+ All Categories
Home > Documents > Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential...

Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential...

Date post: 13-Aug-2019
Category:
Upload: dinhkien
View: 220 times
Download: 0 times
Share this document with a friend
24
Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance Instructions In this procedure document we have endeavoured to make the information as accurate as possible. We cannot accept any responsibility should it be found that in any respect the information is inaccurate or incomplete or becomes so as a result of further developments or otherwise. Intatec Ltd Airfield Industrial Estate Hixon Staffordshire ST18 0PF Tel: 01889 272 180 Fax: 01889 272 181 email: [email protected] web: www.intatec.co.uk © Intatec Ltd. 2016
Transcript
Page 1: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

Wall & Deck MountedSequential ControlThermostatic MixerHTMWMCP, HTMDMCPHTMWMRS & HTMDMRS

Installation and Maintenance Instructions

In this procedure document we have endeavoured to make theinformation as accurate as possible.We cannot accept any responsibility should it be found that inany respect the information is inaccurate or incomplete orbecomes so as a result of further developments or otherwise.

Intatec LtdAirfield Industrial Estate

HixonStaffordshire

ST18 0PF

Tel: 01889 272 180Fax: 01889 272 181

email: [email protected]: www.intatec.co.uk

© Intatec Ltd. 2016

Page 2: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 1

Contents Thank you for choosing the Inta lever operated thermostatic wall mixer.

Subject Page Introduction 2

Technical Data 2

Components - Wall Mounted 3

Components - Wall Mounted with Removable Spout 4

Components - Deck Mounted 5

Components - Deck Mounted with Removable Spout 6

Dimensions 7

Installation 8

Operation 9

Trouble Shooting 9

Re-calibration 10

Cartridge Removal 10

Aftercare 11

Removing Spout and Disinfection 12

System Flushing Procedure 13

Sterilization Process 14

TMV3 Installation Instructions 16

Guarantee 21

Page 3: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 2

Introduction This installation guide has been produced for the wall and deck mounted sequential control mixer. These instructions cover the installation, operation and maintenance. Please read the enclosed instructions before commencing the installation of this product, please note; We recommend that the installation is carried out by an approved installer. The installation must be carried out strictly in accordance with the Water Supply (Water Fitting) Regulations 1999 and any local authority regulations. If in doubt we recommend that you contact WRAS - Water Regulations Advisory Scheme on Tel: 0333 207 9030, your local water authority - details available on the WRAS website or the Chartered Institute of Plumbing and Heating Engineers on Tel: 01708 472 791. All products MUST be re-commissioned to suit site conditions to ensure optimum performance levels of the product are obtained.

Check Content Before commencing remove all components from packaging and check each component with the contents list. Ensure all parts are present, before discarding any packaging. If any parts are missing, do not attempt to install your control mixer until the missing parts have been obtained.

Product Range HTMWMCP - HTM safe touch thermostatic sequential wall mounted tap. HTMDMCP - HTM safe touch thermostatic sequential deck mounted tap. HTMWMRS - HTM safe touch thermostatic sequential wall mounted tap with removable spout. HTMDMRS - HTM safe touch thermostatic sequential deck mounted tap with removable spout.

Technical Data This Inta thermostatic mixer is suitable for installations on all types of plumbing systems, including gravity supplies, fully pumped, modulating combination boiler, unvented water heater and unbalanced supplies i.e. Cold Mains & Tank Fed Hot. Max Dynamic Pressure 5 bar Min Operating Pressure 1.0 bar Max Static Pressure 12 bar Min Inlet Temperature 10˚C Max Inlet Temperature 85˚C Temperature Stability ± 2˚C Pre Set Factory Temp Setting 41˚C Min Temp Differential to Max Unbalanced Pressure Ratio ensure fail-safe between hot Without Flow Regulator 5:1 and cold supplies 10˚C

Preparation for Installation Before starting the installation, ensure that the site conditions are suitable - see Technical Data. The tap is supplied for wall or deck mounting as shown. Flush the water supply pipes thoroughly prior to installation - see page 13. Do not allow debris, PTFE tape or any metal particles to enter the mixer.

