using3-hour Average

4.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

PM < 10 micron: less than or equal to 1.34 lbs/hour using 3-hour Average5.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000

PM < 2.5 micron: less than or equal to 0.0040 grains/dry standard cubic foot using3-hour Average

6.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

PM < 2.5 micron: less than or equal to 1.34 lbs/hour using 3-hour Average7.0

LIMIT Minn. R. 7011.1005, subp. 3(D) Opacity: less than or equal to 10 percent opacity from SV 001.8.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Process Throughput: less than or equal to 780,000 tons/year using 12-monthRolling Sum of grain received.

9.0

CD Title I Conditions: To avoid majorsource threshold under Section52.21 and Minn. R. 7007.3000

Vent all captured emissions from all grain receiving and handling equipment tofabric filter CE 001. The Permittee shall document periods of non-operation of CE001 during operation of any grain receiving and handling equipment. Refer tosubject item CE 001 for applicable periodic monitoring requirements.

10.0

Page 109: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 15 of 76

LIMIT Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000;Minn. R. 7017.2025, subp. 3

Process Throughput: less than or equal to 416.67 tons/hour using 8-hour BlockAverage of grain received. This operating parameter can not be increased withoutPM10 and PM2.5 remodeling. However a new (lesser) limit may be set pursuant toMinn. R. 7017.2025, subp. 3 based on the throughput recorded during the mostrecent MPCA-approved performance test where compliance was demonstrated.The new limit shall be implemented upon receipt of the Notice of Compliance lettergranting preliminary approval. The limit is final upon issuance of a permitamendment incorporating the change. This operating parameter must remain in thepermit to define the maximum capacity of the process on an hourly basis.

11.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000;Minn. Stat. Section 116.07, subds.4a & 9; Minn. R. 7007.0100, subp.7(A), 7(L), & 7(M); Minn. R.7007.0800, subps. 2 & 4; Minn.R. 7009.0010-7009.0080

Grain Receiving Operating Times: The Permittee shall restrict EU 001 and EU 002grain receiving operations to the 12-hour period between 6 AM and 6 PM.

12.0

CD hdr EQUIPMENT FLEXIBILITY13.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Equipment Flexibility:

The Permittee may replace, add, or modify grain handling and storage equipment.If the Permittee replaces grain handling and storage equipment, adds new grainhandling and storage equipment, or modifies existing grain handling and storageequipment, such equipment is subject to all of the requirements of SV 001 as wellas those listed in the Total Facility subject item of this permit. Grain handling andstorage equipment is grain elevators, grain bins, and scalpers, but does not includereceiving pits.

Additionally:

1) Prior to making such a change, the Permittee shall apply for and obtain theappropriate permit amendment, as applicable. The Permittee shall completecalculations described in Minn. R. 7007.1200. A permit amendment is still requiredregardless of the emissions increase if the change will be subject to a newapplicable requirement or requires revisions to limits or monitoring andrecordkeeping requirements in this permit.

(continued)

14.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Equipment Flexibility (continued):

2) The Permittee shall submit a written notification to the MPCA no later than sevendays after completion of installation of any equipment installed under theseflexibility provisions;

3) Emissions of PM, PM10, and PM2.5 shall remain below the limits specified inthis subject item (SV 001);

4) All existing, new, replaced, and modified grain handling and storage equipmentat the facility shall be vented to CE 001 at all times that any of the equipment isoperating;

5) After the addition, replacement, or modification of equipment, stack emissionstesting for PM, PM10, and PM2.5 emissions shall be completed within 90 days aftercompleting the addition, replacement, or modification to ensure that the newequipment does not cause an exceedance of applicable emission limits;

6) Replacement, modification, and/or addition of a unit/process venting to SV 001does not relieve the Permittee from SV 001 Title I 1990 CAAA requirements.

15.0

CD hdr RECORDKEEPING16.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000;Minn. Stat. Section 116.07, subds.4a & 9; Minn. R. 7007.0100, subp.7(A), 7(L), & 7(M); Minn. R.7007.0800, subps. 4 & 5; Minn. R.7009.0010-7009.0080

Grain Receiving Operating Times Recordkeeping: Each calendar day the Permitteeshall record and maintain a record of the daily start and stop time of EU 001 andEU 002 operation.

17.0

Page 110: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 16 of 76

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Daily Grain Throughput Monitoring and Recordkeeping:

Once each day the Permittee shall calculate and record:

1. the total grain received (in tons per day),2. the grain received by straight truck delivery (in tons per day).

18.0

CD Minn. R. 7007.0800, subps. 4 and5

Monthly Grain Throughput Monitoring and Recordkeeping:

By the 15th day of each month, the Permittee shall calculate and record the grainreceiving throughput for the previous calendar month using the daily total grainthroughput records, and for the previous twelve-month period by summing themonthly throughput records for the previous 12 months.

19.0

CD hdr PERFORMANCE TESTING20.0

CD Minn. R. 7017.2020, subp. 1 The Permittee shall monitor and record all relevant Appendix VII process operatingparameters and control equipment operating parameters during stack testing.

21.0

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 60 months starting 06/01/2011 tomeasure SV 001 total particulate matter emissions. Testing shall be conducted atworst case conditions as defined at Minn. R. 7017.2005, subp. 8, using EPAReference Methods 5 and 202, or other method(s) approved by MPCA in theperformance test plan approval. Test results shall be reported in units of lb PM/hrand gr PM/dscf.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

22.0

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 60 months starting 06/01/2011 tomeasure SV 001 PM10 emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethods 5 and 202, 201A and 202, or other method(s) approved by MPCA in theperformance test plan approval. Test results shall be reported in units of lb PM10/hrand gr PM10/dscf.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

23.0

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 60 months starting 06/01/2011 tomeasure SV 001 PM2.5 emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethods 5 and 202, 201A and 202, or other method(s) approved by MPCA in theperformance test plan approval. Test results shall be reported in units of lbPM2.5/hr and gr PM2.5/dscf.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

24.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 90 days after Equipment Installation to measure SV 001 PMemissions. Testing shall be conducted at worst case conditions as defined at Minn.R. 7017.2005, subp. 8, using EPA Reference Methods 5 and 202, or othermethod(s) approved by MPCA in the performance test plan approval. Test resultsshall be reported in units of lb PM/hr and gr PM/dscf.

'Equipment Installation' is the installation of new grain handling and storageequipment, modification of existing grain handling and storage equipment, and/orreplacement of existing grain handling and storage equipment with same functionequipment.

25.0

Page 111: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 17 of 76

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 90 days after Equipment Installation to measure SV 001PM10 emissions. Testing shall be conducted at worst case conditions as defined atMinn. R. 7017.2005, subp. 8, using EPA Reference Methods 5 and 202, 201A and202, or other method(s) approved by MPCA in the performance test plan approval.Test results shall be reported in units of lb PM10/hr and gr PM10/dscf.

'Equipment Installation' is the installation of new grain handling and storageequipment, modification of existing grain handling and storage equipment, and/orreplacement of existing grain handling and storage equipment with same functionequipment.

26.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 90 days after Equipment Installation to measure SV 001PM2.5 emissions. Testing shall be conducted at worst case conditions as definedat Minn. R. 7017.2005, subp. 8, using EPA Reference Methods 5 and 202, 201Aand 202, or other method(s) approved by MPCA in the performance test planapproval. Test results shall be reported in units of lb PM2.5/hr and gr PM2.5/dscf.

'Equipment Installation' is the installation of new grain handling and storageequipment, modification of existing grain handling and storage equipment, and/orreplacement of existing grain handling and storage equipment with same functionequipment.

27.0

CD Minn. R. 7007.0800, subp. 2;Minn. R. 7017.2018; Minn. R.7017.2030, subps. 1-4, Minn. R.7107.2035, subps. 1 & 2

Procedure to Increase Process Throughput Limit:

The Permittee may increase the SV 001 process throughput limit by conducting aperformance test at an operating rate that exceeds the permitted SV 001 processthroughput limit and meeting requirements 1 through 7 below.

1. Performance Test Notification (written): due 90 days before performance test atan increased process throughput rate.

2. The Permittee may exceed the existing process throughput limit upon MPCAreceipt of the notification of a performance test at a higher process throughput(required by item 1 above).

3. The Permittee shall calculate actual emissions (i.e. for emission inventory or anyother purpose) using the emission rate from the increased process throughputperformance test retroactive to the date of the Performance Test Notification.

(continued)

28.0

CD Minn. R. 7007.0800, subp. 2;Minn. R. 7017.2018; Minn. R.7017.2030, subps. 1-4, Minn. R.7107.2035, subps. 1 & 2

Procedure to Increase Process Throughput Limit (continued):

4. Performance Test Plan: due 30 days before performance test. The Test Planshall identify the new proposed maximum process throughput limit.

5. Performance Test Pre-Test Meeting: due 7 days before performance test.

6. Performance Test Report: due 45 days after performance test.

7. Performance Test Report - Microfiche Copy: due 105 days after eachperformance test.

The Notification, Test Plan, and Test Report may be submitted in an alternativeformat as allowed by Minn. R. 7017.2018.

29.0

Page 112: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 18 of 76

Subject Item: SV 002 Hammermilling Stack (CE 002)

Associated Items: EU 011 Hammermill 1 - Milling Equipment

EU 012 Hammermill 2 - Milling Equipment

EU 057 Hammermill 3 - Milling Equipment

NC/CA

Type Citation Requirement

CD hdr LIMITS AND OPERATING REQUIREMENTS1.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000

Total Particulate Matter: less than or equal to 0.0040 grains/dry standard cubic footusing 3-hour Average

2.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Total Particulate Matter: less than or equal to 0.94 lbs/hour using 3-hour Average3.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000

PM < 10 micron: less than or equal to 0.0040 grains/dry standard cubic foot using3-hour Average

4.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

PM < 10 micron: less than or equal to 0.94 lbs/hour using 3-hour Average5.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000

PM < 2.5 micron: less than or equal to 0.0040 grains/dry standard cubic foot using3-hour Average

6.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

PM < 2.5 micron: less than or equal to 0.94 lbs/hour using 3-hour Average7.0

LIMIT Minn. R. 7011.1005, subp. 3(D) Opacity: less than or equal to 10 percent opacity from SV 002.8.0

LIMIT Minn. R. 7017.2025, subp. 3 Process Throughput: less than or equal to 109.2 tons/hour using 8-hour BlockAverage (3,900 bushels/hour at 56 pounds per bushel) of corn received unless anew limit is set pursuant to Minn. R. 7017.2025, subp. 3 based on the throughputrecorded during the most recent MPCA-approved performance test wherecompliance was demonstrated. The new limit shall be implemented upon receipt ofthe Notice of Compliance letter granting preliminary approval. The limit is finalupon issuance of a permit amendment incorporating the change. This operatingparameter must remain in the permit to define the maximum capacity of theprocess on an hourly basis.

9.0

CD Title I Conditions: To avoid majorsource threshold under Section52.21 and Minn. R. 7007.3000

Vent all emissions from all hammer mills to fabric filter CE 002. The Permittee shalldocument periods of non-operation of CE 002 during operation of any hammermilling equipment. Refer to subject item CE 002 for applicable periodic monitoringrequirements.

10.0

CD hdr EQUIPMENT FLEXIBILITY11.0

Page 113: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 19 of 76

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Equipment Flexibility:

The Permittee may replace, add, or modify hammer milling equipment. If thePermittee replaces hammer milling equipment, adds new hammer millingequipment, or modifies existing hammer milling equipment, such equipment issubject to all of the requirements of SV 002 as well as those listed in the TotalFacility subject item of this permit.

Additionally:

1) Prior to making such a change, the Permittee shall apply for and obtain theappropriate permit amendment, as applicable. The Permittee shall completecalculations described in Minn. R. 7007.1200. A permit amendment is still requiredregardless of the emissions increase if the change will be subject to a newapplicable requirement or requires revisions to limits or monitoring andrecordkeeping requirements in this permit.

(continued)

12.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Equipment Flexibility (continued):

2) The Permittee shall submit a written notification to the MPCA no later than sevendays after completion of installation of any equipment installed under theseflexibility provisions;

3) Emissions of PM, PM10, and PM2.5 shall remain below the limits specified inthis subject item (SV 002);

4) All existing, new, replaced, and modified grain handling and storage equipmentat the facility shall be vented to CE 002 at all times that any of the equipment isoperating;

5) After the addition, replacement, or modification of equipment, stack emissionstesting for PM, PM10, and PM2.5 emissions shall be completed within 90 days aftercompleting the addition, replacement, or modification to ensure that the newequipment does not cause an exceedance of applicable emission limits;

6) Replacement, modification, and/or addition of a unit/process venting to SV 002does not relieve the Permittee from SV 002 Title I 1990 CAAA requirements.

13.0

CD hdr PERFORMANCE TESTING14.0

CD Minn. R. 7017.2020, subp. 1 The Permittee shall monitor and record all relevant Appendix VII process operatingparameters and control equipment operating parameters during stack testing.

15.0

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 60 months starting 06/01/2011 tomeasure SV 002 total particulate matter emissions. Testing shall be conducted atworst case conditions as defined at Minn. R. 7017.2005, subp. 8, using EPAReference Methods 5 and 202, or other method(s) approved by MPCA in theperformance test plan approval. Test results shall be reported in units of lb PM/hrand gr PM/dscf.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

16.0

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 60 months starting 06/01/2011 tomeasure SV 002 PM10 emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethods 5 and 202, 201A and 202, or other method(s) approved by MPCA in theperformance test plan approval. Test results shall be reported in units of lb PM10/hrand gr PM10/dscf.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

17.0

Page 114: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 20 of 76

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 60 months starting 06/01/2011 tomeasure SV 002 PM2.5 emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethods 5 and 202, 201A and 202, or other method(s) approved by MPCA in theperformance test plan approval. Test results shall be reported in units of lbPM2.5/hr and gr PM2.5/dscf.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

18.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 90 days after Equipment Installation to measure SV 002 PMemissions. Testing shall be conducted at worst case conditions as defined at Minn.R. 7017.2005, subp. 8, using EPA Reference Methods 5 and 202, or othermethod(s) approved by MPCA in the performance test plan approval. Test resultsshall be reported in units of lb PM/hr and gr PM/dscf.

'Equipment Installation' is the installation of new hammer milling equipment,modification of existing hammer milling equipment, and/or replacement of existinghammer milling equipment with same function equipment.

19.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 90 days after Equipment Installation to measure SV 002PM10 emissions. Testing shall be conducted at worst case conditions as defined atMinn. R. 7017.2005, subp. 8, using EPA Reference Methods 5 and 202, 201A and202, or other method(s) approved by MPCA in the performance test plan approval.Test results shall be reported in units of lb PM10/hr and gr PM10/dscf.

'Equipment Installation' is the installation of new hammer milling equipment,modification of existing hammer milling equipment, and/or replacement of existinghammer milling equipment with same function equipment.

20.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 90 days after Equipment Installation to measure SV 002PM2.5 emissions. Testing shall be conducted at worst case conditions as definedat Minn. R. 7017.2005, subp. 8, using EPA Reference Methods 5 and 202, 201Aand 202, or other method(s) approved by MPCA in the performance test planapproval. Test results shall be reported in units of lb PM2.5/hr and gr PM2.5/dscf.

'Equipment Installation' is the installation of new hammer milling equipment,modification of existing hammer milling equipment, and/or replacement of existinghammer milling equipment with same function equipment.

21.0

CD hdr MONITORING AND RECORDKEEPING22.0

CD Minn. R. 7007.0800, subp. 2;Minn. R. 7017.2018; Minn. R.7017.2030, subps. 1-4, Minn. R.7107.2035, subps. 1 & 2

Procedure to Increase Process Throughput Limit:

The Permittee may increase the SV 002 process throughput limit by conducting aperformance test at an operating rate that exceeds the permitted SV 002 processthroughput limit and meeting requirements 1 through 7 below.

1. Performance Test Notification (written): due 90 days before performance test atan increased process throughput rate.

2. The Permittee may exceed the existing process throughput limit upon MPCAreceipt of the notification of a performance test at a higher process throughput(required by item 1 above).

3. The Permittee shall calculate actual emissions (i.e. for emission inventory or anyother purpose) using the emission rate from the increased process throughputperformance test retroactive to the date of the Performance Test Notification.

(continued)

23.0

Page 115: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 21 of 76

CD Minn. R. 7007.0800, subp. 2;Minn. R. 7017.2018; Minn. R.7017.2030, subps. 1-4, Minn. R.7107.2035, subps. 1 & 2

Procedure to Increase Process Throughput Limit (continued):

4. Performance Test Plan: due 30 days before performance test. The Test Planshall identify the new proposed maximum process throughput limit.

5. Performance Test Pre-Test Meeting: due 7 days before performance test.

6. Performance Test Report: due 45 days after performance test.

7. Performance Test Report - Microfiche Copy: due 105 days after eachperformance test.

The Notification, Test Plan, and Test Report may be submitted in an alternativeformat as allowed by Minn. R. 7017.2018.

24.0

Page 116: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 22 of 76

Subject Item: SV 003 Fermentation (CO2) Scrubber Stack (CE 003)

Associated Items: EU 013 Fermenter 1; 730,000 gallons - Fermentation Equipment

EU 014 Fermenter 2; 730,000 gallons - Fermentation Equipment

EU 015 Fermenter 3; 730,000 gallons - Fermentation Equipment

EU 016 Fermenter 4; 730,000 gallons - Fermentation Equipment

EU 017 Beerwell; 985,000 gallons - Fermentation Equipment

EU 058 Fermenter 5; 730,000 gallons - Fermentation Equipment

EU 059 Fermenter 6; 730,000 gallons - Fermentation Equipment

NC/CA

Type Citation Requirement

CD hdr LIMITS AND OPERATING REQUIREMENTS1.0

LIMIT Minn. R. 7011.0715, subp. 1(A) Total Particulate Matter: less than or equal to 0.30 grains/dry standard cubic foot ofexhaust gas unless required to further reduce emissions to comply with the lessstringent limit of either Minn. R. 7011.0730 or Minn. R. 7011.0735.

Capacity-based PTE is 0.04 lb/hr

2.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000

Volatile Organic Compounds: less than or equal to 7.31E-04 lbs/gallon using 3-hourAverage of ethanol produced.

3.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2 andMinn. R. 7011.7000

Volatile Organic Compounds: less than or equal to 6.00 lbs/hour using 3-hourAverage as measured on a total mass VOC basis.

4.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Acetaldehyde: less than or equal to 1.10 lbs/hour using 3-hour Average5.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Acrolein: less than or equal to 0.0060 lbs/hour using 3-hour Average6.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Formaldehyde: less than or equal to 0.0150 lbs/hour using 3-hour Average7.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Methanol: less than or equal to 0.0150 lbs/hour using 3-hour Average8.0

LIMIT Minn. R. 7011.0715, subp. 1(B) Opacity: less than or equal to 20 percent opacity9.0

LIMIT Minn. R. 7017.2025, subp. 3 Process Throughput: less than or equal to 1050 gallons/minute using 8-hour BlockAverage of mash from a liquefaction tank (EU 023 or EU 024) into a fermenter (EU013 - EU 016), unless a new limit is set pursuant to Minn. R. 7017.2025, subp. 3based on the throughput recorded during the most recent MPCA-approvedperformance test where compliance was demonstrated. The new limit shall beimplemented upon receipt of the Notice of Compliance letter granting preliminaryapproval. The limit is final upon issuance of a permit amendment incorporating thechange. This operating parameter must remain in the permit to define the maximumcapacity of the process on an hourly basis.

10.0

Page 117: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 23 of 76

CD Title I Conditions: To avoid majorsource threshold under Section52.21 and Minn. R. 7007.3000,and to avoid major sourcethreshold under 40 CFR Section63.2 and Minn. R. 7011.7000

Vent all emissions from all fermentation equipment to scrubber CE 003. ThePermittee shall document periods of non-operation of CE 003 during operation ofany fermentation equipment. Refer to subject item CE 003 for applicable periodicmonitoring requirements.

11.0

CD hdr EMISSION UNIT FLEXIBILITY12.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Equipment Flexibility:

The Permittee may replace, add, or modify existing fermentation equipment.Fermentation equipment is fermentation tanks and/or beerwells. If the Permitteereplaces any existing fermentation equipment, adds new fermentation equipment,or modifies existing fermentation equipment, such fermentation equipment issubject to all of the requirements of SV 003 as well as the requirements in the TotalFacility subject item of this permit.

Additionally:

1) Prior to making such a change, the Permittee shall apply for and obtain theappropriate permit amendment, as applicable. The Permittee shall completecalculations described in Minn. R. 7007.1200. A permit amendment is still requiredregardless of the emissions increase if the change will be subject to a newapplicable requirement or requires revisions to limits or monitoring andrecordkeeping requirements in this permit.

(continued)

13.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Equipment Flexibility (continued):

2) VOC emissions shall remain below the limits specified in this subject item (SV003);

3) All existing, new, replaced, and modified fermentation equipment at the facilityshall be vented to CE 003 at all times that any of the equipment is operating;

4) After the addition, replacement, or modification of equipment, stack emissionstesting for VOC and HAPs emissions shall be completed within 90 days aftercompleting the addition, replacement, or modification to ensure that the newequipment does not cause an exceedance of the SV 003 VOC emission limit;

5) Replacement, modification, and/or addition of a unit/process venting to SV 003does not relieve the Permittee from SV 003 Title I 1990 CAAA requirements.

14.0

CD hdr PERFORMANCE TESTING15.0

CD Minn. R. 7017.2020, subp. 1 The Permittee shall monitor and record all relevant Appendix VII process operatingparameters and control equipment operating parameters during stack testing.

16.0

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 36 months starting 05/13/2014 tomeasure SV 003 VOC emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethod 18, 25A, 320, or other method approved by MPCA in the performance testplan approval. Test results shall be reported in units of lb VOC/gal 200 proofethanol and lb VOC/hr.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

17.0

Page 118: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 24 of 76

S/A Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and 7011.7000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 36 months starting 05/13/2014 tomeasure SV 003 HAP emissions. Testing must include all chemicals listed inAppendix V of this permit, including acetaldehyde, acrolein, formaldehyde, andmethanol. Testing shall be conducted at worst case conditions as defined at Minn.R. 7017.2005, subp. 8, using EPA Reference Method 18, 320, or other methodapproved by MPCA in the performance test plan approval. Test results shall bereported in units of lb HAP compound/hr.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

18.0

S/A Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 90 days after Equipment Installation to measure SV 003VOC emissions in units of lb VOC/gal 200 proof ethanol and lb VOC/hr. Testingshall be conducted at worst case conditions as defined at Minn. R. 7017.2005,subp. 8, using EPA Reference Method 18, 25A, 320, or other method approved byMPCA in the performance test plan approval. Test results shall be reported in unitsof lb VOC/gal 200 proof ethanol and lb VOC/hr.

'Equipment Installation' is the installation of new fermentation equipment,modification of existing fermentation equipment, and/or replacement of existingfermentation equipment with same function equipment.

19.0

S/A Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and 7011.7000;Minn. R. 7017.2020, subp. 1

Performance Test: due 90 days after Equipment Installation to measure SV 003HAP emissions. Testing must include all chemicals listed in Appendix V of thispermit, including acetaldehyde, acrolein, formaldehyde, and methanol. Theperformance test shall be conducted at worst case conditions as defined at Minn.R. 7017.2005, subp. 8, using EPA Reference Method 18, 320, or other methodapproved by MPCA in the performance test plan approval. Test results shall bereported in units of lb HAP compound/hr.

'Equipment Installation' is the installation of new fermentation equipment,modification of existing fermentation equipment, and/or replacement of existingfermentation equipment with same function equipment.

20.0

CD Minn. R. 7007.0800, subp. 2;Minn. R. 7017.2018; Minn. R.7017.2030, subps. 1-4, Minn. R.7107.2035, subps. 1 & 2

Procedure to Increase Process Throughput Limit:

The Permittee may increase the SV 003 process throughput limit by conducting aperformance test at an operating rate that exceeds the permitted SV 003 processthroughput limit and meeting requirements 1 through 7 below.

1. Performance Test Notification (written): due 90 days before performance test atan increased process throughput rate.

2. The Permittee may exceed the existing process throughput limit upon MPCAreceipt of the notification of a performance test at a higher process throughput(required by item 1 above).

3. The Permittee shall calculate actual emissions (i.e. for emission inventory or anyother purpose) using the emission rate from the increased process throughputperformance test retroactive to the date of the Performance Test Notification.

(continued)

21.0

CD Minn. R. 7007.0800, subp. 2;Minn. R. 7017.2018; Minn. R.7017.2030, subps. 1-4, Minn. R.7107.2035, subps. 1 & 2

Procedure to Increase Process Throughput Limit (continued):

4. Performance Test Plan: due 30 days before performance test. The Test Planshall identify the new proposed maximum process throughput limit.

5. Performance Test Pre-Test Meeting: due 7 days before performance test.

6. Performance Test Report: due 45 days after performance test.

7. Performance Test Report - Microfiche Copy: due 105 days after eachperformance test.

The Notification, Test Plan, and Test Report may be submitted in an alternativeformat as allowed by Minn. R. 7017.2018.

22.0

Page 119: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 25 of 76

Subject Item: SV 004 Regenerative Thermal Oxidizer (CE 005)

Associated Items: EU 018 DDGS Dryer A (CE 006 & CE 005/SV 004 or CE 006 & CE 028/SV 005) - Dehydrator

EU 019 Mixer (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 020 Slurry Tank (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 021 Cook Tube (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 022 Flash Tank (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 023 Liquefaction Tank 1 (CE 005/SV 004 or CE 028/SV 005) - Liquefaction Equipment

EU 024 Liquefaction Tank 2 (CE 005/SV 004 or CE 028/SV 005) - Liquefaction Equipment

EU 025 Yeast Tank (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 026 Beer Column (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 027 Side Stripper (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 028 Rectifier Column (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 029 190 Proof Condenser (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 030 Molecular Sieve (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 031 200 Proof Condenser (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 032 Centrifuges (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 033 Evaporators (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 034 DDGS Dryer B (CE 007 & CE 005/SV 004 or CE 007 & CE 028/SV 005) - Dehydrator

EU 049 Regenerative Thermal Oxidizer (RTO) - Thermal Process Equipment

EU 060 Molecular Sieve (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

GP 005 Process Units Vented to Boiler or Regenerative Thermal Oxidizer

NC/CA

Type Citation Requirement

CD hdr LIMITS

Refer to subject items GP 005, CE 005, and MR 005 for additional applicablerequirements.

1.0

LIMIT Minn. R. 7011.0715, subp. 1(A) Total Particulate Matter: less than or equal to 0.30 grains/dry standard cubic foot ofexhaust gas unless required to further reduce emissions to comply with the lessstringent limit of either Minn. R. 7011.0730 or Minn. R. 7011.0735.

2.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Total Particulate Matter: less than or equal to 0.116 lbs/ton of DDGS produced,using 3-hour Average.

3.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Total Particulate Matter: less than or equal to 3.25 lbs/hour using 3-hour Average4.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

PM < 10 micron: less than or equal to 0.116 lbs/ton of DDGS produced, using3-hour Average.

5.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

PM < 10 micron: less than or equal to 3.25 lbs/hour using 3-hour Average6.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

PM < 2.5 micron: less than or equal to 0.116 lbs/ton of DDGS produced, using3-hour Average.

7.0

Page 120: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 26 of 76

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

PM < 2.5 micron: less than or equal to 3.25 lbs/hour using 3-hour Average8.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Sulfur Dioxide: less than or equal to 0.275 lbs/ton of DDGS produced, using 3-hourAverage.

9.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Sulfur Dioxide: less than or equal to 7.73 lbs/hour using 3-hour Average10.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Nitrogen Oxides: less than or equal to 0.083 lbs/ton of DDGS produced, using3-hour Average.

11.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Nitrogen Oxides: less than or equal to 2.33 lbs/hour using 3-hour Average12.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Volatile Organic Compounds: less than or equal to 0.306 lbs/ton of DDGSproduced, using 3-hour Average.

13.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2

Volatile Organic Compounds: less than or equal to 8.59 lbs/hour using 3-hourAverage as measured on a total mass VOC basis.

14.0

LIMIT Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Carbon Monoxide: less than or equal to 0.412 lbs/ton of DDGS produced, using3-hour Average.

15.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Carbon Monoxide: less than or equal to 11.56 lbs/hour using 3-hour Average16.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Acetaldehyde: less than or equal to 0.15 lbs/hour using 3-hour Average17.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Acrolein: less than or equal to 0.015 lbs/hour using 3-hour Average18.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Formaldehyde: less than or equal to 0.075 lbs/hour using 3-hour Average19.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Methanol: less than or equal to 0.075 lbs/hour using 3-hour Average20.0

LIMIT Minn. R. 7011.0610, subp. 1(A)(2) Opacity: less than or equal to 20 percent opacity except for one six-minute periodper hour of not more than 60 percent opacity.

21.0

CD Minn. R. 7007.0800, subp. 2 EU 049 RTO Permitted Fuel: pipeline natural gas, propane/LPG, and process gas(DDGS dryer exhaust gases).

22.0

Page 121: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 27 of 76

LIMIT Minn. R. 7017.2025, subp. 3 Process Throughput: less than or equal to 1050 gallons/minute using 8-hour BlockAverage of beer from the Beer Well (EU 017) to the Beer Column (EU 026), unlessa new limit is set pursuant to Minn. R. 7017.2025, subp. 3 based on the throughputrecorded during the most recent MPCA-approved performance test wherecompliance was demonstrated. The new limit shall be implemented upon receipt ofthe Notice of Compliance letter granting preliminary approval. The limit is final uponissuance of a permit amendment incorporating the change. This operatingparameter must remain in the permit to define the maximum capacity of theprocess on an hourly basis.

23.0

LIMIT Minn. R. 7017.2025, subp. 3 Process Throughput: less than or equal to 22.0 tons/hour using 8-hour BlockAverage of DDGS output from DDGS Dryer B (EU 034), unless a new limit is setpursuant to Minn. R. 7017.2025, subp. 3 based on the throughput recorded duringthe most recent MPCA-approved performance test where compliance wasdemonstrated. The new limit shall be implemented upon receipt of the Notice ofCompliance letter granting preliminary approval. The limit is final upon issuance ofa permit amendment incorporating the change. This operating parameter mustremain in the permit to define the maximum capacity of the process on an hourlybasis.

24.0

CD hdr PERFORMANCE TESTING25.0

CD Minn. R. 7017.2020, subp. 1 The Permittee shall monitor and record all relevant Appendix VII process operatingparameters and control equipment operating parameters during stack testing.

26.0

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due before end of each 60 months starting 06/09/2011 tomeasure SV 004 PM emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethods 5 and 202, or other method(s) approved by MPCA in the performance testplan approval. Test results shall be reported in units of lb PM/ton DDGS and lbPM/hr.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

27.0

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due before end of each year starting 06/09/2011 to measure SV004 PM10 emissions. Testing shall be conducted at worst case conditions asdefined at Minn. R. 7017.2005, subp. 8, using EPA Reference Methods 5 and 202,201A and 202, or other method(s) approved by MPCA in the performance test planapproval. Test results shall be reported in units of lb PM10/ton DDGS and lbPM10/hr.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

28.0

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due before end of each year starting 06/09/2011 to measure SV004 PM2.5 emissions. Testing shall be conducted at worst case conditions asdefined at Minn. R. 7017.2005, subp. 8, using EPA Reference Methods 5 and 202,201A and 202, or other method(s) approved by MPCA in the performance test planapproval. Test results shall be reported in units of lb PM2.5/ton DDGS and lbPM2.5/hr.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

29.0

Page 122: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 28 of 76

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 60 days after Permit Issuance to measure SV 004 SO2emissions. Testing shall be conducted at worst case conditions as defined at Minn.R. 7017.2005, subp. 8, using EPA Reference Method 6C, or other methodapproved by MPCA in the performance test plan approval. Test results shall bereported in units of lb SO2/mmBtu and lb SO2/hr.

30.0

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due before end of each 60 months starting 06/09/2011 tomeasure SV 004 NOx emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethod 7E, or other method approved by MPCA in the performance test planapproval. Test results shall be reported in units of lb NOx/mmBtu and lb NOx/hr.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

31.0

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due before end of each 60 months starting 06/09/2011 tomeasure SV 004 CO emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethod 10, or other method approved by MPCA in the performance test planapproval. Test results shall be reported in units of lb CO/ton DDGS and lb CO/hr.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

32.0

S/A Title I Condition: 1990 CAAA;Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due before end of each 60 months starting 06/09/2011 tomeasure SV 004 VOC emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethod 18, 25A, 320, or other method approved by MPCA in the performance testplan approval. Test results shall be reported in units of lb VOC/ton DDGS and lbVOC/hr.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

33.0

S/A Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and 7011.7000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 60 months starting 06/09/2011 tomeasure SV 004 HAP emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethod 18, 320, or other method approved by MPCA in the performance test planapproval. Testing must include all chemicals listed in Appendix V of this permit,including acetaldehyde, acrolein, formaldehyde, and methanol. Test results shall bereported in units of lb HAP compound/hr.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

34.0

S/A Minn. R. 7017. 2020, subp. 1 Testing Frequency Plan: due 60 days after Performance Test for SV 004 SO2emissions. The plan shall specify a testing frequency based on the testperformance test results and MPCA guidance. Future performance tests at12-month, 36-month, or 60-month intervals, or as applicable, shall be required uponwritten approval of the plan by the MPCA.

35.0

Page 123: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 29 of 76

Subject Item: SV 007 DDGS Cooler (EU 037) w/fabric filter (CE 027)

Associated Items: EU 037 Cooling Cyclone w/fabric filter (CE 027) - Cooler

NC/CA

Type Citation Requirement

CD hdr LIMITS AND OPERATING REQUIREMENTS

Refer to subject item EU 037 for additional applicable requirements.

1.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Total Particulate Matter: less than or equal to 0.0040 grains/dry standard cubic footusing 3-hour Average

2.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

PM < 10 micron: less than or equal to 0.0040 grains/dry standard cubic foot using3-hour Average

3.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

PM < 2.5 micron: less than or equal to 0.0040 grains/dry standard cubic foot using3-hour Average

4.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Volatile Organic Compounds: less than or equal to 13.27 lbs/hour using 3-hourAverage measured on a total mass VOC basis.

5.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Volatile Organic Compounds: less than or equal to 0.4806 lbs/ton of DDGSproduced using 3-hour Average, measured on a total mass VOC basis.

6.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Acetaldehyde: less than or equal to 0.15 lbs/hour using 3-hour Average7.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Acrolein: less than or equal to 0.030 lbs/hour using 3-hour Average8.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Formaldehyde: less than or equal to 0.060 lbs/hour using 3-hour Average9.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Methanol: less than or equal to 0.060 lbs/hour using 3-hour Average10.0

LIMIT Minn. R. 7011.1005, subp. 3(D) Opacity: less than or equal to 10 percent opacity11.0

LIMIT Minn. R. 7017.2025, subp. 3 Process Throughput: less than or equal to 22.0 tons/hour using 8-hour BlockAverage of DDGS input to EU 037 from DDGS Dryer B (EU 034), unless a new limitis set pursuant to Minn. R. 7017.2025, subp. 3 based on the throughput recordedduring the most recent MPCA-approved performance test where compliance wasdemonstrated. The new limit shall be implemented upon receipt of the Notice ofCompliance letter granting preliminary approval. The limit is final upon issuance ofa permit amendment incorporating the change. This operating parameter mustremain in the permit to define the maximum capacity of the process on an hourlybasis.

12.0

CD Title I Conditions: To avoid majorsource threshold under Section52.21 and Minn. R. 7007.3000

Vent all emissions from DDGS cooling equipment to fabric filter CE 027. ThePermittee shall document periods of non-operation of CE 027 during operation ofany DDGS cooling equipment. Refer to subject item CE 027 for applicablemonitoring requirements.

13.0

CD hdr PERFORMANCE TESTING14.0

CD Minn. R. 7017.2020, subp. 1 The Permittee shall monitor and record all relevant Appendix VII process operatingparameters and control equipment operating parameters during stack testing.

15.0

Page 124: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 30 of 76

S/A Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 60 months starting 06/01/2011 tomeasure SV 007 total particulate matter emissions. Testing shall be conducted atworst case conditions as defined at Minn. R. 7017.2005, subp. 8, using EPAReference Methods 5 and 202, or other method(s) approved by MPCA in theperformance test plan approval. Test results shall be reported in units of grPM10/dscf.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

16.0

S/A Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 60 months starting 06/01/2011 tomeasure SV 007 PM10 emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethods 5 and 202, 201A and 202, or other method(s) approved by MPCA in theperformance test plan approval. Test results shall be reported in units of grPM10/dscf.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

17.0

S/A Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 60 months starting 06/01/2011 tomeasure SV 007 PM2.5 emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethods 5 and 202, 201A and 202, or other method(s) approved by MPCA in theperformance test plan approval. Test results shall be reported in units of grPM2.5/dscf.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

18.0

S/A Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 60 months starting 06/01/2011 tomeasure SV 007 VOC emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethod 18, 25A, 320, or other method approved by MPCA in the performance testplan approval. Test results shall be reported in units of lb VOC/ton DDGS and lbVOC/hr.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

19.0

Page 125: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 31 of 76

S/A Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and 7011.7000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 60 months starting 06/01/2011 tomeasure SV 007 HAP emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethod 18, 320, or other method approved by MPCA in the performance test planapproval. Testing must include all chemicals listed in Appendix V of this permit,including acetaldehyde, acrolein, formaldehyde, and methanol. Test results shall bereported in units of lb HAP compound/hr.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date, and will not reset the test due date forfuture testing as required: 1) by this permit; 2) by the most recently approvedPerformance Test Frequency Plan; or 3) within a Notice of Compliance letter.Testing conducted more than two months prior to the performance test due datesatisfies this test due date requirement and will reset the performance test duedate.

20.0

Page 126: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 32 of 76

Subject Item: SV 008 DDGS Handling & Loadout Baghouse (CE 009)

Associated Items: EU 038 Truck Load Spout (DDGS) - Loading-Unloading Equipment

EU 039 DDGS Dump Pit/Auger - Material Handling Equipment

EU 052 DDGS storage silo - Silo/Bin

EU 055 DDGS storage silo 2 - Silo/Bin

NC/CA

Type Citation Requirement

CD hdr LIMITS AND OPERATING REQUIREMENTS1.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Total Particulate Matter: less than or equal to 0.0040 grains/dry standard cubic footusing 3-hour Average

2.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Total Particulate Matter: less than or equal to 0.36 lbs/hour using 3-hour Average3.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

PM < 10 micron: less than or equal to 0.0040 grains/dry standard cubic foot using3-hour Average

4.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

PM < 10 micron: less than or equal to 0.36 lbs/hour using 3-hour Average5.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

PM < 2.5 micron: less than or equal to 0.0040 grains/dry standard cubic foot using3-hour Average

6.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

PM < 2.5 micron: less than or equal to 0.36 lbs/hour using 3-hour Average7.0

LIMIT Minn. R. 7011.1005, subp. 3(D) Opacity: less than or equal to 10 percent opacity from SV 008.8.0

LIMIT Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000;Minn. R. 7017.2025, subp. 3

Process Throughput: less than or equal to 400 tons/hour using 8-hour BlockAverage of DDGS loaded (assuming 40 lb/bushel and 20,000 bushels/hr). Thisoperating parameter can not be increased without PM10 and PM2.5 remodeling.However a new (lesser) limit may be set pursuant to Minn. R. 7017.2025, subp. 3based on the throughput recorded during the most recent MPCA-approvedperformance test where compliance was demonstrated. The new limit shall beimplemented upon receipt of the Notice of Compliance letter granting preliminaryapproval. The limit is final upon issuance of a permit amendment incorporating thechange. This operating parameter must remain in the permit to define the maximumcapacity of the process on an hourly basis.

9.0

CD Title I Conditions: To avoid majorsource threshold under Section52.21 and Minn. R. 7007.3000

Vent all captured DDGS emissions from all DDGS loadout, handling, and storageequipment to fabric filter CE 009. The Permittee shall document periods ofnon-operation of CE 009 during operation of any DDGS loadout, handling, andstorage equipment. Refer to subject item CE 009 for applicable periodic monitoringrequirements.

