TPM Diagnostic 4/15/2010 Rev B A. TPM Organization Traditional 1 2 3 4 TPM 5 A.1 Leadership Vision – It is essential that top management have a strong commitment to TPM and understand what that commitment entails. Establishing a favorable environment is management’s primary responsibility. Top management must inform their employees of this decision and communicate enthusiasm for the program. A.1.1 Quality of TPM Vision 1-2 Elements 3-4 Elements 5-6 Elements 7-8 Elements 9 Elements The TPM vision optimizes equipment effectiveness, eliminates breakdowns and promotes autonomous operator maintenance through day- to-day activities. Elements: Active commitment from director to shop floor A can-do approach Use OEE to promote achievement, pride and ownership. Increase the knowledge of TPM Eliminate the six big losses and show reasons why Promote and improve Small Group Activity teamwork Understand and use all equipment performance measurements. Achievable short, medium and long term goals Develop belief in TPM by using results communicated to all. A.1.2 Vision Deployment Management and the workforce have been educated/trained, understand and embrace the vision of lean production. Management has not communicated a vision of TPM Less than 10% of management and the workforce understands the vision. Less than 50% of management and the workforce understands the vision. Less than 70% of management and the workforce understands the vision. More than 71% of management and the workforce understands the vision. A.1.3 Basic Organization Structure The concept of a TPM system is used to organize maintenance and support required to produce product Organization is process based (traditional functional organization structure). 6 or 7 elements of authority are vested in the product-based organization. 8 or 9 elements of authority are vested in the product-based organization. 10 to 11 elements of authority are vested in the product-based organization. 12 or more elements of authority are vested in the product-based organization. Elements of production system authority: 1. Physical maintenance organization 2. Personnel assignments 3. Cellularization 4. Organization of factory teams 5. Quality polices and practices 6. Supplier/spares integration 7. Inventory policies 8. Metrics and measurement (including waste) 9. Reporting lines of support functions 10. Continuous process improvement approach 11. Gain sharing policies for workforce 12. Job stability policies for workforce 13. Manufacturing practices and processes. Page 1 of 3
Transcript
Page 1: Tpm Diagnostic              4

TPM Diagnostic 4/15/2010 Rev B

A. TPM OrganizationTraditional

1 2 3 4

TPM

5

A.1 LeadershipVision – It is essential that top management have a strong commitment to TPM and understand what that commitment entails. Establishing a favorable environment is management’s primary responsibility. Top management must inform their employees of this decision and communicate enthusiasm for the program.

A.1.1 Quality of TPM Vision 1-2 Elements 3-4 Elements 5-6 Elements 7-8 Elements 9 ElementsThe TPM vision optimizes equipment effectiveness, eliminates breakdowns and promotes autonomous operator maintenance through day-to-day activities.

Elements:Active commitment from director to shop floorA can-do approachUse OEE to promote achievement, pride and

ownership.Increase the knowledge of TPMEliminate the six big losses and show reasons why

Promote and improve Small Group Activity teamworkUnderstand and use all equipment performance measurements.Achievable short, medium and long term goalsDevelop belief in TPM by using results communicated to all.

A.1.2 Vision DeploymentManagement and the workforce have been educated/trained, understand and embrace the vision of lean production.

Management has not communicated a vision of

TPM

Less than 10% of management and the

workforce understands the vision.

Less than 50% of management and the

workforce understands the vision.

Less than 70% of management and the

workforce understands the vision.

More than 71% of management and the

workforce understands the vision.

A.1.3 Basic Organization Structure

The concept of a TPM system is used to organize maintenance and support required to produce product

Organization is process based (traditional functional organization structure).

6 or 7 elements of authority are vested in the product-based organization.

8 or 9 elements of authority are vested in the product-based organization.

10 to 11 elements of authority are vested in the product-based organization.

12 or more elements of authority are vested in the product-based organization.

Elements of production system authority:1. Physical maintenance organization2. Personnel assignments3. Cellularization4. Organization of factory teams5. Quality polices and practices6. Supplier/spares integration

7. Inventory policies8. Metrics and measurement (including waste)9. Reporting lines of support functions10. Continuous process improvement approach11. Gain sharing policies for workforce12. Job stability policies for workforce13. Manufacturing practices and processes.

Page 1 of 3

TPM Diagnostic Page 2 of 3

A. TPM Organization Traditional

1 2 3 4

TPM

5

A.2 TPM StructureVision – The physical organization and layout of the factory should support the concept of a “Lean “ factory organization. Production flow, status and problems should be readily apparent to the casual observer. Maintenance operations within cells have been optimized to minimize wasted time and effort.

A.2.1 Factory Organization Less than 25% of factory 25-49% of factory 50-74% of factory 75-89% of factory Over 90% of factory

Page 2: Tpm Diagnostic              4

The factory is ideally organized into cells by product. Maintenance may be based on group technology or parts family concepts.

organized product

A.2.2 Flow Between Product Cells and Maintenance AreasClear, visible workflow, and input and output for maintenance product cells.

Less than 25% of factory has clear and well-defined input/output areas.

25-49% of factory 50-74% of factory 75-89% of factory Over 90% of factory

A.2.3 Internal Maintenance Cell Optimization

1 Element 3 Elements 5 Elements 7 Elements 9 Elements

Concepts of cell optimization are used, understood and implemented in setting up maintenance areas.

Elements:Minimized travelMinimized process stepsNecessary materials in placeNecessary tools in place

1. Necessary equipment in place 2. Minimized inventory between processes3. Clearly define input and output4. Material, tools and equipment ergonomically arranged5. Cell organized for safety

A.2.4 Physical ResourcesThe cell business unit controls assets required to produce the product. (Laser alignment equipment, test equipment, etc).

Less than 25% of assets required to produce the product are controlled within the cell or applicable business unit.

25-49% of assets 50-74% of assets 75-89% of assets Over 90% of assets

A.2.5 Production/Maintenance Status/Communications

A.2.5.1 External Communication of Production/Maintenance StatusProduction flow, status, and problems are apparent to the casual observer.

