    Publication Numbers:

    EPA: EPA-505-B-04-900C

    DoD: DTIC ADA 427486

    Intergovernmental Data Quality Task Force

    Workbook for

    Uniform Federal Policy for Quality Assurance

    Project Plans

    Evaluating, Assessing, and Documenting Environmental Data

    Collection and Use Programs

    Part 2A: UFP-QAPP Workbook

    This Workbook supplements Part 1 of the UFP-

    QAPP, the UFP-QAPP Manual. Proper

    completion of these worksheets requires

    knowledge of the QAPP elements explained in the

  • 5/24/2018 Workbook-ufp Wbk 0305

    2/45

    Thi s page intentional ly left blank.

  • 5/24/2018 Workbook-ufp Wbk 0305

    3/45

    TABLE OF CONTENTS

    INTRODUCTIONQAPP Worksheet #1. Title and Approval Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

    QAPP Worksheet #2. QAPP Identifying Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

    QAPP Worksheet #3. Distribution List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

    QAPP Worksheet #4. Project Personnel Sign-Off Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

    QAPP Worksheet #5. Project Organizational Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    QAPP Worksheet #6. Communication Pathways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

    QAPP Worksheet #7. Personnel Responsibilities and Qualifications Table . . . . . . . . . . . . . . 11

    QAPP Worksheet #8. Special Personnel Training Requirements Table . . . . . . . . . . . . . . . . . 12QAPP Worksheet #9. Project Scoping Session Participants Sheet . . . . . . . . . . . . . . . . . . . . . 13

    QAPP Worksheet #10. Problem Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

    QAPP Worksheet #11. Project Quality Objectives/Systematic Planning Process Statements 15

    QAPP Worksheet #12. Measurement Performance Criteria Table

    . .

    . . . . . . . . . . . . . . . . . . . . . . 16

    QAPP Worksheet #13. Secondary Data Criteria and Limitations Table . . . . . . . . . . . . . . . . . . 17

    QAPP Worksheet #14. Summary of Project Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

    QAPP Worksheet #15. Reference Limits and Evaluation Table . . . . . . . . . . . . . . . . . . . . . . . . 19QAPP Worksheet #16. Project Schedule/Timeline Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

    QAPP Worksheet #17. Sampling Design and Rationale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

    QAPP Worksheet #18. Sampling Locations and Methods/SOP Requirements Table . . . . . . . . 22

    QAPP Worksheet #19. Analytical SOP Requirements Table . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

    QAPP Worksheet #20. Field Quality Control Sample Summary Table . . . . . . . . . . . . . . . . . . . 24

    QAPP Worksheet #21. Project Sampling SOP Reference Table . . . . . . . . . . . . . . . . . . . . . . . . 25

    QAPP Worksheet #22. Field Equipment Calibration, Maintenance, Testing, and Inspection

    Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26QAPP Worksheet #23. Analytical SOP Reference Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

    QAPP Worksheet #24. Analytical Instrument Calibration Table . . . . . . . . . . . . . . . . . . . . . . . . 28

    QAPP Worksheet #25. Analytical Instrument and Equipment Maintenance, Testing, and

    Inspection Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

    QAPP Worksheet #26 Sample Handling System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

    QAPP Worksheet #27. Sample Custody Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

    QAPP Worksheet #28. QC Samples Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

    QAPP Worksheet #29. Project Documents and Records Table . . . . . . . . . . . . . . . . . . . . . . . . . 33QAPP Worksheet #30. Analytical Services Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

    QAPP Worksheet #31. Planned Project Assessment Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35

    QAPP Worksheet #32. Assessment Findings and Response Actions . . . . . . . . . . . . . . . . . . . . . 36

    QAPP Worksheet #33. QA Management Reports Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

    QAPP Worksheet #34 Sampling and Analysis Verification (Step I) Process Table 38

  • 5/24/2018 Workbook-ufp Wbk 0305

    4/45

    WORKBOOK FOR UNIFORM FEDERAL POLICY FOR QUALITY ASSURANCE

    PROJECT PLANS

    INTRODUCTION

    This Workbook for Uniform Federal Policy for Quality Assurance Project Plansis Part 2A of the

    Uniform Federal Policy for Quality Assurance Project Plans(UFP-QAPP). It provides examples

    of worksheets to assist with the preparation of QAPPs in accordance with Part 1 of the UFP-QAPP

    (the UFP-QAPP Manual) and Section 6 (Part B) of Quality Systems for Environmental Data and

    Technology Programs - Requirements with guidance for use, ANSI/ASQ E4 (February 2004). ThisWorkbook may be used by the lead organization and its contractors to assist with the preparation

    of QAPPs for environmental data gathering activities.

    Each worksheet addresses specific requirements of the UFP-QAPP. Both the UFP-QAPP Manual

    and the Workbook are intended to be comprehensive and are not intended to be program-specific.

    Since the content and level of detail in a specific QAPP will vary by program, by the work being

    performed, and by the intended use of the data, specific worksheets may not be applicable to allprojects.

