Water & Electric Building Energy Audits 1 Water & Electric Building 40 Station Road Built in 1890 the Water and Electric building has expanded over the years. A new garage was built in 2000. It connects the original building with another older garage. This has increased the square footage by approximately 8,000 square feet to approximately 15,000 square feet.. The older garage is neither heated or air conditioned. It is lit by ten incandescent bulbs of 150 watts. There are ten 10’x 4” sky lights and seven 4’x8’ single glazed windows. They are metal frame windows. There are three 12’x 16’ garage doors and a 6’x80” double door connecting with the new addition. It is a sheet metal building and there is a rotted section at ground level near the mid-building garage door on the east wall. This garage contains 5,100 square feet. Possible Options: Sky lights should be cleaned of the algae to aid in lighting the garage during daytime hours. Rotted sheet metal should be repaired. Incandescent light fixtures should be replaced with ----. The new garage has four 10’’x16’ entrance doors on the south side and one 12’x16’ door on the north side. Four ceiling fans and wall mounted fan on the north wall provide air circulation. Heat is supplied by three gas operated ceiling mounted blowers. It is lit by twenty-one 4’ florescent fixtures having two lamps each. These lamps are the new t- 8s. The product # is F40T12FW8651.There is insulation in the ceiling. There is a pass through connecting to the original building. It has a metal roller door but no insulated door and connects to the uninsulated garage area of the original building. Possible Options: An insulated door should be installed in the pass through. A timer or motion sensor should be installed for the light fixtures. More switching could be installed, separating the storage area from the garage. The original building has about 6700 square feet that is heated. Only 3000 square feet is air conditioned. The building has four areas; a garage, a supply room/with work area, a lunchroom and office space. The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO Additionally there are (6) 4’ fixtures with 2 lamps and (4) 4’ fixtures with 4 lamps in the bath locker room. These fixtures have equal lamping of F40T12CW-RS-WM and F72T12CW/HO. The supply area is lit by (27) 4’ fixtures with 2 lamps each and (9) 8’ fixtures with 2 lamps. The work area’s string of (3) 8’and (1) 4’ fixtures with 2 lamps are always on due the switch being semi hidden. The lunchroom is lit by (6) 4’ 4 lamp fixtures and 1 incandescent bulb in a closet. The reception area is lit by (6) 4’ fixtures, 5 of them have 3 lamps and 1 has 2 lamps. The rest of the office space is lit by (13) 4’ 4 lamp fixtures. Some of these lamps have been replaced with newer high efficiency fluorescence’s. There is no insulation in the attic and the stucco is broken in one spot at ground level.
Transcript
Page 1: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 1

Water & Electric Building 40 Station Road

Built in 1890 the Water and Electric building has expanded over the years. A

new garage was built in 2000. It connects the original building with another older

garage. This has increased the square footage by approximately 8,000 square

feet to approximately 15,000 square feet.. The older garage is neither heated or air conditioned. It is lit by ten incandescent bulbs of 150 watts. There are ten 10’x 4” sky lights and seven 4’x8’ single glazed windows. They are metal frame windows. There are three 12’x 16’ garage doors and a 6’x80” double door connecting with the new addition. It is a sheet metal building and there is a rotted section at ground level near the mid-building garage door on the east wall. This garage contains 5,100 square feet. Possible Options:

Sky lights should be cleaned of the algae to aid in lighting the garage during daytime hours.

Rotted sheet metal should be repaired. Incandescent light fixtures should be replaced with ----.

The new garage has four 10’’x16’ entrance doors on the south side and one 12’x16’

door on the north side. Four ceiling fans and wall mounted fan on the north wall provide

air circulation. Heat is supplied by three gas operated ceiling mounted blowers. It is lit

by twenty-one 4’ florescent fixtures having two lamps each. These lamps are the new t-

8s. The product # is F40T12FW8651.There is insulation in the ceiling. There is a pass

through connecting to the original building. It has a metal roller door but no insulated

door and connects to the uninsulated garage area of the original building.

Possible Options: An insulated door should be installed in the pass through. A timer or motion sensor should be installed for the light fixtures. More switching could be installed, separating the storage area from the garage.

The original building has about 6700 square feet that is heated. Only 3000 square feet

is air conditioned. The building has four areas; a garage, a supply room/with work

area, a lunchroom and office space. The garage area is lit by (9) 8’ fixtures with 2

lamps each. The product # of these lamps is F96T12CoolSS/ECO Additionally there

are (6) 4’ fixtures with 2 lamps and (4) 4’ fixtures with 4 lamps in the bath locker room.