Less than 25% of factory has clear production flow, status and problem visibility.

25-49% of factory 50-74% of factory 75-89% of factory Over 90% of factory

A.2.5.2 Internal Communication of Production/Maintenance StatusData for cell operations is available for all team members. Each cell and business unit has easily visible facilities for communications (meeting areas, boards, etc.).

Less than 25% of factory has data availability and good facilities for communications.

25-49% of factory 50-74% of factory 75-89% of factory Over 90% of factory

Page 3: Tpm Diagnostic              4

A.2.6 5S’s The 5S methods are the key to a quality work environment. The underlying principle is a place for everything and everything in its place, clean and ready for use (Score using Levels of Excellence Sheet.) Instructions: Start at the bottom of each column and check the box(s) that reflect the maximum level achieved.

Sort Simplify Sweep Standardize Self-discipline

Level 5:

Focus on Prevention

Employees are continually seeking improvement opportunities

A dependable, documented method has been developed to provide continual evaluation, and a process is in place to implement improvements.

Area employees use a dependable, documented method of preventative cleaning & maintenance.

Everyone is continually seeking the elimination of waste with changed documented and information shared

There is a general appearance of a confident understanding of and adherence to 5S principles.

Level 4:

Focus on Consistency

A dependable, documented method is established to keep the work area free of unnecessary items.

A dependable, documented method has been established to recognize in a visual sweep if items are out of place or exceed quantity limits.

5S agreements are understood and practiced continually.

Substantial process documentation is available and followed.

Follow-through with 5S agreements and safety practices is evident.

Level 3:

Make it Visual

Unnecessary items are removed from the workplace

Designated locations are marked to make organization more visible.

Work/break areas & machines are cleaned daily. Visual controls are established and well marked.

Working environment changes are being documented. Visual control agreements for labeling and quantity levels established.

5S agreements and safety practices have been developed and are utilized

Level 2:

Focus on Basics

Necessary and unnecessary items are separated.

A designated location has been established for items.

Work/break areas & machines are cleaned on a regular schedule. Key items to check are identified.

Methods are improving, but changes haven’t been documented

A recognizable effort has been made to improve the condition of the workplace.

Level 1:

Focus on Starting

Needed and not needed items are mixed throughout the workplace.

Items randomly located throughout the work place.

Work place areas are dirty, disorganized and key items not marked or identified

Work place methods are not consistently followed and are undocumented.

Work place checks are randomly performed and there is no visual measurement of 5S performance.

Page 3 of 3

Page 4: Tpm Diagnostic              4

TPM Diagnostic 4/15/2010 Rev B

B. TPM Metrics Vision – What gets measured gets done.

Traditional

1 2 3 4

TPM

5

B.1 Management 0-2 Elements 3-4 Elements 5-6 Elements 7-9 Elements All 10 Elements

Measuring maintenance effectiveness requires constant review and goal setting to focus and channel improvement activities and to attain standardization of metrics.

Elements:1. Operating profit2. Ratio of operating profit to gross capital3. Value added productivity.4. Labor productivity5. Cost reduction

6. Headcount reduction7. Reduction in product stock value8. Reduction in work in process value9. Equipment investment efficiency10. Plant/Labor ratio

B.2 Plant Effectiveness 0-2 Elements 3-4 Elements 5-6 Elements 7-9 Elements All 10 ElementsEnsures each department clearly understands their particular responsibilities and sets targets reflecting those responsibilities.

Elements:1. Overall plant effectiveness2. Overall sub process effectiveness3. Overall effectiveness of critical equipment4. Overall availability5. Performance rate

6. Standard production rate7. Average actual production rate8. Quality rate9. Number of equipment (plant) failures10. Number of process failures

B.3 Quality and Energy Savings 0-3 Elements 4-6 Elements 7-9 Elements 9-10 Elements All 11 ElementsThese savings are important performance indicators. Treat them as key unit consumption indicators that relate directly to production costs.

Elements:1. Process defect rate2. Cost of process defects3. Number of defects passed on4. Number of warranty claims5. Value of warranty claims6. Overall Yield

7. Electrical consumption8. Steam consumption9. Fuel consumption10. Lubrication/Fluid consumption11. Auxiliary Material consumption

B.4 Maintenance Reliability and Maintainability

1-2 Element 3 Elements 4 Elements 5 Elements All 6 Elements

Evaluate two aspects of maintenance. First assess improvements in equipment reliability and maintainability and see how these help to raise plant effectiveness and product quality. Evaluate efficiency of manufacturing work.

Elements:1. Failure frequency2. Failure severity rate3. Cost of stoppages due to failure

4. Number of idling and minor stoppages5. Meantime between failures6. Emergency maintenance rate

B.5 Maintenance Efficiency 1 Element 2 Elements 3 Elements 4 Elements All 5 ElementsSystematize and speed up Preventive Maintenance and Condition Based Maintenance to achieve quick turn around and achieve smooth rapid startup by eliminating startup problems.

Elements:1. Reduction in number of shut down maintenance days (SMD)2. Vertical startup after shutdown maintenance3. Preventive Maintenance achievement rate4. Corrective Maintenance Trend

Page 5: Tpm Diagnostic              4

5. Maintenance head count reduction rate

Page 1 of 3

Page 6: Tpm Diagnostic              4

TPM Diagnostic Page 2 of 3

B. TPM Metrics

Traditional

1 2 3 4

TPM

5

B.6 Maintenance Cost 1 Element 2-3 Elements 4 Elements 5-6 Elements All 7 ElementsIs the maintenance budget being utilized effectively? Is the work using the most economical methods? Reference reliability, maintainability, maintenance efficiency, maintenance cost, other maintenance indicators.