    The ultimate success of an environmental program or project depends on the quality of the

    environmental data collected and used in decision-making, and this may depend significantly on the

    adequacy of the QAPP and its effective implementation. It is recommended that the individual

    worksheets included in this Workbook be taken to the project scoping and planning sessions. The

    use of the worksheets will aid in identifying the critical project information that will ensure that the

    right type, quality, and quantity of data are collected to meet all of the projects quality objectives.Though the format of each worksheet is not mandatory, the information required on the worksheets

    must still be presented in the QAPP, as appropriate to the project. In addition, QAPP preparers are

    encouraged to develop additional tables, as appropriate to the project. Sufficient written discussion

    in text format should accompany all tables. Certain sections, by their nature, will require more

    written discussion than others. In particular, Section 3.1.1 should provide an in-depth explanation

    of the sampling design rationale, and Section 5.2 should describe the procedures and criteria that

    will be used for data review.

  • 5/24/2018 Workbook-ufp Wbk 0305

    5/45

    QAPP Worksheet #1(UFP-QAPP Manual Section 2.1)

    Title and Approval Page

    Site Name/Project Name:Site Location:

    Title:Revision Number:Revision Date:Page ___ of ___

    ___________________________________________________________________________________Document Title

    ___________________________________________________________________________________Lead Organization

    ___________________________________________________________________________________Preparers Name and Organizational Affiliation

    ___________________________________________________________________________________Preparers Address, Telephone Number, and E-mail Address

    ____________________________________Preparation Date (Day/Month/Year)

    Investigative Organizations Project Manager:____________________________________________Signature

    _______________________________________________________________________Printed Name/Organization/Date

    Investigative Organizations Project QA Officer: _________________________________________Signature

    ______________________________________________________________________Printed Name/Organization/Date

    Lead Organizations Project Manager:__________________________________________________Signature

    ______________________________________________________________________Printed Name/Organization/Date

    Approval Signatures: ____________________________________________________________Signature

    ____________________________________________________________ Printed Name/Title/Date

  • 5/24/2018 Workbook-ufp Wbk 0305

    6/45

    QAPP Worksheet #2(UFP-QAPP Manual Section 2.2.4)

    QAPP Identifying Information

    Site Name/Project Name:Site Location:Site Number/Code:Operable Unit:Contractor Name:Contractor Number:Contract Title:Work Assignment Number:

    1. Identify guidance used to prepare QAPP:

    Title:Revision Number:Revision Date:Page ___ of ___

    ______________________________________________________________________________

    2. Identify regulatory program: _____________________________________________________

    3. Identify approval entity: _________________________________________________________

    4. Indicate whether the QAPP is a generic or a project-specific QAPP. (circle one)

    5. List dates of scoping sessions that were held:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    6. List dates and titles of QAPP documents written for previous site work, if applicable:

    Title Approval Date ________________________________________________________ _____________ ________________________________________________________ _____________ ________________________________________________________ _____________ ________________________________________________________ _____________

    7. List organizational partners (stakeholders) and connection with lead organization: __________ ____________________________________________________________________________ _____________________________________________________________________________

    8. List data users:

  • 5/24/2018 Workbook-ufp Wbk 0305

    7/45

    QAPP Worksheet #2

    QAPP Identifying Information

    (continued)

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Identify where each required QAPP element is located in the QAPP (provide section, worksheet,

    table, or figure number) or other project planning documents (provide complete document title,

    date, section number, page numbers, and location of the information in the document). Circle

    QAPP elements and required information that are not applicable to the project. Provide an

    explanation in the QAPP.

    Required QAPP Element(s) and

    Corresponding QAPP Section(s) Required Information

    Crosswalk to RelatedDocuments

    Project Management and Objectives

    2.1 Title and Approval Page - Title and Approval Page

    2.2 Document Format and Table of Contents2.2.1 Document Control Format

    2.2.2 Document Control Numbering System 2.2.3 Table of Contents

    2.2.4 QAPP Identifying Information

    - Table of Contents- QAPP Identifying

    Information

    2.3 Distribution List and Project Personnel Sign-Off Sheet

    2.3.1 Distribution List2.3.2 Project Personnel Sign-Off Sheet

    - Distribution List- Project Personnel Sign-Off

    Sheet

    2.4 Project Organization2.4.1 Project Organizational Chart2.4.2 Communication Pathways2.4.3 Personnel Responsibilities and

    Qualifications2.4.4 Special Training Requirements and

    Certification

    - Project OrganizationalChart- Communication Pathways- Personnel Responsibilities

    and Qualifications Table- Special Personnel Training

    Requirements Table

    2.5 Project Planning/Problem Definition2.5.1 Project Planning (Scoping)

    2.5.2 Problem Definition, Site History, andBackground

    - Project Planning SessionDocumentation (including

    Data Needs tables)- Project Scoping Session

    Participants Sheet- Problem Definition, Site

    History, and Background- Site Maps (historical and

    present)

  • 5/24/2018 Workbook-ufp Wbk 0305

    8/45

    QAPP Worksheet #2

    QAPP Identifying Information

    (continued)

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Required QAPP Element(s) and

