8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 1/20
PROJECT / CONTRACT REF.: 3708 / GC13109700
CONTRACT TITLE: -
EPIC FOR WASTE MANAGEMENT FACILITY AT
RLC
DOCUMENT TITLE :
PROJECT DOSSIER – SECTION INDEX
14-06-15 0 ISSUED FOR REVIEW / COMMENTS SATYA NISHANT EMAD
DATEREV.
NO.REASON FOR REVISION PREPARED CHECKED APPD.
APPD.
Q.P.
DOCUMENT NO: 3708 - RLGE - 0 - 40 - 0002 SHT 01 OF 20
3708-RLGE-0-40-0002 REV. 0 Page 1 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 2/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
1.0 DOSSIER USER GUIDE
1.1 BRIEF CONTENTS GUIDE xxx xxx
Project Dossier Main Index xxx xxx
Project Dossier Section Index xxx xxx
Project Dossier Volume Index xxx xxx
1.2 SYNOPSIS xxx xxx
1.3 1.3.1 EQUIPMENT TAG KEY LIST xxx xxx
2.0 OVERALL PLANT OPERATING INSTRUCTIONS
2.1 Introduction xxxx xxx
2.2 Basis of Design final issue xxxx xxx
Design Basis Civil & Structural xxxx xxx
3708-RFWMF-1-29-0001 A 33 Structural Design Basis Memorandum xxxx xxx
3708-RFWMF-1-29-0002 A 50 Civil Works Design Basis Memorandum xxxx xxx
3708-RFWMF-1-29-0003 A 5 Architectural Design Basis Memorandum xxxx xxx
Design Basis Electrical xxxx xxx
3708-RFWMF-2-29-0001 A 10 Electrical Design Basis Memorandum xxxx xxx
Design Basis Mechnical xxxx xxx
3708-RFWMF-5-29-0001 A 11 Mechanical Design Basis Memorandum (Part B) xxxx xxx
Design Basis Telecommunication xxxx xxx
3708-RFWMF-8-29-0001 A 7Telecommunication System Design Basis
Memorandum (Part B)xxxx xxx
2.3 Plant Operating Instructions
2.3.1 Overall operating Philosophy N/A
2.3.2 General description of Plant & Controls N/A
2.3.3 Commissioning plan/Precommissioning Procedures xxxx xxx
Project Specific Commissioning Plan xxxx xxx
2.3.4 Operating and Maintenance Procedure N/A
2.3.5 Emergency Procedures N/A
2.3.6 Troubleshooting N/A
3.0 VENDOR DOCUMENTATION
3.1 Vendor Drawings,Parts Lists, Data Sheets etc
3.1.1 General & Multi Discipline - Common N/A
3.1.2 Civil xxx xxx
VEN-3206-RLB29-1-03-0001 1 29 Mabani Steel Design Philosophy of Steel Roof Design xxx xxx
VEN-RLB29-1-12-0001 1 332Mabani Steel Design Calculations for Transfer Station Building No.
1xxx xxx
VEN-RLB29-1-12-0002 1 104Mabani Steel Design Calculations for Transfer Station Building No.
2xxx xxx
VEN-3708-RLB29-1-71-0002 0 6 Schedule of Opening xxx xxx
3.1.3 Electrical N/A
3.1.4 Safety & Loss Prevention N/A
3.1.5 Instrumentation N/A
Contract No. : GC13109700
Contract Title: EPIC OF WASTE MANAGEMENT FACILIUTY AT
RLC
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
3708-RLGE-0-40-0002 REV. 0 Page 2 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 3/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
VEN-3708-RLB29-4-55-0001 2 1 System Configuration for Maned Weigh Bridge xxx xxx
VEN-3708-RLB29-4-55-0002 2 1 Wiring Diagram for Weighing Enclosure xxx xxx
VEN-3708-RLB29-4-55-0003 2 1 General Arrangement for Weighing Enclosure xxx xxx
VEN-3708-RLB29-4-55-0004 2 1 BOM for Weighing Enclosure xxx xxx
VEN-3708-RLB29-4-55-0005 2 1 Field Termination Unmaned - Weighbridge xxx xxx
VEN-3708-RLB29-4-55-0006 2 1 General Arrangement Ticket Printer Box xxx xxx
VEN-3708-RLB29-4-55-0007 2 1 Earthing Scheme for Weigh Bridge xxx xxx
3.1.6 Mechanical N/A
3.1.7 Process N/A
3.1.8 Pipeline N/A
3.1.9 Telecommunications xxx xxx
3.1.10 Buildings
VEN-3206-RLB29-9-AA-0002 2 1 Transfer Station & Bailing Area Building (B-01) Cladding – General
Notesxxx xxx
VEN-3206-RLB29-9-AD-0001 2 1Transfer Station & Bailing Area Building (B-01) Cladding – Wall
Elevation At G.L - Exxx xxx
VEN-3206-RLB29-9-AD-0002 2 1Transfer Station & Bailing Area Building (B-01) Cladding – Wall
Elevation Along G.L. - Axxx xxx
VEN-3206-RLB29-9-AD-0003 2 1Transfer Station & Bailing Area Building (B-01) Cladding – Endwall
Elevations @ G.L - 8xxx xxx
VEN-3206-RLB29-9-AD-0004 2 1Transfer Station & Bailing Area Building (B-01) Cladding – Wall
Elevation Along G.L. - 8xxx xxx
VEN-3206-RLB29-9-AD-0005 2 1Transfer Station & Bailing Area Building (B-01) Cladding – Wall
Elevations Along G.L – AX’ & BX’xxx xxx
VEN-3206-RLB29-9-AD-0007 2 1Transfer Station & Bailing Area Building (B-01) Cladding – Cross
Sections & Wall Elevation Along G.L – 1Xxxx xxx
VEN-3206-RLB29-9-AE-0001 2 1 Transfer Station & Bailing Area Building (B-01) Cladding – ZiplokRoof Plan xxx xxx
VEN-3206-RLB29-9-AE-0002 2 1Transfer Station & Bailing Area Building (B-01) Cladding – Liner
Roof Planxxx xxx
VEN-3206-RLB29-9-AE-0003 2 1Transfer Station & Bailing Area Building (B-01) Cladding – Roof
Cladding Detailsxxx xxx
VEN-3206-RLB29-9-AE-0004 2 1Staircase & Water Tank Shade Structure in Admin Bldg. (B-02)
Cladding – Ziplok Roof, Liner Roof Plan & Sectionxxx xxx
VEN-3206-RLB29-9-AE-0005 2 1Staircase & Water Tank Shade Structure in Admin Bldg. (B-02)
Cladding - Detailsxxx xxx
VEN-3206-RLB29-9-AK-0001 2 1Transfer Station & Bailing Area Building (B-01) Cladding – Fascia
Elevationsxxx xxx
VEN-3206-RLB29-9-AK-0002 2 1Staircase & Water Tank Shade Structure in Admin Bldg. (B-02)
Cladding – General Notes
xxx xxx
VEN-3206-RLB29-9-AH-0001 2 1 Transfer Station & Bail ing Area Building (B-01) Cladding - Detai ls xxx xxx
3206-RLB29-9-HE-1002-SD 0 2 Adminis tration Building Wooden Door Detail & Schedule xxx xxx
VEN-3708-RLB29-9-AF-0002 0 2 Transfer Station Building Fire Rated Steel Door Detail & Schedule xxx xxx
VEN-3708-RLB29-9-AF-0003 0 5 Adminis tration Building Fire Rated Steel Door Detail & Schedule xxx xxx
VEN-3708-RLB29-9-AF-0004 0Transfer Station Building Series 911-Heavy Duty Rolling Shutted
Door xxx xxx
VEN-3708-RLB29-9-SB-0001 0 5 Adminis tration Building- Car Parking Shades Foundation Details xxx xxx
