THE HUMAN ASPECT OF THE FUKUSHIMA DAIICHI ACCIDENT
Takafumi ANEGAWA
Tokyo Electric Power Company
MagnitudeofEarthquakeandTsunami
震源
原⼦⼒発電所
Seismic intensity distribution of present earthquake
Source area of present earthquake (Created by Earthquake Research Institute, University of Tokyo)
Source of present tsunami (Created by TEPCO)
Earthquake time: Match 11, 2011 (Friday), 2:46 PM • Site of occurrence: Off the Sanriku coast (lat. 38º 06.2′N, long. 142º 51.6′ E.), Focal depth: 24 km • Magnitude of earthquake: 9.0 • Intensity at each location: Kurihara City, Miyagi Prefecture - Intensity 7 • Intensity 6 Upper: Naraha, Tomioka, Okuma and Futaba town in Fukushima Prefecture • Intensity 6 Lower: Ishinomaki City and Onagawa town in Miyagi Prefecture, Tokai village in Ibaraki
Prefecture
©Tokyo Electric Power Company, Inc. All Rights Reserved.
DamagetoFukushimaDaiichiNPS(1)
FloodedAreasatFukushimaDaiichiNPS©Tokyo Electric Power Company, Inc. All Rights Reserved.
DamagetoFukushimaDaiichiNPS(2)
Confirmation result for the main flooding route by on-site confirmation surrounding the building (1) Building entry/exit (2) Equipment hatch (3) Emergency D/G air supply louver (4) Trench, duct (penetration of cables) etc. ⇒ Flooding of D/G, electric panel room etc. through these. Unit 1 containment seawater cooling system pump
Unit 1 D/G (1B)
Unit 1 power panel at turbine building level 1
Unit 5 sea side seawater pump area
©Tokyo Electric Power Company, Inc. All Rights Reserved.
MCRLayoutattheCmeoftheAccident
4 to 5 auxiliary equipment operators
MCRforUnit1
MCRforUnit2
Shi>supervisor
deputysupervisor
senioroperator
SeniorOperator
auxiliaryoperator
auxiliaryoperator
auxiliaryoperator
auxiliaryoperators
operator
operatordeputysenioroperator
©Tokyo Electric Power Company, Inc. All Rights Reserved.
IsolaConCondenser(IC)
DamagetoFukushimaDaiichiNPS(3)
OperaDngStaffhadtoworkatMCRswithverylimitedlightning
TsunamithathitthepowerstaDon
©Tokyo Electric Power Company, Inc. All Rights Reserved.
ICoperaConaIertheEarthquake
①
②
③ ④
⑤
0 2 4 6 8
MPa ① Scrambytheearthquake 14:46 ② PressureincreaseduetoMSIVclosure ③ DepressurizaDonduetoICoperaDon 14:52 ④ PressureincreaseduetostopofIC ⑤ pressurechangerelatedtoICoperaDon(esDmaDon)
around 15:30: end of data recording
RPVpressurechart
Unit1MCR
3A4A
1A 2A
©Tokyo Electric Power Company, Inc. All Rights Reserved.
OrganizaConchartofsiteERC
R/B4F ICVentpipe
R/B
C/B
InformaDonTeam
1.Send/receive informaDon with the Headquarter inTokyo2.GatherinformaDonfromeachteam
NoDficaDon
Team1.NoDce&Liesonw/externalrelatedorganizaDons
PRTeam 1.Respondtomassmedia Engineering
Team
1.Assesstheaccidentstatus2.EsDmatescopeoftheimpact3.Studymeasurestopreventspreadofaccident
SafetyTeam1.StatuscheckofradiaDoninandoutofthesite2.ExposureandcontaminaDoncontrol3.EsDmatethecopeofimpact
HQ(GeneralManagement)
GeneralManager:
NuclearSafetyManager(Site
Superintendent)
R e c o v e r y
Team
1.Form&implementemergencyrestoraDonplan2.Createplantorestorefromtheaccident3.FirefighDngacDvity
P o w e rGeneraDonTeam
1.Graspthestatusoftheaccident2.Take measures needed to prevent the accident fromspreading3.MainDansecurityofthesitefacility
M a t e r i a l
Team1.Procure&transportmaterials2.Procuremobileresources
W e l f a r e
Team1.Procurefoodsandclothes2.ArrangeaccommodaDons
M e d i c a l
Team1.Medicalsupport
G e n e r a lAffairsTeam
1.ShareinformaDonwithinthesite2.Establsih&OperatetheCounter-measureHeadquarter3.Gatherandmoveresources4.Otheritems
Patrolling /
G u i d a n c eTeam
1.On-sitepatrolling2.EvaluaDon/guidanceofvisitors3.OperatephysicalprotecDvefacility ©Tokyo Electric Power Company, Inc. All Rights Reserved.
