Information sheet 49 bitre BITRE Road Construction and Maintenance Price Index and Sub-Indexes—2013 update At a glance This information sheet presents the 2013 re-calibrated BITRE Road Construction and Maintenance Price Index (RCMPI).The revised index is an indicator of the change in input costs faced by the road construction and maintenance industry in Australia. The RCMPI monitors price changes in the following eight major inputs: (1) site-based labour; (2) office-based labour; (3) bituminous materials; (4) cement and concrete; (5) quarry products; (6) other materials; (7) plant hire/ depreciation; and (8) fuel. The re-calibrated RCMPI is now presented on a quarterly basis. In addition, the RCMPI is now calculated on an index reference period of 2011–12 = 100.0. Prior to the 2013 re-calibration, the RCMPI was referenced on 1998-99 = 100.0.This change simplifies comparison of price movements between the RCMPI and the Australian Bureau of Statistics’ producer price indexes. The input per cent shares for road construction and maintenance were re-estimated using survey data collected from 8 state/ territory road authorities, 233 local governments and 36 private sector contractors. The input per cent shares have changed over the 16 years since the last review: º Labour costs have increased to 33.9 per cent of total costs in 2013, from 25.8 per cent of total costs in 1997; º Materials costs have decreased to 37.1 per cent in 2013, from 47.7 per cent in 1997; and º Equipment costs have increased to 29.0 per cent in 2013, from 26.5 in 1997. The role of the private sector in road construction and maintenance projects within Australia has increased to 56.4 per cent, compared to 40.4 per cent in 1997. On the basis of the re-calibrated RCMPI, the cost of road construction and maintenance have increased by 1.42 percentage points between 2011–12 and 2012–13.The most significant contributors to the index increase were rises in ‘site-based labour’ and ‘bituminous materials’ costs.They were counterbalanced, to a limited extent, by falls in ‘plant hire/ depreciation’, ‘other materials’ and ‘fuel’ costs over the same period. This Information sheet introduces two new sub-indexes by major activity: construction and maintenance, and three new sub-indexes by road type: arterial, sealed local and unsealed local roads. Figure S1 shows that between 2011–12 and 2012–13, the costs for road works changed at different rates depending on the type of works activity and type of road.
Transcript

Info

rmat

ion

shee

t49

bitreBITRE Road Construction and Maintenance Price Index and Sub-Indexes—2013 update

At a glance• Thisinformationsheetpresentsthe2013re-calibratedBITRERoadConstructionandMaintenancePriceIndex

(RCMPI).TherevisedindexisanindicatorofthechangeininputcostsfacedbytheroadconstructionandmaintenanceindustryinAustralia.

• TheRCMPImonitorspricechangesinthefollowingeightmajorinputs: (1)site-basedlabour;(2)office-basedlabour;(3)bituminousmaterials;(4)cementandconcrete; (5)quarryproducts;(6)othermaterials;(7)planthire/depreciation;and(8)fuel.

• There-calibratedRCMPIisnowpresentedonaquarterlybasis.Inaddition,theRCMPIisnowcalculatedonanindexreferenceperiodof2011–12=100.0.Priortothe2013re-calibration,theRCMPIwasreferencedon1998-99=100.0.ThischangesimplifiescomparisonofpricemovementsbetweentheRCMPIandtheAustralianBureauofStatistics’producerpriceindexes.

• Theinputpercentsharesforroadconstructionandmaintenancewerere-estimatedusingsurveydatacollectedfrom8state/territoryroadauthorities,233localgovernmentsand36privatesectorcontractors.

• Theinputpercentshareshavechangedoverthe16yearssincethelastreview:º Labourcostshaveincreasedto33.9percentoftotalcostsin2013,from25.8percentoftotalcostsin1997;º Materialscostshavedecreasedto37.1percentin2013,from47.7percentin1997;andº Equipmentcostshaveincreasedto29.0percentin2013,from26.5in1997.

• TheroleoftheprivatesectorinroadconstructionandmaintenanceprojectswithinAustraliahasincreasedto56.4percent,comparedto40.4percentin1997.

• Onthebasisofthere-calibratedRCMPI,thecostofroadconstructionandmaintenancehaveincreasedby1.42percentagepointsbetween2011–12and2012–13.Themostsignificantcontributorstotheindexincreasewererisesin‘site-basedlabour’and‘bituminousmaterials’costs.Theywerecounterbalanced,toalimitedextent,byfallsin‘planthire/depreciation’,‘othermaterials’and‘fuel’costsoverthesameperiod.

• ThisInformationsheetintroducestwonewsub-indexesbymajoractivity:constructionandmaintenance,andthreenewsub-indexesbyroadtype:arterial,sealedlocalandunsealedlocalroads.

• FigureS1showsthatbetween2011–12and2012–13,thecostsforroadworkschangedatdifferentratesdependingonthetypeofworksactivityandtypeofroad.

Info

rmat

ion

shee

t4

9

2

Figure S1 The changes in RCMPI and the sub-indexes from 2011–12 to 2012–13

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

Arterial SealedUnsealed

Local

MaintenanceConstructionRCMPI

Inde

x po

ints

Construction and maintenance

1.42

1.32

1.55

0.97

1.46

1.62

Incertainsituationsitmaybemoreappropriatetousethenewsub-indexesinsteadoftheRCMPI.

Between2011–12and2012–13,themaintenancesub-indexincreasedatagreaterratethantheconstructionsub-index,asthecostof‘site-basedlabour’and‘bituminousmaterials’rosefasterthanotherinputsoverthesameperiodandtheinputpercentsharesofthesecomponentsarehigherwithinthemaintenancesub-index.

1 IntroductionTheBITREroadconstructionandmaintenancepriceindex(RCMPI)isaninput-priceindexwhichhasanumberofapplications.Itisusedasadeflatortoconvertnominal(currentprices)roadexpenditureintoreal(constantprice)values.Italsoprovidesameansforcalculatingrealchangesinroadexpendituresandgovernmentroadfundinglevels(e.g.BITRE2008,2009).

Inaddition,itisusedtomeasuretherateofchangeinthepricesofgoodsandservices,whicharepurchasedbysuppliersofroadconstructionandmaintenanceservices.Itisintendedtoreflecttrendsinpricesofmajorinputcomponentsofroadconstructionandmaintenance.

Morerecently,theRCMPIservedasoneoftheinputsintheNationalTransportCommission’sdeterminationofroadchargesforheavyfreightvehicles(NTC2012).

Thecontributionofeachinputtotheoverallcostofroadconstructionandmaintenanceworkisdeterminedbytwofactors:theunitpriceoftheinputandtheinput’spercentshareinthetotalcostofroadworks.

TheRCMPIisupdatedeachquartertoreflectshiftsinthepriceofinputs.TheupdatesreliedonquarterlydatacompiledbytheAustralianBureauofStatistics(ABS)oninputpricechangesandtheAustralianInstituteofPetroleumonpricesofdieselfuel.

However,thequarterlyupdatesdonotaccountforchangesintherelativequantitiesofinputsused.Overtimechanges to industrypractice, inputprices and technological advanceswill inevitably alter the inputmix, andhencetherelativitiesinthequantitiesusedforbothmaterialandnon-materialinputs.Thechangesresultintheindex gradually deviating from the actual prices for roadworks experienced by government and industry.Theinputpercentshareschangeataslowpaceanddonotrequirefrequentre-calibration.

Overthelast30yearstheroadconstructionandmaintenanceindustryhaschangedinanumberofways,including:increaseduseofcontractorsforbothroadconstructionandmaintenance;improvedtechnologyinroadbuilding;andgreateruseofcapitalequipmentasasubstituteforlabour,whichhasgenerallybecomemoreexpensiveinresponsetogreatercompetitionfromtheminingsector.Theseindustrychangesarethemotivationsbehindthe2013RCMPIre-calibration.

Info

rmat

ion

shee

t4

9

3

AlongwithBITREthereweretwoothercontributorstoliteratureonroadindexesinAustralia.Inthepaststateroadagencieshaveproducedroadconstructionandmaintenancepriceindexes(BTCE1997).However,noneofthemhavepubliclyreleasedtheirroadpriceindexesinrecenttimes.ABSistheothercontributortoliteratureonroadindexes(seeBox1).

Box 1 Comparing the BITRE RCMPI with the ABS Road and bridge construction output price indexFrom2002,theABShaspublishedanoutputproducerpriceindexforthegeneralconstructionindustryintheAustralianandNewZealandStandardIndustrialClassification1993(ANZSIC93subdivision41).Thisindexincludesacomponentfor‘Roadandbridgeconstruction’(ANZSIC93subdivision4121).Since2005thisindexhasbeenpublishedatboththenationalandstate/territorylevels.TheABSindexandtheBITREindexareconceptuallydifferentbecausethe‘Roadandbridge’indexisanoutputpriceindexwhereastheRCMPIisaninputpriceindex.TheABS‘Roadandbridge’indextakesintoaccountthesellingpricesandincludeschangesinprofitmarginsreceivedbysuppliersofroadconstructionproducts.DespitethedifferencesinscopebetweentheABSandRCMPIindexes,thetwoindexesdonotdivergesignificantlywhencompared.Thedifferencesbetweenthetwoindexesareasfollows:

BITRE RCMPI ABS Road and bridge index

Typeofindex Itisaninputpriceindexthatmeasureschangesinthepricesofinputs.

