30
Urgency One of the most pressing challenges of the new construction and maintenance of existing buildings and structures is a hydro-protection and restoration of the bearing capacity of building structures. Water acts on structures in the outer or inner side (atmospheric and groundwater). In the spring thaw raises the groundwater level (GWL), which interact with mineral and organic particles, change their chemical composition and concentration. Groundwater level fluctuations activate the leaching of lime in concrete structures. Rainwater captures from the atmosphere of a large number of gaseous industrial emissions. Is converted to the acid rain solution destroying concrete, marble, silicate bricks, this increases the number of pores, capillaries, and cracks. For protection of various constructions from surface wear and cracking, i.e. from the harmful effects of water and aggressive environment use various waterproofing materials (based on cement, bitumen, polymer).
Transcript

Urgency

One of the most pressing challenges of the new construction and maintenance of existing buildings and structures is a hydro-protection and restoration of the bearing capacity of building structures. Water acts on structures in the outer or inner side

(atmospheric and groundwater).

In the spring thaw raises the groundwater level (GWL), which interact with mineral and organic particles, change their chemical composition and concentration. Groundwater level fluctuations activate the leaching of lime in concrete structures. Rainwater captures from the atmosphere of a large number of gaseous industrial emissions. Is converted to the acid rain solution destroying concrete, marble, silicate bricks, this increases the number of pores, capillaries, and cracks.

For protection of various constructions from surface wear and cracking, i.e. from the harmful effects of water and aggressive environment use various waterproofing materials (based on cement, bitumen, polymer).

Urgency

Relevant environmental, technical and economic problem in many countries is the utilization of sulfur formed as waste oil and

gas, the amount of which is increasing every year, reaching several million tons.

Processing of low-cost sulfur is economically viable and could solve the environmental problem in any

region.

The pollution of the environment sulfur dust, which in windy weather spreads

over long distances. Are often sulfur dust explosions occur.

LLC «Gubkin E & TC» has developed a unique product - a waterproof coating on the basis of polymeric sulfur,

which would solve two problems at once: 2

•- problem of disposal of the sulfur formed as a departure of oil and gas processing, the amount of which is increasing every year

1

•- the problem of new construction and operation of existing buildings and structures associated with waterproofing and repair of building structures (foundations, etc.) exposed to groundwater, surface water and industrial waste waters, adverse climatic factors

The application of waterproofing coatings based on highly polymerized sulfur

The lining and protection of underground facilities

Waterproofing underwater, waterworks

Waterproofing dams, bridge piers, quays

Waterproofing pools, reservoirs, ponds

Waterproofing of building structures in the disposal of

chemical waste

Examples of constructions which can be used for waterproof coating on a highly polymerized sulfur:

Hydraulic facilities:

• Reservoirs (open, diked etc.)• Swimming pools (open and closed)• Manholes• Docks• Berths• The design of treatment facilities

(aeration tanks, septic tanks, sewers, pumping, etc.)

• concrete seawall• Dams, etc.

Civil engineering structures:

• Foundations• Basements• Underground facilities (parking

lots, garages, transitions, etc.)• Balconies• Lift shafts

Examples of constructions which can be used for waterproof coating on a highly polymerized

sulfur:

Industrial and agricultural facilities:

• Industrial premises• Pools of cooling towers• Vaults• Chimneys• Mines• Bins• Concrete structures exposed to

aggressive action, etc.

Objects of energy sector:

• Spent nuclear fuel pools• Pumping stations• Storage of spent nuclear fuel• Canals• Overpass of fuel• Cable tunnels

Examples of constructions which can be used for waterproof coating on a highly polymerized sulfur:

Objects of Defense and Emergencies :

• Seekers• Fire tanks, etc.

Concrete structures exposed to radiation, etc. Transport infrastructure :

• Tunnels (road, rail, walking, etc.)• Subways• The elements of bridges and roads,

etc.

The benefits of an innovative product :

Economic efficiency

Efficiency, reliability, durability

The opportunity to work with a variety of

construction materials (concrete, brick, etc.)

No pretreatment step of building materials

Ability to work under the negative ambient

temperatures

Safety and environmental

Market

• Construction is one of the most important sectors of the national economy. Its condition largely determines the level of development of

society and its productive forces.