    Corresponding QAPP Section(s) Required Information

    Crosswalk to RelatedDocuments

    2.7 Secondary Data Evaluation - Sources of Secondary Dataand Information

    - Secondary Data Criteria

    and Limitations Table

    2.8 Project Overview and Schedule - Summary of Project Tasks2.8.1 Project Overview - Reference Limits and2.8.2 Project Schedule Evaluation Table

    - Project Schedule/TimelineTable

    Measurement/Data Acquisition

    3.1 Sampling Tasks3.1.1 Sampling Process Design and Rationale3.1.2 Sampling Procedures and Requirements

    3.1.2.1 Sampling Collection Procedures3.1.2.2 Sample Containers, Volume, and

    Preservation3.1.2.3 Equipment/Sample Containers

    Cleaning and DecontaminationProcedures

    3.1.2.4 Field Equipment Calibration,

    Maintenance, Testing, andInspection Procedures

    3.1.2.5 Supply Inspection and AcceptanceProcedures

    3.1.2.6 Field Documentation Procedures

    - Sampling Design andRationale- Sample Location Map- Sampling Locations and

    Methods/ SOPRequirements Table

    - Analytical Methods/SOPRequirements Table

    - Field Quality ControlSample Summary Table

    - Sampling SOPs- Project Sampling SOP

    References Table- Field Equipment

    Calibration, Maintenance,Testing, and InspectionTable

    3.2 Analytical Tasks3.2.1 Analytical SOPs3.2.2 Analytical Instrument Calibration

    Procedures3.2.3 Analytical Instrument and Equipment

    Maintenance, Testing, and InspectionProcedures

    3.2.4 Analytical Supply Inspection andAcceptance Procedures

    - Analytical SOPs- Analytical SOP References

    Table- Analytical Instrument

    Calibration Table- Analytical Instrument and

    Equipment Maintenance,Testing, and InspectionTable

  • 5/24/2018 Workbook-ufp Wbk 0305

    9/45

    QAPP Worksheet #2

    QAPP Identifying Information

    (continued)

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Required QAPP Element(s) and

    Corresponding QAPP Section(s)

    Required Information

    Crosswalk to RelatedDocuments

    3.3 Sample Collection Documentation,Handling, Tracking, and Custody Procedures

    3.3.1 Sample Collection Documentation

    3.3.2 Sample Handling and Tracking System3.3.3 Sample Custody

    - Sample CollectionDocumentation Handling,Tracking, and Custody

    SOPs- Sample Container

    Identification- Sample Handling Flow

    Diagram- Example Chain-of-Custody

    Form and Seal

    3.4 Quality Control Samples3.4.1 Sampling Quality Control Samples

    3.4.2 Analytical Quality Control Samples

    - QC Samples Table- Screening/Confirmatory

    Analysis Decision Tree

    3.5 Data Management Tasks3.5.1 Project Documentation and Records3.5.2 Data Package Deliverables3.5.3 Data Reporting Formats3.5.4 Data Handling and Management3.5.5 Data Tracking and Control

    - Project Documents andRecords Table

    - Analytical Services Table- Data Management SOPs

    Assessment/Oversight

    4.1 Assessments and Response Actions4.1.1 Planned Assessments4.1.2 Assessment Findings and Corrective

    Action Responses

    - Assessments and ResponseActions

    - Planned ProjectAssessments Table

    - Audit Checklists- Assessment Findings andCorrective

    Action Responses Table

    4.2 QA Management Reports - QA Management ReportsTable

    4.3 Final Project Report

  • 5/24/2018 Workbook-ufp Wbk 0305

    10/45

    QAPP Worksheet #2

    QAPP Identifying Information

    (continued)

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Required QAPP Element(s) and

    Corresponding QAPP Section(s) Required Information

    Crosswalk to RelatedDocuments

    Data Review

    5.1

    Overview

    5.2 Data Review Steps 5.2.1 Step I: Verification 5.2.2 Step II: Validation 5.2.2.1 Step IIa Validation Activities 5.2.2.2 Step IIb Validation Activities 5.2.3 Step III: Usability Assessment 5.2.3.1 Data Limitations and Actions from

    Usability Assessment5.2.3.2 Activities

    - Verification (Step I)Process Table

    - Validation (Steps IIa andIIb) Process Table

    - Validation (Steps IIa andIIb) Summary Table

    - Usability Assessment

    5.3 Streamlining Data Review 5.3.1 Data Review Steps To Be Streamlined 5.3.2 Criteria for Streamlining Data Review 5.3.3 Amounts and Types of Data Appropriate

    for Streamlining

  • 5/24/2018 Workbook-ufp Wbk 0305

    11/45

    7

    QAPP Worksheet #3

    (UFP-QAPP Manual Section 2.3.1)

    List those entities to whom copies of the approvedQAPP, subsequent QAPP revisions, addenda, and amendments.

    Title:

    Revision Number:

    Revision Date:Page___ of___

    Distribution List

    Document Control

    QAPP Recipients Title Organization Telephone Number Fax Number E-mail Address Number

  • 5/24/2018 Workbook-ufp Wbk 0305

    12/45

    8

    QAPP Worksheet #4

    (UFP-QAPP Manual Section 2.3.2)

    Have copies of this form signed by key project personnel from each organizationto indicate that they have read the applicable sections of the QAPP and will

    perform the tasks as described. Ask each organization to forward signed sheets to

    the central project file.

