+ All Categories
Home > Documents > 10’ Plan View · 2020. 6. 29. · - Keep exhibit components away from heat and prolonged sun...

10’ Plan View · 2020. 6. 29. · - Keep exhibit components away from heat and prolonged sun...

Date post: 19-Sep-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
6
© 2020 Plan View 10’ 20’ RE-2054 - 10’ x 20’ Display d like to tell us about your experience with your setup instructions please email us at [email protected] SETUP INSTRUCTIONS
Transcript
Page 1: 10’ Plan View · 2020. 6. 29. · - Keep exhibit components away from heat and prolonged sun exposure. Heat and UV exposure will warp and fade components. - Retain all provided

© 2020

Locked layer containsplaceholder marks.

Plan View

10’

20’

RE-2054 - 10’ x 20’ Display

If you would like to tell us about your experience with your setup instructions please email us at [email protected] INSTRUCTIONS

Page 2: 10’ Plan View · 2020. 6. 29. · - Keep exhibit components away from heat and prolonged sun exposure. Heat and UV exposure will warp and fade components. - Retain all provided

© 2020

DO NOT USE POWER TOOLS

ALL CONNECTIONS MUSTBE TIGHTLY SECURED

Part Identification - Numbering

Spline Connection Base Plate & Extrusion Connection

General Setup Instructions- Read entire setup instruction manual prior tounpacking parts and pieces.

- The setup instructions are created specificallyfor this configuration.

- Setup instructions are laid out sequentially insteps, including exploded views with detailedexplanation for assembly.

WARNINGCleaning & Packing- For Cleaning Metal, Plex, & Laminate Parts:

Use a MILD NON-ABRASIVE cleanser andsoft cloth/paper towel to clean all surfaces.

- Keep exhibit components away from heatand prolonged sun exposure.Heat and UV exposure will warp andfade components.

- Retain all provided Packing Materials.All provided packing materials are forease of repacking & component protection.

Disassembly- For loss prevention, tighten all set screws

and locks during disassembly.

7A

Hex Tool - Essential for Assembly

Extrusion & Lock Connection Engaged Lock

LADDERS OR LIFTS MAY BE REQUIRED

General Information

Page 3: 10’ Plan View · 2020. 6. 29. · - Keep exhibit components away from heat and prolonged sun exposure. Heat and UV exposure will warp and fade components. - Retain all provided

© 2020

Assembly Assembly Cont’d

Stacking Unstacking

Stacking Assembly 1) Place one horizontal frame on top of the other, lining up the

center grooves.

2) Turn stacking lock clockwise to tighten into place. Repeatfor each lock.

Stacking Disassembly1) Turn the stacking lock counter-clockwise to loosen.

2) The whole spring on the stacking lock should be in view torelease each frame. The disengaged spring should releasethe stacking lock. If not, keep turning the stacking lock untilit disengages.

Side-by-Side Assembly1) Frames: Place frames side-by-side with one higher than the

other, then slide panel down to lock panels securely together.

2) Corner Connectors: Repeat Step 1 for installing cornerconnectors to frames.

Side-by-Side Disassembly1) Pull pin lock outwards to disengage.

2) Pull frames upward and apart at the same time to detatch.

Push stacking lock into the slotof the upper frame, then spin the cap to tighten the lock.

Push pin lock into hole of connecting frame.Note: Block of pin lock will secure in groove.

Disengage the stacking lock by spinning the cap counterclockwise and pulling down.

CapStackingLock

Pin LockTop View

Corner Connector

SEGGrooves

Note: Orientation of Corner Connector may change.

Gravitee Assembly

Page 4: 10’ Plan View · 2020. 6. 29. · - Keep exhibit components away from heat and prolonged sun exposure. Heat and UV exposure will warp and fade components. - Retain all provided

© 2020

Graphic Removal

To remove the graphic the frame, locate the fabric pull tab. Gently pull up on the tab to remove the fabric.

