WRDC/A-2.18
12
ANNEX 1
(Item 3.2.1)
SCOPE AND COMPOSITION OF WATER RESOURCES DIVISION COUNCIL
Scope: Standardization in the field of water resources development and management; to include activities covering utilization of water resources for all uses. In regard to drinking and industrial water supply, the work shall be confined to making the raw water available for treatment and distribution. However, special publication for water management shall include all facets of technology and engineering covering entire hydrologic cycle. In regard to water for hydroelectric uses, the work shall include planning and design of hydroelectric development and powerhouse structures but may not include generation, transmission and distribution equipment
CHAIRMAN : SHRI S MASOOD HUSAIN, CHAIRMAN (CWC)
S. NO. NAME OF THE ORGANISATION REPRESENTED BY MEETING ATTENDED
15th 16th 17th
1. CENTRAL WATER COMMISSION SHRI MASOOD HUSAIN, CHAIRMAN (CWC)
2. CENTRAL BOARD OF IRRIGATION & POWER, NEW DELHI
SECRETARY SHRI A.C. GUPTA DIRECTOR (WR) (Alternate)
3. CENTRAL ELECTRICITY AUTHORITY, NEW DELHI CHIEF ENGINEER (HE&TD) DIRECTOR (HP&I) (Alternate)
4. CENTRAL GROUND WATER BOARD, FARIDABAD DR. PNANDAKUMARAN DR. S K JAIN (Alternate)
5. CENTRAL SOIL & MATERIAL RESEARCH STATION, NEW DELHI
DIRECTOR DR. R. CHITRA (Alternate)
6. CENTRAL WATER & POWER RESEARCH STATION, PUNE
DR. V.V. BHOSEKAR SHRI M.N. SINGH (Alternate)
7. CENTRAL WATER COMMISSION, NEW DELHI CHIEF ENGINEER (DSO) DIRECTOR (FE&SA) (Alternate)
8. JACOBS CONSULTING ENGG. SERVICES (I) PVT. LTD, NEW DELHI
SHRI P.K. CHATTERJEE SHRI V.K. KAPUR (Alternate)
9. FLY ASH UNIT, MINISTRY OF SCIENCE AND TECHNOLOGY, NEW DELHI
SCIENTIST 'G'& HEAD
10. GANGA FLOOD CONTROL COMMISSION, PATNA SHRI N.K. BHANDARI SHRI A. PARAMESHAM (Alternate)
11. GEOLOGICAL SURVEY OF INDIA, NAGPUR DR.V. K. SHARMA Dr. M.S. BODAS (Alternate)
12. INDIAN INSTITUTE OF TECHNOLOGY, ROORKEE HEAD (WRDM)
13. INDIAN NATIONAL COMMITTEE ON IRRIGATION AND DRAINAGE, NEW DELHI
MEMBER SECRETARY
14. INDIAN WATER RESOURCES SOCIETY, ROORKEE
DR. DEEPAK KHARE DR. ASHISH PANDEY (Alternate)
15. IRRIGATION & WATERWAYS DIRECTORATE GOVT. OF WEST BENGAL, KOLKATTA
CHIEF ENGINEER (D & R) DIRECTOR (CDO) (Alternate)
16. IRRIGATION DEPARTMENT, GOVT OF MAHARASHTRA, MUMBAI
MRS. MALINI SHANKAR (IAS) SHRI E.B PATIL (Alternate)
17. IRRIGATION DEPARTMENT, GOVT. OF UTTRAKHAND, ROORKEE
SUPERINTENDING ENGINEER (JVM) EXECUTIVE ENGINEER (JVKP)
18. IRRIGATION DEPTT. GOVT OF U.P, LUCKNOW SHRI JAIPAL SINGH CHIEF ENGINEER (DESIGN) (Alternate)
WRDC/A-2.18
13
19. NARMADA, WATER SUPPLY & KALPSAR DEPTT.GOVT OF GUJARAT, GANDHI NAGAR
SECRETARY (WR) CHIEF ER. (NG) & ADDL. SECY.
(Alternate)
20. NATIONAL BANK FOR AGRI & RURAL DEVELOPMENT, MUMBAI
DR. A.R. KHAN SHRI K.I. SHARIF (Alternate)
21. NATIONAL ENVIRONMENTAL ENGINEERING RESEARCH INSTITUTE, NAGPUR
DR. P.K. LABHASETWAR ER. SUBHASH. P. ANDEY (Alternate)
22. NATIONAL INSTITUTE OF CONSTRUCTION MANAGEMENT AND RESEARCH, HYDERABAD
PROF. K.R. RAMANA PROF. K. SRINIVAS (Alternate)
23. NATIONAL INSTITUTE OF HYDROLOGY, ROORKEE
DIRECTOR HEAD (WATER RESOURCES DIVISION) (Alternate)
24. NATIONAL REMOTE SENSING CENTRE,BALANAGAR
GROUP DIRECTOR (W.R)
25. NHPC LIMITED, FARIDABAD DIRECTOR (TECHNICAL) EXE. DIRECTOR (DESIGN & ENGG.) (Alternate)
26. NORTH EASTERN ELECTRIC POWER CORPORATION LTD, GUWAHATI
SHRI BASANTA K. DEKA SHRI PRADIP KR. SAIKIA (Alternate)
27. NTPC LTD, NOIDA SHRI V.K. GUPTA SHRI G. RAVINDRA (Alternate)
y
28. PUBLIC WORKS DEPARTMENT GOVT. OF TAMILNADU, CHENNAI
ENGINEER - IN - CHIEF SUPERINTENDING ENGINEER (Design Circle)
29. WATER & LAND MANAGEMENT INSTITUTE, MAHARASHTRA, AURANGABAD
DIRECTOR GENERAL S.E & JOINT DIRECTOR (TRG) (Alternate)
30. WATER RESOURCES DEPARTMENT, GOVT OF MADHYA PRADESH, BHOPAL
CHIEF ENGINEER (BODHI) DIRECTOR (RESEARCH) (Alternate)
WRDC/A-2.18
14
ANNEX 2 (Item 4.1)
COMPOSITION OF HYDROMETRY SECTIONAL COMMITTEE,WRD 1
Scope: a) Standardization of methods, procedures, instruments and equipment relating to techniques for
hydrometric determination of water level, velocity, discharge and sediment transport in open channels and fluid flow in closed conduits, hydrological and meterological investigations.
b) Co-ordination with the work of: i) ISO/TC 113 Hydrometry and its subcommittees SC 1 and SC6 - secretariat ii) ISO/TC 113/SC1, SC2, SC5 & SC 6 - P member iii) ISO/TC 30 Measurement of fluid flow in closed conduits and its subcommittees SC 2, SC5 and SC 7 - O member
Last 3 meetings 19th WRD1- 31 Mar. 2016 20th WRD1- 9 Dec. 2016 21st WRD 1- 20th September. 2017
SL.NO. NAME OF THE ORGANISATION REPRESENTED BY MEETINGS ATTENDED 19th 20th 21st
1. CENTRAL WATER & POWER RESEARCH STATION,PUNE DIRECTOR (CHAIRMAN) Presently: DR MRS V V BHOSEKAR
2. BHAKRA BEAS MANAGEMENT BOARD,PUNJAB
DIRECTOR(WR) SENIOR DESIGN ENGINEER (WR) (Alternate)
3. BRAHMAPUTRA BOARD, GOVT. OF INDIA,GUWAHATI SHRI CHAMAN LAL SHRI DHRUBA JYOTI BORGOHAIN (Alternate)
4. CENTRAL WATER & POWER RESEARCH STATION,PUNE DR.(MRS) V.V. BHOSEKAR SHRI R.G PATIL(Alternate-1) SMT.NEENA ISSAC (Alternate-2)
5. CENTRAL WATER COMMISSION, NEW DELHI CHIEF ENGINEER(YBO) DIRECTOR HYD (SOUTH) (Alternate-1) DIRECTOR (RDC-2) (Alternate-2)
6. CENTRE FOR WATER RESOURCES DEVELOPMENT AND MANAGEMENT (CWRDM)
DR. ANITHA DR. GEORGE ABE (Alternate)
7. FLUID CONTROL RESEARCH INSTITUTE, PALAKKAD SHRI J.P. K. SURESH MR.GOPAN.C.K .(Alternate)
8. IISC, BANGALORE PROF. M.S. MOHAN KUMAR
9. IIT,CHENNAI DR.BALAJI NARASIMHAN DR.VENU CHANDRA
10. IIT,ROORKEE DR.NAYAN SHARMA DR.SUMIT SEN (Alternate)
11. IIT,DELHI DR.B.R.CHAHAR DR.D R KAUSHAL (Alternate)
12. INDIA METEOROLOGICAL DEPARTMENT, NEW DELHI SHRI B.P. YADAV
13. IRRIGATION & PUBLIC HEALTH ENGINERRING DEPTT., HIMACHAL PRADESH
NOMINAITION AWAITED
- - -
14. IRRIGATION DEPARTMENT.GOVT.OF PUNJAB, AMRITSAR ER.H.S MINHAS SHRI VIJAY KUMAR (Alternate)
15. IRRIGATION DEPARTMENT.GOVT.OF ANDHRA PRADESH, HYDERABAD
SHRI P. JOHN VICTOR SHRI A.G. MANOJ KUMAR (Alternate)
WRDC/A-2.18
15
16. JACOBS CONSULTING ENGINEERING SERVICES (INDIA) PRIVATE LIMITED, NEW DELHI
SHRI R.K. SHARMA MS MALIKA CHATTERJEE (Alternate)
17. NARMADA WATER RESOURCES & WATER SUPPLY & KALPSARDEPTT.,VADODARA
DIRECTOR (GERI) JOINT DIRECTOR (GERI)(Alternate)
18. NATIONAL INSTITUTE OF HYDROLOGY,ROORKEE DR.RAKESH KUMAR DR.SANJAY KUMAR(Alternate)
19. NATIONAL PHYSICAL LABORATORY, NEW DELHI DR. A.K. BANDHYOPADHAYAY SHRI SHIV KUMAR JAISWAL (Alternate)
20. NATIONAL REMOTE SENSING CENTRE, HYDERABAD DR. V. VENKATESHWAR RAO SHRI K.H.V.DURGA RAO (Alternate)
21. NATIONAL WATER DEVELOPMENT AGENCY, NEW DELHI SHRI K.P. GUPTA SHRI AFROZ ALAM (Alternate)
22. NHPC LIMITED, FARIDABAD SHRI RAJEEV BABOOTA MS. MANJUSHA MISHRA (Alternate)
23. PLANETCAST TECHNOLOGIES LTD (ESSEL SHYAM), NOIDA SHRI RAJESH VERMA ASST. MANAGER MARKETING (Alternate)
24. PUBLIC WORKS DEPTT. GOVT OF TAMIL NADU, CHENNAI ENGINEER IN CHIEF (WRO) SUPTG. ENGINEER (DESIGN) WRO
25. RESEARCH DESIGN & STANDARDS ORGANIZATION, LUCKNOW
SHRI PRADIP KUMAR SHRI U.V. SINGH (Alternate)
26. SUTRON HYDROMET SYSTEMS PVT.LTD.,NEW DELHI SHRI DEEPAK GUPTA SHRI SONESH KUMAR (Alternate)
WRDC/A-2.18
16
COMPOSITION OF WRD 1:1
Last 3 meetings 7th WRD 1:1 – 20th March 2015
8th WRD 1:1 –31st March 2016
9th WRD 1:1 – 0 9 Dec 2016
S. No.
Name of the organization Represented by Email address
1. CONVENER Mr Ashok Goel [email protected]
2. Central Water Commission, New Delhi
Chief Engineer (HSO) (Presently Mr. C Lal )
Director (P&D) [email protected]
Director (River Data compilation) [email protected]
3. Central Water & Power Research Station, Pune
Director(CWPRS) (Presently Dr (Mrs.) V.V. Bhosekar)
Dr (Mrs.) V.V. Bhosekar [email protected] [email protected]
Mr. R.G. Patil, Sc D [email protected]
4. Central Ground Water Board, Faridabad
Member (SAM) (Dr D Saha)
[email protected] [email protected]
5. National Institute of Hydrology, Roorkee
Director NIH, (Dr. S. K. Jain)
[email protected] [email protected]
Dr. S. K. Jain
[email protected] [email protected]
Dr. M.K. Goel [email protected]
6. IIT, Roorkee Dr N.K. Goel [email protected], [email protected]
Dr. M.L. Kansal [email protected]
7. Indian Institute of Tropical Meteorology, Pune
Dr (Mrs) Nayana R Deshpande, Sc.D
8. Fluid Control Research Institute, Kerala
Mr. P.K. Suresh [email protected]
9. IIT Chennai NOMINATION AWAITED
10. IIT Gandhinagar Dr Pranab Mohapatra [email protected]
WRDC/A-2.18
17
COMPOSITIONOFGROUND WATERAND RELATED INVESTIGATIONS
SECTIONAL COMMITTEE,WRD 3
SCOPE: a) Standardization of all aspects of ground water resources, related investigations, water harvesting and recharge for ground water b) Co-ordination with the work of ISO/TC 113 /SC 8
Last 3 meetings 16th WRD 03 – 29th Oct. 2013 17th WRD03 – 19 March. 2015 18th WRD 03- 21st September 2017
S.NO. NAMEOFTHEORGANISATION REPRESENTED BY MEETINGS ATTENDED
16th 17th 18th
1. CENTRAL GROUND WATER BOARD,NEWDELHI MEMBER(HQ) (CHAIRMAN)
2. CENTRAL ELECTRICITY AUTHORITY,NEWDELHI SHRI RAKESH KUMAR SHRI MUKESH KUMAR (Alternate)
3. CENTRAL GROUND WATER BOARD, FARIDABAD DR. SANJAY MARWAHA DR. S.N DWIVEDISHRI S.KSINHA (Alternate)
x
4. CENTRAL POLLUTION CONTROL BOARD, NEW DELHI DR.D.D.BASU SHRI R.M.BHARDWAJ (Alternate)
5. CENTRAL SOIL &WATER CONSERVATION RESEARCH & TRAINING INSTITUTE, DEHRADUN
DR.D.R.SENA
6. CENTRALSOIL AND SALINITY RESEARCH INSTITUTE, KARNAL DR. D.S. BUNDELA DR. M.J. KALEDHONKAR (Alternate)
7. CENTRAL WATER & POWER RESEARCH STATION, PUNE SHRI R.S. RAMTEKE DR.C. KRISHNAIAH (Alternate)
8. CENTRAL WATER COMMISSION, FARIDABAD SUPTDG.ENGINEER (P.CIRCLE) DIRECTOR(WM) (Alternate)
9. CENTRE FOR WATER RESOURCES DEVELOPMENT& MANAGEMENT,KOZHIKODE
SHRI SUSHANTH C M DR. PRIJU C P (Alternate)
- -
10. G.B. PANT INSTITUTE OF HIMALAYAN ENVIRONMENT & DEVELOPMENT, KOSI
SHRI SAUKIN TARAFDAR SHRI VAIBHAV GOSAVI (Alternate)
11. GEOLOGICAL SURVEY OF INDIA, FARIDABAD SHRI SANJEEV SHARMA DR. SHREEMATI GUPTA(Alternate)
x x
12. GROUND WATER SURVEYS AND DEVELOPMENT AGENCY,PUNE DR. VIJAT PAKHMODE SHRI S.M. DESHPANDE (Alternate)
13. GUJARAT WATER RESOURCES DEVELOPMENT CORPORATION, GUJARAT
SHRI J.P.RAVAL SHRI A.D. GOHIL(Alternate)
14. GUJURAT WATER SUPPLY & SEWERGE BOARD, GUJURAT NOMINATION AWAITED - - -
15. INDIA METEROLOGICAL DEPARTMENT, NEW DELHI DR.(MRS) SURINDER KAUR SHRI S.B.TYAGI (Alternate)
16. INDIAN INSTITUTE OF TECHNOLOGY, ROORKEE DR.DEEPAK KHARE
17. IRRIGATION DEPARTMENT, GOVT. OF PUNJAB,CHANDIGARH CHIEF ENGINEER DIRECTOR (DAM) (Alternate)
18. IRRIGATION DEPARTMENT, GOVT. OF UTTARAKHAND, ROORKEE
SHRI RANVEER SINGH CHAUHAN SHRI DEVENDRA KR. PACHAURI (Alternate)
19. KRGRAIN WATER FOUNDATION, CHENNAI SHRI K.A.GOPINATH
20. MINISTRY OF ENVIRONMENT & FORESTS, NEW DELHI ADVISOR DR.(MRS) NALINI BHAT (Alternate)
21. NABARD,MUMBAI SHRI VIJENDRA SHARMA SHRI N.V. BASKARAN (Alternate)
22. NATIONAL GEOPHYSICAL RESEARCH INSTITUTE, HYDERABAD DR.M.J.NANDAN
WRDC/A-2.18
18
23. NATIONAL INSTITUTE OF HYDROLOGY DR.N.C.GHOSH DR. (MRS.) ANUPAMA SHARMA (Alternate)
24. NATIONAL REMOTE SENSING CENTRE, HYDERABAD DR.S.K.SUBRAMANIAN
25. NHPC LTD,FARIDABAD SHRI SL KAPIL SHRI MOHINDER PAL SINGH (Alternate)
26. NERIWALAM, TEJPUR DR. AMULYA CHANDRA DEBNATH DR. UZZAL MANI HAZARIKA (Alternate)
27. SURVEY OF INDIA, NEW DELHI MAJ, Gen G.S. CHANDELA SHRI R.K. MEENA (Alternate)
28. TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD,CHENNAI
ENGINEERING DIRECTOR SR.HYDROGEOLOGIST (Alternate)
29. WADIA INSTITUTE OF HIMALAYAN GEOLOGY, DEHRADUN DR.S.K.BARTARYA
COMPOSITION OF WRD 3:1
Last 3 meetings 8th WRD 3:1 – 18 May
2015 7th WRD 3:1 – 27 Jan 2015 6th WRD 3:1 – 29 Oct 2013
S. NO.
NAME OF THE ORGANISATION REPRESENTED BY E-Mail ID
1 CENTRAL WATER COMMISSION SHRI A S Goel [CONVENER] & CHAIRMAN ISO/TC 113
2 CENTRAL WATER COMMISSION, NEW DELHI
DIRECTOR (P&D) [email protected]
3 CENTRAL WATER & POWER RESEARCH STATION,PUNE
DIRECTOR DR K VENUGOPAL, CRO
4 CENTRAL GROUND WATER BOARD, NEW DELHI
MEMBER (SAM) . D Saha
DR. S Shekhar
[email protected] [email protected]
5 NATIONAL INSTITUTE OF HYDROLOGY ROORKEE
DIRECTOR DR. N C GHOSH
[email protected] [email protected] [email protected]
6 NATIONAL GEOPHYSICAL RESEARCH INSTITUTE, HYDERABAD
DR. R RANGARAJAN [email protected]
7 IIT DELHI PROF. A K KESARI [email protected] [email protected]
8 IIT, ROORKEE PROF. DEEPAK KASHYAP [email protected]
9 WAPCOS LTD. NOMINATION AWAITED
10 DR. A.K. RASTOGI, PROF. EMERITUS, IIT MUMBAI, IN PERSONAL CAPACITY
ACCEPTANCE AWAITED [email protected]
WRDC/A-2.18
19
COMPOSITIONOFGEOLOGICAL INVESTIGATIONS AND SUB-SURFACE EXPLORATION SECTIONAL COMMITTEE, WRD 5
Last 3 meetings 18th WRD 05 – 08 Sept 2015 19
th WRD 05 – 22 July 2016 20th WRD 05 – 28 March 2018
SL. NO.