• Along with the development of the construction industry is growing demand for high-performance waterproofing coating. Existing on the market waterproofing materials have a number of drawbacks, such as high cost, low efficiency, fragility, low resistance to aggressive media,

etc.

• Thus, an innovative product - the waterproof coating on the basis of a highly polymerized sulfur will be worthy competition to existing

waterproofing materials on the market and the demand is expected to be high.

Areas of use of an innovative product

Thus, the implementation of technology applied waterproofing coating can be carried out at the plants by entering additional workshops, as well as at the location of the object, using compact equipment necessary for the application of a waterproofing coating.

Waterproofing at during manufacture of building

materials

Waterproofing on stage repair of

finished constructions

Technologies of drawing of waterproofing coating based on a highly polymerized sulfur on building materials:

Complete impregnation

• In the first method the impregnation is carried out by dipping the product in the chamber with the melt impregnation of polymeric sulfur. This flow chart is best suited for permanent installation, for example, at an operating plant of concrete products as a complementary technology unit in which part of the products produced by the plant can be processed in the melt of polymeric sulfur. Possible to use this method for operating a mobile unit in which the impregnation products operate on site immediately before installation (for example, prior to impregnation pile elements clogging or zero cycle before their installation). The first method is used when processing prefabricated usually new, not yet assembled products. The depth of infiltration is provided and monitors the flow rate of the solution in the bath for impregnation cycle.

Surface impregnation

• By the second method the melt polymeric sulfur applied to the surface of structures by brushing, rolling, spraying, or by another similar device. The method can be used for precast have not yet mounted structures and elements for existing buildings, including at their repair or reconstruction.

Embodiments of an innovative product

1

•Construction of the production of polymeric sulfur and sales of waterproofing material as to the factories that manufacture building materials, as to individuals willing to repair the building structures.

2

•Construction of the production of polymeric sulfur and maintenance of commercial production of a new product at the plant, produces building materials, and, accordingly, sales of a new product - "a building material with a waterproofing coating."

The calculation of the construction unit for production of polymeric sulfur capacity - 6000 tons / year. This will

get the following amounts of development of technology:

The impregnation of concrete• Complete impregnation requires the

consumption of a building material for 1m3 approximately 6kg, which will handle about 1 000 000 m3 of building products.

• A melt flow of polymeric sulfur per 1m2 for surface treatment is 0.8-1.0 kg. It will handle more than 6000000 m2 of surface.

The impregnation of bricks• Complete impregnation of one brick

requires the consumption of 0.11 kg of polymeric sulfur, which will handle nearly 54 mln bricks.

• In 1m2 masonry contains 51 brick, hence the polymer sulfur flow rate per 1m2 at full treatment is 51 * 0.11 = 5.61 kg.

• A flow of polymeric sulfur per 1m2 for surface treatment is 0.8-1.0 kg. It will handle more than 6 000 000 m2 of surface.

• In 1m3 masonry contains 394 bricks, from here on 1m3 brick masonry with full treatment takes about 394 * 0.11 = 43.34 kg.

Technological scheme of the unit for the preparation of polymeric sulfur in

3D

Overview of the equipment needed to produce polymeric sulfur

1. Storage tanks and sulfur stabilizer, equipped with electric paddles and heating jacket, coolant - superheated steam.

2. Reactor-mixer for preparing a composition of liquid sulfur and stabilizer: equipped with a paddle stirrer with electric and heating jacket, Heat carrier - superheated steam.

3. Fridge-crystallizer scraper, refrigerant: cooling water or liquid propane from propane refrigeration cycle.

4. Heater - heat exchanger scraper, Heat carrier - superheated steam;

5. Pumps;

6. Dispensers.

Safety and environmental project

• In the solid polymeric sulfur (polymerization degree 75-80%) - fire resistant material, non-toxic, hazard class 4. Liquid sulfur is non-toxic.

• Melting point-120°C, the temperature of spontaneous combustion 575 °C.

• Solid polymeric sulfur is in the glassy state and does not generate sulfur dust.