These fixtures have equal lamping of F40T12CW-RS-WM and F72T12CW/HO. The supply area is lit by (27) 4’ fixtures with 2 lamps each and (9) 8’ fixtures with 2 lamps. The work area’s string of (3) 8’and (1) 4’ fixtures with 2 lamps are always on due the switch being semi hidden. The lunchroom is lit by (6) 4’ 4 lamp fixtures and 1 incandescent bulb in a closet.

The reception area is lit by (6) 4’ fixtures, 5 of them have 3 lamps and 1 has 2

lamps. The rest of the office space is lit by (13) 4’ 4 lamp fixtures. Some of these

lamps have been replaced with newer high efficiency fluorescence’s. There is no

insulation in the attic and the stucco is broken in one spot at ground level.

Page 2: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 2

Possible Options: All the lamps in the office area and the lunch room should be replaced

with the new higher efficiency lamps. The garage could replace the old fixtures with the new t-8 fixtures and

shut down switching. The store room should change out the old fixtures for the new t-8 fixtures

and add shut down switching and additional switching for the rows between shelves and the work area.

The work area switch should be move to a more accessible

spot. The office area and lunchroom should be insulated. The outside stucco needs to be repaired.

Attachments:

1. Water & Electric Building Complete Profile (pages 3-6)

2. Station Road Electric & Gas (page 7)

3. Energy Star Portfolio (page 8)

4. Direct Install Program Scope of Work (pages 9-10)

5. Direct Install Program Energy Assessment Tool (pages 11-15)

Page 3: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 3

Attachment 1: Water & Electric Building Complete Profile

Page 4: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 4

Building Profile

Name ___Water and Electric Building___

Address __ 40 Station Road_______________ Location

Requirements Remarks

Energy conservation measures

Rough sketch

Site sketch In folder In folder

Orientation of site Rough sketch In folder

Outline of building on site Rough sketch On site

Architect blueprint M Piano has some M Piano has some

Mechanical print M Piano has some On site

Electrical print In folder On site

Simple floor plans Rough sketch None visible

Fire exit plans 1890

Date built

Additions/dates

Dimensions [gross sq ft] 15,000 square feet

Conditioned area [sq ft] 1,700 square feet Acct # 14144

Electric acct # In pump house left of

Electric meter number #17824891 120 Water pumps should be sub metered

Peak load

<200 kW

entrance door

< 200kw >

Central plant [if any] None

Sub-metering [if any]

Page 5: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 5

Building Profile

Name ___Water and Electric Building___

Address __ 40 Station Road_______________

Requirements Remarks Location Energy conservation measures

Gas acct # Acct # 12-531-528-02

Gas meter number PS 2110367 NE wall of sheet metal garage

PS 3496603 S wall near front

Architect blueprint M Piano has some On site

Mechanical print M Piano has some On site

Electrical print M Piano has some On site

System efficiency

narrative Ventilation Fans

In garage areas

Duct work Office area has duct work

Lighting 124 fluorescent fixtures

Mix of T-12s, eco, cool, and

warm lamps

(14) 4’ fixtures 4 lamps In office/break area

(6) 4’ fixtures 2 lamps In office/break area

(5) 4’ fixtures 3 lamps In office/break area

(9) 8’ fixtures 2 lamps Supply room

(27) 4’ fixtures 2 lamps Supply room

(9) 8’ fixtures 2 lamps Old garage

(6) 4’ fixtures 2 lamps Old garage

(4) 4’ fixtures 4 lamps Locker room/bath

(41) T-8s in new addition In new garage

(10) large incandescent bulbs In sheet metal garage

Page 6: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 6

Building Profile

Name ___Water and Electric Building___

Address __ 40 Station Road_______________

Requirements Remarks Location Energy conservation measures

Heating HB Smith Model 19A8-081011 In furnace room

AC Unit Lennox Merit Series Outside north wall of

Model # 13ACF17546-230-01 original building

Component efficiency All systems running well No unusual breakdowns

HAVC zone controls None

Setback operation None

Lighting controls None Timers, motion sensors needed

Electric bills [monthly/ 1 yr] See Energy Star

Gas bills See Energy Star

Hours building is in use 45 hours per week

Occupancy 3

Number of PCs 3

Shell issues

Roofing Appears to be in good shape

Windows Double glazed Office/break area, new

garage

Single glazed in metal frames Sheet metal garage

Doors One metal roller door between Between old garage and Insulated door should be

two garage areas but no new garage installed

insulated door.