10.0

CD Title I Condition: 40 CFR Section52.21(k); Minn. R. 7007.3000;Minn. Stat. Section 116.07, subds.4a & 9; Minn. R. 7007.0100, subp.7(A), 7(L), & 7(M); Minn. R.7007.0800, subps. 2 & 4; Minn.R. 7009.0010-7009.0080

DDGS Loadout Operating Times: The Permittee shall restrict DDGS loadout (EU038) operations to the 12-hour period between 6 AM and 6 PM.

11.0

CD hdr EQUIPMENT FLEXIBILITY12.0

Page 127: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 33 of 76

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Equipment Flexibility:

The Permittee may replace, add, or modify DDGS handling and storage equipment.If the Permittee replaces, adds new, or modifies existing DDGS handling and/orstorage equipment, such equipment is subject to all of the requirements of SV 008as well as those listed in the Total Facility subject item of this permit. DDGShandling and storage equipment is the DDGS dump pit and auger, but does notinclude DDGS loadout spouts.

Additionally:

1) Prior to making such a change, the Permittee shall apply for and obtain theappropriate permit amendment, as applicable. The Permittee shall completecalculations described in Minn. R. 7007.1200. A permit amendment is still requiredregardless of the emissions increase if the change will be subject to a newapplicable requirement or requires revisions to limits or monitoring andrecordkeeping requirements in this permit.

(continued)

13.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Equipment Flexibility (continued):

2) The Permittee shall submit a written notification to the MPCA no later than sevendays after completion of installation of any equipment installed under theseflexibility provisions.

3) Emissions of PM, PM10, and PM2.5 shall remain below the limits specified inthis subject item (SV 008);

4) All existing, new, replaced, and modified DDGS handling and storage equipmentat the facility shall be vented to CE 009 at all times that any of the equipment isoperating;

5) After the addition, replacement, or modification of equipment, stack emissionstesting for PM, PM10, and PM2.5 emissions shall be completed within 90 days aftercompleting the addition, replacement, or modification to ensure that the newequipment does not cause an exceedance of applicable emission limits;

6) Replacement, modification, and/or addition of a unit/process venting to SV 008does not relieve the Permittee from SV 008 Title I 1990 CAAA requirements.

14.0

CD hdr PERFORMANCE TESTING15.0

CD Minn. R. 7017.2020, subp. 1 The Permittee shall monitor and record all relevant Appendix VII process operatingparameters and control equipment operating parameters during stack testing.

16.0

S/A Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each 36 months starting 08/06/2008 tomeasure SV 008 total PM emissions. Testing shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethods 5 and 202, or other method(s) approved by MPCA in the performance testplan approval. Test results shall be reported in units of lb PM/hr and gr PM/dscf.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date requirement, and does not reset the testdue date for future testing required by: 1) this permit, 2) by the most recentlyapproved Performance Test Frequency Plan, or 3) if specified in a Notice ofCompliance letter. Testing conducted more than two months prior to theperformance test due date does not satisfy this test due date requirement and isconsidered an additional test.

17.0

S/A Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each year starting 08/06/2008 to measure SV008 PM10 emissions. Testing shall be conducted at 12-month intervals, and atworst case conditions as defined at Minn. R. 7017.2005, subp. 8, using EPAReference Methods 5 and 202, 201A and 202, or other method(s) approved byMPCA in the performance test plan approval. Test results shall be reported in unitsof lb PM10/hr and gr PM10/dscf.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date requirement, and does not reset the testdue date for future testing required by: 1) this permit, 2) by the most recentlyapproved Performance Test Frequency Plan, or 3) if specified in a Notice ofCompliance letter. Testing conducted more than two months prior to theperformance test due date does not satisfy this test due date requirement and isconsidered an additional test.

18.0

Page 128: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 34 of 76

S/A Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Minn. R. 7017.2020, subp. 1

Performance Test: due before end of each year starting 08/06/2008 to measure SV008 PM2.5 emissions. Testing shall be conducted at 12-month intervals and atworst case conditions as defined at Minn. R. 7017.2005, subp. 8, using EPAReference Methods 5 and 202, 201A and 202, or other method(s) approved byMPCA in the performance test plan approval. Test results shall be reported in unitsof lb PM2.5/hr and gr PM2.5/dscf.

Testing conducted during the 60 days prior to the performance test due datesatisfies the performance test due date requirement, and does not reset the testdue date for future testing required by: 1) this permit, 2) by the most recentlyapproved Performance Test Frequency Plan, or 3) if specified in a Notice ofCompliance letter. Testing conducted more than two months prior to theperformance test due date does not satisfy this test due date requirement and isconsidered an additional test.

19.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 90 days after Equipment Installation to measure SV 008 PMemissions. The performance test shall be conducted at worst case conditions asdefined at Minn. R. 7017.2005, subp. 8, using EPA Reference Methods 5 and 202,or other method approved by MPCA in the performance test plan approval. Testresults shall be reported in units of lb PM/hr and gr PM/dscf.

'Equipment Installation' is the installation of new DDGS handling and storageequipment, modification of existing DDGS handling and storage equipment, and/orreplacement of existing DDGS handling and storage equipment with same functionequipment.

20.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 90 days after Equipment Installation to measure SV 008PM10 emissions. The performance test shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethods 5 and 202, Methods 201A and 202, or other method approved by MPCAin the performance test plan approval. Test results shall be reported in units of lbPM/10hr and gr PM10/dscf.

'Equipment Installation' is the installation of new DDGS handling and storageequipment, modification of existing DDGS handling and storage equipment, and/orreplacement of existing DDGS handling and storage equipment with same functionequipment.

21.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 90 days after Equipment Installation to measure SV 008PM2.5 emissions. The performance test shall be conducted at worst caseconditions as defined at Minn. R. 7017.2005, subp. 8, using EPA ReferenceMethods 5 and 202, Methods 201A and 202, or other method approved by MPCAin the performance test plan approval. Test results shall be reported in units of lbPM2.5/hr and gr PM2.5/dscf.

'Equipment Installation' is the installation of new DDGS handling and storageequipment, modification of existing DDGS handling and storage equipment, and/orreplacement of existing DDGS handling and storage equipment with same functionequipment.

22.0

CD Minn. R. 7007.0800, subp. 2;Minn. R. 7017.2018; Minn. R.7017.2030, subps. 1-4, Minn. R.7107.2035, subps. 1 & 2

Procedure to Increase Process Throughput Limit:

The Permittee may increase the SV 008 process throughput limit by conducting aperformance test at an operating rate that exceeds the permitted SV 008 processthroughput limit and meeting requirements 1 through 7 below.

1. Performance Test Notification (written): due 90 days before performance test atan increased process throughput rate.

2. The Permittee may exceed the existing process throughput limit upon MPCAreceipt of the notification of a performance test at a higher process throughput(required by item 1 above).

3. The Permittee shall calculate actual emissions (i.e. for emission inventory or anyother purpose) using the emission rate from the increased process throughputperformance test retroactive to the date of the Performance Test Notification.

(continued)

23.0

Page 129: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 35 of 76

CD Minn. R. 7007.0800, subp. 2;Minn. R. 7017.2018; Minn. R.7017.2030, subps. 1-4, Minn. R.7107.2035, subps. 1 & 2

Procedure to Increase Process Throughput Limit (continued):

4. Performance Test Plan: due 30 days before performance test. The Test Planshall identify the new proposed maximum process throughput limit.

5. Performance Test Pre-Test Meeting: due 7 days before performance test.

6. Performance Test Report: due 45 days after performance test.

7. Performance Test Report - Microfiche Copy: due 105 days after eachperformance test.

The Notification, Test Plan, and Test Report may be submitted in an alternativeformat as allowed by Minn. R. 7017.2018.

24.0

CD hdr RECORDKEEPING25.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000;Minn. Stat. Section 116.07, subds.4a & 9; Minn. R. 7007.0100, subp.7(A), 7(L), & 7(M); Minn. R.7007.0800, subps. 4 & 5; Minn. R.7009.0010-7009.0080

DDGS Loadout Recordkeeping: Each calendar day the Permittee shall record andmaintain a record of the daily start and stop time of EU 038 operation.

26.0

Page 130: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 36 of 76

Subject Item: EU 018 DDGS Dryer A (CE 006 & CE 005/SV 004 or CE 006 & CE 028/SV 005) - Dehydrator

Associated Items: CE 005 Thermal Oxidizer - Regenerative

CE 006 Multiple Cyclone w/o Fly Ash Reinjection - Most Multiclones

CE 028 Direct Flame Afterburner

GP 005 Process Units Vented to Boiler or Regenerative Thermal Oxidizer

SV 004 Regenerative Thermal Oxidizer (CE 005)

SV 005 NG-Fired Boiler (CE 028)

NC/CA

Type Citation Requirement

CD hdr LIMITS1.0

LIMIT Minn. R. 7011.0715, subp. 1(A) Total Particulate Matter: less than or equal to 0.30 grains/dry standard cubic foot ofexhaust gas unless required to further reduce emissions to comply with the lessstringent limit of either Minn. R. 7011.0730 or Minn. R. 7011.0735.

Compliance with this limit is demonstrated by compliance with the Total ParticulateMatter limit under SV004.

2.0

LIMIT Minn. R. 7011.0715, subp. 1(B) Opacity: less than or equal to 20 percent opacity This opacity limit applies only ifDryer A exhaust is vented directly to atmosphere. Otherwise, the opacity limit underSV004 applies.

3.0

CD hdr OPERATIONAL REQUIREMENTS4.0

CD Minn. R. 7007.0800, subp. 2 Wetcake: When wetcake is stockpiled for offsite shipment and not dried, the wetcake shall be stored onsite for no more than 72 hours, unless the maximum dailytemperature is less than 55 degrees F.

This is a state only requirement and is not enforceable by the EPA Administrator orcitizens under the Clean Air Act.

5.0

CD Minn. R. 7007.0800, subp. 4 Time stored onsite is determined for each 72 hour period (3 consecutive calendardays) by dividing the total amount of wetcake put into storage during the 72 hoursby the average daily amount shipped offsite during the same 72 hours.

This is a state only requirement and is not enforceable by the EPA Administrator orcitizens under the Clean Air Act.

6.0

CD Minn. R. 7007.0800, subp. 5 The Permittee shall keep a record of the amount of wetcake sent to storage eachday and the amount shipped offsite each day.

This is a state only requirement and is not enforceable by the EPA Administrator orcitizens under the Clean Air Act.

7.0

CD Minn. R. 7019.1000, subp. 4Minn. R. 7007.0800, subp. 2

When a shutdown or breakdown of CE 005 or CE 028 occurs, the Permittee shallstop feed of wetcake to the dryers. The Permittee may continue operation of thedryers only as long as necessary to empty material already in the dryers. ThePermittee may resume wetcake feed to the dryers after CE 005 or CE 028 resumesoperation.

This is a state only requirement and is not enforceable by the EPA Administrator orcitizens under the Clean Air Act.

8.0

CD Minn. R. 7017.2025, subp. 3 Limits set as a result of a performance test on SV004 apply until superseded asstated in the MPCA's Notice of Compliance letter granting preliminary approval.Preliminary approval is based on formal review of a subsequent performance teston the same unit as specified by Minn. R. 7017.2025, subp. 3. The limit is finalupon issuance of a permit amendment incorporating the change.

9.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Temperature: less than or equal to 425 degrees F measured at the Dryer A exhaustgas outlet.

10.0

Page 131: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 37 of 76

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2 andMinn. R. 7011.7000

Vent all dryer emissions to the regenerative thermal oxidizer (CE 005) or theboiler/direct flame afterburner (EU 035/CE 028). See CE 005 for operation andmaintenance requirements for the regenerative thermal oxidizer, and EU 035 andCE 028 for operation and maintenance requirements for the direct flameafterburner.

11.0

CD Minn. R. 7007.0800, subp. 14 The Permittee shall operate and maintain dryer A in accordance with the Operationand Maintenance (O & M) Plan. The Permittee shall keep copies of the O & M Planavailable on-site for use by staff and MPCA staff.

12.0

CD hdr MONITORING AND RECORDKEEPING13.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Once each day of EU 018 operation, the Permittee shall observe and record the EU018 exhaust gas temperature.

14.0

Page 132: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 38 of 76

Subject Item: EU 034 DDGS Dryer B (CE 007 & CE 005/SV 004 or CE 007 & CE 028/SV 005) - Dehydrator

Associated Items: CE 005 Thermal Oxidizer - Regenerative

CE 007 Multiple Cyclone w/o Fly Ash Reinjection - Most Multiclones

CE 028 Direct Flame Afterburner

GP 005 Process Units Vented to Boiler or Regenerative Thermal Oxidizer

SV 004 Regenerative Thermal Oxidizer (CE 005)

SV 005 NG-Fired Boiler (CE 028)

NC/CA

Type Citation Requirement

CD hdr LIMITS1.0

LIMIT Minn. R. 7011.0715, subp. 1(A) Total Particulate Matter: less than or equal to 0.30 grains/dry standard cubic foot ofexhaust gas unless required to further reduce emissions to comply with the lessstringent limit of either Minn. R. 7011.0730 or Minn. R. 7011. 0735.

Compliance with this limit is demonstrated by compliance with the Total ParticulateMatter limit under SV004.

2.0

LIMIT Minn. R. 7011.0715, subp. 1(B) Opacity: less than or equal to 20 percent opacity . This opacity limit applies only ifDryer B exhaust is vented directly to atmosphere. Otherwise, the opacity limit underSV004 applies.

3.0

CD hdr OPERATIONAL REQUIREMENTS4.0

CD Minn. R. 7007.0800, subp. 2 Wetcake: When wetcake is stockpiled for offsite shipment and not dried, the wetcake shall be stored onsite for no more than 72 hours, unless the maximum dailytemperature is less than 55 degrees F.

This is a state only requirement and is not enforceable by the EPA Administrator orcitizens under the Clean Air Act.

5.0

CD Minn. R. 7007.0800, subp. 4 Time stored onsite is determined for each 72 hour period (3 consecutive calendardays) by dividing the total amount of wetcake put into storage during the 72 hoursby the average daily amount shipped offsite during the same 72 hours.

This is a state only requirement and is not enforceable by the EPA Administrator orcitizens under the Clean Air Act.

6.0

CD Minn. R. 7007.0800, subp. 5 The Permittee shall keep a record of the amount of wetcake sent to storage eachday and the amount shipped offsite each day.

This is a state only requirement and is not enforceable by the EPA Administrator orcitizens under the Clean Air Act.

7.0

CD Minn. R. 7019.1000, subp. 4Minn. R. 7007.0800, subp. 2

When a shutdown or breakdown of CE 005 or CE 028 occurs, the Permittee shallstop feed of wetcake to the dryers. The Permittee may continue operation of thedryers only as long as necessary to empty material already in the dryers. ThePermittee may resume wetcake feed to the dryers after CE 005 or CE 028 resumesoperation.

This is a state only requirement and is not enforceable by the EPA Administrator orcitizens under the Clean Air Act.

8.0

CD Minn. R. 7017.2025, subp. 3 Limits set as a result of a performance test on SV004 apply until superseded asstated in the MPCA's Notice of Compliance letter granting preliminary approval.Preliminary approval is based on formal review of a subsequent performance teston the same unit as specified by Minn. R. 7017.2025, subp. 3. The limit is finalupon issuance of a permit amendment incorporating the change.

9.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Temperature: less than or equal to 425 degrees F measured at the Dryer B exhaustgas outlet.

10.0

Page 133: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 39 of 76

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2 andMinn. R. 7011.7000

Vent all dryer emissions to the regenerative thermal oxidizer (CE 005) or theboiler/direct flame afterburner (EU 035/CE 028). See CE 005 for operation andmaintenance requirements for the regenerative thermal oxidizer, and EU 035 andCE 028 for operation and maintenance requirements for the direct flameafterburner.

11.0

CD Minn. R. 7007.0800, subp. 14 The Permittee shall operate and maintain Dryer B in accordance with the Operationand Maintenance (O & M) Plan. The Permittee shall keep copies of the O & M Planavailable on-site for use by staff and MPCA staff.

12.0

CD hdr MONITORING AND RECORDKEEPING13.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000

Once each day of EU 034 operation, the Permittee shall observe and record the EU034 exhaust gas temperature.

14.0

Page 134: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 40 of 76

Subject Item: EU 035 NG-Fired Boiler (Direct Flame Afterburner CE 028) - Boiler

Associated Items: GP 005 Process Units Vented to Boiler or Regenerative Thermal Oxidizer

MR 001 NOx

SV 005 NG-Fired Boiler (CE 028)

NC/CA

Type Citation Requirement

CD hdr LIMITS AND OPERATING REQUIREMENTS

Refer to subject items GP 005, CE 028, and MR 006 for additional applicablerequirements.

1.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Total Particulate Matter: less than or equal to 0.0075 lbs/million Btu heat inputusing 3-hour Average applicable at all times including periods of startup, shutdown,or malfunction when EU 035 is not operating as CE 028. PM is measured as thesum of filterable and condensable particulate matter.

2.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Total Particulate Matter: less than or equal to 5.56 lbs/hour using 3-hour Averageapplicable at all times including periods of startup, shutdown, or malfunction whenEU 035 is operating as CE 028. PM is measured as the sum of filterable andcondensable particulate matter.

3.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

PM < 10 micron: less than or equal to 0.0075 lbs/million Btu heat input using 3-hourAverage applicable at all times including periods of startup, shutdown, ormalfunction when EU 035 is not operating as CE 028. PM10 is measured as thesum of filterable and condensable particulate matter.

4.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

PM < 10 micron: less than or equal to 5.56 lbs/hour using 3-hour Averageapplicable at all times including periods of startup, shutdown, or malfunction whenEU 035 is operating as CE 028. PM10 is measured as the sum of filterable andcondensable particulate matter.

5.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

PM < 2.5 micron: less than or equal to 0.0075 lbs/million Btu heat input using3-hour Average applicable at all times including periods of startup, shutdown, ormalfunction when EU 035 is not operating as CE 028. PM2.5 is measured as thesum of filterable and condensable particulate matter.

6.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

PM < 2.5 micron: less than or equal to 5.56 lbs/hour using 3-hour Averageapplicable at all times including periods of startup, shutdown, or malfunction whenEU 035 is operating as CE 028. PM2.5 is measured as the sum of filterable andcondensable particulate matter.

7.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Sulfur Dioxide: less than or equal to 0.0006 lbs/million Btu heat input using 3-hourAverage applicable at all times including periods of startup, shutdown, ormalfunction when EU 035 is not operating as CE 028.

8.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Sulfur Dioxide: less than or equal to 7.73 lbs/hour using 3-hour Average applicableat all times including periods of startup, shutdown, or malfunction when EU 035 isoperating as CE 028.

9.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; 40 CFR Section60.44b(l)(2); Minn. R. 7011.0565

Nitrogen Oxides: less than or equal to 0.10 lbs/million Btu heat input using 30-dayRolling Average applicable at all times including periods of startup, shutdown, ormalfunction.

10.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Volatile Organic Compounds: less than or equal to 0.0054 lbs/million Btu heat inputusing 3-hour Average applicable at all times including periods of startup, shutdown,or malfunction when EU 035 is not operating as CE 028. VOC is measured on atotal mass of VOC basis.

11.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Volatile Organic Compounds: less than or equal to 9.57 lbs/hour using 3-hourAverage applicable at all times including periods of startup, shutdown, ormalfunction when EU 035 is operating as CE 028. VOC is measured on a totalmass of VOC basis.

12.0

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Carbon Monoxide: less than or equal to 26.36 lbs/hour using 3-hour Average whenEU 035 is operating as a control device (CE 028). This limit applies at all timesexcept during periods of startup, shutdown, or malfunction.

13.0

Page 135: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 41 of 76

LIMIT Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000

Carbon Monoxide: less than or equal to 15.0 lbs/hour using 3-hour Average whenEU 035 is not operating as a control device (CE 028). This limit applies at all timesexcept during periods of startup, shutdown, or malfunction.

14.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Acetaldehyde: less than or equal to 0.16 lbs/hour using 3-hour Average15.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Acrolein: less than or equal to 0.037 lbs/hour using 3-hour Average16.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Formaldehyde: less than or equal to 0.18 lbs/hour using 3-hour Average17.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Methanol: less than or equal to 0.062 lbs/hour using 3-hour Average18.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and 7011.7000;Minn. R. 7007.0800, subps. 2 &14

Temperature: greater than or equal to 1575 degrees F using 3-hour RollingAverage at the EU 035 firebox outlet when EU 035 is used to control emissionsnormally controlled by CE 005, unless a new minimum is required to be setpursuant to Minn. R. 7017.2025, subp. 3. If a new minimum is required to be set itwill be based on the values recorded during the most recent MPCA-approvedperformance test where compliance was demonstrated for VOC, CO, and HAPemissions. The new minimum shall be implemented upon receipt of the Notice ofCompliance letter granting preliminary approval. The revised minimum temperatureis final upon issuance of a permit amendment incorporating the change. If the3-hour rolling average temperature is below the required minimum, the VOC, CO,and HAPs emitted during that time are considered uncontrolled until the averagetemperature is above the minimum temperature requirement. This shall be reportedas a deviation.

This requirement is repeated under CE 028. Refer to CE 028 and MR 006 foradditional CE 028 monitoring requirements.

19.0

LIMIT Minn. R. 7017.2025, subp. 3 Process Throughput: less than or equal to 1050 gallons/minute using 8-hour BlockAverage of beer from the Beer Well (EU 017) to the Beer Column (EU 026), unlessa new limit is set pursuant to Minn. R. 7017.2025, subp. 3 based on the throughputrecorded during the most recent MPCA-approved performance test wherecompliance was demonstrated. The new limit shall be implemented upon receipt ofthe Notice of Compliance letter granting preliminary approval. The limit is final uponissuance of a permit amendment incorporating the change. This operatingparameter must remain in the permit to define the maximum capacity of theprocess on an hourly basis.

20.0

LIMIT Minn. R. 7017.2025, subp. 3 Process Throughput: less than or equal to 22.0 tons/hour using 8-hour BlockAverage of DDGS output from DDGS Dryer B (EU 034), unless a new limit is setpursuant to Minn. R. 7017.2025, subp. 3 based on the throughput recorded duringthe most recent MPCA-approved performance test where compliance wasdemonstrated. The new limit shall be implemented upon receipt of the Notice ofCompliance letter granting preliminary approval. The limit is final upon issuance ofa permit amendment incorporating the change. This operating parameter mustremain in the permit to define the maximum capacity of the process on an hourlybasis.

21.0

CD Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

EU 035 Permitted Fuel: Pipeline natural gas and propane/LPG when not controllingemissions normally controlled by EU 049/SV 004.

EU 035 Permitted Fuel: Pipeline natural gas, propane/LPG, and process gas(DDGS dryer exhaust gases) when EU 035 functions as CE 028 and controlsemissions normally controlled by EU 049/SV 004.

22.0

CD hdr PERFORMANCE TESTING REQUIREMENTS23.0

CD Minn. R. 7017.2020, subp. 1 The Permittee shall monitor and record all relevant Appendix VII process operatingparameters and control equipment operating parameters during stack testing.

24.0

Page 136: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 42 of 76

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 180 days after Permit Issuance to measure CE 028 PMemissions. Testing shall be conducted at worst case conditions as defined at Minn.R. 7017.2005, subp. 8, using EPA Reference Methods 5 and 202, or othermethod(s) approved by MPCA in the performance test plan approval. Test resultsshall be reported in units of lb PM/ton DDGS and lb PM/hr.

25.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 180 days after Permit Issuance to measure CE 028 PM10emissions. Testing shall be conducted at worst case conditions as defined at Minn.R. 7017.2005, subp. 8, using EPA Reference Methods 5 and 202, 201A and 202,or other method(s) approved by MPCA in the performance test plan approval. Testresults shall be reported in units of lb PM10/ton DDGS and lb PM10/hr.

26.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 180 days after Permit Issuance to measure CE 028 PM2.5emissions. Testing shall be conducted at worst case conditions as defined at Minn.R. 7017.2005, subp. 8, using EPA Reference Methods 5 and 202, 201A and 202,or other method(s) approved by MPCA in the performance test plan approval. Testresults shall be reported in units of lb PM2.5/ton DDGS and lb PM2.5/hr.

27.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 180 days after Permit Issuance to measure CE 028 SO2emissions. Testing shall be conducted at worst case conditions as defined at Minn.R. 7017.2005, subp. 8, using EPA Reference Method 6C or other method approvedby MPCA in the performance test plan approval. Test results shall be reported inunits of lb SO2/ton DDGS and lb SO2/hr.

28.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 180 days after Permit Issuance to measure CE 028 COemissions. Testing shall be conducted at worst case conditions as defined at Minn.R. 7017.2005, subp. 8, using EPA Reference Method 10 or other method approvedby MPCA in the performance test plan approval. Test results shall be reported inunits of lb CO/ton DDGS and lb CO/hr.

29.0

S/A Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Minn. R. 7017.2020,subp. 1

Performance Test: due 180 days after Permit Issuance to measure CE 028 VOCemissions. Testing shall be conducted at worst case conditions as defined at Minn.R. 7017.2005, subp. 8, using EPA Reference Method 18, 25A, 320, or othermethod approved by MPCA in the performance test plan approval. Test resultsshall be reported in units of lb VOC/ton DDGS and lb VOC/hr.

30.0

S/A Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and 7011.7000;Minn. R. 7017.2020, subp. 1

Performance Test: due 180 days after Permit Issuance to measure CE 028 HAPemissions. Testing must include all chemicals listed in Appendix V of this permit,including acetaldehyde, acrolein, formaldehyde, and methanol.

Testing shall be conducted at worst case conditions as defined at Minn. R.7017.2005, subp. 8, using EPA Reference Method 18, 320, or other methodapproved by MPCA in the performance test plan approval.

Test results shall be reported in units of lb HAP compound/hr.

31.0

S/A Minn. R. 7017. 2020, subp. 1 Testing Frequency Plan: due 60 days after Performance Test for EU 035 PMemissions. The plan shall specify a testing frequency based on the testperformance test results and MPCA guidance. Future performance tests at12-month, 36-month, or 60-month intervals, or as applicable, shall be required uponwritten approval of the plan by the MPCA.

32.0

S/A Minn. R. 7017. 2020, subp. 1 Testing Frequency Plan: due 60 days after Performance Test for EU 035 PM10emissions. The plan shall specify a testing frequency based on the testperformance test results and MPCA guidance. Future performance tests at12-month, 36-month, or 60-month intervals, or as applicable, shall be required uponwritten approval of the plan by the MPCA.

33.0

S/A Minn. R. 7017. 2020, subp. 1 Testing Frequency Plan: due 60 days after Performance Test for EU 035 PM2.5emissions. The plan shall specify a testing frequency based on the testperformance test results and MPCA guidance. Future performance tests at12-month, 36-month, or 60-month intervals, or as applicable, shall be required uponwritten approval of the plan by the MPCA.

34.0

S/A Minn. R. 7017. 2020, subp. 1 Testing Frequency Plan: due 60 days after Performance Test for EU 035 SO2emissions. The plan shall specify a testing frequency based on the testperformance test results and MPCA guidance. Future performance tests at12-month, 36-month, or 60-month intervals, or as applicable, shall be required uponwritten approval of the plan by the MPCA.

35.0

S/A Minn. R. 7017. 2020, subp. 1 Testing Frequency Plan: due 60 days after Performance Test for EU 035 COemissions. The plan shall specify a testing frequency based on the testperformance test results and MPCA guidance. Future performance tests at12-month, 36-month, or 60-month intervals, or as applicable, shall be required uponwritten approval of the plan by the MPCA.

36.0

Page 137: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 43 of 76

S/A Minn. R. 7017. 2020, subp. 1 Testing Frequency Plan: due 60 days after Performance Test for EU 035 VOCemissions. The plan shall specify a testing frequency based on the testperformance test results and MPCA guidance. Future performance tests at12-month, 36-month, or 60-month intervals, or as applicable, shall be required uponwritten approval of the plan by the MPCA.

37.0

S/A Minn. R. 7017. 2020, subp. 1 Testing Frequency Plan: due 60 days after Performance Test for EU 035 HAPemissions. The plan shall specify a testing frequency based on the testperformance test results and MPCA guidance. Future performance tests at12-month, 36-month, or 60-month intervals, or as applicable, shall be required uponwritten approval of the plan by the MPCA.

38.0

CD hdr MONITORING39.0

CD 40 CFR Section 60.48b(a); Minn.R. 7017.1010

The Permittee shall install, calibrate, maintain, and operate a continuous monitoringsystem for measuring EU 035 nitrogen oxides emissions discharged to theatmosphere and record the output of the system.

Refer to subject item MR 001 for additional NOx monitoring requirements.

40.0

CD 40 CFR Section 60.48b(f) NOx Monitoring During CEMS Breakdown: When NOx emission data are notobtained because of CEMS breakdowns, repairs, calibration checks and zero andspan adjustments, emission data will be obtained by using standby monitoringsystems, Method 7 of appendix A of pt. 60, Method 7A of appendix A of pt. 60, orother approved reference methods to provide emission data for a minimum of 75percent of the operating hours in each steam generating unit operating day, in atleast 22 out of 30 successive steam generating unit operating days.

41.0

CD Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2 and7011.7000; Minn. R. 7007.0800,subp. 4(B)

Monitoring Equipment: The Permittee shall install and maintain thermocouples toconduct CE 028 firebox temperature monitoring required by this permit. Themonitoring equipment must be installed, in use, and properly maintained wheneveroperation of the monitored control equipment is required.

Refer to subject items CE 028 and MR 006 for additional CE 028 temperaturemonitoring requirements.

42.0

CD hdr RECORDKEEPING AND REPORTING43.0

CD 40 CFR Section 60.49b(b)Minn. R. 7011.0565

The Permittee shall submit to the Administrator the performance test data from theinitial performance test and the performance evaluation of the CEMS. ThePermittee shall submit to the Administrator the maximum heat input capacity datafrom the demonstration of the maximum heat input capacity of the affected facility.

44.0

CD 40 CFR Section 60.49b(g)Minn. R. 7011.0565

The Permittee shall maintain records of the following information for each steamgenerating unit operating day:

(1) Calendar date.(2) The average hourly nitrogen oxides emission rates (expressed as NO2) (ng/J orlb/million Btu heat input) measured or predicted.(3) The 30-day average nitrogen oxides emission rates (ng/J or lb/million Btu heatinput) calculated at the end of each steam generating unit operating day from themeasured or predicted hourly nitrogen oxide emission rates for the preceding 30steam generating unit operating days.(4) Identification of the steam generating unit operating days when the calculated30-day average nitrogen oxides emission rates are in excess of the nitrogen oxidesemissions limit, with the reasons for such excess emissions as well as a descriptionof corrective actions taken.

(continued)

45.0

Page 138: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 44 of 76

CD 40 CFR Section 60.49b(g)Minn. R. 7011.0565

(Continued from above)

(5) Identification of the steam generating unit operating days for which pollutantdata have not been obtained, including reasons for not obtaining sufficient data anda description of corrective actions taken.(6) Identification of the times when emission data have been excluded from thecalculation of average emission rates and the reasons for excluding data.(7) Identification of "F" factor used for calculations, method of determination, andtype of fuel combusted.(8) Identification of the times when the pollutant concentration exceeded full span ofthe continuous monitoring system.(9) Description of any modifications to the continuous monitoring system that couldaffect the ability of the continuous monitoring system to comply with PerformanceSpecification 2 or 3.(10) Results of daily CEMS drift tests and quarterly accuracy assessments asrequired under appendix F, Procedure 1.

46.0

CD 40 CFR Section 60.49b(d)Minn. R. 7011.0565

The Permittee shall record and maintain records of the amounts of each fuelcombusted during each day and calculate the annual capacity factor individually foreach fuel for the reporting period. The annual capacity factor is determined on a12-month rolling average basis with a new annual capacity factor calculated at theend of each calendar month.

47.0

S/A 40 CFR Section 60.49b(h)Minn. R. 7011.0565

Excess Emissions/Downtime Reports (EER's): due 30 days after end of eachcalendar quarter following Initial Startup of the Monitor. Submit DeviationsReporting Form DRF-1 as amended. The EER shall indicate all periods of monitorbypass and all periods of exceedances of the limit including exceedances allowedby an applicable standard, i.e. during startup, shutdown, and malfunctions. TheEER must be submitted even if there were no excess emissions, downtime orbypasses during the quarter.

48.0

CD 40 CFR Section 60.7(f)Minn. R. 7017.1130

Recordkeeping: The owner or operator must retain records of all CEMS monitoringdata and support information for a period of five years from the date of themonitoring sample, measurement or report. Records shall be kept at the source.

49.0

Page 139: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 45 of 76

Subject Item: EU 040 Ethanol Loading Rack - Loading-Unloading Equipment

Associated Items: CE 010 Flaring

SV 009 Ethanol Loading Rack Flare (CE 010)

NC/CA

Type Citation Requirement

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall vent all emissions to the CE 010 flare when loading ethanolinto tanker trucks. Refer to subject item CE 010 for flare operating and monitoringrequirements.

1.0

Page 140: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 46 of 76

Subject Item: EU 048 Fire Pump 300 Hp CI 2005 - Reciprocating IC Engine

Associated Items: SV 017 Fire Pump

NC/CA

Type Citation Requirement

CD 40 CFR Section 63.6590(a)(1)(iii);Minn. R. 7011.8150

EU 048 is an existing stationary reciprocating internal combustion engine located atan area source of hazardous air pollutants because construction of EU 048commenced prior to June 12, 2006.

1.0

CD hdr OPERATING REQUIREMENTS2.0

CD Minn. R. 7007.0800, subp. 2;Minn. R. 7005.0100, subp. 35a

Fuel Type: Restricted to distillate fuel oil, biodiesel, or blends of distillate fuel oiland biodiesel

3.0

LIMIT Minn. R. 7011.2300, subp. 1 Opacity: less than or equal to 20 percent opacity once operating temperatures havebeen attained.

4.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Emergency Engine Operation Other Than Testing: EU 048 may operate outside ofthe 4-hour time period allowed for testing, only in the event of an emergency.

5.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Operation for maintenance checks and readiness must be conducted between12:00 PM and 4:00 PM CST.

6.0

CD hdr NSPS SUBPART IIII REQUIREMENTS7.0

CD 40 CFR Section 60.4205(c)Minn. R. 7011.2305

Owners and operators of fire pump engines with a displacement of less than 30liters per cylinder must comply with the emission standards in table 4 to subpart IIIIfor all pollutants.

8.0

CD 40 CFR Section 60.4207(a)40 CFR Section 60.4207(b)40 CFR Section 80.510(a)Minn. R. 7011.2305Most stringent, meets limitrequired by Minn. R. 7011.2300

On and after October 1, 2010, diesel fuel must meet 40 CFR Section 80.510(b) fornonroad diesel fuel as follows:

Sulfur content, 15 ppm maximum (meets SO2 limit in Minn. R. 7011.2300);

A minimum cetane index of 40 or a maximum aromatic content of 35 volumepercent.

9.0

CD 40 CFR Section 60.4209(a)Minn. R. 7011.2305

The engine must be equipped with a non-resettable hour meter.10.0

CD 40 CFR Section 60.4211(b)Minn. R. 7011.2305

The Permittee shall keep the records or perform the tests specified in one of themethods specified in 40 CFR Section 60.4211.

11.0

CD 40 CFR Section 60.4211(e)Minn. R. 7011.2305

Annual operation for maintenance checks and readiness testing is limited to 100hrs/yr.

12.0

Page 141: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 47 of 76

Subject Item: EU 049 Regenerative Thermal Oxidizer (RTO) - Thermal Process Equipment

Associated Items: CE 005 Thermal Oxidizer - Regenerative

SV 004 Regenerative Thermal Oxidizer (CE 005)

NC/CA

Type Citation Requirement

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Fuel Usage: Natural gas and propane only.1.0

Page 142: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 48 of 76

Subject Item: EU 053 Admin Bldg Emergency Generator 268 Hp CI 2005 - Reciprocating IC Engine

Associated Items: SV 020 Admin. Bldg. Emergency Generator

NC/CA

Type Citation Requirement

CD 40 CFR Section 63.6590(a)(1)(iii)Minn. R. 7011.8150

EU 053 is an existing stationary reciprocating internal combustion engine located atan area source of hazardous air pollutants because construction of EU 053commenced prior to June 12, 2006.

1.0

CD hdr LIMITS AND OPERATING REQUIREMENTS2.0

CD Minn. R. 7007.0800, subp. 2Minn. R. 7005.0100, subp. 35a

Fuel type: Restricted to distillate fuel oil, biodiesel, or blends of distillate fuel oil andbiodiesel

3.0

LIMIT Minn. R. 7007.0800, subp. 2 Sulfur Content of Fuel: less than or equal to 15 parts per million of sulfur by weight.Meets SO2 limit at Minn. R. 7011.2300.

4.0

CD Minn. R. 7007.0800, subp. 2 Annual operation for maintenance checks and readiness testing is limited to 100hrs/yr.

5.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Operation for maintenance checks and readiness must be conducted between12:00 PM and 4:00 PM CST.

6.0

LIMIT Minn. R. 7011.2300, subp. 1 Opacity: less than or equal to 20 percent opacity once operating temperatures havebeen attained.

7.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Emergency Engine Operation Other Than Testing: EU 053 may operate outside ofthe 4-hour time period allowed for testing, only in the event of an emergency.

8.0

CD hdr RECORDKEEPING9.0

CD Minn. R. 7007.0800, subp. 4 The engine must be equipped with a non-resettable hour meter.10.0

Page 143: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 49 of 76

Subject Item: EU 054 Boiler Feedwater Emergency Generator 150 Hp SI 2005 - Reciprocating IC Engine

Associated Items: SV 022 Emergency Boiler Water Pump

NC/CA

Type Citation Requirement

CD 40 CFR Section 63.6590(a)(1)(iii)Minn. R. 7011.8150

EU 054 is an existing stationary reciprocating internal combustion engine located atan area source of hazardous air pollutants because construction of EU 054commenced prior to June 12, 2006.

1.0

CD hdr OPERATING REQUIREMENTS2.0

CD Minn. R. 7005.0100, subp. 35a Permitted fuel type: propane or natural gas only3.0

LIMIT Minn. R. 7011.2300, subp. 1 Opacity: less than or equal to 20 percent opacity once operating temperatures havebeen attained.

4.0

CD Minn. R. 7007.0800, subp. 2 Annual operation for maintenance checks and readiness testing is limited to 100hrs/yr.

5.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Operation for maintenance checks and readiness must be conducted between12:00 PM and 4:00 PM CST.

6.0

CD Title I Condition: 40 CFR Section52.21(k) and Minn. R. 7007.3000

Emergency Engine Operation Other Than Testing: EU 054 may operate outside ofthe 4-hour time period allowed for testing, only in the event of an emergency.

7.0

Page 144: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 50 of 76

Subject Item: CE 001 Fabric Filter - Low Temperature, i.e., T<180 Degrees F

Associated Items: EU 001 Truck Receiving 1 - Loading-Unloading Equipment

EU 002 Truck Receiving 2 - Loading-Unloading Equipment

EU 003 Grain Elevator 1 - Elevator

EU 004 Conveyor

EU 005 Grain Bin 1 - Silo/Bin

EU 006 Grain Bin 2 - Silo/Bin

EU 007 Grain Day Bin (scalping bin) - Silo/Bin

EU 008 Grain Elevator 2 - Elevator

EU 009 Grain Day Bin (grinding bin) - Silo/Bin

EU 010 Hammermill Feed Conveyors - Conveyor

GP 001 Grain Receiving, Handling, & Storage; DDGS Handling & Loadout

NC/CA

Type Citation Requirement

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the control equipment such that itachieves a collection efficiency for Total Particulate Matter: greater than or equal to99.0 percent collection efficiency

1.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the control equipment such that itachieves a collection efficiency for PM < 10 micron: greater than or equal to 99.0percent collection efficiency

2.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the control equipment such that itachieves a collection efficiency for PM < 2.5 micron: greater than or equal to 99.0percent collection efficiency

3.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Pressure Drop: greater than or equal to 0.25 inches of water column and less thanor equal to 8.0 inches of water column . A new range may be set pursuant to Minn.R. 7017.2025, subp. 3 based on the values recorded during the most recentMPCA-approved performance test where compliance was demonstrated. The newrange shall be implemented upon receipt of the Notice of Compliance lettergranting preliminary approval. The range is final upon issuance of a permitamendment incorporating the change. The Permittee shall record the pressuredrop at least once every 24 hours when in operation.