Itisanoutputpriceindexmeasuringchangesintheprices(revenues)receivedbybusinessesundertakingroadandbridgeconstructionlessanydirecttaxpaid.

Questionbeingaskedandanswered

WhatistherateofchangeinthepricesoftheinputsusedinroadconstructionandmaintenanceinAustralia?

Whatistherateofchangeinthepricesofoutputsofroadandbridgeconstructionsoldintheperiodinquestion?

Basisoftheindex Therearetwokeypillars:(a)Inputpercentsharescollectedfromsurveysoflocalgovernments,state/territoryroadauthoritiesandprivatesectorcontractors.Thesesharesareupdatedirregularly.(b)ABSproducerpriceindexesfortheinputsrecognisedintheindex.Theseareupdatedquarterly.

ThevalueweightsarederivedfromdataonaselectionofrepresentativemainroadandhighwayprojectsinNewSouthWales,Victoria,Queensland,SouthAustraliaandWesternAustralia.Pricesfortheoutputsarecollectedquarterly,andtheyarecollectedasworkinplace.Thisisanall-inclusivepriceforaserviceorproduct.

Scope Itcoversbothnewroadconstructionandroadmaintenance.Itexcludescostoflandacquisition

Itcoversonlynewroadconstruction.Theoutputpriceexcludescostoflandacquisition

TherestoftheInformationsheetisstructuredasfollows:

• Section2providesabriefhistoryoftheRCMPI.• Section3discussesthemethodologyusedinre-calibratingtheRCMPI.• Section4discussesthemethodologyusedincalibratingthefivenewsub-indexes.Twoofthesub-indexesare

classifiedbytypeofmajoractivity:constructionandmaintenance,andthreeareclassifiedbyroadtype:arterial,sealedlocalroadsandunsealedlocalroads.

• Section5presentstheresultsandsummarisesthefindingsfromthisstudy.• Section6recapstheoutcomesofthisInformationsheet.

Road grader. ImagecourstesyofCaterpillarInc.

Info

rmat

ion

shee

t4

9

4

2 History of the RCMPIOneoftheearliestCommonwealthcontributionsinthisareawasbytheCommonwealthBureauofRoads(CBR).AftertheamalgamationoftheCBRandtheBureauofTransportEconomics(BTE)in1976,theBTEanditssuccessorscontinuedtopublishroadconstructionpriceindexes(BTE(1978),BTCE(1997),BITRE(2012,2011a)).

BITRE’sroadconstructionandmaintenanceindexhasevolvedovermanyyears.Keydatesinthisevolutionare:1981,1997and2013.

1981In1981, theBureauofTransportEconomics (BTE) introducedanew input-price index (withnoadjustmentfor productivity) and it was based on inputs purchased by the industry (for example, labour, materialsand plant). Itwaswhen the RCMPIwas created and the basicmethodology has remained the same eversince. Up to 1997 the RCMPI included six components to represent the inputs used in constructing andmaintaining roads.The six inputswere: (1) salaried labour (2)other labour (3)bitumen (4)othermaterials(5)plantacquisitionordepreciationand(6)fuel.Theinputpercentsharesforthesixfactorswerethesamefrom1981to1997.Surveydatatoestimateinputpercentshareswerecollectedfromstate/territoryroadauthoritiesandlocalgovernments,butnotcontractors.

1997In1997,afterconsultationwithanumberofstate/territoryroadauthoritiesandlocalgovernments,andtakinginto consideration data availability, two additional input components were added to the previous index:(7)concrete;and(8)quarryproducts.Theiradditionprovidedabetterrepresentationofmaterialsusedinroadconstructionandmaintenance.Togethertheycontributedabout52percentofthetotalmaterialscomponent.Furthermore,in1997itwasacknowledgedthattheproportionofroadconstructionandmaintenanceworksthatlocalgovernmentsandstate/territoryroadauthoritieswerecontractingouttoprivatesectorcontractorswasincreasing.Thereforeprivatesectorcontractorswereexplicitlyincludedinthesurveyoftheindustrytoestablishtheinputpercentsharesapplicableintheroadconstructionandmaintenancesector.

2013The2013re-calibrationoftheRCMPIintroducedchangesthataffectedthreeinputs.Upuntil2013,twoseparatelabourinputswereusedintheRCMPI:‘salariedlabour’and‘otherlabour’.Thewagecostsforthetwoinputsweremonitoredusingaverageweeklyearningsformalesinallindustries,Australia-wide.

Inanefforttoaccuratelylabelthelabourinputs,theywererenamedas‘site-basedlabour’(previously‘otherlabour’)and‘office-basedlabour’(previously‘salariedlabour’)in2013.

Moreover,inordertomonitorchangesinthecostof‘site-basedlabour’,theABSseriesonhourlyratesofpayintheconstructionsectorwereintroduced.TheABSproducerpriceindexesforengineeringdesignandengineeringconsultingwerealsointroducedtomonitorchangesinthecostof‘office-basedlabour’.Thenewindexesprovidedabetterrepresentationoflabourcostsinvolvedinroadconstructionandmaintenance.

‘Othermaterials’capturedthecostofresidualinputs,thetypeofinputsusedinroadconstructionandmaintenancewhichwerenotexplicitlynamedintheRCMPI.Upuntil2013,theABSproducerpriceindexfor‘allgroups’inputstothehouseconstructionindustrywasusedtomonitorchangesinthecostof‘othermaterials’.

Inthe2013re-calibration,theABSproducerpriceindexforreinforcingsteelwasintroducedtomonitorchangesininputcostsof‘othermaterials’toreplacetheABS‘allgroups’houseconstructioninputindex.ThereasonbeingreinforcingsteelwasoneofthemostimportantinputsnotexplicitlylistedintheRCMPI.Theyareusedforreinforcingconcretepavementsandroadfurniture.

Info

rmat

ion

shee

t4

9

5

3 Methodology: An overview of the RCMPI re-calibrationThestepsinvolvedinre-calibratingtheRCMPIareillustratedinFigure1.

Figure 1 A schematic overview of the RCMPI re-calibration

Step 1 REVIEWTHEINPUTSUSEDINRCMPI

Step 2 SURVEYSThenumberofrespondentswere:8State/territoryroadauthorities233outof558Localgovernments36Privatesectorcontractors

Step 3 TOTALROADEXPENDITUREINAUSTRALIAWhoundertookwhattypeofroadworks?Howmuchwasdonein-house?Howmuchwasoutsourced?

Step 4 WHATINPUTMIXESWEREUSED?

Step 5a

SURVEYRESULTS:STATE/TERRITORYCONSTRUCTION/MAINTENANCEArterialroadsSealedlocalroadsUnsealedlocalroads

Step 5b

SURVEYRESULTS:LOCALGOVERNMENTSCONSTRUCTION/MAINTENANCEArterialroadsSealedlocalroadsUnsealedlocalroads

Step 5c

SURVEYRESULTS:PRIVATESECTORCONSTRUCTION/MAINTENANCEArterialroadsSealedlocalroadsUnsealedlocalroads

Step 6 CONSOLIDATEINPUTMIXTABLESBYROADTYPENational:SealedlocalroadsNational:UnsealedlocalroadsNational:Arterialroads

Step 7 CONSOLIDATEINPUTMIXTABLESBYACTIVITYTYPEConstruction:AllroadsMaintenance:Allroads

Step 8 CREATEANATIONALINPUTMIXTABLECOMBININGFIVETABLES(fromstep6andstep7)

Step 9a

COMPUTEAre-calibratedRCMPI

Step 9b

COMPUTESub-indexesbyactivitytypeConstruction:AllroadsMaintenance:Allroads

Step 9c

COMPUTESub-indexesbyroadtypeArterialroadsSealedlocalroadsUnsealedlocalroads

Info

rmat

ion

shee

t4

9

6

3.1 Review of the RCMPIAspartoftheRCMPIre-calibration,BITREreviewedthecomponentinputsoftheindexusedinthe16yearsto2013.BITREalsoexaminedtheextenttowhichtheinputswerealignedwiththecorrespondingproducerpriceindexes.Table1summarisestheresultsofthereviewandshowsthatthere-alignmentbetweeninputsandthevariablesusedtomeasurepricechangeisunchangedforfiveoftheeightvariablesinthere-calibratedBITRERCMPI,whichmeanstheyremainthesameasinthepre-2013BITRERCMPI.