    Project Personnel Sign-Off Sheet

    Organization:_________________________

    Title:

    Revision Number:

    Revision Date:Page ___ of ___

    Project Personnel Title Telephone Number Signature Date QAPP Read

  • 5/24/2018 Workbook-ufp Wbk 0305

    13/45

    9

    QAPP Worksheet #5

    (UFP-QAPP Manual Section 2.4.1)

    Identify reporting relationships between all organizations

    involved in the project, including the lead organization and all contractor and subcontractororganizations. Identify the organizations providing field sampling, on-site and off-site analysis,

    and data review services, including the names and telephone numbers of all project managers,

    project team members, and/or project contacts for each organization.

    Project Organizational Chart

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

  • 5/24/2018 Workbook-ufp Wbk 0305

    14/45

    10

    QAPP Worksheet #6

    (UFP-QAPP Manual Section 2.4.2)

    Describe the communication pathways and modes of communication that will

    be used during the project, after the QAPP has been approved. Describe the procedures

    for soliciting and/or obtainingapproval between project personnel, between different

    contractors, and between samplers and laboratory staff. Describe the procedure that

    will be followed when any project activity originally documented in an approved QAPP

    requires real-time modification to achieve project goals or a QAPP amendment is required.

    Describe the procedures for stopping work and identify who is responsible.

    Communication Pathways

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Communication Drivers Responsible Entity Name Phone Number Procedure (Timing, Pathways, etc.)

  • 5/24/2018 Workbook-ufp Wbk 0305

    15/45

    11

    QAPP Worksheet #7

    (UFP-QAPP Manual Section 2.4.3)

    Identify project personnel associated with each organization, contractor,

    and subcontractor participating in responsible roles. Includedata users,

    decision-makers, project managers, QA officers, project contacts for

    organizations involved in the project, project health and safety officers,

    geotechnical engineers and hydrogeologists, field operation personnel,

    analytical services, and data reviewers. Identify project team members

    with an asterisk (*). Attach resumes to this worksheet or note the location

    of the resumes.

    Personnel Responsibilities and Qualifications Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Education and Experience

    Name Title Organizational Affiliation Responsibilities Qualifications

  • 5/24/2018 Workbook-ufp Wbk 0305

    16/45

    12

    QAPP Worksheet #8

    (UFP-QAPP Manual Section 2.4.4)

    Provide the following information for those projects requiring personnel

    with specialized training. Attach training records and/or certificates to

    the QAPP or note their location.

    Special Personnel Training Requirements Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Personnel

    Specialized Training Personnel/Groups Titles/

    Project Title or Description of Training Training Receiving Organizational Location of Training

    Function Course Provider Date Training Affiliation Records/Certificates1

    1If training records and/or certificates are on file elsewhere, document their location in this column. If training records and/or certificates do

    not exist or are not available, then this should be noted.

  • 5/24/2018 Workbook-ufp Wbk 0305

    17/45

    QAPP Worksheet #9

    (UFP-QAPP Manual Section 2.5.1)

    Complete this worksheet for each project scoping session held.Identify project team members who are responsible for planning

    the project.

    Project Scoping Session Participants Sheet

    Title:

    Revision Number:

    Revision Date:Page ___ of ___

    Project Name___________________ Site Name___________________________________________

    Projected Date(s) of Sampling________________________ Site Location________________________________________

    Project Manager___________________________________

    Date of Session:

    Scoping Session Purpose:

    Name Title Affiliation Phone # E-mail Address Project Role

    Comments/Decisions:________________________________________________________________________________

  • 5/24/2018 Workbook-ufp Wbk 0305

    18/45

    QAPP Worksheet #10

    (UFP-QAPP Manual Section 2.5.2)

    Clearly define the problem and the environmental questions that should

    be answered for the current investigation and develop the project

    decision If..., then... statements in the QAPP, linking data results with

    possible actions. The prompts below are meant to help the project team

    define the problem. They are not comprehensive.

    Problem Definition

    The problem to be addressed by the project:

    The environmental questions being asked:

    Observations from any site reconnaissance reports:

    A synopsis of secondary data or information from site reports:

    The possible classes of contaminants and the affected matrices:

    The rationale for inclusion of chemical and nonchemical analyses:

    Information concerning various environmental indicators:

    Project decision conditions (If..., then... statements):

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    14

  • 5/24/2018 Workbook-ufp Wbk 0305

    19/45

    15

    QAPP Worksheet #11

    (UFP-QAPP Manual Section 2.6.1)

    Use this worksheet to develop project quality objectives (PQOs) in terms of type, quantity, and

    quality of data determined using a systematic planning process. Provide a detailed discussion

    of PQOs in the QAPP. List the PQOs in the form of qualitative and quantitative statements.

    These statements should answer questions such as those listed below. These questions are

    examples only, however; they are neither inclusive nor appropriate for all projects.

    Project Quality Objectives/Systematic Planning Process Statements

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Who will use the data?