• Liquid polymeric sulfur in the overflow and storage (in direct contact with oxygen in air) generates sulfur dioxide (SO2) in a small amount (within the maximum allowable concentration). The maximum permissible concentration (MPC) for airborne concentrations are: for sulfur dioxide - 10 mg/m3. Monitoring the MPC is the local branch of environmental control.

• Polymeric sulfur is not more toxic compounds forms in the air and waste waters in the presence of other substances and it has no cumulative properties.

On this innovative product is designed MSDS

Safety and environmental project

Qualified personnel must be trained Knowledge check on industrial safety and

labor protection, safety at work with polymer sulfur, as well as familiar with the relevant sections of the instructions and emergency

response plans.

When working with polymer modified sulfur staff must be provided with personal protective

equipment (PPE) and protective equipment Respiratory Equipment (RPE) (special clothing,

safety goggles, rubber gloves, respirators).

Calculation of income from the sale of polymeric sulfur

Item nameAmount , in tons / year

Unit price of,EUR / ton

Overall, EUR / year

Sulfur Polymer, including: 6 000    

- sulfur from the gas processing 5 940 37.5 222750

- stabilizator 60 1875 112500

Total raw materials 6 000   335250

Sulfur Polymer 6 000 200 1200000

Total income     864750

Technical and economic characteristics of the installation for the production of polymeric

sulfur capacity of 6000 tons / year

№ data module units of

1 Annual operating mode час. 8 000 

2Commercial products in

natural units:   

2.1 Polymeric sulfur tons / year 6 000

3 Commodity output EUR 1 200 000

4 Growth of commodity products EUR 864750

5Additional operational

expensesEUR 350000

6 Profits tax EUR 103000

7 Net income for the year EUR 411875

8 Capital expenses EUR 432497,5

9 Payback period year 1,05

The dynamics of growth of tariffs for raw materials, wages, operating costs and the

cost of commodity product

datanormative,

% module todayafter 1 year

after 2 year

after 3 year

after 4 year after 5 year

wages 8EUR / year 254671 275045 297049 320812 346477 374960

the cost of electric power 2,5

EUR / year 78000 79950 81949 83998 86098 88250

operating costs (transport, replacement

materials, service) 2EUR / year 14178 14462 14751 15046 15347 15654

raw material costs 1,5EUR / year 335250 340279 345383 350564 355822 361160

commodity price of the product 2,3

EUR / year 200 204,5 209,25 214 219 224

The dynamics of growth of wages, insurance premiums and tax

payments

тыс. руб.

Technology of production of building materials with a

waterproofing coating

• This technology is to fully melt impregnation of building materials, and polymeric sulfur can be carried out directly on plants producing building

materials.

• Below are the results of calculations of this technology for the impregnation of concrete and

brick. The calculation for each construction material is kept separately.

The calculation of the capital cost of the introduction of the installation for applying a waterproofing coating for building materials

№ 

Name of equipment and costsNumber of units.

 

Required Ratio% of the cost 

Unit price of, .EUR

Sum, EUR. 

1 basic equipment:        

1.1 Heated tank for liquid polymeric sulfur 1   16250 16250

1.2 The conveyor-belt 1   50 000 50 000

1.3 Other     2500

Total capital equipment       687502 Iinstrumentation   20   13750

3 Shut-off and control and relief valves   30   20625

Total equipment       34375

4 Transportation, harvesting and storage costs   10   10313

5 Dismantling, assembly   15   15469

6 Project work   50   51563Total capital expenditures       180469

Calculation of income from the sale of building materials with a waterproofing coating of polymeric sulfur.

Waterproofing concrete Waterproofing brick

Item name

Number of m3 / year (concrete

cubes)(S, ton/year)

Unit price of, EUR./

м3

Sum, mln EUR./ year

Raw materials, including:      

- concrete 1 000 000 100 100

- polymeric sulfur 6 000 200 1,2

Total raw materials:     101,2

concrete with waterproofing coating

1 000 000 110 110

Total income     8,8

Item nameNumber, ths units / year

(S, ton/year)

Unit price ,EUR/

ths units

Sum, mln EUR./ year

Raw materials, including:      