Table 1 Description of inputs in the RCMPI and measures of change in the price of inputs

Aspect Input Input description Measures of price change used in 2013 re-calibration of the RCMPI

Measures of price change used in BTCE (1997)

1 Site-basedlabour

Site-basedlabourreferstomainlymanualoccupationssuchaslabourers,technicians,drivers,equipmentoperators,andtradespersons.Peopleintheseoccupationsareoftenpaidanhourlyrate.

Description:ABSquarterlyindexfortotalhourlyratesofpay(excludingbonuses)earnedbyallworkersintheprivateandpublicconstructionsectorsfromABScatalogue6345.0WagePriceIndex,Australia,IDA2603589K.

Previouslydescribedas‘otherlabour’butitformsalargershareoftotalcost.Description:ABSestimatesofaverageweeklyearnings(excludingbonuses)inallindustriesAustralia-wideformales;employedasfulltimeonadultpayratesfromABScatalogue6302.0,AverageWeeklyEarnings,seriesIDA2734021V.

2 Office-basedlabour

Office-basedlabourreferstomainlynon-manualoccupationssuchasadministrators,projectmanagers,engineers,lawyers,andaccountants.Peopleintheseoccupationsaretypicallypaidafixedannualsalary.

Description:ABSquarterlyindexforengineeringdesignandengineeringconsultingservicesfromABScatalogue6427.0,Producerpriceindexes,seriesIDA2314202T.

Previouslydescribedas‘Salariedlabour’andseriesIDA2734021Vwasusedtomonitorpricechangefortheinput.

3 Bituminousmaterials

Costofasphalticconcrete(includingbitumen,mineralaggregate,sand,rockdust,andotheradditives).

Thisinputisunchangedbecauseitisaccuratelydescribingthechangesofinputprices

Description:WeightedAverageof6CapitalCities;AsphaltplacedfromABSProducerPriceIndexes(6427.0),seriesID2314822F.

4 Cementandconcrete

CostofPortlandorblendedcementconcrete(includingmineralaggregateandadditives,excludingsteelforreinforcement).

Unchanged:samereasonasinput3 Description:IndexNumber;Ready-mixedconcrete;WeightedAverageof6CapitalCitiesfromABSProducerPriceIndexes(6427.0),seriesIDA2389358J.

5 Quarryproducts

Thisreferstomaterialssuchasgravelandsandsexcludingmaterialsusedasacomponentofasphalticconcrete.

Unchanged:samereasonasinput3 Description:IndexNumber;Sand;WeightedAverageof6CapitalCitiesfromABSProducerPriceIndexes(6427.0),seriesIDA2389412K.

6 Othermaterials(reinforcingsteel)

Allotherinputs(themostimportantofwhichissteel)usedasreinforcingforconcretepavementsandforroadfurniture.

Description:IndexNumber;Reinforcingsteel;WeightedAverageof6CapitalCitiesfromABSProducerPriceIndexes(6427.0),seriesIDA2389361W.

Description:InputtotheHouseconstructionindustry;WeightedAverageof6CapitalCitiesfromABSProducerPriceIndexes(6427.0),A2390558X.

7 Hire/depreciation

Costsofhireorownershipofplantandequipment.

Unchanged:samereasonasinput3 Description:IndexNumbers;663OthergoodsandequipmentrentalandhiringfromABSProducerPriceIndexes(6427.0),seriesIDA2314181T.

8 Fuel Dieselfuelusedtorunequipment. Unchanged:samereasonasinput3 Description:AustralianInstituteofPetroleumWeeklyDieselPricesreport,“Retail:DieselPumpPrice(NationalAverage)”—AverageforthequarterfromtheAustrlainInstituteofPetroleumathttp://www.aip.com.au/pricing/

Note: Theshadedrowshighlighttheinputswhichusenewvariablestomonitorpricechangesinthere-calibratedRCMPI. Thedieselfuelpricesareretailpriceswhichincludesretailprofit,however,theyarethebestdataavailableforthisinput.Dieselfuelaccountsfor

approximately6%ofthetotalroadconstructionandmaintenancecosts.

3.1.1 Distinguishing between labour input typesOneoftheissuesidentifiedbythereviewwasthatinrecentversionsoftheRCMPI,thetwodifferentlabourinputs‘salariedlabour’and‘otherlabour’usedthesameindicatorofpricechange.ThesolutiontotheissuewastoassigntwonewABSindexestomonitorpricechangesin‘site-basedlabour’(previously‘otherlabour’)and‘office-basedlabour’(previously‘salariedlabour’).

Info

rmat

ion

shee

t4

9

7

Thetwotypesoflabourinputshavedifferenttrainingrequirements,skilllevelsandremuneration.‘Site-basedlabour’includestechnicians,drivers,equipmentoperators,andtradespersonsandmakesupthelargestproportionoftotallabourinputinroadprojects.‘Office-basedlabour’ismadeupofoccupationssuchasadministrators,projectmanagers,engineers,lawyers,andaccountants.Upuntil2013,thechangesinthecostofthetwotypesoflabourweremonitoredusingtheABSestimatesofaverageweeklyearnings(excludingbonuses).ItincludedallindustriesAustralia-wideformalesemployedasfulltimeonadultpayrates(usingdatafromABScatalogue6302.0,seriesIDA2734021V).

Inordertoaccuratelydescribethetwolabourinputs,there-calibratedindexnowmonitorsmovementsinthewagecostsof‘site-basedlabour’usingtheABSquarterlyindexfortotalhourlyratesofpay(excludingbonuses)earnedbyallworkers(maleandfemale)intheprivateandpublicconstructionsectors(usingdatafromABScatalogue6345.0,Wagepriceindex,Australia,seriesIDA2603589K).

‘Office-basedlabour’requiresdifferentskillsandtheyarepaidatadifferentrates,thereforethere-calibratedindexusesaquarterlyindexforengineeringdesignandengineeringconsultingservices(fromABScatalogue6427.0,Producerpriceindexes(PPI),seriesIDA2314202T)tomonitorchangesinthewagecostsof‘office-basedlabour’.

Figure 2 Comparing the price indicators for labour inputs

0

20

40

60

80

100

120

ABS Male Weekly Earnings – All IndustriesABS PPI Engineering DesignABS Hourly Rate – Construction

Jun-2

013

Dec-2

012

Jun-2

012

Dec-2

011

Jun-2

011

Dec-2

010

Jun-2

010

Dec-2

009

Jun-2

009

Dec-2

008

Jun-2

008

Dec-2

007

Jun-2

007

Dec-2

006

Jun-2

006

Dec-2

005

Jun-2

005

Dec-2

004

Jun-2

004

Dec-2

003

Jun-2

003

Dec-2

002

Jun-2

002

Dec-2

001

Jun-2

001

Dec-2

000

Jun-2

000

Inde

x va

lues

Figure2comparesthetwonewindicatorsforlabourinputswiththeindicatorusedupto2013.Theindicatorsforhourlyrate–constructionandengineeringdesignarepreferredbecausetheydistinguishbetweenthetwolabourinputswithdifferentremunerationstructures.

3.1.2 A new indicator for price changes in ‘other materials’ThesecondissueidentifiedbythereviewwasthatfollowingarecommendationbyBTCE(1997),recentversionsoftheRCMPIusedtheweightedaverageofsixAustraliancapitalsforthe‘Allgroups’indexformaterialsusedinhousebuildingasanapproximationtopricechangesfor‘othermaterials’.Thereviewnotedthattheaforementionedindexwasnotagoodapproximationof‘othermaterials’inroadconstructionandmaintenance.

The2013re-calibrationoftheRCMPIintroducedtheproducerpriceindexforreinforcingsteeltomonitorpricechangesin‘othermaterials’.ThePPIforreinforcingsteelhasreplacedtheindicatorforhouseconstructionbecauseitreflectsthecostpressureonthe‘othermaterials’inputsmoreaccurately.

Info

rmat

ion

shee

t4

9

8

Figure3comparesthenewindicatorfor‘othermaterials’withthepriceindicatorusedupto2013.

Figure 3 Comparing the price indicators for ‘other materials’

0

20

40

60

80

100

120

140

160

180

ABS All Groups PPI – House ConstructionABS PPI Reinforcing Steel

Inde

x va

lues

Jun-2

013

Dec-2

012

Jun-2

012

Dec-2

011

Jun-2

011

Dec-2

010

Jun-2

010

Dec-2

009

Jun-2

009

Dec-2

008

Jun-2

008

Dec-2

007

Jun-2

007

Dec-2

006

Jun-2

006

Dec-2

005

Jun-2

005

Dec-2

004

Jun-2

004

Dec-2

003

Jun-2

003

Dec-2

002

Jun-2

002

Dec-2

001

Jun-2

001

Dec-2

000

Jun-2

000

3.2 The surveysInstep2(Figure1)surveyswereusedtocollectinformationforre-calibratingtheRCMPI.ThequestionnairesusedwereverysimilartotheonesusedinBTCE(1997).Themajordifferencewasthattherespondentswereexplicitlyrequestedtoestimateinputpercentsharesbyactivitytype:constructionversusmaintenance,andbyroadtype:arterial,unsealedlocalroadsandsealedlocalroads.