Elements:1. Overall maintenance cost rate2. Unit maintenance costs3. Maintenance cost reduction rate

4. Unexpected failure repair cost5. Maintenance fees6. Reduction in spares inventory7. Maintenance cost rate

B.7 Other maintenance indicators 1 Element 2 Elements 3 Elements 4 Elements All 5 Elements

Elements:1. Contact maintenance rate – extent due to lack of technology and skills2. Contact maintenance rate – extent needed to absorb capacity (labor) shortages3. Renovation rate4. In house development5. Failure straight through rate

B.8 Health/Safety Environment 1 Element 2 Elements 3 Elements 4 Elements All 5 ElementsEvery plant appoints managers and supervisors to be responsible for health, safety and environmental matters. Develop countermeasures to prevent past accidents and disasters from recurring analyze the reasons for near misses and establish safety measures.

Elements:1. Accident frequency2. Accident severity rate3. Number of accidents requiring time off work4. Number of plant accidents5. Number of continuously accident free days

6. Number of near misses detected7. Number of safety problems spotted by safety team8. Number of improvements made on unsafe items9. Work place noise levels10. Number of external complaints (noise, dust, odors, etc)11. Number of discharges to outside (waste, oil, sludge, etc)

B.9 Training and Morale 1 Element 2 Elements 3 Elements 4 Elements All 5 ElementsThrough training and hands on practice, TPM aims to revolutionize the workforce and develop highly skilled, motivated and self-reliant people who know their equipment and processes intimately

Elements:1. Number of meetings or time spent on SGA2. Number of focused improvement topics documented3. Cost savings due to focused improvements4. Number of improvement suggestions

5. Number of outside company presentations6. Number of single point lesson sheets7. Number of maintenance trainees8. Number of official qualifications earned for both mechanics

and technicians.

B.10 Promotion Goals 1-2 Element 3-4 Elements 4-6 Elements 7-9 Elements All 10 ElementsEvaluating TPM involves assessing whether the company has achieved the policy and goals set at the introduction of TPM and realized the intended benefits. It also involves judging how effectively priority topics, action items and quantitative targets have been pursued through improvement activities

Elements:1. Cost reduction compared with fiscal year (FY)2. Variable production cost compared with FY.3. Fixed production cost compared with FY.4. Labor productivity compared with FY. 5. Number of major failures per period

6. Number of failures monthly rates end of period7. Number of quality problems, claims per year.8. Number of accidents per year9. Number of accidents per year requiring time off10. Number of accidents per year with no time off

Page 7: Tpm Diagnostic              4

TPM Diagnostic Page 3 of 3

B. TPM Metrics

Traditional

1 2 3 4

TPM

5

B.11 Autonomous Maintenance No visible signs of cleaning, inspection or

lube routes present

Machine contamination apparent.

5S Level < 1.9

No small group activities

5S Level > 2.0

Equipment history is reviewed.

Minimum visual management is

present on asset

Small group activity meeting are held on

emergency basis only

Management walkthrough checklist

completed monthly

5S Level> 3.0

TPM information current

Small group activity meetings taking place

5S Level > 4.0

Equipment is benefiting from root

cause analysis

Physical evidence of Cleaning is Inspection

on asset.

Consumables are identified and stocked

5S Level = 5.0

Small group activities are self- directed.

Equipment availability data is posted

showing positive trend.

Visual management is present.

All steps of AM are being audited

B.12 Overall Equipment EffectivenessOEE means “the amount of productive service that equipment provides.” OEE identifies pieces of equipment that present opportunities for improvement.

Less than 10% of assets utilize OEE data

Less than 20% of assets utilize OEE

data

Less than 40% of assets utilize OEE

data

Less than 60% of assets utilize OEE data

Less than 80% of assets utilize OEE

data

TPM Diagnostic 4/15/2010 Rev B

C. TPM PILLARSTraditional

1 2 3 4

TPM

5

C.1 Planned MaintenanceVision – Equipment/process is operating such that zero breakdowns occur during production, and equipment/processes are available when required by the customer.

C.1.1 Supplier/ Stores Management IntegrationVision – Supplier Management, Maintenance and Manufacturing personnel function as one cohesive team. In order to accomplish this, parts & materials from certified suppliers deliver directly to the point of use with minimal appropriate receiving inspection both in Operations and Maintenance.

Page 8: Tpm Diagnostic              4

C.1.1.1 Source Inspection Delegation

Motors, oil, electrical components, etc.

Delegation program not established. Static Supplier base.

Process established for delegation; 25% of suppliers approved.

50% of suppliers have delegation authority. Supplier base reduction underway.

75% of suppliers have delegation authority.

90% or > of suppliers have delegation authority. Minimal supplier base.

C.1.1.2 Supplier Management Responsibility

Material resource buyers co-located with customers.

Supplier Management is separate from Manufacturing.

Supplier Management is coordinating with Manufacturing.

Continuous & direct (face to face) communication between organizations.

Supplier Management & Manufacturing view supplier management as joint responsibility.

Shop floor personnel coordinate directly with suppliers for delivery. S/M&P manages the contract.

C.1.1.3 JIT Deliveries

C.1.1.3.1 Raw Material

Sheet stock, paint, wood, etc.

No JIT contracts. JIT delivery on a minimum of 25% of raw materials.

JIT delivery on a minimum of 50% of raw materials.

JIT delivery on a minimum of 75% of raw materials.

JIT delivery on >90% of raw materials.

C.1.1.3.2 Detail Parts

Spindles, power wire boards, light fixtures, etc.

No JIT contracts. JIT delivery on a minimum of 25% of detail parts.

JIT delivery on a minimum of 50% of detail parts.

JIT delivery on a minimum of 75% of detail parts.

JIT delivery on >90% of detail parts.

C.1.1.3.3 Assemblies

Motors, gear box, boilers, high value components.

No JIT contracts. JIT delivery on a minimum of 25% of assemblies.

JIT delivery on a minimum of 50% of assemblies.

JIT delivery on a minimum of 75% of assemblies.

JIT delivery on 90% + of assemblies.

C.1.1.3.4 Stores/Supplier “kitted” assemblies.