4.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Visible Emissions: The Permittee shall check the fabric filter stack (SV 001) for anyvisible emissions once each day of operation during daylight hours.

5.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Recordkeeping of Visible Emissions and Pressure Drop. The Permittee shallrecord the time and date of each visible emission inspection and pressure dropreading, and whether or not any visible emissions were observed, and whether ornot the observed pressure drop was within the range specified in this permit

6.0

CD Minn. R. 7007.0800, subp. 14 The Permittee shall operate and maintain the fabric filter in accordance with theOperation and Maintenance (O & M) Plan. The Permittee shall keep copies of theO & M Plan available onsite for use by staff and MPCA staff.

7.0

CD Minn. R. 7007.0800, subps. 4, 5,and 14

Corrective Actions: The Permittee shall take corrective action as soon as possible ifany of the following occur:- visible emissions are observed;- the recorded pressure drop is outside the required operating range; or- the fabric filter or any of its components are found during the inspections to needrepair.Corrective actions shall return the pressure drop to within the permitted range,eliminate visible emissions, and/or include completion of necessary repairsidentified during the inspection, as applicable. Corrective actions include, but arenot limited to, those outlined in the O & M Plan for the fabric filter. The Permitteeshall keep a record of the type and date of any corrective action taken for eachfilter.

8.0

Page 145: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 51 of 76

CD Minn. R. 7007.0800, subps. 4, 5,and 14

Periodic Inspections: At least once per calendar quarter, or more frequently asrequired by the manufacturing specifications, the Permittee shall inspect the controlequipment components. The Permittee shall maintain a written record of theseinspections.

9.0

CD Minn. R. 7007.0800, subp. 4 Monitoring Equipment: The Permittee shall install and maintain the necessarymonitoring equipment for measuring and recording pressure drop as required bythis permit. The monitoring equipment must be installed, in use, and properlymaintained when the monitored fabric filter is in operation.

10.0

CD Minn. R. 7007.0800, subps. 2 and14

Calibrate or replace the pressure drop gauge annually, or as often as required bythe manufacturer's specifications. Maintain a written record of the calibration andany action resulting from calibration.

11.0

Page 146: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 52 of 76

Subject Item: CE 002 Fabric Filter - Low Temperature, i.e., T<180 Degrees F

Associated Items: EU 011 Hammermill 1 - Milling Equipment

EU 012 Hammermill 2 - Milling Equipment

EU 057 Hammermill 3 - Milling Equipment

NC/CA

Type Citation Requirement

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the control equipment such that itachieves a control efficiency for Total Particulate Matter: greater than or equal to99.0 percent control efficiency

1.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the control equipment such that itachieves a control efficiency for PM < 10 micron: greater than or equal to 99.0percent control efficiency

2.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the control equipment such that itachieves a control efficiency for PM < 2.5 micron: greater than or equal to 99.0percent control efficiency

3.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Pressure Drop: greater than or equal to 0.25 inches of water column and less thanor equal to 8.0 inches of water column . A new range may be set pursuant to Minn.R. 7017.2025, subp. 3 based on the values recorded during the most recentMPCA-approved performance test where compliance was demonstrated. The newrange shall be implemented upon receipt of the Notice of Compliance lettergranting preliminary approval. The range is final upon issuance of a permitamendment incorporating the change. The Permittee shall record the pressuredrop at least once every 24 hours when in operation.

4.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Visible Emissions: The Permittee shall check the fabric filter stack (SV 002) for anyvisible emissions once each day of operation during daylight hours.

5.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Recordkeeping of Visible Emissions and Pressure Drop. The Permittee shallrecord the time and date of each visible emission inspection and pressure dropreading, and whether or not any visible emissions were observed, and whether ornot the observed pressure drop was within the range specified in this permit

6.0

CD Minn. R. 7007.0800, subp. 14 The Permittee shall operate and maintain the fabric filter in accordance with theOperation and Maintenance (O & M) Plan. The Permittee shall keep copies of theO & M Plan available onsite for use by staff and MPCA staff.

7.0

CD Minn. R. 7007.0800, subps. 4, 5,and 14

Corrective Actions: The Permittee shall take corrective action as soon as possible ifany of the following occur:- visible emissions are observed;- the recorded pressure drop is outside the required operating range; or- the fabric filter or any of its components are found during the inspections to needrepair.Corrective actions shall return the pressure drop to within the permitted range,eliminate visible emissions, and/or include completion of necessary repairsidentified during the inspection, as applicable. Corrective actions include, but arenot limited to, those outlined in the O & M Plan for the fabric filter. The Permitteeshall keep a record of the type and date of any corrective action taken for eachfilter.

8.0

CD Minn. R. 7007.0800, subps. 4, 5,and 14

Periodic Inspections: At least once per calendar quarter, or more frequently asrequired by the manufacturing specifications, the Permittee shall inspect the controlequipment components. The Permittee shall maintain a written record of theseinspections.

9.0

CD Minn. R. 7007.0800, subp. 4 Monitoring Equipment: The Permittee shall install and maintain the necessarymonitoring equipment for measuring and recording pressure drop as required bythis permit. The monitoring equipment must be installed, in use, and properlymaintained when the monitored fabric filter is in operation.

10.0

CD Minn. R. 7007.0800, subps. 2 and14

Calibrate or replace the pressure drop gauge annually, or as often as required bythe manufacturer's specifications. Maintain a written record of the calibration andany action resulting from calibration.

11.0

Page 147: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 53 of 76

Subject Item: CE 003 Packed-Gas Adsorption Column

Associated Items: EU 013 Fermenter 1; 730,000 gallons - Fermentation Equipment

EU 014 Fermenter 2; 730,000 gallons - Fermentation Equipment

EU 015 Fermenter 3; 730,000 gallons - Fermentation Equipment

EU 016 Fermenter 4; 730,000 gallons - Fermentation Equipment

EU 017 Beerwell; 985,000 gallons - Fermentation Equipment

EU 058 Fermenter 5; 730,000 gallons - Fermentation Equipment

EU 059 Fermenter 6; 730,000 gallons - Fermentation Equipment

GP 004 Fermentation Units Vented to Scrubber (SV 003/CE 003)

NC/CA

Type Citation Requirement

CD hdr OPERATIONAL REQUIREMENTS1.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the fermentation scrubber CE 003 so itachieves a control efficiency for Volatile Organic Compounds: greater than or equalto 98 percent control efficiency

2.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Alternate limit: less than or equal to 20 ppmv VOC if the inlet concentration of VOCis less than 200 ppmv

3.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the fermentation scrubber CE 003 so itachieves a control efficiency for Acetaldehyde: greater than or equal to 98 percentcontrol efficiency

4.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the fermentation scrubber CE 003 so itachieves a control efficiency for Acrolein: greater than or equal to 98 percentcontrol efficiency

5.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the fermentation scrubber CE 003 so itachieves a control efficiency for Formaldehyde: greater than or equal to 98 percentcontrol efficiency

6.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the fermentation scrubber CE 003 so itachieves a control efficiency for Methanol: greater than or equal to 98 percentcontrol efficiency

7.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Pressure Drop: greater than or equal to 2.0 inches of water column and less than orequal to 28.0 inches of water column when fermenters have been in operation atleast 12 hours.

A new range may be set pursuant to Minn. R. 7017.2025, subp. 3 based on thevalues recorded during the most recent MPCA-approved performance test wherecompliance was demonstrated. The new range shall be implemented upon receiptof the Notice of Compliance letter granting preliminary approval. The range is finalupon issuance of a permit amendment incorporating the change. The Permitteeshall record the pressure drop at least once every 24 hours when in operation.

8.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Water flow rate: greater than or equal to 50 gallons/minute . A new minimum maybe set pursuant to Minn. R. 7017.2025, subp. 3 based on the values recordedduring the most recent MPCA-approved performance test where compliance wasdemonstrated. The new minimum shall be implemented upon receipt of the Noticeof Compliance letter granting preliminary approval. The new minimum is final uponissuance of a permit amendment incorporating the change. The Permittee shallrecord the flowrate at least once every 24 hours when in operation.

9.0

LIMIT Title I Condition: to avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Liquid Flow Rate: greater than or equal to 5.7 gallons/hour for the CE 003 sodiumbisulfite scrubber additive.

10.0

CD hdr MONITORING AND RECORDKEEPING11.0

Page 148: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 54 of 76

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: to avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subp. 4(B)

Monitoring Equipment: The Permittee shall install and maintain the necessarymonitoring equipment for measuring and recording CE 003 scrubber water flowrate, scrubber liquid additive rate, and scrubber pressure drop. The monitoringequipment must be installed, in use, and properly maintained when CE 003 is inoperation.

12.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subps. 4 & 5

Recordkeeping of CE 003 Pressure Drop, Water Flow Rate, and Scrubber LiquidAdditive Flow Rate:

Once each day the Permittee shall record the CE 003 pressure drop in inches ofwater column), water flow rate (in gallons per minute), and additive flow rate (ingallons per hour). Each record shall be signed and include the date and time ofeach reading.

13.0

CD Minn. R. 7007.0800, subps. 2 and14

Calibrate the gauges annually, or as often as required by the manufacturer andmaintain a written record of the calibration and any action resulting from thecalibration.

14.0

CD Minn. R. 7007.0800, subps. 2 and14

Inspect monthly, or more frequently as required by the manufacturer, allcomponents that are subject to wear or plugging. Maintain a written record of theinspection and any action resulting from the inspection.

15.0

CD Minn. R. 7007.0800, subp. 14 The Permittee shall operate and maintain the CE 003 CO2 scrubber in accordancewith the Operation and Maintenance (O&M) Plan. The Permittee shall keep copiesof the O&M Plan available onsite for use by staff and MPCA staff.

16.0

CD Minn. R. 7007.0800, subps. 4, 5,and 14

Corrective Actions: The Permittee shall take corrective action as soon as possible ifany of the following occur:

- the water flow rate is below the required minimum;- the scrubber additive flow rate is below the required minimum;- the pressure drop is outside the required operating range;- any components are found during the inspections to need repair.

Corrective actions shall return the water flow rate, scrubber additive flow rate,and/or pressure drop to within the permitted range, and/or include completion ofnecessary repairs identified during an inspection, as applicable. Corrective actionsinclude, but are not limited to, those outlined in the O&M Plan. The Permittee shallkeep a record of the type and date of any corrective action taken.

17.0

Page 149: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 55 of 76

Subject Item: CE 005 Thermal Oxidizer - Regenerative

Associated Items: EU 018 DDGS Dryer A (CE 006 & CE 005/SV 004 or CE 006 & CE 028/SV 005) - Dehydrator

EU 019 Mixer (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 020 Slurry Tank (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 021 Cook Tube (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 022 Flash Tank (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 023 Liquefaction Tank 1 (CE 005/SV 004 or CE 028/SV 005) - Liquefaction Equipment

EU 024 Liquefaction Tank 2 (CE 005/SV 004 or CE 028/SV 005) - Liquefaction Equipment

EU 025 Yeast Tank (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 026 Beer Column (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 027 Side Stripper (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 028 Rectifier Column (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 029 190 Proof Condenser (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 030 Molecular Sieve (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 031 200 Proof Condenser (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 032 Centrifuges (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 033 Evaporators (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 034 DDGS Dryer B (CE 007 & CE 005/SV 004 or CE 007 & CE 028/SV 005) - Dehydrator

EU 049 Regenerative Thermal Oxidizer (RTO) - Thermal Process Equipment

EU 060 Molecular Sieve (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

GP 005 Process Units Vented to Boiler or Regenerative Thermal Oxidizer

MR 005 RTO Temperature

NC/CA

Type Citation Requirement

CD hdr OPERATING REQUIREMENTS1.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the RTO CE 005 so that it achieves adestruction efficiency for Volatile Organic Compounds: greater than or equal to 98.0percent destruction efficiency

2.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the RTO CE 005 so that it achieves adestruction efficiency for Carbon Monoxide: greater than or equal to 98.0 percentdestruction efficiency

3.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the RTO CE 005 so that it achieves acontrol efficiency for Total Particulate Matter: greater than or equal to 95.0 percentdestruction efficiency

4.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the RTO CE 005 so that it achieves acontrol efficiency for PM < 10 micron: greater than or equal to 95.0 percentdestruction efficiency

5.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the RTO CE 005 so that it achieves acontrol efficiency for PM < 2.5 micron: greater than or equal to 95.0 percent controlefficiency

6.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the RTO CE 005 so that it achieves adestruction efficiency for Acetaldehyde: greater than or equal to 98.0 percentdestruction efficiency

7.0

Page 150: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 56 of 76

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the RTO CE 005 so that it achieves adestruction efficiency for Acrolein: greater than or equal to 98.0 percent destructionefficiency

8.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the RTO CE 005 so that it achieves adestruction efficiency for Formaldehyde: greater than or equal to 98.0 percentdestruction efficiency

9.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the RTO CE 005 so that it achieves adestruction efficiency for Methanol: greater than or equal to 98.0 percentdestruction efficiency

10.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: to avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the CE 005 regenerative thermal oxidizerany time that any process equipment controlled by the thermal oxidizer is inoperation. The Permittee shall document periods of non-operation of CE 005 whenprocesses normally vented to CE 005 are operating and not vented to CE 028.

11.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: to avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

Temperature: greater than or equal to 1400 degrees F using 3-hour RollingAverage at the CE 005 combustion chamber outlet. A new minimum may be setpursuant to Minn. R. 7017.2025, subp. 3 based on the values recorded during themost recent MPCA-approved performance test where compliance wasdemonstrated. The new minimum shall be implemented upon receipt of the Noticeof Compliance letter granting preliminary approval. The limit is final upon issuanceof a permit amendment incorporating the change. If the 3-hour rolling averagetemperature is below the minimum temperature limit, the VOC emissions duringthat time shall be considered uncontrolled until the average temperature is abovethe minimum temperature limit. This shall be reported as a deviation.

12.0

CD Minn. R. 7007.0800, subp. 14 The Permittee shall operate and maintain CE 005 in accordance with the Operationand Maintenance (O&M) Plan. The Permittee shall keep copies of the O&M Planavailable onsite for use by staff and MPCA staff.

13.0

CD Minn. R. 7007.0800, subps. 4, 5,& 14

Quarterly Inspections: At least once per calendar quarter, or more frequently asrequired by manufacturer's specifications, the Permittee shall inspect CE 005external system components, including but not limited to electrical systems (CE 005is not equipped with a heat exchanger). The Permittee shall maintain a writtenrecord of the inspection and any corrective actions taken resulting from theinspection.

14.0

CD Minn. R. 7007.0800, subps. 4, 5,& 14

Internal Inspections: The Permittee shall inspect CE 005 internal componentsincluding but not limited to the refractory, during all planned shutdowns of sufficientlength for the refractory to adequately cool for the inspection, but not less thanannually.

15.0

CD Minn. R. 7007.0800, subps. 4, 5,& 14

Corrective Actions: If CE 005 temperature is below the minimum specified by thispermit or if the thermal oxidizer or any of its components are found during theinspections to need repair, the Permittee shall take corrective actions as soon aspossible. Corrective actions shall return the temperature to at least the permittedminimum and/or include completion of necessary repairs identified during theinspection, as applicable. Corrective actions include, but are not limited to, thoseoutlined in the CE 005 O&M Plan. The Permittee shall keep a record of the typeand date of any corrective action taken.

16.0

CD Minn. R. 7019.1000, subp. 4Minn. R. 7007.0800, subp. 2

When a shutdown or breakdown of CE 005 occurs, the Permittee shall either:

1. Stop wet cake feed to the dryers (the Permittee may continue operation of thedryers only as long as necessary to empty material already in the dryers) or,

2. Immediately vent emissions (from CE 005 Associated Items) to CE 028.

17.0

CD hdr MONITORING REQUIREMENTS18.0

Page 151: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 57 of 76

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subp. 4(B)

Monitoring Equipment: The Permittee shall install and maintain thermocouples toconduct temperature monitoring required by this permit. The monitoring equipmentmust be installed, in use, and properly maintained whenever CE 005 operation isrequired.

Refer to subject item MR 005 for additional CE 005 RTO temperature monitoringrequirements.

19.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subps. 4 & 5

Monitoring and Recordkeeping of CE 005 Temperature:

The Permittee shall use MR 005 to hourly calculate and record the three-hourrolling average CE 005 temperature.

20.0

Page 152: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 58 of 76

Subject Item: CE 009 Fabric Filter - Low Temperature, i.e., T<180 Degrees F

Associated Items: EU 038 Truck Load Spout (DDGS) - Loading-Unloading Equipment

EU 039 DDGS Dump Pit/Auger - Material Handling Equipment

EU 052 DDGS storage silo - Silo/Bin

EU 055 DDGS storage silo 2 - Silo/Bin

GP 001 Grain Receiving, Handling, & Storage; DDGS Handling & Loadout

NC/CA

Type Citation Requirement

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the control equipment such that itachieves a collection efficiency for Total Particulate Matter: greater than or equal to99.0 percent collection efficiency

1.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the control equipment such that itachieves a collection efficiency for PM < 10 micron: greater than or equal to 99.0percent collection efficiency

2.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the control equipment such that itachieves a collection efficiency for PM < 2.5 micron: greater than or equal to 99.0percent collection efficiency

3.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Pressure Drop: greater than or equal to 0.25 inches of water column and less thanor equal to 8.0 inches of water column . A new range may be set pursuant to Minn.R. 7017.2025, subp. 3 based on the values recorded during the most recentMPCA-approved performance test where compliance was demonstrated. The newrange shall be implemented upon receipt of the Notice of Compliance lettergranting preliminary approval. The range is final upon issuance of a permitamendment incorporating the change. The Permittee shall record the pressuredrop at least once every 24 hours when in operation.

4.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Minn. R. 7007.0800, subp. 4

Visible Emissions: The Permittee shall check the fabric filter stack (SV008) for anyvisible emissions once each day of operation during daylight hours.

5.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Minn. R. 7007.0800, subp. 5

Recordkeeping of Visible Emissions and Pressure Drop. The Permittee shallrecord the time and date of each visible emission inspection and pressure dropreading, and whether or not any visible emissions were observed, and whether ornot the observed pressure drop was within the range specified in this permit

6.0

CD Minn. R. 7007.0800, subp. 14 The Permittee shall operate and maintain the fabric filter in accordance with theOperation and Maintenance (O & M) Plan. The Permittee shall keep copies of theO & M Plan available onsite for use by staff and MPCA staff.

7.0

CD Minn. R. 7007.0800, subps. 4, 5,and 14

Corrective Actions: The Permittee shall take corrective action as soon as possible ifany of the following occur:- visible emissions are observed;- the recorded pressure drop is outside the required operating range; or- the fabric filter or any of its components are found during the inspections to needrepair.Corrective actions shall return the pressure drop to within the permitted range,eliminate visible emissions, and/or include completion of necessary repairsidentified during the inspection, as applicable. Corrective actions include, but arenot limited to, those outlined in the O & M Plan for the fabric filter. The Permitteeshall keep a record of the type and date of any corrective action taken for eachfilter.

8.0

CD Minn. R. 7007.0800, subps. 4, 5,and 14

Periodic Inspections: At least once per calendar quarter, or more frequently asrequired by the manufacturing specifications, the Permittee shall inspect the controlequipment components. The Permittee shall maintain a written record of theseinspections.

9.0

CD Minn. R. 7007.0800, subp. 4 Monitoring Equipment: The Permittee shall install and maintain the necessarymonitoring equipment for measuring and recording pressure drop as required bythis permit. The monitoring equipment must be installed, in use, and properlymaintained when the monitored fabric filter is in operation.

10.0

Page 153: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 59 of 76

CD Minn. R. 7007.0800, subps. 2 and14

Calibrate or replace the pressure drop gauge annually, or as often as required bythe manufacturer's specifications. Maintain a written record of the calibration andany action resulting from calibration.

11.0

Page 154: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 60 of 76

Subject Item: CE 010 Flaring

Associated Items: EU 040 Ethanol Loading Rack - Loading-Unloading Equipment

EU 061 Loading Rack Flare (CE 010; air assisted) - Thermal Process Equipment

NC/CA

Type Citation Requirement

CD hdr EMISSION LIMITS1.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain CE 010 flare so it achieves a controlefficiency for Volatile Organic Compounds: greater than or equal to 98.0 percentcontrol efficiency

2.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subps. 4, 5, and 14

CE 010 must be designed for and operated with no visible emissions except for aperiod not to exceed a total of 5 minutes during any 2 consecutive hours.

3.0

CD hdr OPERATING REQUIREMENTS4.0

CD Minn. R. 7007.0800, subp. 2 CE 010 Permitted Fuel: Liquid propane or natural gas5.0

CD Minn. R. 7007.0800, subps. 2 and14

Operation Requirement: At all times, including periods of startup, shutdown, andmalfunction, owners shall maintain and operate CE 010 in a manner consistent withgood air pollution control practice for minimizing emissions. Determination ofwhether acceptable operating and maintenance procedures are being used will bebased on available information which may include, but is not limited to, monitoringresults, opacity observations, review of operating and maintenance procedures,and inspection of the source.

6.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subps. 4, 5, and 14

Operation Requirement: CE 010 shall be operated at all times when emissions maybe vented to the flare.

7.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subps. 4, 5, and 14

Operating Requirement: CE 010 shall be operated with a flame present at all times.8.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subp. 4 and 5

Operation Requirement: CE 010 flame presence shall be monitored using athermocouple or any other equivalent device.

9.0

Page 155: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 61 of 76

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subp. 14

Construction Requirement: CE 010 shall be steam-assisted, air-assisted, ornon-assisted. CE 010 is an air-assisted flare.

10.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subps. 4, 5, and 14

Operation Requirement: CE 010 shall be monitored to ensure that it is operatedand maintained in conformance with its design.

11.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subps. 4 and 5

Records Requirement: Keep a record of any malfunction of the flare.12.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subps. 4 and 5

Recordkeeping: Maintain a file of all measurements, CMS performanceevaluations, calibration checks, adjustments and maintenance, and all otherinformation required under 40 CFR Section 60.18 in permanent form, suitable forinspection for at least two years following the date of such measurements,maintenance, and records.

13.0

CD Minn. R. 7007.0800, subps. 2 and14;Minn. R. 7017.2020, subp. 1

Compliance Requirement: Reference Method 22 shall be used to determine thepresence of visible emissions. The Permittee shall determine the presence ofvisible emissions when requested by the Commissioner.

14.0

Page 156: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 62 of 76

Subject Item: CE 027 Fabric Filter - Low Temperature, i.e., T<180 Degrees F

Associated Items: EU 037 Cooling Cyclone w/fabric filter (CE 027) - Cooler

NC/CA

Type Citation Requirement

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the control equipment such that itachieves a control efficiency for Total Particulate Matter: greater than or equal to99.0 percent control efficiency

1.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the control equipment such that itachieves a control efficiency for PM < 10 micron: greater than or equal to 99.0percent control efficiency

2.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

The Permittee shall operate and maintain the control equipment such that itachieves a control efficiency for PM < 2.5 micron: greater than 99.0 percent controlefficiency

3.0

LIMIT Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Pressure Drop: greater than or equal to 0.25 inches of water column and less thanor equal to 8.0 inches of water column . A new range may be set pursuant to Minn.R. 7017.2025, subp. 3 based on the values recorded during the most recentMPCA-approved performance test where compliance was demonstrated. The newrange shall be implemented upon receipt of the Notice of Compliance lettergranting preliminary approval. The range is final upon issuance of a permitamendment incorporating the change. The Permittee shall record the pressuredrop at least once every 24 hours when in operation.

4.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Visible Emissions: The Permittee shall check the fabric filter stack for any visibleemissions once each day of operation during daylight hours.

5.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

Recordkeeping of Visible Emissions and Pressure Drop. Once each day, thePermittee shall observe and record CE 027 pressure drop, and determine if SV 007is emitting any visible emissions. The Permittee shall record the time and date ofeach pressure drop reading and visible emission observation, whether any visibleemissions were observed, and whether the observed pressure drop was within therange specified in this permit.

6.0

CD Minn. R. 7007.0800, subp. 14 The Permittee shall operate and maintain the fabric filter in accordance with theOperation and Maintenance (O & M) Plan. The Permittee shall keep copies of theO & M Plan available onsite for use by staff and MPCA staff.

7.0

CD Minn. R. 7007.0800, subps. 4, 5,and 14

Corrective Actions: The Permittee shall take corrective action as soon as possible ifany of the following occur:- visible emissions are observed;- the recorded pressure drop is outside the required operating range; or- the fabric filter or any of its components are found during the inspections to needrepair.Corrective actions shall return the pressure drop to within the permitted range,eliminate visible emissions, and/or include completion of necessary repairsidentified during the inspection, as applicable. Corrective actions include, but arenot limited to, those outlined in the O & M Plan for the fabric filter. The Permitteeshall keep a record of the type and date of any corrective action taken for eachfilter.

8.0

CD Minn. R. 7007.0800, subps. 4, 5,and 14

Periodic Inspections: At least once per calendar quarter, or more frequently asrequired by the manufacturing specifications, the Permittee shall inspect the controlequipment components. The Permittee shall maintain a written record of theseinspections.

9.0

CD Minn. R. 7007.0800, subp. 4 Monitoring Equipment: The Permittee shall install and maintain the necessarymonitoring equipment for measuring and recording pressure drop as required bythis permit. The monitoring equipment must be installed, in use, and properlymaintained when the monitored fabric filter is in operation.

10.0

CD Minn. R. 7007.0800, subps. 2 and14

Calibrate the gauges annually, or as often as required by the manufacturer'sspecifications. Maintain a written record of the calibration and any action resultingfrom calibration.

11.0

Page 157: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 63 of 76

Subject Item: CE 028 Direct Flame Afterburner

Associated Items: EU 018 DDGS Dryer A (CE 006 & CE 005/SV 004 or CE 006 & CE 028/SV 005) - Dehydrator

EU 019 Mixer (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 020 Slurry Tank (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 021 Cook Tube (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 022 Flash Tank (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 023 Liquefaction Tank 1 (CE 005/SV 004 or CE 028/SV 005) - Liquefaction Equipment

EU 024 Liquefaction Tank 2 (CE 005/SV 004 or CE 028/SV 005) - Liquefaction Equipment

EU 025 Yeast Tank (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 026 Beer Column (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 027 Side Stripper (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 028 Rectifier Column (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 029 190 Proof Condenser (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 030 Molecular Sieve (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 031 200 Proof Condenser (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 032 Centrifuges (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 033 Evaporators (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

EU 034 DDGS Dryer B (CE 007 & CE 005/SV 004 or CE 007 & CE 028/SV 005) - Dehydrator

EU 060 Molecular Sieve (CE 005/SV 004 or CE 028/SV 005) - Distillation Equipment

GP 005 Process Units Vented to Boiler or Regenerative Thermal Oxidizer

MR 006 Direct Flame Afterburner Temperature

NC/CA

Type Citation Requirement

CD hdr OPERATING REQUIREMENTS1.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 & Minn. R.7007.3000

The Permittee shall operate and maintain the direct flame afterburner (NG boiler)CE 028 so that it achieves a destruction efficiency for Volatile Organic Compounds:greater than or equal to 98.0 percent destruction efficiency

2.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 & Minn. R.7007.3000

The Permittee shall operate and maintain the direct flame afterburner (NG boiler)CE 028 so that it achieves a destruction efficiency for Carbon Monoxide: greaterthan or equal to 98.0 percent destruction efficiency

3.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 & Minn. R.7007.3000

The Permittee shall operate and maintain the direct flame afterburner (NG boiler)CE 028 so that it achieves a control efficiency for Total Particulate Matter: greaterthan or equal to 95.0 percent control efficiency

4.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 & Minn. R.7007.3000

The Permittee shall operate and maintain the direct flame afterburner (NG boiler)CE 028 so that it achieves a control efficiency for PM < 10 micron: greater than orequal to 95.0 percent control efficiency

5.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 & Minn. R.7007.3000

The Permittee shall operate and maintain the direct flame afterburner (NG boiler)CE 028 so that it achieves a control efficiency for PM < 2.5 micron: greater than orequal to 95.0 percent control efficiency

6.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the direct flame afterburner (NG boiler)CE 028 so that it achieves a destruction efficiency for Acetaldehyde: greater than orequal to 98.0 percent destruction efficiency

7.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the direct flame afterburner (NG boiler)CE 028 so that it achieves a destruction efficiency for Acrolein: greater than orequal to 98.0 percent destruction efficiency

8.0

Page 158: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 64 of 76

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the direct flame afterburner (NG boiler)CE 028 so that it achieves a destruction efficiency for Formaldehyde: greater thanor equal to 98.0 percent destruction efficiency

9.0

LIMIT Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000

The Permittee shall operate and maintain the direct flame afterburner (NG boiler)CE 028 so that it achieves a destruction efficiency for Methanol: greater than orequal to 98.0 percent destruction efficiency

10.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 & Minn. R.7007.3000; Title I Condition: toavoid major source thresholdunder 40 CFR Section 63.2 andMinn. R. 7011.7000

The Permittee shall operate and maintain the CE 028 direct flame afterburner anytime that any process equipment controlled by the afterburner is in operation. ThePermittee shall document periods of non-operation of CE 028 when processesvented to CE 028 are operating and not vented to CE 005.

11.0

CD Minn. R. 7019.1000, subp. 4Minn. R. 7007.0800, subp. 2

When a shutdown or breakdown of CE 028 occurs, the Permittee shall either:

1. Stop wet cake feed to the dryers (the Permittee may continue operation of thedryers only as long as necessary to empty material already in the dryers) or,

2. Immediately vent emissions (from CE 028 Associated Items) to CE 005.

12.0

LIMIT Title I Condition: to avoid majorsource threshold under 40 CFRSection 52.21(b) & Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2 &Minn. R. 7011.7000

Temperature: greater than or equal to 1575 degrees F using 3-hour RollingAverage at the CE 028 combustion chamber outlet. A new minimum may be setpursuant to Minn. R. 7017.2025, subp. 3 based on the values recorded during themost recent MPCA-approved performance test where compliance wasdemonstrated. The new minimum shall be implemented upon receipt of the Noticeof Compliance letter granting preliminary approval. The limit is final upon issuanceof a permit amendment incorporating the change. If the 3-hour rolling averagetemperature is below the minimum temperature limit, the VOC used during thattime shall be considered uncontrolled until the average temperature is above theminimum temperature limit. This shall be reported as a deviation.

13.0

CD Minn. R. 7007.0800, subps. 4, 5,& 14

Quarterly Inspections: At least once per calendar quarter, or more frequently asrequired by the manufacturer, the Permittee shall inspect CE 028 external systemcomponents, including but not limited to the heat exchanger, and electricalsystems. The Permittee shall maintain a written record of the inspection and anycorrective actions taken resulting from the inspection.

The Permittee shall inspect CE 028 internal components including, but not limitedto the refractory, during all planned shutdowns and not less than annually.

14.0

CD Minn. R. 7007.0800, subps. 4, 5,& 14

Corrective Actions: If the temperature is below the minimum specified by this permitor if the direct flame afterburner or any of its components are found during theinspections to need repair, the Permittee shall take corrective actions as soon aspossible. Corrective actions shall return the temperature to at least the permittedminimum and/or include completion of necessary repairs identified during theinspection, as applicable. Corrective actions include, but are not limited to, thoseoutlined in the O & M Plan for the direct flame afterburner. The Permittee shall keepa record of the type and date of any corrective action taken.

15.0

CD Minn. R. 7007.0800, subp. 14 The Permittee shall operate and maintain the direct flame afterburner inaccordance with the Operation and Maintenance (O & M) Plan. The Permittee shallkeep copies of the O & M Plan available onsite for use by staff and MPCA staff.

16.0

CD hdr MONITORING AND RECORDKEEPING17.0

CD Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2 and7011.7000; Minn. R. 7007.0800,subp. 4(B)

Monitoring Equipment: The Permittee shall install and maintain thermocouples toconduct CE 028 temperature monitoring. The monitoring equipment must beinstalled, in use, and properly maintained whenever CE 028 is in operation.

Refer to subject item MR 006 for additional CE 028 Direct Flame Afterburnertemperature monitoring requirements.

18.0

Page 159: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 65 of 76

CD Title I Condition: To avoid majorsource threshold at 40 CFRSection 52.21(b) and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2 and7011.7000; Minn. R. 7007.0800,subps. 4 & 5

Monitoring and Recordkeeping of CE 028 Temperature:

The Permittee shall use MR 006 to hourly calculate and record the three-hourrolling average CE 028 temperature.

19.0

Page 160: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 66 of 76

Subject Item: FS 001 Paved Road Requirements

NC/CA

Type Citation Requirement

CD hdr FACILITY ROAD REQUIREMENTS

The following permit conditions are based on the parameters and assumptionsused in the air disperion modeling for permit No. 0630000-005 documented inAppendix I of this permit.

1.0

CD Minn. R. 7011.0150; Minn. R. ch.7009

Facility Road Requirements:

1. All roads must be paved with hot mix asphalt or concrete.

2. On each day of operation, the Permittee shall visually inspect all paved roadsurfaces to minimize or eliminate fugitive emissions. The facility shall maintainrecords of each inspection including the inspection date and time, whether fugitivedust was observed, any corrective actions taken and when they were taken, andwhether the corrective actions eliminated the fugitive dust.

(continued)

2.0

CD Minn. R. 7011.0150; Minn. R. ch.7009

Facility Road Requirements (cont.):

3. Anytime fugitive emissions are observed on facility roads, the Permittee shallimmediately eliminate the fugitive emissions by sweeping those roads and/orapplying water or a chemical dust suppressant.

4. The Permittee shall implement and enforce a 15 miles per hour facility-widespeed limit. The Permittee shall post and maintain speed limit signage in a highlyvisible location near the facility entrance.

3.0

CD Minn. R. 7011.0150; Minn. R. ch.7009

The Permittee shall follow the requirements of Appendix IV Road Dust ControlPlan. However, the FS 001 requirements supersede the Appendix IV FugitiveEmissions Control Plan requirements until the Plan is amended as required by thispermit (No. 0630005-005).

4.0

CD Minn. R. 7011.0150 Fugitive Emissions: Do not cause or permit the transporting of any material in amanner which may allow avoidable amounts of particulate matter to becomeairborne. Do not cause or permit a road or a driveway to be constructed, used,repaired, or demolished without applying all such reasonable measures as may berequired to prevent particulate matter from becoming airborne.

5.0

S/A Minn. R. 7007.0800, subp. 2 Fugitive Emissions Control Plan: due 60 days after Permit Issuance. This submittalis a revised Fugitive Emissions Control Plan that reflects the paved road fugitivedust requirements in subject item FS 001. The Permittee shall implement therequirements in Table A subject item FS 001 in place of the existing Appendix IVFugitive Emissions Control Plan, until the existing plan is amended.

6.0

Page 161: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 67 of 76

Subject Item: FS 004 Equipment Leaks

NC/CA

Type Citation Requirement

CD hdr STANDARDS: PUMPS1.0

CD 40 CFR Section 60.482-2Minn. R. 7011.2900(A)

Pumps in light liquid service:

Each pump in light liquid service shall be monitored monthly to detect leaks by themethods specified in 40 CFR Section 60.485(b), except as provided in 40 CFRSection 60.482-1(c) and paragraphs (d), (e), and (f).

Each pump in light liquid service shall be checked by visual inspection eachcalendar week for indications of liquids dripping from the seal.

2.0

CD 40 CFR Section 60.482-2(b) & (c)Minn. R. 7011.2900(A)

(b)(1) If an instrument reading of 10,000 ppm or greater is measured, a leak isdetected.

(2) If there are indications of liquids dripping from the pump seal, a leak is detected.

(c)(1) When a leak is detected, it shall be repaired as soon as practicable, but notlater than 15 calendar days after it is detected, except as provided in 40 CFRSection 60.482-9 (Delay of Repair).

(2) A first attempt at repair shall be made no later than 5 calendar days after eachleak is detected.

3.0

CD hdr STANDARDS: COMPRESSORS4.0

CD 40 CFR Section 60.482-3(a)Minn. R. 7011.2900(A)

(a) Each compressor shall be equipped with a seal system that includes a barrierfluid system that prevents leakage of VOC to the atmosphere, except as providedin 40 CFR Section 60.482-1(c) and 40 CFR Section 60.482-3(h) and (i).

5.0

CD 40 CFR Section 60.482-3(b)Minn. R. 7011.2900(A)

(b) Each compressor seal system shall be:

(1) Operated with the barrier fluid at a pressure that is greater than the compressorstuffing box pressure; or

(2) Equipped with a barrier fluid system that is connected by a closed vent systemto a control device that complies with the requirements of 40 CFR Section60.482-10; or

(3) Equipped with a system that purges the barrier fluid into a process stream withzero VOC emissions to the atmosphere.

6.0

CD 40 CFR Section 60.482-3(c) & (d)Minn. R. 7011.2900(A)

(c) The barrier fluid system shall be in heavy liquid service or shall not be in VOCservice.

(d) Each barrier fluid system shall be equipped with a sensor that will detect failureof the seal system, barrier fluid system, or both.

7.0

CD 40 CFR Section 60.482-3(e)Minn. R. 7011.2900(A)

(e)(1) Each sensor shall be checked daily or shall be equipped with an audiblealarm.

(2) The owner or operator shall determine, based on design considerations andoperating experience, a criterion that indicates failure of the seal system, the barrierfluid system, or both.

8.0

CD 40 CFR Section 60.482-3(f)Minn. R. 7011.2900(A)

(f) If the sensor indicates failure of the seal system, the barrier system, or bothbased on the criterion determined under paragraph 40 CFR Section 60.482-3(e)(2),a leak is detected.

9.0

CD 40 CFR Section 60.482-3(g)Minn. R. 7011.2900(A)

(g)(1) When a leak is detected, it shall be repaired as soon as practicable, but notlater than 15 calendar days after it is detected except as provided in 40 CFRSection 60.482-9 (Delay of Repair).

(2) A first attempt at repair shall be made no later than 15 calendar days after it isdetected, except as provided in 40 CFR Section 60.482-9.

10.0

CD hdr STANDARDS: PRESSURE RELIEF DEVICES IN GAS/VAPOR SERVICE11.0

CD 40 CFR Section 60.482-4(a)Minn. R. 7011.2900(A)

(a) Except during pressure releases, each pressure relief device in gas/vaporservice shall be operated with no detectable emissions, as indicated by aninstrument reading of less than 500 ppm above background as determined by themethods specified in 40 CFR Section 60.485(c).

12.0

Page 162: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 68 of 76

CD 40 CFR Section 60.482-4(b)Minn. R. 7011.2900(A)

(b)(1) After each pressure release, the pressure relief device shall be returned to acondition of no detectable emissions, as indicated by an instrument reading of lessthan 500 ppm above background, as soon as practicable, but no later than 5calendar days after the pressure release, except as provided in 40 CFR Section60.482-9 (Delay of Repair).

13.0

CD hdr STANDARDS: SAMPLING CONNECTION SYSTEMS14.0

CD 40 CFR Section 60.482-5(a)Minn. R. 7011.2900(A)

(a) Each sampling connection system shall be equipped with a closed-purged,closed-loop, or closed-vent system, except as provided in 40 CFR Section60.482-1(c).

15.0

CD 40 CFR Section 60.482-5(b) and(c)Minn. R. 7011.2900(A)

(b) If an instrument reading of 10,000 ppm or greater is measured, a leak isdetected.

(c)(1) Any valve for which a leak is not detected for 2 successive months may bemonitored the first month of every quarter, beginning with the next quarter, until aleak is detected.

(2) If a leak is detected, the valve shall be monitored monthly until a leak is notdetected for 2 successive months.

16.0

CD hdr STANDARDS: OPEN ENDED VALVES OR LINES17.0

CD 40 CFR Section 60.482-6(a)Minn. R. 7011.2900(A)

(a)(1) Each open-ended valve or line shall be equipped with a cap, blind flange,plug, or a second valve, except as provided in 40 CFR Section 60.482-1(c).

(2) The cap, blind flange, plug, or second valve shall seal the open end at all timesexcept during operations requiring process fluid flow through the open-ended valveor line.

18.0

CD 40 CFR Section 60.482-6(b) and(c)Minn. R. 7011.2900(A)

(b) Each open-ended valve or line equipped with a second valve shall be operatedin a manner such that the valve on the process fluid end is closed before thesecond valve is closed.