VEN-3206-RLB29-9-AK-0003 0 1Transfer Station & Bailing Area Building (B-01) Roof Layout - Fall
Arrest Systemxxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 3 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 4/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
VEN-3206-RLB29-9-AK-0004 0 1Transfer Station & Bailing Area Building (B-01) Cross Sections - Fall Arrest System ( 1 Sheet)
xxx xxx
VEN-3708-RLB29-9-AF-0005 0 2 Administration Building- Fire Rated Hollow Metal Steel Window,
Elevation, Section & Detailsxxx xxx
VEN-3206-RLB29-9-AJ-0001 0 4 Adminis tration Building Stainless Steel Handrail Details xxx xxx
3.2Spare Parts List and Interchangeability Record (SPIR)
Forms
3.2.1 General & Multi Discipline - Common xxx xxx
3.2.2 Civil N/A
3.2.3 Electrical xxx xxx
3.2.4 Safety & Loss Prevention N/A
3.2.5 Instrumentation N/A
3.2.6 Mechanical N/A3.2.7 Process N/A
3.2.8 Pipeline N/A
3.2.9 Telecommunications xxx xxx
3.2.10 Handing over of Materials xxx xxx
3.3 Manuals and other Vendor Documentation
3.3.1 General & Multi Discipline - Common N/A
3.3.2 Civil xxx xxx
3.3.3 Electrical xxx xxx
3.3.4 Safety & Loss Prevention N/A
3.3.5 Instrumentation N/A
3.3.6 Mechanical N/A
3.3.7 Process N/A3.3.8 Pipeline N/A
3.3.9 Telecommunications xxx xxx
4.0 REQUISITIONS AND PURCHASE ORDERS
4.1 Requisitions
4.1.1 General & Multi Discipline - Common N/A
4.1.2 Civil xxx xxx
4.1.3 Electrical xxx xxx
4.1.4 Safety & Loss Prevention N/A
4.1.5 Instrumentation N/A
4.1.6 Mechanical N/A
4.1.7 Process N/A
4.1.8 Pipeline N/A
4.1.9 Telecommunications xxx xxx
4.2 Purchase Orders
4.2.1 General & Multi Discipline - Common N/A
4.2.2 Civil xxx xxx
ATC/AK/QP/RLC/GC13109700/
CONCORD/2014/00010 8 Survey Works xxx xxx
ATC/AK/QP/RLC/GC13109700/
OPD/2014/00160 11 Maintenance Data Acquisition and Optim,ization- SAP System xxx xxx
ATC/AK/QP/RLC/GC13109700/
QBC/2014/002-A11 9 Supply & Laying of Backfilling Materials -Amendment 1 xxx xxx
ATC/AK/QP/RLC/GC13109700/
QMI/2014/0056-A11 18 Fabrication, Supply, Delivery & Installation of Single Leaf Steel Door xxx xxx
ATC/AK/QP/RLC/GC13109700/
ALMABANI/2014/0140 0 50 Supply and Apply of Internal and External Painting Works xxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 4 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 5/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
ATC/AK/QP/RLC/GC13109700/RS/2014/0141
0 30 Supply, Delivery & Installation of False Ceiling & Partition Works xxx xxx
ATC/AK/QP/GC13109700/2014
/01330 20 Supply & Delivery of Granite xxx xxx
ATC/AK/QP/GC13109700/2014
/01340 12 Porcelain and Ceramic Tiles xxx xxx
ATC/AK/QP/GC13109700/2014
/01220 8 Supply, Delivery and Instal lation of Industr ial Rol ling Shutter Doors xxx xxx
ATC/AK/QP/GC13109700/STC/
2014/01470 21 Fabrication, Supply & Installation of Internal Signage xxx xxx
4.2.3 Electrical xxx xxx
4.2.4 Safety & Loss Prevention N/A
4.2.5 Instrumentation N/A
4.2.6 Mechanical N/A
4.2.7 Process N/A
4.2.8 Pipeline N/A
4.2.9 Telecommunications xxxx xxx
5.0 DESIGN DOCUMENTS xxxx xxx
5.1 Drawings and Drawing Index xxxx xxx
5.1.1 General & Multi Discipline - Common xxxx xxx
5.1.2 Civil xxxx xxx
3708-RFWMF-1-78-0001 A 1Ras Laffan Industrial City Waste Management Facility Proposed
Traffic Management Planxxxx xxx
3206-RFWMF-1-87-0001 A 1 35 Meter High-Mast Foundation Detail ( 1 Sheet) xxxx xxx
3708-RFWMF-1-87-0001 0 110 Meters Height Octagonal Light Pole Foundation Details ( 1
Sheet)xxxx xxx
5.1.3 Electrical xxxx xxx
3708-RFWMF-2-72-0001 A 1 DB Schedules xxxx xxx
3708-RFWMF-2-67-2001 A 1 Site Plan Lighting Layout Part B xxxx xxx
3708-RFWMF-2-54-3001 E 1 Single Line Diagram for LV Switchboard xxxx xxx
3708-RFWMF-2-67-3002 A 1 Service Bay Area Lighting & Power Layout Part B xxxx xxx
3708-RFWMF-2-52-2001 A 2 Site Plan Power Layout Part B xxxx xxx
3708-RFWMF-2-65-0001 A 1 Service Bay & Weighbridge Earthing Layout xxxx xxx
5.1.4 Safety & Loss Prevention xxxx xxx
3708-RFWMF-3-50-3002 A 1 Safety Equipment Layout for Weighbridge Control Room – Part B xxxx xxx
3708-RFWMF-3-50-3003 A 1Safety Equipment Layout for Servicing Bay, Equipment Storage
Room & Rest Area – Part Bxxxx xxx
3708-RFWMF-3-56-3001 C 1 Fire & Gas Cause and Effect Diagram Part B xxxx xxx
3708-RFWMF-3-58-0001 A 1 Fire Water Layout – Part B xxxx xxx
5.1.5 Instrumentation N/A
5.1.6 Mechanical N/A
5.1.7 Process N/A
5.1.8 Pipeline N/A
5.1.9 Telecommunications N/A N/A
5.1.10 Buildings xxxx xxx
3206-RLB29-9-CD-1001 C 3Ras Laffan Industrial City Waste Management Facility Roads,
Parking Layoutxxxx xxx
3206-RBL29-9-CD-2005 C 3Ras Laffan Industrial City Waste Management Facility Road Section
Foundation Details Utility Cross Section Part-Axxxx xxx
3708-RFWMF-9-AA-3001 1 4Ras Laffan Industrial City Waste Management Facility Standard
Architectural Details – Part Bxxxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 5 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 6/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
3206-RLB29-9-SD-2001 E 1Ras Laffan Industrial City Waste Management FacilityReinforcement Details of Substructure Transfer Station Building –
Part A
xxxx xxx
3708-RFWMF-9-FF-3002 E 1Ras Laffan Industrial City Waste Management Facility Fire Alarm
Schematic Diagram – Part Bxxxx xxx
3708-RFWMF-9-CA-3001 A 1Ras Laffan Industrial City Waste Management Facility Civil and
Structural General Notes and Legend – Part Bxxxx xxx
3708-RFWMF-9-CE-3003 A 1
Ras Laffan Industrial City Waste Management Facility Structural
Details – Servicing Bay Equipment Storage Room & Rest Area –