Deputydirector
SRE(5-6U)DisasterprevenDonandsafetyGrmanager
SeniorReactorEngineer(1-4U)
24
1314
15
16
17
18
19
20
21
22
23
1
2
3
4
5
6
7
8
9
10
11
12
Safetyteamleader
Deputydirector
Welfareteamleader
GeneralAffairsteamleaderResourceteamleader
Security/guidanceteamleader
ExternalCommunicaDonteamleader
NoDficaDonteamleader
Medicalteamleader
Director
InformaDonteamleader
Deputydirector
Deputydirector
Deputydirector
Deputydirector
SeniorDirector
PowergeneraDonteamleader
RestoraDonteamleader
25
Qualityandsafetyseniormanager
Engineeringteamleader
DisasterprevenDonseniormanager
FloorplanatthesiteERC
©Tokyo Electric Power Company, Inc. All Rights Reserved.
SPDSinformaDon(safetyparameterdisplaysystem)isdisplayedinlarge-sizedscreens,roundtableandsmallmonitorsforeachteam.Staffcancheckandmonitorthelateststatusoftheplant.
EmergencyResponseCenter
ShareinformaDonvialargescreens
(RoundTableandTeams)ShareinformaDonviasmallmonitors
Reference)communicaConduringnormaloperaCon
©Tokyo Electric Power Company, Inc. All Rights Reserved.
ICoperaConaIertheTsunami
©Tokyo Electric Power Company, Inc. All Rights Reserved.
FloorplanofUnit1RectorBuilding
R/B
Doubledoors
C/B
T/B
©Tokyo Electric Power Company, Inc. All Rights Reserved.
LogicsequenceofICoperaCon
◆AutomaDcStart
CSlocaDonAUTO
RPVpressurehigh(A)
OutersidecontainmentisolaDonvalveMO-3A OpenMO-3B Open
◆AutomaDcShutdown
RPVpressurehigh(C)RPVpressurehigh(B)RPVpressurehigh(D)
7.13MPa
7.13MPa7.13MPa
7.13MPa
ConDnuefor15sec.
CSlocaDonAUTOPipingdifferenDalpressurehigh(subsystem-A)STEAMdPS-1349-A,C
ContainmentisolaDonvalvesinsidePCVMO-1AClosed
ContainmentisolaDonvalvesoutsidePCVMO-2AClosed
OutersidecontainmentisolaDonvalveMO-3A
IsolaDonvalvesinsidecondenserMO-4A
MO-17AClosedMO-20AClosed
PipingdifferenDalpressurehigh(subsystem-A)WATERdPS-1350-A,C
62.27kPa
31.87kPaCSlocaDonAUTO
PipingdifferenDalpressurehigh(subsystem-B)STEAMdPS-1349-B,D
ContainmentisolaDonvalvesinsidePCVMO-1BClosed
ContainmentisolaDonvalvesoutsidePCVMO-2BClosed
OutersidecontainmentisolaDonvalve MO-3B
IsolaDonvalveinsideIC MO-4BClosed MO-17BClosed MO-20BClosed
PipingdifferenDalpressurehigh(subsystem-B)WATERdPS-1350-B,D
62.27kPa
49.82kPa?
©Tokyo Electric Power Company, Inc. All Rights Reserved.
AlternaCvewaterinjecConlines
FilteredWaterTank
CondensateStorageTank
FireexCnguishingsystemElectricpump
D/Gpump
Electricpump(stand-by)
ElectricpumpCondensateWaterMakeupSystem
CoreSpraySystemCVCoolingSystem
PV
Drywell
Suppressionpool
MO
MO
MO
MO
FireEnginesSourcesback-c leaningvalvespits,etc.(seawater,etc.)