(c) When a double block and bleed system is being used, the bleed valve or linemay remain open during operations that require venting the line between the blockvalves but shall comply with paragraph (a) at all other times.

19.0

CD hdr STANDARDS: VALVES20.0

CD 40 CFR Section 60.482-7(a)Minn. R. 7011.2900(A)

(a) Each valve shall be monitored monthly to detect leaks by the methods specifiedin 40 CFR Section 60.485(b).

21.0

CD 40 CFR Section 60.482-7(b) & (c)Minn. R. 7011.2900(A)

(b) If an instrument reading of 10,000 ppm or greater is measured, a leak isdetected.

(c)(1) Any valve for which a leak is not detected for 2 successive months may bemonitored the first month of every quarter, beginning with the next quarter, until aleak is detected.

(2) If a leak is detected, the valve shall be monitored monthly until a leak is notdetected for 2 successive months.

22.0

CD 40 CFR Section 60.482-7(d)Minn. R. 7011.2900(A)

(d)(1) When a leak is detected, it shall be repaired as soon as practicable, but nolater than 15 calendar days after the leak is detected, except as provided in 40 CFRSection 60.482-9.

(2) A first attempt at repair shall be made no later than 5 calendar days after eachleak is detected.

23.0

CD 40 CFR Section 60.482-7(e)Minn. R. 7011.2900(A)

(e) First attempts at repair include, but are not limited to, the following bestpractices where practicable:

(1) Tightening of bonnet bolts;(2) Replacement of bonnet bolts;(3) Tightening of packing gland nuts;(4) Injection of lubricant into lubricated packing.

24.0

CD hdr STANDARDS: PUMPS AND VALVES IN HEAVY LIQUID SERVICE, PRESSURERELIEF DEVICES IN LIGHT LIQUID OR HEAVY LIQUID SERVICE, ANDFLANGES AND OTHER CONNECTORS

25.0

CD 40 CFR Section 60.482-8(a)Minn. R. 7011.2900(A)

(a) Pumps and valves in heavy liquid service, pressure relief devices in light liquidor heavy liquid service and flanges and other connectors shall be monitored within5 days by the method specified in 40 CFR Section 60.485(b) if evidence of apotential leak is found by visual, audible, olfactory, or any other detection method.

26.0

Page 163: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 69 of 76

CD 40 CFR Section 60.482-8(b) and(c)Minn. R. 7011.2900(A)

(b) If an instrument reading of 10,000 ppm or greater is measured, a leak isdetected.

(c)(1) When a leak is detected, it shall be repaired as soon as practicable, but notlater than 15 calendar days after it is detected, except as provided in 40 CFRSection 60.4829 (Delay of Repair).

(2) A first attempt at repair shall be made no later than 5 calendar days after eachleak is detected.

27.0

CD 40 CFR Section 60.482-8(d)Minn. R. 7011.2900(A)

(d) First attempts at repair include, but are not limited to, the best practicesdescribed under 40 CFR Section 60.482-7(e).

28.0

CD hdr DELAY OF REPAIR29.0

CD 40 CFR Section 60.482-9(a) and(b)Minn. R. 7011.2900(A)

(a) Delay of repair of equipment for which leaks have been detected will be allowedif the repair is technically infeasible without a process unit shutdown. Repair of thisequipment shall occur before the end of the next process unit shutdown.

(b) Delay of repair of equipment will be allowed for equipment which is isolatedfrom the process and which does not remain in VOC service.

30.0

CD 40 CFR Section 60.482-9(c)Minn. R. 7011.2900(A)

(c) Delay of repair for valves will be allowed if:

(1) The owner or operator demonstrates that emissions of purged material resultingfrom the immediate repair are greater than the fugitive emissions likely to resultfrom delay of repair, and

(2) When repair procedures are affected, the purged material is collected anddestroyed or recovered in a control device complying with 40 CFR Section60.482-10.

31.0

CD 40 CFR Section 60.482-9(d)Minn. R. 7011.2900(A)

(d) Delay of repair for pumps will be allowed if:

(1) Repair required the use of a dual mechanical seal system that includes a barrierfluid system, and

(2) Repair is completed as soon as practicable, but not later than 6 months after theleak was detected.

32.0

CD 40 CFR Section 60.482-9(e)Minn. R. 7011.2900(A)

(e) Delay of repair beyond a process shutdown will be allowed for a valve, if valveassembly replacement is necessary during the process unit shutdown, valveassembly supplies have been depleted, and valve assembly supplies had beensufficiently stocked before the supplies were depleted. Delay of repair beyond thenext process unit shutdown will not be allowed unless the next process unitshutdown occurs sooner than 6 months after the first process unit shutdown.

33.0

CD hdr TESTING PROCEDURES34.0

CD 40 CFR Section 60.486(b)Minn. R. 7011.2900(A)

Compliance shall be determined by the methods specified in 40 CFR Section60.485.

35.0

CD hdr RECORDKEEPING36.0

CD 40 CFR Section 60.496(b)Minn. R. 7011.2900(A)

(b) When each leak is detected, the following requirements apply:

(1) A weatherproof and readily visible identification, marked with the equipmentidentification number, shall be attached to the leaking equipment.

(2) The identification on a valve may be removed after it has been monitored for 2successive months as specified in 40 CFR Section 60.482-7(c) and no leak hasbeen detected during those 2 months.

(3) The identification on equipment except on a valve may be removed after it hasbeen repaired.

37.0

CD 40 CFR Section 60.486(c)(1)-(4)Minn. R. 7011.2900(A)

(c) When each leak is detected the following information shall be recorded in a logand shall be kept for 2 years in a readily accessible location:

(1) The instrument and operator identification numbers and the equipmentidentification number.(2) The date the leak was detected and the dates of each attempt to repair the leak.(3) Repair methods applied in each attempt to repair the leak.(4) Above 10,000 if the maximum instrument reading measured by the methodsspecified in 40 CFR Section 60.485(a) after each repair attempt is equal to orgreater than 10,000 ppm.

38.0

Page 164: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 70 of 76

CD 40 CFR Section 60.486(c)(5)-(9)Minn. R. 7011.2900(A)

(5) Repair delayed and the reason for the delay if a leak is not repaired within 15calendar days after discover of the leak.(6) The signature of the owner or operator whose decision it was that the repaircould not be affected without a process shutdown.(7) The expected date of successful repair of the leak if a leak is not repaired within15 days.(8) Dates of process unit shutdown that occurs while the equipment is unrepaired.(9) The date of successful repair of the leak.

39.0

CD hdr REPORTING REQUIREMENTS40.0

CD 40 CFR Section 60.487(a)Minn. R. 7011.2900(A)

(a) Each owner or operator subject to the provisions of this subpart shall submitsemiannual reports to the Administrator beginning six months after the initial startupdate.

41.0

CD 40 CFR Section 60.487(b)Minn. R. 7011.2900(A)

(b) The initial semiannual report to the Administrator shall include the followinginformation:

(1) Process unit identification,(2) Number of valves subject to the requirements of 40 CFR Section 60.482-7,(3) Number of pumps subject to the requirements of 40 CFR Section 60.482-2,(4) Number of compressors subject to the requirements of 40 CFR Section60.482-3.

42.0

CD 40 CFR Section 60.487(c)(1) and(2)(i)-(2)(iv)Minn. R. 7011.2900(A)

(c) All semiannual reports to the Administrator shall include the followinginformation, summarized from the information in 40 CFR Section 60.486:

(1) Process unit identification,(2) For each month during the semiannual reporting period, (i) Number of valves for which leaks were detected as described in 40 CFRSection 60.482(7)(b) or 40 CFR Section 60.483-2. (ii) Number of valves for which leaks were not repaired as required in 40 CFRSection 60.482-7(d)(1), (iii) Number of pumps for which leaks were detected as described in 40 CFRSection 60.482-2(b) and (d)(6)(i), (iv) Number of pumps for which leaks were not repaired as required in 40 CFRSection 60.482-2(c)(1) and (d)(6)(ii),

43.0

CD 40 CFR Section60.487(c)(2)(v)-(vii)Minn. R. 7011.2900(A)

(v) Number of compressors for which leaks were detected as described in 40CFR Section 60.482-3(f), (vi) Number of compressors for which leaks were not repaired as required in 40CFR Section 60.482-3(g)(1), (vii) The facts that explain each delay of repair and, where appropriate, why aprocess unit shutdown was technically infeasible.

44.0

CD 40 CFR Section 60.487(c)(3) and(4)Minn. R. 7011.2900(A)

(3) Dates of process unit shutdowns which occurred within the semiannualreporting period.(4) Revisions to items reported according to paragraph (b) if changes haveoccurred since the initial report or subsequent revisions to the initial report.

45.0

CD 40 CFR Section 60.487(e)Minn. R. 7011.2900(A)

(e) Report the results of all performance tests in accordance with 40 CFR Section60.8. The provisions of 40 CFR Section 60.8(d) do not apply to affected facilitiessubject to the provisions of this subpart except that an owner or operator mustnotify the Administrator of the schedule for the initial performance tests at least 30days before the initial performance tests.

46.0

S/A 40 CFR Section 60.487(a)Minn. R. 7011.2900(A)

Report: due 31 days after end of each calendar half-year starting 09/05/2007 thatincludes the information specified in 40 CFR Section 60.487. The requiredinformation is summarized in Subject Item FS 004 of this permit.

47.0

Page 165: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 71 of 76

Subject Item: FS 007 Ethanol Loadout (Rail) - Material Handling/Transfer/Storage

NC/CA

Type Citation Requirement

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000

All rail cars must be dedicated fleet (carry only ethanol and placarded as ethanol).No loadout controls are required for dedicated fleet rail cars.

Emissions from loadout to rail cars may be vented to CE 010. Refer to CE 010 forCE 010 applicable requirements.

1.0

Page 166: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 72 of 76

Subject Item: MR 001 NOx

Associated Items: CM 001

EU 035 NG-Fired Boiler (Direct Flame Afterburner CE 028) - Boiler

NC/CA

Type Citation Requirement

CD 40 CFR Section 60.48b(a)Minn. R. 7011.0565

The Permittee shall install, calibrate, maintain, and operate a continuous monitoringsystem for measuring nitrogen oxides emissions discharged to the atmosphere andrecord the output of the system.

1.0

CD 40 CFR Section 60.13(e)(2)Minn. R. 7017.1010

CEMS Monitor Design: Each CEMS shall be designed to complete a minimum ofone cycle of sampling, analyzing, and data recording in each 15-minute period.

2.0

CD 40 CFR Section 60.13(e),Minn. R. 7017.1090, subp. 1Minn. R. 7017.1010

Continuous Operation: CEMS must be operated and data recorded during allperiods of emission unit operation including periods of emission unit start-up,shutdown, or malfunction except for periods of acceptable monitor downtime. Thisrequirement applies whether or not a numerical emission limit applies during theseperiods. A CEMS must not be bypassed except in emergencies where failure tobypass would endanger human health, safety, or plant equipment.

3.0

CD Minn. R. 7017.1170, subp. 2;40 CFR pt. 60, App. F; section 3

QA Plan: Develop and implement a written quality assurance plan that covers eachCEMS. The plan shall be on site and available for inspection within 30 days aftermonitor certification. The plan shall contain all of the information required by 40CFR pt. 60, Appendix F, Section 3.

4.0

CD 40 CFR pt. 60, Appendix F;40 CFR Section 60.13(a)Minn. R. 7017.1010

CEMS QA/QC: The Permittee shall operate, calibrate, and maintain each CEMSaccording to the QA/QC procedures in 40 CFR pt. 60, Appendix F as amended andmaintain a written QA/QC program available in a form suitable for inspection.

5.0

CD 40 CFR pt. 60, Appendix F,section 4.1;40 CFR Section 60.13(d)(1)regarding CEMS;Minn. R. 7017.1170, subp. 3Minn. R. 7017.1010

CEMS Daily Calibration Drift Check: Permittees must automatically check the zero(low level value between 0 and 20 percent of span value) and span (50 to 100percent of span value) calibration drifts at least once daily. The zero and spanmust, at a minimum, be adjusted whenever the drift exceeds two times the limitspecified in 40 CFR pt. 60, Appendix B. 40 CFR pt. 60, Appendix F shall be used todetermine out-of-control periods for CEMS.

6.0

CD 40 CFR pt. 60, Appendix F,section 5.1.2; Minn. R. 7017.1170,subp. 4

Cylinder Gas Audit: due before end of each calendar quarter following CEMcertification test. A CGA is not required during any calendar quarter in which aRATA was performed.

7.0

CD 40 CFR pt. 60, Appendix F,section 5.1.1; Minn. R. 7017.1170,subp. 5

CEMS Relative Accuracy Test Audit (RATA): due before end of each year followingCEM certification test. Follow the procedures in 40 CFR pt. 60, Appendix F.

8.0

S/A Minn. R. 7017.1180, subp.1 Cylinder Gas Audit (CGA) Results Summary: due 30 days after end of eachcalendar quarter starting 12/16/2010

9.0

CD Minn. R. 7017.1180, subp. 2 Relative Accuracy Test Audit (RATA) Notification: due 30 days before CEMsRelative Accuracy Test Audit (RATA)

10.0

S/A Minn. R. 7017.1180, subp. 3 Relative Accuracy Test Audit (RATA) Results Summary: due 30 days after end ofeach calendar quarter starting 12/16/2010

11.0

CD 40 CFR Section 60.13(h)(2)Minn. R. 7017.1010

Monitoring Data: Reduce all NOx continuous monitoring systems data to 1-houraverages, in accordance with 40 CFR Section 60.13(h). 1-hour averages shall becomputed from four or more data points equally spaced over each 1-hour period.

12.0

CD 40 CFR Section 60.47b(e)Minn. R. 7011.0565

The procedures under 40 CFR Section 60.13 shall be followed for installation,evaluation, and operation of the CEMS.

(1) All CEMS shall be operated in accordance with the applicable procedures underPerformance Specifications 1, 2, and 3 (appendix B).(2) Quarterly accuracy determinations and daily calibration drift tests shall beperformed in accordance with Procedure 1 (appendix F).

13.0

Page 167: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 73 of 76

CD 40 CFR Section 60.47b(e)(4)(i)and (ii)Minn. R. 7011.0565

As an alternative to meeting the requirements of requirements of 40 CFR Section60.47b paragraphs (e)(1) and (e)(2), the Permittee may elect to implement thefollowing alternative data accuracy assessment procedures:

(i) if the NOx CEMS span value exceeds 100 ppm, the NOx CEMS daily calibrationerror test and calibration adjustment procedures described in sections 2.1.1 and2.1.3 of appendix B to pt. 75 may be followed instead of the calibration drift (CD)assessment procedures in Procedure 1, section 4.1 of appendix F to pt. 60.

(ii) if the NOx CEMS span value exceeds 30 ppm, the NOx CEMS quarterly linearitychecks may be performed in accordance with section 2.2.1 of appendix B to pt. 75,instead of performing the cylinder gas audits (CGAs) described in Procedure 1,section 5.1.2 of appendix F to pt. 60.

(cont. below)

14.0

CD 40 CFR Section 60.47b(e)(4)(ii)Minn. R. 7011.0565

(cont. from above)

If this option is selected: The frequency of the linearity checks shall be as specifiedin section 2.2.1 of appendix B to pt. 75; the applicable linearity specifications insection 3.2 of appendix A to pt. 75 shall be met; the data validation andout-of-control criteria in section 2.2.3 of appendix B to pt. 75 shall be followedinstead of the excessive audit inaccuracy and out-of-control criteria in Procedure 1,section 5.2 of appendix F to pt. 60; and the grace period provisions in section 2.2.4of appendix B to pt. 75 shall apply. For the purposes of data validation under 40CFR pt. 60, subp. Db, the cylinder gas audits described in Procedure 1, section5.1.2 of appendix F to pt. 60 shall be performed if the NOx span value is less thanor equal to 30 ppm; and

(cont. below)

15.0

CD 40 CFR Section 60.47b(e)(4)(iii)Minn. R. 7011.0565

(cont. from above)

(iii) The NOx CEMS RATAs may be performed in accordance with section 2.3 ofappendix B to pt. 75 instead of following the procedures described in Procedure 1,section 5.1.1 of appendix F to pt. 60. If this option is selected: The frequency ofeach RATA shall be as specified in section 2.3.1 of appendix B to pt. 75; theapplicable relative accuracy specifications shown in Figure 2 in appendix B to pt. 75shall be met; the data validation and out-of-control criteria in section 2.3.2 ofappendix B to pt. 75 shall be followed instead of the excessive audit inaccuracy andout-of-control criteria in Procedure 1, section 5.2 of appendix F to pt. 60; and thegrace period provisions in section 2.3.3 of appendix B to pt. 75 shall apply.

(cont. below)

16.0

CD 40 CFR Section 60.47b(e)(4)(iii)Minn. R. 7011.0565

(cont. from above)

For the purposes of data validation under pt. 60, subp. Db, the relative accuracyspecification in section 13.2 of Performance Specification 2 in appendix B to pt. 60shall be met on a lb/MMBtu basis for NOx when the average NOx emission ratemeasured by the reference method during the RATA is less than 0.100 lb/MMBtu.

17.0

CD 40 CFR Section 60.48b(c), (d),and (e)Minn. R. 7011.0565

The NOx CEMS shall be operated and data recorded during all periods of EU 035operation except for CEMS breakdowns and repairs. Data shall be recorded duringcalibration checks, and zero and span adjustments.

The one-hour average NOx emission rates measured by the NOx CEMS shall beexpressed as lb/million Btu heat input and shall be used to calculate the averageemission rates. The one-hour averages shall be calculated using at least two datapoints for each one-hour average.

The procedures under 40 CFR Section 60.13 shall be followed for installation,evaluation, and operation of the NOx CEMS. The span value for measuringnitrogen oxides shall be 500 ppm.

As an alternative to meeting the requirements of 40 CFR Section 60.48b(e)(2)(i),the Permittee may elect to use the NOx span values determined according tosection 2.1.2 in appendix A to pt. 75, and such span values shall be rounded offaccording to section 2.1.2 in appendix A to pt.75.

18.0

Page 168: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 74 of 76

CD 40 CFR Section 60.48b(f)Minn. R. 7011.0565

When nitrogen oxides emission data are not obtained because of continuousmonitoring system breakdowns, repairs, calibration checks and zero and spanadjustments, emission data will be obtained by using standby monitoring systems,or other approved reference methods to provide emission data for a minimum of 75percent of the operating hours in each steam generating unit operating day, in atleast 22 out of 30 successive steam generating unit operating days.

19.0

Page 169: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 75 of 76

Subject Item: MR 005 RTO Temperature

Associated Items: CE 005 Thermal Oxidizer - Regenerative

NC/CA

Type Citation Requirement

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subp. 4(B)

Monitoring Equipment: The Permittee shall install and maintain thermocouples toconduct temperature monitoring of the CE 005 firebox. The monitoring equipmentmust be installed, in use, and properly maintained whenever CE 005 operation isrequired.

1.0

CD Title I Condition: 1990 CAAA; TitleI Condition: To avoid major sourcethreshold under 40 CFR Section52.21 and Minn. R. 7007.3000;Title I Condition: To avoid majorsource threshold under 40 CFRSection 63.2 and Minn. R.7011.7000; Minn. R. 7007.0800,subps. 4 & 5

The Permittee shall maintain a continuous hard copy readout or computer disk fileof the RTO firebox temperature readings and hourly calculated three-hour rollingaverage temperatures.

2.0

CD Minn. R. 7007.0800, subps. 4 & 5 The Permittee shall maintain and operate a thermocouple monitoring device thatcontinuously indicates and records the CE 005 combustion chamber temperature.The monitoring device shall have a margin of error less than the greater of +/- 0.75percent of the temperature being measured or +/- 2.5 degrees Celsius. Therecording device shall also calculate the three-hour rolling average combustionchamber temperature.

3.0

CD Minn. R. 7007.0800, subps. 4 & 5 Daily Monitoring: The Permittee shall check the MR 005 temperature readoutdevice at least once each operating day to verify that it is working and thattemperature is being recorded properly.

4.0

CD Minn. R. 7007.0800, subps. 4, 5,& 14

Annual Calibration: The Permittee shall calibrate or replace temperature monitorMR 005 at least annually and shall maintain a written record of the calibration andany action taken from the calibration.

5.0

Page 170: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

MINNESOTA POLLUTION CONTROL AGENCYAIR QUALITY520 LAFAYETTE ROADST. PAUL, MN 55155-4194 COMPLIANCE PLAN CD-01

Facility Name: Heron Lake BioEnergy LLC

Permit Number: 06300025 - 005

1 May, 2015 15:42Page 76 of 76

Subject Item: MR 006 Direct Flame Afterburner Temperature

Associated Items: CE 028 Direct Flame Afterburner

NC/CA

Type Citation Requirement

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2 andMinn. R. 7011.7000; Minn. R.7007.0800, subp. 4(B)

Monitoring Equipment: The Permittee shall install and maintain thermocouples toconduct temperature monitoring of the CE 028 firebox. The monitoring equipmentmust be installed, in use, and properly maintained whenever CE 028 operation isrequired.

1.0

CD Title I Condition: To avoid majorsource threshold under 40 CFRSection 52.21 and Minn. R.7007.3000; Title I Condition: Toavoid major source thresholdunder 40 CFR Section 63.2 andMinn. R. 7011.7000; Minn. R.7007.0800, subps. 4 & 5

The Permittee shall maintain a continuous hard copy readout or computer disk fileof the Direct Flame Afterburner temperature readings and hourly calculatedthree-hour rolling average temperatures.

2.0

CD Minn. R. 7007.0800, subps. 4 & 5 The Permittee shall maintain and operate a thermocouple monitoring device thatcontinuously indicates and records the CE 028 combustion chamber temperature.The monitoring device shall have a margin of error less than the greater of +/- 0.75percent of the temperature being measured or +/- 2.5 degrees Celsius. Therecording device shall also hourly calculate the three-hour rolling averagecombustion chamber temperature.

3.0

CD Minn. R. 7007.0800, subps. 4 & 5 Daily Monitoring: The Permittee shall check the MR 006 temperature readoutdevice at least once each operating day to verify that it is working and thattemperature is being recorded properly.

4.0

CD Minn. R. 7007.0800, subps. 4, 5,& 14

Annual Calibration: The Permittee shall calibrate or replace temperature monitorMR 006 at least annually and shall maintain a written record of the calibration andany action taken from the calibration.

5.0

Page 171: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Attachment 3 - Points Calculator

Page 172: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Points-Based Fee Calculator

1) AQ Facility ID No.: 06300025 Total Points 702) Facility Name: Heron Lake BioEnergy LLC3) Small business? y/n? N     4) DQ Numbers (including all rolled) : 4660, 3380, 3528, 3694, 3771, 3837, 4399, 4508, 4907     5) Date of each Application Received: --6) Final Permit No. 06300025-0057) Permit Staff M Cole8) "Work completed" in which .xls file (i.e. unit 2b, unit 1a, biofuels)?

Application Type DQ No. Qty. Points Total Points DetailsAdministrative Amendment 1 0Minor Amendment 4 0Applicability Request 10 0Moderate Amendment 15 0Major Amendment 4640 1 25 25Individual State Permit - First Time 50 0Individual Part 70 Permit - First Time 75 0

Additional PointsModeling Review 4640 1 15 15 revised modeling

BACT Review 15 0LAER Review 15 0CAIR/Part 75 CEM analysis 10 0NSPS Review 4640 1 10 10 subp. Db changes due to fuel switchNESHAP Review 10 0Case-by-case MACT Review 20 0Netting 10 0Limits to remain below threshold

4640 2 10 20

Plantwide Applicability Limit (PAL) 20 0AERA review 15 0Variance request under 7000.7000 35 0Confidentiality request under 7000.1300 2 0EAW reviewPart 4410.4300, subparts 18, item A; and 29 15 0Part 4410.4300, subparts 8, items A & B; 10, items A to C; 16, items A & D; 17, items A to C & E to G; and 18, items B & C

35 0

Part 4410.4300, subparts 4; 5 items A & B; 13; 15; 16, items B & C; and 17 item D

70 0

NOTES: NSPS subp. Db requirements revised due to change in method of operation when coal was replaced by natural gas as fuel. Limits to remain below threshold is for the addition of HAP limits and HAP control efficiency requirements to avoid major source under 40 CFR pt. 63..

1. addition of HAP limits and control requirements to avoid 40 CFR pt. 63; 2. revision of ethanol production limit to avoid PSD and 40 CFR pt. 63

Worksheet in ole_main (DQ 4640)

Page 173: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Attachment 4 - February 2012 AERA Revision Not Required Email

Page 174: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

From: Burman, Shelley (MPCA) <[email protected]> Sent: Monday, February 06, 2012 11:13 AM To: Brian Aerne Cc: [email protected]; 'Brent Pavelko'; [email protected]; Jessica Karras-Bailey; [email protected]; Becker, Dennis L (MPCA); Beil, David L (MPCA); Magee-Hill, Heather (MPCA); Pak, Steven (MPCA); Schutt, Carolina (MPCA) Subject: RE: Heron Lake BioEnergy - AERA Good Morning Brian, Thank you for your letter. It summarizes the discussions you and I have had accurately. During the course of our discussions, I have also discussed this topic with the Unit Supervisors in our Air Permitting Section and have shared your summary with them; they also are in agreement that it accurately reflects the expectations for the anticipated HLBE permit modification application. Regards, Shelley Shelley Burman, P.E. Unit Supervisor Risk Evaluation Air Modeling Environmental Analysis and Outcomes Division Minnesota Pollution Control Agency phone 651 757 2255 From: Brian Aerne [mailto:[email protected]] Sent: Friday, February 03, 2012 3:22 PM To: Burman, Shelley (MPCA) Cc: [email protected]; 'Brent Pavelko'; [email protected]; 'Jessica Bailey'; [email protected]; Becker, Dennis L (MPCA); Beil, David L (MPCA); Magee-Hill, Heather (MPCA) Subject: Heron Lake BioEnergy - AERA Good Afternoon Shelley: Please find attached a letter regarding our conversation on Wednesday morning about the need for Heron Lake BioEnergy to complete an AERA analysis based on their proposed permit modifications. Please don’t hesitate to call or email if you have any questions or would like to discuss further. Thank you, Brian Brian Aerne Senior Environmental Scientist

Page 175: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

RTP Environmental Associates, Inc. 400 Post Avenue - Suite 405 Westbury, NY 11590 Ph: (516) 333-4526 Fax: (516) 333-4571 www.rtpenv.com ___________________________________________________________________ CONFIDENTIALITY This e-mail and any attachments are confidential and also may be privileged. If you are not the named recipient, or have otherwise received this communication in error, please delete it from your inbox, notify the sender immediately, and do not disclose its contents to any other person, use them for any purpose, or store or copy them in any medium. Thank you for your cooperation.

Page 176: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,
Page 177: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,
Page 178: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Attachment 5 - Modeling Data

Page 179: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

1

MPCA REPORT CREATION DATE & TIME: 04/21/2014 13:05:33 **************************************************** * Modeling Parameters and Modeling Results Summary * * for Air Modeling Submittal in Directory(s) Below * **************************************************** Note to MPCA Permit Engineer: Please use... Landscape Courier, 8 pt Margins: 0.5 left/right/bottom, 0.8 top for header. **************************************************** X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\CO X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2 X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\Increment X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM25 X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2

Page 180: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

2

MPCA REPORT CREATION DATE & TIME: 04/21/2014 13:05:33 **************************************************** * Modeling Parameters and Modeling Results Summary * * for Air Modeling Submittal in Directory(s) Below * **************************************************** This MPCA computer-generated summary report includes: Directory of AERMOD Model Output Files, followed by: Model Setup Options Summary Emission Sources Source Groups Misc. Info. (e.g. ECHO, INCLUDED, meteorology, etc.) See corresponding input/output files for other items: building and terrain information, more urban details, sample meteorological data and wind speed categories, emission scalars, receptors, plot/post/other outputs, and other EPA AERMOD dispersion model features/items. Pathname Description: Pathname has 3 parts: fixed MPCA; flexible MPCA; USER Pathname Part1(MPCA): X:\...\Air_Modeling\Projects\ Pathname Part2(MPCA): \PermitId_CompanyName\YEARMNDY\ Pathname Part3(USER): user folder name and file name. Filenames with spaces were replaced with underscores. Please direct questions about this summary report to: Dennis Becker 651-757-2217 [email protected]. ***************************************************** X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\CO 10/10/2013 01:52 PM 248,997 HLB_CO$$.LST X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2 10/10/2013 01:05 PM 435,887 HLB_NO2_1hr_T3$$.LST 10/10/2013 01:48 PM 300,987 HLB_NO2_T3_2006_NO2$$.LST 10/10/2013 01:52 PM 300,987 HLB_NO2_T3_2007_NO2.LST 10/10/2013 01:55 PM 300,987 HLB_NO2_T3_2008_NO2.LST 10/10/2013 01:58 PM 300,986 HLB_NO2_T3_2009_NO2.LST 10/10/2013 02:02 PM 301,787 HLB_NO2_T3_2010_NO2.LST X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\Increment 10/10/2013 09:03 AM 290,679 HLB_INC_2006_PM10$$.LST 10/10/2013 09:07 AM 290,679 HLB_INC_2007_PM10.LST 10/10/2013 09:10 AM 290,679 HLB_INC_2008_PM10.LST 10/10/2013 09:14 AM 290,678 HLB_INC_2009_PM10.LST 10/10/2013 09:17 AM 291,479 HLB_INC_2010_PM10.LST X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS 10/10/2013 09:07 AM 411,002 HLB_NAAQS_2006_PM10$$.LST 10/10/2013 09:13 AM 411,247 HLB_NAAQS_2007_PM10.LST 10/10/2013 09:19 AM 411,247 HLB_NAAQS_2008_PM10.LST 10/10/2013 09:25 AM 411,246 HLB_NAAQS_2009_PM10.LST 10/10/2013 09:31 AM 412,047 HLB_NAAQS_2010_PM10.LST 11/14/2013 03:35 PM 286,971 HLB_PM10_NAAQS_Ann_2006_PM10$$.LST 11/14/2013 03:41 PM 286,971 HLB_PM10_NAAQS_Ann_2007_PM10.LST

Page 181: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

3

11/14/2013 03:47 PM 286,971 HLB_PM10_NAAQS_Ann_2008_PM10.LST 11/14/2013 03:54 PM 286,970 HLB_PM10_NAAQS_Ann_2009_PM10.LST 11/14/2013 04:00 PM 287,771 HLB_PM10_NAAQS_Ann_2010_PM10.LST X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM25 10/10/2013 09:23 AM 407,578 HLB_PM25$$.LST X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2 10/10/2013 09:11 AM 638,546 HLB_2006_SO2$$.LST 10/10/2013 09:12 AM 638,546 HLB_2007_SO2.LST 10/10/2013 09:14 AM 638,546 HLB_2008_SO2.LST 10/10/2013 09:15 AM 638,545 HLB_2009_SO2.LST 10/10/2013 09:16 AM 639,346 HLB_2010_SO2.LST 11/18/2013 02:14 PM 239,737 HLB_SO2_1hr$$.LST

Page 182: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

4

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\CO\HLB_CO$$.LST Misc. Input (ECHO, INCLUDED, meteorology, etc.) ** ECHO CO TITLEONE Heron Lake BioEnergy LLC (HLB) CO TITLETWO Major Modification Permit Modeling - August 2013 CO MODELOPT DFAULT CONC CO AVERTIME 1 8 CO POLLUTID CO SO EMISFACT HLBSV17 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBSV20 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBEU54 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO INCLUDED "C:\Beework\HLBE\Maj_Mod_2011\CO\HLB$43.8065N_95.2892W_2005NEIandFAR2G_CO__.far" SO SRCGROUP ALL ME SURFFILE "c:\Beework\HLBE\Maj_Mod_2011\Met_Data\MJQMPX5Y.SFC" FREE ME PROFFILE "c:\Beework\HLBE\Maj_Mod_2011\Met_Data\MJQMPX5Y.PFL" ME SURFDATA 99999 2006 ME UAIRDATA 94983 2006 ME PROFBASE 440.7 METERS OU RECTABLE 1 SECOND OU RECTABLE 8 SECOND OU PLOTFILE 1 ALL SECOND "C:\Beework\HLBE\Maj_Mod_2013\CO\HLB_CO.GRF" 31 OU PLOTFILE 8 ALL SECOND "C:\Beework\HLBE\Maj_Mod_2013\CO\HLB_CO.GRF" 31

Page 183: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

5

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\CO\HLB_CO$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 14:47:13 PAGE 1 **MODELOPTs: RegDFAULT CONC ELEV *** MODEL SETUP OPTIONS SUMMARY *** - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - **Model Is Setup For Calculation of Average CONCentration Values. -- DEPOSITION LOGIC -- **NO GAS DEPOSITION Data Provided. **NO PARTICLE DEPOSITION Data Provided. **Model Uses NO DRY DEPLETION. DRYDPLT = F **Model Uses NO WET DEPLETION. WETDPLT = F **Model Uses RURAL Dispersion Only. **Model Uses Regulatory DEFAULT Options: 1. Stack-tip Downwash. 2. Model Accounts for ELEVated Terrain Effects. 3. Use Calms Processing Routine. 4. Use Missing Data Processing Routine. 5. No Exponential Decay. **Model Assumes No FLAGPOLE Receptor Heights. **Model Calculates 2 Short Term Average(s) of: 1-HR 8-HR **This Run Includes: 6 Source(s); 1 Source Group(s); and 640 Receptor(s) **The Model Assumes A Pollutant Type of: CO **Model Set To Continue RUNning After the Setup Testing. **Output Options Selected: Model Outputs Tables of Highest Short Term Values by Receptor (RECTABLE Keyword) Model Outputs Tables of Overall Maximum Short Term Values (MAXTABLE Keyword) Model Outputs External File(s) of High Values for Plotting (PLOTFILE Keyword) Model Outputs Separate Summary File of High Ranked Values (SUMMFILE Keyword) **NOTE: The Following Flags May Appear Following CONC Values: c for Calm Hours m for Missing Hours b for Both Calm and Missing Hours **Misc. Inputs: Base Elev. for Pot. Temp. Profile (m MSL) = 440.70 ; Decay Coef. = 0.000 ; Rot. Angle = 0.0 Emission Units = GRAMS/SEC ; Emission Rate Unit Factor = 0.10000E+07 Output Units = MICROGRAMS/M**3 **Approximate Storage Requirements of Model = 3.6 MB of RAM. **Input Runstream File: HLB_CO.DTA **Output Print File: HLB_CO.LST **File Created for Event Model: C:\Beework\HLBE\Maj_Mod_2011\RTO\CO\HLB_CO_EVENTOUT_DETAIL **File for Summary of Results: C:\Beework\HLBE\Maj_Mod_2013\CO\HLB_CO.SUM

Page 184: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

6

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 14:47:13 PAGE 2 **MODELOPTs: RegDFAULT CONC ELEV *** POINT SOURCE DATA *** NUMBER EMISSION RATE BASE STACK STACK STACK STACK BLDG URBAN CAP/ EMIS RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT TEMP. EXIT VEL. DIAMETER EXISTS SOURCE HOR SCALAR ID CATS. (METERS) (METERS) (METERS) (METERS) (DEG.K) (M/SEC) (METERS) VARY BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBSV4 0 0.14310E+01 316014.0 4852934.0 432.9 38.10 491.48 24.80 1.32 YES NO NO HLBSV5 0 0.33200E+01 315867.0 4852934.0 433.1 45.72 491.48 21.38 2.51 YES NO NO HLBSV9 0 0.57900E+00 315950.0 4853172.0 432.8 10.67 970.37 4.02 2.29 YES NO NO HLBSV17 0 0.21600E+00 315991.0 4852826.0 432.8 2.44 683.15 64.81 0.13 YES NO NO HROFDY HLBSV20 0 0.22600E+00 315646.0 4853068.0 432.8 2.74 735.93 71.33 0.13 YES NO NO HROFDY HLBEU54 0 0.18912E+01 315969.0 4852941.0 433.1 1.52 927.59 19.02 0.15 YES NO NO HROFDY

Page 185: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

7

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 14:47:13 PAGE 3 **MODELOPTs: RegDFAULT CONC ELEV *** SOURCE IDs DEFINING SOURCE GROUPS *** GROUP ID SOURCE IDs ALL HLBSV4 , HLBSV5 , HLBSV9 , HLBSV17 , HLBSV20 , HLBEU54 ,

Page 186: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

8

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 14:47:13 PAGE 4 **MODELOPTs: RegDFAULT CONC ELEV *** DIRECTION SPECIFIC BUILDING DIMENSIONS *** THIS & MOST OTHER ITEMS NOT PRINTED TO SAVE SPACE

Page 187: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

9

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBSV17 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBSV20 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBEU54 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 *** METEOROLOGICAL DAYS SELECTED FOR PROCESSING *** (1=YES; 0=NO) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE: METEOROLOGICAL DATA ACTUALLY PROCESSED WILL ALSO DEPEND ON WHAT IS INCLUDED IN THE DATA FILE. *** UPPER BOUND OF FIRST THROUGH FIFTH WIND SPEED CATEGORIES *** (METERS/SEC) 1.54, 3.09, 5.14, 8.23, 10.80,

Page 188: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

10

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 14:47:13 PAGE 16 **MODELOPTs: RegDFAULT CONC ELEV *** UP TO THE FIRST 24 HOURS OF METEOROLOGICAL DATA *** Surface file: MJQMPX5Y.SFC Met Version: 11059 Profile file: MJQMPX5Y.PFL Surface format: FREE Profile format: FREE Surface station no.: 99999 Upper air station no.: 94983 Name: UNKNOWN Name: UNKNOWN Year: 2006 Year: 2006 First 24 hours of scalar data YR MO DY JDY HR H0 U* W* DT/DZ ZICNV ZIMCH M-O LEN Z0 BOWEN ALBEDO REF WS WD HT REF TA HT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 06 01 01 1 01 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 111. 10.0 269.1 2.0 06 01 01 1 02 -1.5 0.043 -9.000 -9.000 -999. 21. 4.6 0.01 0.49 1.00 1.50 98. 10.0 268.1 2.0 06 01 01 1 03 -999.0 -9.000 -9.000 -9.000 -999. -999. -99999.0 0.01 0.49 1.00 0.00 0. 10.0 268.1 2.0 06 01 01 1 04 -1.7 0.043 -9.000 -9.000 -999. 21. 4.2 0.01 0.49 1.00 1.50 83. 10.0 269.1 2.0 06 01 01 1 05 -4.2 0.061 -9.000 -9.000 -999. 34. 4.5 0.01 0.49 1.00 2.10 93. 10.0 269.1 2.0 06 01 01 1 06 -6.5 0.075 -9.000 -9.000 -999. 48. 5.6 0.01 0.49 1.00 2.60 102. 10.0 269.1 2.0 06 01 01 1 07 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 95. 10.0 270.1 2.0 06 01 01 1 08 -1.5 0.043 -9.000 -9.000 -999. 21. 4.6 0.01 0.49 1.00 1.50 83. 10.0 270.1 2.0 06 01 01 1 09 -5.8 0.108 -9.000 -9.000 -999. 82. 18.6 0.01 0.49 0.83 2.60 77. 10.0 270.1 2.0 06 01 01 1 10 -5.0 0.122 -9.000 -9.000 -999. 98. 30.8 0.01 0.49 0.69 2.60 71. 10.0 271.1 2.0 06 01 01 1 11 -3.2 0.136 -9.000 -9.000 -999. 115. 67.7 0.01 0.49 0.64 2.60 74. 10.0 271.1 2.0 06 01 01 1 12 -1.5 0.175 -9.000 -9.000 -999. 169. 296.8 0.01 0.49 0.62 3.10 66. 10.0 271.1 2.0 06 01 01 1 13 -0.5 0.178 -9.000 -9.000 -999. 173. 918.2 0.01 0.49 0.62 3.10 73. 10.0 273.1 2.0 06 01 01 1 14 -2.5 0.234 -9.000 -9.000 -999. 260. 439.3 0.01 0.49 0.63 4.10 69. 10.0 273.1 2.0 06 01 01 1 15 -6.0 0.228 -9.000 -9.000 -999. 250. 166.1 0.01 0.49 0.65 4.10 62. 10.0 273.1 2.0 06 01 01 1 16 -11.1 0.251 -9.000 -9.000 -999. 290. 122.2 0.01 0.49 0.71 4.60 64. 10.0 273.1 2.0 06 01 01 1 17 -16.1 0.294 -9.000 -9.000 -999. 366. 133.6 0.01 0.49 0.88 5.10 51. 10.0 273.1 2.0 06 01 01 1 18 -16.1 0.294 -9.000 -9.000 -999. 366. 133.5 0.01 0.49 1.00 5.10 47. 10.0 273.1 2.0 06 01 01 1 19 -12.5 0.228 -9.000 -9.000 -999. 252. 80.4 0.01 0.49 1.00 4.10 54. 10.0 273.1 2.0 06 01 01 1 20 -14.4 0.261 -9.000 -9.000 -999. 307. 105.6 0.01 0.49 1.00 4.60 47. 10.0 273.1 2.0 06 01 01 1 21 -12.5 0.228 -9.000 -9.000 -999. 251. 80.4 0.01 0.49 1.00 4.10 50. 10.0 273.1 2.0 06 01 01 1 22 -12.5 0.228 -9.000 -9.000 -999. 250. 80.4 0.01 0.49 1.00 4.10 42. 10.0 273.1 2.0 06 01 01 1 23 -12.5 0.228 -9.000 -9.000 -999. 250. 80.4 0.01 0.49 1.00 4.10 40. 10.0 273.1 2.0 06 01 01 1 24 -12.5 0.228 -9.000 -9.000 -999. 250. 80.4 0.01 0.49 1.00 4.10 30. 10.0 273.1 2.0 First hour of profile data YR MO DY HR HEIGHT F WDIR WSPD AMB_TMP sigmaA sigmaW sigmaV 06 01 01 01 10.0 1 111. 2.10 269.2 99.0 -99.00 -99.00 F indicates top of profile (=1) or below (=0)