Page 4: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 3

Item Description Item Description

1 Body inc. Outlet Diffuser 10 Hot Water Insulator

2 Thermostatic Cartridge11

Cold Water Inlet Assemblyincluding 5 l/m flow regulator3 Lever

4 Lever Retaining Screw12

Hot Water Inlet Assemblyincluding 5 l/m flow regulator5 Concealing Plate

6 Cold Water Inlet Tail Assembly 13 Hot Water Port Blanking Assembly

7 Hot Water Inlet Tail Assembly 14 Cold Water Port Blanking Assembly

8 Sealing Washer 15 Backnut

9 Swivel Nut

Components - Wall Mounted with Fixed Spout

1

2

34

56

57

89

11

13

14

15

15

10

12

Page 5: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 4

Item Description Item Description

1 Body 18 Spout Retaining Screw

17 Spout 19 ‘O’ Ring

Components - Wall Mounted with Removable Spout

Additional Components - Removable Spout

1

2

34

56

57

89

11

13

14

15

15

10

12

1718

19

Page 6: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 5

Item Description Item Description

1 Body inc. Outlet Diffuser 10 Hot Water Insulator

2 Thermostatic Cartridge11

Cold Water Inlet Assemblyincluding 5 l/m flow regulator3 Lever

4 Lever Retaining Screw12

Hot Water Inlet Assemblyincluding 5 l/m flow regulator5 Concealing Plate

6 Cold Water Inlet Tail Assembly 13 Hot Water Port Blanking Assembly

7 Hot Water Inlet Tail Assembly 14 Cold Water Port Blanking Assembly

8 Sealing Washer 15 Backnut

9 Swivel Nut 16 Washer - Chrome

Components - Deck Mounted with Fixed Spout

1

2

34

11

6

5

8

9

7

5

13

14

1615

10

12

Page 7: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 6

Item Description Item Description

1 Body 18 Spout Retaining Screw

17 Spout 19 ‘O’ Ring

Components - Deck Mounted with Removable Spout

1

2

34

11

6

5

8

9

7

5

13

14

1615

10

12

1718

19

Additional Components - Removable Spout

Page 8: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 7

Dimensions - Wall Mounted

Dimensions - Deck Mounted

37

G½B

12875 105

186.5Ø45

266

116.

5

Ø50 Ø33

75187.5

200

G½B

Ø50

Ø33

100

Page 9: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 8

Installation Wall Mounting • The tap is supplied as shown in the Components section except that the thermostatic cartridge (2) and swivel nut connectors (9) are fitted into the body. • Fit the concealing plates (5) onto the tailpieces (6) & (7). • Screw the tailpiece (6) into the cold water inlet of the tap, right hand side when facing the tap. ATTENTION: The hot water inlet connection tail can be identified by the brass insulator pipe that protrudes past the connecting thread. Care must be taken to ensure the Hot Water Inlet Tail Assembly is connected securely into the hot water inlet of the tap body. • Screw the tailpiece (7) into the hot water inlet of the tap, left hand side when facing the tap. • For wall mounting fit the tap assembly to the mounting panel, using the back nuts (15) and slide the concealing plates to the panel. • Care should be taken that the maximum panel thickness does not exceed 33mm.. • Connect the supply pipes to the tap, cold on the right, hot on the left. • Fit the lever (3) to the tap using the grub screw (4) provided. • Please ensure that the hydraulic installation is completed and that all check valves are open.

Deck Mounting • Screw the tailpiece (6) into the cold water inlet of the tap, right hand side when facing the tap. ATTENTION: The hot water inlet connection tail can be identified by the brass insulator pipe that protrudes past the connecting thread. Care must be taken to ensure the Hot Water Inlet Tail Assembly is connected securely into the hot water inlet of the tap body. • Screw the tailpiece (7) into the hot water inlet of the tap, left hand side when facing the tap. • For deck mounting fit the tap assembly to the basin, using the washers (16) and back nuts (15) (supplied) and slide the concealing plates to the basin. • Connect the supply pipes to the tap, cold on the right, hot on the left. • Fit the lever (3) to the tap using the grub screw (4) provided. • Please ensure that the hydraulic installation is completed and that all isolation valves are in the open position.

Cold waterinlet tail

Sealingwasher

6Hot waterinlet tail

7

Page 10: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 9

As the handle is rotated anti-clockwise from the off position the delivered water progresses fromcold, through warm to the pre-set maximum temperature of approximately 43˚C.