    What will the data be used for?

    What type of data are needed? (target analytes, analytical groups, field screening, on-site analytical or off-site laboratory techniques,

    sampling techniques)

    How good do the data need to be in order to support the environmental decision?

    How much data are needed? (number of samples for each analytical group, matrix, and concentration)

    Where, when, and how should the data be collected/generated?

    Who will collect and generate the data?

    How will the data be reported?

    How will the data be archived?

  • 5/24/2018 Workbook-ufp Wbk 0305

    20/45

    16

    QAPP Worksheet #12

    (UFP-QAPP Manual Section 2.6.2)

    Complete this worksheet for each matrix, analytical group, and concentration level.

    Identify the data quality indicators (DQIs), measurement performance criteria (MPC),

    and QC sample and/or activity used to assess the measurement performance for both the

    sampling and analytical measurement systems. Use additional worksheets

    if necessary. If MPC for a specific DQI vary within an analytical parameter, i.e., MPC

    are analyte-specific, then provide analyte-specific MPC on an additional worksheet.

    Measurement Performance Criteria Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Matrix

    Analytical Group1

    Concentration Level

    Sampling Procedure2Analytical

    Method/SOP3 Data Quality Indicators (DQIs) Measurement Performance Criteria

    QC Sample and/or Activity Used to

    Assess Measurement Performance

    QC Sample Assesses Error

    for Sampling (S),

    Analytical (A) or both

    (S&A)

    1If information varies within an analytical group, separate by individual analyte.

    2Reference number from QAPP Worksheet #21 (see Section 3.1.2).3Reference number from QAPP Worksheet #23 (see Section 3.2).

  • 5/24/2018 Workbook-ufp Wbk 0305

    21/45

    17

    QAPP Worksheet #13

    (UFP-QAPP Manual Section 2.7)

    Identify all secondary data and information that will be used for

    the project and their originating sources. Specify how the secondary data

    will be used and the limitations on their use.

    Secondary Data Criteria and Limitations Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Secondary Data

    Data Source

    (Originating Organization,Report Title, and Date)

    Data Generator(s)

    (Originating Org., Data

    Types, DataGeneration/Collection Dates) How Data Will Be Used Limitations on Data Use

  • 5/24/2018 Workbook-ufp Wbk 0305

    22/45

    18

    QAPP Worksheet #14

    (UFP-QAPP Manual Section 2.8.1)

    Provide a brief overview of the listed project activities.

    Summary of Project Tasks

    Sampling Tasks:

    Analysis Tasks:

    Quality Control Tasks:

    Secondary Data:

    Data Management Tasks:.

    Documentation and Records:

    Assessment/Audit Tasks:

    Data Review Tasks:

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

  • 5/24/2018 Workbook-ufp Wbk 0305

    23/45

    19

    QAPP Worksheet #15

    (UFP-QAPP Manual Section 2.8.1)

    Complete this worksheet for each matrix, analytical group, and concentration

    level. Identify the target analytes/contaminants of concern and project-requiredaction limits. Next, determine the quantitation limits (QLs) that must be met to

    achieve the project quality objectives. Finally, list the published and achievable

    detection and quantitation limits for each analyte.

    Reference Limits and Evaluation Table

    Matrix:Analytical Group:

    Concentration Level:

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Project Action Project Analytical Method1 Achievable Laboratory Limits2

    Limit Quantitation Limit

    Analyte CAS Number (applicable units) (applicable units) MDLs Method QLs MDLs QLs

    1Analytical MDLs and QLs are those documented in validated methods.2Achievable MDLs and QLs are limits that an individual laboratory can achieve when performing a specific analytical method.

  • 5/24/2018 Workbook-ufp Wbk 0305

    24/45

    QAPP Worksheet #16

    (UFP-QAPP Manual Section 2.8.2)

    List all project activities as well as the QA assessments that will be

    performed during the course of the project. Include the anticipated start and

    completion dates.

    Project Schedule/Timeline Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    20

    Dates (MM/DD/YY)

    Anticipated Date(s) Anticipated Date of

    Activities Organization of Initiation Completion Deliverable Deliverable Due Date

  • 5/24/2018 Workbook-ufp Wbk 0305

    25/45

    21

    QAPP Worksheet #17

    (UFP-QAPP Manual Section 3.1.1)

    Describe the project sampling approach. Provide the rationale

    for selecting sample locations and matrices for each

    analytical group and concentration level.

    Sampling Design and Rationale

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Describe and provide a rationale for choosing the sampling approach (e.g., grid system, biased statistical approach):

    Describe the sampling design and rationale in terms of what matrices will be sampled, what analytical groups will be analyzed and at

    what concentration levels, the sampling locations (including QC, critical, and background samples), the number of samples to be taken,

    and the sampling frequency (including seasonal considerations) [May refer to map or Worksheet #18 for details]:

  • 5/24/2018 Workbook-ufp Wbk 0305

    26/45

    QAPP Worksheet #18

    (UFP-QAPP Manual Section 3.1.1)

    List all site locations that will be sampled and include sample/ ID number,

    if available. (Provide a range of sampling locations of ID numbers if a site

    has a large number.) Specify matrix and, if applicable, depth at which samples

    will be taken. Only a short reference for the sampling location

    rationale is necessary for the table. The text of the QAPP should clearly

    identify the detailed rationale associated with each reference. Complete all

    required information, using additional worksheets if necessary.