Insulation Office area has ceiling and Original garage roof needs Roof area should be insulated

outside wall insulation insulation

Page 7: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 7

Attachment 2: Station Road Electric & Gas

Water and Electric Building Acct # 14144 Acct # 12-531-528-02

Base Year 2008 Base Year 2008 Base Year 2008

meter 17824891 meter 2434763 meter 2053958

Month Electric Gas kwh demand ccf therms ccf therms

Jan-08 $4,424.44 $4,312.85 43080 120 2969 3064 291 300

Feb $4,632.32 $4,542.65 40560 120 3420 3533 334 346

Mar $7,145.64 $3,360.85 33600 120 2741 2834 278 287

Apr $8,178.44 $1,946.28 26880 120 2197 2267 234 242

May $10,355.02 $638.32 34080 120 673 694 87 89

Jun $10,244.97 $195.76 36120 120 138 142 6 6

Jul $8,068.39 $128.92 60480 120 42 43 5 5

Aug $3,213.87 $129.01 70920 120 43 44 5 5

Sep $3,588.68 $133.53 92280 120 52 54 7 7

Oct $3,404.32 $323.72 91200 120 323 333 6 6

Nov $2,444.96 $2,180.63 69840 120 1682 1728 139 143

Dec $2,079.49 $2,893.23 22200 120 2311 2364 211 216

Total $67,780.54 $20,785.75 $88,566.29 621240 16591 17100 1603 1652

Water & Electric Building

$12,000.00

$10,000.00

$8,000.00

$6,000.00

Electric

$4,000.00 Gas

$2,000.00

$0.00

8

b r r y n l

g p

t

v c

a p u c

0 e a u u e o e

A J

- F M M J A S O N

D

n

a

J

Page 8: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 8

Attachment 3: Energy Star Portfolio

My Portfolio: Stephan Stocker

September 12, 2010 - 02:38:03 PM

Total Buildings: 9

Current Change

Rating

from

Total

Current

Facility Name

Baseline: Floor Energy Use Alerts

Energy Eligibility for the Last

Adjusted Space Period ENERGY STAR Modified

(1-100)

Energy (Sq. Ft.) Ending Date

Use (%)

Civic Center

N/A

0

17,500

Data > 120 days old

12/31/2009 Not Eligible: Rating must

9/7/2010

be 75 or above

Less than 1 year of data; Not Eligible: Rating must

Community Safety Building N/A N/A 37,600 Data > 120 days old 6/30/2009 be 75 or above 8/18/2010

Not Eligible: Rating must

Department of Public Works N/A 0 13,745 Data > 120 days old 12/31/2009 be 75 or above 9/7/2010

Hartley Dodge Memorial Building

N/A

-34.4

45,000

Data > 120 days old

9/30/2009 Not Eligible: Rating must

8/18/2010

be 75 or above

Not Eligible: Rating must

Madison Public Library N/A N/A 39,000 be 75 or above 8/19/2010

Not Eligible: Rating must

Museum of Early Trades N/A N/A 5,800 be 75 or above 8/19/2010

Not Eligible: Less then

90% of Facility is owned or

Volunteer Ambulance Corps N/A N/A 7,000 managed 8/19/2010

Waste Water Treatment Plant N/A N/A N/A N/A 8/19/2010

Less than 1 year of data; Not Eligible: Rating must

Water & Electric Company N/A N/A 16,000 Data > 120 days old 12/31/2009 be 75 or above 9/7/2010

Group Total 181645

Page 9: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 9

Attachment 4: Direct Install Program Scope of Work

DIRECT INSTALL PROGRAM

PARTICIPATION AGREEMENT

SCOPE OF WORK ATTACHMENT

“Parties”:

Participating Customer*: Borough of Madison

Participating Contractor*: RJ Donnelly

Facility Name*: Water & Electric Plant

Facility Address: 40 Station Rd Madison, NJ 07940

Street City Zip

*as listed on Application

When fully signed, this Scope of Work Attachment (“Attachment”) shall become part of the Direct Install