AlternaDvewaterinjecDonfromCSTAlternaDvewaterinjecDonlinefromFP
AlternaDvewaterinjecDonlinefromfireengines
©Tokyo Electric Power Company, Inc. All Rights Reserved.
DesigndocumentandTrainingmaterialforOperators
Design documents and training manuals for operators
©Tokyo Electric Power Company, Inc. All Rights Reserved.
ICoperaCon
Movie when IC is activated
©Tokyo Electric Power Company, Inc. All Rights Reserved.
ImprovedoperaCngcrewstaffing
JudgeoperaDonInstruct/ordertooperators
Oversight&operaDon
ApairofworkersformateamtorespondthefieldbasedontheinstrucDonofthedeputyshi>operator.
Oversight/operaDon/instrucDon
Shi>supervisor
deputysenioroperator
deputysenioroperator
senioroperator mainequipmentoperator
Senioroperator mainequipmentoperator
auxiliaryequipmentoperator
auxiliaryequipmentoperator
Senioroperatorordeputysenioroperator
auxiliaryequipmentoperator
auxiliaryequipmentoperator
auxiliaryequipmentoperator
Senioroperatorordeputysenioroperator
auxiliaryequipmentoperator
OperaDontorespondthefield
OperaDontorespondthefield
StructureofUnit7duringtheevent
StructureofUnit6duringtheevent
Liaison/coordinatewithEMRCoordinateamongunitreactorsMonitordeputysenioroperator
FieldSupport(IniDalfireexDncDon,etc.)
auxiliaryequipmentoperator
auxiliaryequipmentoperator
Staffinchargeoffieldsupport
Field
MCR
Unit7underoperaCon Supportshi>supervisoroperaDonCoachingandskilltransfertooperatorsGrasptheplantstatus
(when2plantsareinoperaCon:18crew+1STA)
Unit6underoperaCon
Oversight/operaDon/instrucDon
JudgeoperaDonInstruct/ordertooperators
Oversight&operaDon
©Tokyo Electric Power Company, Inc. All Rights Reserved.
IntroducConofICSconcept
(Before)Build12funcDonalteamsinparallelundertheDirector. (A>er)NarrowtheDirector’sspanofcontrolandstraDfygroupsbyfuncDon
PRteam Director
thenucleardisasterprevenDonmanager(sitesuperintendent)
NoDficaDonteam
InformaDonteam
Engineeringteam
RestoraDonteam
Securityteam
PowergeneraDonteam
Resourceteam
Welfareteam
Medicalteam
GeneralAffairsteam
Patrolling/guidanceteam
SRE
SafetyAuditor
U1-5Controller
Unit7Controller
RestoraDonteamU1-5)
GeneralAffairsteam
Resourceteam
Site/PRteam Externalresponsecontroller
NoDficaDonteam
PlanningteamU1-5
PlanningteamU6-7
Securityteam
Planning/
InformaCon
Director DisasterPrevenDon
Controller(SiteSuperintendent)
Decisionmaking/command
LogisDcs/resourcemanagement
InternalcommunicaDon
ExternalcommunicaDon
DatacollecDon/planning
Unit6Controller
Unitteam(U1-5)
RestoraDonteam(U6)
Unitteam(U6)
RestoraDonteam(U7)
Unitteam(U7)
©Tokyo Electric Power Company, Inc. All Rights Reserved.
ImprovedcommunicaContools
TSCMCR
Plant data transmission
system
(Wireless network)
Wired network (existing since
before the accident)
Safety Related Parameter
Display system
Satellite phone system
Radio communication
tool
Satellite phone system
Radio communication
tool
Enhanced diversity of communication tools between MCRs and TSC
©Tokyo Electric Power Company, Inc. All Rights Reserved.