Part B
xxxx xxx
3708-RFWMF-9-CE-3010 A 1Ras Laffan Industrial City Waste Management Facility Fire Water
Tank – RC Details of Base Platexxxx xxx
3708-RFWMF-9-CE-3011 A 2Ras Laffan Industrial City Waste Management Facility Standard
Concrete Details – Part Bxxxx xxx
3708-RFWMF-9-CE-3012 C 1Ras Laffan Industrial City Waste Management Facility Land
Treatment Unit Plan & Sections – Part Bxxxx xxx
3708-RFWMF-9-HA-2001 A 1Ras Laffan Industrial City Waste Management Facility Legend,
Symbols & Notes HVAC Layoutxxxx xxx
3708-RFWMF-9-DA-2001 A 1Ras Laffan Industrial City Waste Management Facility Legends,
Symbols & Notes Drainage Layoutxxxx xxx
3708-RFWMF-9-HG-2001 E 2Ras Laffan Industrial City Waste Management Facility Part B
Installation Details HVAC Layoutxxxx xxx
3708-RFWMF-9-FD-3001 E 1Ras Laffan Industrial City Waste Management Facility Weighbridge
Fire Alarm Layout – Part Bxxxx xxx
3708-RFWMF-9-FD-3002 E 1Ras Laffan Industrial City Waste Management Facility Service Bay
Fire Alarm Layout Equipment Storage Room & Rest Area – Part Bxxxx xxx
3708-RFWMF-9-DH-2001 A 6 Installation Details Drainage Layout xxxx xxx
3708-RFWMF-9-DB-1001 B 6 Site Plan Foul Drainage Layout xxxx xxx
3708-RFWMF-9-ED-3001 A 1Ras Laffan Industrial City Waste Management Facility Electrical
Installation Details Part Bxxxx xxx
3708-RFWMF-9-HA-1002 A 1 Ras Laffan Industrial City Waste Management Facility ElectricalInstallation Details Part B
xxxx xxx
3206-RLB29-9-SG-0003 A 1Ras Laffan Industrial City Waste Management Facility Transfer
Station & Bailing Area Building (B-01) Part Marking Layout Planxxxx xxx
3708-RFWMF-9-ED-3002 A 1Ras Laffan Industrial City Waste Management Facility Electrical
Installation Details Part Bxxxx xxx
3708-RFWMF-9-DC-1005 B 1Ras Laffan Industrial City Waste Management Facility Service Bay
Area Drainage Layoutxxxx xxx
3206-RLB29-9-AA-2001 B 4Ras Laffan Industrial City Waste Management Facility Architectural
Details – Transfer Station Buildingxxxx xxx
3206-RLB29-9-AG-2012 B 1Ras Laffan Industrial City Waste Management Facility Staircase
Details – Administration Buildingxxxx xxx
3206-RLB29-9-AH-2013 B 1Ras Laffan Industrial City Waste Management Facility
Miscellaneous Details Administration Buildingxxxx xxx
3206-RLB29-9-AK-2006 B 3Ras Laffan Industrial City Waste Management Facility Sections –
Transfer Station Building xxxx xxx
3206-RLB29-9-AK-2018 B 1Ras Laffan Industrial City Waste Management Facility Sections –
Administration Buildingxxxx xxx
3206-RLB29-9-CE-1001 B 2Ras Laffan Industrial City Waste Management Facility Standard
Concrete Details – Part Axxxx xxx
3206-RLB29-9-CE-1015 B 1Ras Laffan Industrial City Waste Management Facility Sections –
Administration Building Part Axxxx xxx
3206-RLB29-9-CE-1016 B 1Ras Laffan Industrial City Waste Management Facility Staircase
Detail – Administration Building – Part Axxxx xxx
3206-RLB29-9-SC-1006 B 1Ras Laffan Industrial City Waste Management Facility Slab on
Ground Layout – Transfer Station Building – Part Axxxx xxx
3206-RLB29-9-SC-2004 B 1Ras Laffan Industrial City Waste Management Facility Structural GA
of Foundation and Pedestals Transfer Station Building – Part Axxxx xxx
3206-RLB29-9-SC-2015 B 1Ras Laffan Industrial City Waste Management Facility Structural GA
of Foundation and Columns – Administration Building Part A xxxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 6 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 7/20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 8/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
3206-RLB29-4-12-0001 A 30HSSD Calculation For Ground Floor Electrical Room And First FloorTechnical Room
xxxx xxx
5.4.6 Mechanical N/A
5.4.7 Process N/A
5.4.8 Pipeline N/A
5.4.9 Telecommunications xxxx xxx
5.4.10 Buildings xxxx xxx
3708-RFWMF-9-12-0005 2 8 Drainage Calculation Report xxxx xxx
5.5 SCHEDULE xxxx xxx
5.5.1 General & Multi Discipline - Common N/A
5.5.2 Civil xxxx xxx
5.5.3 Electrical xxxx xxx
3708-RFWMF-2-37-0001 A 2 Power & Earthing Cable Schedule- Part B ( 2 sheets)
5.5.4 Safety & Loss Prevention N/A
5.5.5 Instrumentation N/A
3708-RFWMF-4-37-0006 2 2 Fire & Gas Cable Schedule - Part- B
5.5.6 Mechanical N/A
5.5.7 Process N/A
5.5.8 Pipeline N/A
5.5.9 Telecommunications xxxx xxxx
5.6 PROCEDURES /METHOD STATEMENTS
5.6.1 General & Multi Discipline - Common xxxx xxx
3708-RLGE-1-19-0001 A 17 Method Statement For Site Facilities xxxx xxx
3708-RLGE-1-19-0003 A 17 Method Statement For Survey Works xxxx xxx
5.6.2 Civil xxxx xxx
3708-RLGE-1-19-0004 A 13 Method Statement & JSA for Compaction Test xxxx xxx
3708-RLGE-1-19-0005 A 21 Method Statement & JSA for Excavation & Back Filling Works xxxx xxx
3708-RLGE-1-19-0006 A 44 Method Statement & JSA for Concrete Works xxxx xxx
3708-RLGE-1-19-0007 A 22 Method Statement & JSA for Roof Water Proofing System xxxx xxx
3708-RLGE-1-19-0008 A 21 Method Statement & JSA for Site Grading Works xxxx xxx
3708-RLGE-1-19-0009 A 25 Method Statement & JSA for Block Works xxxx xxx
3708-RLGE-1-19-0010 A 20 Method Statement & JSA for Suspended Ceilings xxxx xxx
3708-RLGE-1-19-0011 A 23 Method Statement & JSA for Soft Landscaping Works xxxx xxx
3708-RLGE-1-19-0012 A 11 Method Statement & JSA for Plate Bearing Test xxxx xxx
3708-RLGE-1-19-0013 A 18 Method Statement & JSA for Utility Trenching Works xxxx xxx
3708-RLGE-1-19-0014 A 21 Method Statement & JSA for Tile Fixing xxxx xxx
3708-RLGE-1-19-0015 A 21 Method Statement & JSA for Substructure Water Proofing xxxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 8 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 9/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