NAME OF THE ORGANISATION REPRESENTED BY MEETINGS ATTENDED
18th 19th 20th
1 IN PERSONAL CAPACITY, GURGAON DR. P.C. NAWANI (CHAIRMAN)
2
AFCONS INFRA STRUCTURE LIMITED, MUMBAI
SHRI P . S. BANSOD SHRI V.G. ABHYANKAR (Alternate)
3
CENTRAL BUILDING RESEARCH INSTITUTE, ROORKEE
DR. S. SARKAR DR. P.K. S. CHAVHAN (Alternate)
4
CENTRAL INSTITUTE OF MINING & FUEL RESEARCH, ROORKEE
DR. R.K. GOEL DR. J.K. MOHNOT(Alternate)
5
CENTRAL SOIL & MATERIAL RESEARCH STATION, NEW DELHI
SHRI S.L. GUPTA SHRI N.P. HANKANDAVAR (Alternate)
6
CENTRAL WATER & POWER RESEARCH STATION, PUNE (Co – opted)
DR. C KRISHNAIAH SHRI CH. SUBBARAO (Alternate)
--
--
--
7 CENTRAL WATER COMMISSION, NEW DELHI DIRECTOR (FE&SA) DIRECTOR CMDD(E&NE) (Alternate)
8 FERRO CONCRETE CONSTRUCTION (I) PVT LTD, INDORE DR. MAHAVIR BIDASARIA
9 GEOLOGICAL SURVEY OF INDIA DR. SANDIP KUMAR SOM DR. SAIBAL GHOSH (Alternate)
10 HCC LIMITED, MUMBAI (Co – opted) SHRI SATISH KUMAR SHARMA SHRI JATINDER BALI (Alternate)
--
11 JINDAL POWER LTD, GURGAON FRESH NOMINATION AWAITED
12 NARMADA CONTROL AUTHORITY, INDORE SHRI M.K. CHAUHAN
13 NATIONAL INSTITUTE OF ROCK MECHANICS, KARNATAKA DR. AJAY KUMAR NAITHANI SHRI SANDEEP NELLIAT (Alternate)
y
14 NHPC LTD, FARIDABAD SHRI R C SHARMA SHRI ARINDOM CHAKRABORTY (Alternate)
15
NTPC LIMITED, NOIDA (Co – opted)
SHRI NAVEEN KUMAR JAIN SHRI BHUVNESH KUMAR (Alternate)
--
--
16 THDC INDIA LIMITED, RISHIKESH (Co – opted) SMT. CHITRA NEGI (INVITEE) --- X
17 UJVN LTD., DEHRADUN DR. HARISH BAHUGUNA SHRI I M S KARASI (Alternate)
WRDC/A-2.18
20
COMPOSITION OF WATER RESOURCES PLANNING, MANAGEMENTAND EVALUATION SECTIONAL COMMITTEE, WRD 6
Last 3 meetings 15th – 08th June 2016 14
th – 23rd July 2015 13th – 25
th Mar 2013
S.
No. NAME OF THE ORGANISATION REPRESENTED BY MEETINGS ATTENDED
13th 14th 15th
1. CENTRAL WATER COMMISSION, NEW DELHI CHIEF ENGINEER (PAO) (CHAIRMAN)
2. BHAKRA BEAS MANAGEMENT BOARD, CHANDIGARH DIRECTOR (DESIGN) DY. SECRETARY (PLANNING) (Alternate)
3. CENTRAL BOARD OF IRRIGATION & POWER, NEW DELHI
SHRI A C GUPTA SHRI M L BAWEJA (Alternate)
x
4. CENTRAL ELECTRICITY AUTHORITY, NEW DELHI CHIEF ENGINEER (HP&I) DIRECTOR-III [HP&I] (Alternate)
5. CENTRAL SOIL & MATERIALS RESEARCH STATION, NEW DELHI
SHRI S L GUPTA SHRI HARI DEV(Alternate)
6. ICAR-INDIAN INSTITUTE OF SOIL AND WATER CONSERVATION
DR. D R SENA
7. CENTRAL WATER COMMISSION, NEW DELHI DIRECTOR (PA), SOUTH DIRECTOR (PA), NORTH (Alternate)
8. GANGA FLOOD CONTROL COMMISSION, PATNA SHRI AJIT KUMAR SHRI AMITABH PRABHAKAR (Alternate)
9. GEOLOGICAL SURVEY OF INDIA, NAGPUR SHRI M P SRIVASTAVA SHRI N C SHARMA (Alternate)
10. HCC LIMITED, MUMBAI (Co – opted) SHRI SATISH SHARMA SHRI JATINDER BALI (Alternate)
-- -- --
11. IRRIGATION & WR DEPARTMENT, HARYANA SUPERINTENDING ENGINEER (CDO)
12. HIMACHAL PRADESH POWER CORPORATION LTD, SHIMLA (
ER. K K GOEL DR. POONAM BINJOLKAR (Alternate)
13. INDIAN AGRICULTURAL RESEARCH INSTITUTE, NEW DELHI
DR. (MRS.) RAVINDER KAUR DR. MANOJ KHANNA (Alternate)
14. INDIAN INSTITUTE OF TECHNOLOGY, ROORKEE DR. NAYAN SHARMA DR. S K MISHRA (Alternate)
15 INDIAN INSTITUTE OF TECHNOLOGY, KHARAGPUR (Co – opted)
PROF. V R DESAI DR. BHABAGRAHI SAHOO
16. INDIAN NATIONAL COMMITTEE ON IRRIGATION AND DRAINAGE, NEWDELHI
MEMBER SECRETARY CONSULTANT(Alternate)
17. IRRIGATION & POWER RESEARCH INSTITUTE, AMRITSAR
NOMINATION AWAITED -
18. IRRIGATION & PUBLIC HEALTH DEPTT, GOVT OF HIMACHAL PRADESH, SHIMLA
ER. ANIL BAHRI ER. SUMAN VIKRANT (Alternate)
WRDC/A-2.18
21
19. IRRIGATION AND CAD DEPARTMENT, GOVT. OF ANDHRA PRADESH, HYDERABAD
CHIEF ENGINEER (CDO) SUPTD ENGINEER (DAMS CIRCLE) (Alternate)
20. IRRIGATION DEPARTMENT, GOVT OF UTTAR PRADESH
NOMINATION AWAITED -
21. IRRIGATION DEPARTMENT, GOVT. OF MAHARASHTRA, MUMBAI
ADMINISTRATOR SUPTDG ENGR. & DY. SECY (I.M.) (Alternate)
22. IRRIGATION DEPARTMENT, GOVT. OF UTTARAKHAND, DEHRADUN
CHIEF ENGINEER (YAMUNA VALLEY) SUPTD. ENGINEER (Alternate)
23. IRRIGATION DEPTT. IRRIGATION & ADMINISTRATION, THIRUVANANTHAPURAM
MS. P LATHIKA MS. P S SOBHANA (Alternate)
24. JAYPEE INFRA VENTURES, NOIDA SHRI VATSAL CHOPRA (PM) SHRI P K KAUSHIK (AM) (Alternate)
25. MINISTRY OF ENVIRONMENT & FORESTS, NEW DELHI SHRI B B BARMAN SHRI R N JINDAL (Alternate)
26. NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT, MUMBAI
SHRI VIJENDRA SHARMA SHRI N V BASKARAN (Alternate)
27. NATIONAL REMOTE SENSING CENTRE, HYDERABAD
DR.V VENKATESHWAR RAO -
28. NHPC LIMITED, FARIDABAD SHRI S C JOSHI SHRI SANKHADIP CHOWDHURY (Alternate)
29. NTPC LTD, NOIDA NOMINATIONAWAITED - - -
30. PLANNING COMMISSION, NEW DELHI SHRI AVINASH MISHRA SMT VANDANA SHARMA (Alternate)
31 SARDAR SAROVAR NARMADA NIGAM, GANDHI NAGAR (Co – opted)
SHRI K B PARMAR
32. SATLUJ JAL VIDYUT NIGAM LIMITED, SHIMLA SHRI R K ABROL (Alternate)
33. WATER RESOURCES DEPARTMENT, GOVT OF BIHAR SHRI ARUN KUMAR VERMA
34. WATER RESOURCES DEPARTMENT GOVT. OF TAMIL NADU, CHENNAI
ENGINEER-IN-CHIEF (WRD) JT. CHIEF ENGINEER (IRRI) (Alternate)
35. WATER RESOURCES DEPARTMENT, ARUNACHAL PRADESH
SHRI LIKAR ANGU
36. WATER RESOURCES DEPTT., GOVT. OF CHATTISGARH, RAIPUR
SHRI K S DHRUV SHRI D N GIDRONIA (Alternate)
37. WATER RESOURCES DEPTT., GOVT. OF RAJASTHAN, JAIPUR
SHRI D R MEENA SHRI CHOTH MAL CHOUDHARY (Alternate)
38. WATER RESOURCES DEPTT, GOVT. OF MADHYA PRADESH, BHOPAL
SHRI S K KHARE SHRI M K ACHARYA (Alternate)
39. WATER RESOURCES SYSTEM DIVISION, NATIONAL INSTITUTE OF HYDROLOGY, ROORKEE
DR SHARAD KUMAR JAIN DR SANJAY KUMAR JAIN (Alternate)
WRDC/A-2.18
22
COMPOSITION OF FOUNDATIONS AND FOUNDATION TREATMENT
SECTIONAL COMMITTEE, WRD 8
SCOPE : Standardization of criteria for design and construction of foundations on rocks, impermeable and permeable strata for water resource projects, including methods of foundation treatment
Last 3 meetings 17th Meeting -8th Mar.2016 18th Meeting -09 Feb.2017 19th Meeting -28 Feb. 2018
S. NO.
NAMEOFTHEORGANISATION
REPRESENTED BY
MEETINGS ATTENDED
17th 18th 19th
1. CENTRAL SOILS AND MATERIAL RESEARCH STATION, NEW DELHI SHRI HASAN ABDULLAH DIRECTOR (CHAIRMAN)
2. AFCONS INFRASTRUCTURE LIMITED, MUMBAI DR. SUNIL BASARKAR SHRI PRAKASH SHANKAR BANSOD(Alternate)
3. AIMILLTD,NEWDELHI DR V.M. SHARMA SHRI SHARIQUE KHAN (Alternate)
4. CENTRAL BOARD OF IRRIG. & POWER, NEW DELHI SHRI A.C.GUPTA SHRI M.L. BAWEJA (Alternate)
5. CENTRAL SOIL & MATERIAL RESEARCH STATION, NEW DELHI DR R.CHITRA DR. MANISH GUPTA (Alternate)
6. CENTRAL WATER &POWER RESEARCH STATION, PUNE SHRI K.R.DHAWAN SHRI A.K.GHOSH (Alternate)
7. CENTRAL WATER COMMISSION, NEW DELHI DIRECTOR(FE&SA)) DIRECTOR EMBANKMENT(N&W)(Alternate)
8. FERRO CONCRETE CONSTRUCTION (I) PVT LTD,INDORE SHRI MAHAVIR BIDASARIA ER. MANISH VAISH (Alternate)
9. GAMMON INDIALTD.,MUMBAI SHRI ASHOK B BHUTADA SHRI ASHISH GUPTA(Alternate)
10. GEOLOGICAL SURVEY OF INDIA, KOLKATA SHRI B.M. GOIROLA SHRI PRADIP SINGH (Alternate)
11. HINDUSTAN CONSTRUCTION COMPANY LTD.,MAHARASHTRA SHRI DIGVIJAY M.KUDTARKAR SHRI AARIF SHAIKH (Alternate)
12. INPERSONAL CAPACITY, NEW DELHI DR A.K.DHAWAN
13. IRRIGATION DEPARTMENT DEHRADUN, UTTARKHAND CHIEF ENGINEER SUPERINTENDING ENGINEER (Alternate)
14. IRRIGATION WORKS PUNJAB, CHANDIGARH
SHRI KULDIP SINGH TAKSHI SHRI JATINDER PAL SINGH (Alternate)
15. IRRIGATION DEPARTMENT,GOVT.OF ANDHRA PRADESH, HYDERABAD.
CHIEF ENGINEER
16. IT DCEMENTATION INDIA LTD.,MUMBAI SHRI S.R. BHATTACHARYA SHRI R.Y. PUTTY (Alternate)
17. JAL VIDYUT NIGAM LTD, UTTRAKHAND NOMINATION AWAITED - - -
18. JAYPEE INFRAVENTURES PVT LTD,NOIDA SHRI P.K. ALAGH SHRI VIPIN KUMAR (Alternate)
19. L&T ECC, FARIDABAD NOMINATION AWAITED - - -
WRDC/A-2.18
23
20. M/S TATA CONSULTING ENGINEERS, MUMBAI SHRI SANJEEV GUPTA SHRI KIRAN DA LAL(Alternate)
21. MAHARASHTRA ENGINEERING RESEARCH INSTITUTE,NASHIK
SCIENTIFIC RESEARCH OFFICER ASSISTANT RESEARCH OFFICER (Alternate)
22. NHPCLTD,FARIDABAD SHRI A.K. JAIN SHRI VIVEK TRIVEDI (Alternate)
23. NORTH EASTERN ELECTRIC POWER CORPORATION LTD, SHILLONG
SHRI AMIT PAUL
24. NTPCLTD.,NOIDA SHRI NAVEEN KUMAR JAIN SHRI NIRAJ KUMAR (Alternate)
25. PUBLIC WORKS DEPTT,TAMILNADU ER.P. RAMALINGAM ER.N. PANDIAN (Alternate)
26. THDC INDIA LTD,RISHIKESH SHRI RAJEEV VISHNOI SHRI NEERAJ AGRAWAL (Alternate)
27. WATER RESOURCES DEPTT., GOVT.OF MADHYA PRADESH, BHOPAL
CHIEF ENGINEER (BODHI) SHRI H.K. SHARMA (Alternate)
WRDC/A-2.18
24
COMPOSITION OFDAMS & SPILLWAYS SECTIONAL COMMITTEE,WRD 09
SCOPE: Standardization of criteria for planning, design, construction, maintenance and related
aspects of various types of dams and spillways
Last 3 meetings 14thWRD 09 –15 Mar 2013 15thWRD 09 – 0 7 J a n 2015 16thWRD 09 –11TH April 2017
SL. NO.
NAME OF THE ORGANISATION REPRESENTED BY MEETINGS ATTENDED
14th 15th 16th
1. CENTRALWATERCOMMISSION,NEWDELHI C.EDESIGNS(E&NE)(CHAIRMAN)
2. (INPERSONALCAPACITY), PUNE SHRI P.B DEOLALIKAR
3. BHAKRA BEAS MANAGEMENT BOARD,NANGAL TOWNSHIP
CHIEF ENGINEER (BHAKRADAM) DIRECTOR (DESIGN)(Alternate)
4. CENTRAL BOARD OF IRRIG. &POWER, NEW DELHI SHRI A.C GUPTA SHRI M.L. BAWEJA (Alternate)
5. CENTRAL SOIL & MATERIAL RESEARCH STATION, NEW DELHI
DIRECTOR SHRI S.L.GUPTA (Alternate)
6. CENTRAL WATER &POWER RESEARCH STATION,PUNE
MRS.V.V. BHOSEKAR Dr. M.R. BHAJANTRI (Alternate)
7. CENTRAL WATER COMMISSION,NEW DELHI DIRECTOR,[CMDD-NW&S],WB-II DIRECTOR (CMDD(N&W))(Alternate)
8. JACOBS CONSULTING ENGG. SERVICES(I) PVT.LTD, NEW DELHI SHRI RAJIB CHKRABORTY MS. ABHA GUPTA (Alternate)
9. DEPT.OF WRDM, IIT ROORKEE DR.NAYAN SHARMA
10. GAMMON INDIA, MUMBAI SHRI ASHISH GUPTA SHRI GIRISH P JOSHI (Alternate)
11. GEOLOGICALSURVEYOF INDIA, KOLKATA DR. SAIBAL GHOSH SHRI BHUPENDER SINGH (Alternate)
12. IN PERSONAL CAPACITY ,FARIDABAD SHRI S.C.MITTAL SHRI KARTIKAY SHARMA (Alternate)
13. IIT, NEW DELHI HEAD OF CIVIL ENGINEERING
14. IRRIGATION DEPARTMENT, GOVT. OF MAHARASHTRA,NASHIK
SHRI R.E.UPASANI SHRI M.S. BENDRE (Alternate) SHRI M.P. SURYANWANSHI (Alt-2)
15. INDIAN INSTITUTE OF TECHNOLOGY, NEW DELHI HEAD OF CIVIL ENGINEERING
16. IRRIGATIONDEPTT.GOVT.OF HARYANA CHIEF ENGINEER/ BML SE/JLN(Alternate)
17. IRRIGATIONDEPARTMENT,GOVT.OF PUNJAB, CHANDIGARH
SHRI KULDIP SINGH TAKSHI DIRECTOR (Alternate)
18. IRRIGATION DEPARTMENT, GOVT.OF ANDHRA PRADESH,HYDERABAD
CHIEF ENGINEER SUPTD. ENGINEER(Alternate)
19. IRRIGATION RESEARCH INSITUTE ROORKEE SHRI LALTI KUMAR SHARMA SHRI NAVEEN M SINGHAL (Alternate)
20. JAYPEE INFRA VENTURES, NOIDA SHRI VIPIN KUMAR SHRI V.K.GUPTA(Alternate)
WRDC/A-2.18
25
21. KERALA STATE ELECTRICITY BOARD, THIRUVANANTHAPURAM
SMT. ANNI PHILIP DEPUTY C.E.(DESIGNS) (Alternate)
22. LARSEN AND TOUBRO LIMITED,DELHI SHRI P.K.YADAV
23. NARMADA & WATER RESOURCES ,WATER SUPPLY & KALPASAR DEPTT.,GANDHINAGAR
SHRI H.U. KALYANI SHRI H.J. PATEL (Alternate)
24. NATIONAL BANK OF AGRICULTURE AND RURAL DEVL.,BANDRA (EAST)
NOMINATIONAWAITED - - -
25. NATIONA L INSTITUTE OF ROCK MECHANICS,BANGALORE DR. SRIPAD R NAIK SHRI B.H.VIJAY SEKAR (Alternate)
26. NHPC LIMITED,FARIDABAD SHRI A.K. JAIN SHRI R. MUSHARRAF ALI KHAN(Alternate)
27. NORTH EASTERN ELECTRIC POWER CORPORATION LTD. GUWAHATI
SHRI S. DHAR
28. NTPC LIMITED,NOIDA SHRI NAVEEN KUMAR JAIN SHRI PRASHANT NARAYAN GAUR (Alternate)
29. PUBLICWORKSDEPARTMENTGOVT.OFTAMILNADU,CHENNAI
ENGINEER-IN-CHIEF,WRD&CE(G) SUPTD. ER. (DESIGN) (Alternate)
30. THDC INDIA LTD,UTTARAKHAND
SHRI RAJEEV KUMAR BISHNOI
31. WATER RESOURCES DEPTT., GOVT.OF MADHYA PRADESH, BHOPAL
CHIEF ENGINEER(BODHI) DIRECTOR (DAMSAFETY) (Alternate)
WRDC/A-2.18
26
COMPOSITION OF RESERVOIRS AND LAKES SECTIONAL COMMITTEE, WRD 10
SCOPE: Standardization of criteria for planning, design, operation, maintenance and
other related aspects of reservoirs/lakes
Last 3 meetings 16th WRD10 – 18 Mar. 2016 17th WRD 10- 17 Feb. 2017 18th WRD 10- 21 Feb. 2018
S.No.