Page 189: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

11

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2\HLB_NO2_1hr_T3$$.LST Misc. Input (ECHO, INCLUDED, meteorology, etc.) ** ECHO CO TITLEONE Heron Lake BioEnergy LLC (HLB) - August 2013 CO TITLETWO Major Modification Permit Modeling - NO2 NAAQS 1-hr - Tier 3 (OLM) CO MODELOPT CONC OLM CO AVERTIME 1 CO POLLUTID NO2 CO OZONEVAL 75.0 PPB CO OZONEFIL "C:\Beework\HLBE\Maj_Mod_2011\NO2\HLB$43.8065N_95.2892W_20062010_HOURLY_OZNE_ALLSITESvia1overR.bkg" UG/M3 (4I2,F8.2) CO NO2STACK 0.5 CO NO2EQUIL 0.9 SO EMISFACT HLBSV17 HROFDY 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 SO EMISFACT HLBSV20 HROFDY 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 SO EMISFACT HLBEU54 HROFDY 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 SO NO2RATIO HLBSV17 0.1 SO NO2RATIO HLBSV20 0.1 SO INCLUDED "C:\Beework\HLBE\Maj_Mod_2011\NO2\HLB$43.8065N_95.2892W_2005NEIandFAR2G_NO2_.far" SO SRCGROUP HLBSV17 HLBSV17 SO SRCGROUP HLBSV20 HLBSV20 SO SRCGROUP HLBEU054 HLBEU54 SO SRCGROUP ALL ME SURFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX0610.SFC" FREE ME PROFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX0610.PFL" ME SURFDATA 99999 2006 ME UAIRDATA 94983 2006 ME PROFBASE 440.7 METERS OU RECTABLE 1 EIGHTH OU PLOTFILE 1 ALL EIGHTH "C:\Beework\HLBE\Maj_Mod_2013\NO2\1-hr\HLB_NO2_1hr_T3.GRF" 31 OU PLOTFILE 1 HLBSV17 EIGHTH "C:\Beework\HLBE\Maj_Mod_2013\NO2\1-hr\HLB_NO2_1hr_T3.GRF" 31 OU PLOTFILE 1 HLBSV20 EIGHTH "C:\Beework\HLBE\Maj_Mod_2013\NO2\1-hr\HLB_NO2_1hr_T3.GRF" 31 OU PLOTFILE 1 HLBEU054 EIGHTH "C:\Beework\HLBE\Maj_Mod_2013\NO2\1-hr\HLB_NO2_1hr_T3.GRF" 31

Page 190: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

12

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2\HLB_NO2_1hr_T3$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 NAAQS 1-hr - Tier 3 (OLM) *** 13:48:50 PAGE 1 **MODELOPTs: NonDFAULT CONC ELEV OLM *** MODEL SETUP OPTIONS SUMMARY *** - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - **Model Is Setup For Calculation of Average CONCentration Values. -- DEPOSITION LOGIC -- **NO GAS DEPOSITION Data Provided. **NO PARTICLE DEPOSITION Data Provided. **Model Uses NO DRY DEPLETION. DRYDPLT = F **Model Uses NO WET DEPLETION. WETDPLT = F **Model Uses RURAL Dispersion Only. **Model Allows User-Specified Options: 1. Stack-tip Downwash. 2. Model Accounts for ELEVated Terrain Effects. 3. Use Calms Processing Routine. 4. Use Missing Data Processing Routine. 5. No Exponential Decay. 6. Ozone Limiting Method (OLM) Used for NO2 Conversion with an Equilibrium NO2/NOx Ratio of 0.900 **Model Assumes No FLAGPOLE Receptor Heights. **Model Calculates 1 Short Term Average(s) of: 1-HR **This Run Includes: 16 Source(s); 5 Source Group(s); and 640 Receptor(s) **The Model Assumes A Pollutant Type of: NO2 **Note that special processing requirements apply for the 1-hour NO2 NAAQS - check available guidance. Model will process user-specified ranks of daily maximum 1-hour values averaged across the number of years modeled. For annual NO2 NAAQS modeling, the multi-year maximum of PERIOD values can be simulated using the MULTYEAR keyword. Multi-year PERIOD and 1-hour values should only be done in a single model run using the MULTYEAR option with a single multi-year meteorological data file using STARTEND keyword. **Model Set To Continue RUNning After the Setup Testing. **Output Options Selected: Model Outputs Tables of Highest Short Term Values by Receptor (RECTABLE Keyword) Model Outputs Tables of Overall Maximum Short Term Values (MAXTABLE Keyword) Model Outputs External File(s) of High Values for Plotting (PLOTFILE Keyword) Model Outputs Separate Summary File of High Ranked Values (SUMMFILE Keyword) **NOTE: The Following Flags May Appear Following CONC Values: c for Calm Hours m for Missing Hours b for Both Calm and Missing Hours **Misc. Inputs: Base Elev. for Pot. Temp. Profile (m MSL) = 440.70 ; Decay Coef. = 0.000 ; Rot. Angle = 0.0 Emission Units = GRAMS/SEC ; Emission Rate Unit Factor = 0.10000E+07 Output Units = MICROGRAMS/M**3 **Approximate Storage Requirements of Model = 4.1 MB of RAM. **Input Runstream File: HLB_NO2_1hr_T3.DTA **Output Print File: HLB_NO2_1hr_T3.LST **File for Summary of Results: C:\Beework\HLBE\Maj_Mod_2013\NO2\1-hr\HLB_NO2_1hr_T3.SUM

Page 191: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

13

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 NAAQS 1-hr - Tier 3 (OLM) *** 13:48:50 PAGE 2 **MODELOPTs: NonDFAULT CONC ELEV OLM *** POINT SOURCE DATA *** NUMBER EMISSION RATE BASE STACK STACK STACK STACK BLDG URBAN CAP/ EMIS RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT TEMP. EXIT VEL. DIAMETER EXISTS SOURCE HOR SCALAR ID CATS. (METERS) (METERS) (METERS) (METERS) (DEG.K) (M/SEC) (METERS) VARY BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBSV4 0 0.28900E+00 316014.0 4852934.0 432.9 38.10 491.48 24.80 1.32 YES NO NO HLBSV5 0 0.26500E+01 315867.0 4852934.0 433.1 45.72 491.48 21.38 2.51 YES NO NO HLBSV9 0 0.10900E+00 315950.0 4853172.0 432.8 10.67 970.37 4.02 2.29 YES NO NO HLBSV17 0 0.48300E+00 315991.0 4852826.0 432.8 2.44 683.15 64.81 0.13 YES NO NO HROFDY HLBSV20 0 0.10500E+01 315646.0 4853068.0 432.8 2.74 735.93 71.33 0.13 YES NO NO HROFDY HLBEU54 0 0.14364E+00 315969.0 4852941.0 433.1 1.52 927.59 19.02 0.15 YES NO NO HROFDY

Page 192: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

14

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 NAAQS 1-hr - Tier 3 (OLM) *** 13:48:50 PAGE 3 **MODELOPTs: NonDFAULT CONC ELEV OLM *** VOLUME SOURCE DATA *** NUMBER EMISSION RATE BASE RELEASE INIT. INIT. URBAN EMISSION RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT SY SZ SOURCE SCALAR VARY ID CATS. (METERS) (METERS) (METERS) (METERS) (METERS) (METERS) BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 481 0 0.18300E+01 335320.7 4863255.5 432.2 10.00 20.00 4.19 NO 1708 0 0.40300E+01 362360.2 4836972.0 378.0 25.00 20.00 10.00 NO 1723 0 0.33500E+01 358818.5 4847968.0 381.0 10.00 20.00 4.19 NO 1724 0 0.22900E+01 352428.1 4851196.0 401.9 10.00 20.00 4.19 NO 477 0 0.47700E+00 328366.1 4858764.0 431.6 10.00 20.00 4.19 NO 478 0 0.51400E+00 329774.4 4859116.5 415.5 10.00 20.00 4.19 NO 479 0 0.60700E+00 330173.9 4859962.0 419.8 10.00 20.00 4.19 NO 1435 0 0.21000E+00 339280.6 4833142.0 442.0 10.00 20.00 4.19 NO 1948 0 0.14800E+01 294536.8 4836044.5 474.1 10.00 20.00 4.19 NO 1957 0 0.80400E+00 297606.4 4841976.5 465.6 10.00 20.00 4.19 NO

Page 193: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

15

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 NAAQS 1-hr - Tier 3 (OLM) *** 13:48:50 PAGE 4 **MODELOPTs: NonDFAULT CONC ELEV OLM *** SOURCE IDs DEFINING SOURCE GROUPS *** GROUP ID SOURCE IDs FAR>10KM 481 , 1708 , 1723 , 1724 , 477 , 478 , 479 , 1435 , 1948 , 1957 , HLBSV17 HLBSV17 , HLBSV20 HLBSV20 , HLBEU054 HLBEU54 , ALL HLBSV4 , HLBSV5 , HLBSV9 , HLBSV17 , HLBSV20 , HLBEU54 , 481 , 1708 , 1723 , 1724 , 477 , 478 , 479 , 1435 , 1948 , 1957 ,

Page 194: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

16

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 NAAQS 1-hr - Tier 3 (OLM) *** 13:48:50 PAGE 5 **MODELOPTs: NonDFAULT CONC ELEV OLM *** SOURCE IDs DEFINING OLM SOURCE GROUPS *** *** FOR COMBINING PLUMES *** OLMGRP ID SOURCE IDs ALL HLBSV4 , HLBSV5 , HLBSV9 , HLBSV17 , HLBSV20 , HLBEU54 , 481 , 1708 , 1723 , 1724 , 477 , 478 , 479 , 1435 , 1948 , 1957 ,

Page 195: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

17

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 NAAQS 1-hr - Tier 3 (OLM) *** 13:48:50 PAGE 6 **MODELOPTs: NonDFAULT CONC ELEV OLM *** IN-STACK NO2 RATIOS FOR OLM/PVMRM OPTIONS *** SOURCE_ID NO2_RATIO SOURCE_ID NO2_RATIO SOURCE_ID NO2_RATIO SOURCE_ID NO2_RATIO HLBSV4 0.500 HLBSV5 0.500 HLBSV9 0.500 HLBSV17 0.100 HLBSV20 0.100 HLBEU54 0.500 481 0.500 1708 0.500 1723 0.500 1724 0.500 477 0.500 478 0.500 479 0.500 1435 0.500 1948 0.500 1957 0.500

Page 196: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

18

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 NAAQS 1-hr - Tier 3 (OLM) *** 13:48:50 PAGE 7 **MODELOPTs: NonDFAULT CONC ELEV OLM *** DIRECTION SPECIFIC BUILDING DIMENSIONS *** THIS & MOST OTHER ITEMS NOT PRINTED TO SAVE SPACE

Page 197: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

19

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBSV17 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .00000E+00 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBSV20 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .00000E+00 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBEU54 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .00000E+00 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 *** METEOROLOGICAL DAYS SELECTED FOR PROCESSING *** (1=YES; 0=NO) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE: METEOROLOGICAL DATA ACTUALLY PROCESSED WILL ALSO DEPEND ON WHAT IS INCLUDED IN THE DATA FILE. *** UPPER BOUND OF FIRST THROUGH FIFTH WIND SPEED CATEGORIES *** (METERS/SEC) 1.54, 3.09, 5.14, 8.23, 10.80,

Page 198: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

20

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 NAAQS 1-hr - Tier 3 (OLM) *** 13:48:50 PAGE 19 **MODELOPTs: NonDFAULT CONC ELEV OLM *** UP TO THE FIRST 24 HOURS OF METEOROLOGICAL DATA *** Surface file: MJQMPX0610.SFC Met Version: 12345 Profile file: MJQMPX0610.PFL Surface format: FREE Profile format: FREE Surface station no.: 99999 Upper air station no.: 94983 Name: UNKNOWN Name: UNKNOWN Year: 2006 Year: 2006 First 24 hours of scalar data YR MO DY JDY HR H0 U* W* DT/DZ ZICNV ZIMCH M-O LEN Z0 BOWEN ALBEDO REF WS WD HT REF TA HT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 06 01 01 1 01 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 111. 10.0 269.1 2.0 06 01 01 1 02 -1.5 0.043 -9.000 -9.000 -999. 21. 4.6 0.01 0.49 1.00 1.50 98. 10.0 268.1 2.0 06 01 01 1 03 -999.0 -9.000 -9.000 -9.000 -999. -999. -99999.0 0.01 0.49 1.00 0.00 0. 10.0 268.1 2.0 06 01 01 1 04 -1.7 0.044 -9.000 -9.000 -999. 21. 4.3 0.01 0.49 1.00 1.50 83. 10.0 269.1 2.0 06 01 01 1 05 -4.2 0.061 -9.000 -9.000 -999. 34. 4.5 0.01 0.49 1.00 2.10 93. 10.0 269.1 2.0 06 01 01 1 06 -6.5 0.075 -9.000 -9.000 -999. 48. 5.6 0.01 0.49 1.00 2.60 102. 10.0 269.1 2.0 06 01 01 1 07 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 95. 10.0 270.1 2.0 06 01 01 1 08 -1.6 0.044 -9.000 -9.000 -999. 21. 4.7 0.01 0.49 1.00 1.50 83. 10.0 270.1 2.0 06 01 01 1 09 -5.9 0.111 -9.000 -9.000 -999. 85. 19.5 0.01 0.49 0.83 2.60 77. 10.0 270.1 2.0 06 01 01 1 10 -5.1 0.124 -9.000 -9.000 -999. 101. 32.0 0.01 0.49 0.69 2.60 71. 10.0 271.1 2.0 06 01 01 1 11 -3.2 0.138 -9.000 -9.000 -999. 118. 69.9 0.01 0.49 0.64 2.60 74. 10.0 271.1 2.0 06 01 01 1 12 -1.6 0.178 -9.000 -9.000 -999. 172. 305.3 0.01 0.49 0.62 3.10 66. 10.0 271.1 2.0 06 01 01 1 13 -0.5 0.181 -9.000 -9.000 -999. 177. 943.7 0.01 0.49 0.62 3.10 73. 10.0 273.1 2.0 06 01 01 1 14 -2.5 0.237 -9.000 -9.000 -999. 265. 451.8 0.01 0.49 0.63 4.10 69. 10.0 273.1 2.0 06 01 01 1 15 -6.1 0.231 -9.000 -9.000 -999. 255. 171.0 0.01 0.49 0.65 4.10 62. 10.0 273.1 2.0 06 01 01 1 16 -11.2 0.255 -9.000 -9.000 -999. 297. 125.9 0.01 0.49 0.71 4.60 64. 10.0 273.1 2.0 06 01 01 1 17 -15.9 0.290 -9.000 -9.000 -999. 360. 130.4 0.01 0.49 0.88 5.10 51. 10.0 273.1 2.0 06 01 01 1 18 -16.0 0.290 -9.000 -9.000 -999. 360. 130.3 0.01 0.49 1.00 5.10 47. 10.0 273.1 2.0 06 01 01 1 19 -12.4 0.225 -9.000 -9.000 -999. 247. 78.5 0.01 0.49 1.00 4.10 54. 10.0 273.1 2.0 06 01 01 1 20 -14.2 0.258 -9.000 -9.000 -999. 301. 103.0 0.01 0.49 1.00 4.60 47. 10.0 273.1 2.0 06 01 01 1 21 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 50. 10.0 273.1 2.0 06 01 01 1 22 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 42. 10.0 273.1 2.0 06 01 01 1 23 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 40. 10.0 273.1 2.0 06 01 01 1 24 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 30. 10.0 273.1 2.0 First hour of profile data YR MO DY HR HEIGHT F WDIR WSPD AMB_TMP sigmaA sigmaW sigmaV 06 01 01 01 10.0 1 111. 2.10 269.2 99.0 -99.00 -99.00 F indicates top of profile (=1) or below (=0)

Page 199: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

21

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2\HLB_NO2_T3_2006_NO2$$.LST Misc. Input (ECHO, INCLUDED, meteorology, etc.) ** ECHO CO TITLEONE Heron Lake BioEnergy LLC (HLB) - August 2013 CO TITLETWO Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) CO MODELOPT CONC OLM CO AVERTIME ANNUAL CO POLLUTID NO2 CO OZONEVAL 75.0 PPB CO OZONEFIL "C:\Beework\HLBE\Maj_Mod_2011\NO2\HLB$43.8065N_95.2892W_2006_HOURLY_OZNE_ALLSITESvia1overR.bkg" UG/M3 (4I2,F8.2) CO NO2STACK 0.5 CO NO2EQUIL 0.9 SO EMISFACT HLBSV17 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBSV20 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBEU54 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO NO2RATIO HLBSV17 0.1 SO NO2RATIO HLBSV20 0.1 SO INCLUDED "C:\Beework\HLBE\Maj_Mod_2011\NO2\HLB$43.8065N_95.2892W_2005NEIandFAR2G_NO2_.far" SO SRCGROUP HLBONLY HLBSV4 HLBSV5 HLBSV9 HLBSV17 HLBSV20 HLBEU54 SO SRCGROUP ALL ME SURFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX06.SFC" FREE ME PROFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX06.PFL" ME SURFDATA 99999 2006 ME UAIRDATA 94983 2006 ME PROFBASE 440.7 METERS OU PLOTFILE ANNUAL ALL "C:\Beework\HLBE\Maj_Mod_2013\NO2\HLB_NO2_T3_2006_NO2.GRF" 31 OU PLOTFILE ANNUAL HLBONLY "C:\Beework\HLBE\Maj_Mod_2013\NO2\HLB_NO2_T3_2006_NO2.GRF" 31

Page 200: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

22

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2\HLB_NO2_T3_2006_NO2$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:45:23 PAGE 1 **MODELOPTs: NonDFAULT CONC ELEV OLM *** MODEL SETUP OPTIONS SUMMARY *** - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - **Model Is Setup For Calculation of Average CONCentration Values. -- DEPOSITION LOGIC -- **NO GAS DEPOSITION Data Provided. **NO PARTICLE DEPOSITION Data Provided. **Model Uses NO DRY DEPLETION. DRYDPLT = F **Model Uses NO WET DEPLETION. WETDPLT = F **Model Uses RURAL Dispersion Only. **Model Allows User-Specified Options: 1. Stack-tip Downwash. 2. Model Accounts for ELEVated Terrain Effects. 3. Use Calms Processing Routine. 4. Use Missing Data Processing Routine. 5. No Exponential Decay. 6. Ozone Limiting Method (OLM) Used for NO2 Conversion with an Equilibrium NO2/NOx Ratio of 0.900 **Model Assumes No FLAGPOLE Receptor Heights. **Model Calculates ANNUAL Averages Only **This Run Includes: 16 Source(s); 3 Source Group(s); and 640 Receptor(s) **The Model Assumes A Pollutant Type of: NO2 **Model Set To Continue RUNning After the Setup Testing. **Output Options Selected: Model Outputs Tables of ANNUAL Averages by Receptor Model Outputs External File(s) of High Values for Plotting (PLOTFILE Keyword) Model Outputs Separate Summary File of High Ranked Values (SUMMFILE Keyword) **NOTE: The Following Flags May Appear Following CONC Values: c for Calm Hours m for Missing Hours b for Both Calm and Missing Hours **Misc. Inputs: Base Elev. for Pot. Temp. Profile (m MSL) = 440.70 ; Decay Coef. = 0.000 ; Rot. Angle = 0.0 Emission Units = GRAMS/SEC ; Emission Rate Unit Factor = 0.10000E+07 Output Units = MICROGRAMS/M**3 **Approximate Storage Requirements of Model = 3.7 MB of RAM. **Input Runstream File: HLB_NO2_T3_2006_NO2.DTA **Output Print File: HLB_NO2_T3_2006_NO2.LST **File for Summary of Results: C:\Beework\HLBE\Maj_Mod_2013\NO2\HLB_NO2_T3_2006_NO2.SUM

Page 201: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

23

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:45:23 PAGE 2 **MODELOPTs: NonDFAULT CONC ELEV OLM *** POINT SOURCE DATA *** NUMBER EMISSION RATE BASE STACK STACK STACK STACK BLDG URBAN CAP/ EMIS RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT TEMP. EXIT VEL. DIAMETER EXISTS SOURCE HOR SCALAR ID CATS. (METERS) (METERS) (METERS) (METERS) (DEG.K) (M/SEC) (METERS) VARY BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBSV4 0 0.28900E+00 316014.0 4852934.0 432.9 38.10 491.48 24.80 1.32 YES NO NO HLBSV5 0 0.26500E+01 315867.0 4852934.0 433.1 45.72 491.48 21.38 2.51 YES NO NO HLBSV9 0 0.10900E+00 315950.0 4853172.0 432.8 10.67 970.37 4.02 2.29 YES NO NO HLBSV17 0 0.48300E+00 315991.0 4852826.0 432.8 2.44 683.15 64.81 0.13 YES NO NO HROFDY HLBSV20 0 0.10500E+01 315646.0 4853068.0 432.8 2.74 735.93 71.33 0.13 YES NO NO HROFDY HLBEU54 0 0.14364E+00 315969.0 4852941.0 433.1 1.52 927.59 19.02 0.15 YES NO NO HROFDY

Page 202: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

24

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:45:23 PAGE 3 **MODELOPTs: NonDFAULT CONC ELEV OLM *** VOLUME SOURCE DATA *** NUMBER EMISSION RATE BASE RELEASE INIT. INIT. URBAN EMISSION RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT SY SZ SOURCE SCALAR VARY ID CATS. (METERS) (METERS) (METERS) (METERS) (METERS) (METERS) BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 481 0 0.18300E+01 335320.7 4863255.5 432.2 10.00 20.00 4.19 NO 1708 0 0.40300E+01 362360.2 4836972.0 378.0 25.00 20.00 10.00 NO 1723 0 0.33500E+01 358818.5 4847968.0 381.0 10.00 20.00 4.19 NO 1724 0 0.22900E+01 352428.1 4851196.0 401.9 10.00 20.00 4.19 NO 477 0 0.47700E+00 328366.1 4858764.0 431.6 10.00 20.00 4.19 NO 478 0 0.51400E+00 329774.4 4859116.5 415.5 10.00 20.00 4.19 NO 479 0 0.60700E+00 330173.9 4859962.0 419.8 10.00 20.00 4.19 NO 1435 0 0.21000E+00 339280.6 4833142.0 442.0 10.00 20.00 4.19 NO 1948 0 0.14800E+01 294536.8 4836044.5 474.1 10.00 20.00 4.19 NO 1957 0 0.80400E+00 297606.4 4841976.5 465.6 10.00 20.00 4.19 NO

Page 203: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

25

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:45:23 PAGE 4 **MODELOPTs: NonDFAULT CONC ELEV OLM *** SOURCE IDs DEFINING SOURCE GROUPS *** GROUP ID SOURCE IDs FAR>10KM 481 , 1708 , 1723 , 1724 , 477 , 478 , 479 , 1435 , 1948 , 1957 , HLBONLY HLBSV4 , HLBSV5 , HLBSV9 , HLBSV17 , HLBSV20 , HLBEU54 , ALL HLBSV4 , HLBSV5 , HLBSV9 , HLBSV17 , HLBSV20 , HLBEU54 , 481 , 1708 , 1723 , 1724 , 477 , 478 , 479 , 1435 , 1948 , 1957 ,

Page 204: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

26

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:45:23 PAGE 5 **MODELOPTs: NonDFAULT CONC ELEV OLM *** SOURCE IDs DEFINING OLM SOURCE GROUPS *** *** FOR COMBINING PLUMES *** OLMGRP ID SOURCE IDs ALL HLBSV4 , HLBSV5 , HLBSV9 , HLBSV17 , HLBSV20 , HLBEU54 , 481 , 1708 , 1723 , 1724 , 477 , 478 , 479 , 1435 , 1948 , 1957 ,

Page 205: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

27

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:45:23 PAGE 6 **MODELOPTs: NonDFAULT CONC ELEV OLM *** IN-STACK NO2 RATIOS FOR OLM/PVMRM OPTIONS *** SOURCE_ID NO2_RATIO SOURCE_ID NO2_RATIO SOURCE_ID NO2_RATIO SOURCE_ID NO2_RATIO HLBSV4 0.500 HLBSV5 0.500 HLBSV9 0.500 HLBSV17 0.100 HLBSV20 0.100 HLBEU54 0.500 481 0.500 1708 0.500 1723 0.500 1724 0.500 477 0.500 478 0.500 479 0.500 1435 0.500 1948 0.500 1957 0.500

Page 206: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

28

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:45:23 PAGE 7 **MODELOPTs: NonDFAULT CONC ELEV OLM *** DIRECTION SPECIFIC BUILDING DIMENSIONS *** THIS & MOST OTHER ITEMS NOT PRINTED TO SAVE SPACE

Page 207: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

29

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBSV17 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBSV20 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBEU54 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 *** METEOROLOGICAL DAYS SELECTED FOR PROCESSING *** (1=YES; 0=NO) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE: METEOROLOGICAL DATA ACTUALLY PROCESSED WILL ALSO DEPEND ON WHAT IS INCLUDED IN THE DATA FILE. *** UPPER BOUND OF FIRST THROUGH FIFTH WIND SPEED CATEGORIES *** (METERS/SEC) 1.54, 3.09, 5.14, 8.23, 10.80,

Page 208: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

30

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:45:23 PAGE 19 **MODELOPTs: NonDFAULT CONC ELEV OLM *** UP TO THE FIRST 24 HOURS OF METEOROLOGICAL DATA *** Surface file: MJQMPX06.SFC Met Version: 12345 Profile file: MJQMPX06.PFL Surface format: FREE Profile format: FREE Surface station no.: 99999 Upper air station no.: 94983 Name: UNKNOWN Name: UNKNOWN Year: 2006 Year: 2006 First 24 hours of scalar data YR MO DY JDY HR H0 U* W* DT/DZ ZICNV ZIMCH M-O LEN Z0 BOWEN ALBEDO REF WS WD HT REF TA HT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 06 01 01 1 01 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 111. 10.0 269.1 2.0 06 01 01 1 02 -1.5 0.043 -9.000 -9.000 -999. 21. 4.6 0.01 0.49 1.00 1.50 98. 10.0 268.1 2.0 06 01 01 1 03 -999.0 -9.000 -9.000 -9.000 -999. -999. -99999.0 0.01 0.49 1.00 0.00 0. 10.0 268.1 2.0 06 01 01 1 04 -1.7 0.044 -9.000 -9.000 -999. 21. 4.3 0.01 0.49 1.00 1.50 83. 10.0 269.1 2.0 06 01 01 1 05 -4.2 0.061 -9.000 -9.000 -999. 34. 4.5 0.01 0.49 1.00 2.10 93. 10.0 269.1 2.0 06 01 01 1 06 -6.5 0.075 -9.000 -9.000 -999. 48. 5.6 0.01 0.49 1.00 2.60 102. 10.0 269.1 2.0 06 01 01 1 07 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 95. 10.0 270.1 2.0 06 01 01 1 08 -1.6 0.044 -9.000 -9.000 -999. 21. 4.7 0.01 0.49 1.00 1.50 83. 10.0 270.1 2.0 06 01 01 1 09 -5.9 0.111 -9.000 -9.000 -999. 85. 19.5 0.01 0.49 0.83 2.60 77. 10.0 270.1 2.0 06 01 01 1 10 -5.1 0.124 -9.000 -9.000 -999. 101. 32.0 0.01 0.49 0.69 2.60 71. 10.0 271.1 2.0 06 01 01 1 11 -3.2 0.138 -9.000 -9.000 -999. 118. 69.9 0.01 0.49 0.64 2.60 74. 10.0 271.1 2.0 06 01 01 1 12 -1.6 0.178 -9.000 -9.000 -999. 172. 305.3 0.01 0.49 0.62 3.10 66. 10.0 271.1 2.0 06 01 01 1 13 -0.5 0.181 -9.000 -9.000 -999. 177. 943.7 0.01 0.49 0.62 3.10 73. 10.0 273.1 2.0 06 01 01 1 14 -2.5 0.237 -9.000 -9.000 -999. 265. 451.8 0.01 0.49 0.63 4.10 69. 10.0 273.1 2.0 06 01 01 1 15 -6.1 0.231 -9.000 -9.000 -999. 255. 171.0 0.01 0.49 0.65 4.10 62. 10.0 273.1 2.0 06 01 01 1 16 -11.2 0.255 -9.000 -9.000 -999. 297. 125.9 0.01 0.49 0.71 4.60 64. 10.0 273.1 2.0 06 01 01 1 17 -15.9 0.290 -9.000 -9.000 -999. 360. 130.4 0.01 0.49 0.88 5.10 51. 10.0 273.1 2.0 06 01 01 1 18 -16.0 0.290 -9.000 -9.000 -999. 360. 130.3 0.01 0.49 1.00 5.10 47. 10.0 273.1 2.0 06 01 01 1 19 -12.4 0.225 -9.000 -9.000 -999. 247. 78.5 0.01 0.49 1.00 4.10 54. 10.0 273.1 2.0 06 01 01 1 20 -14.2 0.258 -9.000 -9.000 -999. 301. 103.0 0.01 0.49 1.00 4.60 47. 10.0 273.1 2.0 06 01 01 1 21 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 50. 10.0 273.1 2.0 06 01 01 1 22 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 42. 10.0 273.1 2.0 06 01 01 1 23 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 40. 10.0 273.1 2.0 06 01 01 1 24 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 30. 10.0 273.1 2.0 First hour of profile data YR MO DY HR HEIGHT F WDIR WSPD AMB_TMP sigmaA sigmaW sigmaV 06 01 01 01 10.0 1 111. 2.10 269.2 99.0 -99.00 -99.00 F indicates top of profile (=1) or below (=0)

Page 209: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

31

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\Increment\HLB_INC_2006_PM10$$.LST Misc. Input (ECHO, INCLUDED, meteorology, etc.) ** ECHO CO TITLEONE Heron Lake BioEnergy LLC (HLB) - PM10 Increment Modeling CO TITLETWO Major Modification Permit Modeling - July 2013 CO MODELOPT DFAULT CONC CO AVERTIME 24 PERIOD CO POLLUTID PM10 SO EMISFACT HLBSV17 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBSV20 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBEU54 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBFS2N HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO EMISFACT HLBFS2S HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO EMISFACT HLBFS3N HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO EMISFACT HLBFS3S HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO SRCGROUP ALL ME SURFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX06.SFC" FREE ME PROFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX06.PFL" ME SURFDATA 99999 2006 ME UAIRDATA 94983 2006 ME PROFBASE 440.7 METERS OU RECTABLE 24 SECOND OU PLOTFILE 24 ALL SECOND "C:\Beework\HLBE\Maj_Mod_2013\PM10\HLB_INC_2006_PM10.GRF" 31 OU PLOTFILE PERIOD ALL "C:\Beework\HLBE\Maj_Mod_2013\PM10\HLB_INC_2006_PM10.GRF" 31

Page 210: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

32

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\Increment\HLB_INC_2006_PM10$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 Increment Modeling *** 10/10/13 *** Major Modification Permit Modeling - July 2013 *** 10:00:11 PAGE 1 **MODELOPTs: RegDFAULT CONC ELEV *** MODEL SETUP OPTIONS SUMMARY *** - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - **Model Is Setup For Calculation of Average CONCentration Values. -- DEPOSITION LOGIC -- **NO GAS DEPOSITION Data Provided. **NO PARTICLE DEPOSITION Data Provided. **Model Uses NO DRY DEPLETION. DRYDPLT = F **Model Uses NO WET DEPLETION. WETDPLT = F **Model Uses RURAL Dispersion Only. **Model Uses Regulatory DEFAULT Options: 1. Stack-tip Downwash. 2. Model Accounts for ELEVated Terrain Effects. 3. Use Calms Processing Routine. 4. Use Missing Data Processing Routine. 5. No Exponential Decay. **Model Assumes No FLAGPOLE Receptor Heights. **Model Calculates 1 Short Term Average(s) of: 24-HR and Calculates PERIOD Averages **This Run Includes: 18 Source(s); 1 Source Group(s); and 640 Receptor(s) **The Model Assumes A Pollutant Type of: PM10 **Model Set To Continue RUNning After the Setup Testing. **Output Options Selected: Model Outputs Tables of PERIOD Averages by Receptor Model Outputs Tables of Highest Short Term Values by Receptor (RECTABLE Keyword) Model Outputs Tables of Overall Maximum Short Term Values (MAXTABLE Keyword) Model Outputs External File(s) of High Values for Plotting (PLOTFILE Keyword) Model Outputs Separate Summary File of High Ranked Values (SUMMFILE Keyword) **NOTE: The Following Flags May Appear Following CONC Values: c for Calm Hours m for Missing Hours b for Both Calm and Missing Hours **Misc. Inputs: Base Elev. for Pot. Temp. Profile (m MSL) = 440.70 ; Decay Coef. = 0.000 ; Rot. Angle = 0.0 Emission Units = GRAMS/SEC ; Emission Rate Unit Factor = 0.10000E+07 Output Units = MICROGRAMS/M**3 **Approximate Storage Requirements of Model = 3.6 MB of RAM. **Input Runstream File: HLB_INC_2006_PM10.DTA **Output Print File: HLB_INC_2006_PM10.LST **File Created for Event Model: C:\Beework\HLBE\Maj_Mod_2011\PM10\HLB_PM10_PSD_EVENTOUT_DETAIL **File for Summary of Results: C:\Beework\HLBE\Maj_Mod_2013\PM10\HLB_INC_2006_PM10.SUM

Page 211: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

33

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 Increment Modeling *** 10/10/13 *** Major Modification Permit Modeling - July 2013 *** 10:00:11 PAGE 2 **MODELOPTs: RegDFAULT CONC ELEV *** POINT SOURCE DATA *** NUMBER EMISSION RATE BASE STACK STACK STACK STACK BLDG URBAN CAP/ EMIS RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT TEMP. EXIT VEL. DIAMETER EXISTS SOURCE HOR SCALAR ID CATS. (METERS) (METERS) (METERS) (METERS) (DEG.K) (M/SEC) (METERS) VARY BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBSV1 0 0.16850E+00 316060.0 4853024.0 433.1 48.77 293.15 18.76 1.12 YES NO NO HLBSV2 0 0.11880E+00 316037.0 4853013.0 433.1 48.77 293.15 17.74 0.97 YES NO NO HLBSV3 0 0.58000E-02 315960.0 4853071.0 432.8 31.70 293.15 9.70 0.61 YES NO NO HLBSV4 0 0.40300E+00 316014.0 4852934.0 432.9 38.10 491.48 24.80 1.32 YES NO NO HLBSV5 0 0.10332E+01 315867.0 4852934.0 433.1 45.72 491.48 21.38 2.51 YES NO NO HLBSV7 0 0.12100E+00 316053.0 4852947.0 432.9 41.15 293.15 20.12 0.91 YES NO NO HLBSV8 0 0.45400E-01 316078.0 4852952.0 432.8 12.19 293.15 7.55 0.91 YES NO NO HLB120A 0 0.11800E-01 316018.0 4852841.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLB120B 0 0.11800E-01 316026.0 4852843.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLB120C 0 0.11800E-01 316035.0 4852845.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLB120D 0 0.11800E-01 316043.0 4852847.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLBSV17 0 0.33300E-01 315991.0 4852826.0 432.8 2.44 683.15 64.81 0.13 YES NO NO HROFDY HLBSV20 0 0.74300E-01 315646.0 4853068.0 432.8 2.74 735.93 71.33 0.13 YES NO NO HROFDY HLBEU54 0 0.26460E-01 315969.0 4852941.0 433.1 1.52 927.59 19.02 0.15 YES NO NO HROFDY

Page 212: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

34

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 Increment Modeling *** 10/10/13 *** Major Modification Permit Modeling - July 2013 *** 10:00:11 PAGE 3 **MODELOPTs: RegDFAULT CONC ELEV *** VOLUME SOURCE DATA *** NUMBER EMISSION RATE BASE RELEASE INIT. INIT. URBAN EMISSION RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT SY SZ SOURCE SCALAR VARY ID CATS. (METERS) (METERS) (METERS) (METERS) (METERS) (METERS) BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBFS2N 0 0.23700E-01 316068.0 4853034.0 433.1 1.83 12.56 4.56 NO HROFDY HLBFS2S 0 0.23700E-01 316081.0 4852982.0 432.8 1.83 12.56 4.56 NO HROFDY HLBFS3N 0 0.10000E-02 316079.0 4853037.0 433.1 1.83 12.56 4.56 NO HROFDY HLBFS3S 0 0.10000E-02 316092.0 4852984.0 432.8 1.83 12.56 4.56 NO HROFDY

Page 213: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

35

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 Increment Modeling *** 10/10/13 *** Major Modification Permit Modeling - July 2013 *** 10:00:11 PAGE 4 **MODELOPTs: RegDFAULT CONC ELEV *** SOURCE IDs DEFINING SOURCE GROUPS *** GROUP ID SOURCE IDs ALL HLBSV1 , HLBSV2 , HLBSV3 , HLBSV4 , HLBSV5 , HLBSV7 , HLBSV8 , HLB120A , HLB120B , HLB120C , HLB120D , HLBSV17 , HLBSV20 , HLBEU54 , HLBFS2N , HLBFS2S , HLBFS3N , HLBFS3S ,

Page 214: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

36

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 Increment Modeling *** 10/10/13 *** Major Modification Permit Modeling - July 2013 *** 10:00:11 PAGE 5 **MODELOPTs: RegDFAULT CONC ELEV *** DIRECTION SPECIFIC BUILDING DIMENSIONS *** THIS & MOST OTHER ITEMS NOT PRINTED TO SAVE SPACE

Page 215: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

37

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBSV17 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBSV20 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBEU54 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBFS2N ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBFS2S ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00

Page 216: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

38

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBFS3N ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBFS3S ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 *** METEOROLOGICAL DAYS SELECTED FOR PROCESSING *** (1=YES; 0=NO) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE: METEOROLOGICAL DATA ACTUALLY PROCESSED WILL ALSO DEPEND ON WHAT IS INCLUDED IN THE DATA FILE. *** UPPER BOUND OF FIRST THROUGH FIFTH WIND SPEED CATEGORIES *** (METERS/SEC) 1.54, 3.09, 5.14, 8.23, 10.80,