Operation

Trouble Shooting Fault Diagnosis Mixed water temperature is not hot enough. Ensure the hot water supply is at a constant temperature above 60˚C. Re-calibrate as per page 10. Check for airlocks in the pipework. The water goes cold during operation. Insufficient stored hot water supply. Ensure that the boiler is still firing for combi boilers. Adjust the boiler control to a minimum setting of 65˚C not necessarily the best flow rate. Temperature is too hot or when set to Check the commissioned maximum hot water runs cold. temperature of the valve. Check connections to the mixer are not reversed. Flow of water through the valve is low. Check the filters are clean and supply pressure is above 1 bar. No flow of water. Ensure the mixer has not fail-safed, and check that there is water flow to the mixer and the service valves are not closed - see exploded drawing.

Off

Warm

Cold

Max. blendtemperature(preset)

Hot SupplyCold Supply

Page 11: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 10

Re-Calibration The factory setting at 41˚C can be altered to suit site conditions.

Warning: Care must be taken when altering the setting as incorrect calibration can cause injury.

• Remove the grub screw.

• Lift the handle cover off.

• Re-calibrate by removing the temperature stop rings from the cartridge and set the mixed water to the required temperature by temporarily re-fitting the control lever.

• Once the required temperature is achieved replace the two temperature stop rings on the splined spindle of the cartridge as shown. These two rings are used to prevent the temperature of the cartridge from being altered whilst in use. The stop rings should be locked at either end of the operating cycle and will form a physical stop to prevent the cartridge turning (see below)

• Refit the lever assembly and grub screw.

• Recheck the calibrated temperature

A

B

A

AB

B

Remove rings and set water temperature

Replace rings as shown

Rings act as stops

Cartridge removal 1 Unscrew the retaining screw and remove the lever. 2 The thermostatic cartridge is a single piece construction and should be unscrewed anti-clockwise from the mixer body using a suitably sized spanner. 3 When re-installing the cartridge into the mixer body, it should be tightened to a maximum torque of 15 Nm

Page 12: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 11

Aftercare • With all highly polished items, care should be taken not to damage any of the external surfaces.

• We recommend that to ensure the physical appearance of the product and component parts that it is periodically cleaned with a soft damp cloth and a mild detergent. The use of abrasive or solvent cleaners will damage the finish of the product.

• We recommend periodically that the flow straightener is cleaned using a suitable scaling solvent. Check first it does not affect the plated surface.

• The internal bore of the flow straightener must be periodically wiped using a damp cloth.

• We recommend that this fitting is serviced at least once a year.

• Only use genuine spare parts, the full list is available on request by ringing the Technical Helpline number on the back page.

Removing Spout The HTMWMRS wall mounted and HTMDMRS deck mounted taps have a removable spout to assist with cleaning, disinfection by immersion or sterilisation in an autoclave.

Inta recommend that a replacement spout is available as the tap should not be left without a spout (HTMSP16XX).

Cleaning, disinfection and sterilisation is only necessary if there is evidence of solid deposits around the outlet from the tap or a minimum of once per year.

• Ensure the isolation valve in both supplies to the tap are in the closed position and the lever is also in the closed position to prevent water flow and potential flooding.

Internal borein flow straightener

Page 13: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 12

• Using a suitably sized Allen key unscrew the grub screw (18) located beneath the spout. The grub screw must be removed completely to ensure the ‘O’ rings are not damaged when the spout is pulled away.

• Pull the spout (17) away for the body of the tap, care should be taken to prevent damage to the chrome finish of the spout.

• Check the condition of the two ‘O’ rings (19) on the spigot of the tap body, if damaged they must be replaced.

Once the spout has been removed disinfection or sterilisation can commence.

• The spout can be sterilised in an Autoclave following standard sterilisation procedures.

• The spout after disinfection and sterilisation should be stored in such a manner that they will not become infected or dirty before refitting.

Refitting Spout • When refitting the spout lubricate the two ‘O’ rings with a suitable lubricant to ease re-assembly.

• Fit and re-tighten the grub screw (18).

• Open the isolation valve in both supplies to the tap.

• Only use genuine spare parts, the full list is available on request by ringing the Technical Helpline number on the back page.

Removing Spout

17

18

Lever in closed position

19

Page 14: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 13

System Flushing ProcedureThe water system must be thoroughly flushed before attempting to commission or operate this tap toensure all pipework is clean and free from any debris. This system flushing procedure allows theprocess to be efficiently conducted with the tap installed. Failure to carry out effective system flushingbefore commissioning or operating this product could damage or limit the performance of theproduct and invalidate the product guarantee.