    Sampling Locations and Methods/SOP Requirements Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    22

    Sampling Number of Rationale for

    Location/ID Depth Concentration Samples (identify Sampling SOP Sampling

    Number Matrix (units) Analytical Group Level field duplicates) Reference1 Location

    1Specify the appropriate letter or number from the Project Sampling SOP References table (Worksheet #21).

  • 5/24/2018 Workbook-ufp Wbk 0305

    27/45

    23

    QAPP Worksheet #19

    (UFP-QAPP Manual Section 3.1.1)

    For each matrix, analytical group, and concentration level, list the analytical

    and preparation method/SOP and associated sample volume, container

    specifications, preservation requirements, and maximum holding time.

    Analytical SOP Requirements Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Matrix Analytical GroupConcentration

    Level

    Analytical and

    Preparation

    Method/SOPReference1 Sample Volume

    Containers

    (number, size,and type)

    Preservation

    Requirements

    (chemical,

    temperature,light protected)

    Maximum

    Holding Time

    (preparation/analysis)

    1Specify the appropriate reference letter or number from the Analytical SOP References table (Worksheet #23).

  • 5/24/2018 Workbook-ufp Wbk 0305

    28/45

    24

    QAPP Worksheet #20

    (UFP-QAPP Manual Section 3.1.1)

    Summarize by matrix, analytical group, and concentration level

    the number of field QC samples that will be collected and sent to

    the laboratory.

    Field Quality Control Sample Summary Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Matrix

    Analytical

    Group

    Concentration

    Level

    Analytical

    and

    Preparation

    SOP

    Reference1

    No. of

    Sampling

    Locations2

    No. of Field

    Duplicate

    Pairs

    Inorganic

    No. of Field

    Blanks

    No. of

    Equip.

    Blanks

    No. of PT

    Samples

    Total No. of

    Samples to

    LabNo. of MS

    1Specify the appropriate reference letter or number from the Analytical SOP References table (Worksheet #23).2If samples will be collected at different depths at the same location, count each discrete sampling depth as a separate sampling location or station.

  • 5/24/2018 Workbook-ufp Wbk 0305

    29/45

    QAPP Worksheet #21

    (UFP-QAPP Manual Section 3.1.2)

    List all SOPs associated with project sampling including, but not limited to,

    sample collection, sample preservation, equipment cleaning and decontamination,

    equipment testing, inspection and maintenance, supply inspection and acceptance, andsample handling and custody. Include copies of the SOPs as attachments or reference all

    in the QAPP. Sequentially number sampling SOP references in the Reference Number column.

    The reference number can be used throughout the QAPP to refer to a specific SOP.

    Project Sampling SOP References Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    25

    Modified for

    Reference Project Work?Number Title, Revision Date and/or Number Originating Organization Equipment Type (Y/N) Comments

  • 5/24/2018 Workbook-ufp Wbk 0305

    30/45

    QAPP Worksheet #22

    (UFP-QAPP Manual Section 3.1.2.4)

    Identify all field equipment and instruments (other than analytical instrumentation)

    that require calibration, maintenance, testing, or inspection and provide the SOP

    reference number for each type of equipment. In addition, document the frequencyof activity, acceptance criteria, and corrective action requirements on the worksheet.

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    26

    Field Equipment Calibration, Maintenance, Testing, and Inspection Table

    Field

    Equipment

    Calibration

    Activity

    Maintenance

    Activity

    Testing

    Activity

    Inspection

    ActivityFrequency

    Acceptance

    Criteria

    Corrective

    Action

    Responsible

    Person

    SOP

    Reference1

    1Specify the appropriate reference letter or number from the Project Sampling SOP References table (Worksheet #21).

  • 5/24/2018 Workbook-ufp Wbk 0305

    31/45

    QAPP Worksheet #23

    (UFP-QAPP Manual Section 3.2.1)

    List all SOPs that will be used to perform on-site or off-site analysis. Indicate

    whether the procedure produces screening or definitive data. Sequentially number

    analytical SOP references in the Reference Number column. Include copies of theSOPs as attachments or reference in the QAPP. The reference number can be used

    throughout the QAPP to refer to a specific SOP.

    Analytical SOP References Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    27

    Title, Revision Organization Modified for

    Reference Date, and/or Definitive or Performing Project Work?Number Number Screening Data Analytical Group Instrument Analysis (Y/N)

  • 5/24/2018 Workbook-ufp Wbk 0305

    32/45

    QAPP Worksheet #24

    (UFP-QAPP Manual Section 3.2.2)

    Identify all analytical instrumentation that requires calibration and provide

    the SOP reference number for each. In addition, document the frequency,

    acceptance criteria, and corrective action requirements on the worksheet.