Page 217: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

39

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 Increment Modeling *** 10/10/13 *** Major Modification Permit Modeling - July 2013 *** 10:00:11 PAGE 20 **MODELOPTs: RegDFAULT CONC ELEV *** UP TO THE FIRST 24 HOURS OF METEOROLOGICAL DATA *** Surface file: MJQMPX06.SFC Met Version: 12345 Profile file: MJQMPX06.PFL Surface format: FREE Profile format: FREE Surface station no.: 99999 Upper air station no.: 94983 Name: UNKNOWN Name: UNKNOWN Year: 2006 Year: 2006 First 24 hours of scalar data YR MO DY JDY HR H0 U* W* DT/DZ ZICNV ZIMCH M-O LEN Z0 BOWEN ALBEDO REF WS WD HT REF TA HT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 06 01 01 1 01 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 111. 10.0 269.1 2.0 06 01 01 1 02 -1.5 0.043 -9.000 -9.000 -999. 21. 4.6 0.01 0.49 1.00 1.50 98. 10.0 268.1 2.0 06 01 01 1 03 -999.0 -9.000 -9.000 -9.000 -999. -999. -99999.0 0.01 0.49 1.00 0.00 0. 10.0 268.1 2.0 06 01 01 1 04 -1.7 0.044 -9.000 -9.000 -999. 21. 4.3 0.01 0.49 1.00 1.50 83. 10.0 269.1 2.0 06 01 01 1 05 -4.2 0.061 -9.000 -9.000 -999. 34. 4.5 0.01 0.49 1.00 2.10 93. 10.0 269.1 2.0 06 01 01 1 06 -6.5 0.075 -9.000 -9.000 -999. 48. 5.6 0.01 0.49 1.00 2.60 102. 10.0 269.1 2.0 06 01 01 1 07 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 95. 10.0 270.1 2.0 06 01 01 1 08 -1.6 0.044 -9.000 -9.000 -999. 21. 4.7 0.01 0.49 1.00 1.50 83. 10.0 270.1 2.0 06 01 01 1 09 -5.9 0.111 -9.000 -9.000 -999. 85. 19.5 0.01 0.49 0.83 2.60 77. 10.0 270.1 2.0 06 01 01 1 10 -5.1 0.124 -9.000 -9.000 -999. 101. 32.0 0.01 0.49 0.69 2.60 71. 10.0 271.1 2.0 06 01 01 1 11 -3.2 0.138 -9.000 -9.000 -999. 118. 69.9 0.01 0.49 0.64 2.60 74. 10.0 271.1 2.0 06 01 01 1 12 -1.6 0.178 -9.000 -9.000 -999. 172. 305.3 0.01 0.49 0.62 3.10 66. 10.0 271.1 2.0 06 01 01 1 13 -0.5 0.181 -9.000 -9.000 -999. 177. 943.7 0.01 0.49 0.62 3.10 73. 10.0 273.1 2.0 06 01 01 1 14 -2.5 0.237 -9.000 -9.000 -999. 265. 451.8 0.01 0.49 0.63 4.10 69. 10.0 273.1 2.0 06 01 01 1 15 -6.1 0.231 -9.000 -9.000 -999. 255. 171.0 0.01 0.49 0.65 4.10 62. 10.0 273.1 2.0 06 01 01 1 16 -11.2 0.255 -9.000 -9.000 -999. 297. 125.9 0.01 0.49 0.71 4.60 64. 10.0 273.1 2.0 06 01 01 1 17 -15.9 0.290 -9.000 -9.000 -999. 360. 130.4 0.01 0.49 0.88 5.10 51. 10.0 273.1 2.0 06 01 01 1 18 -16.0 0.290 -9.000 -9.000 -999. 360. 130.3 0.01 0.49 1.00 5.10 47. 10.0 273.1 2.0 06 01 01 1 19 -12.4 0.225 -9.000 -9.000 -999. 247. 78.5 0.01 0.49 1.00 4.10 54. 10.0 273.1 2.0 06 01 01 1 20 -14.2 0.258 -9.000 -9.000 -999. 301. 103.0 0.01 0.49 1.00 4.60 47. 10.0 273.1 2.0 06 01 01 1 21 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 50. 10.0 273.1 2.0 06 01 01 1 22 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 42. 10.0 273.1 2.0 06 01 01 1 23 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 40. 10.0 273.1 2.0 06 01 01 1 24 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 30. 10.0 273.1 2.0 First hour of profile data YR MO DY HR HEIGHT F WDIR WSPD AMB_TMP sigmaA sigmaW sigmaV 06 01 01 01 10.0 1 111. 2.10 269.2 99.0 -99.00 -99.00 F indicates top of profile (=1) or below (=0)

Page 218: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

40

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_NAAQS_2006_PM10$$.LST Misc. Input (ECHO, INCLUDED, meteorology, etc.) ** ECHO CO TITLEONE Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS CO TITLETWO Major Modification Permit Modeling - August 2013 CO MODELOPT DFAULT CONC CO AVERTIME 24 PERIOD CO POLLUTID PM10 SO EMISFACT HLBSV17 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBSV20 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBEU54 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBFS2N HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO EMISFACT HLBFS2S HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO EMISFACT HLBFS3N HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO EMISFACT HLBFS3S HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO INCLUDED "C:\Beework\HLBE\Maj_Mod_2013\PM10\HLB$43.8065N_95.2892W_2005NEIandFAR2G_PM10.far" SO SRCGROUP ALL ME SURFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX06.SFC" FREE ME PROFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX06.PFL" ME SURFDATA 99999 2006 ME UAIRDATA 94983 2006 ME PROFBASE 440.7 METERS OU RECTABLE 24 SIXTH OU PLOTFILE 24 ALL 6 C:\Beework\HLBE\Maj_Mod_2011\PM10\HLB_PM10_NAAQS_24hr OU PLOTFILE PERIOD ALL C:\Beework\HLBE\Maj_Mod_2011\PM10\HLB_PM10_NAAQS_Ann

Page 219: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

41

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_NAAQS_2006_PM10$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:00:59 PAGE 1 **MODELOPTs: RegDFAULT CONC ELEV MULTYR *** MODEL SETUP OPTIONS SUMMARY *** - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - **Model Is Setup For Calculation of Average CONCentration Values. -- DEPOSITION LOGIC -- **NO GAS DEPOSITION Data Provided. **NO PARTICLE DEPOSITION Data Provided. **Model Uses NO DRY DEPLETION. DRYDPLT = F **Model Uses NO WET DEPLETION. WETDPLT = F **Model Uses RURAL Dispersion Only. **Model Uses Regulatory DEFAULT Options: 1. Stack-tip Downwash. 2. Model Accounts for ELEVated Terrain Effects. 3. Use Calms Processing Routine. 4. Use Missing Data Processing Routine. 5. No Exponential Decay. **Model Assumes No FLAGPOLE Receptor Heights. **Model Calculates 1 Short Term Average(s) of: 24-HR and Calculates PERIOD Averages **This Run Includes: 29 Source(s); 2 Source Group(s); and 640 Receptor(s) **The Model Assumes A Pollutant Type of: PM10 **Model Set To Continue RUNning After the Setup Testing. **Output Options Selected: Model Outputs Tables of PERIOD Averages by Receptor Model Outputs Tables of Highest Short Term Values by Receptor (RECTABLE Keyword) Model Outputs Tables of Overall Maximum Short Term Values (MAXTABLE Keyword) Model Outputs External File(s) of High Values for Plotting (PLOTFILE Keyword) Model Outputs Separate Summary File of High Ranked Values (SUMMFILE Keyword) **NOTE: The Following Flags May Appear Following CONC Values: c for Calm Hours m for Missing Hours b for Both Calm and Missing Hours **Misc. Inputs: Base Elev. for Pot. Temp. Profile (m MSL) = 440.70 ; Decay Coef. = 0.000 ; Rot. Angle = 0.0 Emission Units = GRAMS/SEC ; Emission Rate Unit Factor = 0.10000E+07 Output Units = MICROGRAMS/M**3 **Approximate Storage Requirements of Model = 3.7 MB of RAM. **Input Runstream File: HLB_NAAQS_2006_PM10.DTA **Output Print File: HLB_NAAQS_2006_PM10.LST **File for Saving Result Arrays: HLB_NAAQS_2006_PM10.MUL **File Created for Event Model: C:\Beework\HLBE\Maj_Mod_2011\PM10\HLB_PM10_EVENTOUT_DETAIL **File for Summary of Results: C:\Beework\HLBE\Maj_Mod_2013\PM10\HLB_NAAQS_2006_PM10.SUM **This Run is Part of a Multi-year (MULTYEAR) Application. NOTE: The PERIOD Results Table Reflects Current Period Only; The Overall Maximum PERIOD Results Table and Short Term Results are Cumulative Across All Years Processed.

Page 220: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

42

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:00:59 PAGE 2 **MODELOPTs: RegDFAULT CONC ELEV MULTYR *** POINT SOURCE DATA *** NUMBER EMISSION RATE BASE STACK STACK STACK STACK BLDG URBAN CAP/ EMIS RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT TEMP. EXIT VEL. DIAMETER EXISTS SOURCE HOR SCALAR ID CATS. (METERS) (METERS) (METERS) (METERS) (DEG.K) (M/SEC) (METERS) VARY BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBSV1 0 0.16850E+00 316060.0 4853024.0 433.1 48.77 293.15 18.76 1.12 YES NO NO HLBSV2 0 0.11880E+00 316037.0 4853013.0 433.1 48.77 293.15 17.74 0.97 YES NO NO HLBSV3 0 0.58000E-02 315960.0 4853071.0 432.8 31.70 293.15 9.70 0.61 YES NO NO HLBSV4 0 0.40300E+00 316014.0 4852934.0 432.9 38.10 491.48 24.80 1.32 YES NO NO HLBSV5 0 0.10332E+01 315867.0 4852934.0 433.1 45.72 491.48 21.38 2.51 YES NO NO HLBSV7 0 0.12100E+00 316053.0 4852947.0 432.9 41.15 293.15 20.12 0.91 YES NO NO HLBSV8 0 0.45400E-01 316078.0 4852952.0 432.8 12.19 293.15 7.55 0.91 YES NO NO HLB120A 0 0.11800E-01 316018.0 4852841.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLB120B 0 0.11800E-01 316026.0 4852843.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLB120C 0 0.11800E-01 316035.0 4852845.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLB120D 0 0.11800E-01 316043.0 4852847.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLBSV17 0 0.33300E-01 315991.0 4852826.0 432.8 2.44 683.15 64.81 0.13 YES NO NO HROFDY HLBSV20 0 0.74300E-01 315646.0 4853068.0 432.8 2.74 735.93 71.33 0.13 YES NO NO HROFDY HLBEU54 0 0.26460E-01 315969.0 4852941.0 433.1 1.52 927.59 19.02 0.15 YES NO NO HROFDY

Page 221: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

43

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:00:59 PAGE 3 **MODELOPTs: RegDFAULT CONC ELEV MULTYR *** VOLUME SOURCE DATA *** NUMBER EMISSION RATE BASE RELEASE INIT. INIT. URBAN EMISSION RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT SY SZ SOURCE SCALAR VARY ID CATS. (METERS) (METERS) (METERS) (METERS) (METERS) (METERS) BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBFS2N 0 0.23700E-01 316068.0 4853034.0 433.1 1.83 12.56 4.56 NO HROFDY HLBFS2S 0 0.23700E-01 316081.0 4852982.0 432.8 1.83 12.56 4.56 NO HROFDY HLBFS3N 0 0.10000E-02 316079.0 4853037.0 433.1 1.83 12.56 4.56 NO HROFDY HLBFS3S 0 0.10000E-02 316092.0 4852984.0 432.8 1.83 12.56 4.56 NO HROFDY 481 0 0.34100E+01 335320.7 4863255.5 432.2 10.00 20.00 4.19 NO 1957 0 0.64500E+01 297606.4 4841976.5 465.6 10.00 20.00 4.19 NO 1435 0 0.19000E+00 339280.6 4833142.0 442.0 10.00 20.00 4.19 NO 1445 0 0.16200E+00 325522.2 4838265.5 450.0 10.00 20.00 4.19 NO 1685 0 0.29600E+00 356830.2 4824632.0 401.8 10.00 20.00 4.19 NO 1723 0 0.27000E+00 358818.5 4847968.0 381.0 10.00 20.00 4.19 NO 1724 0 0.79500E+00 352428.1 4851196.0 401.9 10.00 20.00 4.19 NO 1893 0 0.41300E+00 300369.8 4880886.0 441.9 10.00 20.00 4.19 NO 1948 0 0.17700E+00 294536.8 4836044.5 474.1 10.00 20.00 4.19 NO 1950 0 0.26100E+00 291468.1 4836529.0 479.0 10.00 20.00 4.19 NO 1951 0 0.18800E+00 295168.1 4836625.5 473.4 10.00 20.00 4.19 NO

Page 222: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

44

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:00:59 PAGE 4 **MODELOPTs: RegDFAULT CONC ELEV MULTYR *** SOURCE IDs DEFINING SOURCE GROUPS *** GROUP ID SOURCE IDs FAR>10KM 481 , 1957 , 1435 , 1445 , 1685 , 1723 , 1724 , 1893 , 1948 , 1950 , 1951 , ALL HLBSV1 , HLBSV2 , HLBSV3 , HLBSV4 , HLBSV5 , HLBSV7 , HLBSV8 , HLB120A , HLB120B , HLB120C , HLB120D , HLBSV17 , HLBSV20 , HLBEU54 , HLBFS2N , HLBFS2S , HLBFS3N , HLBFS3S , 481 , 1957 , 1435 , 1445 , 1685 , 1723 , 1724 , 1893 , 1948 , 1950 , 1951 ,

Page 223: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

45

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:00:59 PAGE 5 **MODELOPTs: RegDFAULT CONC ELEV MULTYR *** DIRECTION SPECIFIC BUILDING DIMENSIONS *** THIS & MOST OTHER ITEMS NOT PRINTED TO SAVE SPACE

Page 224: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

46

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBSV17 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBSV20 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBEU54 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBFS2N ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBFS2S ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00

Page 225: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

47

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBFS3N ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBFS3S ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 *** METEOROLOGICAL DAYS SELECTED FOR PROCESSING *** (1=YES; 0=NO) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE: METEOROLOGICAL DATA ACTUALLY PROCESSED WILL ALSO DEPEND ON WHAT IS INCLUDED IN THE DATA FILE. *** UPPER BOUND OF FIRST THROUGH FIFTH WIND SPEED CATEGORIES *** (METERS/SEC) 1.54, 3.09, 5.14, 8.23, 10.80,

Page 226: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

48

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:00:59 PAGE 20 **MODELOPTs: RegDFAULT CONC ELEV MULTYR *** UP TO THE FIRST 24 HOURS OF METEOROLOGICAL DATA *** Surface file: MJQMPX06.SFC Met Version: 12345 Profile file: MJQMPX06.PFL Surface format: FREE Profile format: FREE Surface station no.: 99999 Upper air station no.: 94983 Name: UNKNOWN Name: UNKNOWN Year: 2006 Year: 2006 First 24 hours of scalar data YR MO DY JDY HR H0 U* W* DT/DZ ZICNV ZIMCH M-O LEN Z0 BOWEN ALBEDO REF WS WD HT REF TA HT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 06 01 01 1 01 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 111. 10.0 269.1 2.0 06 01 01 1 02 -1.5 0.043 -9.000 -9.000 -999. 21. 4.6 0.01 0.49 1.00 1.50 98. 10.0 268.1 2.0 06 01 01 1 03 -999.0 -9.000 -9.000 -9.000 -999. -999. -99999.0 0.01 0.49 1.00 0.00 0. 10.0 268.1 2.0 06 01 01 1 04 -1.7 0.044 -9.000 -9.000 -999. 21. 4.3 0.01 0.49 1.00 1.50 83. 10.0 269.1 2.0 06 01 01 1 05 -4.2 0.061 -9.000 -9.000 -999. 34. 4.5 0.01 0.49 1.00 2.10 93. 10.0 269.1 2.0 06 01 01 1 06 -6.5 0.075 -9.000 -9.000 -999. 48. 5.6 0.01 0.49 1.00 2.60 102. 10.0 269.1 2.0 06 01 01 1 07 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 95. 10.0 270.1 2.0 06 01 01 1 08 -1.6 0.044 -9.000 -9.000 -999. 21. 4.7 0.01 0.49 1.00 1.50 83. 10.0 270.1 2.0 06 01 01 1 09 -5.9 0.111 -9.000 -9.000 -999. 85. 19.5 0.01 0.49 0.83 2.60 77. 10.0 270.1 2.0 06 01 01 1 10 -5.1 0.124 -9.000 -9.000 -999. 101. 32.0 0.01 0.49 0.69 2.60 71. 10.0 271.1 2.0 06 01 01 1 11 -3.2 0.138 -9.000 -9.000 -999. 118. 69.9 0.01 0.49 0.64 2.60 74. 10.0 271.1 2.0 06 01 01 1 12 -1.6 0.178 -9.000 -9.000 -999. 172. 305.3 0.01 0.49 0.62 3.10 66. 10.0 271.1 2.0 06 01 01 1 13 -0.5 0.181 -9.000 -9.000 -999. 177. 943.7 0.01 0.49 0.62 3.10 73. 10.0 273.1 2.0 06 01 01 1 14 -2.5 0.237 -9.000 -9.000 -999. 265. 451.8 0.01 0.49 0.63 4.10 69. 10.0 273.1 2.0 06 01 01 1 15 -6.1 0.231 -9.000 -9.000 -999. 255. 171.0 0.01 0.49 0.65 4.10 62. 10.0 273.1 2.0 06 01 01 1 16 -11.2 0.255 -9.000 -9.000 -999. 297. 125.9 0.01 0.49 0.71 4.60 64. 10.0 273.1 2.0 06 01 01 1 17 -15.9 0.290 -9.000 -9.000 -999. 360. 130.4 0.01 0.49 0.88 5.10 51. 10.0 273.1 2.0 06 01 01 1 18 -16.0 0.290 -9.000 -9.000 -999. 360. 130.3 0.01 0.49 1.00 5.10 47. 10.0 273.1 2.0 06 01 01 1 19 -12.4 0.225 -9.000 -9.000 -999. 247. 78.5 0.01 0.49 1.00 4.10 54. 10.0 273.1 2.0 06 01 01 1 20 -14.2 0.258 -9.000 -9.000 -999. 301. 103.0 0.01 0.49 1.00 4.60 47. 10.0 273.1 2.0 06 01 01 1 21 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 50. 10.0 273.1 2.0 06 01 01 1 22 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 42. 10.0 273.1 2.0 06 01 01 1 23 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 40. 10.0 273.1 2.0 06 01 01 1 24 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 30. 10.0 273.1 2.0 First hour of profile data YR MO DY HR HEIGHT F WDIR WSPD AMB_TMP sigmaA sigmaW sigmaV 06 01 01 01 10.0 1 111. 2.10 269.2 99.0 -99.00 -99.00 F indicates top of profile (=1) or below (=0)

Page 227: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

49

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_PM10_NAAQS_Ann_2006_PM10$$.LST Misc. Input (ECHO, INCLUDED, meteorology, etc.) ** ECHO CO TITLEONE Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS CO TITLETWO Major Modification Permit Modeling - August 2013 CO MODELOPT DFAULT CONC CO AVERTIME PERIOD CO POLLUTID PM10 SO EMISFACT HLBSV17 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBSV20 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBEU54 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBFS2N HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO EMISFACT HLBFS2S HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO EMISFACT HLBFS3N HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO EMISFACT HLBFS3S HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO INCLUDED "C:\Beework\HLBE\Maj_Mod_2013\PM10\HLB$43.8065N_95.2892W_2005NEIandFAR2G_PM10.far" SO SRCGROUP ALL ME SURFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX06.SFC" FREE ME PROFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX06.PFL" ME SURFDATA 99999 2006 ME UAIRDATA 94983 2006 ME PROFBASE 440.7 METERS OU PLOTFILE PERIOD ALL "C:\Beework\HLBE\Maj_Mod_2013\PM10\HLB_PM10_NAAQS_Ann_2006_PM10.GRF" 31

Page 228: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

50

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_PM10_NAAQS_Ann_2006_PM10$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 11/14/13 *** Major Modification Permit Modeling - August 2013 *** 15:29:41 PAGE 1 **MODELOPTs: RegDFAULT CONC ELEV *** MODEL SETUP OPTIONS SUMMARY *** - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - **Model Is Setup For Calculation of Average CONCentration Values. -- DEPOSITION LOGIC -- **NO GAS DEPOSITION Data Provided. **NO PARTICLE DEPOSITION Data Provided. **Model Uses NO DRY DEPLETION. DRYDPLT = F **Model Uses NO WET DEPLETION. WETDPLT = F **Model Uses RURAL Dispersion Only. **Model Uses Regulatory DEFAULT Options: 1. Stack-tip Downwash. 2. Model Accounts for ELEVated Terrain Effects. 3. Use Calms Processing Routine. 4. Use Missing Data Processing Routine. 5. No Exponential Decay. **Model Assumes No FLAGPOLE Receptor Heights. **Model Calculates PERIOD Averages Only **This Run Includes: 29 Source(s); 2 Source Group(s); and 640 Receptor(s) **The Model Assumes A Pollutant Type of: PM10 **Model Set To Continue RUNning After the Setup Testing. **Output Options Selected: Model Outputs Tables of PERIOD Averages by Receptor Model Outputs External File(s) of High Values for Plotting (PLOTFILE Keyword) Model Outputs Separate Summary File of High Ranked Values (SUMMFILE Keyword) **NOTE: The Following Flags May Appear Following CONC Values: c for Calm Hours m for Missing Hours b for Both Calm and Missing Hours **Misc. Inputs: Base Elev. for Pot. Temp. Profile (m MSL) = 440.70 ; Decay Coef. = 0.000 ; Rot. Angle = 0.0 Emission Units = GRAMS/SEC ; Emission Rate Unit Factor = 0.10000E+07 Output Units = MICROGRAMS/M**3 **Approximate Storage Requirements of Model = 3.6 MB of RAM. **Input Runstream File: HLB_PM10_NAAQS_Ann_2006_PM10.DTA **Output Print File: HLB_PM10_NAAQS_Ann_2006_PM10.LST **File Created for Event Model: C:\Beework\HLBE\Maj_Mod_2011\PM10\HLB_PM10_EVENTOUT_DETAIL **File for Summary of Results: C:\Beework\HLBE\Maj_Mod_2013\PM10\HLB_PM10_NAAQS_Ann_2006_PM10.SUM

Page 229: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

51

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 11/14/13 *** Major Modification Permit Modeling - August 2013 *** 15:29:41 PAGE 2 **MODELOPTs: RegDFAULT CONC ELEV *** POINT SOURCE DATA *** NUMBER EMISSION RATE BASE STACK STACK STACK STACK BLDG URBAN CAP/ EMIS RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT TEMP. EXIT VEL. DIAMETER EXISTS SOURCE HOR SCALAR ID CATS. (METERS) (METERS) (METERS) (METERS) (DEG.K) (M/SEC) (METERS) VARY BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBSV1 0 0.16850E+00 316060.0 4853024.0 433.1 48.77 293.15 18.76 1.12 YES NO NO HLBSV2 0 0.11880E+00 316037.0 4853013.0 433.1 48.77 293.15 17.74 0.97 YES NO NO HLBSV3 0 0.58000E-02 315960.0 4853071.0 432.8 31.70 293.15 9.70 0.61 YES NO NO HLBSV4 0 0.40300E+00 316014.0 4852934.0 432.9 38.10 491.48 24.80 1.32 YES NO NO HLBSV5 0 0.10332E+01 315867.0 4852934.0 433.1 45.72 491.48 21.38 2.51 YES NO NO HLBSV7 0 0.12100E+00 316053.0 4852947.0 432.9 41.15 293.15 20.12 0.91 YES NO NO HLBSV8 0 0.45400E-01 316078.0 4852952.0 432.8 12.19 293.15 7.55 0.91 YES NO NO HLB120A 0 0.11800E-01 316018.0 4852841.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLB120B 0 0.11800E-01 316026.0 4852843.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLB120C 0 0.11800E-01 316035.0 4852845.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLB120D 0 0.11800E-01 316043.0 4852847.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLBSV17 0 0.33300E-01 315991.0 4852826.0 432.8 2.44 683.15 64.81 0.13 YES NO NO HROFDY HLBSV20 0 0.74300E-01 315646.0 4853068.0 432.8 2.74 735.93 71.33 0.13 YES NO NO HROFDY HLBEU54 0 0.26460E-01 315969.0 4852941.0 433.1 1.52 927.59 19.02 0.15 YES NO NO HROFDY

Page 230: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

52

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 11/14/13 *** Major Modification Permit Modeling - August 2013 *** 15:29:41 PAGE 3 **MODELOPTs: RegDFAULT CONC ELEV *** VOLUME SOURCE DATA *** NUMBER EMISSION RATE BASE RELEASE INIT. INIT. URBAN EMISSION RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT SY SZ SOURCE SCALAR VARY ID CATS. (METERS) (METERS) (METERS) (METERS) (METERS) (METERS) BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBFS2N 0 0.23700E-01 316068.0 4853034.0 433.1 1.83 12.56 4.56 NO HROFDY HLBFS2S 0 0.23700E-01 316081.0 4852982.0 432.8 1.83 12.56 4.56 NO HROFDY HLBFS3N 0 0.10000E-02 316079.0 4853037.0 433.1 1.83 12.56 4.56 NO HROFDY HLBFS3S 0 0.10000E-02 316092.0 4852984.0 432.8 1.83 12.56 4.56 NO HROFDY 481 0 0.34100E+01 335320.7 4863255.5 432.2 10.00 20.00 4.19 NO 1957 0 0.64500E+01 297606.4 4841976.5 465.6 10.00 20.00 4.19 NO 1435 0 0.19000E+00 339280.6 4833142.0 442.0 10.00 20.00 4.19 NO 1445 0 0.16200E+00 325522.2 4838265.5 450.0 10.00 20.00 4.19 NO 1685 0 0.29600E+00 356830.2 4824632.0 401.8 10.00 20.00 4.19 NO 1723 0 0.27000E+00 358818.5 4847968.0 381.0 10.00 20.00 4.19 NO 1724 0 0.79500E+00 352428.1 4851196.0 401.9 10.00 20.00 4.19 NO 1893 0 0.41300E+00 300369.8 4880886.0 441.9 10.00 20.00 4.19 NO 1948 0 0.17700E+00 294536.8 4836044.5 474.1 10.00 20.00 4.19 NO 1950 0 0.26100E+00 291468.1 4836529.0 479.0 10.00 20.00 4.19 NO 1951 0 0.18800E+00 295168.1 4836625.5 473.4 10.00 20.00 4.19 NO

Page 231: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

53

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 11/14/13 *** Major Modification Permit Modeling - August 2013 *** 15:29:41 PAGE 4 **MODELOPTs: RegDFAULT CONC ELEV *** SOURCE IDs DEFINING SOURCE GROUPS *** GROUP ID SOURCE IDs FAR>10KM 481 , 1957 , 1435 , 1445 , 1685 , 1723 , 1724 , 1893 , 1948 , 1950 , 1951 , ALL HLBSV1 , HLBSV2 , HLBSV3 , HLBSV4 , HLBSV5 , HLBSV7 , HLBSV8 , HLB120A , HLB120B , HLB120C , HLB120D , HLBSV17 , HLBSV20 , HLBEU54 , HLBFS2N , HLBFS2S , HLBFS3N , HLBFS3S , 481 , 1957 , 1435 , 1445 , 1685 , 1723 , 1724 , 1893 , 1948 , 1950 , 1951 ,

Page 232: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

54

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 11/14/13 *** Major Modification Permit Modeling - August 2013 *** 15:29:41 PAGE 5 **MODELOPTs: RegDFAULT CONC ELEV *** DIRECTION SPECIFIC BUILDING DIMENSIONS *** THIS & MOST OTHER ITEMS NOT PRINTED TO SAVE SPACE

Page 233: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

55

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBSV17 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBSV20 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBEU54 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBFS2N ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBFS2S ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00

Page 234: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

56

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBFS3N ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBFS3S ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 *** METEOROLOGICAL DAYS SELECTED FOR PROCESSING *** (1=YES; 0=NO) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE: METEOROLOGICAL DATA ACTUALLY PROCESSED WILL ALSO DEPEND ON WHAT IS INCLUDED IN THE DATA FILE. *** UPPER BOUND OF FIRST THROUGH FIFTH WIND SPEED CATEGORIES *** (METERS/SEC) 1.54, 3.09, 5.14, 8.23, 10.80,

Page 235: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

57

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 11/14/13 *** Major Modification Permit Modeling - August 2013 *** 15:29:41 PAGE 20 **MODELOPTs: RegDFAULT CONC ELEV *** UP TO THE FIRST 24 HOURS OF METEOROLOGICAL DATA *** Surface file: MJQMPX06.SFC Met Version: 12345 Profile file: MJQMPX06.PFL Surface format: FREE Profile format: FREE Surface station no.: 99999 Upper air station no.: 94983 Name: UNKNOWN Name: UNKNOWN Year: 2006 Year: 2006 First 24 hours of scalar data YR MO DY JDY HR H0 U* W* DT/DZ ZICNV ZIMCH M-O LEN Z0 BOWEN ALBEDO REF WS WD HT REF TA HT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 06 01 01 1 01 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 111. 10.0 269.1 2.0 06 01 01 1 02 -1.5 0.043 -9.000 -9.000 -999. 21. 4.6 0.01 0.49 1.00 1.50 98. 10.0 268.1 2.0 06 01 01 1 03 -999.0 -9.000 -9.000 -9.000 -999. -999. -99999.0 0.01 0.49 1.00 0.00 0. 10.0 268.1 2.0 06 01 01 1 04 -1.7 0.044 -9.000 -9.000 -999. 21. 4.3 0.01 0.49 1.00 1.50 83. 10.0 269.1 2.0 06 01 01 1 05 -4.2 0.061 -9.000 -9.000 -999. 34. 4.5 0.01 0.49 1.00 2.10 93. 10.0 269.1 2.0 06 01 01 1 06 -6.5 0.075 -9.000 -9.000 -999. 48. 5.6 0.01 0.49 1.00 2.60 102. 10.0 269.1 2.0 06 01 01 1 07 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 95. 10.0 270.1 2.0 06 01 01 1 08 -1.6 0.044 -9.000 -9.000 -999. 21. 4.7 0.01 0.49 1.00 1.50 83. 10.0 270.1 2.0 06 01 01 1 09 -5.9 0.111 -9.000 -9.000 -999. 85. 19.5 0.01 0.49 0.83 2.60 77. 10.0 270.1 2.0 06 01 01 1 10 -5.1 0.124 -9.000 -9.000 -999. 101. 32.0 0.01 0.49 0.69 2.60 71. 10.0 271.1 2.0 06 01 01 1 11 -3.2 0.138 -9.000 -9.000 -999. 118. 69.9 0.01 0.49 0.64 2.60 74. 10.0 271.1 2.0 06 01 01 1 12 -1.6 0.178 -9.000 -9.000 -999. 172. 305.3 0.01 0.49 0.62 3.10 66. 10.0 271.1 2.0 06 01 01 1 13 -0.5 0.181 -9.000 -9.000 -999. 177. 943.7 0.01 0.49 0.62 3.10 73. 10.0 273.1 2.0 06 01 01 1 14 -2.5 0.237 -9.000 -9.000 -999. 265. 451.8 0.01 0.49 0.63 4.10 69. 10.0 273.1 2.0 06 01 01 1 15 -6.1 0.231 -9.000 -9.000 -999. 255. 171.0 0.01 0.49 0.65 4.10 62. 10.0 273.1 2.0 06 01 01 1 16 -11.2 0.255 -9.000 -9.000 -999. 297. 125.9 0.01 0.49 0.71 4.60 64. 10.0 273.1 2.0 06 01 01 1 17 -15.9 0.290 -9.000 -9.000 -999. 360. 130.4 0.01 0.49 0.88 5.10 51. 10.0 273.1 2.0 06 01 01 1 18 -16.0 0.290 -9.000 -9.000 -999. 360. 130.3 0.01 0.49 1.00 5.10 47. 10.0 273.1 2.0 06 01 01 1 19 -12.4 0.225 -9.000 -9.000 -999. 247. 78.5 0.01 0.49 1.00 4.10 54. 10.0 273.1 2.0 06 01 01 1 20 -14.2 0.258 -9.000 -9.000 -999. 301. 103.0 0.01 0.49 1.00 4.60 47. 10.0 273.1 2.0 06 01 01 1 21 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 50. 10.0 273.1 2.0 06 01 01 1 22 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 42. 10.0 273.1 2.0 06 01 01 1 23 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 40. 10.0 273.1 2.0 06 01 01 1 24 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 30. 10.0 273.1 2.0 First hour of profile data YR MO DY HR HEIGHT F WDIR WSPD AMB_TMP sigmaA sigmaW sigmaV 06 01 01 01 10.0 1 111. 2.10 269.2 99.0 -99.00 -99.00 F indicates top of profile (=1) or below (=0)

Page 236: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

58

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM25\HLB_PM25$$.LST Misc. Input (ECHO, INCLUDED, meteorology, etc.) ** ECHO CO TITLEONE Heron Lake BioEnergy LLC (HLB) - PM2.5 NAAQS CO TITLETWO Major Modification Permit Modeling - August 2013 CO MODELOPT DFAULT CONC CO AVERTIME 24 ANNUAL CO POLLUTID PM25 SO EMISFACT HLBSV17 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBSV20 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBEU54 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBFS2N HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO EMISFACT HLBFS2S HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO EMISFACT HLBFS3N HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO EMISFACT HLBFS3S HROFDY 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 SO INCLUDED "C:\Beework\HLBE\Maj_Mod_2013\PM25\HLB$43.8065N_95.2892W_2005NEIandFAR2G_PM25.far" SO SRCGROUP ALL ME SURFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX0610.SFC" FREE ME PROFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX0610.PFL" ME SURFDATA 99999 2006 ME UAIRDATA 94983 2006 ME PROFBASE 440.7 METERS OU RECTABLE 24 EIGHTH OU PLOTFILE 24 ALL EIGHTH "C:\Beework\HLBE\Maj_Mod_2013\PM25\HLB_PM25.GRF" 31 OU PLOTFILE ANNUAL ALL "C:\Beework\HLBE\Maj_Mod_2013\PM25\HLB_PM25.GRF" 31

Page 237: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

59

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM25\HLB_PM25$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM2.5 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:02:31 PAGE 1 **MODELOPTs: RegDFAULT CONC ELEV *** MODEL SETUP OPTIONS SUMMARY *** - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - **Model Is Setup For Calculation of Average CONCentration Values. -- DEPOSITION LOGIC -- **NO GAS DEPOSITION Data Provided. **NO PARTICLE DEPOSITION Data Provided. **Model Uses NO DRY DEPLETION. DRYDPLT = F **Model Uses NO WET DEPLETION. WETDPLT = F **Model Uses RURAL Dispersion Only. **Model Uses Regulatory DEFAULT Options: 1. Stack-tip Downwash. 2. Model Accounts for ELEVated Terrain Effects. 3. Use Calms Processing Routine. 4. Use Missing Data Processing Routine. 5. No Exponential Decay. **Model Assumes No FLAGPOLE Receptor Heights. **Model Calculates 1 Short Term Average(s) of: 24-HR and Calculates ANNUAL Averages **This Run Includes: 21 Source(s); 2 Source Group(s); and 640 Receptor(s) **The Model Assumes A Pollutant Type of: PM25 **Note that special processing requirements apply for the 24-hour PM2.5 NAAQS - check available guidance. Model will process user-specified ranks of high 24-hour values averaged across the number of years modeled, and the multi-year average of individual ANNUAL values, averaged across the number of years modeled. **Model Set To Continue RUNning After the Setup Testing. **Output Options Selected: Model Outputs Tables of ANNUAL Averages by Receptor Model Outputs Tables of Highest Short Term Values by Receptor (RECTABLE Keyword) Model Outputs Tables of Overall Maximum Short Term Values (MAXTABLE Keyword) Model Outputs External File(s) of High Values for Plotting (PLOTFILE Keyword) Model Outputs Separate Summary File of High Ranked Values (SUMMFILE Keyword) **NOTE: The Following Flags May Appear Following CONC Values: c for Calm Hours m for Missing Hours b for Both Calm and Missing Hours **Misc. Inputs: Base Elev. for Pot. Temp. Profile (m MSL) = 440.70 ; Decay Coef. = 0.000 ; Rot. Angle = 0.0 Emission Units = GRAMS/SEC ; Emission Rate Unit Factor = 0.10000E+07 Output Units = MICROGRAMS/M**3 **Approximate Storage Requirements of Model = 3.8 MB of RAM. **Input Runstream File: HLB_PM25.DTA **Output Print File: HLB_PM25.LST **File for Summary of Results: C:\Beework\HLBE\Maj_Mod_2013\PM25\HLB_PM25.SUM

Page 238: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

60

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM2.5 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:02:31 PAGE 2 **MODELOPTs: RegDFAULT CONC ELEV *** POINT SOURCE DATA *** NUMBER EMISSION RATE BASE STACK STACK STACK STACK BLDG URBAN CAP/ EMIS RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT TEMP. EXIT VEL. DIAMETER EXISTS SOURCE HOR SCALAR ID CATS. (METERS) (METERS) (METERS) (METERS) (DEG.K) (M/SEC) (METERS) VARY BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBSV1 0 0.16850E+00 316060.0 4853024.0 433.1 48.77 293.15 18.76 1.12 YES NO NO HLBSV2 0 0.11880E+00 316037.0 4853013.0 433.1 48.77 293.15 17.74 0.97 YES NO NO HLBSV3 0 0.58000E-02 315960.0 4853071.0 432.8 31.70 293.15 9.70 0.61 YES NO NO HLBSV4 0 0.40300E+00 316014.0 4852934.0 432.9 38.10 491.48 24.80 1.32 YES NO NO HLBSV5 0 0.10332E+01 315867.0 4852934.0 433.1 45.72 491.48 21.38 2.51 YES NO NO HLBSV7 0 0.12100E+00 316053.0 4852947.0 432.9 41.15 293.15 20.12 0.91 YES NO NO HLBSV8 0 0.45400E-01 316078.0 4852952.0 432.8 12.19 293.15 7.55 0.91 YES NO NO HLB120A 0 0.11800E-01 316018.0 4852841.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLB120B 0 0.11800E-01 316026.0 4852843.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLB120C 0 0.11800E-01 316035.0 4852845.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLB120D 0 0.11800E-01 316043.0 4852847.0 432.8 10.06 302.59 10.78 5.49 YES NO NO HLBSV17 0 0.33300E-01 315991.0 4852826.0 432.8 2.44 683.15 64.81 0.13 YES NO NO HROFDY HLBSV20 0 0.74300E-01 315646.0 4853068.0 432.8 2.74 735.93 71.33 0.13 YES NO NO HROFDY HLBEU54 0 0.26460E-01 315969.0 4852941.0 433.1 1.52 927.59 19.02 0.15 YES NO NO HROFDY

Page 239: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

61

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM2.5 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:02:31 PAGE 3 **MODELOPTs: RegDFAULT CONC ELEV *** VOLUME SOURCE DATA *** NUMBER EMISSION RATE BASE RELEASE INIT. INIT. URBAN EMISSION RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT SY SZ SOURCE SCALAR VARY ID CATS. (METERS) (METERS) (METERS) (METERS) (METERS) (METERS) BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBFS2N 0 0.39900E-02 316068.0 4853034.0 433.1 1.83 12.56 4.56 NO HROFDY HLBFS2S 0 0.39900E-02 316081.0 4852982.0 432.8 1.83 12.56 4.56 NO HROFDY HLBFS3N 0 0.10000E-02 316079.0 4853037.0 433.1 1.83 12.56 4.56 NO HROFDY HLBFS3S 0 0.10000E-02 316092.0 4852984.0 432.8 1.83 12.56 4.56 NO HROFDY 1957 0 0.17700E+01 297606.4 4841976.5 465.6 10.00 20.00 4.19 NO 481 0 0.46100E+00 335320.7 4863255.5 432.2 10.00 20.00 4.19 NO 1724 0 0.34800E+00 352428.1 4851196.0 401.9 10.00 20.00 4.19 NO

Page 240: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

62

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM2.5 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:02:31 PAGE 4 **MODELOPTs: RegDFAULT CONC ELEV *** SOURCE IDs DEFINING SOURCE GROUPS *** GROUP ID SOURCE IDs FAR>10KM 1957 , 481 , 1724 , ALL HLBSV1 , HLBSV2 , HLBSV3 , HLBSV4 , HLBSV5 , HLBSV7 , HLBSV8 , HLB120A , HLB120B , HLB120C , HLB120D , HLBSV17 , HLBSV20 , HLBEU54 , HLBFS2N , HLBFS2S , HLBFS3N , HLBFS3S , 1957 , 481 , 1724 ,

