REMINDER Check in on the COLLABORATE mobile app The Primavera Suite: How the tools work together Session ID#: 15466 Prepared by: Alexander Vos Director of Scheduling Peter Kiewit Sons
Transcript
Page 1: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

REMINDERCheck in on the

COLLABORATE mobile app

The Primavera Suite: How the tools work togetherSession ID#: 15466

Prepared by:Alexander VosDirector of SchedulingPeter Kiewit Sons

Page 2: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

IntroductionAlexander VosDirector of Scheduling■ Peter Kiewit Sons for 6 years■ From: Oak Ridge, NC■ Live in Omaha, NE■ Experience in both construction field and IT

Page 3: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

■ Engineering and Construction■ North America and Australia■ Multiple Markets and Industries

Page 4: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14
Page 5: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Objectives

■ Explain how data is transferred between the applications▪ Publishing▪ ETL

■ Explain the architecture of the overall system

■ How administration of this new system has changed

Page 6: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

PrimaveraProfessional (VDI)

XENA

Primavera EPPM (Web 

Based)

Import/ Export

Updates

KMC

EPPM Dashboards

ETLETL

Analytics

Dashboards

BI Publisher REPORTS ETLETL

Primavera 

Member

Primavera Team 

Member

iOS

HTTP

Context Sensitive Help

Overall Environment

Page 7: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Oracle Database - Production

Energy

Infrs

Tech/IM

X01

X02

Page 8: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Primavera Production Database

■ Oracle Database R11■ Where All Data Resides

▪ 5 Databases— Energy

— Infrastructure

— Estimating

— KCI

— X01 - Exception

Page 9: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

PrimaveraProfessional (VDI)

XENA

Primavera EPPM (Web 

Based)

Import/ Export

Updates

KMC

EPPM Dashboards

ETLETL

Analytics

Dashboards

BI Publisher REPORTS ETLETL

Primavera 

Member

Primavera Team 

Member

iOS

HTTP

Context Sensitive Help

Primavera Professional (Client)

Page 10: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

P6 Windows (Desktop) Client

• ‘Heavy lifting’• TIAs (Time Impact

Analysis)• VDI (Virtual Desktop

Infrastructure)

Roles• Schedulers• Schedule Managers

Primavera P6 Release 8 “R8.2 Client”

Page 11: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

PrimaveraProfessional (VDI)

XENA

Primavera EPPM (Web 

Based)

Import/ Export

Updates

KMC

EPPM Dashboards

ETLETL

Analytics

Dashboards

BI Publisher REPORTS ETLETL

Primavera 

Member

Primavera Team 

Member

iOS

HTTP

Context Sensitive Help

Primavera EPPM (Web Based)

Page 12: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

■ Oracle 11.2.0.2+ Enterprise■ Oracle Linux 64 Bit■ 3TB Storage

Primavera EPPM (Web Based)

Page 13: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

EPPM PortfoliosProject Codes help organize the projects in the EPS (Enterprise Project Structure) in groups according to specific categories, such as district, Type of Schedule, and Contract Type.   By assigning project Codes P6 can filter, sort and provide reporting information for Kiewit Projects.

By entering in Project Codes using “Kiewit Standard Project Code 

Assignment” Layout custom EPPM dashboards are populated.

Portfolio DrivesPortfolio Drives

Project Codes define portfolio criteria

Project Codes define criteria for the Dashboard

Page 14: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Primavera Release 8.2 EPPM■ Web based access to Database

Page 15: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Primavera Release 8 “R8.2 Web”• Role-based Views• Portfolio focused

Dashboards• Project-based

Collaboration Workspace• Risk Register• Project Documents• Issues• Team Communication

• Geospatial

Page 16: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

EPPM Dashboards

Page 17: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14
Page 18: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

EPPM Enhancements

■ “Link selected” in order of clicks■ Control arrows for hierarchy■ Right click collapse all

Page 19: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

PrimaveraProfessional (VDI)

XENA

Primavera EPPM (Web 

Based)

Import/ Export

Updates

KMC

EPPM Dashboards

ETLETL

Analytics

Dashboards

BI Publisher REPORTS ETLETL

Primavera 

Member

Primavera Team 

Member

iOS

HTTP

Context Sensitive Help

Primavera Analytics

Page 20: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Proprietary and Confidential

• Advanced ‘Drill Down’ / Analytical Dashboards & Reports

• Trends• Robust Ad-hoc reporting• Geospatial reports• Combine third party data for joint

analysis

• Roles• Schedulers• Schedule Managers• District Management• Corp Management

Primavera Analytics

Page 21: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Primavera Analytics - Dashboards