No JIT contracts JIT delivery on a minimum of 25% of supplier kits.

JIT delivery on a minimum of 50% of supplier kits.

JIT delivery on a minimum of 75% of supplier kits.

JIT delivery on 90% + of supplier kits.

C.1.1.4 Inventory System Integration Vision - Deliveries are based upon the shop floor need & delivered just prior to the need.

C.1.1.4.1 Inventory System Integration With Supplier

No integration with supplier’s system.

Developing some integration with supplier’s systems.

Established EDI with some key suppliers as pilot.

Most major suppliers are transmitted data via EDI.

All major suppliers have EDI . All supplier problems are addressed prior to the next delivery.

Page 1 of 4

TPM Diagnostic Page 2 of 4

C.1 Planned MaintenanceTraditional

1 2 3 4

TPM

5

C.1.1.4.2 Internal Pull System All deliveries are based on negotiated delivery schedule.

Most deliveries are based on smaller sized lots. Kitting of parts to floor from stockrooms.

Deliveries are based upon minimal inventory pads to the original need dates. Kits are delivered in logical work sizes.

Kitting of parts by suppliers.

Deliveries are based upon the shop floor need and delivered just prior to need. No large lot deliveries.

C.1.1.4.3 Inventory Turns Not measured. 1 element. 2 elements. 3 elements. 4 elements.

Elements:1 . Measured at facility level 3. Continuous improvement

Page 9: Tpm Diagnostic              4

2. Measured at cell level 4. Benchmark data is used frequently over past 24 months

C.1.1.5 Point of Use Stocking By External Suppliers

C.1.1.5.1 Low value parts (standards & small details).

100% traditional stocking. Point of use stocking negotiated with suppliers or implemented in pilot areas (under 20% of areas).

Point of use stocking in 21% - 49% of areas.

Point of use stocking in 50% - 89% of areas.

Point of use stocking fully utilized. Over 90% of areas.

C.1.1.5.2 Mid-Value detail and assemblies

100% traditional stocking. Point of use stocking negotiated with suppliers or implemented in pilot areas (under 20% of areas)

Point of use stocking in 21% - 49% of areas.

Point of use stocking in 50% - 89% of areas.

Point of use stocking fully utilized. Over 90% of areas.

C.1.1.5.3 High Value Parts100% traditional stocking. Point of use stocking

negotiated with suppliers or implemented in pilot areas (under 20% of areas)

Point of use stocking in 21% - 49% of areas.

Point of use stocking in 50% - 89% of areas.

Point of use stocking fully utilized. Over 90% of areas.

C.1.1.5.4 Stores/Supplier “kitted” assemblies.

100% traditional stocking. Point of use stocking negotiated with suppliers or implemented in pilot areas (under 20% of areas)

Point of use stocking in 21% - 49% of areas.

Point of use stocking in 50% - 89% of areas.

Point of use stocking fully utilized. Over 90% of areas.

C.1.2 Maintenance & Production SchedulesVision – The scheduling system is horizontally integrated across the site. Visual signals have been set up and utilized to drive the next need.

C.1.2.1 Capacity Planning integrated with Maintenance Schedules

Capacity planning process not documented or considered when scheduling planned maintenance.

Capacity is analyzed after maintenance order release. Final work scheduling made after order launched.

Capacity is taken into account prior to launching maintenance orders into the maintenance product team.

User friendly capacity system accessible to all teams.

Factory is level loaded and producing to customer demand. Planned maintenance products are treated the same as operations products for scheduling.

TPM Diagnostic Page 3 of 4

C.1 Planned MaintenanceTraditional

1 2 3 4

TPM

5

C.1.2.2 Maintenance Work Order

Material & tooling position is unknown at time of release.

Material & tooling position is unknown at time of release, but analyzed after release.

Material & tooling are forecast and analyzed prior to order release.

Orders are not released until all materials & tools are available.

Orders not released until all materials, tools & machines are available.

C.1.2.3 Maintenance Activity/Cycle Time & Shop

No formal plan for cycle time reduction.

Formal plan exists. <24% progress to

25-49% progress toward meeting goal.

50-74% progress toward meeting goal.

75% or better % progress toward

Page 10: Tpm Diagnostic              4

Floor Reduction meeting objective. meeting goal.

C.1.2.4 Parts Management - Impact of Shortages

Manages the shop by shortages. 75%-100% of orders are expedited. A number of “Priority” lists exist.

Critical shortage list is the priority list. 50% - 74% of orders are expedited.

Shortage position known by all. Orders are accurately tracked. (system & manual lists)

Focus on accurately forecasting needs via dispatch list. No manual lists.

Shortages are dealt with as an exception and system speeds up to accommodate requirements.

C.1.3 Quality

Any good or service provided to a downstream customer; i.e. painted room, installed machine, oil analyzed, completed work order, parts received,, etc

C.1.3.1 Standardization of Job

Job requirements have been standardized and simplified. Qualified workers can produce product with little or no training.

No plans in place to accomplish this.

Written plan developed and implementation is at less that 30%.

30-49% of the jobs have been standardized and simplified.

50-89% of the jobs have been standardized and simplified.

90% or more of the jobs have been standardized and simplified.

C.1.3.2 Advanced Maintenance Moving from reactive to proactive maintenance. <30% planned work.

Moving from reactive to proactive maintenance. 30-50% planned work.Critical assets facilitized.Providing education and training on a pull basis.

Moving from reactive to proactive maintenance. 50-80% planned work.Work planned and schedule using visual management tools.Facilities stores organized and support kitting for planned work.

Moving from reactive to proactive maintenance. >80% planned work.Work planned and schedule using visual management tools.

Root cause analysis and Maintenance prevention are systemic within enterprise.CBM implemented

C.1.3.3 Set-up Reduction

Development of a set-up reduction policy focusing on reducing non-value added time, motion and manpower while maintaining or decreasing variability in all aspects of maintenance.

No plan in place to reduce set-up times.