Page 241: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

63

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM2.5 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:02:31 PAGE 5 **MODELOPTs: RegDFAULT CONC ELEV *** DIRECTION SPECIFIC BUILDING DIMENSIONS *** THIS & MOST OTHER ITEMS NOT PRINTED TO SAVE SPACE

Page 242: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

64

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBSV17 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBSV20 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBEU54 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBFS2N ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBFS2S ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00

Page 243: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

65

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBFS3N ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBFS3S ; SOURCE TYPE = VOLUME : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .10000E+01 7 .10000E+01 8 .10000E+01 9 .10000E+01 10 .10000E+01 11 .10000E+01 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .10000E+01 17 .10000E+01 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 *** METEOROLOGICAL DAYS SELECTED FOR PROCESSING *** (1=YES; 0=NO) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE: METEOROLOGICAL DATA ACTUALLY PROCESSED WILL ALSO DEPEND ON WHAT IS INCLUDED IN THE DATA FILE. *** UPPER BOUND OF FIRST THROUGH FIFTH WIND SPEED CATEGORIES *** (METERS/SEC) 1.54, 3.09, 5.14, 8.23, 10.80,

Page 244: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

66

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM2.5 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:02:31 PAGE 20 **MODELOPTs: RegDFAULT CONC ELEV *** UP TO THE FIRST 24 HOURS OF METEOROLOGICAL DATA *** Surface file: MJQMPX0610.SFC Met Version: 12345 Profile file: MJQMPX0610.PFL Surface format: FREE Profile format: FREE Surface station no.: 99999 Upper air station no.: 94983 Name: UNKNOWN Name: UNKNOWN Year: 2006 Year: 2006 First 24 hours of scalar data YR MO DY JDY HR H0 U* W* DT/DZ ZICNV ZIMCH M-O LEN Z0 BOWEN ALBEDO REF WS WD HT REF TA HT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 06 01 01 1 01 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 111. 10.0 269.1 2.0 06 01 01 1 02 -1.5 0.043 -9.000 -9.000 -999. 21. 4.6 0.01 0.49 1.00 1.50 98. 10.0 268.1 2.0 06 01 01 1 03 -999.0 -9.000 -9.000 -9.000 -999. -999. -99999.0 0.01 0.49 1.00 0.00 0. 10.0 268.1 2.0 06 01 01 1 04 -1.7 0.044 -9.000 -9.000 -999. 21. 4.3 0.01 0.49 1.00 1.50 83. 10.0 269.1 2.0 06 01 01 1 05 -4.2 0.061 -9.000 -9.000 -999. 34. 4.5 0.01 0.49 1.00 2.10 93. 10.0 269.1 2.0 06 01 01 1 06 -6.5 0.075 -9.000 -9.000 -999. 48. 5.6 0.01 0.49 1.00 2.60 102. 10.0 269.1 2.0 06 01 01 1 07 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 95. 10.0 270.1 2.0 06 01 01 1 08 -1.6 0.044 -9.000 -9.000 -999. 21. 4.7 0.01 0.49 1.00 1.50 83. 10.0 270.1 2.0 06 01 01 1 09 -5.9 0.111 -9.000 -9.000 -999. 85. 19.5 0.01 0.49 0.83 2.60 77. 10.0 270.1 2.0 06 01 01 1 10 -5.1 0.124 -9.000 -9.000 -999. 101. 32.0 0.01 0.49 0.69 2.60 71. 10.0 271.1 2.0 06 01 01 1 11 -3.2 0.138 -9.000 -9.000 -999. 118. 69.9 0.01 0.49 0.64 2.60 74. 10.0 271.1 2.0 06 01 01 1 12 -1.6 0.178 -9.000 -9.000 -999. 172. 305.3 0.01 0.49 0.62 3.10 66. 10.0 271.1 2.0 06 01 01 1 13 -0.5 0.181 -9.000 -9.000 -999. 177. 943.7 0.01 0.49 0.62 3.10 73. 10.0 273.1 2.0 06 01 01 1 14 -2.5 0.237 -9.000 -9.000 -999. 265. 451.8 0.01 0.49 0.63 4.10 69. 10.0 273.1 2.0 06 01 01 1 15 -6.1 0.231 -9.000 -9.000 -999. 255. 171.0 0.01 0.49 0.65 4.10 62. 10.0 273.1 2.0 06 01 01 1 16 -11.2 0.255 -9.000 -9.000 -999. 297. 125.9 0.01 0.49 0.71 4.60 64. 10.0 273.1 2.0 06 01 01 1 17 -15.9 0.290 -9.000 -9.000 -999. 360. 130.4 0.01 0.49 0.88 5.10 51. 10.0 273.1 2.0 06 01 01 1 18 -16.0 0.290 -9.000 -9.000 -999. 360. 130.3 0.01 0.49 1.00 5.10 47. 10.0 273.1 2.0 06 01 01 1 19 -12.4 0.225 -9.000 -9.000 -999. 247. 78.5 0.01 0.49 1.00 4.10 54. 10.0 273.1 2.0 06 01 01 1 20 -14.2 0.258 -9.000 -9.000 -999. 301. 103.0 0.01 0.49 1.00 4.60 47. 10.0 273.1 2.0 06 01 01 1 21 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 50. 10.0 273.1 2.0 06 01 01 1 22 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 42. 10.0 273.1 2.0 06 01 01 1 23 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 40. 10.0 273.1 2.0 06 01 01 1 24 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 30. 10.0 273.1 2.0 First hour of profile data YR MO DY HR HEIGHT F WDIR WSPD AMB_TMP sigmaA sigmaW sigmaV 06 01 01 01 10.0 1 111. 2.10 269.2 99.0 -99.00 -99.00 F indicates top of profile (=1) or below (=0)

Page 245: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

67

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2\HLB_2006_SO2$$.LST Misc. Input (ECHO, INCLUDED, meteorology, etc.) ** ECHO CO TITLEONE Heron Lake BioEnergy LLC (HLB) - August 2013 CO TITLETWO Major Modification Permit Modeling - SO2 3-Hr 24-Hr & Annual NAAQS CO MODELOPT DFAULT CONC CO AVERTIME 3 24 ANNUAL CO POLLUTID SO2 SO EMISFACT HLBSV17 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBSV20 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO INCLUDED "C:\Beework\HLBE\Maj_Mod_2013\SO2\HLB$43.8065N_95.2892W_2005NEIandFAR2G_SO2_.far" SO SRCGROUP HLBONLY HLBSV4 HLBSV5 HLBSV17 HLBSV20 SO SRCGROUP ALL ME SURFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX06.SFC" FREE ME PROFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX06.PFL" ME SURFDATA 99999 2006 ME UAIRDATA 94983 2006 ME PROFBASE 440.7 METERS OU RECTABLE 3 SECOND OU RECTABLE 24 SECOND OU PLOTFILE 3 ALL SECOND "C:\Beework\HLBE\Maj_Mod_2013\SO2\HLB_2006_SO2.GRF" 31 OU PLOTFILE 24 ALL SECOND "C:\Beework\HLBE\Maj_Mod_2013\SO2\HLB_2006_SO2.GRF" 31 OU PLOTFILE ANNUAL ALL "C:\Beework\HLBE\Maj_Mod_2013\SO2\HLB_2006_SO2.GRF" 31 OU PLOTFILE 3 HLBONLY SECOND "C:\Beework\HLBE\Maj_Mod_2013\SO2\HLB_2006_SO2.GRF" 31 OU PLOTFILE 24 HLBONLY SECOND "C:\Beework\HLBE\Maj_Mod_2013\SO2\HLB_2006_SO2.GRF" 31 OU PLOTFILE ANNUAL HLBONLY "C:\Beework\HLBE\Maj_Mod_2013\SO2\HLB_2006_SO2.GRF" 31

Page 246: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

68

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2\HLB_2006_SO2$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - SO2 3-Hr 24-Hr & Annual NAAQS *** 10:10:06 PAGE 1 **MODELOPTs: RegDFAULT CONC ELEV *** MODEL SETUP OPTIONS SUMMARY *** - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - **Model Is Setup For Calculation of Average CONCentration Values. -- DEPOSITION LOGIC -- **NO GAS DEPOSITION Data Provided. **NO PARTICLE DEPOSITION Data Provided. **Model Uses NO DRY DEPLETION. DRYDPLT = F **Model Uses NO WET DEPLETION. WETDPLT = F **Model Uses RURAL Dispersion Only. **Model Uses Regulatory DEFAULT Options: 1. Stack-tip Downwash. 2. Model Accounts for ELEVated Terrain Effects. 3. Use Calms Processing Routine. 4. Use Missing Data Processing Routine. 5. No Exponential Decay. **Model Assumes No FLAGPOLE Receptor Heights. **Model Calculates 2 Short Term Average(s) of: 3-HR 24-HR and Calculates ANNUAL Averages **This Run Includes: 6 Source(s); 3 Source Group(s); and 640 Receptor(s) **The Model Assumes A Pollutant Type of: SO2 **Model Set To Continue RUNning After the Setup Testing. **Output Options Selected: Model Outputs Tables of ANNUAL Averages by Receptor Model Outputs Tables of Highest Short Term Values by Receptor (RECTABLE Keyword) Model Outputs Tables of Overall Maximum Short Term Values (MAXTABLE Keyword) Model Outputs External File(s) of High Values for Plotting (PLOTFILE Keyword) Model Outputs Separate Summary File of High Ranked Values (SUMMFILE Keyword) **NOTE: The Following Flags May Appear Following CONC Values: c for Calm Hours m for Missing Hours b for Both Calm and Missing Hours **Misc. Inputs: Base Elev. for Pot. Temp. Profile (m MSL) = 440.70 ; Decay Coef. = 0.000 ; Rot. Angle = 0.0 Emission Units = GRAMS/SEC ; Emission Rate Unit Factor = 0.10000E+07 Output Units = MICROGRAMS/M**3 **Approximate Storage Requirements of Model = 3.7 MB of RAM. **Input Runstream File: HLB_2006_SO2.DTA **Output Print File: HLB_2006_SO2.LST **File for Summary of Results: C:\Beework\HLBE\Maj_Mod_2013\SO2\HLB_2006_SO2.SUM

Page 247: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

69

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - SO2 3-Hr 24-Hr & Annual NAAQS *** 10:10:06 PAGE 2 **MODELOPTs: RegDFAULT CONC ELEV *** POINT SOURCE DATA *** NUMBER EMISSION RATE BASE STACK STACK STACK STACK BLDG URBAN CAP/ EMIS RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT TEMP. EXIT VEL. DIAMETER EXISTS SOURCE HOR SCALAR ID CATS. (METERS) (METERS) (METERS) (METERS) (DEG.K) (M/SEC) (METERS) VARY BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBSV4 0 0.95800E+00 316014.0 4852934.0 432.9 38.10 491.48 24.80 1.32 YES NO NO HLBSV5 0 0.97400E+00 315867.0 4852934.0 433.1 45.72 491.48 21.38 2.51 YES NO NO HLBSV17 0 0.75599E-01 315991.0 4852826.0 432.8 2.44 683.15 64.81 0.13 YES NO NO HROFDY HLBSV20 0 0.67500E-01 315646.0 4853068.0 432.8 2.74 735.93 71.33 0.13 YES NO NO HROFDY

Page 248: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

70

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - SO2 3-Hr 24-Hr & Annual NAAQS *** 10:10:06 PAGE 3 **MODELOPTs: RegDFAULT CONC ELEV *** VOLUME SOURCE DATA *** NUMBER EMISSION RATE BASE RELEASE INIT. INIT. URBAN EMISSION RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT SY SZ SOURCE SCALAR VARY ID CATS. (METERS) (METERS) (METERS) (METERS) (METERS) (METERS) BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1708 0 0.12400E+02 362360.2 4836972.0 378.0 25.00 20.00 10.00 NO 1948 0 0.20500E+00 294536.8 4836044.5 474.1 10.00 20.00 4.19 NO

Page 249: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

71

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - SO2 3-Hr 24-Hr & Annual NAAQS *** 10:10:06 PAGE 4 **MODELOPTs: RegDFAULT CONC ELEV *** SOURCE IDs DEFINING SOURCE GROUPS *** GROUP ID SOURCE IDs FAR>10KM 1708 , 1948 , HLBONLY HLBSV4 , HLBSV5 , HLBSV17 , HLBSV20 , ALL HLBSV4 , HLBSV5 , HLBSV17 , HLBSV20 , 1708 , 1948 ,

Page 250: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

72

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - SO2 3-Hr 24-Hr & Annual NAAQS *** 10:10:06 PAGE 5 **MODELOPTs: RegDFAULT CONC ELEV *** DIRECTION SPECIFIC BUILDING DIMENSIONS *** THIS & MOST OTHER ITEMS NOT PRINTED TO SAVE SPACE

Page 251: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

73

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBSV17 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBSV20 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 *** METEOROLOGICAL DAYS SELECTED FOR PROCESSING *** (1=YES; 0=NO) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE: METEOROLOGICAL DATA ACTUALLY PROCESSED WILL ALSO DEPEND ON WHAT IS INCLUDED IN THE DATA FILE. *** UPPER BOUND OF FIRST THROUGH FIFTH WIND SPEED CATEGORIES *** (METERS/SEC) 1.54, 3.09, 5.14, 8.23, 10.80,

Page 252: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

74

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - SO2 3-Hr 24-Hr & Annual NAAQS *** 10:10:06 PAGE 16 **MODELOPTs: RegDFAULT CONC ELEV *** UP TO THE FIRST 24 HOURS OF METEOROLOGICAL DATA *** Surface file: MJQMPX06.SFC Met Version: 12345 Profile file: MJQMPX06.PFL Surface format: FREE Profile format: FREE Surface station no.: 99999 Upper air station no.: 94983 Name: UNKNOWN Name: UNKNOWN Year: 2006 Year: 2006 First 24 hours of scalar data YR MO DY JDY HR H0 U* W* DT/DZ ZICNV ZIMCH M-O LEN Z0 BOWEN ALBEDO REF WS WD HT REF TA HT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 06 01 01 1 01 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 111. 10.0 269.1 2.0 06 01 01 1 02 -1.5 0.043 -9.000 -9.000 -999. 21. 4.6 0.01 0.49 1.00 1.50 98. 10.0 268.1 2.0 06 01 01 1 03 -999.0 -9.000 -9.000 -9.000 -999. -999. -99999.0 0.01 0.49 1.00 0.00 0. 10.0 268.1 2.0 06 01 01 1 04 -1.7 0.044 -9.000 -9.000 -999. 21. 4.3 0.01 0.49 1.00 1.50 83. 10.0 269.1 2.0 06 01 01 1 05 -4.2 0.061 -9.000 -9.000 -999. 34. 4.5 0.01 0.49 1.00 2.10 93. 10.0 269.1 2.0 06 01 01 1 06 -6.5 0.075 -9.000 -9.000 -999. 48. 5.6 0.01 0.49 1.00 2.60 102. 10.0 269.1 2.0 06 01 01 1 07 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 95. 10.0 270.1 2.0 06 01 01 1 08 -1.6 0.044 -9.000 -9.000 -999. 21. 4.7 0.01 0.49 1.00 1.50 83. 10.0 270.1 2.0 06 01 01 1 09 -5.9 0.111 -9.000 -9.000 -999. 85. 19.5 0.01 0.49 0.83 2.60 77. 10.0 270.1 2.0 06 01 01 1 10 -5.1 0.124 -9.000 -9.000 -999. 101. 32.0 0.01 0.49 0.69 2.60 71. 10.0 271.1 2.0 06 01 01 1 11 -3.2 0.138 -9.000 -9.000 -999. 118. 69.9 0.01 0.49 0.64 2.60 74. 10.0 271.1 2.0 06 01 01 1 12 -1.6 0.178 -9.000 -9.000 -999. 172. 305.3 0.01 0.49 0.62 3.10 66. 10.0 271.1 2.0 06 01 01 1 13 -0.5 0.181 -9.000 -9.000 -999. 177. 943.7 0.01 0.49 0.62 3.10 73. 10.0 273.1 2.0 06 01 01 1 14 -2.5 0.237 -9.000 -9.000 -999. 265. 451.8 0.01 0.49 0.63 4.10 69. 10.0 273.1 2.0 06 01 01 1 15 -6.1 0.231 -9.000 -9.000 -999. 255. 171.0 0.01 0.49 0.65 4.10 62. 10.0 273.1 2.0 06 01 01 1 16 -11.2 0.255 -9.000 -9.000 -999. 297. 125.9 0.01 0.49 0.71 4.60 64. 10.0 273.1 2.0 06 01 01 1 17 -15.9 0.290 -9.000 -9.000 -999. 360. 130.4 0.01 0.49 0.88 5.10 51. 10.0 273.1 2.0 06 01 01 1 18 -16.0 0.290 -9.000 -9.000 -999. 360. 130.3 0.01 0.49 1.00 5.10 47. 10.0 273.1 2.0 06 01 01 1 19 -12.4 0.225 -9.000 -9.000 -999. 247. 78.5 0.01 0.49 1.00 4.10 54. 10.0 273.1 2.0 06 01 01 1 20 -14.2 0.258 -9.000 -9.000 -999. 301. 103.0 0.01 0.49 1.00 4.60 47. 10.0 273.1 2.0 06 01 01 1 21 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 50. 10.0 273.1 2.0 06 01 01 1 22 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 42. 10.0 273.1 2.0 06 01 01 1 23 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 40. 10.0 273.1 2.0 06 01 01 1 24 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 30. 10.0 273.1 2.0 First hour of profile data YR MO DY HR HEIGHT F WDIR WSPD AMB_TMP sigmaA sigmaW sigmaV 06 01 01 01 10.0 1 111. 2.10 269.2 99.0 -99.00 -99.00 F indicates top of profile (=1) or below (=0)

Page 253: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

75

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2\HLB_SO2_1hr$$.LST Misc. Input (ECHO, INCLUDED, meteorology, etc.) ** ECHO CO TITLEONE Heron Lake BioEnergy LLC (HLB) - August 2013 CO TITLETWO Major Modification Permit Modeling - SO2 1-Hr NAAQS CO MODELOPT DFAULT CONC CO AVERTIME 1 CO POLLUTID SO2 SO EMISFACT HLBSV17 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO EMISFACT HLBSV20 HROFDY 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 SO INCLUDED "C:\Beework\HLBE\Maj_Mod_2011\SO2\HLB$43.8065N_95.2892W_2005NEIandFAR2G_SO2_.far" SO SRCGROUP ALL ME SURFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX0610.SFC" FREE ME PROFFILE "c:\Beework\HLBE\Maj_Mod_2013\Met_Data\MJQMPX0610.PFL" ME SURFDATA 99999 2006 ME UAIRDATA 94983 2006 ME PROFBASE 440.7 METERS OU RECTABLE 1 FOURTH OU PLOTFILE 1 ALL FOURTH "C:\Beework\HLBE\Maj_Mod_2013\SO2\1-hr\HLB_SO2_1hr.GRF" 31

Page 254: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

76

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2\HLB_SO2_1hr$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 11/18/13 *** Major Modification Permit Modeling - SO2 1-Hr NAAQS *** 14:07:36 PAGE 1 **MODELOPTs: RegDFAULT CONC ELEV *** MODEL SETUP OPTIONS SUMMARY *** - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - **Model Is Setup For Calculation of Average CONCentration Values. -- DEPOSITION LOGIC -- **NO GAS DEPOSITION Data Provided. **NO PARTICLE DEPOSITION Data Provided. **Model Uses NO DRY DEPLETION. DRYDPLT = F **Model Uses NO WET DEPLETION. WETDPLT = F **Model Uses RURAL Dispersion Only. **Model Uses Regulatory DEFAULT Options: 1. Stack-tip Downwash. 2. Model Accounts for ELEVated Terrain Effects. 3. Use Calms Processing Routine. 4. Use Missing Data Processing Routine. 5. No Exponential Decay. **Model Assumes No FLAGPOLE Receptor Heights. **Model Calculates 1 Short Term Average(s) of: 1-HR **This Run Includes: 6 Source(s); 2 Source Group(s); and 640 Receptor(s) **The Model Assumes A Pollutant Type of: SO2 **Note that special processing requirements apply for the 1-hour SO2 NAAQS - check available guidance. Model will process user-specified ranks of daily maximum 1-hour values averaged across the number of years modeled. **Model Set To Continue RUNning After the Setup Testing. **Output Options Selected: Model Outputs Tables of Highest Short Term Values by Receptor (RECTABLE Keyword) Model Outputs Tables of Overall Maximum Short Term Values (MAXTABLE Keyword) Model Outputs External File(s) of High Values for Plotting (PLOTFILE Keyword) Model Outputs Separate Summary File of High Ranked Values (SUMMFILE Keyword) **NOTE: The Following Flags May Appear Following CONC Values: c for Calm Hours m for Missing Hours b for Both Calm and Missing Hours **Misc. Inputs: Base Elev. for Pot. Temp. Profile (m MSL) = 440.70 ; Decay Coef. = 0.000 ; Rot. Angle = 0.0 Emission Units = GRAMS/SEC ; Emission Rate Unit Factor = 0.10000E+07 Output Units = MICROGRAMS/M**3 **Approximate Storage Requirements of Model = 3.7 MB of RAM. **Input Runstream File: HLB_SO2_1hr.DTA **Output Print File: HLB_SO2_1hr.LST **File for Summary of Results: C:\Beework\HLBE\Maj_Mod_2013\SO2\1-hr\HLB_SO2_1hr.SUM

Page 255: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

77

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 11/18/13 *** Major Modification Permit Modeling - SO2 1-Hr NAAQS *** 14:07:36 PAGE 2 **MODELOPTs: RegDFAULT CONC ELEV *** POINT SOURCE DATA *** NUMBER EMISSION RATE BASE STACK STACK STACK STACK BLDG URBAN CAP/ EMIS RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT TEMP. EXIT VEL. DIAMETER EXISTS SOURCE HOR SCALAR ID CATS. (METERS) (METERS) (METERS) (METERS) (DEG.K) (M/SEC) (METERS) VARY BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HLBSV4 0 0.95800E+00 316014.0 4852934.0 432.9 38.10 491.48 24.80 1.32 YES NO NO HLBSV5 0 0.97400E+00 315867.0 4852934.0 433.1 45.72 491.48 21.38 2.51 YES NO NO HLBSV17 0 0.75599E-01 315991.0 4852826.0 432.8 2.44 683.15 64.81 0.13 YES NO NO HROFDY HLBSV20 0 0.67500E-01 315646.0 4853068.0 432.8 2.74 735.93 71.33 0.13 YES NO NO HROFDY

Page 256: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

78

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 11/18/13 *** Major Modification Permit Modeling - SO2 1-Hr NAAQS *** 14:07:36 PAGE 3 **MODELOPTs: RegDFAULT CONC ELEV *** VOLUME SOURCE DATA *** NUMBER EMISSION RATE BASE RELEASE INIT. INIT. URBAN EMISSION RATE SOURCE PART. (GRAMS/SEC) X Y ELEV. HEIGHT SY SZ SOURCE SCALAR VARY ID CATS. (METERS) (METERS) (METERS) (METERS) (METERS) (METERS) BY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1708 0 0.12400E+02 362360.2 4836972.0 378.0 25.00 20.00 10.00 NO 1948 0 0.20500E+00 294536.8 4836044.5 474.1 10.00 20.00 4.19 NO

Page 257: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

79

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 11/18/13 *** Major Modification Permit Modeling - SO2 1-Hr NAAQS *** 14:07:36 PAGE 4 **MODELOPTs: RegDFAULT CONC ELEV *** SOURCE IDs DEFINING SOURCE GROUPS *** GROUP ID SOURCE IDs FAR>10KM 1708 , 1948 , ALL HLBSV4 , HLBSV5 , HLBSV17 , HLBSV20 , 1708 , 1948 ,

Page 258: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

80

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 11/18/13 *** Major Modification Permit Modeling - SO2 1-Hr NAAQS *** 14:07:36 PAGE 5 **MODELOPTs: RegDFAULT CONC ELEV *** DIRECTION SPECIFIC BUILDING DIMENSIONS *** THIS & MOST OTHER ITEMS NOT PRINTED TO SAVE SPACE

Page 259: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

81

* SOURCE EMISSION RATE SCALARS WHICH VARY FOR EACH HOUR OF THE DAY * SOURCE ID = HLBSV17 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 SOURCE ID = HLBSV20 ; SOURCE TYPE = POINT : 1 .00000E+00 2 .00000E+00 3 .00000E+00 4 .00000E+00 5 .00000E+00 6 .00000E+00 7 .00000E+00 8 .00000E+00 9 .00000E+00 10 .00000E+00 11 .00000E+00 12 .10000E+01 13 .10000E+01 14 .10000E+01 15 .10000E+01 16 .00000E+00 17 .00000E+00 18 .00000E+00 19 .00000E+00 20 .00000E+00 21 .00000E+00 22 .00000E+00 23 .00000E+00 24 .00000E+00 *** METEOROLOGICAL DAYS SELECTED FOR PROCESSING *** (1=YES; 0=NO) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE: METEOROLOGICAL DATA ACTUALLY PROCESSED WILL ALSO DEPEND ON WHAT IS INCLUDED IN THE DATA FILE. *** UPPER BOUND OF FIRST THROUGH FIFTH WIND SPEED CATEGORIES *** (METERS/SEC) 1.54, 3.09, 5.14, 8.23, 10.80,

Page 260: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

82

*** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 11/18/13 *** Major Modification Permit Modeling - SO2 1-Hr NAAQS *** 14:07:36 PAGE 16 **MODELOPTs: RegDFAULT CONC ELEV *** UP TO THE FIRST 24 HOURS OF METEOROLOGICAL DATA *** Surface file: MJQMPX0610.SFC Met Version: 12345 Profile file: MJQMPX0610.PFL Surface format: FREE Profile format: FREE Surface station no.: 99999 Upper air station no.: 94983 Name: UNKNOWN Name: UNKNOWN Year: 2006 Year: 2006 First 24 hours of scalar data YR MO DY JDY HR H0 U* W* DT/DZ ZICNV ZIMCH M-O LEN Z0 BOWEN ALBEDO REF WS WD HT REF TA HT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 06 01 01 1 01 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 111. 10.0 269.1 2.0 06 01 01 1 02 -1.5 0.043 -9.000 -9.000 -999. 21. 4.6 0.01 0.49 1.00 1.50 98. 10.0 268.1 2.0 06 01 01 1 03 -999.0 -9.000 -9.000 -9.000 -999. -999. -99999.0 0.01 0.49 1.00 0.00 0. 10.0 268.1 2.0 06 01 01 1 04 -1.7 0.044 -9.000 -9.000 -999. 21. 4.3 0.01 0.49 1.00 1.50 83. 10.0 269.1 2.0 06 01 01 1 05 -4.2 0.061 -9.000 -9.000 -999. 34. 4.5 0.01 0.49 1.00 2.10 93. 10.0 269.1 2.0 06 01 01 1 06 -6.5 0.075 -9.000 -9.000 -999. 48. 5.6 0.01 0.49 1.00 2.60 102. 10.0 269.1 2.0 06 01 01 1 07 -3.0 0.061 -9.000 -9.000 -999. 34. 6.4 0.01 0.49 1.00 2.10 95. 10.0 270.1 2.0 06 01 01 1 08 -1.6 0.044 -9.000 -9.000 -999. 21. 4.7 0.01 0.49 1.00 1.50 83. 10.0 270.1 2.0 06 01 01 1 09 -5.9 0.111 -9.000 -9.000 -999. 85. 19.5 0.01 0.49 0.83 2.60 77. 10.0 270.1 2.0 06 01 01 1 10 -5.1 0.124 -9.000 -9.000 -999. 101. 32.0 0.01 0.49 0.69 2.60 71. 10.0 271.1 2.0 06 01 01 1 11 -3.2 0.138 -9.000 -9.000 -999. 118. 69.9 0.01 0.49 0.64 2.60 74. 10.0 271.1 2.0 06 01 01 1 12 -1.6 0.178 -9.000 -9.000 -999. 172. 305.3 0.01 0.49 0.62 3.10 66. 10.0 271.1 2.0 06 01 01 1 13 -0.5 0.181 -9.000 -9.000 -999. 177. 943.7 0.01 0.49 0.62 3.10 73. 10.0 273.1 2.0 06 01 01 1 14 -2.5 0.237 -9.000 -9.000 -999. 265. 451.8 0.01 0.49 0.63 4.10 69. 10.0 273.1 2.0 06 01 01 1 15 -6.1 0.231 -9.000 -9.000 -999. 255. 171.0 0.01 0.49 0.65 4.10 62. 10.0 273.1 2.0 06 01 01 1 16 -11.2 0.255 -9.000 -9.000 -999. 297. 125.9 0.01 0.49 0.71 4.60 64. 10.0 273.1 2.0 06 01 01 1 17 -15.9 0.290 -9.000 -9.000 -999. 360. 130.4 0.01 0.49 0.88 5.10 51. 10.0 273.1 2.0 06 01 01 1 18 -16.0 0.290 -9.000 -9.000 -999. 360. 130.3 0.01 0.49 1.00 5.10 47. 10.0 273.1 2.0 06 01 01 1 19 -12.4 0.225 -9.000 -9.000 -999. 247. 78.5 0.01 0.49 1.00 4.10 54. 10.0 273.1 2.0 06 01 01 1 20 -14.2 0.258 -9.000 -9.000 -999. 301. 103.0 0.01 0.49 1.00 4.60 47. 10.0 273.1 2.0 06 01 01 1 21 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 50. 10.0 273.1 2.0 06 01 01 1 22 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 42. 10.0 273.1 2.0 06 01 01 1 23 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 40. 10.0 273.1 2.0 06 01 01 1 24 -12.4 0.225 -9.000 -9.000 -999. 246. 78.5 0.01 0.49 1.00 4.10 30. 10.0 273.1 2.0 First hour of profile data YR MO DY HR HEIGHT F WDIR WSPD AMB_TMP sigmaA sigmaW sigmaV 06 01 01 01 10.0 1 111. 2.10 269.2 99.0 -99.00 -99.00 F indicates top of profile (=1) or below (=0)

Page 261: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

83

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\CO\HLB_CO$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 14:47:13 **This Run Includes: 6 Source(s); 1 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_CO.DTA *** THE SUMMARY OF HIGHEST 1-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL HIGH 2ND HIGH VALUE IS 1223.20014 ON 10122214: AT ( 315988.90, 4852750.50, 432.54, 432.54, 0.00) DC *** THE SUMMARY OF HIGHEST 8-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL HIGH 2ND HIGH VALUE IS 313.29626 ON 09120616: AT ( 315988.90, 4852750.50, 432.54, 432.54, 0.00) DC *** AERMOD Finishes Successfully ***

Page 262: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

84

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2\HLB_NO2_1hr_T3$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 NAAQS 1-hr - Tier 3 (OLM) *** 13:48:50 **This Run Includes: 16 Source(s); 5 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_NO2_1hr_T3.DTA *** THE SUMMARY OF MAXIMUM 8TH-HIGHEST MAX DAILY 1-HR RESULTS AVERAGED OVER 5 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 8.78678 AT ( 316867.00, 4851201.95, 428.15, 428.15, 0.00) DC HLBSV17 1ST HIGHEST VALUE IS 88.29089 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC HLBSV20 1ST HIGHEST VALUE IS 105.57383 AT ( 315601.00, 4853198.10, 432.96, 432.96, 0.00) DC HLBEU054 1ST HIGHEST VALUE IS 27.70857 AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** THE SUMMARY OF MAXIMUM 8TH-HIGHEST MAX DAILY 1-HR RESULTS AVERAGED OVER 5 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL 1ST HIGHEST VALUE IS 105.86698 AT ( 315601.00, 4853198.10, 432.96, 432.96, 0.00) DC *** AERMOD Finishes Successfully ***

Page 263: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

85

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2\HLB_NO2_T3_2006_NO2$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:45:23 **This Run Includes: 16 Source(s); 3 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_NO2_T3_2006_NO2.DTA *** THE SUMMARY OF MAXIMUM ANNUAL RESULTS AVERAGED OVER 1 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.08854 AT ( 317599.05, 4853934.00, 430.35, 430.35, 0.00) DC HLBONLY 1ST HIGHEST VALUE IS 2.21645 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC ALL 1ST HIGHEST VALUE IS 2.29597 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC *** AERMOD Finishes Successfully ***

Page 264: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

86

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2\HLB_NO2_T3_2007_NO2.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:48:46 **This Run Includes: 16 Source(s); 3 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_NO2_T3_2007_NO2.DTA *** THE SUMMARY OF MAXIMUM ANNUAL RESULTS AVERAGED OVER 1 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.08171 AT ( 317599.05, 4851934.00, 427.65, 427.65, 0.00) DC HLBONLY 1ST HIGHEST VALUE IS 2.11185 AT ( 315601.00, 4853198.10, 432.96, 432.96, 0.00) DC ALL 1ST HIGHEST VALUE IS 2.17865 AT ( 315601.00, 4853198.10, 432.96, 432.96, 0.00) DC *** AERMOD Finishes Successfully ***

Page 265: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

87

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2\HLB_NO2_T3_2008_NO2.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:52:08 **This Run Includes: 16 Source(s); 3 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_NO2_T3_2008_NO2.DTA *** THE SUMMARY OF MAXIMUM ANNUAL RESULTS AVERAGED OVER 1 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.08135 AT ( 317152.58, 4854466.09, 430.07, 430.07, 0.00) DC HLBONLY 1ST HIGHEST VALUE IS 2.20519 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC ALL 1ST HIGHEST VALUE IS 2.28333 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC *** AERMOD Finishes Successfully ***

Page 266: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

88

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2\HLB_NO2_T3_2009_NO2.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:55:28 **This Run Includes: 16 Source(s); 3 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_NO2_T3_2009_NO2.DTA *** THE SUMMARY OF MAXIMUM ANNUAL RESULTS AVERAGED OVER 1 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.07701 AT ( 317152.58, 4851401.91, 429.73, 429.73, 0.00) DC HLBONLY 1ST HIGHEST VALUE IS 2.32217 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC ALL 1ST HIGHEST VALUE IS 2.38145 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC *** AERMOD Finishes Successfully ***

Page 267: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

89

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2\HLB_NO2_T3_2010_NO2.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - NO2 Annual NAAQS - Tier 3 (OLM) *** 14:58:52 **This Run Includes: 16 Source(s); 3 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_NO2_T3_2010_NO2.DTA *** THE SUMMARY OF MAXIMUM ANNUAL RESULTS AVERAGED OVER 1 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.10077 AT ( 317152.58, 4854466.09, 430.07, 430.07, 0.00) DC HLBONLY 1ST HIGHEST VALUE IS 2.40695 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC ALL 1ST HIGHEST VALUE IS 2.48225 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC *** AERMOD Finishes Successfully ***

Page 268: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

90

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\Increment\HLB_INC_2006_PM10$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 Increment Modeling *** 10/10/13 *** Major Modification Permit Modeling - July 2013 *** 10:00:11 **This Run Includes: 18 Source(s); 1 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_INC_2006_PM10.DTA *** THE SUMMARY OF MAXIMUM PERIOD ( 8760 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL 1ST HIGHEST VALUE IS 1.77827 AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL HIGH 2ND HIGH VALUE IS 12.75701 ON 06121824: AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** AERMOD Finishes Successfully ***

Page 269: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

91

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\Increment\HLB_INC_2007_PM10.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 Increment Modeling *** 10/10/13 *** Major Modification Permit Modeling - July 2013 *** 10:03:44 **This Run Includes: 18 Source(s); 1 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_INC_2007_PM10.DTA *** THE SUMMARY OF MAXIMUM PERIOD ( 8760 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL 1ST HIGHEST VALUE IS 1.81744 AT ( 316185.90, 4852955.10, 432.81, 432.81, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL HIGH 2ND HIGH VALUE IS 16.32291b ON 07110824: AT ( 316174.10, 4852846.00, 432.22, 432.22, 0.00) DC *** AERMOD Finishes Successfully ***

Page 270: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

92

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\Increment\HLB_INC_2008_PM10.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 Increment Modeling *** 10/10/13 *** Major Modification Permit Modeling - July 2013 *** 10:07:17 **This Run Includes: 18 Source(s); 1 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_INC_2008_PM10.DTA *** THE SUMMARY OF MAXIMUM PERIOD ( 8784 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL 1ST HIGHEST VALUE IS 1.97475 AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL HIGH 2ND HIGH VALUE IS 14.20535c ON 08101624: AT ( 316184.40, 4853028.00, 433.15, 433.15, 0.00) DC *** AERMOD Finishes Successfully ***

Page 271: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

93

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\Increment\HLB_INC_2009_PM10.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 Increment Modeling *** 10/10/13 *** Major Modification Permit Modeling - July 2013 *** 10:10:44 **This Run Includes: 18 Source(s); 1 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_INC_2009_PM10.DTA *** THE SUMMARY OF MAXIMUM PERIOD ( 8760 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL 1ST HIGHEST VALUE IS 1.93198 AT ( 316185.90, 4852955.10, 432.81, 432.81, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL HIGH 2ND HIGH VALUE IS 14.73070c ON 09111524: AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** AERMOD Finishes Successfully ***

Page 272: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

94

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\Increment\HLB_INC_2010_PM10.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 Increment Modeling *** 10/10/13 *** Major Modification Permit Modeling - July 2013 *** 10:14:17 **This Run Includes: 18 Source(s); 1 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_INC_2010_PM10.DTA *** THE SUMMARY OF MAXIMUM PERIOD ( 8760 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL 1ST HIGHEST VALUE IS 1.88471 AT ( 316185.90, 4852955.10, 432.81, 432.81, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID ALL HIGH 2ND HIGH VALUE IS 18.42984c ON 10010524: AT ( 316186.80, 4852906.50, 432.47, 432.47, 0.00) DC *** AERMOD Finishes Successfully ***

Page 273: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

95

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_NAAQS_2006_PM10$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:00:59 **This Run Includes: 29 Source(s); 2 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_NAAQS_2006_PM10.DTA **This Run is Part of a Multi-year (MULTYEAR) Application. *** THE SUMMARY OF MAXIMUM PERIOD ( 8760 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.17458 AT ( 314134.95, 4851934.00, 431.82, 431.82, 0.00) DC ALL 1ST HIGHEST VALUE IS 1.93822 AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 6TH HIGH VALUE IS 2.14951b ON 06062124: AT ( 314334.91, 4851648.42, 430.49, 430.49, 0.00) DC ALL HIGH 6TH HIGH VALUE IS 10.39074 ON 06111324: AT ( 316184.40, 4853028.00, 433.15, 433.15, 0.00) DC *** AERMOD Finishes Successfully ***

Page 274: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

96

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_NAAQS_2007_PM10.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:07:12 **This Run Includes: 29 Source(s); 2 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_NAAQS_2007_PM10.DTA **This Run is Part of a Multi-year (MULTYEAR) Application. *** THE SUMMARY OF MAXIMUM PERIOD ( 8760 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.17458 AT ( 314134.95, 4851934.00, 431.82, 431.82, 0.00) DC ALL 1ST HIGHEST VALUE IS 1.93822 AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 6TH HIGH VALUE IS 2.58385 ON 07050824: AT ( 314581.42, 4851401.91, 428.99, 428.99, 0.00) DC ALL HIGH 6TH HIGH VALUE IS 12.02244 ON 06121524: AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** AERMOD Finishes Successfully ***

Page 275: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

97

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_NAAQS_2008_PM10.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:13:28 **This Run Includes: 29 Source(s); 2 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_NAAQS_2008_PM10.DTA **This Run is Part of a Multi-year (MULTYEAR) Application. *** THE SUMMARY OF MAXIMUM PERIOD ( 8784 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.17560 AT ( 313987.61, 4852249.96, 432.81, 432.81, 0.00) DC ALL 1ST HIGHEST VALUE IS 2.13087 AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 6TH HIGH VALUE IS 2.80499c ON 06090324: AT ( 313897.38, 4852586.70, 433.30, 433.30, 0.00) DC ALL HIGH 6TH HIGH VALUE IS 12.88892c ON 06021824: AT ( 316184.40, 4853028.00, 433.15, 433.15, 0.00) DC *** AERMOD Finishes Successfully ***