3708-RLGE-1-19-0016 A 20 Method Statement & JSA for Soak Away xxxx xxx
3708-RLGE-1-19-0017 A 26 Method Statement & JSA for Asphalt Road Works xxxx xxx
3708-RLGE-1-19-0018 C 48 Method Statement & JSA for Pre-Engineering Building xxxx xxx
3708-RLGE-1-19-0019 A 23 Method Statement & JSA for Plastering Works xxxx xxx
3708-RLGE-1-19-0020 A 25 Method Statement & JSA for Metal Doors & Windows Installation xxxx xxx
3708-RLGE-1-19-0021 A 13 Method Statement & JSA for Epoxy Flooring xxxx xxx
3708-RLGE-1-19-0022 A 26 Method Statement & JSA for Painting Works xxxx xxx
3708-RLGE-1-19-0023 A 21 Method Statement & JSA for Dewatering Works xxxx xxx
3708-RLGE-1-19-0024 A 20 Method Statement & JSA for Soil Investigation xxxx xxx
3708-RLGE-1-19-0025 A 26 Method Statement & JSA for Installation of Interlock and Kerbstone xxxx xxx
3708-RLGE-1-19-0026 A 34Method Statement & JSA for New Irrigation Line by Golden Nails
Decoration & Landscapingxxxx xxx
3708-RLGE-1-19-0027 A 61 Method Statement & JSA For Installation Of Project Sign Board xxxx xxx
3708-RLGE-1-19-0028 A 19 Method Statement For Bolt Tightening xxxx xxx
5.6.3 Electrical xxxx xxx
3708-RLGE-2-19-0001 A 34Method Statement & JSA for Installation of PVC Conduits
Embedded at Surface & Concealed Slabs/Wallsxxxx xxx
3708-RLGE-2-19-0002 A 27Method Statement & JSA for Pulling Wire through GI Conduits &
Trunkingsxxxx xxx
3708-RLGE-2-19-0003 A 26Method Statement & JSA for Installation of GI Cable Tray, Trunking
& Ladder xxxx xxx
3708-RLGE-2-19-0004 A 23 Method Statement & JSA for GI Conduits & Accessories xxxx xxx
3708-RLGE-2-19-0008 A 24 Method Statement & JSA for Earthing and Bonding System xxxx xxx
3708-RLGE-2-19-0007 A 38Method Statement for the Low Voltage Cable
Pulling/Laying/Installation on Cable Trayxxxx xxx
3708-RLGE-2-19-0011 A 64Method Statement for Installation of UG Ducts, Fibre Optics, Copper
Cabling Pulling and Terminationxxxx xxx
3708-RLGE-2-19-0013 A 35Method Statement for Testing & Commissioning of Wirings,
Switches, Sockets and Industrial Socket Outletsxxxx xxx
3708-RLGE-2-19-0005 A 22 Method Statement & JSA for Fire Alarm System xxxx xxx
3708-RLGE-2-19-0006 A 25 Method Statement & JSA for Structured Cabling System xxxx xxx
3708-RLGE-2-19-0010 A 22 Method Statement & JSA for Installation of High Mast Lighting xxxx xxx
3708-RLGE-2-19-0014 A 16Method Statement & JSA for Installation of Uninterruptible Power
System (UPS)xxxx xxx
3708-RLGE-2-19-0015 A 27Method Statement & JSA for the Installation of Tie in for Electrical
Power Supply.xxxx xxx
3708-RLGE-2-19-0016 A 41 Method Statement & JSA For Underground Cable Laying xxxx xxx
5.6.4 Safety & Loss Prevention xxxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 9 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 10/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
5.6.5 Instrumentation N/A
5.6.6 Mechanical N/A
5.6.7 Process N/A
5.6.8 Pipeline N/A
5.6.9 Telecommunications xxxx xxx
5.6.10 Buildings xxxx xxx
3708-RLGE-9-19-0001 A 31Method Statement for the Installation And Testing of Fire Fighting
Systemxxxx xxx
3708-RLGE-9-19-0002 A 25 Method Statement for Plumbing and Drainage System xxxx xxx
3708-RLGE-9-19-0003 A 24 Method Statement for the HVAC System Works xxxx xxx
3708-RLGE-9-19-0004 A 32Method Statement & JSA for the Installation And Testing of External
Underground Sewerage (HDPE) Pipesxxxx xxx
3708-RLGE-9-19-0005 A 30 Method Statement for the Installation of GRP Pipes and fittings xxxx xxx
3708-RLGE-9-19-0006 A 32Method Statement & JSA for Tie in Connection of Potable Water
Supply and irrigation Line Systemxxxx xxx
3708-RLGE-9-19-0010 A 22 Method Statement For The Installation Of Pex Pipes xxxx xxx
5.7 COMPLETED TIE-IN INFORMATION xxxx xxx
5.7.1 General & Multi Discipline - Common N/A
5.7.2 Civil xxxx xxx
5.7.3 Electrical N/A
5.7.4 Safety & Loss Prevention N/A
5.7.5 Instrumentation N/A
5.7.6 Mechanical N/A
5.7.7 Irrigation Network N/A
5.7.8 Process N/A
5.7.9 Pipeline N/A
5.7.10 Telecommunications N/A
5.8 OTHER DOCUMENTATION
5.8.1 Conceptual Studies drawings N/A
5.8.2 Safety Study Reports N/A3708-RLGE-3-04-0004 A 16 ATC – Risk Management Plan
5.8.3 Work actity schedule N/A
5.8.4 Utilities Summaries N/A
5.8.5 General & Technical Reports
6.0 ENVIRONMENTAL DOCUMENTATION xxxx xxx
6.1Initial Environmental Authorizations (IEA) including applications and
approvalsN/A
6.2 Environmental Impact Assessements (EIA) reports N/A
6.3 Environmental Clearance Documents xxxx xxx
6.4 Consent-To-Operate Applications and Permits xxxx xxx
7.0 PROJECT CERTIFICATION
7.1 CONSTRUCTION CONTRACT xxxx xxx7.1.1 EPIC Of Waste Management Facility xxxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 10 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 11/20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 12/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
WMF/J-468/NCR(I)-010 NA
Improper application of water proofing membrane for sub structure
columns, found air voids and damaged joints, which is not
acceptable as per project specification 7 approved method
statement for sub structure water proofing.
xxxx xxx
WMF/J-468/NCR(I)-011 NAMinor damage to surface finish of the transfer station concrete floor
(G/L: C-E/1-6), due to lack of protection during shuttering work.xxxx xxx
WMF/J-468/NCR(I)-012 NA
Minor defects on the retaining wall of transfer station building G/L: C-
E/6-8, such as slight lack of alignment and straightness, filling of yie
rod holes and cleaning of concrete grout splash.