Written plan developed. Metrics displayed at the cell level with goals and performance to goals visible.

Less than 50% of the teams are achieving set-up time reductions.

50-89% of the teams are achieving set-up time reductions.

90% or more of the teams are achieving set-up time reductions.

Page 11: Tpm Diagnostic              4

TPM Diagnostic Page 4 of 4

C.1 Planned MaintenanceTraditional

1 2 3 4

TPM

5

C.1.3.4 Process and Product Variation Reduction System

Process and product Variation Reduction System is in place and applied effectively to a prioritized set of high cost/high waste problem areas.

No Variation Reduction System in place

Variation Reduction tools are applied sporadically, with minimal lasting gains

Variation Reduction tools and activities are executed in a planned and effective manner, but are not yet widespread.

Variation Reduction activities are executed in a planned and effective manner and are widespread

Variation Reduction activities are a way of doing daily business and their effectiveness is reflected in steady improvement in the supplier’s metric(s) for Waste/Defects.

C.1.3.5 Maintenance Quality System Deficient Procedures Adequate procedures, check sheets exist for all procedures.

Internal audit and corrective action process effectively resolves deficiencies.

No deficiencies are identified by the internal audit.

The internal audit includes their supporting business systems.

C.1.3.6 Intolerance for Defects

Systems and Processes are in place. Use of mistake proofing and AQS tools/data driven processes and systems.

No system or process is in place.

The system of in-process checks allows > 10% of internal defects to be passed on.

The system of in-process checks allows 3 - 10% of internal defects to be passed on.

The system of in-process checks allows 1 - 2% of internal defects to be passed on.

The system of in-process checks allows < 1% of internal defects to be passed on.

TPM Diagnostic 4/15/2010 Rev B

C. TPM PILLARSTraditional

1 2 3 4

TPM

5

C.2 Autonomous MaintenanceVision – Employee empowerment and team approaches are used for problem solving on the manufacturing floor. Decision–making is pushed to the lowest appropriate level and managers are viewed as coaches and facilitators.

C.2.1 Small Group Activity (SGA) Teams

C.2.1.1 SGA Teams –Factory and Maintenance work force labor organized according to respective product line.

No written plan. Teams may exist but have no self-direction authority.

Written plan initiated. <10% of business

organized by product line.

10-49% of business organized by product line.

50-89% of business organized by product line.

90% or more of business organized by

product line.

C.2.1.2 Teams—Support Personnel No written plan. Large Plan drawn up but no 10-49% of support 50-89% of support 90% or more of support

Page 12: Tpm Diagnostic              4

Support people are part of Maintenance Product Teams and are accountable to the Product Organization.

centralized core support organization.

substantive implementation (<10%)

function are part of Product Organization

functions are part of Product Organization

functions are part of Product Organization.

C.2.1.3 Teams – External Customer/supplier Integration

Maintenance Product Teams exercise “tactical” coordination with maintenance suppliers and contracted work, working planning, scheduling and quality issues.

Not part of written team plan.

Tactical supplier management in some Product Organizations

(<10%)

Tactical supplier management in some Product Organizations

(10-49%)

Tactical supplier management in some Product Organizations

(50-89%)

Tactical supplier management in most Product Organizations

(90-100%)

C.2.1.4 Empowerment of Teams 0 Elements or No Plan 1-4 Elements 5-8 Elements 9-12 Elements 13-15 Elements

Employee empowerment and team approaches are used for problem solving leading to significant productivity improvements and culture changes.

Elements:1. Goal setting2. Work schedule3. Job assignment4. Cell configuration5. Training6. Meetings7. Job standardization

8. Meaningful input for new team member selection9. Leader/Manager Evaluation10. Peer evaluation (job skills011. Personnel requirements/manpower12. Rewards13. Product area budgeting/record keeping14. Tactical supplier integration15. Continuous product and process analysis and improvements

C.2.1.5 Multi-Skilled LaborMeasuring the ability of workers to perform a broad range of maintenance activities in support of their customer (respecting union negotiated contracts).

Maintenance and Operators are not trained to care for different machines in their work area.

25-49% of all Maintenance and

Operators are trained.

50-74% of all Maintenance and

Operators are trained.

75-89% of all Maintenance and

Operators are trained.

Over 90% of all Maintenance and

Operators are trained to care for different

machines in their work areas.

Page 1 of 4

Page 13: Tpm Diagnostic              4

TPM Diagnostic Page 2 of 4

C.2 Autonomous Maintenance Traditional

1 2 3 4

TPM

5

C.2.1.6 Training 1.46% or less of payroll for training OR

0 elements or no plan.

>1.46<1.90% of payroll for training OR

2-3 elements.

>1.9<2.35% of payroll for training OR

4-5 elements.

>2.35<3.14% of payroll for training OR

6-7 elements

>3.14<3.93% of payroll for training OR

More than 7 elements

Training is provided to facilitate effective teaming, communication skills, and continuous improvement methods.REF: The ranking criteria is derived from the American Society for Training Development’s 1998 State of the Industry Report.

Elements:1. Goal setting2. Work schedule3. Job assignment4. Cell configuration5. Training6. Meetings7. Job standardization

8. Meaningful input for new team member selection9. Leader/Manager Evaluation10. Peer evaluation (job skills011. Personnel requirements/manpower12. Rewards13. Cell budgeting/record keeping14. Tactical supplier integration15. Continuous product and process analysis and improvements

C.2.2 Small Group Activity (SGA) Deliverables

C.2.2.1 Autonomous Maintenance Team

0 elements or no plan. 1-2 elements. 3-4 elements. 5-6 elements More than 6 elements

Elements:1. Individual Operators and Maintenance craft personnel

take ownership in the reliability and effectiveness of their assigned asset.

