TEP / UNSE

Post on 04-Jan-2016

43 views 0 download

Tags:

description

TEP / UNSE. 2008 BTA RMR Studies. RMR Studies. UNSE Santa Cruz RMR Studies. Mohave RMR Studies. No RMR is identified for Mohave projected loads of 1007 MW in 2016 UNSE has converted to Network service eliminating contractual issues on Western’s system. Questions?. - PowerPoint PPT Presentation

transcript

TEP / UNSETEP / UNSE

2008 BTA2008 BTA

RMR StudiesRMR Studies

RMR StudiesRMR Studies

Year

PeakLoadMW

LossesMW

TotalMW

RMRMW

CriticalOutage

Constraint

2011

2629

155 2784

320$426,000

SP-VL&

WN-VL

VoltageStability

2016

3010

193 3203

315$276,000

SP-VL Thermal(NL-WI)

UNSE Santa Cruz RMR UNSE Santa Cruz RMR StudiesStudies

Year

PeakLoadMW

RMRMW

Incr Cost $(000)

2011

85 17 76

2016

99 0 n/a

Mohave RMR StudiesMohave RMR Studies

• No RMR is identified for Mohave projected loads of 1007 MW in 2016

• UNSE has converted to Network service eliminating contractual issues on Western’s system

Questions?Questions?