Program Participation Agreement (“Participation Agreement”) previously executed by the Parties in

connection with the installation of energy efficiency retrofit Measures to be performed by the Participating Contractor (or “Contractor”) at the above listed Facility. This Attachment, together with the Participation Agreement shall constitute the full Agreement between the Parties. Terms capitalized herein are defined in the Participation Agreement. The Participating Customer (or “Customer”) agrees to have Contractor perform retrofit work in connection

with the Measures listed on page 2 of this form (attached). In consideration of the Contractor’s performance

of such work, Customer agrees to pay Contractor based on the measure costs listed below under Customer

Unit Cost for the number of completed units for each Measure upon receipt of invoice; provided the

Contractor may collect a deposit from Customer prior to performing such work, in which case the final

invoice shall be net of such deposit. Customer and Contractor understand that conditions discovered during

installation may require that some measures identified in the energy assessment cannot be installed, or some

areas may require additional measures/quantities to be installed. Should conditions in the field dictate that

the Estimated Program Total Cost shown on page 2 increase by more than 10%, Contractor must obtain both

Market Manager and Customer written approval in the form of an amended Scope of Work Attachment

before proceeding with such additional work. By signing below, the Parties agree the above listed Measures shall be installed by the Contractor. The Customer shall pay

the Contractor as described herein following Completion and Acceptance of Measures. Customer certifies that he/she has

the authority to contract for retrofit work in the Facility in connection with the Measures listed and, if the Customer does not

own the Facility, the Owner has granted permission to Customer for performance of such work.

Participating Customer Date Participating Contractor Date

Savings values are estimates. Actual savings will vary. Incentives and participation subject to program rules and Participation Agreement.

Page 10: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 10

Page 2 Scope of Work The work to be performed by the Participating Contractor in connection with the Project shall be comprised of the below listed Measures in the estimated quantities listed:

Quantity Total Estimated Estimated

To Be Measure Customer Incentive

Measure Description / Location Installed Cost Total Cost Amount

4' T8 3-lamp with EB plus reflector / Breakroom 6 $835.81 $334.33 $501.49 A

4' T8 3-lamp with EB plus reflector / Main Area 6 $835.81 $334.33 $501.49 A

A

LED Universal Exit Sign / Main Area 3 $383.23 $153.29 $229.94

A

4' T8 2-lamp with EB / Behind Receptionist 4 $274.83 $109.93 $164.90

A

4' T8 3-lamp with EB plus reflector / Office in back 2 $278.60 $111.44 $167.16

A

4' T8 3-lamp with EB plus reflector / Second Office in back 2 $278.60 $111.44 $167.16

A

4' T8 3-lamp with EB plus reflector / Third Office in back 2 $278.60 $111.44 $167.16

A

8' T8 2-lamp with EB / Back Storage 9 $993.67 $397.47 $596.20

A

4' T8 2-lamp with EB / Back Storage 3 $206.13 $82.45 $123.68

A

4' T8 1-lamp with EB / Back Storage 25 $1,662.42 $664.97 $997.45

A

8' T8 2-lamp with EB / 1st Garage 10 $1,366.73 $546.69 $820.04

A

4' T8 2-lamp with EB / 1st Garage 4 $352.75 $141.10 $211.65

A

8' T8 2-lamp with EB / Back Storage Building 10 $1,366.73 $546.69 $820.04

A

8' T8 2-lamp with EB / Storage shed behind building 5 $552.04 $220.82 $331.22

A

4' T8 2-lamp with EB / Storage shed behind building 2 $137.42 $54.97 $82.45

A

3-Ton Electric Split System A/C / Behind the Building 1 $6,916.69 $2,766.68 $4,150.02

A

Electronic Fuel-Use Economizers (for AC) / Outside 1 $357.14 $142.86 $214.29

Electronic Fuel-Use Economizers (for Hot Water Heat) / Boiler Room 1 $1,860.95 $744.38 $1,116.57

Programmable Thermostats / Building 1 $222.54 $89.02 $133.53

TOTALS $ 19,160.73 $ 7,664.29 $11,496.44

**Final NJ Clean Energy Incentive Amount: $ 1,250.10

**ARRA-Funded Incentive Amount: $ 10,246.34

COMBINED TOTAL: $ 11,496.44

*Costs listed above are based on typical, common field conditions and scope. All costs associated with project-specific circumstances that are

over and above those deemed typical by the Contractor and/or Market Manager (“Special Costs”) shall not be incentivized by the Program, but

shall be paid fully by the Customer and performed outside of the Participation Agreement. Special Costs include but are not limited to: costs

associated with the correction of code or safety violations, extraordinary scaffolding or crane costs, extraodinary resizing of penetrations,

extraordinary conduit and piping runs, and Customer requests to perform work outside of normal business hours. **Measures that are proposed to be funded through the American Recovery and Reinvestment Act (ARRA) are designated above with an 'A'. Maximum incentive amount available through NJ Clean Energy Programs per Direct Install project is $50,000.