xxxx xxx
WMF/J-468/NCR(I)-013 NA82MM UPVC pipe was provided for storm water drainage in the CB-
15 and CB-16 instead of 110mm pipe.xxxx xxx
WMF/J-468/NCR(I)-014 NAGI Box was not provided in the rest room at point of PVC to GI
conduit in the ground floor administration building.xxxx xxx
WMF/J-468/NCR(I)-015 NAInternal clearance was not taking by civil contractor before
proceeding to laying electrical cable duct crossing.xxxx xxx
WMF/J-468/NCR(I)-016 NAInstallation of Telecom Underground laying with spacer without
material Inspection approval for ducts spacer xxxx xxx
WMF/J-468/NCR(I)-017 NA
Found thin hair line crack network on external plastered wall surface
of transfer station building along G/L: 1-2/E due to improper curing,
this is not complied with the approved method statement and
specification standards
xxxx xxx
WMF/J-468/NCR(I)-018 NAInstallation of UPVC Pipes for irrigation water supply works in
external area without approved ITP.xxxx xxx
WMF/J-468/NCR(I)-019 NAInstallation of threaded rod (HVAC system) in administration
building without approved ITPxxxx xxx
WMF/J-468/NCR(I)-020 NA
The sub base back filling material layed above the compacted
subgrade level along chainage: +240 to +260m of Tilal road found
unsuitable and noticed an uneven surface.
xxxx xxx
Internal CARs
CAR/NCR-01 NA
Subgrade fill material from supplier qbc were found not complying to
project requirement, despite internal ncr (WMF/J-468/NCR-001 , Dt:
08-Jun-14) raised by contractor's qa/qc engineer for the rejected
delivered materials at site, qbc repeatdle supplied the non
conforming earth fill ( large boulder particles notably exceeding
75mm when checked at site stockpile)
xxxx xxx
CAR/NCR-02 NA
The contractor's RFI and some check list forms are not having
document controlling form number which is not in accordance to
Section-1, Part 8.4 of QCS-2010 and section-6 of QP-STD-Q004
Rev1.
xxxx xxx
CAR/NCR-03 NA
PVC conduits installation copleted without the approval of itp # 3708-
ITP-ELE-0001, please refre RFI # 3708-RFI-MEP-0001 for pvc
conduits installation, also the RFI was not referred to related ITP
and method statement
xxxx xxx
CAR/NCR-04 NA
Following Non conformances are noted during lamination of GRP
fire wayer piping near transfer station building. 1)
These installed pipe material are not yet inspected and approved by
QP. Material inspection for GRP pipes and fittings is a witness point
for QP. This is violation of clause B.2 of the contractor's proposed
ITP 3708-ITP-MECH-0005 Rev2 & clause 7.4.3 of ISO 9001:2008.
2) The inspection test plan(ITP) is not yet approved by QP for GRP
site works. This is violation of clause 3.4.1.7 of contract scope of
work (SOW) Part A (Page no. 74 of 3314).
xxxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 12 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 13/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
8.1.8 Audits, Audit Log, Audit Reports xxxx xxx
Audit Log xxxx xxx
Internal Audit Report xxxx xxx
Audit Report No.01 xxxx xxx
QP Audit Report xxxx xxx
GC13113400/QAC/01/2015 N/A 5 Audit Report No.01 xxxx xxx
8.1.9 Concession Requests xxxx xxx
3708-TQ-0001 0 1Technical Query of Details for Sabkha Treatment Under the
Foundationsxxxx xxx
3708-TQ-0002 0 3 Technical Query for Foul / Septic Tank Access Foot Rests
3708-TQ-0003 1 19 Technical Query for UPS for Telephone system & Ethernet switch
3708-TQ-0004 2 21 Technical Query f or Part-B, Ditches Along the Designed Roads
8.1.10 Site Inspection & Test Plan xxxx xxx
8.1.10.1 Civil xxxx xxx
3708-ITP-CIV-0002 A 21 Inspection Test Plan (ITP) for Asphalt Road Works xxxx xxx
3708-ITP-CIV-0003 A 7 Inspection Test Plan (ITP) for Block Works xxxx xxx
3708-ITP-CIV-0004 A 12 Inspection Test Plan (ITP) for Soft Landscaping xxxx xxx
3708-ITP-CIV-0005 A 7 Inspection Test Plan (ITP) for Suspended Ceiling xxxx xxx
3708-ITP-CIV-0006 A 11 Inspection Test Plan (ITP) for Concrete Works xxxx xxx
3708-ITP-CIV-0008 A 6 Inspection Test Plan (ITP) for Epoxy Flooring xxxx xxx
3708-ITP-CIV-0009 A 10 Inspection Test Plan (ITP) for Excavation and Backfilling xxxx xxx
3708-ITP-CIV-0010 A 7 Inspection Test Plan (ITP) for Paint Works xxxx xxx
3708-ITP-CIV-0012 A 9 Inspection Test Plan (ITP) for Plastering Works xxxx xxx
3708-ITP-CIV-0014 A 8 Inspection Test Plan (ITP) for Site Grading Works xxxx xxx
3708-ITP-CIV-0015 A 12 Inspection Test Plan (ITP) for Soak Away xxxx xxx
3708-ITP-CIV-0016 A 6 Inspection Test Plan (ITP) for Substructure Water Proofing xxxx xxx
3708-ITP-CIV-0017 A 6 Inspection Test Plan (ITP) for Survey Works xxxx xxx
3708-ITP-CIV-0018 A 7 Inspection Test Plan (ITP) for Tiles Work xxxx xxx
3708-ITP-CIV-0019 A 4 Inspection Test Plan (ITP) for Utility Trenching Works xxxx xxx
3708-ITP-CIV-0020 A 20Inspection Test Plan (ITP) for Kerbstone & Interlock Pavement
Worksxxxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 13 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 14/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
3708-ITP-CIV-0021 A 7Inspection Test Plan (ITP) For Grouting (Void Between Pedestal &Base Plate)
xxxx xxx
3708-ITP-CIV-0022 A 8Inspection And Test Plan (ITP) For Wood, Carpentry & Joinery
Worksxxxx xxx
8.1.10.2 Electrical xxxx xxx
3708-ITP-ELE-0001 A 3Inspection Test Plan (ITP) for the Installation of PVC Conduits
Embedded in Slabs/Wallsxxxx xxx
3708-ITP-ELE-0002 A 4Inspection Test Plan (ITP) for Pulling Wires through GI Conduits
and Trunkingxxxx xxx
3708-ITP-ELE-0003 A 3Inspection Test Plan (ITP) for the Instal lation of GI Cable Tray,
