Testing Turnaround and HMA QC/QA Subtask Group Joint Meeting DENNIS DVORAK, PAVEMENT AND MATERIALS ENGINEER RESOURCE CENTER 9/29/2015
Transcript
Page 1: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Testing Turnaround

and HMA QC/QA

Subtask Group

Joint Meeting

DENNIS DVORAK, PAVEMENT AND

MATERIALS ENGINEER

RESOURCE CENTER

9/29/2015

Page 2: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

2007 Section 39 Peer Review

2

QC/QA

Stability values

Dispute Resolution

Penalties

NDI vs Cores

Moisture Content

Page 3: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

2007 Peer Review

3

QC/QA recommendations:

Sublot size of 750 Ton

Maximum lot size of 20 sublots

Use t-test for validating contractor test results

Volumetric properties should be used for acceptance

Testing turnaround of 1-3 days

Page 4: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Maine

Use State Tests for Acceptance

3 business days testing turnaround

Contractor transports samples to lab next

day

Maine DOT tests within 2 business days

Contractor and RE are provided results via

E-mail within 24 hours of test completion

4

Page 5: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Maine

Contractor transports samples to lab next

business day

Sample security?

5

Page 6: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Recommendation DEVELOP AND IMPLEMENT UPDATED

TTECHNICIAN CERTIFICATION PROGRAM FOR ALL TESTERS (5 YEAR)

Training

Written Test

Proficiency Test

Passing IA checks (witness and split sample testing as appropriate) during previous 2 years can serve as proficiency test for recertification

6

Page 7: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Recommendation

Independent Assurance

Continue system approach where at least

90% of active testers are checked annually

7

Page 8: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Recommendations Caltrans should not provide results of acceptance

tests until comparison lot (t-test) is complete and all QC test results provided by contractor

Specification should allow new pay lot to start when the a specific mix design has not been placed on project for 30 days (minimum of 3 QC tests).

Multiple pay lots can be combined into one comparison lot (minimum of 4 and maximum of 7 Caltrans acceptance tests)

8

Page 9: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Recommendation

Caltrans should provide contractors

opportunity to conduct split sample or

proficiency sample testing once or twice

a month to ensure that both labs can get

similar results

9

Page 10: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Quality Characteristics used

for Acceptance

10

Quality Characteristic Number of States

Va (Laboratory Air Voids) 43

Density 52

Smoothness 50

%Asphalt Content 45

VMA 32

*2014 FHWA Quality Assurance Assessment Update

Page 11: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

PWL

Used in 30 states

11

Page 12: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Ignition oven and post-

production gradations

Ignition oven

Used in majority of states

Aggregate from burn-off used for

gradation acceptance

12

Page 13: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Recommendations

Va, Density, Smoothness as Pay factors

Could add %AC, VMA and one or two

critical sieves as Pay Factors

Use ignition oven and post-production

gradation

PWL to calculate pay factors

Shut-down criteria for tests without pay

factors

13

Page 14: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Recommendation

Eliminate Maximum Aggregate

Temperature

Use post-production gradation from ignition

oven (or extraction if aggregate has

excessive break down)

Ensure that PG binder grade is not effected

14

Page 15: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Variability in RHMA-G mix

designs

Caltrans allows contractor to vary

number of gyrations and pressure during

mix design

No other state allows number of gyrations

and pressure to change

Page 16: Testing Turnaround and HMA QC/QA Subtask Group Joint Meetingfiles.ctctcdn.com/109c4b78001/3630d08c-1c07-4a34-b41a-e4... · 2015-10-02 · Joint Meeting DENNIS DVORAK, PAVEMENT AND

Recommendation

Standardize number of gyrations and

pressure within three years

Caltrans should not allow contractor to

change number of gyrations and pressure

after mix design approval (unless new mix

design approved)

16


Recommended