A

Waste water flushed through outlet withhose connected

7 - Flushing (hose not supplied)

90° OPEN

CLOSE

1 - Move handle to closed position Water must not pass through the tap before completing system flushing

2 - Ensure both isolation valves are in the closed position

2A - Turn to closed position

3 - Remove end cover from the hot supply end of the tap

1

2

4 - Carefully remove check valve housing using the extraction tool (HTMSP20XX) and rotating anti-clockwise

5 - Screw in connector plug using suitably sized spanner

6 - Attach hose connector (HTMFLUSH)

90° OPEN

CLOSE

6A - Turn to open position

Hot supply pipeworkflushed

Page 15: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 14

System Flushing Procedure

Sterilization ProcessNOTE: Not a replacement for chlorination

90° OPEN

CLOSE

8 - Ensure the isolation valve on the hot supply is closed before

9 - Unscrew the connector plug using suitably sized spanner and refit the check valve and end cover

10 - Repeat the procedure for the cold inlet side before opening both isolation valves

REMOVE

1 - Move handle to open position 2 - Isolate both inlet tails

2A - Turn to the closed position

90° OPEN

CLOSE

3 - Remove the cover from each inlet

4 - Remove hot and cold inlet plugs using a 10mm Allen key

4A

Page 16: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 15

Sterilization Process

5 - Fit the cold inlet plug into the hot position and the hot into the cold position

By carrying out the above procedure you are sterilizing the complete tap with hot water

6 - Open the ball valve on the hot supply to start sterilization procedure

90° OPEN

CLOSE

6A - Turn to open position

7 - Close the isolation valve

90° OPEN

CLOSE

8 - Refit the hot inlet plug into the hot position and the cold into the cold position and refit the covers

90° OPEN

CLOSE

9 - Open the isolation valve and move the handle to the closed position

Temperature Disinfection time

60˚C

65˚C

70˚C

20 minutes

10 minutes

5 minutes

10 - Disinfection times based on water temperature

Page 17: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 16

Code Application Range

HP-W Basin High Pressure

Operating Pressure Range High Pressure Low Pressure

Maximum Static Pressure 10 bar 10 bar

Flow Pressure, Hot and Cold 1 to 5 bar 0.2 to 1 bar

Hot Supply Temperature 55˚C to 65˚C 55˚C to 65˚C

Cold Supply Temperature 5˚C to 20˚C 5˚C to 20˚C

When this Mixer is used in a DO8 Application the following Instructions apply:

Introduction This Inta Thermostatic Mixer has been specifically designed and manufactured to meet the requirements of BS 7942: 2000 and NHS D08. The product has been independently tested and approved as a TYPE 3 valve under the TMV3 scheme.

Technical Specification

Application This thermostatic mixer has been independently tested by WRc and certified as meeting the requirements of the NHS D08 specification under the TMV3 Scheme as being suitable for use on the following;

Outlet Temperature Adjustment Range 30˚C to 50˚C

Temperature Stability ±2˚C

Maximum Hot Inlet Temperature 85˚C

Inlet Temperature Range55˚C to 65˚C : Hot Supply5˚C to 20˚C : Cold Supply

DO8 Working Pressure Range0.2 to 1.0 bar : Low Pressure1.0 to 5.0 bar : High Pressure

Min Temp Differential (Mix to Hot) for Fail-Safe 10˚C

Max. Pressure Inlet Differential 5 : 1

Max. Flow Rate @ 1 bar DifferentialØ15mm 1500 l/h (25 l/m)Ø22mm 1700 l/h (28.3 l/m)

Page 18: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 17

Installation IMPORTANT – The following instructions must be read prior to the installation of any Inta thermostatic mixing valve.

The installer should also be aware of his responsibility and duty of care to ensure that all aspects of the installation comply with all current regulations and legislations.

It has been brought to our attention that flushing water systems using certain chemicals may affect the workings of the valve, which may adversely affect its performance.

We recommend that following system flushing with chemicals, mixers are checked for correct operation.

1. It is essential that, before installing a thermostatic mixing valve, the supply conditions of the system to which the valve is intended to be fitted are checked to confirm compliance with the parameters as quoted within the Technical Specification above and conditions on which the approval is granted i.e. verify supply temperatures, supply pressures, risk assessments etc

2. Consideration must be made for the possibility of multiple/ simultaneous demands being made on the supply system whilst the thermostatic mixing valve is in use, all practical pre-cautions must be made to ensure that the valve is not affected. Failure to make provision within the pipe sizing etc will affect the performance of the valve.

