Date post: | 05-Apr-2015 |
Category: |
Documents |
Upload: | lamprecht-gehret |
View: | 106 times |
Download: | 2 times |
Wir schaffen Wissen – heute für morgen
11. April 2023PSI, 11. April 2023PSI,
Paul Scherrer InstitutMarkus Stadler
BPM test facilities at PSI
June 24, 2010
11. April 2023PSI,
250MeV injector overwiew
11. April 2023PSI, Seite 2
11. April 2023PSI,
Pick-Up Test Facility at SwissFEL Test Injector
11. April 2023PSI, Seite 3
3.3GHz Cavity Ø10mm 3.3GHz Cavity Ø40.5mm
Button Array
Mover (remote)
Mover (manual)
11. April 2023PSI, 11. April 2023PSI, Seite 4
Screen monitors
Pick-Up Test Facility at SwissFEL Test Injector
11. April 2023PSI, 11. April 2023PSI, Seite 5
Resolution measurement
The formulas for determing single BPM resolution using the 3-BPM setup can be seen below (1):
(1) H. Maesaka et al.:“Development of te RF cavity BPM of XFEL/SPRING-8“, Proceedings of DIPAC09, Basel, Switzerland
11. April 2023PSI, 11. April 2023PSI, Seite 6
Thanks !