slide1 Utility Street Works 2007 24 th January 2007 The National Street Gazetteer (NSG) – on the move Tony Black Operations Director Intelligent Addressing Ltd (NSG Hub Custodians)
Transcript
Page 1: Utility street works 24.1.07

slide1

Utility Street Works 200724th January 2007

The National Street Gazetteer (NSG) – on the move

Tony Black

Operations Director

Intelligent Addressing Ltd

(NSG Hub Custodians)

Page 2: Utility street works 24.1.07

slide2

Utility Street Works 2007

Why this presentation on the NSG?

Its:-

•Improved

•Updated

•Complete

The ‘new’ NSG!

Page 3: Utility street works 24.1.07

slide3

Utility Street Works 2007Background:

In the late 1980s Prof Horne in his report into the prospective Computerised and Street Works Register included in his recommendations:• the need for a definitive gazetteer of all the streets in the country • that the data should be collected at source • that it should be application independent – “collect once, use many times”

The NSG working party had a range of members and the resultant specification became BS7666 Part 1.

Page 4: Utility street works 24.1.07

slide4

Utility Street Works 2007The “step change”:

The signing of local government’s Mapping Services Agreement (MSA) in 2005

Local government’s contract with itself to deliver the highest quality data it needs to support its agendas around providing improved services to citizens and links to other organisations.

Intelligent Addressing Ltd appointed NSG (and NLPG) hub custodians

Obligations on Highway Authorities to:- provide regular updates (quarterly moving to monthly)- improve the completeness and quality

Page 5: Utility street works 24.1.07

slide5

Utility Street Works 2007The NSG being used for other applications:-

• 2006 NSG Award winner – Sandwell MBC using its LSG for a wide range of applications including inventory and condition surveys, street lighting and UKPMS

• the National Land and Property Gazetteer (NLPG) is built to BS7666 Part 2, which means it must have links to the NSG for USRNs. As the quality of the NLPG is being improved in terms of completeness, consistency and currency there are knock on benefits for the NSG. For example the greater involvement of the Street Naming and Numbering Officers. The objective of the LA community is to move all 375 authorities to daily updates by October 2007.

Page 6: Utility street works 24.1.07

slide6

Gazetteer submission status by quarter

Page 7: Utility street works 24.1.07

slide7

• Most up to date and comprehensive street gazetteer for England and Wales– Sourced directly from highway authorities with feed

from street naming and numbering• Increasing commitment to NSG since IA become custodians

405060708090

100110120130140150160170180

Nov-04

Feb-05 May-05

Aug-05

Nov-05

Feb-06 May-06

Aug-06

Nov-06

Num

. Sub

mis

sion

sNational Street Gazetteer

100%

Page 8: Utility street works 24.1.07

slide8

Level 3 Gazetteer submission status

Page 9: Utility street works 24.1.07

slide9

90100110120130140150160170180

Nov-05

Mar-06

May-06

Aug-06

Nov-06

Jan-07

Feb-07

Quarter

Nu

m. S

ub

mis

sio

ns

100%

LSG increasingly captured at level 3 (complete street geometry)

LSG – Level 3 Data Submissions

Page 10: Utility street works 24.1.07

slide10

Discussing:

• best Practice for data entry into an LSG

• core element data entry (ESU definition – elementary street unit)

• DNF (Digital National Framework) Compliance

• attribution

• compliance checking improvements

Data quality improvements

Page 11: Utility street works 24.1.07

slide11

Utility Street Works 2007

LSG Data Entry Conventions and Best Practice in the NSG Technical Working PartyRepresentatives from:

• Street Works Community• Street Naming and Numbering• Local Land and Property Gazetteer• Transport for London• Network Rail

Page 12: Utility street works 24.1.07

slide12

Utility Street Works 2007

So the NSG is committed to a programme of continuous improvement.

It’s following rigorous information management principles with the objective of being the definitive list of streets to support the improved provision of services, both on the streets and for an increasing range of applications related to them

Page 13: Utility street works 24.1.07

slide13

Utility Street Works 2007

Any questions?

• visit the NSG stand (examples/demos)

• www.thensg.org.uk

• Intelligent Addressing’s NSG Help Desk 0207 747 3502

• email: [email protected]