Trunking and Ladder xxxx xxx
3708-ITP-ELE-0008 A 7Inspection Test Plan (ITP) for the Installation of Earthing and
Bonding System.xxxx xxx
3708-ITP-ELE-0011 A 11Inspection Test Plan (ITP) for the Installation of Underground Ducts,
Fiber Optics, Copper Cable Pulling and Terminations.xxxx xxx
3708-ITP-ELE-0009 A 10Inspection Test Plan (ITP) for the Testing & Commissioning of the
Internal and External Lighting Fixturesxxxx xxx
3708-ITP-ELE-0013 A 16Inspection Test Plan (ITP) for Installation, Testing & Commissioning
of Wirings, Switches, Isolator, Sockets and Industrial Socket Outletsxxxx xxx
3708-ITP-ELE-0007 A 10Inspection Test Plan (ITP) for Low Voltage Cable
Pulling/Laying/Installation on Cable Trayxxxx xxx
3708-ITP-ELE-0006 A 5Inspection Test Plan for the Installation of Structured Cabling
Systemxxxx xxx
3708-ITP-ELE-0010 A 11 Inspection Test Plan (ITP) for the installation of High Mast Lighting xxxx xxx
3708-ITP-ELE-0014 A 16
Inspection Test Plan (ITP) for the Installation of Uninterruptible
Power System (UPS) xxxx xxx
3708-ITP-ELE-0015 A 6Inspection Test Plan (ITP) for the Installaion of Tie in for Electrical
Power Supplyxxxx xxx
3708-ITP-ELE-0012 A 16Inspection Test Plan (ITP) for the Installation of LV Panel, DB,
Control Panel (Roof Extract Fan, HVAC, Lighting) & Feeder Pillar xxxx xxx
8.1.10.3 Telecom xxxx xxx
8.1.10.4 Loss Prevention xxxx xxx
3708-ITP-LP-0001 A 16Inspection Test Plan (ITP) for the Installation, Testing and
Commissioning of Fire Alarm Systemxxxx xxx
8.1.10.5 Instrumentation xxxx xxx
8.1.10.6 Mechanical xxxx xxx
3708-ITP-MECH-0002 A 21 Inspection Test Plan (ITP) for Internal and External Drainage Works xxxx xxx
3708-ITP-MECH-0004 A 7Inspection Test Plan (ITP) for the installation and Testing of External
Underground Sewerage HDPE Pipesxxxx xxx
3708-ITP-MECH-0001 A 8Inspection Test Plan (ITP) for the Installation and Testing of Fire
Fighting Systemxxxx xxx
3708-ITP-MECH-0009 A 5 Inspection Test Plan (ITP) for the installation of PEX Pipes xxxx xxx
3708-ITP-MECH-0014 A 6 Inspection Test Plan (ITP) for the Installation of CPVC Pipes xxxx xxx
3708-ITP-MECH-0003 A 13 Inspection Test Plan (ITP) for HVAC System Works xxxx xxx
8.1.11 Material Approval Request xxxx xxx
N/A List of Material Approval xxxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 14 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 15/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
8.1.12 Valve Test Reports N/A
8.1.13 Material Test Reports
3708-RFWMF-1-17-0005 1 14 Test Reports for Sub-Base Material (Class B) xxxx xxx
8.1.14 Consumable Test Certificates N/A
8.1.15 Equipment Certificates N/A
8.1.16 Third Party Inspection Reports N/A
8.1.17 Approved Material Submittals xxxx xxx
8.1.17.1 Civil
3708-MS-CIV-0040 1 82 Material Submittal for Weigh Bridge - Rice Lake, India xxxx xxx
3708-MS-CIV-0032 0 29
Material Submittal for Manhole Cover and Catch Basin Grating -
Ducast Factory L.L.C. xxxx xxx
3708-MS-CIV-0002 0 90 Material Submittal for Steel Reinforcement Bars - Skyeye Company xxxx xxx
3206-MS-CIV-0013 3 20Material Submittal for Ceramic, Porcelain Tiles & Skirting - Tadmur
Trading W.L.L.xxxx xxx
3708-MS-CIV-0014 1 48Material Submittal for Polysulphidemastic Joint Sealant - Tadmur
Trading W.L.L.xxxx xxx
3708-MS-CIV-0015 1 43Material Submittal for Concrete Repair Mortar - Tadmur Trading
W.L.L.xxxx xxx
3708-MS-CIV-0020 1 10Material Submittal for Non-Shrink Cementitious Grout - Tadmur
Trading W.L.L.xxxx xxx
3708-MS-CIV-0004 1 17 Material Submittal for 1000 Gauge Polythelene Sheet - Petro Plastic xxxx xxx
3708-MS-CIV-0005 1 34
Material Submittal for 6mm Thick Protection Board - Tadmur
Trading W.L.L. xxxx xxx
3708-MS-CIV-0006 1 30Material Submittal for Water Proof Membrane (Substructure) -
Tadmur Trading W.L.L.xxxx xxx
3708-MS-CIV-0007 1 67Material Submittal for 50mm Extruded Rigid Polystrene Insulation
Board - Tadmur Trading W.L.L.xxxx xxx
3708-MS-CIV-0008 1 20Material Submittal for 4mm Thick Water Proofing Membrane -
Tadmur Trading W.L.L.xxxx xxx
3708-MS-CIV-0009 1 74Material Submittal for Geotextile Filter Membrane - Tadmur Trading
W.L.L.xxxx xxx
3708-MS-CIV-0049 1 41 Material Submittal for Blow Hole Filler - Tadmur Trading W.L.L. xxxx xxx
3708-MS-CIV-0011 1 40Material Submittal for 50mm Thick Insulation Board for Roof -
Tadmur Trading W.L.L.xxxx xxx
3708-MS-CIV-0012 1 11
Material Submittal for 20mm/25mm Thick Joint Filler Board - Jolly
Board Ltd. xxxx xxx
3708-MS-CIV-0013 0 20Material Submittal for Plaster and Block Wall Accessories -
Expanded Metal Manufacturing Company (EXMET)xxxx xxx
3708-MS-CIV-0018 1 29 Material Submittal for Tile Adhesive - Tadmur Trading W.L.L. xxxx xxx
3708-MS-CIV-0019 0 37 Material Submittal for Tile Grout - Tadmur Trading W.L.L. xxxx xxx
3708-MS-CIV-0056 3 5 Material Submittal for Purlin Coil - Mabani Steel L.L.C. xxxx xxx
3708-MS-CIV-0057 3 6 Material Submittal for Welding Electrode - Mabani Steel L.L.C. xxxx xxx
3206-MS-CIV-0015 1 43Material Submittal for JRC14 Manhole Covers & Accessories -
Qatar Universal Trading & Contractingxxxx xxx
3206-MS-CIV-0016 0 36 Material Submittal for Non-Woven Geo Textile Membrane xxxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 15 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 16/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
3708-MS-CIV-0003 1 Material Submittal for Anti Termite xxxx xxx
3708-MS-CIV-0061 0 8 Material Submittal for Sub-Grade Filling Material xxxx xxx
3708-MS-CIV-0062 0 14 Material Submittal for Sub-Base Material (Class B) xxxx xxx