- brick 53 93258 300 16,1798

- polymeric sulfur 6 000 200 1,2

Total raw materials:     17,3798

brick with waterproofing coating

53 93258 337,5 18,2023

Total income     0,8225

Technical and economic parameters of the unit for applying a waterproofing coating for building

materials

Waterproofing concrete

№ Data module U

1 Annual operating mode hour  

2 Commercial products:    

2.1 Concrete with waterproofing coating м3 1 000 000

3 Cost of commodity production

ths. EUR 110 000

4 Growth of commodity products ths. EUR 8800

5 Additional operational expenses

ths. EUR 8388,2

6 Profits tax ths. EUR 82,36

7 Net income for the year ths. EUR 329,44

8 Capital expenses ths. EUR 180,47

9 Payback period year 0,55

Waterproofing brick

№ Data module U

1 Annual operating mode hour  

2 Commercial products::    

2.1 Brick with waterproofing coating

ths units 53 93258

3 Cost of commodity production ths. EUR 18202,3

4 Growth of commodity products ths. EUR 822,5

5 Additional operational expenses

ths. EUR 701,4

6 Profits tax ths. EUR 24,21

7 Net income for the year ths. EUR 96,86

8 Capital expenses ths. EUR 180,47

9 Payback period year 1,86

The dynamics of growth of tariffs

Waterproofing concrete

datanormative,

% module today after 1 year after 2 year after 3 year after 4 year after 5 year

wages 8Ths EUR /

year 254,67 275,05 297,05 320,81 346,48 374,20

the cost of electric power 2,5

Ths EUR / year 8125 8328,13 8536,33 8749,74 8968,48 9192,69

operating costs (transport,

replacement materials, service) 2

Ths EUR / year 7,01 7,15 7,30 7,44 7,59 7,74

raw material costs 1,5Ths EUR /

year 101200 102718 104259 105823 107410 109021

commodity price of the product 1,7

Ths EUR / year 0,11 0,1118 0,1138 0,1158 0,1178 0,1198

The dynamics of growth of tariffs

Waterproofing brick

datanormative,

% module today after 1 year after 2 year after 3 yearafter 4 year after 5 year

wages 8Ths EUR /

year 254,67 275,05 297,05 320,81 346,48 374,20

the cost of electric power 2,5

Ths EUR / year 438,2 449,16 460,39 471,9 483,69 495,79

operating costs (transport,

replacement materials, service) 2

Ths EUR / year 7,01 7,15 7,30 7,44 7,59 7,74

raw material costs 1,5Ths EUR /

year 1738 17640,5 17905,1 18173,7 18446,3 18722,9

commodity price of the product 1,7

Ths EUR / year 0,3375 0,34325 0,349 0,355 0,361 0,36725

The dynamics of growth of wages, insurance premiums and tax

payments

тыс. руб.

Waterproofing concrete Waterproofing brick

conclusion:

ООО «Губкинский инженерно-технический центр»http://gubkin-etc.ru/

Necessary information from the customer to design the plant for the production of polymeric sulfur:

1. Productivity of the plant;

2. Information about the initial temperature of the raw sulfur coming to the plant;

3. Type of refrigerant (propane, ammonia, water) and parameters (t, P);

4. Selection of shipment (packaging) of the finished product (type, size of package).

Comparative characteristics of waterproof materials and placement of seats in accordance

with the evaluation criteriaThe evaluation criteria Type of waterproofing material

Waterproofing on the basis of polymeric sulfur

Waterproofing cement-based

Waterproofing bitumen-based

Polymer waterproofing

Cost-effectiveness (cost / expense)

0,2 € /m21,75 € /m2 3,2 € /m2 15 € /m2

Efficiency (ratio of water absorption)

durabilityComparable with the lifetime of

the building materialComparable with the lifetime of

the building material

15years 20-30 years

The need for pre-treatmentPretreatment is not needed required surface preparation required surface preparation requires careful preparation of the

surface

Safety and environmental-operation at elevated

temperaturesoperation at elevated

temperatures;- hazardous emissions into the

atmosphere

Resistance to aggressive environments

Total:

2

41 3

1 4 3 2

1

2

1 24 3

1 3 4

3

14

2

1 3

2

2

4

3

1 2

4

3


Recommended