Direct Install Energy Assessment Tool (ver. 4.0) ©2010 TRC Energy Services. Property of TRC.

9/2/2010 Scope of Work Contractor granted limited license. Savings values are estimates. Actual savings will vary. Incentives and participation subject to program rules and Participation Agreement.

Page 11: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 11

Attachment 5: Direct Install Program Energy Assessment Tool

New Jersey Office of Clean Energy

Direct Install Program

Energy Assessment Tool

General Project Information

Participating Customer: Borough of Madison Facility Type: Other

Contractor / Project #: RJ Donnelly Total Facility Square Footage: 16,000

Facility Name: Water & Electric Plant Avg Weekly Hrs of Operation: 45

Street Address: 40 Station Rd # of Full-Time Employees: 3

City / Zip Code: Madison 07940 Year Constructed: 1890

Will the project receive EECBG funding?: Y Tax Exempt?: Y

ELECTRIC UTILITY INFORMATION GAS UTILITY INFORMATION

Electric Provider: Municipal Electric or Co-op Gas Provider: PSE&G

Service Class: Service Class:

Account #: 14144 Account #: 1253152918

Billing Period Start Date: 08/08/08 Billing Period Start Date: 12/19/08

Billing Period End Date: 09/08/08 Billing Period End Date: 01/14/09

Billing Period kWh Consumption: 92,280 Billing Period Therm Consumption: 219

Billing Period Total Cost: $10,355.02 Billing Period Total Cost: $301.84

Total Taxes + Fees on Bill: Total Taxes + Fees on Bill:

Project Summary

Electric - Average Cost ( $/kWh): $0.112 Gas - Average Cost ( $/Therm): $1.38

Estimated

kWh Saved per Annual Total Measure Incentive Total Cost to Simple

Year Savings Cost Amount Customer Payback (Yrs)

Lighting Measures Total: 14,488 $ 1,625.72 $ 9,803.40 $ 5,882.04 $ 3,921.36 2.41

Motors & VFD Measures Total: - $ - $ - $ - $ - -

HVAC Electric Measures Total: 1,997 $ 224.11 $ 7,273.84 $ 4,364.30 $ 2,909.53 12.98

Refrigeration Measures Total: - $ - $ - $ - $ - -

TOTAL ELECTRIC MEASURES: 16,485 $ 1,849.84 $ 17,077.24 $ 10,246.34 $ 6,830.89 3.69

Therms /yr.

TOTAL GAS MEASURES: 800 $ 1,102.61 $ 2,083.49 $ 1,250.10 $ 833.40 0.76

Gallons /yr.

TOTAL OIL MEASURES: - $ - $ - $ - $ - -

Gallons /yr.

TOTAL PROPANE MEASURES: - $ - $ - $ - $ - -

COMBINED TOTALS: $ 2,952.45 $ 19,160.73 $ 11,496.44 $ 7,664.29 2.60

PROJECT TRC TEST: 2.52

Percentage of Energy Savings Percentage of Dollar Savings Per Percent Change in Total

Measure Category

Per Measure Category Energy Consumuption

Lighting Gas

Gas Lighting

HVAC

HVAC -3.4%

Direct Install Energy Assessment Tool (ver. 4.0) ©2010 TRC Energy Services. Property of TRC. 9/2/2010 Project Summary Contractor granted limited license.