State/ territory road authoritiesSurveyformsweresenttoall(8)state/territoryroadauthoritiesandthesurveyscollecteddataon:

• TheinputpercentsharesofinputsusedintheconstructionandmaintenanceoftheNationalHighwaysystem,statehighwaysandarterialroads;

• Thelengthofroadsundertheirjurisdictionbyroadtype:localroads(sealedandunsealed)andarterialroads(includingnationalhighways);

• Thetotalroadinfrastructureexpendituresub-dividedbyroadtype:arterialversuslocalroads;byactivitytype:constructionversusmaintenanceandbyroadtype:localroads(sealedandunsealed)andarterialroads(includingnationalhighways);and

• Theextentofroadworksoutsourcingtolocalgovernmentsandprivatesectorcontractors.

AppendixAprovidesasummaryoftheinputpercentsharesestimatesusedinprojectsimplemented(fundedandundertakenin-house)bystate/territoryroadauthorities.

Local governmentsSurveyformsweredistributedtoall(558)localgovernmentsinAustralia.

Localgovernmentsareresponsiblefortheconstructionandmaintenanceoflocalroads,somearterialroads,andtolesserextentstatehighways.Theirinvolvementindifferenttypesofroadvariesbetweenstatesandevenwithinstates.Themainpurposeofthesurveyoflocalgovernmentswastoobtain:

• Dataoninputpercentsharesthatapplyintheconstructionandmaintenanceoflocalroadsaswellasarterialroadsandstatehighways;

• Thelengthofroadsundertheirjurisdictionbyroadtype:localroads(sealedandunsealed)andarterialroads(includingnationalhighways);and

• Informationonthepercentageofconstructionandmaintenanceworkstheycontractedouttoprivatesectorfirms.AppendixAshowstheestimatesofinputpercentsharesforprojectsundertakenin-housebylocalgovernments.

Info

rmat

ion

shee

t4

9

9

Private contractorsBITREcommissionedArup,aprivatesectorconsultingfirm,tocollectdataviaasurveyabouttheinputpercentsharesusedintheprivatesector.BITREprovidedArupwithasamplesurveyquestionnaire.Inaddition,Arupcollectedfurthersupplementarydatafromrespondents,includingtotalvalueofconstructionandmaintenancecostofroadprojectsdeliveredin2011–12,andthenumberofkilometresacompanyconstructedormaintainedin2011–12perstateforeachroadtype-arterial,sealedlocalandunsealedlocal.

ThemajorityofthefirmscontactedarelistedinAustroads(2013).Semi-structuredinterviewswereundertakenwithestimators,businessdevelopmentmanagersandaccountantsofthesefirms.Table2showsthedistributionofrespondingfirmsbyannualaveragesizeofcompanyturnover.TheinputpercentsharesusedbytheprivatesectorcontractorsaresummarisedinAppendixA.

Table 2 Private sector firms responded to the surveys, sorted by turnover

Annual turnover ($ millions) Number of firms that responded Per cent of respondents

0to50 16 44.44

51to100 4 11.11

101to150 6 16.67

150plus 7 19.44

Unstated 3 8.33

Total 36 100

Note: Componentsmaynotnecessarilyadduptothetotalsduetorounding.Source: Arup(2013).

3.3 Road expenditure and the roles played in road works projectsAkeyelementinre-calibratingtheRCMPIwastodeterminetheinputmixesusedbytheagenciesthatconstructandmaintainroadsinAustralia.Step3(Figure1)identifiedtherolesamongthethreemajorsuppliersofroadworksservices.Therolesaredifferentfromthoserelatedtofundingofroadworks.Forexample,theprivatesector’scontributionrepresentsasmallpercentageofthetotalroadexpenditure,however,thesectorplaysamajorroleasasupplierofroadconstructionandroadmaintenanceservices.Incontrast,Table3showsthattheAustralian(commonwealth)governmentdoesnotprovideroadworksservices,despitebeingasignificantcontributortototalroadexpenditure(seeBITRE2013).

Dataonroadexpenditurebylevelsofgovernment:Commonwealth,state/territory,localandalsotheprivatesectorareinBITRE(2013).

Table3combinestheBITREsurveysdatacollected fromthethreemajorsuppliersof roadconstructionandmaintenanceservicesinAustralia:state/territorydepartmentsofmainroads;localgovernmentsandprivatesectorcontractors.

Table3showsthat in2013,about56percentoftotalroadconstructionandmaintenanceexpenditurewereexpendedonprojectsimplementedbytheprivatesector.Someofthesewereprojectsfortheprivatesector,butthemajorityoftheprojectswereoutsourcedtotheprivatesectorandfundedbyeitherstate/territorygovernmentsorlocalgovernments.

Info

rmat

ion

shee

t4

9

10

Table 3 The roles in the supply of road construction and road maintenance services: 1997 and 2013

Supplier of services Units 1997 2013 Change from1997 to 2013

State/territoryroadauthoritiesa

% 26.06 16.23 -9.83

Localgovernmentsb % 33.58 27.36 -6.22

Privatesectorc % 40.36 56.41 16.05

Total % 100.00 100.00 0.00

Totalroadexpenditured $Million 5725.60 19459.40 13733.80

Notes:a. Fundsonprojectsimplementedbystate/territoryroadauthorities=grossstate/territoryroadexpenditurefromABSdataonGovernment

FinanceStatisticsLESSexpenditureonprojectsoutsourcedtolocalgovernmentsandprivatesectorcontractors.b. Fundsonprojectsimplementedbylocalgovernments=grosslocalgovernmentroadexpenditurefromABSGovernmentFinanceStatistics

LESSexpenditureonprojectsoutsourcedtoprivatesectorcontractors.c. Fundsonprojects implementedbyprivatesectorcontractorsequalgrossprivatesectorroadexpenditurefromABSdataonGovernment

FinanceStatisticsPLUSprojectsoutsourcedtoprivatesectorcontractorsbylocalgovernmentsandstate/territoryroadauthorities.d. Thedataontotalroadexpenditurefor2013arefromBITRE(2013).Source: BasedonBITRE(2013)andBITREsurveysofstate/territorydepartmentsofmainroads,localgovernmentsandprivatesectorcontractors.

3.4 Estimating input per cent sharesAttheendofstep5(Figure1)theunitrecorddatasetincludesinformationfrom:

• Eachof3respondingstateroadauthoritiesoninputshares;• Eachof36respondingprivatesectorfirmsoninputshares;and• Eachof233respondinglocalgovernmentsoninputshares.

Eachrespondenttothesurveyprovidedatmostsixsetsofinputpercentsharesrelatedto:

• Theconstructionofarterialroads,sealedlocalroadsandunsealedlocalroads;and• Themaintenanceofarterialroads,sealedlocalroadsandunsealedlocalroads.

Steps6,7,and8(inFigure1)relatetotheaggregationoftheseinputsharesintothenationalinputpercentshares.ThesenationalinputpercentsharesaresummarisedinAppendixB.Theinputpercentsharesarescaledtosumtoone(or100percent),andthereforetheycanbeinterpretedaseachinput’sproportionwithinthetotalpriceofroadconstructionandmaintenance.Thisscalinghasnoeffectonthecalculation.Theshadedcolumns(withinTablesinAppendixB)aretheaggregatedinputpercentsharesusedinthecomputationsofthere-calibratedRCMPIandvarioussub-indexes.

3.5 Computing the re-calibrated RCMPIStep9a(Figure1)isthecomputationofthere-calibratedRCMPIusingthenationalinputpercentsharesinAppendixB.Eachinputisassociatedwithapriceindicator.Theindexvalueforapointintime(inthiscaseaquarter)iscalculatedasthesumoftheproductoftheinputs’priceindicatormultipliedbyitsinputpercentshare.

Anindexreferenceperiodischosenfortheindexandit istypicallyassignedanindexvalueof100.Theindexreferenceperiodforthere-calibratedRCMPIis2011–12which,foraquarterlyindex,meansthattheaverageoftheindexvaluesforthefourquartersinthefinancialyearis100.Theresultssectionpresentsthere-calibratedRCMPIingraphicalandtabularform.Furthermore,itprovidesacomparisonbetweenthere-calibratedRCMPIandtheRCMPIbasedon1997inputpercentshares.