    Analytical Instrument Calibration Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    28

    Person

    Instrument

    Calibration

    Procedure

    Frequency of

    Calibration

    Acceptance

    Criteria

    Corrective Action

    (CA)

    Responsible for

    CA SOP Reference1

    1Specify the appropriate reference letter or number from the Analytical SOP References table (Worksheet #23).

  • 5/24/2018 Workbook-ufp Wbk 0305

    33/45

    QAPP Worksheet #25

    (UFP-QAPP Manual Section 3.2.3)

    Identify all analytical instrumentation that requires maintenance, testing, or inspection

    and provide the SOP reference number for each. In addition, document the

    frequency, acceptance criteria, and corrective action requirements on the worksheet.

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    29

    Analytical Instrument and Equipment Maintenance, Testing, and Inspection Table

    Instrument/ Maintenance Testing Inspection Acceptance Corrective Responsible SOP

    Equipment Activity Activity Activity Frequency Criteria Action Person Reference1

    1Specify the appropriate reference letter or number from the Analytical SOP References table (Worksheet #23).

  • 5/24/2018 Workbook-ufp Wbk 0305

    34/45

    30

    QAPP Worksheet #26

    (UFP-QAPP Manual Appendix A)

    Use this worksheet to identify components of the project-specific sample handling system.

    Record personnel, and their organizational affiliations, who are primarily responsible for

    ensuring proper handling, custody, and storage of field samples from the time of collection,to laboratory delivery, to final sample disposal. Indicate the number of days field samples

    and their extracts/digestates will be archived prior to disposal.

    Sample Handling System

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    SAMPLE COLLECTION, PACKAGING, AND SHIPMENT

    Sample Collection (Personnel/Organization):

    Sample Packaging (Personnel/Organization):

    Coordination of Shipment (Personnel/Organization):

    Type of Shipment/Carrier:

    SAMPLE RECEIPT AND ANALYSIS

    Sample Receipt (Personnel/Organization):

    Sample Custody and Storage (Personnel/Organization):

    Sample Preparation (Personnel/Organization):

    Sample Determinative Analysis (Personnel/Organization):

    SAMPLE ARCHIVING

    Field Sample Storage (No. of days from sample collection):

    Sample Extract/Digestate Storage (No. of days from extraction/digestion):

    Biological Sample Storage (No. of days from sample collection):SAMPLE DISPOSAL

    Personnel/Organization:

    Number of Days from Analysis

  • 5/24/2018 Workbook-ufp Wbk 0305

    35/45

    31

    QAPP Worksheet #27

    (UFP-QAPP Manual Section 3.3.3)

    Describe the procedures that will be used to maintain sample custody and

    integrity. Include examples of chain-of-custody forms, traffic reports, sample

    identification, custody seals, laboratory sample receipt forms, and laboratorysample transfer forms. Attach or reference applicable SOPs.

    Sample Custody Requirements

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Field Sample Custody Procedures (sample collection, packaging, shipment, and delivery to laboratory):

    Laboratory Sample Custody Procedures (receipt of samples, archiving, disposal):

    Sample Identification Procedures:

    Chain-of-custody Procedures:

  • 5/24/2018 Workbook-ufp Wbk 0305

    36/45

    32

    QAPP Worksheet #28

    (UFP-QAPP Manual Section 3.4)

    Complete a separate worksheet for each sampling technique, analytical method/SOP,

    matrix, analytical group, and concentration level. If method/SOP QC acceptance

    limits exceed the measurement performance criteria, the data obtained may beunusable for making project decisions.

    QC Samples Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Matrix

    Analytical Group

    Concentration LevelSampling SOP

    Analytical Method/

    SOP Reference

    Samplers Name

    Field Sampling

    Organization

    Analytical

    Organization

    No. of Sample

    Locations

    Person(s)

    Method/SOP QC Responsible for Data Quality Measurement Performance

    QC Sample: Frequency/Number Acceptance Limits Corrective Action Corrective Action Indicator (DQI) Criteria

  • 5/24/2018 Workbook-ufp Wbk 0305

    37/45

    QAPP Worksheet #29

    (UFP-QAPP Manual Section 3.5.1)

    Identify the documents and records that will be generated for all aspects of the

    project including, but not limited to, sample collection and field measurement,

    on-site and off-site analysis, and data assessment.

    Project Documents and Records Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    33

    Sample Collection

    Documents and Records

    On-site Analysis

    Documents and Records

    Off-site Analysis

    Documents and Records

    Data Assessment

    Documents and RecordsOther

  • 5/24/2018 Workbook-ufp Wbk 0305

    38/45

    34

    QAPP Worksheet #30

    (UFP-QAPP Manual Section 3.5.2.3)

    Identify all laboratories or organizations that will provide analytical services

    for the project, including on-site screening, on-site definitive, and off-site

    laboratory analytical work. Group by matrix, analytical group, concentration,and sample location or ID number. If applicable, identify the subcontractor

    laboratories and backup laboratory or organization that will be used if the

    primary laboratory or organization cannot be used.