Page 12: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 12

New Jersey Office of Clean Energy

Direct Install Program

Energy Assessment Tool

Lighting Measures

Default Actual Fixture

# of Default Actual Ceiling Est.

Annual Annual

Watts per

Demand Annual kWh

Fixture Location Con- Lighting Measure Description Fix- Watts per Height Total Cost Lighting Notes:

Oper. Oper. Hrs trolled? tures Fixture Fixture (if >12 ft? Savings Savings

Hours (if different) different) (kW)

1 4,242 2340 Breakroom Existing N Fluorescent, (4) 48", STD lamp 6 188 N $ 835.81 0.5 1,698

Proposed N 4' T8 3-lamp with EB plus reflector 6 54

81

2 4,242 2340 Main Area Existing N Fluorescent, (3) 48", STD lamp 6 151 N $ 835.81 0.3 1,111

Proposed N 4' T8 3-lamp with EB plus reflector 6 54

81

3 4,242 2340 Main Area Existing N EXIT Incandescent, (1) 20W lamp 3 20 N $ 383.23 0.0 143

Proposed N LED Universal Exit Sign 3 2

4 4,242 2340 Mike's Office Existing N Fluorescent, (4) 48", STD lamp 0 188 N $ - - -

Proposed Y 4' T8 3-lamp with EB plus reflector 0 54

81

5 4,242 2340 Behind Receptionist Existing N Fluorescent, (2) 48", STD lamp 4 94 N $ 274.83 0.1 370

Proposed N 4' T8 2-lamp with EB 4 59

6 4,242 2340 Office in back Existing N Fluorescent, (4) 48", STD lamp 2 188 N $ 278.60 0.2 396

Proposed Y 4' T8 3-lamp with EB plus reflector 2 54

81

7 4,242 2340 Second Office in back Existing N Fluorescent, (4) 48", STD lamp 2 188 N $ 278.60 0.2 396

Proposed Y 4' T8 3-lamp with EB plus reflector 2 54

81

8 4,242 2340 Third Office in back Existing N Fluorescent, (4) 48", STD lamp 2 188 N $ 278.60 0.2 396

Proposed Y 4' T8 3-lamp with EB plus reflector 2 54

81

9 4,242 2340 Back Storage Existing N Fluorescent, (2) 96", STD lamp 9 173 N $ 993.67 0.5 1,066

Proposed Y 8' T8 2-lamp with EB 9 109

10 4,242 2340 Back Storage Existing N Fluorescent, (2) 48", STD lamp 3 94 N $ 206.13 0.1 278

Proposed N 4' T8 2-lamp with EB 3 59

11 4,242 2340 Back Storage Existing N Fluorescent, (1) 48", STD lamp 25 57 N $ 1,662.42 0.5 1,719

Proposed N 4' T8 1-lamp with EB 25 31

12 4,242 2340 Back Storage Existing N EXIT Incandescent, (1) 20W lamp 0 20 N $ - - -

Proposed N LED Universal Exit Sign 0 2

13 4,242 2340 1st Garage Existing N Fluorescent, (2) 96", STD lamp 10 173 Y $ 1,366.73 0.5 1,692

Proposed N 8' T8 2-lamp with EB 10 109

14 4,242 2340 1st Garage Existing N Fluorescent, (2) 48", STD lamp 4 94 Y $ 352.75 0.1 370

Proposed N 4' T8 2-lamp with EB 4 59

15 4,242 2340 Last Garage Existing N Incandescent, (1) 200W lamp 0 200 Y $ - - -

Proposed N CF 36-1L SCREW IN CFL 0 41

16 4,242 2340 Back Storage Building Existing N Fluorescent, (2) 96", STD lamp 10 173 Y $ 1,366.73 0.5 1,692

Proposed N 8' T8 2-lamp with EB 10 109

17 4,242 2340 Storage shed behind Existing N Fluorescent, (2) 96", STD lamp 5 173 N $ 552.04 0.3 846

building Proposed N 8' T8 2-lamp with EB 5 109

18 4,242 2340 Storage shed behind Existing N Fluorescent, (2) 48", STD lamp 2 94 N $ 137.42 0.1 185

building Proposed N 4' T8 2-lamp with EB 2 59

Lighting Direct Install Energy Assessment Tool (ver. 4.0)

©2010 TRC Energy Services. Property of TRC. 9/2/2010 Contractor granted limited license.

Page 13: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 13

TOTALS: $ 9,803.40 4.1 12,358

Lighting Controls

Est. # of

Est. Actual Reduced # of

Est.

