+ All Categories
Home > Documents > Trade and Investment Project

Trade and Investment Project

Date post: 01-Feb-2016
Category:
Upload: ophira
View: 17 times
Download: 0 times
Share this document with a friend
Description:
Trade and Investment Project. Liberalization in Aviation Policy Presented to the Confederation of Mozambican Business Associations (CTA). Andy Ricover December 15,2005. Current effective policy. Formal policy. Institutional framework. Effective policy. Function of two factors. - PowerPoint PPT Presentation
Popular Tags:
40
Liberalization in Aviation Policy Presented to the Confederation of Mozambican Business Associations (CTA) Trade and Investment Project Andy Ricover December 15,2005
Transcript
Page 1: Trade and Investment Project

Liberalization in Aviation PolicyPresented to the Confederation of Mozambican Business Associations (CTA)

Trade and Investment Project

Andy RicoverDecember 15,2005

Page 2: Trade and Investment Project

2

Formal policyInstitutional framework

Effective policy

Current effective policy

Function of two factors

Page 3: Trade and Investment Project

3

Current effective policy (continued)

• Function of two factors―There is written policy―But the institutional arrangement can

condition the real applicable policy

Page 4: Trade and Investment Project

4

Current formal policy—Legal framework

• Resolution 40/2002, May 14th - replacing 5/96 April 2nd―Does not deal with access to market (5/96 did) ―Domestic market: to “adjust number of operators to

demand”

• Regulamento 39/98, August 26th―Defines access to market:

Regular international (intercontinental and regional) Regular domestic Nonregular

―Route allocation to new operator after “listen” to incumbent

Page 5: Trade and Investment Project

5

Current formal policy—Regular-Int’l operations

• Access to market―Designated in the BASA (bilateral air services

agreement)―Selected by tender

• Regime―Exclusive rights for 10 years (renewable by tender)―Intercontinental: single designation―Regional: one operator per route―Provision for multiple designation, subject to public

interest

Page 6: Trade and Investment Project

6

Current formal policy—Regular-domestic operations

• Access to market―Concession

• Regime―By route―By tender―5 year periods (renewable)―Subject to public interest: exclusive rights

Page 7: Trade and Investment Project

7

Current formal policy—Nonregular operations

• Access to market―By obtaining a licence compatible with

service

• Regime―By tender―In addition to regular services

Page 8: Trade and Investment Project

8

IACM IACM ADM ADM LAM et al IACM

Ministry of Transport & Communic.

Accidents investigation

RegulationPolicymaking Operation

ATC Airports Airlines

Current institutional framework—Bodies and functions

Page 9: Trade and Investment Project

9

Institutional framework—Competences of IACM

• According to Decree 41/2001―Concentration of functions

Regulate procedures of policy application and legal framework (Art. 6: 1.a & n)

Technical regulation (Art. 6) Accidents investigation (Art. 6, g)

―Creates conflict of interest―Allows policymaking through regulation

Page 10: Trade and Investment Project

10

Civil Aviation Board

autonomous bodies(arm’s length from the government)

IACM ADM ADM AirlinesAccidents

Investigation Board

ParliamentMinistry of

Transport & Communic.

Accidents investigation

RegulationPolicymaking Operation

ATC Airports Airlines

Proposed institutional framework—Bodies and functions

Page 11: Trade and Investment Project

11

Current effective policy

• Consequence of formal policy and institutional framework―Formally protective of LAM, considered of “national

interest” Restrictive access to international markets Semi-restrictive for domestic markets

―Informal protection Difficulties in obtaining nonregular/special permits Price control Scheduling regulations (SAA should depart 90’ away from

LAM)

Page 12: Trade and Investment Project

12

Seven operators

LAM

Air Corridor

MEX

STA

SAA

TAP

Pelikan Air

Intl Intl RegReg DomDom

√ √ √

Current situation—Operators

Page 13: Trade and Investment Project

13

Current situation—Airport infrastructure

• 3 international airports―Maputo, Beira, Nampula

• 6 main airports―Inhambane, Quilimane, Tete, Lichinga,

Pemba & Vilanculus (by traffic)

