European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire
Update on the PSB CV Projects
LIU-PSB Working Group Meeting, 28.08.2018
Gabor Petrika EN-CV
Work Packages:
• Cooling (Demi Water)• Chilled Water• POPS cooling modification• (Ventilation)
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire
Scope:
• New cooling towers 4 x 2.3[MW]; > N+1 redundancy
• New cooling station (pumps, heat exchanges…) 4,5 [MW] + 0.5 [MW];
• New electrical & control system;
• New instrumentation;
• Distribution network modifications > Surface-Tunnel separation, RF line
• Pressure rating upgrade; > 20 %Higher flow
Status & next steps:• UR + WP (EDMS 1963310); > ASAP
• ECR, WPA & WDP; > 09.2018
• 3D integration, P&ID & engineering specification, primary hydraulic study;
• Tendering launched;
• Order launching; > 31.08.2018
• Detailed design; > 09-12.2018
• On-site activities; > 12.2018
PSBCooling & ChW
Scope &Status
Cooling plantB237
Cooling distribution B361
Chilled water plant
P&ID
Budget status
Planning
POPS
COOLING
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire
Scope:
• Common raw water plant with the cooling; > N+1 redundancy
• New chillers (HFO) 2 x 700 [kW] + Existing chiller 1 x 700 [kW] (R134a)
• New production plant in B141 (pumps, heat exchanges…);
• New electrical & control system;
• New instrumentation;
• Connected to the existing distribution system in B361; > WL2 ventilation
Status & next steps:• B141 consolidation
• ECR & WPA; > 09.2018
• 3D integration, P&ID & engineering specification,
• Tendering launched;
• Order launching; > 31.08.2018
• Detailed design; > 09-12.2018
• On-site activities; > 11.2018
Chilled Water PlantPSB
Cooling & ChW
Scope &Status
Cooling plantB237
Cooling distribution B361
Chilled water plant
P&ID
Budget status
Planning
POPS
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire
COOLING
Cooling plant external view
B237 Cooling plant 3D
B237 Cooling plant - Layout
3D integration G. H. Nitwinko EN-CV-DO
PSBCooling & ChW
Scope &Status
Cooling plantB237
Cooling distribution B361
Chilled water plant
P&ID
Budget status
Planning
POPS
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire
Cooling tunnel circuit upgrade – RF line Cooling tunnel circuit – PN upgrade
3D integration G. H. Nitwinko EN-CV-DO
PSBCooling & ChW
Scope &Status
Cooling plantB237
Cooling distribution B361
Chilled water plant
P&ID
Budget status
Planning
POPS
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire
B141 - Chiller plant
3D integration G. H. Nitwinko EN-CV-DO
User group Cooling
load
[kW]
Location Service
area
PSB – AHUs 980 B361 Primary
MPS - AHUs 160 B245 Primary
PS-AHUs 300 B359
B357
Primary
Reserve 765 - Secondary
PSBCooling & ChW
Scope &Status
Cooling plantB237
Cooling distribution B361
Chilled water plant
P&ID
Budget status
Planning
POPS
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire
Chilled water P&ID
B141 WL1 – LS2
B361 WL2
PSBCooling & ChW
Scope &Status
Cooling plantB237
Cooling distribution B361
Chilled water plant
P&ID
Budget status
Planning
POPSG. H. Nitwinko EN-CV-DO
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire
Cooling Plant Primary circuit - P&ID
B237 - Primary
B237 roof – Cooling towers
PSBCooling & ChW
Scope &Status
Cooling plantB237
Cooling distribution B361
Chilled water plant
P&ID
Budget status
Planning
POPSG. H. Nitwinko EN-CV-DO
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire
Cooling Plant demi circuits - P&ID
Surface Circuit
85m3/h
Tunnel circuit
153 m3/h
Tunnel circuit
RF149 m3/h
PSBCooling & ChW
Scope &Status
Cooling plantB237
Cooling distribution B361
Chilled water plant
P&ID
Budget status
Planning
POPSG. H. Nitwinko EN-CV-DO
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire
Budget status – Cooling & ChW
Cooling ChW
TotalBC 5363553674
BC 53603
B237 Dismantling 49,000 53,000 102,000 [CHF]
B237 Cooling primary 578,000 385,000 963,000 [CHF]
B237 Demi water stations 497,000 - 497,000 [CHF]
PG & B361 Demi water distribution 454,000 - 454,000 [CHF]
B237 Cabling and control 127,000 85,000 212,000 [CHF]
- Design, transport, testing 203,000 84,000 287,000 [CHF]
B141 Chilled water production - 270,000 270000 [CHF]
B361 Chilled water distribution - 33,000 33,000 [CHF]
B141 Cabling and control - 98,000 98,000 [CHF]
B141 B141 gen. services - 34,000 34,000 [CHF]
- Design, transport, testing - 52,000 52,000 [CHF]
B237 Water treatment 70,000 20,000 90,000 [CHF]
B141 Chillers - 247,000 247,000 [CHF]
B289 Power cubicles 85,000 69,000 154,000 [CHF]
- FSU 130,000 140,000 270,000 [CHF]
- EL power supply 124,000 124,000 248,000 [CHF]
- Scaffolding&transport 50,000 50,000 100,000 [CHF]
B237 &B141 SMB 88,000 98,000 186,000 [CHF]
Total 2,455,000 1,842,000 4,297,000 [CHF]
CV
co
ntr
acto
r D
elta
-Ti
Fra
me
wo
rk c
on
tra
ct
Nr.
B1
49
7
Oth
er
CV
fra
me
wo
rk
co
ntr
acts
Inte
rna
l
co
ntr
ibu
tion
PSBCooling & ChW
Scope &Status
Cooling plantB237
Cooling distribution B361
Chilled water plant
P&ID
Budget status
Planning
POPS
Will be reused:
• 0.7 [MW] chiller (recently overhauled);
• Demi heat exchanger for Chw;
• Demi cartridges;
• Exp. Vessels;
• Existing pipes on the PG;
Cancelled activities:
• Ventilation consolidation;
• Heating system removal in the PSB tunnel;
• Removal and consolidation activities in B361;
• ChW distribution consolidation for AHUs;
• Buffer tank consolidation;
• VSD for constant flow circuits;
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire
Planning
Today
On-site activity
starts
No cooling RF tests
PSBCooling & ChW
Scope &Status
Cooling plantB237
Cooling distribution B361
Chilled water plant
P&ID
Budget status
Planning
POPS
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire
POPS Cooling System ModificationPSB
Cooling & ChW
Scope &Status
Cooling plantB237
Cooling distribution B361
Chilled water plant
P&ID
Budget status