Info

rmat

ion

shee

t4

9

11

4 Methodology: Computing the input per cent shares for the sub-indexes

AkeystrengthoftheRCMPIisthatitestimatestheinputpricechangesintheconstructionofan‘average’roadinAustralia.However,itisnotpossibleto‘unpack’theBITREindex,andrevealhowtheinputpricesdifferbyclass/categoryofroadorbytypeofactivity.Inresponse,thisinformationsheetprovidesestimatesofthesub-indexeswhichshowhowthecostofroadworkschangesbythreecategoriesofroadandtwotypesofroadworksactivity.

4.1 Sub-indexes by type of activityStep9b(Figure1)classifiedthemainactivitiesintotwocategories:constructionandmaintenance.Roadconstructionincludesconstructionofanewroad,bridge,ortunnelwherenonepreviouslyexisted;majorwideningorreplacement,e.g.replacementofatwo-laneroadwithafour-laneroad;upgradestointersections,e.g.changestointersectionlayoutorinstallationofnewtrafficsignals;large-scaleheavypatchingorpavementrehabilitation,andminorimprovementsinalignment;andreplacementofanunsealedroadwithasealedroad.

Roadmaintenance includes restoring edgewear, repairing potholes and small-scale pavement rehabilitation;re-sheetingofgravelroadsandresealingofbitumen-surfacedroads;line-marking;minorbridgeandtunnelrepairs;repairstoguardrailsortrafficsignsandsignals;cleaningofroaddrainsandculverts;androad-sidelandscaping.

Oneofthemainreasonsforcreatingasub-indexforroadconstruction,separatefromthatformaintenance,isbecausethetwoactivitiesdifferintermsofinputrequirements.TheinputpercentsharesforconstructionactivityandmaintenanceactivityaggregatedoverroadtypeareshowninAppendixB.

Figure4 shows that for the roadconstruction sub-index, the inputper cent share formaterials ishigherby3.7percentagepointsthaninthere-calibratedRCMPI.Thisiscounter-balancedbythevalueoftheinputpercentshareforlabour,whichintheconstructionindexislowerbyabout2.1percentagepointsthaninthere-calibratedRCMPI.

Ontheotherhand,theroadmaintenancesub-indexinFigure4showsthattheinputpercentshareforlabourishigherby2.3percentagepointsthaninthere-calibratedRCMPI.Thisiscounter-balancedbythevalueoftheinputpercentshareformaterials,whichinthemaintenanceindexislowerby3.2percentagepointsthaninthere-calibratedRCMPI.

Figure 4 Input per cent shares: RCMPI, Construction and Maintenance activity sub-indexes

0

5

10

15

20

25

30

35

40

45

EquipmentMaterials Labour

Inpu

t pe

r ce

nt s

hare

s (%

)

Index by activity: Maintenance

Index by activity: Construction

Re-calibrated RCMPI

33.9

37.1

29.0

31.8

40.8

27.4

36.233.9

29.9

Source: BITREestimatesbasedondatainTableB1,B2andB3inAppendixB.

Info

rmat

ion

shee

t4

9

12

4.2 Sub-indexes by type of roadStep9c(Figure1)computesthesub-indexesbyroadtype.

Figure 5 summarises data on the input per cent shares in the sub-indexes and the re-calibrated RCMPI.Thesub-indexes forarterial roads, sealed local roads,andunsealed local roadsencompass thecostsofbothconstructionandmaintenanceworks.

Thefollowingdifferencesbetweentheindexesbyroadtypeandthere-calibratedRCMPIareworthnoting.

Thesub-indexforsealedlocalroads:Theinputpercentshareformaterialsinthesealedlocalroadssub-indexishigherby2percentagepointsthaninthere-calibratedRCMPI,andtheinputpercentshareforequipmentinthesealedlocalroadsindexishigherbyabout0.7percentagepoints.Thisiscounter-balancedbythevalueoftheinputpercentshareforlabour,whichinthesealedlocalroadsindexis2.7percentagepointslowerthaninthere-calibratedRCMPI.

Thesub-indexforunsealedlocalroads:Theinputpercentshareformaterialsintheunsealedlocalroadssub-indexislowerby4.4percentagepointsthaninthere-calibratedRCMPI.Thisiscounter-balancedbythevalueoftheinputpercentshareforequipment,whichintheunsealedlocalroadsindexishigherby1.5percentagepoints,andforlabour2.8percentagepointshigherthaninthere-calibratedRCMPI.

Theabovementionedrelationshipssuggestforsealedlocalroadsprojects,theRCMPIwouldoverstatetheimpactofchangesinlabourcosts,butitwouldalsounderstatetheimpactofchangesinmaterialsandequipmentcosts.Fortheseprojectsitmightbeappropriatetousethesealedlocalroadssub-index.Ontheotherhand,forunsealedlocalroadsprojectstheRCMPIwouldunderstatetheimpactofchangesinlabourandequipmentcosts,butoverstatetheimpactofchangesinmaterialscosts.Fortheseprojectsitmightbeappropriatetousetheunsealedlocalroadssub-index.

Figure 5 Input per cent shares: RCMPI, Arterial, Sealed local and Unsealed local roads sub-indexes

0

5

10

15

20

25

30

35

40

45

Unsealed local roadsSealed local roadsArterial roadsRe-calibrated RCMPI

EquipmentMaterials Labour

33.9

37.1

29.0

33.4

39.0

27.6

31.2

39.1

29.7

36.7

32.730.5

Inpu

t pe

r ce

nt s

hare

s (%

)

Note: Componentsmaynotnecessarilyadduptothetotalsduetorounding.Source: BITREestimatesbasedondatainTableB1,B4,B5andB6inAppendixB.

Info

rmat

ion

shee

t4

9

13

5 ResultsThissectionsummarisesthekeyresultsofthisstudy.

5.1 Sample surveysBITREdirectlysurveyedstate/territoryroadauthoritiesandlocalgovernments.AsurveywasalsocommissionedforAruptocollectdatafromprivatesectorcontractors.Map1showsthegeographicaldistributionofthesampleobservationsonwhichnewestimatesarebased.

Map 1 Sample observationsa,b,c for RCMPI by state and territory, 2013.

Notes:a. Allstate/territoryroadauthoritiesrespondedtothesurveyandsupplieddataonroadexpenditure.Theyalsoprovidedtheextentthey

outsourceprojectstolocalgovernmentsandprivatesectorcontractors.NSW,QldandSA,inaddition,supplieddataoninputpercentshares(denotedbya*onthemap).

b. Thepercentagefigurerepresentsthepercentageoflocalgovernmentsinthestateorterritorythatrespondedtothesurvey.Atotalof233outof558localgovernmentsresponded,givinganoverallresponserateof41.8%foralllocalgovernmentswithinAustralia.

c. 36privatesectorcompaniesrespondedtothesurvey.Ofthese16haveanationalpresenceinAustraliaand,in2011–12,hadroadprojectsinallstatesandterritories.Theyareshownas‘Private-National’onthemap.Therestwerelocalcompaniesoperatinginonlyonestateorterritory,andtheyareshownas‘Private-Local’.

Source: BITREsurveys.

5.2 Role of the private sector has increasedThe2013surveydatashowthattheroleoftheprivatesectorinroadconstructionandmaintenanceprojectsinAustraliahasincreasedto56percentfrom40percentin1997.Therolesofstate/territoryroadauthoritiesandoflocalgovernments,assuppliersofroadworksservices,areestimatedtohavedecreasedto16percent(from26percentin1997)and27percent(from34percentin1997)respectively.Theroleoftheprivatesectorisestimatedbythevalueofprojectsthesectorundertakesforprivatesectorclients,plusthevalueofprojectsoutsourcedtotheprivatesectorcontractorsbyeitherstate/territorygovernmentsorbylocalgovernmentsasapercentageofthetotalroadexpenditure.Thispercentagedoesnotrelatetowhopaysforroadprojects,ratheritrelatestowhophysicallyundertakestheroadconstructionandmaintenanceactivities.

Info

rmat

ion

shee

t4

9

14

5.3 Input per cent shares for labour, materials and equipment have changedSurveydatashowthatoverthe16yearsto2013,therehavebeenchangesinthethreecategoriesofinputsusedinroadconstructionandmaintenance:

• Labourcostshaveincreasedto33.9percentoftotalcostsin2013from25.8percentoftotalcostsin1997;• Materialscostshavedecreasedto37.1percentin2013from47.7percentin1997;and• Equipmentcostshaveincreasedto29percentin2013from26.5in1997.

5.4 A re-calibrated Road Construction and Maintenance Price Index (RCMPI)The2013re-calibratedBITRERoadConstructionandMaintenancePriceIndex(RCMPI)takesintoaccountthefollowingeightmajorinputsusedinroadconstructionandmaintenance:(1)site-basedlabour(2)office-basedlabour(3)bituminousmaterials(4)cementandconcrete(5)quarryproducts(6)othermaterials(7)planthire/depreciationand(8)fuel.