NAMEOFTHEORGANISATION
REPRESENTED BY
MEETINGS ATTENDED
16th 16th 18th
1. NATIONAL INSTITUTE OF HYDROLOGY, ROORKEE DIRECTOR (CHAIRMAN)
2. A.P.ENGINEERING RESEARCH LABORATIORIES, HYDERABAD SHRI J. SRI DEVI SHRI P.JOHN VICTOR (Alternate)
x x x
3. BHAKRA BEAS MANAGEMENT BOARD, PUNJAB SUPERINTENDING ENGINEER EXECUTIVE ENGINEER (Alternate)
x x x
4. CENTRAL WATER & POWER RESEARCH STATION, PUNE MRS.NEENA ISSAC DR.C.RAMESH (Alternate)
x x
5. CENTRAL WATER COMMISSION, NEW DELHI DIRECTOR [HYD.(C)] DIRECTOR (R.O) (Alternate)
x
6. JACOBS CONSULTING ENGG. SERVICES (INDIA) PVT.LTD.,NEW DELHI
SHRI PIUSH K. DATTA MS. MALLIKA CHATTERJEE (Alternate)
x x x
7. DHI GROUP,NEW DELHI DR.MOHAMMAD FAHIMUDDIN DR FLEMMING JAKOBSEN GREVE (Alternate)
x x
8. IN PERSONALCAPACITY PROF.S.MOHAN x x x
9. IN PERSONAL CAPACITY DR.A.L. RAMANATHAN x x x
10. INDIAN INSTITUTE OF TECHNOLOGY,ROORKEE, ROORKEE DR.DEEPAK KHARE SHRI MAHENDRA PAL SHARMA (Alternate)
x x
11. IRRIGATION DEPARTMENT, GOVT.OFANDHRA PRADESH,HYDERABAD
CHIEF ENGINEER SUPTG ER.(DAMS)(Alternate)
x x x
12. IRRIGATION DEPARTMENT,GOVT.OF ORISSA, BHUBANESHWAR CHIEF ENGINEER (D&R) DIR. [HEAD WORKS& COMPUTER] (Alternate)
x x x
13. IRRIGATION DEPARTMENT,GOVT.OF PUNJAB, PUNJAB CHIEF ENGINEER (RSDD) DIRECTOR DAM (RSDD) (Alternate)
y x x
14. IRRIGATION DEPTT.,GOVT.OF MAHARASHTRA, MAHARASHTRA SHRI M.S.BENDRE SHRI R. A SHIMPI (Alternate)
x x x
15. IRRIGATION RESEARCH INSTITUTE, ROORKEE CHIEF ENGINEER & DIRECTOR REASERACH OFFICER(H4) (Alternate)
x x
16. J&K LAKES AND WATER WAY DEV. AUTHORITY, SRINAGAR ER.GHULAM QADIR BHAT ER.TARIQ AHMAD DAR (Alternate)
- x x
17. MAHARASHTRA ENGINEERING RESEARACH INSTITUTE,NASHIK
SUPT.ENGG.&JOINT DIRECTOR R.O.(SEDIMENTN SURVEYDIV.) (Alternate)
x x
18. NARMADA, WATER RESOURCES, WATER SUPPLY & KALPASAR DEPTT.,GANDHI NAGAR
SHRI R.G.BHATT JT.DIRECTOR (DAM SAFETY) (Alternate)
x x x
19. NATIONAL INSTITUTE OF HYDROLOGY, ROORKEE DR.M.KGOEL DR.SANJAY KUMAR JAIN(Alternate)
x
WRDC/A-2.18
27
20. NATIONAL REMOTE SENSING CENTRE, BALANGAR (A.P) DR.V. VENKATESHWAR RAO SHRI M. SHANKER (Alternate)
x x x
21. NATIONAL WATER ACADEMY,PUNE MR S.K SRIVASTAVA MR D S CHASKAR (Alternate)
x x x
22. NATIONAL WATER DEVELOPMENT AGENCY,NEWDELHI
CHIEF ENGINEER (HQ) SUPTD., ENGINEER-III (Alternate)
- x
23. NHPC LIMITED,FARIDABAD SHRI RAJEEV BABOOTA MS. BHARTI GUPTA (Alternate)
x
24. NTPC LTD, NOIDA SHRI V.KGUPTA DR.A.K.SINGH (Alternate)
x X x
25. OFFICE OF THE ENGINEER-IN-CHIEF,BHOPAL SHRI B.C. PURANDARE SHRI S.R. UIKEY(Alternate)
x X x
26. SARDAR SAROVAR CONSTRUCTION ADVISORY COMMITTEE,VADODARA
SHRI N.K. BHANDARI SHRI K.V. RATHOD (Alternate)
x X x
27. SARDAR SAROVAR NARMADA NIGAM LTD., GANDHINAGAR DIRECTOR (CANALS) SUPERINTENDING ENGINEER (Alternate)
x X x
28. SATLUJ JAL VIDYUT NIGAM LIMITED,SHIMLA SHRI DEEPAK NAKHASI SHRI SUNIL BHARDWAJ (Alternate)
x x x
29. THDC LTD SHRI H.L. ARORA SHRI PRAVEEN SAXENA (Alternate)
x x
30. TOJO-VIKAS INTERNATIONAL (PVT.)LTD SHRI N W CHAR
X x
31. WAPCOS LTD.,GURGAON DR.A.K.SHARMA SHRI A.STEPHEN LEO(Alternate)
WRDC/A-2.18
28
COMPOSITION OF HYDRAULIC GATES & VALVES SECTIONAL COMMITTEE, WRD12
Last 3 meetings 17
th WRD12 – 23 Feb 2017 16th WRD12 – 29 Feb 2016 15
th WRD12 – 25 Mar 2015
S. No. NAMEOFTHEORGANISATION REPRESENTED BY MEETINGS
ATTENDED
15th 16th 17th
1. NHPC LTD, FARIDABAD GM (D&E) (CHAIRMAN)
y y y
2. [IN PERSONALCAPACITY], HYDERABAD SHRI N KANNAIAH NAIDU y y x
3. BHAKRA BEAS MANAGEMENT BOARD, PUNJAB DY. CHIEF ENGINEER EXECUTIVE ENGINEER (Alternate)
x x x
4. BHARAT HEAVY ELECTRICALS LTD., BHOPAL SHRI J S HANSPAL x x y
5. CENTRAL ELECTRICITY AUTHORITY, NEW DELHI NOMINATION AWAITED x x --
6. CENTRAL WATER & POWER RESEARCH STATION, PUNE SHRI A K AGARWAL SHRI RAJKUMAR (Alternate)
x y y
7. CENTRAL WATER COMMISSION, NEW DELHI DIRECTOR GATES (E&NE) DEPUTY DIRECTOR (N&NW&S)
x y y
8. HIMACHAL PRADESH POWER CORPORATIONLTD., DISTT.MANDI
ER KUMAD KUMAR GOEL DR POONAM BINJOLKAR (Alternate)
y x y
9. IIT ROORKEE, DR. B K GANDHI x x x
10. IN PERSONAL CAPACITY, NEW DELHI SHRI K C BAHETY x x x
11. IRRIGATION RESEARCH INSTITUTE, ROORKEE CHIEF ENGINWEER (DESIGN) SUERINTENDING ENGINEER (Alternate)
x x y
12. JAYPE E INFRA VENTURES, NOIDA SHRI V K GUPTA x y y
13. M/S PRECISION INFRATECH LTD, AHMEDABAD SHRI NALIN VIBHAKAR SHRI DHEERAJ VANIA (Alternate)
x x y
14. NHPC LTD, FARIDABAD SHRI S P MUKHERJEE SHRI SUVEER PANDEY(Alternate)
y y y
15. NTPC LTD. , NEW DELHI NOMINATION AWAITED -- -- --
16. DEPT. OF WATER RESOURCES, GOVT. OF ODISHA NOMINATION AWAITED y y --
17. P.E.S.ENGINEERS(P) LTD, HYDERABAD SHRI S V S S RAJU DR. V SURYA (Alternate)
y y x
18. R.M.SINHA & CO., KOLKATTA SHRI SANJIT KUMAR SINHA SHRI DEBJIT SINHA (Alternate)
y y y
19. SJVN LIMITED, SHIMLA SHRI ANISH KUMAR SHARMA x x y
20. TEXMACO LTD, KOLKATA SHRI UDAYAN BANERJEE,VP(E&M)-STRL/HME SHRI BINAYAK BHATTACHARYA, AGM( DESIGN-STRL) (Alternate)
x y x
21. WATER RESOURCES DEPARTMENT, NASHIK SUPTG. ENGINEER(GATES) EXECUTIVE ENGINEER(G.O.-4) (Alternate)
y x y
WRDC/A-2.18
29
COMPOSITIONOFCANALS&CROSSDRAINAGEWORKS SECTIONALCOMMITTEE,WRD13
SCOPE : Standardization of criteria for planning, location, design, construction, inspection,
maintenance and other related aspects for canals and cross drainage works
Last 3 meetings 17thWRD13 – 16 Dec. 2015 18thWRD13– 30 Dec. 2016 19thWRD13– 10 Aug. 2017
S. No.
NAMEOFTHEORGANISATION REPRESENTED BY MEETINGS ATTENDED
17th 18th 19th
1. CENTRAL WATER COMMISSION,NEW DELHI CHIEF ENGINEER DESIGN(N&W) (CHAIRMAN)
2. BRAHMAPUTRA BOARD,GUWAHATI SHRI JOY BARMAN SHRI G.P. SINGH (Alternate)
3. BHAKRA BEAS MANAGEMENT BOARD, PUNJAB DIRECTOR DESIGNS SUPERINTENDING ENGINEER (Alternate)
4. CENTRAL BOARD OF IRRIGATION & POWER,NEW DELHI SHRI A.C.GUPTA SHRI M.L. BAWEJA (Alternate)
5. CENTRAL SOIL AND MATERIALS RESEARCH STATION, NEW DELHI
SHRI RAJEEV KUMAR SHRI MAHABIR DIXIT (Alternate)
6. CENTRAL WATER & POWER RESEARCH STATION, PUNE SHRI N.P. KHAPARDE SHRI SURESH KUMAR(Alternate)
7. CENTRAL WATER COMMISSION,NEWDELHI DIRECTOR BCD (N&W) DIRECTOR, BCD (E&NE](Alternate)
8. JACOB CONSULTING ENGINEERING SERVICES(INDIA) LTD.,NEW DELHI
SHRI PIUSH K DATTA SHRI A.K. AGARWAL (Alternate)
9. IIT, ROORKEE, ROORKEE SHRI ASHISH PANDY DR. S.K. MISHRA (Alternate)
10. IN PERSONAL CAPACITY,JAIPUR SHRI Y.C. AGRAWAL
11. INDIAN INSTITUTE OF TECHNOLOGY,DELHI DR.B.R.CHAHAR DR. PRABHAT KR. SINGH KIKSHIT
12. IRRIGATIONDEPARTMENT,HARYANA SHRI A.K.GUPTA SHRI S.K. KOCHHAR (Alternate)
13. IRRIGATIONDEPARTMENTGOVT.OF BIHAR SUPERINTENDING ENGINEER (GATES)
14. IRRIGATION DEPARTMENT GOVT.OF RAJASTHAN,JAIPUR CHIEF ENGINEER (ID&R) DIRECTOR (CANALSID & R) (Alternate)
15. IRRIGATION DEPARTMENT, GOVT. OF MAHARASHTRA,NASHIK
SUPERINTENDING ENGINEER(GATES) EXECUTIVE ENGINEER(C.S.-1)(Alternate)
16. IRRIGATION DEPARTMENT, GOVT. OF PUNJAB, CHANDIGARH
CHIEF ENGINEER(CANAL) DIRECTOR (CDO)(Alternate)
17. IRRIGATION DEPARTMENT, GOVT. OF UTTARPRADESH, LUCKNOW
SHRI SHANKAR RAM SHRI MUKESH SHARMA(Alternate)
18. IRRIGATION DEPARTMENT, GOVT.OF ANDHRA PRADESH, HYDERABAD
CHIEF ENGINEER SUPTDG ENGINEER(CANAL)(Alternate)
19. IRRIGATION DEPARTMENT,KARNATAKA NOMINATION AWAITED - - -
WRDC/A-2.18
30
20. IRRIGATION DIVISION, O/o CHIEF ENGINEER, THIRUVANANTHAPURAM
SHRI K.A JOSHY SHRI MANJU BALAKRISHNAN (Alternate)
21. IRRIGATION RESEARCH INSTITUTE, ROORKEE SHRI LALIT KUMAR SHARMA SHRI NAVEEN SINGHAL (Alternate)
22. NARMADA WATER RESOURCES,WATER SUPPLY & KALPASAR DEPT.,GANDHINAGAR
SHRI R.G. BHATT UNIT LEADER (UNIT-G)(Alternate)
23.
24. NHPC LTD.,FARIDABAD SHRI KESHAV DESHMUKH SHRI AJAY MITTAL(Alternate)
25. PUBLIC WORKS DEPARTMENTGOVT.OFTAMIL NADU,CHENNAI
EIC, WRO PWD, (D&E) SUPTDG ENG.(DESIGN,WRD)(Alternate)
26. SARDAR SAROVAR NARMADA NIGAM LTD.,GUJARAT DIRECTOR(CANALS) CHIEF ENGINEER (DESIGN)(Alternate)
27. WAPCOS LIMITED, GURGAON SHRI SHAMBHU AZAD SHRI A.K. GEHLOT (Alternate)
28. WATER RESOURCES DEPARTMENT,RAIPUR SHRI R.K.NAGARIA SHRI U.R. RATHOR (Alternate)
29. WATER RESOURCES DEPARTMENT,MADHYA PRADESH, BHOPAL SHRI V.K.WASHIK SHRI BHAGWATI PRASAD GUPTA (Alternate)
WRDC/A-2.18
31
COMPOSITION OF WATER CONDUCTOR SYSTEMS SECTIONAL COMMITTEE, WRD 14
Last 3 meetings 16th WRD14 – 26 July 2017 15
th WRD14 – 17 Feb 2016 14th WRD14 – 27 Mar 2015
S. No. NAME OF THE ORGANISATION REPRESENTED BY
MEETINGS ATTENDED
14th 15th 16th
1. CENTRAL WATER COMMISSION, NEW DELHI C.E DESIGN (NW&S) (CHAIRMAN) Presently: Shri A S P Sinha
2. BHAKRA BEAS MANAGEMENT BOARD, NANGAL TOWNSHIP CHIEF ENGINEER (BSL) DIRECTOR (WATER REGULATION) (Alternate)
x x
3. CENTRAL SOIL & MATERIALS RESEARCH STATION, NEW DELHI SHRI HARI DEV SHRI S K JAIN (Alternate)
4. CENTRAL WATER & POWER RESEARCH STATION, PUNE SHRI A K AGRAWAL SHRI Y N SRIVASTAVA (Alternate)
x x x
5. CENTRAL WATER COMMISSION, NEW DELHI DIRECTOR [HCD(E&NE)] DIRECTOR HCD (N&W) (Alternate)
6. CENTRAL INSTITUTE OF MINING & FUEL RESEARCH, ROORKEE DR. MORE RAMULU DR. ABHAY KUMAR SINGH (Alternate)
x x x
7. JACOBS & CES , NEW DELHI NOMINATION AWAITED x x x
8. DELHI TECHNOLOGICAL UNIVERSITY, DELHI PROF. S K SINGH DR. ANIL KUMAR HARITASH (Alternate)
-- -- --
9. GEOLOGICAL SURVEY OF INDIA, FARIDABAD DR. SAIBAL GHOSH SHRI BHUPENDER SINGH (Alternate)
x x
10. H.C.C. LTD, MUMBAI (I) (Co – opted) SHRI SATISH KUMAR SHARMA SHRI NANDA DULAL MAITI(Alternate)
x x
11. HIMACHAL PRADESH POWER CORPORATION LIMITED, SUNDERNAGAR
ER. K K GOEL ER. POONAM BINJOLKAR (Alternate)
x x
12. IIT, ROORKEE DR. NAYAN SHARMA DR. ZULFEQUAR AHMAD (Alternate)
x x
13. WATER RESOURCES DEPARTMENT, CENTRAL DESIGNS ORGANIZATION, NASHIK DESIGN, TRAINING, HYDROLOGY, RESEARCH & SAFETY, MERI, NASHIK
DIRECTOR GENERAL (DTHRS) SUPERINTENDING ENGINEER (CANAL DESIGN CIRCLE), CDO (Alternate)
x x x
14. IRRIGATION RESEARCH INSTITUTE, ROORKEE SHRI ANIL KUMAR VERMA SHRI DHEERENDRA SINGH PUNDIR (Alternate)
x x x
15. SNC LAVALIN, NEW DELHI (I) (Co – opted) SHRI ABHIJIT PAUL SHRI T S K SINGH (Alternate)
-- --
16. NHPC LTD, FARIDABAD SHRI S C JOSHI SHRI RAJESH KUMAR (Alternate)
x x
17. NTPC LTD, NOIDA SHRI NAVEEN KUMAR JAIN SHRI NIRAJ KUMAR (Alternate)
x x
18. SJVN LTD., NEW SHIMLA SHRI RAKESH SEHGAL SHRI O P THAKUR (Alternate)
x x x
WRDC/A-2.18
32
19. TEXMACO LIMITED, KOLKATA SHRI ARNAB GANGULY SHRI SRIMANTA HAZRA (Alternate
x x
20. THDC INDIA LTD, RISHIKESH SHRI RAJEEV KUMAR VISHNOI SHRI SHAILENDRA SINGH (Alternate)
x x x
21. WATER RESOURCES DEPARTMENT (BODHI) BHOPAL (C) (Co – opted)
NOMINATION AWAITED -- -- --
WRDC/A-2.18
33
COMPOSITION OF HYDROELECTRIC POWER HOUSE STRUCTURES
SECTIONAL COMMITTEE, WRD 15
Last 3 meetings 15
th WRD15 – 23 June 2017 14th WRD15 – 27 March 2015 13
th WRD15 – 18 April 2013
S.