3. The supply system to which the Thermostatic Mixing Valve is to be installed into must be thoroughly flushed and cleaned to remove any debris (see page 13), which may be accumulated during the installation. Failure to remove any debris will affect the performance and the manufacturer’s warranty on the product.

4. Independent filters/check valves and isolation valves must be fitted in conjunction with the valve. In areas that are subject to hard water, provision must be made to treat the supplies prior the supplies entering any product.

5. The maximum flow rate of the valve will only be achieved when the supply conditions are achieved as quoted, with a flow condition under 1 bar differential pressure.

6. This Inta thermostatic mixer has been designed to be wall mounted. It is essential that access to the valve is not obstructed for future maintenance, that may be required to the valve or associated fittings.

7. The connection of the hot and cold supplies must be in accordance with the instructions shown on page 8 i.e. hot water connected to the left hand side of the valve when the nozzle is facing you.

8. In a situation where one or both of the water supplies are excessive, it is recommended to fit a Pressure Reducing Valve, WRAS approved product, to reduce the pressure(s) to within those stated in the Technical Specification previously stated or a suitable flow regulator.

9. We recommend that Y pattern strainers and full bore isolation valves are installed in conjunction with this product as close as practically possible to the location valve.

Page 19: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 18

Application Recommended Set Hot Water Temperature

Wash Hand Basin 41˚C

Installation 10. It is essential that this product should not be installed in situations where there is a possibility of the valve being deprived of water or where demands for water are greater than the actual stored supplies.

11. To ensure that the performance levels of this Thermostatic Mixing Valve are maintained (in the event of cold water failure) the temperature of the hot water supply at the point of entry to the valve must be a minimum of 10°C above the commissioned mixed water discharge temperature.

12. This Thermostatic Mixing Valve must not be subject to any extreme temperature variations either during the installation or under normal operating condition

CommissioningIMPORTANT – The following instructions must be read and understood prior to the commissioningof a Thermostatic Mixer. If under any circumstances there are aspects to the installation/system whichdo not comply with the specification laid down, the valve MUST NOT is put into operation until thesystem/installation complies with our specification.

1. Ensure that the system is thoroughly cleaned and free from any debris prior to the commissioning of the valve. (See page 10)

2. The commissioning of the temperature must be carried out using a suitably calibrated thermometer – preferably a digital thermometer. (See page 8)

3. In the absence of other temperatures being specified we recommend that the outlet temperatures quoted in table 1 are used, extracted from the “National Health Service – Health Guidance Note – Safe Hot Water and Surface Temperatures”.

Table 1

4. Each valve must be commissioned taking into consideration any fluctuations, which may occur within the system due to simultaneous demands. It is advisable that any outlets which are connected to the same supply as the mixing valve are opened during setting of the mixed water temperature. It is advisable to ensure that the water temperatures are established before any attempt to commission.

5. Once the supply temperatures are stable and the normal operating conditions are established, the valve can be commissioned. We suggest that the following sequence is followed when commissioning the valve:

5.1 Using the lever turn to the maximum hot setting of the tap, the mixed water temperature should be preset (see page 8).

5.2 Measure and record the temperature of the hot and cold water supplies at the connections to the valve.

Page 20: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 19

Application Maximum Hot Water Temperature

Wash Hand Basin 43˚C

Table 2

Commissioning 5.3 Measure and record the temperature of the water discharging from the valve for the largest and smallest draw off point.

5.4 Isolate the cold water supply to the valve and monitor the mixed water temperature.

5.5 Measure and record the maximum mixed water temperature and the final temperature. The final temperature found during the test should not exceed the values quoted in table 2.

5.6 Record all the equipment used during the commissioning.

6. Ensure that the application, to which the valve will be used, is appropriate for the approved designation.

7. The above information must be recorded and updated on every occasion when any work is carried out on the valve.

In Service TestingTo ensure that the Thermostatic Mixer maintains a high level of protection, we advise the following inservice testing is followed (the same equipment used to commission the valve initially must be used inthe following tasks).

1. After a period of between 6 and 8 weeks after commissioning carry out the following.

a) Record the temperature of the hot and cold water supplies.

b) Record the temperature of the mixed water at the largest draw off flow rate.

c) Record the temperature of the mixed water at the smallest draw off flow rate.

2. If the mixed water temperature has changed significantly from the previous test results (e.g. > 1 k), record the change and before re-setting the mixed water temperature check that:

a) All the strainers are clean

b) All the check valves are in good working order

c) The isolation valves are fully open.