Figure6belowcomparesthefourindexes:

• Re-calibratedRCMPI(2013data,2013inputpercentshares)—theindextobeusedfrom2013onwards.Itutilisesthemostrecentdataonproducerpriceindexesandadoptsthenew2013inputpercentshares.

• RCMPI(2013data,1997inputpercentshares)—anindexcreatedtoillustratestheimpactofthenewinputpercentshares.Ithasnoformalstatus.

• DiscontinuedRCMPI(oldmethodology:pre-2013inputsand1997inputpercentshares)—theofficialindexusedupto2012(BITRE,2012).Theindexvaluesareaveragesofthefourquarterswithinthefinancialyear.TheyarenottheJunequartervaluesoftheindex.

• ABSRoadandBridgeconstructionoutputpriceindex.

Figure 6 Re-calibrated RCMPI (2013 data, 2013 input per cent shares), RCMPI (2013 data, 1997 input per cent shares), discontinued RCMPI and ABS output price index for Road and Bridges Construction (2011–12 = 100)

60

65

70

75

80

85

90

95

100

105

Jun-2

013

Dec-2

012

Jun-2

012

Dec-2

011

Jun-2

011

Dec-2

010

Jun-2

010

Dec-2

009

Jun-2

009

Dec-2

008

Jun-2

008

Dec-2

007

Jun-2

007

Dec-2

006

Jun-2

006

Dec-2

005

Jun-2

005

Dec-2

004

Jun-2

004

Dec-2

003

Jun-2

003

Dec-2

002

Jun-2

002

Dec-2

001

Jun-2

001

Dec-2

000

Jun-2

000

110

ABS Producer Price Index – Road and Bridge ConstructionRCMPI (2013 data, 1997 input per cent shares)Re-calibrated RCMPI 2013

Discontinued RCMPI

Inde

x va

lues

Source: BTCE(1997),ABS(2013a,c),BITRE(2012)andBITREestimates.

There-calibratedindexandthediscontinuedRCMPIgenerallytrackoneanotherveryclosely.TheexceptionwastheperiodbetweenSeptember2008toMarch2010,whenagapopensupbeforetrendingbacktogether.Therearetwomainreasonsastowhythemovementoccurred.

First,thenewpriceindicator(reinforcingsteel)introducedtomonitorpricesof‘othermaterials’wassignificantlyimpactedbetweenSeptemberquarter2008andMarchquarterof2010.AsshowninFigure3,thenewpriceindicator

Info

rmat

ion

shee

t4

9

15

(reinforcingsteel)roseby59.5percentagepoints,whereastheindicatorfor‘othermaterials’(allgroupshouseconstruction)inthediscontinuedRCMPIwentonatthesamerate.Thereforethere-calibratedRCMPIandRCMPI(2013data,1997inputpercentshares)arehigherthanthediscontinuedRCMPIduringthatperiod.

Secondly,theinputpercentsharefor‘othermaterials’hasdecreasedsignificantlyto5.85percentinthere-calibratedRCMPI,comparedto10.8percentintheRCMPI(2013data,1997inputpercentshares).Thereforeduringthatperiod,theriseofthepriceindicatorfor‘othermaterials’(reinforcingsteel)hasabiggerimpactintheRCMPI(2013data,1997inputpercentshares),sinceitsinputpercentshareishigher.

Thesefactorsparticularlyimpactonthecomparisonsof

a. There-calibratedRCMPIandtheRCMPI(2013data,1997inputpercentshares)(Figure7and8);

b. There-calibratedRCMPIandthenewsub-indicesonRoadConstructionandMaintenance(Figures9and10);

c. There-calibratedRCMPIagainstthediscontinuedRCMPI.

5.5 The change in the Indices between 2011–12 and 2012–13Figure7comparesthequarter-on-quarterpercentagechangebetweenthere-calibratedRCMPI(2013data,2013inputpercentshares),RCMPI(2013data,1997inputpercentshares)andthediscontinuedRCMPI.

ThediscontinuedRCMPIisonafinancialyearbasis,thereforeinFigure7,theaveragequarterlychangeintheindexisequaltothedifferencebetweentheindexvaluesfortwoconsecutivefinancialyearsdividedbyfour.Thisconversionallowsthedifferentindicestobecomparedonthesamebasis.

Figure 7 Quarter-on-Quarter percentage changes: the re-calibrated RCMPI (2013 input per cent shares) compared to RCMPI (2013 data, 1997 input per cent shares) and average quarterly changes in the discontinued RCMPI

-3

-2

-1

0

1

2

3

4

5

6

Quarterly change: RCMPI (2013 data, 1997 input per cent shares)Quarterly change: Re-calibrated RCMPI 2013

Jun-2

013

Dec-2

012

Jun-2

012

Dec-2

011

Jun-2

011

Dec-2

010

Jun-2

010

Dec-2

009

Jun-2

009

Dec-2

008

Jun-2

008

Dec-2

007

Jun-2

007

Dec-2

006

Jun-2

006

Dec-2

005

Jun-2

005

Dec-2

004

Jun-2

004

Dec-2

003

Jun-2

003

Dec-2

002

Jun-2

002

Dec-2

001

Jun-2

001

Dec-2

000

Jun-2

000

Average quarterly change: Discontinued RCMPI

Inde

x po

ints

Source: BTCE(1997),ABS(2013a,c),BITRE(2012)andBITREestimates.

There-calibratedquarterlyindexcanbeconvertedtoafinancialyearindexasshowninTable4.Figure8comparestheyear-on-yearpercentagechangebetweenthere-calibratedRCMPI(2013data,2013inputpercentshares)andthediscontinuedRCMPI.

Info

rmat

ion

shee

t4

9

16

Figure 8 Year-on-year percentage changes: the re-calibrated RCMPI (2013 input per cent shares) compared to the discontinued RCMPI

-3

-1

1

3

5

7

Annual Change: Re-calibrated RCMPIAnnual Change: Discontinued RCMPI

2012

–13

2011

–12

2010

–11

2009

–10

2008

–09

2007

–08

2006

–07

2005

–06

2004

–05

2003

–04

2002

–03

2001

–02

Inde

x po

ints

2.15

2.87

4.03

3.43

4.02

3.13

3.602.89

5.69

1.28

2.82

6.56

2.33

3.14

0.36

2.86

3.59

2.52

4.80

6.74

-0.85

2.73

1.42

4.76

Source: BITREestimates.

Figure9showsthatthere-calibratedRCMPIincreasedby1.42percentagepointsbetween2011–12and2012–13.Themostsignificantcontributorstotheindexincreasewererisesin‘site-basedlabour’and‘bituminousmaterials’costs.Theywerecounterbalanced,toalimitedextent,byfallsin‘planthire/depreciation’,‘othermaterials’and‘fuelcosts’overthesameperiod.

Figure 9 Contributions by inputs to the change in the BITRE RCMPI (2013 data, 2013 input per cent shares) between 2011–12 and 2012–13.

-1.0

-0.5

0.0

0.5

1.0

1.5

2.0

Total

Cemen

t and

conc

rete

Offic

e-base

d lab

our

Qua

rry pr

oduc

ts

Bitum

inous

mate

rials

Site-b

ased l

abou

rFu

el

Oth

er m

ateria

ls (St

eel)

Equip

ment h

ire/de

prec

iation

-0.48

-0.07-0.03

0.88

0.75

0.250.08 0.04 1.42

Inde

x po

ints

Source: BITREestimates.

Info

rmat

ion

shee

t4

9

17

5.6 Five new RCMPI sub-indexesThecomputationofthesub-indexesreliesonthesamemethodologyastheRCMPI.However,thecorrespondinginputpercentshareswerecollectedexplicitlyandseparatelybysurveysonmajorsuppliersofroadworksservicesinAustralia,andtheyaredifferentfromthoseintheRCMPI.

Figure10presentsingraphicalformthetwonewsub-indexesbytypeofactivityanditshowstheyhaveslopessimilartothatoftheRCMPI.

Figure11presentsingraphicalformthethreenewsub-indexesbyroadtype.Asforthesub-indexesbyactivitytype,asimplecomparisonofthesub-indexeswiththere-calibratedRCMPIshowssimilarityintheslopesbetweentheindexes.

Table4showsthetimeseriesdataofthesub-indexes.

Figure 10 Two new sub-indexes by type of major activity: construction and maintenance

60

65

70

75

80

85

90

95

100

105

MaintenanceConstructionRe-calibrated RCMPI

Jun-2

013

Dec-2

012

Jun-2

012

Dec-2

011

Jun-2

011

Dec-2

010

Jun-2

010

Dec-2

009

Jun-2

009

Dec-2

008

Jun-2

008

Dec-2

007

Jun-2

007

Dec-2

006

Jun-2

006

Dec-2

005

Jun-2

005

Dec-2

004

Jun-2

004

Dec-2

003

Jun-2

003

Dec-2

002

Jun-2

002

Dec-2

001

Jun-2

001

Dec-2

000

Jun-2

000

Inde

x va

lues

Source: BITREestimates.