    Analytical Services Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Matrix

    Analytical

    Group

    Concentration

    Level

    Sample

    Locations/ID

    Numbers Analytical SOP

    Data Package

    Turnaround

    Time

    Laboratory/Organization

    (Name and Address,

    Contact Person and

    Telephone Number)

    BackupLaboratory/Organization

    (Name and Address,

    Contact Person and

    Telephone Number)

  • 5/24/2018 Workbook-ufp Wbk 0305

    39/45

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    QAPP Worksheet #31

    (UFP-QAPP Manual Section 4.1.1)

    Identify the type, frequency, and responsible parties of

    planned assessment activities that will be performed for the project.

    Planned Project Assessments Table

    35

    AssessmentType Frequency

    Internal orExternal

    Organization

    PerformingAssessment

    Person(s) Responsible

    for

    Performing Assessment

    (Title and OrganizationalAffiliation)

    Person(s) Responsible

    for Responding to

    Assessment Findings

    (Title and OrganizationalAffiliation)

    Person(s) Responsible

    for Identifying

    and Implementing

    Corrective Actions (CA)

    (Title and OrganizationalAffiliation)

    Person(s)

    Responsible for

    Monitoring

    Effectiveness of

    CA (Title and

    OrganizationalAffiliation)

    QAPP W k h t #32 Titl

  • 5/24/2018 Workbook-ufp Wbk 0305

    40/45

    36

    QAPP Worksheet #32

    (UFP-QAPP Manual Section 4.1.2)

    For each type of assessment describe procedures for handling

    QAPP and project deviations encountered during the planned

    project assessments.

    Assessment Findings and Corrective Action Responses

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Individual(s) Nature of Individual(s)

    Nature of Notified of Findings Corrective Action Receiving Corrective

    Assessment Deficiencies (Name, Title, Timeframe of Response Action Response Timeframe for

    Type Documentation Organization) Notification Documentation (Name, Title, Org.) Response

    QAPP Worksheet #33 Title:

  • 5/24/2018 Workbook-ufp Wbk 0305

    41/45

    37

    QAPP Worksheet #33

    (UFP QAPP Manual Section 4.2)

    Identify the frequency and type of planned QA Management

    Reports, the project delivery dates, the personnel responsible

    for report preparation, and the report recipients.

    QA Management Reports Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Type of Report

    Frequency (daily, weekly

    monthly, quarterly,

    annually, etc.) Projected Delivery Date(s)

    Person(s) Responsible for

    Report Preparation (Title

    and Organizational

    Affiliation)

    Report Recipient(s) (Title

    and Organizational

    Affiliation)

    QAPP Worksheet #34 Title:

  • 5/24/2018 Workbook-ufp Wbk 0305

    42/45

    38

    QAPP Worksheet #34

    (UFP-QAPP Manual Section 5.2.1)

    Describe the processes that will be followed to verify project data.

    Manual (Section 5.1). Describe how each item will be verified, when

    the activity will occur, and what documentation is necessary, and identifythe person responsible. Internalor externalis in relation to the data generator.

    Verification (Step I) Process Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Internal/ Responsible for Verification

    Verification Input Description External (Name, Organization)

    QAPP Worksheet #35 Title:

  • 5/24/2018 Workbook-ufp Wbk 0305

    43/45

    39

    QAPP Worksheet #35

    (UFP-QAPP Manual Section 5.2.2)

    Describe the processes that will be followed to validate project data.

    Validation inputs include items such as those listed in Table 9

    of the UFP-QAPP Manual (Section 5.1). Describe how each item will bevalidated, when the activity will occur, and what documentation is necessary and

    identify the person responsible. Differentiate between steps IIa and IIb of validation.

    Validation (Steps IIa and IIb) Process Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Responsible for Validation

    Step IIa/IIb Validation Input Description (Name, Organization)

    QAPP Worksheet #36 Title:

  • 5/24/2018 Workbook-ufp Wbk 0305

    44/45

    40

    QAPP Worksheet #36

    (UFP-QAPP Manual Section 5.2.2)

    Identify the matrices, analytical groups, and concentration levels that each

    entity performing validation will be responsible for, as well as criteria

    that will be used to validate those data.

    Validation (Steps IIa and IIb) Summary Table

    Title:

    Revision Number:

    Revision Date:

    Page ___ of ___

    Data Validator (title

    Concentration and organizational

    Step IIa/IIb Matrix Analytical Group Level Validation Criteria affiliation)

    QAPP Worksheet #37 Title:

  • 5/24/2018 Workbook-ufp Wbk 0305

    45/45

    41

    Q

    (UFP-QAPP Manual Section 5.2.3)

    Describe the procedures/methods/activities that will be used to

    determine whether data are of the right type, quality, and quantity

    to support environmental decision-making for the project. Describehow data quality issues will be addressed and how limitations on the

    use of the data will be handled.

    Usability Assessment

    Revision Number:

    Revision Date:

    Page ___ of ___

    Summarize the usability assessment process and all procedures, including interim steps and any statistics, equations, and computer

    algorithms that will be used:

    Describe the evaluative procedures used to assess overall measurement error associated with the project:

    Identify the personnel responsible for performing the usability assessment:

    Describe the documentation that will be generated during usability assessment and how usability assessment results will be presented

    so that they identify trends, relationships (correlations), and anomalies:


Recommended