HPCIdatachartatUnit3
21
-4000
-2000
0
2000
4000
6000
3/12 6:003/12 9:003/12 12:003/12 15:003/12 18:003/12 21:003/13 0:003/13 3:003/13 6:003/13 9:003/13 12:003/13 15:00
原子炉水位(燃料域※1)(A)(mm)
原子炉水位(燃料域※1)(B)(mm)
当直引継日誌別紙 水位※2(mm)
0.00
2.00
4.00
6.00
8.00
10.00
3/12 6:003/12 9:003/12 12:003/12 15:003/12 18:003/12 21:003/13 0:003/13 3:003/13 6:003/13 9:003/13 12:003/13 15:00
A系 原子炉圧力(MPa abs)
当直引継日誌別紙 原子炉圧力(MPa abs)
運転中(7.1MPa abs)
逃がし弁機能設定圧力(7.54,7.61,7.68MPa abs)
設計圧力(8.7MPa abs)
運転圧力(7.1MPa abs)
0.000
0.200
0.400
0.600
0.800
1.000
3/12 6:003/12 9:003/12 12:003/12 15:003/12 18:003/12 21:003/13 0:003/13 3:003/13 6:003/13 9:003/13 12:003/13 15:00
S/C圧力(MPa abs)
D/W圧力(MPa abs)
当直引継日誌別紙 S/C圧力(MPa abs)
当直引継日誌別紙 D/W圧力(MPa abs)
運転中(0.11MPa abs)
設計圧力(0.49MPa abs)
1号機原子炉建屋爆発(15:36)TAF到達<地震発生後約42時間>(9:10頃)
炉心損傷開始[水素発生開始]<地震発生後約44時間>(10:40頃)
<MAAP解析>
TAF
L-0(-1220mm)
L-1(450mm)
L-2(2950mm)
L-8(5655mm)
NWL(5327mm)
S/C
, D/W
pressu
re
[M
Pa abs]
RP
V pre
ssure
[M
Pa abs]
©Tokyo Electric Power Company, Inc. All Rights Reserved.
RP
V w
ater le
vel
[m
m]
HPCI(HighPressureCoreInjecCon)systematUnit3CondensateStorageTank
RPV MO
MainSteamTube
MO
FIC
MO
StreamVolumeControl
Turbine
MO
MO
MO
WaterSourceSwitchLineMO
PressureControlRoom
MO
HO
HO
AO
WaterSup
plySystem
TurbineStopValve
RegulatorValve
RCV
MO
MinimumFlowBypassValve
MinimumFlowLine
InjecDonLine
SteamTube
MO
TestLine
MO
TestBypassValve
©Tokyo Electric Power Company, Inc. All Rights Reserved.
Filtered Water Tank
Condensate Storage Tank
E l e c t r i c a l Pump
Electrical Pump(Standby)
Electrical PumpCondensate Water Makeup System
S u p p r e s s i o n Pool
DrywellCondensate Water Makeup System
L o w P r e s s u r e Water Injection
RCV Cooling
Pressure Vessel Head Spray 消火系
Con
den
sate
Water
Makeup
System
Fire Extinguishing System
C o n d e n s a t e Water Makeup System
Pr
es
su
re
Vessel
Condensate Water Makeup System
Suppression Pool Spray
D/G Pump
MO MO
MO
MO MO
MO
MO
MO
MO MO
Fire Engines
WaterinjecConbyfireengines
©Tokyo Electric Power Company, Inc. All Rights Reserved.
【HPCI Shutdown and Responses Afterwards】
n Operators thought they could manually open SRV only with the light of the indicator lamp. The status should have been carefully checked,
n They should have prepared necessary gas (nitrogen cylinder) to start-up and D/C power to drive the solenoid valve in advance.
n Depressurizing should have been conducted with keeping HCPI’s operation, and then inject cooling water via D/D FP.
n Similar to the situation we had with IC, risk analysis of the HPCI shutdown was not sufficient.
【On information sharing before HPCI shutdown】
n The idea to stop HPCI was shared among shift team and TSC Power Generation team, while it took one hour for the entire TSC to recognize it .
⭕It is necessary for the site to have a structure that can endure simultaneous events in multiple units and continuous response for the long term.
LessonsfromHPCIoperaConatUnit3
©Tokyo Electric Power Company, Inc. All Rights Reserved.
Conclusions
Our Resolution: We will never forget the Fukushima Nuclear Accident. We will increase the level of safety today more than yesterday and tomorrow more than today, and we will become a nuclear operator that continues to create unparalleled safety.
©Tokyo Electric Power Company, Inc. All Rights Reserved.