Page 21: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 20

In Service Testing 3. If the mixed water temperature is acceptable, carry out the following:

a) Record the temperature of the hot and cold water supplies.

b) Record the temperature of the mixed water at the largest draw off flow rate.

c) Record the temperature of the mixed water at the smallest draw off flow rate.

d) Isolate the cold water supply to the mixing valve and monitor the mixed water temperature.

e) Record the maximum temperature achieved as a result and the final temperature (the final temperature should not exceed the values quoted in table 2)

f) Record the equipment used during these tests.

4. If during the test, paragraph 3, the mixed water temperature is greater than the values quoted in table 2 or the maximum temperature exceeds the corresponding values from previous test results by more than 2˚C, the tap must be serviced.

5. After a period of between 12 and 15 weeks after commissioning, carry out the sequence of tests as described in 1, 2, 3 and 4 of this section.

6. Dependant upon the results obtained from the first two series of tests; there are a number of possible outcomes.

a) If no significant change in the mixed water temperatures (e.g. < 1˚C) is recorded between commissioning and step 3e above or between commissioning and 5 of this section, the next in service testing should be carried out at a period of 24 to 28 weeks after initial commissioning.

b) If a small change (e.g. 1 - 2˚C) in the mixed water temperature is recorded in only one of these periods, necessitating adjustment of the mixed water temperature, then the next in service test can be deferred to 24 to 28 weeks after commissioning.

c) If small change (e.g. 1 - 2˚C) in the mixed water temperature is recorded in both of these periods, necessitating adjustment of the mixed water temperature, then the next in service test can be deferred to 18 to 21 weeks after commissioning.

d) If significant changes (e.g. >2˚C) in the mixed water temperature are recorded in both of these periods necessitating service work, then the next in service test should be carried out at 18 - 21 weeks after commissioning.

7. The general principle to be observed after the first two or three in service tests is that the intervals of future test should be set to those which previous tests have shown can be achieved with no more than a small change in mixed water temperature.

8. In all areas periodic maintenance of the valve and associated fittings i.e. strainers, check valves will ensure optimum performance levels are maintained.

9. On the inlet strainers on both the hot and cold water supply inlet can be removed for cleaning.

10. The built in check valves can be accessed in a similar way to the filters to ensure freedom and correct seating.

Page 22: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 21

GuaranteeIntatec guarantees the product to be free from defects in materials and workmanship at the dateof purchase. If the product is determined to be defective at the date of original purchase due toimproper materials or workmanship and you inform us of this within the prescribed warrantyperiod, (five years for showering products, one year for commercial products), of the date ofpurchase, Intatec will, without charge for labour or parts, repair or (at the discretion of Intatec)replace the product or its defective parts subject to the terms and limitations below. Intatec mayreplace defective products or parts with new or refurbished products or parts.

Guarantee services will be provided only if the original invoice or sales receipt (indicating thedate of purchase and supplier's name) is presented with the defective product within theguarantee period.

The free of charge service may be refused if this information is not available. The guarantee willnot apply if the product has not been installed correctly.

This guarantee does not cover (without limitation):

• Periodic maintenance or parts replacement due to wear and tear;

• Damage or defects caused by misuse in operation;

• Installation or use of the product inconsistent with good working practice;

• Failure to maintain the product in accordance with instructions;

• Repair or attempted repair by persons who are not qualified;

• Neglect

Consumers have legal (statutory) rights under applicable laws relating to the sale of consumerproducts. This guarantee does not affect statutory rights you may have or those rights that cannotbe excluded or limited, nor rights against the person from whom you purchased the product. Youmay assert any rights you have at your sole discretion.

Please leave this Manual for the User

Page 23: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016 22

Notes:

Page 24: Wall & Deck Mounted Sequential Control Thermostatic Mixer€¦ · Wall & Deck Mounted Sequential Control Thermostatic Mixer HTMWMCP, HTMDMCP HTMWMRS & HTMDMRS Installation and Maintenance

© Intatec Ltd 2016

Intatec LtdAirfield Industrial Estate

HixonStaffordshire

ST18 0PF

Tel: 01889 272 180Fax: 01889 272 181

email: [email protected]: www.intatec.co.ukE & O.E

10-08-16

To activate your product warranty please visit

www.intatec.co.ukand click on Product Registration

Please leave this Manual for the User


Recommended