No. NAME OF THE ORGANISATION REPRESENTED BY MEETINGS
ATTENDED
13th 14th 15th
1 CENTRAL WATER COMMISION, NEW DELHI CE DESIGN (N&W) (CHAIRMAN) Presently Shri T K SIVARAJAN
2 [IN PERSONAL CAPACITY], NEW DELHI SHRI M P CHAKRAVORTY
3 [IN PERSONAL CAPACITY], NOIDA SHRI R S CHADHA
4 ANDRITZ HYDRO PVT. LTD., DISTT. FARIDABAD SHRI CHANDRA KANT JAIN
5 BHAKRA BEAS MANAGEMENT BOARD, CHANDIGARH MEMBER (IRRIGATION) SR. DESIGN ENGINEER – II (Alternate)
6 BHARAT HEAVY ELECTRICALS LTD., BHOPAL NOMINATION AWAITED
7 CENTRAL ELECTRICITY AUTHORITY, NEW DELHI SHRI PANKAJ GUPTA SHRI DEEPAK SHARMA (Alternate)
8 CENTRAL INSTITUTE OF MINING AND FUEL RESEARCH, ROORKEE
DR. R K GOEL SHRI ANIL SWARUP (Alternate)
9
CENTRAL WATER & POWER RESEARCH STATION, PUNE
SHRI RIZWAN ALI SHRI M S HANUMANTHAPPA (Alternate)
10
CENTRAL WATER COMMISSION, NEW DELHI DIRECTOR HCD (N&W) DIRECTOR HCD (E&NE) (Alternate)
11
JACOBS CONSULTING ENGINEERING SERVICE, NEW DELHI
NOMINATION AWAITED
12
GEOLOGICAL SURVEY OF INDIA, KOLKATA NIROJ KUMAR SARKAR DR. T B GHOSHAL (Alternate)
13
HIMACHAL PRADESH POWER CORPORATION LIMITED, SUNDERNAGAR
ER. KUMAD KUMAR GOEL ER. KALI DAS (Alternate)
14
IIT, ROORKEE DR. M L KANSAL DR. THANGA RAJ CHELLIAH (Alternate)
15
IRRIGATION RESEARCH INSTITUTE, ROORKEE SHRI GOURAV GOEL SHRI AMAR JEET SAH (Alternate)
16
RANJIT SAGAR DAM DESIGN, IRRIGATION WORKS, GOVT. OF PUNJAB, CHANDIGARH
NOMINATION AWAITED
17
JAYPEE INFRA VENTURES, NOIDA SHRI VATSAL CHOPRA SHRI P K ALAGH (Alternate)
18
M/S GE POWER INDIA LTD, NOIDA NOMINATION AWAITED -- -- --
WRDC/A-2.18
34
19
NHPC LIMITED, FARIDABAD SHRI Y K CHAUBEY SHRI SARABJIT SINGH (Alternate)
20
NTPC LTD, NOIDA SHRI NAVEEN KUMAR JAIN SHRI AMAR SINGH (Alternate)
21
SJVNLTD., NEW SHIMLA SHRI SANJEEV GUPTA SHRI MANISH CHAUHAN (Alternate)
22
THDC INDIA LTD., RISHIKESH SHRI SHAILENDRA SINGH SHRI SANJAY GOEL (Alternate)
23
UTTRAKHAND JAL VIDYUT NIGAM LTD. , DEHRADUN NOMINATION AWAITED
24
WAPCOS LTD, GURGAON (I) SHRI ANUPAM MISHRA SMT. P SUMANA (Alternate)
WRDC/A-2.18
35
COMPOSITION OF HYDRAULIC STRUCTURESINSTRUMENTATION
SECTIONAL COMMITTEE, WRD 16
SCOPE: Standardization of criteria for selection, installation, usage and maintenance of instruments used for the measurement of displacement, strain, stress, temperature etc. in hydraulic structures.
Last 3 meetings 17th Meeting -8th Mar.2016 18th Meeting- 9th Feb. 2017 19th Meeting-28th Feb.2018
S.No. NAMEOFTHEORGANISATION REPRESENTED BY MEETING ATTENDED
17th 18th 19th
1. CENTRAL SOIL& MATERIALS RESEARCH STATION, NEW DELHI HASAN ABDULLAH DIRECTOR (CHAIRMAN)
2. AIMIL LTD,NEW DELHI SHRI ABHAY SHANKER SHUKLA SHRI SHARIQUE KHAN (Alternate)
3. BHAKRA BEAS MANAGEMENT BOARD, NANGAL TOWNSHIP DIRECTOR / DAM SAFETY EXECUTIVE ENGINEER (Alternate)
4. CENTRAL INSTITUTE OF MINING AND FUEL RESEARCH PROF.(DR.)S.K. KASHYAP SH. MANISH KUMAR (Alternate)
5. CENTRAL SOIL & MATERIALS RESEARCH STATION,NEW DELHI SHRI S.L. GUPTA SHRI R.S SEHRA (Alternate)
6. CENTRAL WATER & POWER RESEARCH STATION,PUNE SHRI RIZWAN ALI SHRI SELVA BALAN (Alternate)
7. CENTRAL WATER COMMISSION, NEW DELHI DIRECTOR (INST) DIRECTOR EMBANKMENT (N&W) (Alternate)
8. JACOBS CONSULTING ENGINEERING SERVICES (I) LTD., NEW DELHI
SHRI S.S.NARANG MS. BHAWNA THULEY (Alternate)
9. CRRI, NEW DELHI NOMINATION AWAITED - -
10. DAMODAR VALLEY CORPORATION LTD, JHARKHAND SHRI PRABHAT KIRAN SUPTDG.ENGINEER(CIVIL) (Alternate)
11. ENCARDIO-RITE ELECTRONICS PVT. LTD., LUCKNOW SHRI AMOD GUJRAL SHRI K.K.RAI (Alternate)
12. GOLDER ASSOCIATES NOMINATION AWAITED - -
13. IN PERSONAL CAPACITY,NEW DELHI DR A.K. DHAWAN
14. INDIAN INSTITUTE OF TECHNOLOGY, ROORKEE,UTTARANCHAL SHRI DEEPAK KHARE DR NAYAN SHARMA (Alternate)
15. IRRIGATION DEPARTMENT, GOVT. OF ANDHRA PRADESH, HYDERABAD
PROF.ASHOK KUMAR SHRI A.MANOJ KUMAR(Alternate)
16. IRRIGATION DEPARTMENT, GOVT. OF GUJARAT, VADODARA SHRI R.H. FEFAR SHRI P.B.CHAUDHARI (Alternate)
17. IRRIGATION DEPARTMENT, GOVT. OF PUNJAB, CHANDIGARH SHRI KULDIP SINGH TAKSHI SHRI JATINDER PAL SINGH (Alternate)
18. IRRIGATION DEPARTMENT,(MERI) GOVT. OF MAHARASHTRA, NASHIK
SHRI RAJENDRA PAWAR SHRI PRAVEEN P. BIRADE (Alternate)
WRDC/A-2.18
36
19. IRRIGATION RESEARCH INSTITUTE,ROORKEE SHRI LALIT KUMAR SHARMA SHRI NAVEEN SINGHAL (Alternate)
20. KERALA STATE ELECTRICITY BOARD, KERALA SHRI BIBIN JOSEPH SHRI MANIKANDAN A.K (Alternate)
21. NHDC LIMITED, BHOPAL SHRI A.K.JAIN SHRI SAROJ KUMAR(Alternate)
22. NHPC LTD,FARIDABAD SHRI AJAY MITTAL SHRI SANTANU BORAH (Alternate)
23. NTPC LIMITED, NOIDA,UP SHRI R.C.SENAN SHRI MADHUKAR AGARWAL (Alternate)
24. PROGRESSIVE MACHINE TOOLS, JAUNPUR SHRI A.K. DRON
25. PUBIC WORKS DEPTT., GOVT. OF TAMIL NADU, TAMILNADU EIC, WRO & CE (G1) SHRI R.SELVAM (Alternate)
26. SATLUJ JAL VIDYUT NIGAM LIMITED,NEW SHIMLA SHRI BRIJESH KUMAR GUPTA
27. TANGEDCO,CHENNAI ER.C. RAMESH ER.V.SANTHANA KRISHNAN (Alt-1) ER.S. SIVAKUMAR (Alt-2)
28. THDC INDIA LTD, RISHIKESH NOMINATION AWAITED - -
29. UTTARAKHAND JAL VIDYUT NIGAM LIMITED,DEHRADUN SHRI VYAS DEV AJMANI SHRI N.K. MAHESHWARI (Alternate)
WRDC/A-2.18
37
COMPOSITION OF SAFETY IN CONSTRUCTION, OPERATION & MAINTENANCE OF RIVER VALLEY PROJECTS SECTIONAL COMMITTEE, WRD 21
SCOPE: Standardization of safety aspects during various stages of construction, operation and
maintenance of components and appurtenances of water resource projects
Last 3 meetings 11thWRD 21– 28 Mar.2014 12thWRD 21– 31 Mar.2015 13thWRD 21– 24 April.2018
S.No. NAMEOFTHEORGANISATION REPRESENTED BY MEETINGS ATTENDED
11th 12th 13TH
1. NHPC LTD. SHRI KISHOR KUMAR GENERAL MANAGER (SAFETY) [CHAIRMAN]
2. [IN PERSONAL CAPACITY], COCHIN SHRI G.B.MENON
3. BEML LTD, BANGALORE NOMINATION AWAITED - -
4. BHAKRA BEAS MANAGEMENT BOARD,CHANDIGARH MEMBER (IRRIGATION) DIRECTOR (DAM SAFETY) (Alternate)
5. BHARAT HEAVY ELECTRICALS LTD,BHOPAL NOMINATION AWAITED - -
6. CENTRAL BOARD OF IRRIGATION & POWER, NEW DELHI
SHRI A.C.GUPTA SHRI M.L. BAWEJA(Alternate)
7. CENTRAL ELECTRICITY AUTHORITY,NEW DELHI DIRECTOR (HPM DIVISION) DY. DIRECTOR (HPM DIVISION) (Alternate)
8. CENTRAL WATER COMMISSION,NEW DELHI DIRECTOR (DSM) DIRECTOR (DSR) (Alternate)
9. CONTROLLER OF EXPLOSIVES (CENTRE FOR FIRE, EXPLOSIVE ENV SAFETY )
NOMINATIONAWAITED - -
10. DEFENCE INSTITUTE OF FIRE RESEARCH, DELHI NOMINATIONAWAITED - -
11. DELHI FIRE SERVICES NOMINATION AWAITED - -
12. GAMMON INDIA SHRI M V JATKAR SHRI ASHISH GUPTA (Alternate)
- -
13. GEOLOGICAL SURVEY OF INDIA,KOLKATA DR. INDRA PRAKASH SHRI J.M.GAUTAM (Alternate)
14. HCC LTD, NEW DELHI SHRI AVINASH HARDE SHRI JAI PRAKASH (Alternate)
-
15. HIMACHAL PRADESH POWER CORPORATION LTD, ER. DEVENDRA K. SHARMA ER. K.K. GOEL (Alternate)
-
16. IN PERSONAL CAPACITY SHRI R.C.SHARMA -
17. INDIAN INSTITUTE OF TECHNOLOGY ROORKEE DR.GOPAL CHAUHAN
18. IRRIGATION DEPARTMENT & C.A.D, GOVT.OF ANDHRA PRADESH
SHRI I.S.N RAJU SHRI S. PANDURANGA RAO (Alternate)
19. IRRIGATION DEPARTMENT,GOVT.OF MAHARASHTRA, NASHIK
SUPTDGENGINEER (DSO) EXECUTIVE ENGINEER (DSO) (Alternate)
20. IRRIGATION DEPARTMENT, GOVT. OF PUNJAB, CHANDIGARH
CHIEF ENGINER (RSDD) DIRECTOR DAMS (RSDD) (Alternate)
x
21. IRRIGATION DEPARTMENT,GOVT.OF UTTARAKHAND, DEHRADUN
CHIEF ENGINEER (GANGA VALLEY) SUPTDG ENGINEER (MB DAM) (Alternate)
WRDC/A-2.18
38
22. JAYPEE NOMINATION AWAITED - - -
23. LARSEN & TOUBRO LIMITED, CHENNAI SHRI N RAGHAVAN
24. NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED, FARIDABAD
SHRI MUKUL KUMAR SHRI N.P. PRASAD (Alternate)
25. NATIONAL WATER DEVELOPMENT AGENCY, NEW DELHI SHRI N.C. JAIN SHRI O.P.S KUSHEAH (Alternate)
26. NHDC LTD, M.P NOMINATION AWAITED - -
27. NHPC LTD, FARIDABAD SHRI AKHIL KUMAR SAXENA SHRI RAJESH KUMAR GUPTA (Alternate)
28. NORTH EASTERN ELECTRIC POWER CORPORATION LTD.,SHILLONG
SHRI RAJENDRA SHARMA SHRI BINOD CHANDRA BORAH (Alternate)
29. NTPCLTD,NOIDA SHRI G.L. HURIA
30. SARADAR SAROVAR NARMADA NIGAM LTD., GANDHI NAGAR
CHIEF ENGINEER (DAM & VADODARA) SUPTG. ENGINEER (Alternate)
31. SATLUJJAL VIDYUTNIGAM,SHIMLA SHRI ARVIND MAHAJAN SHRI AJAY UPPAL(Alternate)
32. TAMIL NADU GENERATION AND DISTRIBUTION CORPORATIONLTD,CHENNAI
ER.N. MURUGESAN ER. V GOPALAKRISHNAN (Alternate)
33. TEHRI HYDRO DEVELOPMENT CORPORATION LTD., RISHIKESH
SHRI R.K VISHNOI SHRI MANOJ SARDANA (Alternate)
34. TELCON,JAMSHEDPUR NOMINATION AWAITED -
35. UJVNLIMITED,UTTARAKHAND SHRI ARVIND KUMAR SHRI PANKAJ KUMAR(Alternate)
36. WATER RESOURCES DEPARTMENT,GOVT.OFMADHYA PRADESH,BHOPAL
SHRI B.C. PURANDARE SHRI R.K.JAIN (Alternate)
WRDC/A-2.18
39
COMPOSITION OF FLOOD MANAGEMENT, EROSION MANAGEMENT AND DIVERSION WORKS SECTIONAL COMMITTEE, WRD 22
SCOPE: Standardization of criteria for planning, design, construction, operation, maintenance and other
related aspects of river training works, barrages, weirs and diversion works
Last 3 meetings 14thWRD22– 27 Mar 2012 15thWRD22– 19 Jun 2014 16thWRD22– 31 March 2016
S.No. NAMEOFTHEORGANISATION REPRESENTED BY MEETINGS ATTENDED
14th 15th 16th
1. CENTRAL WATER COMMISSION,NEW DELHI SHRI C.P. SINGH CHIEF ENGINEER (FM) (CHAIRMAN)
2. BHAKRA BEAS MANAGEMENT BOARD, NANGAL TOWNSHIP SHRI MAHESH KUMAR SHRI R.K. DUBEY (Alternate)
3. BORDER ROADS ORGANIZATION,NEW DELHI SHRI T. THANG CHILIAN SHRI MUKUL KUMAR MISHTRA (Alternate)
4. BRAHAMPUTRA BOARD,GAUWHATI GENERAL MANAGER CHIEF ENGINEER (P&D) (Alternate)
5. CENTRAL WATER & POWER RESEARCH STATION, PUNE DR.R.G.PATIL SHRI KULDIP MALIK (Alternate)
6. CENTRAL WATER COMMISSION,(D&RWING) DIRECTOR BCD (E&NE) DEPUTY DIRECTOR (BCD) E&NE (Alternate)
NR
7. JACOBS CONSULTING ENGINEERING SERVICES(I) PVT. LTD,NEW DELHI
SHRI S.B.BHATTACHARYA SHRI MAILIKA CHATTERJEE (Alternate)
8. GAMMON INDIA LIMITED,MUMBAI SHRI M.S BLSARIA SHRI V.N HEGGADE (Alternate)
9. GANGA FLOOD CONTROL COMMISSION, PATNA DIRECTOR(MP-I) DIRECTOR(MP-II) (Alternate)
10. HPPCL,SUNDERNAGAR ER. K. K. GOEL - - -
11. ICT PVT LTD.,NEW DELHI DR. NAVIN KUMAR SINGH SHRI SBHASHISH MUKHERJEE (Alternate)
12. IIT,ROORKEE DR. NAYAN SHARMA DR S.K.MISHRA(Alternate)
13. IIT,NEW DELHI PROF. A.K. KESHARI
14. IRRIGATION DEPARTMENT,GOVT. OF ANDHRA PRADESH,HYDERABAD
SUPERINTENDING ENGINEER(B&C) SUPERINTENDING ENGINEER(DAMS) (Alternate)
15. IRRIGATION DEPARTMENT, GOVT.OF HARYANA, CHANDIGARH CHIEF ENGINEER (DRAINAGE) DIRECTOR (CENTRAL DESIGN)(Alternate)
16. IRRIGATION DEPARTMENT,GOVT.OFJAMMU, JAMMU SHRI ASHWANI SHARMA SHRI NATHA RAM (Alternate)
17. IRRIGATION DEPARTMENT,GOVT.OF PUNJAB, CHANDIGARH CHIEF ENGINEER (DRAINAGE) DIRECTOR (CENTRALDESIGNS) (Alternate)
18. IRRIGATION DEPARTMENT, GOVT. OF UTTARAKHAND, ROORKEE
DIRECTOR (IRI) RESEARCH OFFICER (IRI) (Alternate)
WRDC/A-2.18
40
19. IRRIGATION RESEARCH INSTITUTE DR. SUBHASH MITRA SHRI Y.N. GOEL (Alternate)
20. KOLKATA PORT TRUST,CALCUTTA SHRI BIKAS CHAUDHURI SHRI M.N RAY (Alternate)
21. MINISTRY OF RAILWAYS (RDSO), LUCKNOW DIRECTOR (B&S)/CB-II ASSTT.DESIGN ENGINEER(B&F)(Alternate)
22. NHPC LTD. FARIDABAD SHRI MAHESH KUMAR SHRI RAKESH KUMAR DUBEY(Alternate)
23. RANJIT SAGAR DAM DESIGN (RSDD) SHRI KULDIP SINGH TAKSHI SHRI JATINDER PAL SINGH (Alternate)
24. RITES, NEW DELHI SHRI G.SETHURAMAN SHRI MUKESH KUMAR(Alternate)
25. SARDAR SAROVAR NARMADA NIGAM LIMITED, GANDHINAGAR SHRI KIRAN KUMAR AMRATLAL PATE SHRI KETAN KUMAR BALDEV BHAI PARMAR(Alternate)
26. TEHRI HYDRO DEVELOPMENT CORPORATION LTD, RISHIKESH
SHRI ATUL JAIN MS. BHAWANA RAWAT (Alternate)
27. WATER RESOURCES DEPTT.GOVT.OF MAHARASHTRA, NASHIK SHRI R.V.SHRIGIRIWAR SHRI R.A.SHIMPI (Alternate)
28. WATER RESOURCES DEVELOPMENT ORGANIZATION, WRDO, BANGALORE
SHRI MAHESH M. HIREMATH SHRI SHANKAREGOWDA (Alternate)
29. WATERRESOURCESORGANIZATION,,CHENNAI ENGINEER-IN-CHIEF& SUPTDENGINEER (PWD)(Alternate)
WRDC/A-2.18
41
COMPOSITION OF MEASUREMENT AND COST ANALYSIS OF WORKS FOR RIVER VALLEY PROJECTS SECTIONAL COMMITTEE,WRD 23
SCOPE: Standardization in the field of measurement and cost analysis of civil
engineering works for water resource projects
Last 3 meetings 17thWRD23– 3 0 Mar 2015 16thWRD23–21 Mar 2013 15thWRD23–19 Mar 2012
S.No. NAMEOFTHEORGANISATION REPRESENTED BY MEETINGS ATTENDED
15th 16th 17th
1. NHPC LIMITED,FARIDABAD SHRI ANIL KUMAR GENERAL MANAGER, CHAIRMAN
2. BHAKRA BEAS MANAGEMENT BOARD, CHANDIGARH SUPTG ENGG (BSL CIRCLE NO. 2) SUPTNG.ENGG. (TALWARA CIRCLE) (Alternate)
3. CENTRAL WATER COMMISSION,NEWDELHI DIRECTOR [COSTAPP.](HWF) DIRECTOR [COSTAPP.](IRR.)(Alternate)
4. JACOBS CONSULTING ENGINEERING SERVICES(INDIA) LTD., NEW DELHI
SHRI RAJIB CHAKRABORTY SHRI A.K. AGARAWAL(Alternate)
5. ENERGY INFRATECH,GURGAON NOMINATION AWAITED - - -
6. FERRO CONCRETECO (I) PVT LTD,INDORE SHRI MAHAVIR BIDASIARIA SHRI V.K.GEED (Alternate)
7. H C C LTD, MUMBAI SHRI AJIT JOSHI SHRI MANISH SAMEL(Alternate)
8. IRRIGATION DEPARTMENT HARYANA SHRI ANIL KUMAR GUPTA - - -
9. IRRIGATION DEPARTMENT PUNJAB, PUNJAB SHRI KULDIP SINGH TAKSHI SHRI JATINDER PALSINGH(Alternate)
- -
10. IRRIGATION DEPARTMENT U.P. NOMINATION AWAITED - - -
11. IRRIGATION DEPARTMENT,GOVT OF KERALA, THIRUVANANTHAPURAM
SMT.K.A JOSHY SHRI MAJU BALAKRISHNAN (Alternate)
12. IRRIGATION DEPARTMENT,GOVT.OF KARNATAKA,BANGALORE CHIEF ENGINEER(CIVIL)
13. IRRIGATION DPARTMENT GOVT.OF HIMACHAL PRADESH NOMINATION AWAITED - -
14. IRRIGATION RESEARCH INSTITUTE,ROORKEE DR.SUBASH MITRA SHRI SHANKAR KUMAR SAHA (Alternate)
- -
15. KARNATAKA POWER CORPORATION LIMITED, BANGALORE CHIEF ENGINEER (CIVIL DESIGN) - -
16. L&T( ECC),FARIDABAD NOMINATION AWAITED -
17. NHPC LTD,FARIDABAD SHRI Y.K. CHAUBEY SHRI DEEPAK SAIGAL(Alternate)
18. NEEPCO LTD.,GUWAHAT SHRI B.C.BORA
19. NTPC LIMITED,NOIDA SHRI Z.R. KHAN SHRI DEVENDER GUPTA (Alternate)
20. SJVN LTD,NEW SIMLA SHRI M.C.VERMA SHRI V.K. GUPTA (Alternate)
WRDC/A-2.18
42
21. SARDAR SAROVAR NARMADA NIGAMLTD., GANDHINAGAR CHIEFENGINEER(NMC-2) SHRI V.K.GUPTA(Alternate)
22. TEHRI HYDRO DEVELOPMENT CORPORATION LTD.,RISHIKESH SHRI H.L.ARORA R.K.VISHNOI (Alternate)
- -
23. WAPCOS LTD., SHRI ANUPAM MISHRA SHRI AMITABH TRIPATHI(Alternate)
24. WATER RESOURCES DEPARTMENT GOVT.OF MADHYA PRADESH SHRI S.K. KHARE SHRI A.K. GOYAL
NR NR
25. WATER RESPIRCES DEVELOPMENT ORGANISATION, BANGALORE SHRI PRABHAKAR D HAMIGI
26. WATER RESOURCES DEV & MANAGEMENT, ROORKEE SHRI GOPAL CHAUHAN
WRDC/A-2.18
43
COMPOSITION OF ENVIRONMENTAL ASSESSMENT AND MANAGEMENT OF WATER RESOURCE PROJECTS SECTIONAL COMMITTEE, WRD 24
Last 3 meetings 12th WRD24 – 20 Mar 2013 13th WRD24 – 10 Aug 2016 14th WRD24 – 21 March 2018
