TEP / UNSETEP / UNSE
2008 BTA2008 BTA
RMR StudiesRMR Studies
RMR StudiesRMR Studies
Year
PeakLoadMW
LossesMW
TotalMW
RMRMW
CriticalOutage
Constraint
2011
2629
155 2784
320$426,000
SP-VL&
WN-VL
VoltageStability
2016
3010
193 3203
315$276,000
SP-VL Thermal(NL-WI)
UNSE Santa Cruz RMR UNSE Santa Cruz RMR StudiesStudies
Year
PeakLoadMW
RMRMW
Incr Cost $(000)
2011
85 17 76
2016
99 0 n/a
Mohave RMR StudiesMohave RMR Studies
• No RMR is identified for Mohave projected loads of 1007 MW in 2016
• UNSE has converted to Network service eliminating contractual issues on Western’s system