2. Roles and responsibilities are known3. Daily communication between AM team members is

occurring

4. Weekly AM meetings are conducted5. AM team is stable (i.e. long term assignment)6. Team members have skills & knowledge to participate in

AM7. AM Team empowered

C.2.2.2 Environment 0 elements or no plan. 1-3 elements. 4-5 elements. 6-7 elements More than 7 elements

Elements:1. Continuous follow up by Operations/Maintenance management2. Lockout-Tag-Tryout process is documented and used3. Efficient use of energy resources is planned & implemented4. Efficient use of production resources is planned & implemented

5. Improvement activities driven by facts & data6. Continuous improvement is evident7. Unexpected breakdowns are eliminated8. The work environment is safe 9. Measures in place

C.2.2.3 Asset Maintenance 0 elements or no plan. 1--4 elements. 4-8 elements. 9-13 elements More than 14 elements

Elements:1. Asset is inspected using agreed upon routines and timetable2. Chronic sources of contamination are eliminated3. Asset is cleaned using agreed upon routines and timetables4. PM routines, based on usage developed and followed 5. Planned Maintenance schedules known, displayed and followed6. Autonomous Maintenance is a trigger for PM, PdM, and PJ activities7. OEE data is used to focus improvements8. Spares are forecast and consumption rates tracked

9. Non-labor resources available10. PdM routines developed and followed11. Lubrication routines developed and followed12. All lube points are identified13. Hard to reach places are eliminated14. No contamination at asset15. High usage parts at asset

Page 14: Tpm Diagnostic              4

TPM Diagnostic Page 3 of 4

C.2 Autonomous Maintenance Traditional

1 2 3 4

TPM

5

C.2.3 Continuous Process Improvement (CPI) – Production and Maintenance Organization Level

C.2.3.1 Training for CPI

Methods of problem solving, rootcause analysis, continuous improvement are understood and utilized by Team members.

Methods of problem solving , root cause analysis, and continuous improvement are understood or utilized by <10% of Team members.

10-24% of Team/Cell members

25-49% of Team/Cell members

50-89% of Team/Cell members

90%+ of Team/Cell members

C.2.3.2 Data Availability

Teams use real-time data to assess Maintenance and Operations Product Teams performance, including total cost attributable to team, and assess CPI efforts.

Data needed by SGA teams to evaluate their performance has been identified.3 or less elements

Data is visible to SGA teams. SGA teams makes input to data.At least 4 elements

Data is visible in real time format to SGA teams. SGA teams understand data and it’s source.At least 5 elements

Data includes a production efficiency measure.At least 6 elements

Data is available to CPI teams including total cost attributable to each cell operations.At least 8 elements

Elements:1. Production Efficiency2. Inventory Levels3. Set-up Times (per part)4. Takt Time5. Performance Targets

6. Cycle Time (throughput)7. Performance Status8. Cost9. Inventory Turns10. Non-Value Added/Value added ratio 11. Quality

12. Equipment Failures13. Set Up and Adjustment14. Idling and Minor Stoppages15. Quality Defects and Rework16. Start up/Yield losses17. Speed Losses

C.2.3.3 Process Management

Processes are documented and managed using value stream mapping techniques.

Techniques not used or understood.

Higher level processes documented and metrics

in place (defect rates, waste, CPK, etc.)

Lower level processes identified and documented.

Improvement plans initiated on all processes not performing to goal.

Processes at all levels are being continually improved, based on a structured plan with a clear understanding of

benefits.

C.2.3.4 CPI Project Activity

Assigned CPI project members spend a measurable amount of time actively involved with Continuous Process Improvement.

No time spent on CPI projects.

SGA Teams involved with only CPI projects concerning corrective

action for quality issues.

SGA Teams spend 10% or more of their time on

process CPI issues.

SGA Teams spends 15% or more of their time on

process CPI issues.

SGA Teams spends 20% or more of their time on process CPI

projects.

C.2.3.5 Maintenance and Operations Product Level – Customer/Supplier Involvement

External suppliers and customers are integrated into CPI activity.

Limited supplier/customer involvement.

Supplier/customer participation exceeds

10%

Supplier/customer participation exceeds

30%

Supplier/customer participation exceeds

40%

Supplier/customer participation exceeds

50%

Page 15: Tpm Diagnostic              4

TPM Diagnostic Page 4 of 4

C.2 Autonomous Maintenance Traditional

1 2 3 4

TPM

5

C.2.4 Continuous Process Improvement (CPI) – Factory Wide

C.2.4.1 Training for Management and Core Support Personnel

Methods of problem solving, root cause analysis, continuous improvement are understood and utilized by CPI project members.

Methods of problem solving, root cause analysis, and continuous improvement are understood or utilized by <10% of management and support personnel.

10-24% of Management and Support Personnel

25-49% of Management and Support Personnel

50-89% of Management and Support Personnel

90%+ of Management and Support Personnel

C.2.4.2 CPI Project Selection

Management’s role is to assure execution of projects having the greatest impact on the enterprise goals and bottom line.

No systematic approach to identify or prioritize projects has been developed

A traditional (rejection based) systematic approach has been

developed and implemented.

A systematic approach utilizing Lean/AQS

Manufacturing Practices and Principles has been

developed and implemented.

Level 3 and CPI projects are selected with

participation of cell level teams.

Level 4 and after CPI project implementation, results are analyzed and

check for desired outcome.

C.2.4.3 CPI Projects Activity

Support personnel assigned to CPI projects having the greatest impact on the enterprise goals and bottom line.

Less than 10% of support personnel time.

At least 10% of support personnel time

At least 20% of support personnel time

At least 30% of support personnel time

At least 40% of support personnel time

C.2.4.4 Autonomous MaintenanceAutonomous Maintenance is an Operations owned process in which they accept the responsibility for and perform specific daily maintenance activities/checks/inspections/etc. Facilities role in the this process is to participate in the Autonomous Maintenance Workshops help in the decision making process that determine which duties should be part of the operator’s responsibilities and be a full time member of the sustaining AM team.

No systematic approach to identify or prioritize Autonomous Maintenance has been developed.

Development of Master Plan is focused on critical assets.