S. No.
NAME OF THE ORGANISATION REPRESENTED BY MEETINGS ATTENDED
12th 13th 14th
1
CENTRAL WATER COMMISSION, NEW DELHI
CHIEF ENGINEER (EMO) - CHAIRMAN
y
y
y
2
IN PERSONAL CAPACITY, NEW DELHI
DR. A L RAMANATHAN
x
y
x
3
CENTRAL BOARD OF IRRIGATION & POWER, NEW DELHI
DR. G P PATEL SHRI UDAY CHANDER (Alternate)
y
y
x
4
CENTRAL ELECTRICITY AUTHORITY, NEW DELHI
NOMINATION AWAITED
x
x
y
5
CENTRAL GROUND WATER BOARD, NEW DELHI
SHRI G C PATI SMT. RUMI MUKHERJEE (Alternate)
y
y
y
6
CENTRAL POLLUTION CONTROL BOARD, NEW DELHI
NOMINATION AWAITED
y
x
x
7
CENTRAL WATER COMMISSION, NEW DELHI
DIRECTOR (EM) DIRECTOR (EIA)
y
y
y
8
GEOLOGICAL SURVEY OF INDIA, FARIDABAD
NOMINATION AWAITED SHRI NIHAR RANJAN BHATTARCHARJEE (Alternate)
x
y
x
9
IN PERSONAL CAPACITY, NEW DELH I
SHRI R K KHANNA
y
y
y
10
IN PERSONAL CAPACITY, NEW DELH I
DR. M KAPUR SHANKAR DASS
y
x
11
INDIAN SPACE RESEARCH ORGANISATION, HQ, BANGALORE
SHRI P G DIWAKAR DR. S BANDYOPADHYAY (Alternate)
y
y
y
12
IIT ROORKEE, ROORKEE
DR. SURENDRA KUMAR MISHRA
x
x
y
13
MAULANA AZAD MEDICAL COLLEGE, NEW DELHI
DR. NANDINI SHARMA
y
x
x
14
MINISTRY OF ENVIRONMENT & FORESTS, NEW DELHI
DR. S BHOWMIK
x
x
x
15
NARMADA CONTROL AUTHORITY, INDORE
DR. AFROZ AHMAD SMT. USHA DWIVEDI (Alternate)
y
y
y
16
NARMADA WATER RESOURCES , WATER SUPPLY & KALPSAR DEPARTMENT, GANDHI NAGAR
CHIEF ER. (CENTRALGUJARAT)
x
x
x
17
NATIONAL INSTITUTE OF HYDROLOGY, ROORKEE
DR. C K JAIN DR. PRADEEP KUMAR (Alternate)
x
y
x
18
NATIONAL REMOTE SENSING CENTRE, HYDERABAD
DR. V VENKATESWARA RAO
x
x
x
19
NATIONAL WATER DEVELOPMENT AGENCY, NEW DELHI
SHRI R K JAIN SHRI O P S KUSHWAH (Alternate)
x
y
x
20
NHPC LIMITED, FARIDABAD
DR. A K TRIPATHY SHRI GAURAV KUMAR (Alternate)
x
y
y
WRDC/A-2.18
44
21
NORTH EASTERN REGIONAL INSTITUTE OF WATER AND LAND MANAGEMENT, ASSAM, TEZPUR
DR. B C NATH
x
y
x
22
NTPC LIMITED, NOIDA SHRI RAJESH K BADERIA DR. VIJAY PRAKASH (Alternate)
x
x
y
23
THDC INDIA LIMITED, RISHIKESH
DR. D. L. BHATT SHRI SUBHAM MISHRA (Alternate)
y
y
y
24 WAPCOS, GURGAON DR. AMAN SHARMA SHRI A. STEPHEN LEO (Alternate)
x
x
x
25
DESIGN, TRAINING, HYDROLOGY, RESEARCH & SAFETY, MERI, NASHIK
SHRI RAJENDRA PAWAR SHRI D B SALE (Alternate)
y
x
x
26
CH2M Hill INDIA PVT. LIMITED, NOIDA (Co – opted)
NOMINATION AWAITED SHRI ANIL KUMAR (Alternate)
--
y
y
27
CE NTRAL WATER COMMISSION, NEW DELHI (Co – opted)
DIRECTOR [HYDROLOGY]
--
y
x
28
ICAR – CENTRAL INLAND FISHERIES RESEARCH INSTITUTE, KOLKATA (Co – opted)
DR. B K DAS
--
y
x
29
IRG SYSTEMS SOUTH ASIA PVT. LIMITED, NEW DELHI (Co – opted)
SHRI AMIT JAIN SHRI KRISHNA KUMAR (Alternate)
--
x
y
30
RS ENVIRONLINK TECHNOLOGIES PVT. LTD, GURGAON (Co – opted)
DR. ARUN BHASKAR
--
x
x
31
INDIA WATER PARTNERSHIP (Co – opted)
DR. VEENA KHANDURI
--
--
y
WRDC/A-2.18
45
ANNEX 3
(Item 4.3.1)
CHAIRMEN OF SECTIONAL COMMITTEES AS EX-OFFICIO MEMBERS OF THE COUNCIL
Com. No.
Title
Incumbent
Date of Appointment/
Reappointment
WRD 1 Hydrometry DIRECTOR Presently: Dr. (Mrs) V V Bhosekar (CWPRS)
12-07-2012
WRD 3 Ground Water And Related Investigations Member (HQ) Presently: Dr. P. Nandakumaran (CGWB)
July 2011
WRD 5 Geological Investigation And Subsurface Exploration
Presently: Dr. P.C. Nawani ( In Personal Capacity)
12-07-2012
WRD 6 Water Resources Planning, Management And Evaluation
Chief Engineer (Pao) Presently: Shri C.K. L Das CWC)
12-07-2012
WRD 8 Foundations And Foundation Treatment Director Presently: Shri Hasan Abdullah (CSMRS)
12-07-2012
WRD 09 Dams And Spillway Chief Engineer Designs (E&NE) Presently: SHRI T.K. SIVARAJAN (CWC)
WRD 10 Reservoirs And Lakes Director Presently: Dr Sharad Jain (NIH)
28-06-2013
WRD 12 Hydraulic Gates And Valves General Manger (D&E) Presently: Shri V.K. Maini (NHPC)
28-06-2013
WRD 13 Canals And Cross Drainage Works Chief Engineer Design (N&W) Presently: Shri S.K Sibbal (CWC)
28-06-2013
WRD 14 Water Conductor Systems Chief Engineer Design (NW&S) Presently: Shri A.S.P. Sinha (CWC)
28-06-2013
WRD 15 Hydroelectric Power House Structures Chief Engineer Design (NW&S) Presently: Shri S.K.Sibbal (CWC)
28-06-2013
WRD 16 Hydraulic Structures Instrumentation Director Presently: Shri Hasan Abdullah (CSMRS)
19-02-2014
WRD 21 Safety In Construction, Operation & Maintenance Of River Valley
General Manager (Safety) Presently: Shri Kishor Kumar (NHPC)
28-06-2013
WRD 22 Flood Management, Erosion Management And Diversion Works
Chief Engineer (FM) Presently: Shri M.S. Dhillon (CWC)
28-06-2013
WRD 23 Measurement And Cost Analysis Of Works Of River Valley Projects
Chief Engineer (D) Presently: Shri Anil Kumar (NHPC)
28-06-2013 20-11-2010
WRD 24 Environmental Assessment And Management Of Water Resources
Chief Engineer (EMO) Presently: Shri Yogesh Paithankar (CWC)
28-06-2013
WRD 27 Handbooks & Codes For Water Resources Management
Presently: Shri C.D. Thatte, , Former Secretary Ministry of Water Resources, ( In Personal Capacity)
28-06-2013
WRDC/A-2.18
46
ANNEX 4
(Item 4.4.1 )
CO-OPTION BY SECTIONAL COMMITTEES
Com. No. Title Name of Organization
WRD 01 Hydrometry 1. India Meteorological Department, New Delhi
2. National Water Development Agency, New Delhi( M/o WR)
3. Centre For Water Resources Development And Management (CWRDM)
WRD 03 Ground Water And Related Investigations Nil
WRD 05 Geological Investigation And Subsurface Exploration
1. THDC India Limited 2. HCC Limited 3. NTPC Limited, Noida 4. Central Water & Power Research Station,
Pune WRD 06 Water Resources Planning, Management
And Evaluation
1. IIT Kharagpur 2. Sardar Sarovar Narmada Nigam Limited,
Gandhinagar 3. HCC Limited, Mumbai WRD 08 Foundations And Foundation Treatment Nil
WRD 09 Dams and Spillways Nil
WRD 10 Reservoirs and Lakes 1. Shri N.K. Bhendari, [In personal Capacity]
WRD 12 Hydraulic Gates And Valves Nil
WRD 13 Canals And Cross Drainage Works 1. Mr. S.K. Mazumdar (In Personal Capacity)
WRD 14 Water Conductor Systems 1. M/s. HCC Limited, Mumbai
WRD 15 Hydroelectric Power House Structures 1. M/s. S K Systems, New Delhi
WRD 16 Hydraulic Structures Instrumentation Nil
WRD 21
Safety in Construction, Operation and Maintenance of River Valley Projects
1. Patel Engineering, Mumbai 2. Directorate General of Fire Services, Civil
Defance Home guards, Ministry of Home Affairs
3. Oil Industry Safety Directorate (OISD) 4. Shri R.C. Sharma, [In personal Capacity] 5. Sona Enterprises, Delhi 6. GMR, Group 7. Alston, Vadodra 8. National Water Development Agency, New
Delhi
WRD 22 Flood Management, Erosion Management and Diversion
1. Shri G.S. Purba, [ In Personal Capacity]
WRDC/A-2.18
47
WRD 23 Measurement and Cost Analysis of Works of River Valley Projects
Nil
WRD 24 Environmental Assessment And Management Of Water Resources
1. M/s. CH2M Hill India Pvt. Limited, Noida 2. M/s. CH2M Hill India Pvt. Limited, Noida 3. ICAR – Central Inland Fisheries Research
Institute, Kolkata 4. Central Water Commission, New Delhi 5. M/s. R S Envirolinks Technologies Pvt.
Limited, Gurgaon 6. India Water Partnership
WRDC/A-2.18
48
ANNEX 5
(Item 4.5.1 )
WITHDRAWAL OF MEMBERSHIP FROM SECTIONAL COMMITTEES
Com. No. Title Name of Organization Reason for withdrawal
WRD 01 Hydrometry 1. Jacobs Consulting Engineering Services(I) Ltd., New Delhi
( No longer working is field of Hydrometry)
WRD 03 Ground Water And Related Investigations
1. Gujurat Water Supply & Sewerge Board, Gujurat
( No receipt of nomination )
WRD 05 Geological Investigation and Subsurface Explorations
1. Central Water & Power Research Station, Pune
2. NTPC Limited, Noida 3. National Geophysical Research
Institute, Hyderaba 4. Irrigation Department, Govt. of
Uttrakhand 5. Irrigation Department, Govt. of Gujarat 6. In personal capacity 7. Central Ground Water Board, New Delhi 8. M/s. Energy Infratech Pvt. Limited, New
Delhi 9. Maharashtra Engineering Research
Institute, Nashik 10. Mineral Exploration Corporation 11. M/s. Jacobs Consulting Engineering
Services (I) Limited 12. Irrigation Department, Govt. of Andhra
Pradesh 13. M/s. Civil Engineering Services
(Advanced Technology & Engineering Service), AIMIL Limited, New Delhi
14. Gujarat Engineering Research Institute, Vadodara
Inactive participation.
15. Engineers India Limited, New Delhi 16. RITES Limited, Gurgaon
No willingness to participate
WRD 06 Water Resources Planning, Management And Evaluation
1. M/s. Moserbaer Projects Pvt. Limited, New Delhi
Non receipt of response for fresh nomination
WRD 08 Foundation and Foundation Treatment
Nil
WRDC/A-2.18
49
WRD 10 Reservoirs and Lakes 1. Prof. S. Mohan, [In Personal Capacity] 2. Office of Engineer –In- Chief, Bhopal 3. Sardar Sarovar Narmada Nigam, Ltd,
Gandhinagar
( No participation )
WRD 12
Hydraulic Gates and Valves 1. In personal capacity 2. M/s. Consulting Engineering Services (I)
Pvt. Limited, New Delhi 3. Tamil Nadu Electricity Board, Chennai
Inactive participation
WRD 14 Water Conductor System 1. IIT Kanpur
Non receipt of response for active Participation
2. Narmada Valley Development Authority, Bhopal
3. North Eastern Electric Power Corporation Limited, Shillong
4. Narmada Valley Development Authority, Bhopal
5. North Eastern Electric Power Corporation Limited, Shillong
Inactive participation
WRD 15 Hydroelectric Power House Structures
1. Kerala Electrical & Allied Engineering Co. Limited (KEL), Govt. of Kerala
2. North Eastern Electric Power Corporation Limited, Shillong
Inactive participation
3. Punjab State Power Corporation Limited, Patiala
Non – receipt of response for fresh nomination
WRD 16 Hydraulic Structures Instrumentation
Nil
WRD 21
Safety in Construction, Operation and Maintenance of River Valley Projects
1. Shri G.B Menon, [In Personal Capacity]
2. Jaypee, Delhi 3. Telcon Jamshedpur
4. Delhi Fire Services, Delhi
(No attendance)
(No response to cooption letters)
(No response to cooption letters)
(No response to cooption letters)
WRD 22 Flood Management, Erosion Management and Diversion
1. RITES (RITES has informed its inability to participate)
WRD 23 Measurement and Cost Analysis of Works of River Valley Projects
Nil
WRD 24 Environmental Assessment And Management Of Water Resources
1. National Environmental Engineering Research Institute, Nagpur
Inactive participation
WRDC/A-2.18
50
ANNEX 6
(Item 5.1)
MEETINGS OF SECTIONAL COMMITTEES, SINCE LAST REPORTED
Com. No.
Title of Sectional Committee
Date of Meeting
2014 2015 2016 2017 2018
WRD 01 Hydrometry 02-03-2015 31-03-2016 09-12-2016
20-09-2017
WRD 03 Ground Water and Related Investigations 19-03-2015 21-09-2017
WRD 05 Geological Investigation and Subsurface Explorations
25-09-2014 08-09-2015 22-07-2016 28-03-2018
WRD 06 Water Resources Planning, Management and Evaluation
23-07-2015 08-06-2016 08-06-2016
WRD 08 Foundation and Foundation Treatment 05-12-2014 08-03-2016 09-02-2017 28-02-2018
WRD 09 Dam and Spillways 07-01-2015 11-04-2017
WRD 10 Reservoirs and Lakes 18-03-2016 17-02-2017 21-02-2018
WRD 12 Hydraulic Gates and Valves 25-03-2015 29-02-2016 23-03-2017
WRD 13 Canals and cross Drainage Works 19-11-2014 16-12-2015 30-09-2016 10-08-2017
WRD 14 Water Conductor Systems 27-03-2015 17-02-2016 26-07-2017
WRD 15 Hydroelectric Power House Structures 30-03-2015 23-06-2017
WRD 16 Hydraulic Structures Instrumentation 05-12-2014 08-03-2016 09-02-2017 28-02-2018
WRD 21
Safety in Construction, Operation and Maintenance of River Valley Projects
31-03-2015 24-04-2018
WRD 22 Flood Management, Erosion Management and Diversion
19-06-2014 31-03-2016 31-03-2016
WRD 23 Measurement and Cost Analysis of Works of River Valley Projects
30-03-2015 30-03-2015
WRD 24 Environmental Assessment and Management of Water Resource Projects
10-08-2016 21-03-2018
WRD 27 Handbooks & Codes for Water Resources Management
17-02-2017
WRDC/A-2.18
51
ANNEX 7
(Item 5.5.1)
LIST OF PUBLISHED STANDARDS IN EACH SECTIONAL COMMITTEE SINCE LAST MEETING
2014
Sl. No.
Com. No
IS Title
1. WRD 06 IS 13028 Part 1 : 2014 Guidelines for Integrated Planning Development and Management of River Basins Part 1 Overall Planning
2. WRD 12 IS 10096 ( Pt 1 / Sec 1) : 2014 Drum Hoists Part 1 Inspection Testing and Assembly at the Manufacturing Stage Section 1 Gates
3. IS 10096 (Pt 1 / Sec 2) : 2014 Recommendations for Inspection Testing and Maintenance of Radial Gates and Rope Drum Hoists Part 1 Inspection Testing and Assembly at the Manufacturing Stage Section 2 Rope drum hoists
4. WRD 14 IS 4880 ( Part 7) : 2014 Code of practice for design of tunnels conveying water Part 7 Structural design of steel lining
5. IS 16173 : 2014 Criteria for Hydraulic Design of Sediment Removal Devices for Hydro Power Projects
6. WRD 15 IS 4721 : 2014 Code of Practice for Drainage and Dewatering of Surface Underground Hydroelectric Power Stations (2nd Revision)
2015
Sl. No.