3708-MS-CIV-0065 2 46 Material Submittal for Non-Woven Geo Textile Membrane (Part B) xxxx xxx
3708-MS-CIV-0028 1 51 Material Submittal for Internal and External Paint xxxx xxx
3708-MS-CIV-0029 1 77Material Submittal for 400 Micron Heavy Duty & Chemical
Resistance Industrial Epoxy Flooring Systemxxxx xxx
3708-MS-CIV-0033 1 25 Material Submittal for Crash Barriers xxxx xxx
3708-MS-CIV-0039 0 42 Material Submittal for Asphalt Paving xxxx xxx
3206-MS-CIV-0017 0 105 Material Submittal for Chain Link Fence xxxx xxx
3206-MS-CIV-0009 0 91 Material Submittal for Mineral Fiber Suspended Ceiling System xxxx xxx
3206-MS-CIV-0018 0 104 Material Submittal for 600x600 Metal Ceiling System xxxx xxx
3206-MS-CIV-0008 0 9 Material Submittal for Gypsum Board Ceiling xxxx xxx
3206-MS-CIV-0020 0 8 Material Submittal for Wash Sand (Fine Aggregate) xxxx xxx
3206-MS-CIV-0007 1 62 Material Submittal for Raised Access Flooring with PVC Vinyl Finish xxxx xxx
3206-MS-CIV-0012 3 50Material Submittal for Granite Stone - M/S Xiamen Interrock Stone
Co.Ltd / M/S Oriental Touch L.L.C. Qatar xxxx xxx
8.1.17.2 Electrical xxxx xxx
3206-MS-ELE-0001 2 163 Material Submittal for GRP Cable Tray & Accessories xxxx xxx
3206-MS-ELE-0002 5 122 Material Submittal for Lighting Fixtures for Part A xxxx xxx
3206-MS-ELE-0005 3 59Material Submittal for Un-Interruptible Power Supply (UPS) for Part
Axxxx xxx
3206-MS-ELE-0006 1 22Material Submittal for Flood Light (For High Mast Lighting)- MS
Gewiss Italy / MS Darwish Trading WLLxxxx xxx
3708-MS-ELE-0023 0 64Material Submittal for Supports for Cable Tray & Trunkings- M/S
HILTI Qatar WLLxxxx xxx
3708-MS-ELE-0024 1 12 Material Submittal for Exit Lights (Zumtobel -Austria) xxxx xxx
3708-MS-ELE-0025 1 102 Material Submittal for Wires & Cables (M/S Doha Cables) xxxx xxx
3708-MS-ELE-0022 0 76Material Submittal for Un-Interruptible Power Supply (UPS) For Part
B (Dale Power Solutions–UK / Al Moayyed International Group)xxxx xxx
8.1.17.3 Telecom xxxx xxx
3206-MS-TEL-0001 1 110Material Submittal for Telecommunication Structured Cabling &
Accessories (Bulk Materials) for Part Axxxx xxx
3708-MS-TEL-0001 1 80Telecommunication Structured Cabling & Accessories (Bulk
Materials) For Part B (Panduit, Rittal, Cisco / Consolidated Gulf Co.)xxxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 16 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 17/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
8.1.17.4 Material Submittal for Loss Prevention xxxx xxx
3206-MS-LP-0002 1 9 Material Submittal for Eye Wash/Safety Shower xxxx xxx
3206-MS-LP-0003 1 240 Material Submittal for GRP Pipes & Fittings xxxx xxx
3206-MS-LP-0001 1 207Material Submittal for Fire & Gas Alarm System (Bulk Materials) for
Part-Axxxx xxx
3708-MS-LP-0002 1 28 Material Submittal for Fire Alarm Cables xxxx xxx
3708-MS-LP-0008 1 74 Material Submittal for Fire Water Tank – M/S Bridge Stone- Japan xxxx xxx
3708-MS-LP-0009 1 28
Material Submittal for Fire Hydrant- (Hydrant Post, Hydrant Valve &
Storz Coupling: M/s. Steel Recon Industries (SRI)- Malaysia, Gate
Valve: Kennedy- USA/ M.s. Fire Link WLL)
xxxx xxx
3206-MS-LP-0004 1 15Material Submittal for Manual Call Point (Weather Proof) – M/s
Simplex-Grinnel-USA / M/s JBK Controls WLL-Qatarxxxx xxx
8.1.17.5 Material Submittal for Buildings xxxx xxx
3206-MS-BS-0001 2 110Material Submittal for UPVC Pipes & Fittings for Internal Drainage
(Underground & Aboveground)xxxx xxx
3206-MS-BS-0002 2 70Material Submittal for UPVC Pipes & Fittings for External
Underground Drainagexxxx xxx
3206-MS-BS-0019 4 101 Material Submittal for Dust Supression System xxxx xxx
3206-MS-BS-0005 3 63Material Submittal for High Pressure UPVC Pipes for
Below Ground Portable & Irrigation Water Supplyxxxx xxx
3206-MS-BS-0003 3 131 Material Submittal for PEX Pipes & Fittings xxxx xxx
3206-MS-BS-0007 2 25 Material Submittal for Plumbing Valves xxxx xxx
3206-MS-BS-0006 2 14 Material Submittal for Pipe Insulation xxxx xxx
3206-MS-BS-0008 1 23 Material Submittal for Water Hammer Arresters xxxx xxx
3206-MS-BS-0014 1 11Material Submittal for Floor Grating & Floor Cleanout Covers for
Administration Buildingxxxx xxx
3206-MS-BS-0004 1 85 Material Submittal for CPVC Pipes & Fittings for Water Supply xxxx xxx
3206-MS-BS-0011 1 10 Material Submittal for Kitchen Sink xxxx xxx
3206-MS-BS-0016 2 88 Material Submittal for Water Booster Pump Sets xxxx xxx
3206-MS-BS-0017 2 88 Material Submittal for Irrigation Booster Pump Sets xxxx xxx
3206-MS-BS-0022 2 89 Material Submittal for Water Transfer Pump Sets xxxx xxx
3206-MS-BS-0010 3 47Material Submittal for Sanitary Fittings & Accessories (Bulk
Materials)xxxx xxx
3206-MS-BS-0012 2 15 Material Submittal for Angle Valves xxxx xxx
3206-MS-BS-0020 1 14 Material Submittal for Water Meter xxxx xxx
3206-MS-BS-0013 1 48Material Submittal for Support for Plumbing & Drainage Pipes (Bulk
Material)xxxx xxx
3206-MS-BS-0015 1 129 Material Submittal for GRP Insulated Sectional Water Tanks xxxx xxx
3708-RLGE-0-40-0002 REV. 0 Page 17 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 18/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
3206-MS-BS-0018 3 85 Material Submittal for Electric Water Heaters xxxx xxx
3206-MS-BS-0024 0 14 Material Submittal for Floor Gully (for Administration Building) xxxx xxx
3206-MS-BS-0027 0 50
Material Submittal for Fittings for High Pressure UPVC Pipes (For
Below Ground Potable & Irrigation Water Supply) –M/s. Georg
Fischer –Switzerland /M/s. Hepworth Company W.L.L –Doha -
Qatar
xxxx xxx
8.1.17.6 HVAC xxxx xxx