AM SGA assumes ownership of reliability and efficiency of their asset.

AM SGA are deployed in all areas of production

AM SGA are self sustaining, take ownership and responsibility for their asset(s), and initiate factory improvements based upon facts and data.

TPM Diagnostic 4/15/2010 Rev B

C. TPM PILLARSTraditional

1 2 3 4

TPM

5

Page 16: Tpm Diagnostic              4

C.3 Attack the Six Big LossesVision – Overall equipment effectiveness is an internationally accepted measure for focusing improvement activities. OEE measures Availability, Performance Efficiency, and quality.

C.3.1 Application Education and training is provided on a pull basis.

SGA team activity supports implementation of Lean concepts.

SGA teams in early implementation areas meet regularly and continuously attack the ‘Six Big Losses’.

OEE > 50% on all critical assets.

SGA team focuses on continuous reduction of production losses based on facts and data

OEE >70% on all critical production assets.

The SGA team has ownership in the reliability and effectiveness of their assigned assets

OEE >85% on all critical production assets.

Continuous improvement of production efficiency is driven by SGA team stakeholders

C.3.2 Speed losses Equipment specifications not well understood

No speed standards (by product and machinery)

Wide speed variations across shifts/operators

Problems related to speed losses analyzed: mechanical problems, quality problems.

Tentative speed standards set and maintained by product

Necessary improvements being implemented

Speed is set by the product. Cause and effect relationship between the problem and the precision of the equipment

Small speed losses

Operation speed increased to design speed or beyond through equipment improvements.

Final speed standards set and maintained by product.

Zero speed losses

C.3.3 Idling and Minor Stoppage Losses

Losses from minor stoppages unrecognized and unrecorded.

Unstable operating conditions due to fluctuation in frequency and location of losses.

Minor stoppage losses analyzed quantitatively by: frequency and location of occurrence; volume lost.

Losses categorized and analyzed; preventive measures taken on trial and error basis.

All causes of minor stoppages analyzed; all solutions implemented.

Operation speed increased to design speed or beyond through equipment improvements.

Final speed standards set and maintained by product.

Zero minor stoppages (unmanned operation possible)

C.3.4 Quality Defect and Rework Losses

Chronic quality defect problems are neglected

Many reactive and unsuccessful remedial actions have been taken

Chronic quality problems quantified by: details of defect, frequency; volume lost.

Losses categorized and reasons explained: preventive measures taken on trial and error basis.

Causes of chronic quality defect analyzed, solutions implemented,

Automatic in-process detection of defects under study.

Quality losses from 0.1% to zero

Page 1 of 2

Page 17: Tpm Diagnostic              4

TPM Diagnostic Page 2 of 2

C.3. Attack the Six big lossesTraditional

1 2 3 4

TPM

5

C.3.5 Startup Losses Startup losses not recognized, understood or recorded

Startup losses understood in terms of breakdowns and changeovers

Start up losses measured.

Process stabilization dynamics understood and improvements implemented

Causes due to minor stops aligned with startup losses

Remedial actions on breakdowns, setups, minor stops and idling minimize startup losses.

Startup losses minimized through process control

C.3.6 Breakdown Losses Combination of sporadic and chronic breakdowns

Significant breakdown losses

BM>PM No operator asset

care Unstable life span Equipment

weaknesses not recognized

Chronic breakdowns

Breakdown losses still significant

BM=PM Operator asset

care implemented Parts life spans

estimated Equipment

weaknesses well acknowledged

Maintainability improvement applied on above points.

Time based maintenance established

PM>BM Breakdown losses

less than 1% Autonomous

maintenance activities well established

Parts life spans lengthened

Designers and engineers involved in higher level improvements.

Condition-based maintenance

PM Autonomous

maintenance activities stable and refined

Parts life spans predicted

Reliable and maintainable design developed

Breakdown losses from 0.1% to zero

C.3.7 Setup and Adjustment Losses

No control: minimum involvement by operators

Work procedures disorganized: setup and adjustment time varies widely and randomly

Work procedures organized, e.g. internal and external setup distinguished

Setup and adjustment time still unstable

Problems to be improved are identified.

Internal setup operations moved into external setup time

Adjustment mechanisms identified and well understood

Error proofing introduced.

Setup time less than 10 minutes

Immediate product changeover by eliminating adjustment

BM = Breakdown MaintenancePM = Preventive Maintenance

TPM Diagnostic

C. TPM PILLARS Traditional

1 2 3 4

TPM

5

C.4 Early Equipment Design

Page 18: Tpm Diagnostic              4

Vision – Equipment must be flexible to respond to abrupt changes in market demand as well as be specialized to help the company remain competitive. The following five conditions must be examined before acquisition of any asset.

C.4.1 Early Equipment Management

Focus on production capabilities in a Lean

environment.

New assets meet production needs and

minimize life cycle costs.

Education and training is provided on a pull basis.

Ensure maintainability and MTTR/MTBF.

Ensure assets minimize life cycle costs while meeting the needs of

operations

Assets support a Lean flexible production

environment.

Production parts are designed with the

manufacturing process in mind.

Production assets are designed, built, or modified in-house.

C.4.2 Development 1-3 Elements 4-6 Elements 7-9 Elements 10-12 Elements 13 ElementsCombination of product development and development of equipment with related fabrication methods to produce high quality products at low cost. Design for quality adherence Economic life cycle cost Flexibility Low cost autonomation Intrinsic safety

Elements:6. Product plan (cost plan)7. Product development and design8. Prototype testing9. Process planning10. Process quality11. Cost setting

12. Evaluate fabrication methods13. Eliminate technical issues 14. Set equipment specifications15. Evaluate equipment16. Debug equipment design17. Test run initial operation on equipment18. Document regular operation and maintenance

C.4.3 Reliability 0 Element 1-2 Elements 3-4 Elements 5 Elements 6 Elements

Equipment must produce defect free parts and be easily maintainable.