Annual

Fixtures

Annual Annual

# of Annual kW Con- Add'l

Demand Annual kWh Hours Fixture Location Lighting Controls Measure Description Total Cost

Con- Hrs. w/ Hours Units Lighting trolled Relays

Savings Savings

w/o

trolled

Controls (if different)

Hours

Needed

(kW)

Controls

4 2340 0 Mike's Office 1638 Dual Tech Occ. Sensor Wall Switch 0 702 0.00 $ - - -

6 2340 2 Office in back 1638 Dual Tech Occ. Sensor Wall Switch 0 702 0.38 $ - 0.1 298

7 2340 2 Second Office in back 1638 Dual Tech Occ. Sensor Wall Switch 0 702 0.38 $ - 0.1 298

8 2340 2 Third Office in back 1638 Dual Tech Occ. Sensor Wall Switch 0 702 0.38 $ - 0.1 298

9 2340 9 Back Storage 1638 Dual Tech Occ. Sensor Wall Switch 0 702 1.56 $ - 0.4 1,235

TOTALS: $ - 0.7 2,130

Notes:

Lighting Direct Install Energy Assessment Tool (ver. 4.0) ©2010 TRC Energy Services. Property of TRC.

9/2/2010 Contractor granted limited license.

Page 14: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 14

New Jersey Office of Clean Energy

Direct Install Program

Energy Assessment Tool

Packaged HVAC Measures

Annual Actual Existing Age of Min. Actual Min.

Actual Est. Annual

Equiv. Unit

# of Existing Required New EER Required

Demand

EFLH HVAC Location

Measure Description HSPF Total Cost kWh

Full Load Capacity

Units Equipment EER or or SEER HSPF

Savings

(if different) (if higher) Savings

Hours (Tons) (Yrs) SEER (if higher) (heat pumps) (kW)

1 1,131 Behind the Building 3-Ton Electric Split System A/C 1 18 15.0 - $ 6,916.69 0.8 1,357

TOTALS: $ 6,916.69 0.8 1,357

Notes:

Packaged HVAC Direct Install Energy Assessment Tool (ver. 4.0)

©2010 TRC Energy Services. Property of TRC. 9/2/2010 Contractor granted limited license.

Page 15: Water & Electric Buildingsj-site-legacy-migrate.s3.amazonaws.com/m14173!10.pdf · The garage area is lit by (9) 8’ fixtures with 2 lamps each. The product # of these lamps is F96T12CoolSS/ECO

Water & Electric Building Energy Audits 15

New Jersey Office of Clean Energy

Direct Install Program

Energy Assessment Tool

HVAC Control Measures

Controlled Cooling Est.

Unit Energy Opera-

Annual

# of Units Demand

Measure Description Measure Location

Cooling Efficiency tionally

Total Cost kWh

Installed Savings

Capacity Ratio Tested?

Savings

(kW)

(Tons) (EER)

$ - - -

Annual

HVAC Unit Fuel Annual Nat. Gas

# of Units Capacity HVAC Fuel Usage

Measure Description Measure Location

Total Cost kWh Savings

Installed (thousand Source (therms,

Savings (therms /yr)

BTU/hr)

gallons or

KWh /yr)

1 Electronic Fuel-Use Economizers Boiler Room

1 924 Gas 5,000 $ 1,860.95 - 650.0

(for Hot Water Heat)

2 Electronic Fuel-Use Economizers Outside

1 36 Electric 4,000 $ 357.14 520

(for AC)

Annual Primary Gas, Oil,

HVAC or LPG

Annual Nat. Gas

# of Units Fuel

Measure Description Measure Location

Electric Usage

Total Cost kWh Savings

Installed Source for

Usage (therms or Savings (therms /yr)

(kWh) Heating

gal./yr)

3 Programmable Thermostats Building 1 4,000 Gas 5,000 $ 222.54 120 150.0

Hot Water Demand Control Measures

Days per Hot Water Current

Annual Nat. Gas

# of Units Year

Measure Description Measure Location

Fuel Flow Rate Total Cost kWh Savings

Installed Facility

Source (gal./min)

Savings (therms /yr)

Operates

Pipe Pipe Hot Water

Low or Annual Nat. Gas

High

Measure Description Measure Location

Diameter Length Fuel

Total Cost kWh Savings

Temp

(inches) (feet) Source

Savings (therms /yr)

Piping?

TOTALS $ 2,440.64 640 800.0

Notes:

Direct Install Energy Assessment Tool (ver. 4.0)

HVAC & HW Controls Measures ©2010 TRC Energy Services. Property of TRC. 9/2/2010 Contractor granted limited license.


Recommended