Figure 11 Three new sub-indexes by road type: arterial, sealed local and unsealed local roads

60

65

70

75

80

85

90

95

100

105

Unsealed LocalSealed LocalArterialRe-calibrated RCMPI

Jun-2

013

Dec-2

012

Jun-2

012

Dec-2

011

Jun-2

011

Dec-2

010

Jun-2

010

Dec-2

009

Jun-2

009

Dec-2

008

Jun-2

008

Dec-2

007

Jun-2

007

Dec-2

006

Jun-2

006

Dec-2

005

Jun-2

005

Dec-2

004

Jun-2

004

Dec-2

003

Jun-2

003

Dec-2

002

Jun-2

002

Dec-2

001

Jun-2

001

Dec-2

000

Jun-2

000

Inde

x va

lues

Source: BITREestimates.

Info

rmat

ion

shee

t4

9

18

Table 4 BITRE Road Construction and Maintenance Price Indexes and five sub-indexes: (Quarterly, 2011–12=100)

All roads Sub-index by activity type Sub-index by road type

Year Quarter

Re-calibrated

RCMPI(2013 data, 2013 input

per cent shares)

Re-calibrated

RCMPI(Financial

year basis)

Discontinued RCMPI

(Financial year basis, 2011–12

=100)b

RCMPI(2013 data, 1997 input

per cent shares)c

Road Construction

Road Maintenance

Arterial Roads

Sealed Local

Roads

Unsealed Local

Roads

Index reference period, 2011–12 =100a

Index reference period, 2011–12 =100

Index reference period, 2011–12 =100

2004 March 71.65 71.21 71.35 71.82 71.36 71.90 71.67June 72.96 71.67 71.90 72.83 72.79 73.00 72.59 73.22 73.13September 74.65 74.97 74.65 74.51 74.15 74.85 75.20December 75.22 75.58 75.25 75.07 74.72 75.43 75.76

2005 March 76.13 76.48 76.19 75.93 75.54 76.31 76.84June 76.76 75.69 75.30 77.21 76.83 76.55 76.19 76.94 77.46September 78.53 79.10 78.57 78.36 78.01 78.68 79.29December 79.00 79.56 79.01 78.86 78.55 79.19 79.60

2006 March 79.23 79.53 79.21 79.14 78.80 79.39 79.75June 80.40 79.29 78.46 80.76 80.36 80.33 80.02 80.61 80.78September 81.00 81.36 80.98 80.92 80.62 81.13 81.52December 81.10 81.22 81.04 81.06 80.75 81.23 81.48

2007 March 82.17 82.19 82.10 82.12 81.75 82.26 82.67June 82.97 81.81 81.32 83.20 82.99 82.85 82.44 82.97 83.85September 84.59 84.68 84.53 84.54 84.18 84.59 85.26December 85.93 86.13 85.93 85.83 85.48 85.85 86.80

2008 March 86.63 86.86 86.61 86.57 86.25 86.59 87.39June 89.30 86.61 86.99 90.37 89.54 88.98 88.81 89.31 90.33September 92.89 95.56 93.75 91.97 92.42 93.05 93.84December 94.41 98.04 95.80 92.99 93.87 94.68 95.33

2009 March 93.51 96.82 94.87 92.11 92.95 93.73 94.36June 92.62 93.36 88.31 95.12 93.70 91.51 92.08 92.70 93.54September 92.28 93.79 92.97 91.55 91.79 92.22 93.23December 92.41 93.53 92.97 91.81 91.94 92.30 93.35

2010 March 92.20 92.81 92.60 91.76 91.70 91.95 93.36June 93.13 92.50 91.11 93.80 93.49 92.72 92.69 93.00 94.01September 93.73 94.01 93.95 93.46 93.31 93.57 94.60December 94.26 94.21 94.38 94.08 93.80 94.04 95.21

2011 March 95.15 95.07 95.28 94.95 94.57 94.79 96.52June 97.81 95.24 97.67 98.15 97.99 97.58 97.44 97.65 98.67September 99.02 99.30 99.11 98.93 98.98 99.01 99.15December 99.84 99.98 99.93 99.74 99.71 99.73 100.23

2012 March 99.84 99.64 99.76 99.92 99.90 99.88 99.66June 101.30 100.00 100.00 101.09 101.20 101.41 101.42 101.38 100.96September 101.06 100.92 101.01 101.16 101.28 101.14 100.57December 101.62 101.41 101.55 101.72 101.79 101.66 101.23

2013 March 101.62 101.27 101.52 101.75 101.80 101.64 101.22June 101.37 101.42 103.14 100.89 101.21 101.59 101.62 101.40 100.85

Notes:a. Using2011–12astheIndexreferenceperiodmeansthattheaverageoftheindexesforSeptemberquarter2011,Decemberquarter2011,

Marchquarter2012andJunequarter2012is100.b. InthefuturethediscontinuedRCMPIwillnotbeavailablebeyondJunequarter2013.Itissubsumedbythere-calibratedRCMPIbasedon2013

expenditureweightsandinputpercentshares.c. TheRCMPI(2013data,1997inputpercentshares)andthediscontinuedRCMPIarenowcalculatedonanIndexreferenceperiodof2011–12

=100.0.Source: BITREestimates

Info

rmat

ion

shee

t4

9

19

6. ConclusionsThisinformationsheetpresentsthe2013re-calibratedBITRERoadConstructionandMaintenancePriceIndex(RCMPI).The revised indexmonitorspricechanges in theeightmajor inputsused in roadconstructionandmaintenance.Thisisthemostrecentre-calibrationoftheRCMPI.Re-calibrationshavebeenundertakenevery16yearsinthelast32years.

The2013re-calibrationoftheRCMPIinvolvedthreemajortasks:theroadprojectsexpenditureweightswhichreflecttherelativerolesinmajorsuppliersofroadworkshavebeenre-estimated;theinputpercentshareshavealsobeenre-estimated,andthreeoftheinputshavebeenassociatedwithnewproducerpriceindexesinordertomeasurethepricechangesmoreaccurately.

Furthermore,theinformationpaperintroducestwonewsub-indexesbymajoractivity:constructionandmaintenance,andthreenewsub-indexesbyroadtype:arterial,sealedlocalandunsealedlocalroads.Thesesub-indexesareunderpinnedbythesamemethodologyastheRCMPI,however,theyarebasedoninputpercentsharesfortherelevantactivitiesorroadtypes.

TheRCMPIestimatedchangesinthecostofconstructingandmaintainingroadsinAustralia.Foragivenyear,thesub-indexesshowtherangeofpossibleoutcomes,whichdependonthetypeofroadworks(constructionversusmaintenance)andthetypeofroads(arterial,sealedlocalorunsealedlocalroads).

Info

rmat

ion

shee

t4

9

20

Appendix A: Input mix by supplier of road works servicesThefiguresinTableA1areweightedaveragesoftheinputpercentshares,reportedbystate/territoryroadauthoritiesthatprovideddataintheirsurveyresponsesonsubstantialroadworksundertakenin-house.TheweightsusedarebasedontheroaddistancesinTableA2.

TheweightsarecalculatedusingroaddistancesbecausetheyprovideanaccuratereflectionoftheconstructionandmaintenancecostsonAustralianroads.Theyarenotbasedonroadexpendituresinceitplacesgreateremphasistowardsmorecostlyroadworks,suchastunnels,bridgesandmajorroadprojects,andthereforelesslikelytoprovideanexactrepresentationofregularroadworks.

Inthisstudy,roadauthoritiesinNSW,QldandSArespondedwithdataoninputshares.Theotherstatesreportedthattheirroadworkswereoutsourcedtoeitherlocalgovernmentsinthestate/territory,toprivatesectorcontractorsorboth.

Table A1 State/ territory road authorities: Input per cent shares for in-house projects

Arterial roadsa, b Sealed local roadsa, b

Construction Maintenance Maintenance

LABOURSite-based 29.55 37.20 23.18

Office-based 6.95 6.35 1.42

Alllabour 36.50 43.55 24.60MATERIALS

Bituminousmaterials 29.57 27.47 15.39Cementandconcrete 3.11 3.05 0.00

Quarryproducts 0.00 0.00 0.00Othermaterials(reinforcingsteel) 3.11 3.05 2.56

Allmaterials 35.80 33.58 17.95EQUIPMENT

Hire/depreciation 26.91 21.35 55.56Fuel 0.79 1.53 1.88

Allequipment 27.70 22.88 57.44ALLINPUTSc 100.00 100.00 100.00

Samplesize 3 3 2

Notes:a. Theinputsharesinthetableare‘lengthofroad’weightedaveragesofthedatafromstatesthatrespondedtothesurvey.b. The‘lengthofroad’weightsarecomputedusingdatainTableA2as(thelengthofarterialroadsinastateorterritory/thetotallengthofroadin

allthestates/territoriesrespondedtothesurveywithdataoninputpercentshares).ResponseswithestimatesofinputpercentshareswerereceivedfromdepartmentsofmainroadsinNewSouthWales,QueenslandandSouthAustralia.Victoriaindicatedthatmajorityoftheirroadprojectswereoutsourced.

c. Componentsmaynotnecessarilyadduptothetotalsduetorounding.Source: BITREestimates.