Page 276: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

98

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_NAAQS_2009_PM10.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:19:34 **This Run Includes: 29 Source(s); 2 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_NAAQS_2009_PM10.DTA **This Run is Part of a Multi-year (MULTYEAR) Application. *** THE SUMMARY OF MAXIMUM PERIOD ( 8760 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.17560 AT ( 313987.61, 4852249.96, 432.81, 432.81, 0.00) DC ALL 1ST HIGHEST VALUE IS 2.13087 AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 6TH HIGH VALUE IS 2.87285c ON 08090624: AT ( 314094.35, 4852621.43, 429.61, 429.61, 0.00) DC ALL HIGH 6TH HIGH VALUE IS 14.16413b ON 08123124: AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** AERMOD Finishes Successfully ***

Page 277: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

99

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_NAAQS_2010_PM10.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:25:46 **This Run Includes: 29 Source(s); 2 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_NAAQS_2010_PM10.DTA **This Run is Part of a Multi-year (MULTYEAR) Application. *** THE SUMMARY OF MAXIMUM PERIOD ( 8760 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.17560 AT ( 313987.61, 4852249.96, 432.81, 432.81, 0.00) DC ALL 1ST HIGHEST VALUE IS 2.13087 AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 6TH HIGH VALUE IS 2.99016c ON 08012424: AT ( 313897.38, 4852586.70, 433.30, 433.30, 0.00) DC ALL HIGH 6TH HIGH VALUE IS 14.87056c ON 09111524: AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** AERMOD Finishes Successfully ***

Page 278: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

100

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_PM10_NAAQS_Ann_2006_PM10$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 11/14/13 *** Major Modification Permit Modeling - August 2013 *** 15:29:41 **This Run Includes: 29 Source(s); 2 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_PM10_NAAQS_Ann_2006_PM10.DTA *** THE SUMMARY OF MAXIMUM PERIOD ( 8760 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.17458 AT ( 314134.95, 4851934.00, 431.82, 431.82, 0.00) DC ALL 1ST HIGHEST VALUE IS 1.93822 AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** AERMOD Finishes Successfully ***

Page 279: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

101

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_PM10_NAAQS_Ann_2007_PM10.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 11/14/13 *** Major Modification Permit Modeling - August 2013 *** 15:35:46 **This Run Includes: 29 Source(s); 2 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_PM10_NAAQS_Ann_2007_PM10.DTA *** THE SUMMARY OF MAXIMUM PERIOD ( 8760 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.12247 AT ( 314581.42, 4851401.91, 428.99, 428.99, 0.00) DC ALL 1ST HIGHEST VALUE IS 1.92553 AT ( 316185.90, 4852955.10, 432.81, 432.81, 0.00) DC *** AERMOD Finishes Successfully ***

Page 280: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

102

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_PM10_NAAQS_Ann_2008_PM10.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 11/14/13 *** Major Modification Permit Modeling - August 2013 *** 15:41:54 **This Run Includes: 29 Source(s); 2 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_PM10_NAAQS_Ann_2008_PM10.DTA *** THE SUMMARY OF MAXIMUM PERIOD ( 8784 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.17560 AT ( 313987.61, 4852249.96, 432.81, 432.81, 0.00) DC ALL 1ST HIGHEST VALUE IS 2.13087 AT ( 316185.40, 4852979.40, 432.97, 432.97, 0.00) DC *** AERMOD Finishes Successfully ***

Page 281: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

103

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_PM10_NAAQS_Ann_2009_PM10.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 11/14/13 *** Major Modification Permit Modeling - August 2013 *** 15:47:54 **This Run Includes: 29 Source(s); 2 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_PM10_NAAQS_Ann_2009_PM10.DTA *** THE SUMMARY OF MAXIMUM PERIOD ( 8760 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.12664 AT ( 315519.70, 4850964.38, 428.38, 428.38, 0.00) DC ALL 1ST HIGHEST VALUE IS 2.03854 AT ( 316185.90, 4852955.10, 432.81, 432.81, 0.00) DC *** AERMOD Finishes Successfully ***

Page 282: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

104

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS\HLB_PM10_NAAQS_Ann_2010_PM10.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM10 NAAQS *** 11/14/13 *** Major Modification Permit Modeling - August 2013 *** 15:54:04 **This Run Includes: 29 Source(s); 2 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_PM10_NAAQS_Ann_2010_PM10.DTA *** THE SUMMARY OF MAXIMUM PERIOD ( 8760 HRS) RESULTS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.12783 AT ( 314581.42, 4851401.91, 428.99, 428.99, 0.00) DC ALL 1ST HIGHEST VALUE IS 1.99995 AT ( 316185.90, 4852955.10, 432.81, 432.81, 0.00) DC *** AERMOD Finishes Successfully ***

Page 283: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

105

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM25\HLB_PM25$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - PM2.5 NAAQS *** 10/10/13 *** Major Modification Permit Modeling - August 2013 *** 10:02:31 **This Run Includes: 21 Source(s); 2 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_PM25.DTA *** THE SUMMARY OF MAXIMUM ANNUAL RESULTS AVERAGED OVER 5 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.03209 AT ( 314334.91, 4851648.42, 430.49, 430.49, 0.00) DC ALL 1ST HIGHEST VALUE IS 1.11470 AT ( 316180.70, 4852864.10, 432.27, 432.27, 0.00) DC *** THE SUMMARY OF MAXIMUM 8TH-HIGHEST 24-HR RESULTS AVERAGED OVER 5 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.36529 AT ( 314134.95, 4851934.00, 431.82, 431.82, 0.00) DC ALL 1ST HIGHEST VALUE IS 4.75167 AT ( 316180.70, 4852864.10, 432.27, 432.27, 0.00) DC *** AERMOD Finishes Successfully ***

Page 284: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

106

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2\HLB_2006_SO2$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - SO2 3-Hr 24-Hr & Annual NAAQS *** 10:10:06 **This Run Includes: 6 Source(s); 3 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_2006_SO2.DTA *** THE SUMMARY OF MAXIMUM ANNUAL RESULTS AVERAGED OVER 1 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.02479 AT ( 317152.58, 4854466.09, 430.07, 430.07, 0.00) DC HLBONLY 1ST HIGHEST VALUE IS 0.46551 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC ALL 1ST HIGHEST VALUE IS 0.48393 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC *** THE SUMMARY OF HIGHEST 3-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 2ND HIGH VALUE IS 7.68510 ON 06012724: AT ( 317399.09, 4854219.58, 429.85, 429.85, 0.00) DC HLBONLY HIGH 2ND HIGH VALUE IS 23.03831 ON 06020515: AT ( 315988.90, 4852750.50, 432.54, 432.54, 0.00) DC ALL HIGH 2ND HIGH VALUE IS 23.04289 ON 06020515: AT ( 315988.90, 4852750.50, 432.54, 432.54, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 2ND HIGH VALUE IS 1.05474c ON 06010124: AT ( 317399.09, 4854219.58, 429.85, 429.85, 0.00) DC HLBONLY HIGH 2ND HIGH VALUE IS 3.81635c ON 06072124: AT ( 315988.90, 4852750.50, 432.54, 432.54, 0.00) DC ALL HIGH 2ND HIGH VALUE IS 3.82288c ON 06072124: AT ( 315988.90, 4852750.50, 432.54, 432.54, 0.00) DC *** AERMOD Finishes Successfully ***

Page 285: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

107

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2\HLB_2007_SO2.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - SO2 3-Hr 24-Hr & Annual NAAQS *** 10:11:29 **This Run Includes: 6 Source(s); 3 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_2007_SO2.DTA *** THE SUMMARY OF MAXIMUM ANNUAL RESULTS AVERAGED OVER 1 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.03440 AT ( 317558.45, 4852318.36, 426.84, 426.84, 0.00) DC HLBONLY 1ST HIGHEST VALUE IS 0.38781 AT ( 316131.20, 4853299.80, 433.73, 433.73, 0.00) DC ALL 1ST HIGHEST VALUE IS 0.41855 AT ( 316131.20, 4853299.80, 433.73, 433.73, 0.00) DC *** THE SUMMARY OF HIGHEST 3-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 2ND HIGH VALUE IS 12.57525 ON 07022806: AT ( 317467.00, 4852934.00, 427.51, 427.51, 0.00) DC HLBONLY HIGH 2ND HIGH VALUE IS 22.38531 ON 07011415: AT ( 315988.90, 4852750.50, 432.54, 432.54, 0.00) DC ALL HIGH 2ND HIGH VALUE IS 22.38669 ON 07011415: AT ( 315988.90, 4852750.50, 432.54, 432.54, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 2ND HIGH VALUE IS 1.66240m ON 07031724: AT ( 315867.00, 4852034.00, 425.34, 425.34, 0.00) DC HLBONLY HIGH 2ND HIGH VALUE IS 3.76107 ON 07010324: AT ( 316147.30, 4853290.20, 433.84, 433.84, 0.00) DC ALL HIGH 2ND HIGH VALUE IS 3.85279m ON 07022824: AT ( 315988.90, 4852750.50, 432.54, 432.54, 0.00) DC *** AERMOD Finishes Successfully ***

Page 286: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

108

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2\HLB_2008_SO2.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - SO2 3-Hr 24-Hr & Annual NAAQS *** 10:12:51 **This Run Includes: 6 Source(s); 3 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_2008_SO2.DTA *** THE SUMMARY OF MAXIMUM ANNUAL RESULTS AVERAGED OVER 1 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.03333 AT ( 317599.05, 4851934.00, 427.65, 427.65, 0.00) DC HLBONLY 1ST HIGHEST VALUE IS 0.45593 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC ALL 1ST HIGHEST VALUE IS 0.48574 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC *** THE SUMMARY OF HIGHEST 3-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 2ND HIGH VALUE IS 6.75585 ON 08072303: AT ( 317558.45, 4852318.36, 426.84, 426.84, 0.00) DC HLBONLY HIGH 2ND HIGH VALUE IS 20.42423 ON 08120915: AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC ALL HIGH 2ND HIGH VALUE IS 20.42471 ON 08120915: AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 2ND HIGH VALUE IS 1.12330c ON 08082424: AT ( 315867.00, 4852034.00, 425.34, 425.34, 0.00) DC HLBONLY HIGH 2ND HIGH VALUE IS 3.80157b ON 08022524: AT ( 316013.60, 4852750.30, 432.42, 432.42, 0.00) DC ALL HIGH 2ND HIGH VALUE IS 3.80295b ON 08022524: AT ( 316013.60, 4852750.30, 432.42, 432.42, 0.00) DC *** AERMOD Finishes Successfully ***

Page 287: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

109

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2\HLB_2009_SO2.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - SO2 3-Hr 24-Hr & Annual NAAQS *** 10:14:10 **This Run Includes: 6 Source(s); 3 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_2009_SO2.DTA *** THE SUMMARY OF MAXIMUM ANNUAL RESULTS AVERAGED OVER 1 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.03055 AT ( 316144.84, 4851358.31, 425.34, 425.34, 0.00) DC HLBONLY 1ST HIGHEST VALUE IS 0.47523 AT ( 316063.10, 4852749.70, 432.22, 432.22, 0.00) DC ALL 1ST HIGHEST VALUE IS 0.49776 AT ( 316063.10, 4852749.70, 432.22, 432.22, 0.00) DC *** THE SUMMARY OF HIGHEST 3-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 2ND HIGH VALUE IS 8.48254c ON 09122524: AT ( 316179.57, 4851161.35, 425.34, 425.34, 0.00) DC HLBONLY HIGH 2ND HIGH VALUE IS 22.83266 ON 09102215: AT ( 315939.40, 4852751.10, 432.82, 432.82, 0.00) DC ALL HIGH 2ND HIGH VALUE IS 22.83275 ON 09102215: AT ( 315939.40, 4852751.10, 432.82, 432.82, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 2ND HIGH VALUE IS 1.42288c ON 09121724: AT ( 315867.00, 4852034.00, 425.34, 425.34, 0.00) DC HLBONLY HIGH 2ND HIGH VALUE IS 4.50333 ON 09102224: AT ( 315939.40, 4852751.10, 432.82, 432.82, 0.00) DC ALL HIGH 2ND HIGH VALUE IS 4.50363 ON 09102224: AT ( 315939.40, 4852751.10, 432.82, 432.82, 0.00) DC *** AERMOD Finishes Successfully ***

Page 288: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

110

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2\HLB_2010_SO2.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 10/10/13 *** Major Modification Permit Modeling - SO2 3-Hr 24-Hr & Annual NAAQS *** 10:15:31 **This Run Includes: 6 Source(s); 3 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_2010_SO2.DTA *** THE SUMMARY OF MAXIMUM ANNUAL RESULTS AVERAGED OVER 1 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 0.03840 AT ( 317558.45, 4852318.36, 426.84, 426.84, 0.00) DC HLBONLY 1ST HIGHEST VALUE IS 0.48704 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC ALL 1ST HIGHEST VALUE IS 0.52222 AT ( 316038.40, 4852750.00, 432.32, 432.32, 0.00) DC *** THE SUMMARY OF HIGHEST 3-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 2ND HIGH VALUE IS 7.47719c ON 10041906: AT ( 317746.39, 4853618.04, 428.80, 428.80, 0.00) DC HLBONLY HIGH 2ND HIGH VALUE IS 22.89701 ON 10031915: AT ( 316013.60, 4852750.30, 432.42, 432.42, 0.00) DC ALL HIGH 2ND HIGH VALUE IS 22.89725 ON 10031915: AT ( 316013.60, 4852750.30, 432.42, 432.42, 0.00) DC *** THE SUMMARY OF HIGHEST 24-HR RESULTS *** GROUP ID AVERAGE CONC (YYMMDDHH) RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM HIGH 2ND HIGH VALUE IS 1.18851c ON 10030724: AT ( 317746.39, 4853618.04, 428.80, 428.80, 0.00) DC HLBONLY HIGH 2ND HIGH VALUE IS 3.97838m ON 10121124: AT ( 316013.60, 4852750.30, 432.42, 432.42, 0.00) DC ALL HIGH 2ND HIGH VALUE IS 4.12190c ON 10121624: AT ( 316027.70, 4852742.49, 432.32, 432.32, 0.00) DC *** AERMOD Finishes Successfully ***

Page 289: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

111

X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2\HLB_SO2_1hr$$.LST *** AERMOD - VERSION 12345 *** *** Heron Lake BioEnergy LLC (HLB) - August 2013 *** 11/18/13 *** Major Modification Permit Modeling - SO2 1-Hr NAAQS *** 14:07:36 **This Run Includes: 6 Source(s); 2 Source Group(s); and 640 Receptor(s) **Input Runstream File: HLB_SO2_1hr.DTA *** THE SUMMARY OF MAXIMUM 4TH-HIGHEST MAX DAILY 1-HR RESULTS AVERAGED OVER 5 YEARS *** GROUP ID AVERAGE CONC RECEPTOR (XR, YR, ZELEV, ZHILL, ZFLAG) OF TYPE GRID-ID FAR>10KM 1ST HIGHEST VALUE IS 13.61927 AT ( 316144.84, 4851358.31, 425.34, 425.34, 0.00) DC ALL 1ST HIGHEST VALUE IS 28.63429 AT ( 316013.60, 4852750.30, 432.42, 432.42, 0.00) DC *** AERMOD Finishes Successfully ***

Page 290: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

112

Volume in drive X is System Volume Serial Number is B81D-A988 Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files 04/21/2014 08:07 AM <DIR> . 04/21/2014 08:07 AM <DIR> .. 04/21/2014 11:22 AM <DIR> CD 0 File(s) 0 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD 04/21/2014 11:22 AM <DIR> . 04/21/2014 11:22 AM <DIR> .. 04/21/2014 08:06 AM <DIR> Modeling 04/21/2014 08:04 AM <DIR> Revised_Forms 01/09/2014 10:47 AM 209,476 HLBE MajMod EI_FINALREVISED-FOR MPCA.pdf 01/09/2014 10:47 AM 218,112 HLBE MajMod EI_FINALREVISED-FOR MPCA.xls 01/09/2014 04:02 PM 3,143,997 HLBE_CoverLtr&Response-NatGasMod_010914-FINAL.pdf 01/09/2014 11:03 AM 12,455,107 HLBE_MajorModApp_010914-FINALREVISED.pdf 4 File(s) 16,026,692 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling 04/21/2014 08:06 AM <DIR> . 04/21/2014 08:06 AM <DIR> .. 04/21/2014 08:04 AM <DIR> AERMAP 04/21/2014 08:04 AM <DIR> AERMOD 04/21/2014 08:04 AM <DIR> BPIPP 04/21/2014 08:04 AM <DIR> FAR_Files 04/21/2014 08:04 AM <DIR> Figures 04/21/2014 08:04 AM <DIR> Met_Files 04/21/2014 08:04 AM <DIR> Modeling_Protocol_Documents 11/22/2013 03:10 PM 313,856 aq2-48 Model Report Form.doc 11/22/2013 12:56 PM 13,092 READ_ME.docx 2 File(s) 326,948 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMAP 04/21/2014 08:04 AM <DIR> . 04/21/2014 08:04 AM <DIR> .. 11/03/2011 12:01 PM 72,656,351 22190428.tif 03/21/2012 01:47 PM 21,626 HLB.MAP 03/21/2012 01:54 PM 24,965 HLB.Mot 03/21/2012 01:54 PM 40,174 HLB.rcf 03/21/2012 01:47 PM 202 HLB.Rmp 5 File(s) 72,743,318 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD 04/21/2014 08:04 AM <DIR> . 04/21/2014 08:04 AM <DIR> ..

Page 291: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

113

04/21/2014 01:02 PM <DIR> CO 04/21/2014 01:02 PM <DIR> NO2 04/21/2014 08:04 AM <DIR> PM10 04/21/2014 01:00 PM <DIR> PM25 04/21/2014 01:01 PM <DIR> SO2 0 File(s) 0 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\CO 04/21/2014 01:02 PM <DIR> . 04/21/2014 01:02 PM <DIR> .. 10/10/2013 01:52 PM 248,997 HLB_CO$$.LST 10/10/2013 01:47 PM 46,569 HLB_CO.DTA 11/18/2013 01:39 PM 77,181 HLB_CO_1hr_AAQS.plt 11/18/2013 01:40 PM 77,181 HLB_CO_8hr_AAQS.plt 4 File(s) 449,928 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\NO2 04/21/2014 01:02 PM <DIR> . 04/21/2014 01:02 PM <DIR> .. 11/18/2013 01:46 PM 151,040 HLB_NO2_1hr_AAQS.plt 10/10/2013 01:05 PM 435,887 HLB_NO2_1hr_T3$$.LST 10/10/2013 12:48 PM 47,050 HLB_NO2_1hr_T3.DTA 11/18/2013 01:49 PM 70,742 HLB_NO2_Ann_AAQS.plt 11/18/2013 01:50 PM 70,742 HLB_NO2_Ann_Inc.plt 10/10/2013 01:48 PM 300,987 HLB_NO2_T3_2006_NO2$$.LST 10/10/2013 01:39 PM 46,795 HLB_NO2_T3_2006_NO2.DTA 10/10/2013 01:39 PM 46,795 HLB_NO2_T3_2007_NO2.DTA 10/10/2013 01:52 PM 300,987 HLB_NO2_T3_2007_NO2.LST 10/10/2013 01:39 PM 46,795 HLB_NO2_T3_2008_NO2.DTA 10/10/2013 01:55 PM 300,987 HLB_NO2_T3_2008_NO2.LST 10/10/2013 01:39 PM 46,794 HLB_NO2_T3_2009_NO2.DTA 10/10/2013 01:58 PM 300,986 HLB_NO2_T3_2009_NO2.LST 10/10/2013 01:39 PM 46,794 HLB_NO2_T3_2010_NO2.DTA 10/10/2013 02:02 PM 301,787 HLB_NO2_T3_2010_NO2.LST 15 File(s) 2,515,168 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10 04/21/2014 08:04 AM <DIR> . 04/21/2014 08:04 AM <DIR> .. 04/21/2014 01:00 PM <DIR> Increment 04/21/2014 12:59 PM <DIR> NAAQS 0 File(s) 0 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\Increment 04/21/2014 01:00 PM <DIR> .

Page 292: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

114

04/21/2014 01:00 PM <DIR> .. 10/10/2013 09:03 AM 290,679 HLB_INC_2006_PM10$$.LST 10/10/2013 08:59 AM 67,649 HLB_INC_2006_PM10.DTA 10/10/2013 08:59 AM 67,649 HLB_INC_2007_PM10.DTA 10/10/2013 09:07 AM 290,679 HLB_INC_2007_PM10.LST 10/10/2013 08:59 AM 67,649 HLB_INC_2008_PM10.DTA 10/10/2013 09:10 AM 290,679 HLB_INC_2008_PM10.LST 10/10/2013 08:59 AM 67,648 HLB_INC_2009_PM10.DTA 10/10/2013 09:14 AM 290,678 HLB_INC_2009_PM10.LST 10/10/2013 08:59 AM 67,648 HLB_INC_2010_PM10.DTA 10/10/2013 09:17 AM 147,923 HLB_INC_2010_PM10.GRF 10/10/2013 09:17 AM 291,479 HLB_INC_2010_PM10.LST 11/18/2013 01:54 PM 77,181 HLB_PM10_24hr_Inc.plt 11/18/2013 01:53 PM 70,742 HLB_PM10_Ann_Inc.plt 13 File(s) 2,088,283 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM10\NAAQS 04/21/2014 12:59 PM <DIR> . 04/21/2014 12:59 PM <DIR> .. 10/10/2013 09:07 AM 411,002 HLB_NAAQS_2006_PM10$$.LST 10/10/2013 09:00 AM 67,795 HLB_NAAQS_2006_PM10.DTA 10/10/2013 09:00 AM 67,854 HLB_NAAQS_2007_PM10.DTA 10/10/2013 09:13 AM 411,247 HLB_NAAQS_2007_PM10.LST 10/10/2013 09:00 AM 67,854 HLB_NAAQS_2008_PM10.DTA 10/10/2013 09:19 AM 411,247 HLB_NAAQS_2008_PM10.LST 10/10/2013 09:00 AM 67,853 HLB_NAAQS_2009_PM10.DTA 10/10/2013 09:25 AM 411,246 HLB_NAAQS_2009_PM10.LST 10/10/2013 09:00 AM 67,853 HLB_NAAQS_2010_PM10.DTA 10/10/2013 09:31 AM 412,047 HLB_NAAQS_2010_PM10.LST 11/18/2013 02:00 PM 77,181 HLB_PM10_24hr_AAQS.plt 11/18/2013 01:59 PM 70,742 HLB_PM10_Ann_AAQS.plt 11/14/2013 03:35 PM 286,971 HLB_PM10_NAAQS_Ann_2006_PM10$$.LST 11/14/2013 03:29 PM 67,626 HLB_PM10_NAAQS_Ann_2006_PM10.DTA 11/14/2013 03:29 PM 67,626 HLB_PM10_NAAQS_Ann_2007_PM10.DTA 11/14/2013 03:41 PM 286,971 HLB_PM10_NAAQS_Ann_2007_PM10.LST 11/14/2013 03:29 PM 67,626 HLB_PM10_NAAQS_Ann_2008_PM10.DTA 11/14/2013 03:47 PM 286,971 HLB_PM10_NAAQS_Ann_2008_PM10.LST 11/14/2013 03:29 PM 67,625 HLB_PM10_NAAQS_Ann_2009_PM10.DTA 11/14/2013 03:54 PM 286,970 HLB_PM10_NAAQS_Ann_2009_PM10.LST 11/14/2013 03:29 PM 67,625 HLB_PM10_NAAQS_Ann_2010_PM10.DTA 11/14/2013 04:00 PM 287,771 HLB_PM10_NAAQS_Ann_2010_PM10.LST 22 File(s) 4,317,703 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\PM25 04/21/2014 01:00 PM <DIR> . 04/21/2014 01:00 PM <DIR> .. 10/10/2013 09:23 AM 407,578 HLB_PM25$$.LST 10/10/2013 09:02 AM 67,667 HLB_PM25.DTA 11/18/2013 02:03 PM 151,040 HLB_PM25_24hr_AAQS.plt 11/18/2013 02:02 PM 70,742 HLB_PM25_Ann_AAQS.plt

Page 293: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

115

4 File(s) 697,027 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\AERMOD\SO2 04/21/2014 01:01 PM <DIR> . 04/21/2014 01:01 PM <DIR> .. 10/10/2013 09:11 AM 638,546 HLB_2006_SO2$$.LST 10/10/2013 09:09 AM 41,747 HLB_2006_SO2.DTA 10/10/2013 09:09 AM 41,747 HLB_2007_SO2.DTA 10/10/2013 09:12 AM 638,546 HLB_2007_SO2.LST 10/10/2013 09:09 AM 41,747 HLB_2008_SO2.DTA 10/10/2013 09:14 AM 638,546 HLB_2008_SO2.LST 10/10/2013 09:09 AM 41,746 HLB_2009_SO2.DTA 10/10/2013 09:15 AM 638,545 HLB_2009_SO2.LST 10/10/2013 09:09 AM 41,746 HLB_2010_SO2.DTA 10/10/2013 09:16 AM 639,346 HLB_2010_SO2.LST 11/18/2013 02:14 PM 239,737 HLB_SO2_1hr$$.LST 11/18/2013 02:07 PM 41,126 HLB_SO2_1hr.DTA 11/18/2013 02:17 PM 151,040 HLB_SO2_1hr_AAQS.plt 11/18/2013 02:14 PM 77,181 HLB_SO2_24hr_AAQS.plt 11/18/2013 02:13 PM 77,181 HLB_SO2_24hr_Inc.plt 11/18/2013 02:11 PM 77,181 HLB_SO2_3hr_AAQS.plt 11/18/2013 02:13 PM 77,181 HLB_SO2_3hr_Inc.plt 11/18/2013 02:15 PM 70,742 HLB_SO2_Ann_AAQS.plt 11/18/2013 02:16 PM 70,742 HLB_SO2_Ann_Inc.plt 19 File(s) 4,284,373 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\BPIPP 04/21/2014 08:04 AM <DIR> . 04/21/2014 08:04 AM <DIR> .. 08/20/2013 02:45 PM 13,918 HLB_BPIPP_2013.PIP 08/20/2013 02:45 PM 11,070 HLB_BPIPP_2013.PRW 08/20/2013 02:45 PM 36,000 HLB_BPIPP_2013.SO 08/20/2013 02:45 PM 39,300 HLB_BPIPP_2013.SUM 08/20/2013 02:45 PM 522,406 HLB_BPIPP_2013.TAB 5 File(s) 622,694 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\FAR_Files 04/21/2014 08:04 AM <DIR> . 04/21/2014 08:04 AM <DIR> .. 12/19/2011 02:00 PM 23,682 HLB$43.8065N_95.2892W_2005NEIandFAR2G_CO__.far 12/19/2011 02:00 PM 37,733 HLB$43.8065N_95.2892W_2005NEIandFAR2G_NO2_.far 12/19/2011 02:00 PM 38,796 HLB$43.8065N_95.2892W_2005NEIandFAR2G_PM10.far 12/19/2011 02:00 PM 27,804 HLB$43.8065N_95.2892W_2005NEIandFAR2G_PM25.far 12/19/2011 02:00 PM 26,430 HLB$43.8065N_95.2892W_2005NEIandFAR2G_SO2_.far 5 File(s) 154,445 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\Figures

Page 294: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

116

04/21/2014 08:04 AM <DIR> . 04/21/2014 08:04 AM <DIR> .. 11/18/2013 01:34 PM 41,012,582 HLB Model Impact Contour Figures.pdf 11/22/2013 03:15 PM 33,280 HLB Modeling Figure List.doc 2 File(s) 41,045,862 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\Met_Files 04/21/2014 08:04 AM <DIR> . 04/21/2014 08:04 AM <DIR> .. 06/26/2013 01:04 PM 586,920 MJQMPX06.PFL 04/29/2013 03:11 PM 1,445,526 MJQMPX06.SFC 06/26/2013 01:09 PM 2,936,205 MJQMPX0610.PFL 06/26/2013 01:03 PM 7,231,084 MJQMPX0610.SFC 04/29/2013 03:12 PM 586,920 MJQMPX07.PFL 04/29/2013 03:12 PM 1,445,526 MJQMPX07.SFC 04/29/2013 03:12 PM 588,528 MJQMPX08.PFL 04/29/2013 03:12 PM 1,449,486 MJQMPX08.SFC 04/29/2013 03:12 PM 586,920 MJQMPX09.PFL 04/29/2013 03:12 PM 1,445,526 MJQMPX09.SFC 04/29/2013 03:13 PM 586,920 MJQMPX10.PFL 04/29/2013 03:13 PM 1,445,526 MJQMPX10.SFC 12 File(s) 20,335,087 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Modeling\Modeling_Protocol_Documents 04/21/2014 08:04 AM <DIR> . 04/21/2014 08:04 AM <DIR> .. 10/01/2013 08:37 AM 248,320 AQDM-02 - HLB v3 092513.xls 10/01/2013 08:37 AM 73,728 AQDM04_aq2-43_FINAL.doc 10/01/2013 08:37 AM 100,864 AQDM05_aq2-44_FINAL.doc 3 File(s) 422,912 bytes Directory of X:\Agency_Files\Outcomes\Risk_Eval_Air_Mod\Air_Modeling\Projects\06300025_HeronLakeBioEnergy\20140109_RESULTSv1\Files\CD\Revised_Forms 04/21/2014 08:04 AM <DIR> . 04/21/2014 08:04 AM <DIR> .. 01/09/2014 09:36 AM 140,808 1_aq-f1-scp01-REVISED121613.pdf 01/09/2014 09:35 AM 66,620 10_aq-f2-ch04b-SV001-SV004-REVISED121613.pdf 01/09/2014 09:35 AM 66,715 11_aq-f2-ch04b-SV005-SV009-REVISED.pdf 01/09/2014 09:35 AM 66,444 12_aq-f2-ch04b-SV017-EU054&Total-REVISED.pdf 01/09/2014 09:36 AM 125,552 13_aq-f2-ch04c-REVISED121613.pdf 01/09/2014 10:49 AM 35,426 13a_CH-04c backup.pdf 01/09/2014 09:36 AM 151,478 18_aq-f2-ch13-REVISED121713.pdf 01/09/2014 09:36 AM 41,405 8_aq-f2-ch03-REVISED122313.pdf 01/09/2014 09:35 AM 39,315 9_aq-f2-ch04-REVISED121613.pdf 9 File(s) 733,763 bytes Total Files Listed: 124 File(s) 166,764,203 bytes 53 Dir(s) 837,282,594,816 bytes free

Page 295: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

117

Page 296: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Attachment 6 - May 2011 MPCA Paved Road Modeling Policy Memorandum

Page 297: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

DEPARTMENT: POLLUTION CONTROL AGENCY SF-00006-05 (4/86)

STATE OF MINNESOTA

DATE: 5/16/11Office Memorandum

TO: Interested Parties

FROM: Chris Nelson Manager, Strategic Projects Sector Industrial Division

PHONE: 651-757-2603

SUBJECT: Air Quality Policy on Paved Roads and Fugitive Particulate Matter

The Minnesota Pollution Control Agency (PCA) has updated its policy on air dispersion modeling for particulate matter (PM) and paved road fugitive dust. The policy will maintain adequate control of paved road fugitive PM at industrial facilities while allocating air modeling and permitting resources to other projects or issues of environmental and PCA priority, thereby improving overall environmental and program outcomes. The policy applies to new facilities and physical expansions at existing facilities.

Policy

Under specific circumstances, the PCA will no longer require the inclusion of paved road fugitive PM emissions in air quality modeling analyses that support air quality permitting or environmental review. The policy covers modeling for both particulate matter less than 10 microns (PM10) and 2.5 microns (PM2.5). For comparisons with National or Minnesota Ambient Air Quality Standards, those circumstances include instances where a modeling analysis demonstrates that:

• predicted ambient impacts (modeled + background concentrations) equal less than 95% of the applicable PM10 and PM2.5 standards, and the facility air permit contains an appropriate and enforceable fugitive dust control plan or comparable permit conditions; or

• predicted ambient impacts (modeled + background concentrations) equal less than 60% of the applicable PM10 and 80% of the applicable PM2.5 standard. Requirements in Minn. R. 7011.150 to prevent avoidable PM from becoming airborne apply.

For comparisons with federal Prevention of Significant Deterioration increments, those circumstances include instances where a modeling analysis demonstrates that:

• predicted ambient impacts (net modeled concentrations) equal less than 75% of the applicable PM10

standard and 80% of the applicable PM2.5 standard, and the facility air permit contains an appropriate and enforceable fugitive dust control plan or comparable permit conditions; or

• predicted ambient impacts (net modeled concentrations) equal less than 35% of the applicable PM10

and 40% of the applicable PM2.5 standard. Requirements in Minn. R. 7011.150 to prevent avoidable PM from becoming airborne apply.

Page 298: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Exceptions will be determined on a case-by-case basis by PCA Risk Managers. Potential reasons for exceptions include public complaints about fugitive dust or indications that the policy will lead to significant increases in PM emissions from non-fugitive sources. There may also be instances where modeling for Prevention of Significant Deterioration increments may deviate from the policy. This policy does not affect quantification of fugitive PM for the purposes of permit or other rule applicability. Air quality modeling supporting permitting in maintenance areas or development of State Implementation Plans is not affected.

To implement this policy, a small team with representation from the air modeling and air permitting groups drafted a general paved road fugitive PM control plan that can be attached to or incorporated into an air permit. The plan is based on known best practices and existing requirements to keep paved roads clear of silt, spilled commodities, and other debris through regular visual inspections and maintenance. Air modeling staff will update PCA guidance documents as appropriate to reflect the policy.

Page 299: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Paved Road Fugitive Dust Permit Conditions

AQ REGUIREMENTS GUIDE

Paved Road Fugitive Dust – Applicability, Requirements Explanation of Tiers Guidance on use of Tier Help Files Screen Guidance:

The Tier approach and help file language is approved for permits that completed modeling with predicted ambient impacts (modeled + background concentrations), without the inclusion of paved road fugitive emissions, in the following ranges: 1) NAAQS predicted ambient impacts between 60-95% of the PM10 standard and 80-95% of the PM2.5 standard, or 2) PSD increment predicted ambient impacts between 35-75% of the PM10 standard and 40-80% of the PM2.5

standard.

If the facility’s predicted ambient impacts for NAAQS or PSD increment are greater than the above ranges for PM2.5 and PM10, the facility needs to remodel and include a paved road fugitive emissions source group in air quality modeling analyses which will likely result in facility-specific permit conditions.

If the facility’s predicted ambient impacts are less the above ranges for PM2.5

and PM10, there is no need to require paved road fugitive permit conditions. Exceptions will be determined on a case-by-case basis by Risk Managers. Potential reasons for exceptions include public complaints about fugitive dust or indications that the policy will lead to significant increases in PM emissions from non-fugitive sources.

Enter these requirements at the total facility level of the permit under the Source-Specific Requirements header.

Overview of Tiers Screen Guidance:

Tier 1. Low likelihood of paved road fugitive dust. For example, the facility’s paved surface traffic is limited to employee parking and minimal third party truck traffic, it is unlikely that traffic would track dirt from a nearby unpaved surface to the paved surfaces, and it is unlikely that dust would be generated from products hauled by trucks. As needed corrective actions.

Tier 2. Moderate likelihood of paved road fugitive dust. For example, the facility’s paved surface traffic is limited to employee parking and moderate third party truck traffic (approx. less than 100 vehicles per day), it is possible that traffic would track dirt from a nearby unpaved surface to the paved surfaces, or it is possible that dust could be generated from products hauled by trucks with open beds. Weekly inspections, corrective actions, and recordkeeping.

Page 300: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Tier 3. High likelihood of paved road fugitive dust. For example, the facility’s paved surface traffic has high levels of third party truck traffic (approx. more than 100 vehicles per day), it is likely that traffic would track dirt from a nearby unpaved surface to the paved surfaces, or it is likely that dust could be generated from products hauled by trucks with open beds. Daily inspections, water/chemical application, speed limit, and recordkeeping.

Tier 4. Case-by-case requirements to supplement Tier 3 requirements as needed.

TIER 1 Citations

Minn. R. 7011.0150; Minn. R. 7007.0800, subp. 2Requirements

The facility shall take reasonable measure to prevent particulate matter from becoming airborne.The Permittee shall minimize or eliminate fugitive emissions from all paved surfaces. If fugitive emissions from paved surfaces are observed, the Permittee shall record the date that fugitive dust was observed, what corrective actions were taken, when the corrective actions were taken, and whether the corrective actions eliminated the fugitive dust.

TIER 2 Citations

Minn. R. 7011.0150; Minn. R. 7007.0800, subp. 2 Requirements

The facility shall take reasonable measure to prevent particulate matter from becoming airborne.During each week of operation the Permittee shall visually inspect all paved surfaces to minimize or eliminate fugitive emissions. The facility shall maintain a record of this inspection that includes the date of the inspection, whether fugitive dust was observed, what corrective actions were taken, when the corrective actions were taken, and whether the corrective actions eliminated the fugitive dust.

Page 301: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

TIER 3 Citations

Minn. R. 7011.0150; Minn. R. 7007.0800, subp. 2 Requirements

The facility shall take reasonable measure to prevent particulate matter from becoming airborne.On each day of operation, the Permittee shall visually inspect all paved surfaces to minimize or eliminate fugitive emissions. The facility shall maintain records of this inspection that include the date of the inspection, whether fugitive dust was observed, what corrective actions were taken, when the corrective actions were taken, and whether the corrective actions eliminated the fugitive dust. Anytime fugitive emissions are observed on facility roadways, the Permittee shall immediately eliminate fugitive emissions by sweeping those road segments and/or apply water or a chemical dust suppressant. The Permittee shall implement and enforce a facility-wide speed limit of 15 miles per hour. The Permittee must post the speed limit in a highly visible location near the facility entrance.

TIER 4 Citations

Minn. R. 7011.0150; Minn. R. 7007.0800, subp. 2

Requirements The Permittee shall sweep all paved surfaces on each day of operation. The Permittee shall keep a record of the dates of operation and dates when sweeping occurred. The Permittee shall wash paved surfaces on each day of operation using a high pressure, low volume water spray. The Permittee shall keep records of the date and duration of each water application.The Permittee shall keep a daily record of the trucks entering the facility.

The Permittee shall install and operate a truck wash. Each time a truck enters the facility it must remove excess particulates from its exterior in the truck wash. The Permittee shall keep a daily record of the trucks entering the facility and a daily record of the trucks using the wash. During winter months, the Permittee shall apply only salt, not sand to paved surfaces.

All trucks with open beds that enter the facility shall have covers to minimize dust generation from the products hauled. The Permittee shall not allow trucks without covers to make any product deliveries or pick-ups. The Permittee shall implement and enforce a facility-wide speed limit of 10 miles per hour. The Permittee must post the speed limit in a highly visible location near the facility entrance. The Permittee shall implement and enforce a facility-wide speed limit of 5 miles per hour. The Permittee must post the speed limit in a highly visible location near the facility entrance.

Page 302: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

Attachment 7 - EPA Environmental Justice Screening Email

Page 303: TECHNICAL SUPPORT DOCUMENT For … · Heron Lake BioEnergy is a dry mill corn ethanol production ... is conducted at worst case conditions ... (acetaldehyde, acrolein, formaldehyde,

From: Olson, Beckie (MPCA) Sent: Thursday, April 03, 2014 7:07 AM To: Cole, Marshall (MPCA) Subject: FW: Environmental Justice - Jackson County, MN FYI From: Rineheart, Rachel [mailto:[email protected]] Sent: Thursday, April 03, 2014 7:07 AM To: Olson, Beckie (MPCA); Darrow, Jennifer Subject: RE: Environmental Justice - Jackson County, MN EJ concerns are unlikely in this area. From: Olson, Beckie (MPCA) [mailto:[email protected]] Sent: Thursday, April 03, 2014 6:55 AM To: Rineheart, Rachel; Darrow, Jennifer Subject: Environmental Justice - Jackson County, MN Hello. The MPCA intends to begin work on issuing a Major Modification Air Emissions Permit to Heron Lake BioEnergy LLC located at 91246 390th Ave, Heron Lake, MN 56137 (Jackson County). Is this an area where environmental justice might be an issue to consider? If you have an interest in this proposed project, please contact the assigned permit engineer, Marshall Cole, either by phone at 507-206-2653 or by email at [email protected]. Thank you, Beckie Olson State Programs Administrator Technology Specialist St. Paul Office [email protected] 651-757-2123