Page 22: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Primavera Analytics

Page 23: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

■ P6 Analytics R3.1■ Oracle Linux 64 Bit■ 4 Core – 16 GB Ram■ 100GB Storage

Primavera Analytics

Page 24: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Earlier Versions

Page 25: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Primavera Analytics

PxSchema

Page 26: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Primavera Analytics - Publishing

Energy

Infrs

Tech/IM

X01

X02

Page 27: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

■ Px Schema▪ Life line of Analytics▪ Only fields in Px Schema are available in Analytics

Primavera Analytics - Publishing

Page 28: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Primavera Analytics – ETL(Extract Transform Load)

Energy

Infrs

Tech/IM

X01

X02

Page 29: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

■ Extracting data from PMDB

■ Transforming it into format acceptable to Star Schema

■ Loading into Star Schema

Primavera Analytics – ETL(Extract Transform Load)

Page 30: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Primavera AnalyticsEnhancements

■ Add Successor and Predecessor fields to Analytics■ More training available■ Analytics UPK packages

Page 31: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

PrimaveraProfessional (VDI)

XENA

Primavera EPPM (Web 

Based)

Import/ Export

Updates

KMC

EPPM Dashboards

ETLETL

Analytics

Dashboards

BI Publisher REPORTS ETLETL

Primavera 

Member

Primavera Team 

Member

Publish

Hourly

Hourly

iOS

HTTP

Context Sensitive Help

Business Intelligence Publisher

Page 32: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

■ Java JDK 1.6.0_27■ WebLogic 11gR1 (10.3.5)■ Oracle Linux (64 Bit)■ 8 Core - 16GB Ram■ 250 GB Storage

Business Intelligence Publisher

Page 33: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

■ Star Database – Analytics▪ Extended Schema▪ Hierarchical Relationships▪ Efficient & Flexible Analysis

■ ODS (Operational Data Store) – BI Publisher▪ Simplified & Easy to Understand for Reporting▪ Views Similar to P6 EPPM

— OBS, project, cost, and resource data

Star Database vs. ODS

Page 34: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

PrimaveraProfessional (VDI)

XENA

Primavera EPPM (Web 

Based)

Import/ Export

Updates

KMC

EPPM Dashboards

ETLETL

Analytics

Dashboards

BI Publisher REPORTS ETLETL

Primavera 

Member

Primavera Team 

Member

iOS

HTTP

Context Sensitive Help

Primavera Team Member

Page 35: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Proprietary and Confidential

Team Member Updates

• Simplified ‘no training’ Project Statusing

• Web Application• iPhone Application• E-mail Statusing

• Roles• Schedulers• Superintendents• Subcontractors• Superintendents

Page 36: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Team Member App Updates – iOS App

Page 37: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

• Quickly update tasks via Web• Requires little to no training• Predecessor and successor

P6 Team Member - Web App

Page 38: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

P6 Team MemberEnhancements

■ Edit Resource Assignment UDFs in Team Member

Page 39: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

PrimaveraProfessional (VDI)

XENA

Primavera EPPM (Web 

Based)

Import/ Export

Updates

KMC

EPPM Dashboards

ETLETL

Analytics

Dashboards

BI Publisher REPORTS ETLETL

Primavera 

Member

Primavera Team 

Member

Publish

Hourly

Hourly

iOS

HTTP

Context Sensitive Help

Primavera User Productivity Kits (UPK)

Page 40: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

■ Technical Info▪ IIS Server▪ SQL Database

Primavera User Productivity Kits (UPK)

Page 41: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

• Animated Demonstrations• See it! Try it! Do it! Print it!• Primavera Library• Develop Kiewit specific• Processes / Other

Applications• Minimize training / retraining• Reduce Support calls

• Roles• Schedulers• Super Users• Schedule Managers• Off Site Users

Primavera User Productivity Kits (UPK)

Page 42: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

UPK Creation – Record It

■ Adds “team member” functionality for UPK

■ Scheduler can create training video and allow admin to approve and publish to web

Page 43: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Proprietary and Confidential

UPK Record It Licenses

• Rules of Engagement• Script is available via KCI

• Wizard Based• End Users Ability to Create Videos

Page 44: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Overall Administration

■ All admin features are in EPPM■ “Loading” master data now requires coding instead of SDK

Page 45: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14

Conclusion

■ The overall Primavera Suite is now much more than a database and a “thick client”

■ Multiple moving parts which DBA’s, SA’s, need to work hand in hand with “functional” people

■ Administration of Primavera requires more knowledge of coding (SDK vs API)

Page 46: The Primavera suite   how the tools work together - Oracle Primavera Collaborate 14