3206-MS-HVAC-0004 2 36 Material Submittal for Air Curtains xxxx xxx
3708-MS-HVAC-0002 1 19 Material Submittal for Refrigerant Pipes xxxx xxx
3206-MS-HVAC-0007 0 109 Material Submittal for Fibre Glass Duct Insulation xxxx xxx
3708-MS-HVAC-0001 3 35 Material Submittal for High Wall Split AC Units xxxx xxx
3206-MS-HVAC-0001 3 101 Material Submittal for Packaged Type Air Conditioning Units xxxx xxx
3206-MS-HVAC-0006 3 209 Material Submittal for Galvanized Steel Duct Sheets xxxx xxx
3206-MS-HVAC-0005 2 30 Material Submittal for Variable Air Volume Units xxxx xxx
3206-MS-HVAC-0002 4 33 Material Submittal for Roof Extract Fans xxxx xxx
3206-MS-HVAC-0003 4 49 Material Submittal for Twin Box Type Extract Fans xxxx xxx
3708-MS-HVAC-0004 2 16 Material Submittal for Anti Vibration Pads- M/S Weicco WLL/ M/SLeminar Air conditioning Co. WLL-Doha
xxxx xxx
3708-MS-HVAC-0005 0 45
Aluminium Sheet for HVAC Duct Cladding (HINDALCO Industries
Limited. India/Qatar Air Distribution Network Manufacturing factory
W.L.L)
xxxx xxx
3708-MS-HVAC-0006 0 64
Material Submittal for Exhaust Fans For Part-B (M/s. Elicent -
(Parent Company MAICO Italia S.P.A)-Italy / M/s. Qatar Insulation
Co. Qatar)
xxxx xxx
8.2 8.2 CONSTRUCTION DATA BOOK - PAINTING / INSULATION
8.2.1 Painting Check Sheets N/A
8.2.2 Insulation Check Sheets N/A
8.2.3 Painting Works Construction Quality Control forms N/A
8.3 CONSTRUCTION DATA BOOK - WELDING
8.3.1 Welding Procedures & Register xxxx
8.3.2 Welding Procedures Qualifications N/A
8.3.3 Welders Qualifications & Register xxxx
8.3.4 Welding Reports N/A
8.3.5 Welding Inspector's Qualifications N/A
8.3.6 Weld Tracking Log/Records N/A
8.3.7 Welding Procedure Specifications (WPS) N/A
8.4 CONSTRUCTION DATA BOOK - INSPECTION RECORDS
8.4.1 Magnetic Particle Inspection Register (MPI) N/A
8.4.2 Radiographic Reports N/A
8.4.3 Ultrasonic Reports N/A
8.4.4 NDT Procedure N/A8.4.5 Personnel Qualifications & Register N/A
3708-RLGE-0-40-0002 REV. 0 Page 18 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 19/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
8.4.6 PWHT Charts N/A
8.4.7 Hardness Test Reports N/A
8.4.8 NDT Reports & Index N/A
8.4.9 Radiographs Films N/A
8.4.10 Dimensional Inspection Records N/A
8.4.11 Spools / Item release Certificate N/A
8.4.12 PWHT Certifications Showing Temperature Ranges etc. N/A
8.5 CONSTRUCTION DATA BOOK - HYDROTEST
8.5.1 P&ID Mark-ups indicating Limits N/A
8.5.2 Limits of Hydro Test Packs N/A
8.5.3 Hydro Test Packs & Reports N/A
8.6 CONSTRUCTION DATA BOOK - STRUCTURAL
8.6.1Mechanical & Steel Structural Works - Construction Quality Control
FormsN/A
8.7 CONSTRUCTION DATA BOOK - CIVIL
8.7.1 Concrete Cube test certificate xxxx xxx
8.7.2 Batching plant Mix Design Certificate xxxx xxx
8.7.3 Concrete Slump Test certificates xxxx xxx
8.7.4 Reinforcement Test Certificates xxxx xxx
8.7.5 Pour Records xxxx xxx
8.7.6 Pile load test certificates N/A
8.7.7 Geo-Tech and Topographical Survey Report xxxx xxx
8.7.8 Civil works Construction Quality Control forms N/A
8.7.9 Earthworks excavation / subgrade xxxx xxx
8.7.10 Subase/ Roadbase xxxx xxx
8.7.11 Asphalt base course xxxx xxx
8.7.12 Asphat wearing course xxxx xxx
Road Evenness test Reports xxxx xxx
8.7.13 Prime / Tack coat xxxx xxx
8.7.14 Field density test roads xxxx xxx
8.7.15 Kerb stone works xxxx xxx
8.7.16 Pile culverts xxxx xxx
8.7.17 Irrigation landscaping xxxx xxx
8.7.18 Road Makring paint xxxx xxx
8.7.19 Road Traffic Signs xxxx xxx
8.7.20 Tensioning and alignment report for Tensioned corrugated beams xxxx xxx
8.7.21 Protection Slabs xxxx xxx
8.7.22 Soakways xxxx xxx
8.7.23 Highmast / Traffic pole painting xxxx xxx
8.7.24 Miscellaneous xxxx xxx
8.8 CONSTRUCTION DATA BOOK - ELECTRICAL
8.8.1 Electrical Equipment Check Sheets N/A
8.8.2 Electrical Cable Continuity and Insulation Check sheets xxxx xxx
8.8.3 Lighting Check sheets xxxx xxx
8.8.4 Earthing Check Sheets xxxx xxx
8.8.5 Electrical Construction Quality Control Forms N/A
8.8.6 Acceptance Test Reports xxxx xxx
8.9 CONSTRUCTION DATA BOOK - INSTRUMENTATION
8.9.1 Instrument Pressure Testing Schedule Process Piping N/A
3708-RLGE-0-40-0002 REV. 0 Page 19 of 20
8/18/2019 3708-RLGE-0-40-0002-0 not signed
http://slidepdf.com/reader/full/3708-rlge-0-40-0002-0-not-signed 20/20
Sec &
S/SecS/S/Sec Doc No Rev.
No of
Shts Description Sect.Vol.No. Book No
PROJECT DOSSIER - SECTION INDEX
This Section Contains xxx Volumes
8.9.2 Instrument Pre-Installation Calibration sheets N/A
8.9.3 Relief Valve Pre-Installation Check Sheets N/A
8.9.4ns r umen an on r o a e on nu y an n s a a on ec
SheetsN/A
8.9.5 Hydro Test Instrument Calibration check Sheets N/A
8.9.6 Instrument Earthing Check sheets N/A
8.9.7 Instrumentation Works Construction Quality Control Forms N/A
8.10CONSTRUCTION DATA BOOK - MATERIAL TRACEABILITY
RECORDSN/A
8.11 CONSTRUCTION DATA BOOK - TELECOM xxxx xxxx
Traffic light accessories and Control Cable Continuity and
Installation Check Sheetsxxxx xxx
Earthing Check sheets xxxx xxx
Request for inspections xxxx xxx
9 "AS- BUILT" DRAWINGS xxxx xxx
9.0 "AS- BUILT" Drawing index xxxx xxx
9.1 General & Multi Discipline - Common xxxx xxx
9.2 Civil xxxx xxx
9.3 Electrical xxxx xxx
9.4 Safety & Loss Prevention N/A
9.5 Instrumentation N/A
9.6 Mechanical N/A
9.7 Process N/A
9.8 Pipeline N/A
9.9 Telecommunications xxxx xxx
10.0PROJECT COMPLETION AND HANDOVER
DOCUMENTATION01 of 01 xxx
10.1 Project Handover xxxx
10.2 Project Acceptance xxxx
11.0 PROJECT CLOSE OUT REPORT 01 of 01 xxx
11.1 Approved Project cloes out report xxxx xxx
11.2 Asset Capitalization Schedule xxxx xxx