Step 1Insert corner A. Turn edge of graphic so silicon welt is perpendicular to face of graphic. Insert narrow side of welt with fabric to outside into the channel. Repeat for other side of this corner.

Step 2Repeat Step 1 for opposite corner C, then insert corner B, followed by corner D, to complete the installation of the corners.

Step 3Once all corners are inserted, press one silicon edge into channel from corners and work toward the center. Make sure welt is fully inserted into channel. Continue until all sides are done. Smooth out edges of graphic.

It is important to first insert graphic into each alternate corner then to the sides of the frame. If this is not done, graphic will not fit into the frame correctly.

Corner A

Corner D

Corner B

Corner C

from

SEG Installation

Page 5: 10’ Plan View · 2020. 6. 29. · - Keep exhibit components away from heat and prolonged sun exposure. Heat and UV exposure will warp and fade components. - Retain all provided

© 2020

Step 1 of 2

Locked layer containsplaceholder marks.

Steps:1) Assemble Gravitee Panels & Posts [1 through 15]

together in numerical order as shown, then attachEndCap [1A] to Panel [15].See Gravitee Side-by-Side Assembly instructionsin the General Information pages.

Item1

1A23456789101112131415

Qty.1111111111111111

Description46”w x 95”h Gravitee Panel95”h Gravitee EndCap46”w x 95”h Gravitee Panel94.5”h Gravitee Corner Post w/ caps38”w x 95”h Gravitee Panel94.5”h Gravitee Corner Post w/ caps46”w x 95”h Gravitee Panel46”w x 95”h Gravitee Panel94.5”h Gravitee Corner Post w/ caps38”w x 95”h Gravitee Panel w/ Door94.5”h Gravitee Corner Post w/ caps46”w x 95”h Gravitee Panel46”w x 95”h Gravitee Panel46”w x 95”h Gravitee Panel95”h Gravitee Corner Post38”w x 95”h Gravitee Panel

12 3

456

7

2A 2B

89

101112

131415

1A(EndCap)

When assembled

Profile View

Profile ViewProfile View

Profile ViewProfile View

Backwall Assembly

Page 6: 10’ Plan View · 2020. 6. 29. · - Keep exhibit components away from heat and prolonged sun exposure. Heat and UV exposure will warp and fade components. - Retain all provided

© 2020

Step 2 of 2

Locked layer containsplaceholder marks.

SEG Graphic InstallationCorner A

Corner D

Corner B

Corner C

It is important to first insertgraphic into each alternatecorner then to the sides ofthe frame. If this is not done,graphic will not fit into theframe correctly.

Step 1Insert corner A. Turn edge ofgraphic so silicon welt isperpendicular to face ofgraphic. Insert narrow sideof welt with fabric to outsideinto the channel. Repeat forother side of this corner.

Step 2Repeat Step 1 for oppositecorner C, then insert cornerB, followed by corner D, tocomplete the installation ofthe corners.

Graphic Removal

To remove the graphic fromthe frame, locate the fabricpull tab. Gently pull up onthe tab to remove the fabric.

Step 3Once all corners are inserted,press one silicon edge intochannel from corners andwork toward the center.Make sure welt is fully insertedinto channel. Continue untilall sides are done. Smoothout edges of graphic.

Light AttachmentAttach lights toHorizontal wheredesired and tighten in place.

*

DoorHinge

Hinge

Slide pin intohinge attachedto vertical. Slide doorhinge over pin.

Door Attachment*

Pin

Steps:1) Install Door onto Panel [9]. See Door Attachment detail.2) Apply SEG Graphics to back of Panels [1/2], front of panels [6/7]

& front of Panels [11/12/13], as shown.3) Use Velcro to affix Sintra graphics to Panel [4], around

Door Panel [9] & to front & back of Panel [15].4) Connect Lights to top of assembly as shown.

See Light Attachment detail.

* *SEG Graphic

Back SEG Graphic

1911

1213

15

24

67

* * SintraGraphicSintraGraphic

Door

SintraGraphicSintraGraphic *

*

SEG Graphic

Backwall Attachments


Recommended