Elements:1. Mistake proof design2. Fail safe design3. Non mechanical design

4. De-rating the design5. Independent overlapping system design6. Redundant design

C.4.4 Economics 1-2 Elements 2-3 Elements 4-5 Elements 6-7 Elements 8 Elements

Equipment must be inexpensive not only in terms of initial cost but also in terms of its running costs; therefore, the team’s objective is to develop and design equipment with the lowest possible life cycle cost.

Elements:1. Acquisition costs (planning, design and development

construction)2. Product distribution cost (packaging, transportation, handling,

warehousing and storage).3. Maintenance cost (customer service organization

intermediate, plant maintenance and personnel costs)

4. Inventory cost (spares and material support)5. Retirement and disposal costs6. Training and technical data cost7. Operations cost (facilities energy, utilities, taxes)8. Tools and test equipment costs

Page 1 of 2

Page 19: Tpm Diagnostic              4

TPM Diagnostic Page 2 of 2

C. TPM PILLARS Traditional

1 2 3 4

TPM

5

C.4.5 Availability 1-2 Elements 3-5 Elements 6-9 Elements 10-12 Elements 13 Elements

Improving production and manufacturing techniques for equipment to produce to takt time.

Elements: 1. Automation2. Mechanization3. Acceleration4. Linked automation5. Automated material handling6. Robotics.

7. Product analyses8. Process analyses9. Operation analyses10. Process design11. FMEA12. Layout13. Factory wide participation

C.4.6 Maintainability 1Elements 2 Elements 3 Elements 4 Elements 5 Elements

Easy to maintain with zero breakdowns Elements: 1. Development of autonomous maintenance steps2. Breakdown reduction measures, MQ organization, preventive maintenance management.3. Reduce chronic in-process defects and comprehensive quality assurance-related activities.4. Pre-production improvements in new products, QA-friendly design development.5. Education and training in maintenance skills, quality control, etc.

C.4.7 Operability 1 Element 2 Elements 3-4 Elements 5-6 Elements 7 Elements

Easy to operate with zero breakdowns Elements: 1. Are frequent adjustments required?2. Are handle or knobs difficult to operate or located poorly?3. Are any specialized skills or tools required for operation/adjustment?4. Are blockages/stoppages likely?5. Has any diagnostic function built in? (glass panels, gauges, indicators)6. Startups and shutdowns: is additional manning required?7. Are the operator’s working posture unhealthy?

TPM Diagnostic 4/15/2010 Rev B

C.5 Training & EducationTraditional

1 2 3 4

TPM

5Vision – Training is a key element in the success of TPM and is an integral part of producing a highly motivated and multi-skilled workforce.

C.5.1 TPM Education 1-2 Elements 3-5 Elements 6-9 Elements 10-13 Elements 14-16 ElementsA training curriculum is in place with all aspects of TPM knowledge and problem solving skills. Required skills and knowledge for specific job assignments are known. Skills, knowledge and capability of individuals are known with respect

Elements:1. Understands the importance of lubrication.2. Understands the importance of cleaning is inspection 3. Understands the importance of eliminating contamination.

9. Has basic knowledge of life cycle of machine components.10. Understands basic failure causes. 11. Some personnel have specialized training as facilitators for SGA12. Knows how to collect data for Maintenance and OEE.

Page 20: Tpm Diagnostic              4

to their job assignments. 4. Knows the criteria for recognizing abnormalities and understands the causes.

5. Can diagnose failures to a certain extent6. Understands the relationship between equipment and

product quality characteristics and asks the 5 Why’s.7. Understand the causes of defects.8. Understands how to replenish consumables.

13. SGA are taking place and personal are constructively analyzing information

14. Can analyze and correctly assess whether equipment is operating normally or not and when to shut it down

SGA = Small Group Activity

C.5.2 Operator Training 1-2 Elements 3-4 Elements 5-8 Elements 9-11 Elements 12-14 Elements

Elements:16. Operator understands equipment construction.17. Assist in equipment overhauls 18. Operator can perform cleaning is inspection

correctly.19. Operators have basic education and knowledge of

the operation and maintenance of the asset20. Operator has the ability to lube own asset.21. Operator understands the importance of eliminating

contamination.22. Knows the criteria for recognizing abnormalities

and defects understands the causes.23. Operator can judge that the equipment is operating

correctly and when to shut down.

24. Has basic knowledge of life cycle of machine components.25. Understands basic failure causes26. Assist in equipment overhauls27. Work with SGA to improve equipment and component reliability,

lengthen equipment life times, and curb abnormalities and failures.28. Understands basic CBM equipment diagnostics.29. Improves the understanding of their asset and shares it with other

personnel.

Page 1 of 2

Page 21: Tpm Diagnostic              4

TPM Diagnostic Page 2 of 2

C.5 Training & EducationTraditional

1 2 3 4

TPM

5

C.5.3 Maintenance Training 1-2 Elements 3-6 Elements 7-10 Elements 11-14 Elements 15-17 Elements

Elements:1. Understands the importance of eliminating

contamination.2. Can judge correctly when to shut down the equipment3. Can diagnose failures.4. Understands the relationship between equipment and

product quality characteristics.5. Understands the causes of defects.6. Understands the restocking and kitting of spare parts

and consumables.7. Has basic knowledge of life cycle of machine

components.8. Understands basic failure causes9. Performs equipment overhauls10. Understands equipment construction.

11. Knows the criteria for recognizing abnormalities and understands the causes to restore normal operations.

12. Maintenance has basic and advanced knowledge of the operation and maintenance of assets in their care.

13. Can collect data for maintenance and OEE.14. Maintenance personnel are trained in advanced maintenance

processes, CBM, and techniques are being utilized in daily maintenance and standardized.

15. Maintenance professionals must be able to instruct operators in correct handling, operating and daily maintenance of equipment.

16. Work with SGA to improve equipment and component reliability, lengthen equipment life cycle times, and curb abnormalities and failures.

17. Improves the understanding of their asset and shares it with other personnel.