Com. No IS Title
1. WRD 01 IS 16274 : 2015 ISO/TS 24155 : 2007
Hydrometry - Hydrometric Data Transmission Systems - Specification of System Requirements
2. WRD 09 IS 10137 : 2015 Guidelines for Selection of Spillways and Energy Dissipators ( First Revision )
2016
Sl. No.
Com. No IS Title
1. WRD 01 IS 1191 : 2016 Hydrometry - Vocabulary and Symbols (Third Revision )
2. IS 14371 : 2016 ISO 9826 : 1992
Measurement of Liquid Flow in Open Channels - Parshall and SANIIRI Flumes (First Revision)
3. IS 14869 : 2016 ISO 4359 : 2013
Flow Measurement Structures - Rectangular Trapezoidal and U-Shaped Flumes (First Revision)
4. WRD 13 IS 16472 : 2016 Design and Construction of Water Courses - Guidelines
WRDC/A-2.18
52
2017
Sl. No.
Com. No IS Title
1. WRD 01 IS 13083 : 2017
Hydrometric Determinations - Flow Measurement in Open Channels Using Structures - Flat -V Weirs (first revision )
2. IS 15646 : 2017 ISO/TR 9824 : 2007
Hydrometry- Measurement of Free Surface Flow in Closed Conduits (first revision )
3. IS 16364 : 2017 ISO /TS 25377
Hydrometric Uncertainity-Guidance HUG
4. IS 16571 : 2017 ISO 4369 : 1979
Measurement of Liquid Flow in Open Channels Moving-Boat Method
5. WRD 08 IS 16547 : 2017 Investigations for Foundation of Existing Earth and Rock Fill Dams Guidelines
6. WRD 10 IS 6518 : 2017 Guidelines for Control of Sediment in Reservoirs (Second revision)
7. WRD 10 IS 13665 : 2017 ISO 6421 : 2012
Hydrometry - Methods for Assessment of Reservoir Sedimentation (First Revision)
8. WRD 12 IS 11855 : 2017 Design and Use of Rubber Seals for Hydraulic Gates - Recommendations (Second Revision)
9. WRD 13 IS 16238 : 2017 Planning of Parallel Canals - Guidelines
10. WRD 16 IS 8226 : 2017 Installation and Observation of Base Plate Apparatus for Measurement of Foundation Settlement in Embankments Code of Practice (First Revision)
2018
Sl. No.
Com. No IS Title
1. WRD 12 IS 7718 : 2018 Recommendations for Inspection, Testing and Maintenance of Fixed Wheel and Slide Gate (Second Revision)
2. WRD 01 IS 14615 ( Pt 1) : 2018 ISO 5167-1 : 2003
Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross-Section Conduits Running Full Part 1 General Principles and Requirements First Revision
3. IS 14615 ( Pt 2) : 2018 ISO 5167-2 : 2003
Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted in Circular Cross- Section Conduits Running Full Part 2 Orifice Plates
4. IS 14615 ( Pt 3) : 2018 ISO 5167-3 : 2003
Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross-Section Conduits Running Full Part 3 Nozzels and Venturi Nozzels
5. IS 14615 ( Pt 4) : 2018 ISO 5167-4 : 2003
Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross-Section Conduits Running Full Part 4 Venturi Tubes
6. IS 16696 : 2018 ISO 11657: 2014
Hydrometry - Suspended Sediment in Streams and Canals- Determination of Concentration by Surrogate Techniques
WRDC/A-2.18
53
7. IS 16697 : 2018 ISO 13550 : 2002
Hydrometric Determination- Flow Measurement in Open Channels Using Structures- Use of Vertical Underflow Gates
8. WRD 22 IS 12094 : 2018
Planning and Design of River Embankments Levees - Guidelines Second Revision
WRDC/A-2.18
54
ANNEX 8 (Item 5.6)
ISO/TC 113 STANDARDS AND THEIR CORRESPONDENCE WITH RELATED WRD STANDARDS
ISO/TC 113 STANDARDS AND THEIR CORRESPONDENCE WITH RELATED WRD STANDARDS
S. No. ISO Standard TC / SC Corresponding Indian Standard
Degree of Correspondence
1. ISO 748:2007 Hydrometry -- Measurement of liquid flow in open channels using current- meters or floats
TC 113/ SC 1 IS 1192:2013/ ISO 748:2007 Identical, Dual Numbered
2. ISO 1070:1992 Liquid flow measurement in open channels – Slope – area method ISO 1070:1992/Amd 1:1997
TC 113/ SC 1 IS 2912:1999/ ISO 1070:1992
Identical, Dual Numbered
3. ISO 1088:2007 Hydrometry -- Velocity-area methods using current-meters -- Collection and processing of data for determination of uncertainties in flow measurement
TC 113/ SC 5 IS 14573:2014/ ISO 1088:2007
Identical, Dual Numbered
4. ISO 1100-2:2010 Hydrometry -- Measurement of liquid flow in open channels -- Part 2: Determination of the stage-discharge relationship
TC 113/ SC 1 IS 15119 (Pt 2) :2002 ISO 1100-2:2010
Identical, Dual Numbered
5. ISO 1438:2017 Hydrometry -- Open channel flow measurement using thin-plate weirs ISO 1438:2008/Cor 1:2008
TC 113/ SC 2 IS 9108:2013/ISO 1438:2008 May be aligned with latest version
Identical, Dual Numbered.
6. ISO 2425:2010 Hydrometry -- Measurement of liquid flow in open channels under tidal conditions
TC 113/ SC 1 IS 15122:2014/ISO 2425:2010
Identical, Dual Numbered
7. ISO 2537:2007 Hydrometry -- Rotating- element current-meters
TC 113/ SC 5 IS 3910:2013/ISO 2537:2007 Identical, Dual Numbered
8. ISO 3454:2008 Hydrometry -- Direct depth sounding and suspension equipment
TC 113/ SC 5 IS 3912:2013/ISO 3454:2008 Identical, Dual Numbered
9. ISO 3455:2007 Hydrometry -- Calibration of current-meters in straight open tanks
TC 113/ SC 5 IS 13371:2014/ ISO 3455:2007
Identical, Dual Numbered
10. ISO 3846:2008 Hydrometry -- Open channel flow measurement using rectangular broad- crested weirs
TC 113/ SC 2 IS 14974:2001/ISO 3846:1989 (Revision under consideration of WRD 1) (Adoption of ISO 3846:2008 under process)
Identical, Dual Numbered
11. ISO 3847:1977 Liquid flow measurement in open channels by weirs and flumes -- End- depth method for estimation of flow in rectangular channels with a free overfall
TC 113/ SC 2 IS 6330:2012/ISO 3847:1977 Identical, Dual Numbered
WRDC/A-2.18
55
12. ISO 4359:2013 Flow measurement structures --Rectangular, trapezoidal and U-shaped flumes
TC 113/ SC 2 IS14869:2016/ ISO4359: 2013 Amd 1 has been published
in 2017
Identical, Dual Numbered
13. ISO 4360:2008 Hydrometry -- Open channel flow measurement using triangular profile weirs
TC 113/ SC 2 IS 14673:2014/ ISO 4360:2008
Identical, Dual Numbered
14. ISO 4362:1999 Measurement of liquid flow in
open channels –Trapezoidal profile weirs
TC 113/ SC 6 IS 15123:2002/ ISO4362:1999
Identical, Dual Numbered
15. ISO 4365:2005 Liquid flow in open channels -- Sediment in streams and canals -- Determination of concentration, particle size distribution and relative density
TC 113/ SC 6 IS 6339:2013|ISO 4365:2005 Identical, Dual Numbered
16. ISO 4366:2007 Hydrometry -- Echo sounders
for water depth measurements
TC 113/ SC 6 IS14359:1996/ ISO 4366:2007
Identical, Dual Numbered
17. ISO 4371:1984 'Measurement of liquid flow in open channels by weirs and flumes -–End depth method for estimation of flow in non- rectangular channels with a free over fall (approximate method)'
TC 113/ SC 2 IS:14574:1998 / ISO 4371:1984
Identical, Dual Numbered
18. ISO 4373:2008 Hydrometry -- Water level
measuring devices
TC 113/ SC 5 IS 15118:2014/ ISO 4373:2008
Identical, Dual Numbered
19. ISO 4374:1990 'Liquid flow measurement in open channels – Round-nose horizontal broad-crested weirs'
TC 113/ SC 2 IS 13084:1991/ ISO 4374:1990
Identical, Dual Numbered
20. ISO 4375:2014 ' Hydrometry – Cableway systems for stream gauging
TC 113/ SC 5 IS 15117:2002 / ISO 4375:2000 (Adoption of ISO 4375:2014
under process. WRD
01(685))
Identical, Dual Numbered
21. ISO 4377:2012 Hydrometric determinations -- Flow measurement in open channels using structures -- Flat-V weirs
TC 113/ SC 2 IS 13083:1991/ ISO 4377:1990 (Adoption of ISO
4377:2012 under process)
WRD01 (630)
Identical, Dual Numbered
22. ISO 8333:1985 'Liquid flow measurement in open channels by weirs and flumes –V- shaped broad-crested weirs'
TC 113/ SC 2 IS 15353:2003/ ISO 8333:1985
Identical, Dual Numbered
23. ISO 8368:1999 Hydrometric determinations -- Flow measurements in open channels using structures -- Guidelines for selection of structure
TC 113/ SC 2 IS 12752:2013/ ISO 8368:1999
Identical, Dual Numbered
24. ISO 9195:1992 'Liquid flow measurement in open channels – Sampling and analysis of gravel-bed material.
TC 113/ SC 6 IS 15124:2002/ ISO 9195:1992
Identical, Dual Numbered
25. ISO 9196:1992 Liquid flow measurement in open channels – Flow measurements under ice conditions
TC 113 IS 15358:2003/ ISO 9196:1992
Identical, Dual Numbered
WRDC/A-2.18
56
26. ISO 9555-1:1994 Measurement of liquid flow in open channels -- Tracer dilution methods for the measurement of steady flow -- Part 1: General
TC 113 IS 15898(Part 1):2012/ISO 9555-1:1994
Identical, Dual Numbered
27. ISO 9555-3:1992 Measurement of liquid flow in open channels -- Tracer dilution methods for the measurement of steady flow -- Part 3: Chemical tracers
TC 113 IS 15898(Part 3):2011/ISO 9555-3:1992
Identical, Dual Numbered
28. ISO 9555-4:1992 Measurement of liquid flow in open channels -- Tracer dilution methods for the measurement of steady flow -- Part 4: Fluorescent tracers
TC 113 IS 15898(Part 4):2012/ISO 9555-4:1992
Identical, Dual Numbered
29. ISO 9827:1994 'Measurement of liquid flow in
open channels by weirs and flumes – Streamlined
triangular profile weirs'
TC 113/ SC 2 IS 14975:2001/ ISO 9827:1994
Identical, Dual Numbered
30. ISO 11329:2001 'Hydrometric determinations-
Measurement of suspended sediment transport
in tidal channels'
TC 113/ SC 6 IS 15359:2003/ ISO 11329:2001
Identical, Dual Numbered
31. ISO 14139:2000 Hydrometric determinations – Flow measurements in open channels using structures – Compound gauging structures
TC 113/ SC 2 IS 15362:2003/ ISO 14139:2000
Identical, Dual Numbered
32. ISO 5167-1 : 2003 Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross-Section Conduits Running Full Part 1 General Principles and Requirements First Revision
TC 30/SC 2 IS 14615 ( Pt 1) : 2018/ ISO 5167-1 : 2003
Identical, Dual Numbered
33. ISO 5167-2 : 2003 Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted in Circular Cross- Section Conduits Running Full Part 2 Orifice Plates
TC 30/SC 2 IS 14615 ( Pt 2) : 2018/ ISO 5167-2 : 2003
Identical, Dual Numbered
34. ISO 5167-3 : 2003 Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross-Section Conduits Running Full Part 3 Nozzels and Venturi Nozzels
TC 30/SC 2 IS 14615 ( Pt 3) : 2018/ ISO 5167-3 : 2003
Identical, Dual Numbered
35. ISO 5167-4 : 2003 Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross-Section Conduits Running Full Part 4 Venturi Tubes
TC 30/SC 2 IS 14615 ( Pt 4) : 2018/ ISO 5167-4 : 2003
Identical, Dual Numbered
36. ISO/TR 24578:2012 Hydrometry -- Acoustic Doppler profiler -- Method and application for measurement of flow in open channels
TC 113/SC1 IS 16275:2014/ISO/TR 24578:2012
Identical, Dual Numbered
37. ISO 15769:2010 Hydrometry -- Guidelines for the application of acoustic velocity meters using the Doppler and echo correlation methods
TC 113/ SC 1 IS 16223:2014/ ISO 15769:2010
Identical, Dual Numbere
WRDC/A-2.18
57
38. ISO 4369:1979 'Measurement of liquid flow in
open channels –Moving-boat method'
TC 113 IS 16571:2017ISO4369:1979) Identical, Dual Numberd
39. ISO 6420:2016 Hydrometry -- Position fixing equipment for hydrometric boats
TC 113/ SC 5 IS 15352:2003/ ISO6420:1984 exists. May consider aligning with
latest version
Identical, Dual Numbered
40. ISO 24155:2016 Hydrometry -- Hydrometric data transmission systems -- Specification of system requirements
TC 113/SC5 IS 16274: 2014 / ISO/TS 24155:2007 May consider aligning with latest version
Identical, Dual Numbered
41. ISO 11657:2014 Hydrometry -- Suspended sediment in streams and canals -- Determination of concentration by surrogate techniques
TC 113/ SC 6 IS 16696:2018/ ISO 11657:2014
Identical, Dual Numbered
42. ISO 13550:2002 Hydrometric determinations – Flow measurements in open channels using structures –Use of vertical underflow gates
TC 113/ SC 2 ISO 16697:2018/ISO 13550:2002
Identical, Dual Numbered
43. ISO 5667-11:1993 ' Sampling of groundwater – Guidelines'
TC 113/SC 8 IS 13969:1994 Identical, Dual Numbered
44. ISO 772:2011 Hydrometry -- Vocabulary and symbols
TC 113 IS 1191:2016 | ISO 772:2011 Technical Equivalent
45. ISO/TS 3716:2006 Hydrometry -- Functional requirements and characteristics of suspended-sediment samplers
TC 113/ SC 6 IS 3913:2014|ISO/TS 3716:2006
Technical Equivalent
46. ISO/TR 9824:2007 Hydrometry-- Measurement of free surface flow in closed conduits
TC 113/ SC 1 IS 15646(Pt 1)& (Pt 2)::2006 (Adoption of ISO/TR
9824:2007 under
consideration) Doc WRD
01(643)
Technical Equivalent 47. ISO 9825 :2005 Hydrometry -- Field
measurement of discharge in large rivers and rivers in flood
TC 113 IS 15772:2014 I ISO 9825 :2005
Technical Equivalent
48. ISO 9826:1992 Measurement of liquid flow in
open channels -- Parshall and SANIIRI flumes
TC 113/ SC 2 IS 14371:2016/ ISO 9826:1992
Technical Equivalent
49. ISO/TR 11328:1994 'Measurement of liquid flow in open channels- Equipment for the measurement of discharge under ice conditions
TC 113/ SC 5 IS 15822:2008| ISO/TR 11328:1994
Technical Equivalent
50. ISO 11655:1995Measurement of liquid flow in open channels -- Method of specifying performance of hydrometric equipment
TC 113/ SC 5 IS 16091:2013 | ISO 11655:1995
Technical Equivalent
51. ISO 9123:2001 ''Measurement of liquid flow in open channels – Stage-fall-discharge relations'
TC 113/ SC 1 IS 15847:2009 | ISO 9123:2001
Technical Equivalent
52. ISO/TR 9212:2015 Methods of measurement of bed load discharge
TC 113/ SC 6 IS 16222 : 2014 | ISO/TR 9212:2006 (Adoption of ISO
9212 :2015 under process
Doc. WRD 01(686)) Doc. WRD 01(686))
Technical Equivalent
WRDC/A-2.18
58
53. ISO/TS 25377:2007 Hydrometric Uncertainity Guide (HUG)
TC 113 IS 16364:2017 | ISO 25377:2007
Technical Equivalent
54. ISO 21413:2005 Manual method for
measurement of a ground water level in a well
TC 113/SC8 IS 15896:2011 | ISO 21413:2005
Technical Equivalent
55. ISO/TR 14685:2001 Hydrometric determinations - Geophysical logging of boreholes for hydrogeological purposes - Considerations and guidelines for making measurements
TC 113/ SC 8 IS 15755:2007 | ISO/TR 14685:2001
Technical Equivalent
56. ISO 21413:2005 Manual method for measurement of a ground water level in a well
TC 113/SC8 IS 15896:2011 | ISO 21413:2005
Technical Equivalent
57. ISO 4363:2002 Measurement of liquid flow in open channels -- Methods for measurement of characteristics of suspended sediment
TC 113/ SC 6 IS 4890:1968 (Adoption of ISO 4363 :2002
under consideration)
Technical Equivalent
58. ISO 4364:1997 Measurement of liquid flow in
open channels – Bed material sampling ISO 4364:1997/Cor 1:2000
TC 113/ SC 6 IS 3917:2003 & IS 15360:2003 Refer to ISO 4364:1997
Technical Equivalent
59. ISO 6421:2012 ‘Hydrometry-Methods of assessment of river sedimentation assessment of reservoir sedimentation’
TC 113/SC 6 No IS exists.
60. ISO/TR 23211:2009 Hydrometry- Measuring the water level in a well using automated pressure transducer methods
TC/113/SC8 No IS exists.
-
61. ISO/TR 19234:2016 Hydrometry -- Low cost baffle solution to aid fish passage at triangular profile weirs that conform to ISO 4360
TC 113/SC2 No IS exists. -
62. ISO 6416:2004 Hydrometry -- Measurement of discharge by the ultrasonic (acoustic) method
TC 113/ SC 1 No IS exists. --
63. ISO/TR 13973:2014 Artificial recharge to groundwater
TC 113/ SC 8 No IS exists --
64. ISO 14686:2003 Hydrometric determinations --Pumping tests for water wells-- Considerations and guidelines for design,performance and use
TC 113/ SC 8 No IS exists
--
65. ISO/TR 11651:2015 Estimation of sediment
deposition in reservoirs using one dimensional
simulation models
TC 113/ SC 6 No IS exists. --
WRDC/A-2.18
59
* Identical, Dual Numbered -43
** Technical Equivalent -15 *** No.IS exists - 12
66. ISO 18365:2013 Hydrometry -- Selection, establishment and operation of a gauging station
TC 113/ SC 1 No IS exists. -
67. ISO/TR 23211:2009 Hydrometry- Measuring the water level in a well using automated pressure transducer methods
TC/113/SC8 No IS exists. -
68. ISO 26906:2015 Hydrometry- Fishpasses at
flow measurement structures
TC 113/SC2 No IS exists. -
69. ISO/TR 13973:2014 Artificial recharge to groundwater
TC 113/ SC 8 No IS exists
-
70. ISO 14686:2003 Hydrometric determinations -Pumping tests for water wells-- Considerations and guidelines for design, performance and use
TC 113/ SC 8 No IS exists -
WRDC/A-2.18
60
ANNEX 9 (Item 6.4.1)
Report of the 30th Group Meetings of ISO/TC 113 held at Tokyo, Japan
The 30th group meetings of ISO/TC 113 'Hydrometry' and its subcommittees were held at the JSCE Headquarters in
Tokyo, Japan from 24-29 May 2015. The meetings of working groups were also held during this period. The meetings
were attended by the representatives of China, UK, USA, Netherlands, Japan, India and WMO.