• 10 secondary airports• 6 military• Plus almost 300 landing strips

Page 14: Trade and Investment Project

14

Current situation—Airport infrastructure (continued)

• Operated by ADM• No prospects of private sector participation

(PSP)―Failed ACSA deal for MPM―Doubtful financial feasibility for whole group

• However―No capacity/operational constraints―Market is NOT a function of infrastructure

Page 15: Trade and Investment Project

15

Policy background—Freedoms of the air

• 1st—The right to fly over another country without landing

• 2nd—The right to make a landing for technical reasons in another country without picking up/setting down revenue traffic

• 3rd—The right to carry revenue traffic from your own country A to the country B of your treaty partner

Page 16: Trade and Investment Project

16

Policy background—Freedoms of the air (continued)

• 4th—The right to carry traffic from country B back to your own country A

• 5th—The right of an airline from country A to carry revenue traffic between country B and other countries, such as C or D.

• 6th—The use by an airline of country A of two sets of 3rd and 4th rights to carry traffic between two other countries but using its base A as a transit point

Page 17: Trade and Investment Project

17

Current situation—Int’l carriers

• LAM―LIS: code share with TAP

• TAP―LIS: x 2 via JNB – without traffic rights (no

5th freedom)

• Poor offer

• Little competition

Page 18: Trade and Investment Project

18

Current situation—France

• BASA from 1991: 2x PAR-MPM―No interest―Presence of AF in TNR and Reunion―AF/KLM through Kenya Airways―7 freqs a JNB―Camores

Page 19: Trade and Investment Project

19

Current situation—Portugal

• BASA from 1977 with modifications―Single designation: designed for TAP―TAP: largest European presence―3 freqs a LIS (2 via JNB on one way only)―Interest in 5th freedoms in the region (not

allowed today)

Page 20: Trade and Investment Project

20

Current situation—South Africa

• BASA from 2003―Single designation: for LAM & SAA―Price control―Points in MOZ to CT, Durban, JNB, Nelspruit and

Lanseria―Points in RSA to Beira, MPM, Nampula, Pemba,

Vilanculos

• Effective―11 frequencies MPM-JNB (now requesting to 14)―3 freqs to JNB-Nampula―MPM - Vilanculos

Page 21: Trade and Investment Project

21

Current situation—Tour operators/special

• Policy―Limited entry points

• Technical―Delays in issuing permits―No reliability in response time―Often not granted without explanation

Page 22: Trade and Investment Project

22

Current situation—Poor int’l connectivity

JNB

VNX

MPM

LIS

DAR

POL

BEW

LLW / BLZ

HRE

NBO

Page 23: Trade and Investment Project

23

JNB

VNX

MPM

LHR

LIS

HRELAD

NBO

DAR

POL

BEW

LLW / BLZ

Liberalized situation—Improved int’l connectivity

Page 24: Trade and Investment Project

24

Liberalized situation—Int’l carriers

• LAM―LIS with JNB and LAD (Luanda) by use of 5th

freedoms―HRE (Harare), DAR (Dar es Salaam) and

NRO (Nairobi) with 5th freedoms―And same with LHR (Heathrow) and LIS, 5th

freedoms

• TAP―LIS with JNB by use of 5th freedoms―LAD with 5th freedoms granted

Page 25: Trade and Investment Project

25

Liberalized situation—Int’l carriers (continued)

• BA―LHR/LGW – MPM – JNB (with Comair)―and LUN (Lusaka)

• Virgin―LHR – MPM – JNB (with SAA)―and LUN

Page 26: Trade and Investment Project

26

Current situation—Regional carriers

• LAM: JNB• MEX: DAR• SAA: JNB• KIA: HRE NBO• Pelikan: VNX• Air Corridor: BLW?• Poor offer• Little competition