India has a long and established presence in the work of ISO/TC 113 which is evident from the fact that the
Chairman of the main committee, Mr S K G Pandit, is from India. The subcommittee SC 6 on Sediment Transport is
also chaired by Dr. (Mrs.) V V Bhosekar from India. The secretariat of ISO/TC 113 as well as that of the
subcommittee SC 1 on Velocity Area Methods and that of SC 6 on Sediment Transport is held by India Member Body
through BIS. The Indian delegation comprised of:
1. Mr. S K G Pandit, Chairman, Krishna River Management Board, Central Water Commission and Chairman
ISO/TC 113;
2. Dr. (Mrs.) V V Bhosekar, Sc E, Central Water and Power Research Station, Pune, and Chairperson ISO/TC 113/SC6;
3. Dr Sharad Kumar Jain, Sc G, National Institute of Hydrology, Roorkee;
4. Dr R M Krishna, Sc C, Central Ground Water Board; Hyderabad
5. Mr. J.C. Arora, Sc. F & Head (WRD), BIS and Secretary of ISO/TC 113, SC1 & SC6 as well as Member
Secretary of WRD3 ‘Ground water and related investigations';
6. Mrs. Rachna Sehgal, Sc. E (WRD), BIS and Member Secretary of WRD1 ‘Hydrometry’.
A meeting of all the Chairs and Secretaries was held on 24 May 2015 under the chairmanship of Mr. S K G Pandit,
Chairman, KRMB, CWC of India to deliberate on the important issues related to the ISO/TC 113 and its
subcommittees and to exchange notes and other details/requirements for the meetings, including finalization of
schedule. The meeting schedule for the 30th Group Meetings was finalized & agreed without any change in this
meeting. Discussions were held on the important issues related to ISO/TC 113 and its subcommittees as well as on
new issues being considered by the Committee. A preliminary deliberation was also done on the WMO manual on
Stream Gauging. It was agreed to take suitable steps by chairpersons/conveners at all stages of projects, with the
aim that projects are completed within time schedule.
The opening meeting of ISO/TC 113 & plenary meeting was held on 25 and 29 May 2015 respectively under the chairmanship of Mr. S K G Pandit, Chairman, KRMB, CWC of India. In the inaugural session of the ISO/TC 113 meeting on 25 May 2015, opening and welcome speeches were given by Dr. Hirofumi Ohnishi, Executive Director of Japan Society of Civil Engineers, the national committee for ISO/TC113 under the Japanese Industrial Standards Committee, Mr. Yasukazu Fukuda, Director of International Standardization Division, (Science and Technology Policy and Environment Bureau), Ministry of Economy, Trade and Industry, Japan; Mr. Hirokazu Tsukahara, Director of River Planning Division, Ministry of Land, Infrastructure, Transport and Tourism, Japan and Mr S K G Pandit, Chairman ISO/ TC 113. In the opening meeting secretary, Mr. J C Arora presented a report on the committee's work since the last meeting, structure of ISO/TC 113 and informed the committee about the status of various documents directly under it and under its subcommittees. The committee deliberated on actions taken on various resolutions and progress of various standardization projects and members appreciated the progress achieved. Mr. J C Arora also gave a presentation
WRDC/A-2.18
61
regarding ISO developments/recent changes at ISO related to directives (main changes) and resources available on ISO online including ISO/TC113 information. Reappointment of Mr. Stewart Child as chairman of ISO/ TC 113/SC1 and Dr. Yue-Ping Xu appointment as Convener of ISO/TC113/WG3 on Uncertainty was informed by secretariat and they were welcomed by members.
The meeting of subcommittee SC 1 on Velocity Area Methods was held on 25 May 2015 under the chairmanship of
Mr. Stewart Child of UK. The Indian delegation leader for the meeting was Shri S K G Pandit, Chairman, KRMB,
CWC. It was also participated by Dr. Bhosekar, Dr. Jain & Mrs. Rachna Sehgal. This subcommittee has a
considerable amount of work on its programme and the same was presented by Mr. J C Arora during the meeting.
The following documents were considered and deliberated on:
ISO/CD 6416 "Measurement of discharge by the ultrasonic (acoustic) method" - the committee noted with
satisfaction the progress and further decided to expedite the DIS document for ISO/CD 6416 within 3 months, so that
it is circulated by August 2015.
ISO/CD 9123 “Measurement of liquid flow in open channels – stage-fall-discharge relationships”. WG5 met 26 May
2015 to discuss the document and comments. It was decided to incorporate the comments and produce a revised
draft by September, 2015. Prior to circulating this draft formally Stewart Child will review the uncertainties section to
comply with HUG. It was planned to ballot the revised draft as DIS by October 2015. The Chairperson expressed his
appreciation of Dr S K Jain, the WG convener, for progressing the document to the current stage.
The work on ISO/AWI TR 11330 “Determination of volume of water and water level in lakes and reservoirs” will be
led by Mrs. Neena Isaac from India. A working draft is being circulated for comments from other working group
members. The Chairman was immensely appreciative of India and Mrs. Isaac of CWPRS for agreeing to lead the
revisions to this TR.
ISO 1070 “Slope-area method” It was decided that the revision of ISO 1070 will be submitted as NWIP. Mr. Tom
Yorke will be the convener. The Working Group members to include experts from UK, Japan, China, India and the
Netherlands.
ISO/PWI 18320 “Hydrometry – Determination of the stage-discharge relationship” was approved as per result of
voting (N889). It was decided that Mr. Rod Wilkinson, convener, will contact the WG members after incorporating
existing comments and request their comments on the modified working draft within 90 days.
ISO/DTR 9210 "Hydrometry – Measurement in meandering streams with unstable boundaries" - A working draft was
circulated in February and comments were received by April 2015. These comments will be resolved by the project
leader and a revised version will be produced for circulation by August 2015. A suggestion had been previously made
to incorporate ISO/TR 11332:1998 ‘Hydrometric Determinations – Unstable channels and ephemeral streams’ into
ISO TR 9210 but the WG convener Dr Hanspeter Hodel felt that this was not possible at present. The Chairman
expressed his gratitude to Dr Hodel for leading the revisions to ISO TR 9210 to its current stage
ISO/TR 24577 “Non-contact discharge measurement methods” Committee discussed ballot results and USA agreed for additional support by naming their expert Ms. Janice Fulford. The project ISO /TR 24577 now has 5 P-member
WRDC/A-2.18
62
support and meets approval requirements. Dr. Atsuhiro Yorozuya will be the convener. The WG members now include India, Japan, Mexico, UK and USA. ISO 748 “Hydrometry – liquid flow in open channels using current meters or floats”- On reviewing the current position above revision initiation, it was decided that Mr. Bailey from UK will be the convener for revision of ISO 748 and will include incorporation of ISO/TR 9196, ISO/ TR 9209, ISO/ TR 11332 and other topics highlighted in position paper (N890) into it. A NWIP will be submitted along with a draft by UK by June 2016. ISO/TR 11627 “Measurement of liquid flow in open channels - Computing stream flow using an unsteady flow model” has not received sufficient support during balloting. However, China will be interested in this subject further. It was agreed that subsequently it will be taken up, if sufficient support is available in future. ISO/TR 24578 “Hydrometry – Acoustic Doppler Profiler – Method and application for measurement”- It was resolved that Dr. Atsuhiro Yorozuya from Japan will be the convener for upgrading ISO/TR 24578 to a full standard. He will submit a new work item proposal with a draft within six months. The uncertainty clauses of several standards are being, or are about to be revised by SC1. These will be referred to
WG3 for checking and advice. These include ISO 6416, 1070 and 748, which have already been referred above in
this report.
The issue of Stream gauging projects related to WMO was discussed on 26 May 2015. It is proposed to publish the
WMO Stream Gauging Manual Parts 1 & 2 as an ISO TR Mr.Tomasso Abrate, the representative of World
Metrological Organization was present for the discussions. Mr. Tomasso Abrate of WMO gave a presentation on the
documents and also explained the agreement between ISO and WMO to collaborate on the publishing of common
standards. All the member bodies were of the opinion that the manual on Stream gauging is a voluminous document
and to transform it into an ISO document by obtaining comments and resolving them is a gigantic task. Some
members felt that rewriting of some chapters may also be required. It was expected that numerous comments may
be received from member bodies and those would need to be resolved by WMO. If needed, WMO may seek help
from ISO/TC113 to form working group to resolve the same. It was decided that member secretary would try to seek
three months extension on the closing date of ballot for both parts of the document.
The working group ISO/TC113/SC1/WG5 on ISO/CD 9123 “Measurement of liquid flow in open channels – stage-fall-discharge relationships”. met on 26th May 2015. Dr S K Jain, NIH was the convener for WG5. The Indian delegation was led by Dr. Mrs. V V Bhosekar, Sc. E, CWPRS, besides participation by Mrs. Rachna Sehgal. This meeting had generated considerable interest and 21 delegates attended the meeting. Prior to the meeting, about 58 comments were received on the document CD 9123. Many comments were addressed by the Indian team before the meeting. It was decided in the meeting that further work is needed on some of these comments. Some comments need more clarity and the expert who has given the comments will be approached. A detailed resolution of comments was worked out during this meeting. The working group on ISO/TC113/SC8/WG4 on ISO/DTR 21414 Surface Geophysical Surveys for Hydro-geological Purposes also met on 26th May 2015 and Dr R M Krishna, CGWB led the above working group meeting besides participation by Mr. J C Arora. The importance of the comments received from balloting of DTR 21414.2 was discussed. The comments were deliberated and resolved, which required no changes to the document. Working Group 4 resolved that the document will be submitted to ISO CS by the SC8 secretariat for final publication after revision of figures by Dr. Krishna to comply with the ISO format have been completed.
WRDC/A-2.18
63
The meeting of ISO/ TC 113/SC 6 on sediment transport was also held 26th May 2015 in the afternoon under the
chairmanship of Dr. Mrs. V V Bhosekar, Sc. E . Secretary Mr. J C Arora expained all issues one by one. The Indian
delegation was led by Dr S K Jain, NIH, & Mrs. Rachna Sehgal also participated. In this meeting, the progress of two
documents (ISO/TR 9212 and ISO/TR 11651), which have recently been submitted for publication was appreciated
by members. After thorough discussions, the following decisions were taken:
Considering the comments of systematic review, it was resolved to revise ISO 4365: 2005 'Sediment in streams and
canals -- Determination of concentration, particle size distribution and relative density'. It was agreed that Mrs. Neena
Isaac of CWPRS, INDIA will lead the work group for which a NWIP will be submitted by India. UK, USA and China
will depute experts and participate in its formulation.
Further, it was resolved to revise ISO 3716: 2006 'Functional requirements and characteristics of suspended-
sediment samplers' and upgrade it to a full standard. USA (Dr. Mark Landers) will lead the work group with experts
from India, UK and China. The NWIP for it will be submitted by USA.
The new proposed work item on "Sediment transport – measurement required for effective sediment control
operation at river structures" was discussed and it was resolved that a detailed new work item will be resubmitted by
Mr. Rod Wilkinson (UK) within next six months after incorporating the suggestions made during discussions.
Besides above, the working group ISO/TC113/SC6/WG3 was disbanded as its work was over. It was further resolved
that the secretary of ISO/TC 113/SC6 act as a liaison officer with ISO/TC 147.
The meeting of the Ground Water Subcommittee of ISO/TC 113/SC 8 was held on 27 May 2015 and was chaired by Dr A Navoy from USA. The Indian delegation was led by Dr R M Krishna, CGWB besides participation by Mr. J C Arora. The committee discussed the report submitted by working group WG4 on “Surface Geophysical Surveys for Hydro-geological studies”. The contribution of Dr. Krishna was appreciated by the Chairman and he expressed that the revised document is in good shape. The revised draft required no changes in view the comments after their resolution, however these will be considered for further standardization. It was decided that Dr. Krishna will revise the figures in the document to comply with the ISO format.
Following a new work item proposals and suggestions were also made by the committee, which were discussed and agreed for further necessary action: 1) Planning Artificial Recharge to Groundwater will be submitted by UK by November 1, 2015. 2) Surface Geophysical Methods for Site Selection will be submitted by India and Dr Krishna will submit NWIP with
draft by October 1, 2015. 3) Requirements for documentation of groundwater-Flow models used for water-supply planning purposes will be
submitted by USA by August 1, 2015. 4) Role of springs in water supply management in hilly and mountainous terrain and methodology for the
enhancement of yield will be submitted by India, Mr. Amlanjyoti Kar of CGWB, will submit NWIP with draft document by December 1, 2015.
The meeting of the ISO /TC 113/SC2/ WG 11 for revision of ISO 1438 was held under the convenership of Mr. Toru
Ishido on 27 May 2015. India member body had given the comments, which were accepted by the WG. The Indian
delegation was led by Dr V V Bhosekar, CWPRS besides participation by Mrs. Rachna Sehgal.
WRDC/A-2.18
64
A technical field trip was organized by JSCE on 27 May, 2015 to the flood control basin of the Tsurumi River in
Yokohama. The delegates were driven up the Tsurumi River in Yokohama. A presentation on “Flood control measurements in
Tsurumi River” was given prior to the field visit. Later the delegates visited the flood control works and hydrometrical
observation centre. Delegates were shown the flood detention basin to control flooding by the Tsurumi River.
Tsurumi is a small river in the Yokohama area. This area has witnessed rapid urbanization and the river frequently
floods the adjoining areas. To control flood damages, flood water is temporarily diverted to low lying areas adjoining
the river (in the normal times, these areas are used as playground, parking areas, and flood plains) to moderate
downstream flooding. After the passage of the peak flood, the water is gradually released back in the river. Small
efforts are required to clean up the areas where water was stored temporarily. There are no large damages, since no
residential, industrial, or office areas are submerged. A flood forecasting system and CCTV footage is also available
to optimally utilize the storage space and manage floods. This is an effective flood management strategy and can
also be practiced in India in some areas, wherever practical. The delegates also visited the Nissan stadium and the
flood control works in its vicinity.
The subcommittee SC 5 on Instruments, Equipment and Data Management held its meeting on 28 May 2015 under
the chairmanship of Mr. Thomas Yorke of USA. The Indian delegation to the SC 5 meeting was led by Dr V V
Bhosekar, Sc E, CWPRS besides participation by Mrs. Rachna Sehgal. The subcommittee discussed a number of
existing and new work items. Comments on ISO/DIS 24155, Hydrometric data transmission systems—Specification
of system requirements, were addressed by Dr. Nakao and the related work group. An updated document has been
put up to ISO-CS for distribution of the FDIS. The vote and comments on ISO/CD 6420, Position fixing equipment for
hydrometric boats, were received. Mr. Yorke will address the comments and submit an updated document to WG &
subsequently for DIS vote. Mr. Phil Turnipseed (USA) has agreed to re-initiate ISO 13509, Specification for the care
and calibration of acoustic Doppler velocimeters. An NWIP will be circulated. The subcommittee also discussed two
potential new projects. Mr. Tom Yorke (Chairman) will contact P-members regarding possibility of revision of ISO/TR
11328:1994, Measurement of Liquid Flow in Open Channels - Equipment for the Measurement of Discharge Under
Ice Conditions. He also will query P-members to determine whether there is interest in producing a new work item
related to calibration and quality assurance of acoustic Doppler current profilers (ADCPs). India member body
participated actively during the meeting and has provided Indian experts for various projects under development.
The working group (ISO/TC 113/WG3) on Hydrometric Uncertainty, met on 28 May 2015 under the convenership of
Dr. Yue-Ping Xu (China). The working group reviewed the uncertainty work in ISO TC113 and discussed the current
and future working priorities. The Indian delegation was led by Dr S.K. Jain, NIH, Roorkee & participated by Mr. J C
Arora. Mr. Steward Child made a presentation giving the history and background of HUG. It was agreed that the
ISO/WD 25377_Mar2015_N744 will be the working draft for the next revision and will be sent out to the working
group members for comments and that it will be made user friendly, so that it could be readily used by hydrometric
practitioners. Updated GUM will be referred during the revision of HUG. It was also agreed that the inclusion of
Monte Carlo method in HUG is necessary and assumptions and cautions must be explained in HUG for ensuring the
appropriate use of the method. The inclusion of IVE method in HUG will also be considered. The uncertainty clauses
of several standards are being, or are about to be revised besides revision of ISO 25377 (HUG), these include ISO
6416, 1070, 748 etc. These will also be considered by uncertainty group.
The subcommittee SC 2 on Flow Measurement Structures held its meeting on 28 May 2015 under the chairmanship
of Mr. David Tyler of UK. The Indian delegation to the SC 2 meeting was led by Dr V V Bhosekar, Sc E, CWPRS
WRDC/A-2.18
65
besides participation by Mrs. Rachna Sehgal. The committee agreed to reappoint Dr David Tyler as Chair of SC 2 for
a further period of three years. It was resolved that Mr Tom Yorke (US) will consult with the US expert(s) on the
comments submitted on the systematic review on ISO 4362 "Trapezoidal broad-crested weirs" with a view to a
possible revision. It was agreed that ISO 1438 "Open channel flow measurement using thin-plate weirs" can omit the
CD ballot and go directly to DIS stage. The comments on this standard were discussed and resolved during the WG
11 meeting earlier on 27 May 2015 under the convenership of Mr.Toru Ishido. It was resolved that the UK will provide
a project leader to revise ISO 4360 "Open channel flow measurement using triangular profile weirs". The present
status of revision of ISO/CD 18481' Liquid flow measurement using end depth method in channels with a free overfall
' regarding resolution of comments was noted. The need to revise ISO 4359 "Rectangular, trapezoidal and U-shaped
flumes" to correct technical errors was acknowledged by the committee. It was agreed that the UK should further
consider the US comments made on the CD ballot (N 613, August 2011) during the drafting of ISO 4359:2013
"Rectangular, trapezoidal and U-shaped flumes".
The plenary meeting of ISO/TC 113 was held on 29 May 2015 and was chaired by Mr.S K G Pandit, KRMB, CWC. The Indian delegation was led by Dr. Jain Scientist G, NIH and Dr. V V Bhosekar, Sc E, CWPRS CWPRS besides participation by Mrs. Rachna Sehgal. It was agreed to liaise with ISO/TC147. However, it was decided that liaisons with TC 207, 224, 224/WG1 and 282 are not required at present. It was decided to dissolve the Working Group 2 on dilution methods (ISO 9555 various parts) till a convener is identified. The UK member body agreed to approach CEN/TC 318 and try to identify a convener and also to ascertain whether it is possible to produce 1st draft. It was agreed that the latest version of GUM will be utilized for updating/ revision of ISO/TS 25377(HUG). The new work item proposal for an ISO standard on "Specification for a reference raingauge pit" had a positive vote but was abandoned because of insufficient nominations of experts for working group membership. "Measurement of rainfall intensity using catching recording raingauges" had a positive vote but may have similar situation because of insufficient nominations of experts It was decided that the Member-secretary of TC 113 will write to ISO-CS and TC 146/SC5 to explore possibility of formation of a joint WG. It was resolved to continue liaison with TC146/SC5. Report of TC146/SC5 as presented by secretary was accepted. It was resolved in agreement with WMO that after resolution of comments received during the balloting, the documents ISO/TR 21044 (both Part-1 and Part-2) will be re-circulated. If there are substantial technical comments, WMO may request for forming a WG under ISO/TC113 to support WMO in resolving the comments. Members requested the secretary to try to seek three month extension on the existing ballot for ISO/TR 21044 (both Part-1 and Part-2) for providing the comments as this is a huge task. Reports on the resolutions made was presented by the Chairpersons of SC1, SC2, SC5, SC6, SC8 and the
conveners of working groups and by the convener of TC113/WG3 and these were accepted.
TC113 & its subcommittees, further agreed to India member body proposal to host the next group meetings (subject
to necessary clearances), tentatively in the month of Oct./Nov./Dec. 2016.
During discussions it was gathered that many developed countries are now using automatic instruments for hydrometry. While these are very expensive, the quality of collected data is much better than the manually collected data. In India, currently we have a heavy deployment of manually operated instrument. However, we would need to deploy the advanced technology to collect reliable data at frequent intervals, particularly from remote and difficult-to-access areas. Systems are required which transmit the collected data to a central office in (near) real-time for use in modeling and decision making.
WRDC/A-2.18
66
Contribution of Indian Delegation and usefulness of the meeting The work of this international committee is of great national importance from the point of view of our interest in water flow in international rivers for sharing water with neighbouring countries as well as water sharing between states. SC 6 looks into the aspects of sedimentation transport to lakes and reservoirs which is one of the main issues threatening the existing reservoirs. SC 8 looked after issues involved with groundwater which is one of the main sources of water for many farmers and villagers. Sustainability of this source is one of the aspects being looked after by this subcommittee. Indian experts chaired the meetings of ISO TC113, SC6, ISO/TC 113/SC1/WG 5, as well as took lead role in SC8/WG 4 India member body has not only providing the documents for the above technical committee/ subcommittees but has also given many technical comments and proposals against International standards at various stages. Ongoing projects with Indian project leaders are: - ISO 11651 Dr. V V Bhosekar, CWPRS; - ISO 9123 Dr S K Jain, NIH; - ISO/TR 11330 Mrs. Neena Isaac, CWPRS; - ISO/CD 18481 Dr. RG Patil, CWPRS - ISO 21414, Mr R M Krishna, CGWB Further projects where India agreed to lead are: - ISO 4365 - Mrs. Neena Isaac, CWPRS - Surface Geophysical Methods for Site Selection – Dr. R M Krishna; - Role of Springs in Water Supply Management in Hilly and Mountainous Terrain and Methodology for the Enhancement of Yield – Mr Amlanjyoti kar , CGWB. India member body is also taking a leading role to protect the interest of developing countries in the committee work, wherein basic and labour intensive techniques have now fully been replaced by largely sophisticated instrument driven techniques for hydrometric measurement. Any issues which need to be taken up subsequently Technical issues which need to be taken up subsequently in regards to the Secretarial and ‘P’ membership responsibility of ISO/TC 113 and its subcommittees are detailed in paras above. Any action points Actions which need to be taken are detailed in paras above and in the resolutions attached, however the main points are: - To prepare and arrange for next group meetings in India; - Provide NWIP and working drafts for the 3 new projects; - Complete the existing projects in hand with Indian project leaders/conveners Benefits accrued
The activity of ISO/TC 113 is an ongoing exercise and the standards prepared by this committee are generally adopted by the BIS under the dual numbering. In cases, where modifications become necessary due to Indian conditions, technically equivalent documents are processed. ISO standards and adopted/technically equivalent standards are used by the various arms of the Ministry of Water Resources like the Central Water Commission, the
WRDC/A-2.18
67
Central Ground Water Board, the Central Water and Power Research Station, National Institute of Hydrology and Irrigation departments of various State Governments, contracting agencies etc.
In addition to above benefits, the exposure to the international meet was greatly beneficial as various organizations from other countries were represented by their experts and the meeting provided an opportunity to have an exchange of views and practices on various technical matters with other international experts. This will greatly help in formulation of Indian Standards in the ‘Hydrometry’ WRD 1 and ‘Groundwater and related investigations’ sectional committee, WRD 3.
****************
WRDC/A-2.18
68
ANNEX 10 (Item 6.4.2)
BUREAU OF INDIAN STANDARDS WATER RESOURCES DEPARTMENT
REPORT OF 31st PLENARY MEETING OF ISO/TC 113 ‘HYDROMETRY’
Bureau of Indian Standards the National Standards Body of India, Water Resources Department (WRD) holds the secretariat of ISO Technical Committee, TC 113 ‘HYDROMETRTY’ since its inception in 1964. The Scope of the Technical Committee ISO/TC 113 ‘Hydrometry’ is ‘Standardization of methods, procedures, instruments and equipments relating to techniques for hydrometric determination of water level, velocity, discharge and sediment transport in open channels, precipitation and evapotranspiration, availability and movement of ground water, including:
- terminology and symbols;
- collection, evaluation, analysis, interpretation and presentation of data;
- evaluation of uncertainties.
-
The ISO/TC 113 consists of 19 participating and 16 observing members. TC 113 has published 66 ISO Standards related to TC and its Subcommittees. 13 ISO standards are under development related to TC and its Subcommittees. At present BIS, WRD also holds the Secretariat of two subcommittee SC 1 & SC 6 of TC 113. As resolved during the last TC 113 meeting held in 2015 at Tokyo Japan, India was to hold the next meeting of TC 113. Accordingly the 31st Plenary Group meetings of TC 113 was held at NITS, NOIDA in October 2017. The group meetings were attended by delegates from India, Japan, Korea, UK, U.S.A, The Netherlands and the World Meteorological Organization,(WMO). Indian Delegation Chairperson of ISO/TC 113 SC 6, Dr. (Mrs) V V Bhosekar, Director, Central Water and Power Research Station (CWPRS) Pune, lead the Indian delegation. The Indian delegation comprised of representatives from the following organizations and institutions:
1. Central Water Commission, CWC 2. Central Water and Power Research Station, CWPRS 3. Central Ground Water Board, CGWB 4. Centre for Water Resource Development and Management, CWRDM 5. Indian Meteorological Department, IMD 6. Indian Institute of Technology, Gandhi Nagar, IIT GN 7. National Institute of Hydrology, NIH 8. Narmada Control Authority, NCA
WRDC/A-2.18
69
The group meetings of the technical committee TC 113, its subcommittees and their respective Working Groups were spread over the period from 8 to 13 October 2017.
Chairman Advisory Group (CAG) meeting
As a precursor to the ISO/TC 113 Group meetings, the Chairman Advisory Group (CAG) meeting was held on 08 October 2017 under the Chairmanship of Mr A S Goel (India) Chief Engineer, Yamuna Basin Organization, CWC. The CAG comprising of all the Chairpersons and Secretaries of TC 113 and its five subcommittees discussed and finalized the group meeting schedule as detailed below.
The 31st Plenary meeting of ISO/TC 113 was formally inaugurated by Dr R K Bajaj, Deputy Director
General, Training Institute (NITS) on the 9 October 2017. The committee-wise meeting report, the contribution of the Indian delegation and the usefulness of this International meeting are summarized below.
SL NO.
COMMITTEES DATE TIME
1. TC113 HYDROMETRY 9-10-2017 0900-1100
2. ISO/TC 113/SC 1/WG 9 Non-Contact Methods For Measuring Water Surface Velocity And Discharge
9-10-2017 1100-1300
3. ISO/TC 113/SC 1/WG 7 Determination of The Stage-Discharge Relationship
9-10-2017 1400-1500
4. ISO/TC 113/SC 1/WG 10 Revision of ISO 748
9-10-2017 1500-1600
5. ISO/TC 113/SC 1/WG 11 Revision of ISO/TR 24578
9-10-2017 1600-1730
6. ISO/TC 113/WG 3 (Through WebEx ) Uncertainties
10-10-2017 0830-0930
7. TC113/SC1 VELOCITY AREA METHOD 10-10-2017 0930-1300
8. TC113/SC 6 SEDIMENT TRANSPORT 10-10-2017 1400-1530
9. TC113/SC 8 GROUND WATER
10-10-2017 1530-1730
10. Technical Site Visit 11-10-2017
11. ISO/TC 113/SC2/ WG 8 Revision of ISO 8368
12-10-2017 0830-0930
12. TC113/SC 2 FLOW MEASUREMENT STRUCTURES 12-10-2017 0930-1300
13. TC113/SC 5 INSTRUMENTS, EQUIPMENT AND DATA MANAGEMENT
12-10-2017 1400-1530
14. PENDING MEETINGS TO CONTINUE 12-10-2017 1530-1730
15. Plenary meeting of TC 113 13-10-2017 0900-1500
WRDC/A-2.18
70
TC/113 ‘HYDROMETRY’ (09 October 2017)
The Technical Committee meeting of TC 113 ‘HYDROMETRY’ under the Chairmanship of Mr Ashok Sitaram Goel, Chief Engineer, Yamuna Basin Organization, CWC was held on 09 October 2017. The Secretary TC 113, N.Shivanandan gave a presentation on the changes and developments at ISO including updated ISO brochures, provisions available in ISO Project management portal and informed the committee the following salient features.
- A consolidated version of the ISO/IEC Directives Part 1 was published in May 2017.
- Approval of a NWIP requires a 2/3 majority of P-members instead of a simple majority.
- A new 18 month development track has been introduced.
- Technical committee shall review its Strategic Business Plan at every plenary meeting and that
updated business plan no longer require TMB approval but a simple consensus within the
committee.
- If there are no technical changes to be made after Draft International Standard (DIS) the document
should directly proceed to publication and if changes are made than Final Draft International
Standard (FDIS) is mandatory.
During the course of the meeting the following were carried out. - Review of the Structure of TC 113, its sub-committees and their working groups - Review of the Secretariat report since last meeting, covering the activities of the committee, the current status of Work as well as systematic review.
- Appointments of Chairperson of TC 113 and its sub-committees. - Discussion on Liaising with other technical committees.
- Documents under revision and New work items under consideration were reviewed Important Outcome The Korean delegation gave a presentation on their proposal for a new standard specification on ‘Network density of rain gauges’. The committee resolved that Korea will submit the NWIP on Rain gauge Network Density. An important outcome during the meeting of TC 113 was the resolution (Res: N/17-16) to form a working group to review the WMO manual on Stream Gauging (ISO/PWI 21044) to make it suitable as an ISO Technical Report. Dr Mukesh Kumar Sinha, Executive Member, Narmada Control Authority, (India) was nominated as the convener of the working group.
TC 113/SC 1 ‘VELOCITY AREA METHOD’ (10 October 2017) The Subcommittee, ISO/TC 113/SC 1 on ‘Velocity Area Method‘ met under the Chairmanship of Mr Stewart Child (UK) on 10 October 2017. The Secretary N.Shivanandan briefed the committee on the meetings of the Working Groups. The four Working Groups of SC 1 had earlier met on 9th October 2017 to discuss and resolve specific issues assigned to the group. The working group 9 & 11 met under the convener ship of Dr Atsuhiro Yorozuya (Japan) to discuss issues related to ISO/TR 24577 ‘Non-contact Discharge Method and ISO 24578 ‘Acoustic Doppler Profiler-Method and Application for Measurement’ respectively. The Working Group 7 met under the convenership of Mr Rod Wilkinson (UK) to discuss issues related to ISO/PWI, ‘Determination of the Stage-Discharge Relationship. The Working Group 10 met under the convener ship of Mr Roger Bailey to discuss issues related to ISO 748 ‘Liquid Flow in open Channels using Current meters or Floats’.
WRDC/A-2.18
71
The Chairman thanked the conveners for all the works done to date by the respective working groups. The committee appreciated Dr Sharad Jain (India), Director National Institute of Hydrology for progressing the document ISO/CD 9123 ‘Measurement of Liquid Flow in open Channels – Stage-fall Discharge Relationship’ to the final stage. The committee also thanked Mrs Neena Issac (India), CWPRS Pune for leading the Working Group on ISO/AWI TR 11330 ‘Determination of Water and Water Levels in Lakes and Reservoirs. The Chairman congratulated the new Chair-elect Mr Mukesh Kumar Sinha (India), who will be taking over the Chairmanship of ISO/TC 113/SC 1 from Jan 2018. Important development Mr Mukesh Kumar Sinha (India), Executive Officer, Narmada Control Authority, will be taking over the Chairmanship of ISO/TC 113/SC 1 ‘Velocity Area Method’ from Jan 2018.
TC 113/SC 2 ‘FLOW MEASUREMENT STRUCTURES’ (12 October 2017) The Subcommittee ISO/TC 113/SC 2 on ‘Flow measurement structures’ met on the 12th October 2017 under the Chairmanship of Mr Rod Wilkinson (UK). The Secretary Mr Tim Bellamy (UK) presented the Secretariat Report and reviewed the progress of work items and results of systematic reviews. Mr Bellamy also reviewed the working groups progress under the subcommittee. Dr R G Patil (India), CWPRS Pune Convener of Working Group 10 presented his report on ‘End Depth Measurement’ (N 719)
TC 113/SC 5 ‘INSTRUMENT EQUIPMENT AND DATA MANAGEMENT’ (12 October 2017) The subcommittee ISO/TC 113/SC 5 on Instrument, Equipment and Data Management met on 12 October 2017 under the Chairmanship of Mr Thomas H Yorke (U.S.A). The Subcommittee discussed several existing and new work items. The Subcommittee was informed that two International Standards were published since last meeting. ISO 6420 ‘Position fixing equipment for hydrometric boats, was published in October 2016 and ISO 24155 ‘Hydrometric data transmission systems-Specification of system requirement was published in February 2016. The subcommittee also discussed the standards that recently underwent systematic review. The subcommittee agreed that ISO 11655 should be revised and requested India to prepare the New Work Item Proposal (NWIP). Korea presented two proposals for new standards specification for rain gauges and specification for density of rain gauges. Korea delegation was requested to consider the comments of subcommittee and prepare an NWIP on specification for non-recording and recording rain gauges. Important Outcome India to prepare New Work Item Proposal (NWIP) for revision of ISO 1165. Korea to prepare New Work Item Proposal (NWIP) for non-recording and recording rain gauges. TC 113/SC 6 ‘SEDIMENT TRANSPORT’ (10 October 2017)
WRDC/A-2.18
72
The Subcommittee ISO/TC 113/SC 6 on Sediment Transport under the Chairperson Dr (Mrs) V V Bhosekar (India), Director CWPRS Pune, met on 10 October 2017. The Subcommittee discussed several existing and new work items. The Subcommittee was informed that two International Standards were published since last meeting. ISO/TR 9212 ‘Hydrometry-Method of Measurement of Bedload Discharge and ISO 11651 ‘Estimation of Sediment Deposition in Reservoirs using one Dimensional Simulation Models’. The Subcommittee also discussed the standards that recently underwent systematic review. Important Outcome India had put up New Work Item Proposal (NWIP) along with the working draft for the revision of ISO 4365 ‘Liquid Flow in Open Channels- Sediments in streams and Canals- Determination of Concentration, Particle Size Distribution and Relative Density. It was also resolved that India will put up a New Work Item Proposal (NWIP) titled ‘Estimation of Sediment Flushing from Reservoirs using 2-D Simulation Models’ by December 2017.
TC 113/SC 8 ‘GROUND WATER’ (10 October 2017) The subcommittee ISO/TC 113/SC 8 on Ground Water under the Chairmanship of Mr John Eggleston (U.S.A) on 10 October 2017. The subcommittee discussed several existing and new work items. The Subcommittee was informed that ISO/TR 21414 ‘Surface Geophysical Surveys for Hydrogeological Purposes’ was published as an ISO technical report in September 2015. The UK delegation presented progress on NWIP for ‘Planning Artificial Recharge to Ground Water’ and agreed on submission deadline of April 1, 2018. Important Outcome Two proposals were presented by the Indian delegation (representatives from CGWB) during the subcommittee meeting as detailed below. ISO/PWI 20833 ‘Site Selection for surface Geophysical Methods’ describing constraints and requirements when planning and carrying out geophysical surveys for the purpose of characterizing ground water supply potential. ISO/PWI 20840 ‘Role of springs in Water Supply Management in Hilly and Mountainous Terrain and Methodology for the enhancement of yield’ describes a qualitative assessment of spring management for augmentation of its discharge and protection of water quality. The US delegation agreed to work with the Indian delegation in drafting NWIP proposal for both the topics that aligning with ISO TC 113 publication formats and requirements. WebEx MEETING (10 October 2017) During the course of the meeting at NITS a WebEx meeting in co-ordination with BIS ITS team was organized. Dr Xu Peing, (CHINA) convener of Working Group 3 of TC/113 conducted her meeting through WebEx and interacted with the working group members and the delegates. Issues related to ‘Hydrometric Uncertainty Guidance’ were deliberated.
WRDC/A-2.18
73
TECHNICAL FIELD TRIP TO POIYA GHAT, AGRA (11 October 2017) As part of the ISO/TC 113 group meeting schedule a technical field trip was organized for the delegates on 11 October 2017 to Poiya Ghat, Agra. Central Water Commission (CWC) has a hydrological observatory center at Poiya Ghat. A presentation was made at the site by the CWC official on the activities of CWC and the hydrological observatory followed by an interactive session with the delegates. The delegates were taken by boat across the Yamuna River for a live demonstration of observation of water level, discharge etc. by Acoustic Doppler Current Profiler (ADCP). The delegates also witnessed testing of in-situ water quality parameters at the in house test facilities of the Hydrological Observatory. The delegates were also taken on a short tour of the Taj Mahal.
CONTRIBUTION OF INDIAN DELEGATION AND USEFULNESS OF THE MEETING
India has a long and established presence in the work of ISO/TC 113 and had taken lead role which is evident from the fact that the Chairman of the main committee TC 113 being Mr Ashok Sitaram Goel, the Chairperson of Subcommittee SC 6 on Sediment Transport being Dr. (Mrs.) V V Bhosekar and the Chair-elect of the Subcommittee SC 1 on Velocity Area Method being Mr Mukesh Kumar Sinha, whose tenure starts from Jan 2018, are all from India. The Secretariat of ISO/TC 113 as well as that of the Subcommittee SC 1 on Velocity Area Methods and that of SC 6 on Sediment Transport is held by India through BIS. India as a member body has not only provided the documents for the above Technical Committee/Subcommittees but has also given many technical comments and proposals on International Standards at various stages. Projects where India has agreed to lead are
- ISO 4365 ‘Liquid Flow in Open Channels- Sediments in Streams and Canals- Determination of
Concentration, Particle size distribution and Relative Density’ – CWPRS
- Estimation of sediment flushing from reservoirs using 2-D simulation module – CWPRS
- Surface Geophysical Methods for Site selection – CGWB
- Role of Springs in Water Supply Management in Hilly and Mountainous terrain and methodology for
the enhancement of yield – CGWB
India leading the interest of developing countries India as a member body is also taking a leading role to protect the interest of developing countries in the
committee work, wherein basic and labour intensive techniques have now fully being replaced by
instrument driven techniques for hydrometric measurement.
Nomination of Dr Mukesh Kumar Sinha, Executive Member, Narmada Control Authority (India) as the
convener of the working group to review WMO manual on stream gauging is an indication of India’s role to
protect the interest of developing countries.
WRDC/A-2.18
74
The ISO/TC 133 Group Meetings hosted by India has given the Indian delegation an International exposure
and an opportunity to interact with the delegates from other countries on various technical issues. The
proceedings and the decisions arrived at the TC 113 meeting will be carried forward to the National Mirror
Committees of BIS.
The Chairman TC 113 and the Chairpersons of TC 113 Subcommittees have in their reports explicitly
appreciated BIS and NITS for hosting the meeting and providing excellent support and hospitality
throughout the various meetings of TC 113.
__________________________________