Page 27: Trade and Investment Project

27

Liberalized situation—Regional carriers

• LAM: JNB & others, HRE, DAR & NRE with 5th freedoms

• SAA: JNB• Pelikan: VNX• Air Corridor: BLW?• Kulula: JNB & others• 1Time: JNB & others• Air Corridor: JNB & others• Comair: JNB & others

Page 28: Trade and Investment Project

28

JNB

VNX

MPM

LHR

LIS

HRELAD

NBO

DAR

POL

BEW

LLW / BLZ

Liberalized situation—Improved connectivity

Page 29: Trade and Investment Project

29

Liberalized situation—Improved int’l connectivity

• Will open alternatives entry points/routes

• Increasing competition

• Improving quality of service

• Facilitating entry for new services (LCC)

• Reducing prices

Page 30: Trade and Investment Project

30

Cents of US$ / mile (excursion return fares), by city pair distance

Air fares from Johannesburg

Page 31: Trade and Investment Project

31

Cents of US$ / mile (excursion return fares), by city pair distance

Air fares from Maputo

Page 32: Trade and Investment Project

32

Excursion and LCC return fares, cents of US$ / mile

Domestic fares Air Corridorfrom MPM Y class RT excursion RT miles $/mls (Y) $/mls (exc) AirlinesBeira 322 252 528 0.61 0.48Quelimane 410 321 830 0.49 0.39Nampula 504 412 800 0.63 0.52Pemba 555 438 975 0.57 0.45from Beira Y class RT excursion RT miles $/mls (Y) $/mls (exc) AirlinesQuelimane 220 172 170 1.29 1.01Nampula 322 252 410 0.79 0.61Pemba 403 318 580 0.69 0.55Maputo 322 252 528 0.61 0.48

LCC fares in RSAfrom JNB RT miles $/mls AirlinesEast London 127 597 0.21 KululaEast London 125 597 0.21 1 TimeCape Town 325 874 0.37 KululaDurban 98 352 0.28 KululaPorth Elizabeth 153 658 0.23 Kulula

Lowest available domestic fares in two markets

Page 33: Trade and Investment Project

33

Excursion and LCC return fares, cents of US$ / mile

Lowest available domestic fares in two markets (continued)

Page 34: Trade and Investment Project

34

Traffic drivers—Domestic market

• Foreign traffic―Reliability―Offer―Tourism infrastructure―price

• Local traffic―Price―Price―Price

Page 35: Trade and Investment Project

35

Traffic drivers—Int’l market

• Foreign traffic―Offer―Development of the domestic market―Price

• Local traffic―Price as a fx(offer)

Page 36: Trade and Investment Project

36

Domestic market is not self sustained: local population can hardly

support the system

Domestic market depends on the

international inflow

International inflow is restricted to protect

LAM

LAM fails to exploit the opportunity & no other carriers can try

International market remains undeveloped

Domestic market does not get international

inflow

A vicious cycle

Page 37: Trade and Investment Project

37

Trigger: liberalization policy develops the international market

Increases inflow of passengers into

the domestic network

Efficiency and low prices drives

tourism & investment

Increase of foreign traffic into domestic market

Gained support on the domestic market

Increases international traffic

The virtuous cycle

Page 38: Trade and Investment Project

38

Needed reforms

• Liberalization of the international traffic―Boost offer―Lowering prices―Increase inflow into domestic market

• Ease technical barriers in the local market―Increase providers / offer―Promote investment in tourism―Generate more demand―Which brings more international pax

Page 39: Trade and Investment Project

39

Needed reforms (continued)

• LAM Competitiveness Program―Restructuring reform

Adapt to the new challenges: business plan Reallocation of resources Capacity building program

―Management options Change in ownership structure (PSP) Management contract

Page 40: Trade and Investment Project

40

Obrigado


Recommended