Table A2 Length of road in kilometres, by state and territory, by class of road, 2011–12

State/ Territory Arterial roads Local roads Total

(kilometres) (kilometres) (kilometres)

NSW 86225 120462 206687Vic 44457 101323 145780Qld 34986 194186 229172SA 19285 78711 97996WA 29328 140266 169594Tas 5521 25701 31222NT 18499 3264 21763ACT 476 2931 3407Other 19 161 180

Total 238796 667005 905801

Source: BITREestimates.

Info

rmat

ion

shee

t4

9

21

Table A3 Local governments: Input per cent shares in projects undertaken in-house

Arterial roadsa, b Sealed local roadsa, b Unsealed local roadsa, b

Construction Maintenance Construction Maintenance Construction Maintenance

LABOUR

Site-based 28.44 35.31 24.18 34.48 26.05 34.92

Office-based 8.20 7.12 6.26 7.61 4.47 5.63

Alllabour 36.64 42.43 30.44 42.09 30.52 40.55

MATERIALS

Bituminousmaterials 14.84 13.99 17.02 12.33 1.57 1.45

Cementandconcrete 3.45 2.70 5.64 3.12 2.78 0.99

Quarryproducts 14.29 7.02 16.42 7.73 26.75 14.21

Othermaterials(reinforcingsteel) 5.08 5.45 7.90 7.37 5.76 3.87

Allmaterials 37.66 29.15 46.97 30.56 36.86 20.52

EQUIPMENT

Hire/depreciation 18.09 19.56 15.33 19.18 23.32 27.57

Fuel 7.61 8.86 7.26 8.18 9.30 11.35

Allequipment 25.70 28.42 22.59 27.35 32.62 38.93

ALLINPUTSc 100.00 100.00 100.00 100.00 100.00 100.00

Samplesize 67 85 130 172 49 88

Notes:a. Theinputsharesinthetablearelengthofroadweightedaveragesofthedatafromstatesthatrespondedtothesurvey.Theweightsusedarein

TableA4.b. Thelengthofroadweightsarecomputedas(thelengthofagivenroadtype(e.g.arterialroads)inalocalgovernments/thetotallengthofthe

roadtypeinallthelocalgovernmentsthatrespondedtothesurveywithdataoninputpercentshares).c. Componentsmaynotnecessarilyadduptothetotalsduetorounding.Source: BITREestimates.

Table A4 Length of road in kilometres reported by local governments that responded, by state/ territory, 2011–12

Road lengtha Road weightsb

NSW 125816 0.3120

VIC 90508 0.2244

QLD 76301 0.1892

SA 43545 0.1080

WA 59102 0.1466

TAS 7012 0.0174

NT 977 0.0024

TOTALb 403262 1.0000

Note:a. Thisisthetotalroadlengthreportedbylocalgovernmentsthatrespondedtothesurveywithdataoninputpercentshares. Roadweightiscalculatedas(roadlengthinlocalgovernmentsthatrespondedwithdataoninputpercentsharesinastateorterritory)divided

by(totalroadlengthinalllocalgovernmentsthatrespondedwithdataoninputpercentshares).b. Componentsmaynotnecessarilyadduptothetotalsduetorounding.Source: BITREestimates.

Info

rmat

ion

shee

t4

9

22

Table A5 Private sector contractors: Input per cent shares used in projects

Arterial roadsa Sealed local roadsa Unsealed local roadsa

Construction Maintenance Construction Maintenance Construction Maintenance

LABOURSite-based 18.10 20.57 21.55 23.90 25.36 33.14

Office-based 10.84 7.44 7.02 8.80 7.36 8.71Alllabour 28.94 28.01 28.57 32.70 32.71 41.86

MATERIALSBituminousmaterials 11.12 24.89 12.01 26.20 0.14 0.00Cementandconcrete 5.81 7.62 7.76 8.00 1.71 0.00

Quarryproducts 15.17 9.22 15.64 7.20 27.29 26.29Othermaterials(reinforcingsteel) 8.51 3.63 11.24 2.60 10.57 3.43

Allmaterials 40.61 45.37 46.65 44.00 39.71 29.71EQUIPMENT

Hire/depreciation 25.02 21.49 19.01 17.90 20.57 23.29

Fuel 5.43 5.13 5.77 5.40 7.00 5.14Allequipment 30.46 26.62 24.78 23.30 27.57 28.43

ALLINPUTSb 100.00 100.00 100.00 100.00 100.00 100.00Samplesize 21 9 18 10 7 7

Notes:a. Theinputsharesinthetableareaveragesofthedatafrom36companiesthatrespondedtothesurvey.b. Componentsmaynotnecessarilyadduptothetotalsduetorounding.Source: Arup(2013).

Info

rmat

ion

shee

t4

9

23

Appendix B: National aggregated input per cent shares used in RCMPI and sub-indexesTable B1 RCMPI: input per cent shares—2013

State / territory road authorities’

input per cent shares

Local governments’

input per cent shares

Private sector contractors’

input per cent shares

Roada expenditure

weighted input per cent shares

Road expenditure

weighted input per cent shares

Change between

1997 & 2013

2013 1997LABOUR

Site-based 29.98 30.56 23.77 26.64 17.00 9.64Office-based 4.91 6.55 8.36 7.31 8.90 -1.59Alllabour 34.88 37.11 32.13 33.94 25.80 8.14

MATERIALSBituminousmaterials 24.14 10.20 12.39 13.70 12.00 1.70Cementandconcrete 2.06 3.11 5.15 4.09 9.70 -5.61

Quarryproducts 0.00 14.41 16.80 13.42 15.30 -1.88

Othermaterials(reinforcingsteel) 2.91 5.90 6.66 5.85 10.80 -4.95Allmaterials 29.11 33.62 41.01 37.06 47.70 -10.64

EQUIPMENTHire/depreciation 34.61 20.51 21.21 23.19 19.60 3.59

Fuel 1.40 8.76 5.65 5.81 6.80 -0.99Allequipment 36.01 29.27 26.86 29.00 26.50 2.50

ALLINPUTSb 100.00 100.00 100.00 100.00 100.00 naExpenditureweights

(FromTable4ofthisIS)0.1623 0.2736 0.5641 1.00 na na

Note:a. Thedataintheshadedcolumnrepresenttheinputpercentsharesusedinthere-calibratedRCMPI2013. na:notapplicableb. Componentsmaynotnecessarilyadduptothetotalsduetorounding.Source: BITREestimates.

Table B2 Construction sub-index: input per cent shares—2013

State / territory road authorities’ input

per cent shares

Local governments’ input per cent

shares

Private sector contractors’ input

per cent shares

Road expenditurea weighted input per cent shares

LABOUR

Site-based 29.55 26.22 21.67 24.19

Office-based 6.95 6.31 8.41 7.60

Alllabour 36.50 32.53 30.07 31.79

MATERIALS

Bituminousmaterials 29.57 11.14 7.76 12.23

Cementandconcrete 3.11 3.95 5.10 4.46

Quarryproducts 0.00 19.16 19.36 16.16

Othermaterials(reinforcingsteel) 3.11 6.24 10.11 7.92

Allmaterials 35.80 40.50 42.32 40.77

EQUIPMENT

Hire/depreciation 26.91 18.91 21.53 21.69

Fuel 0.79 8.05 6.07 5.76

Allequipment 27.70 26.97 27.60 27.44

ALLINPUTSb 100.00 100.00 100.00 100.00

Expenditureweights(FromTable4ofthisIS)

0.1623 0.2736 0.5641 1.00

Note:a. Thedataintheshadedcolumnrepresenttheinputpercentsharesusedinthe2013roadconstructionsub-index.b. Componentsmaynotnecessarilyadduptothetotalsduetorounding.Source: BITREestimates.

Info

rmat

ion

shee

t4

9

24

Table B3 Maintenance sub-index: input per cent shares—2013

State / territory road authorities’ input

per cent shares

Local governments’ input per cent

shares

Private sector contractors’ input

per cent shares

Road expenditurea

weighted input per cent shares

LABOUR

Site-based 30.19 34.90 25.87 29.04

Office-based 3.89 6.79 8.32 7.18

Alllabour 34.08 41.69 34.19 36.22

MATERIALS

Bituminousmaterials 21.43 9.26 17.03 15.62

Cementandconcrete 1.53 2.27 5.21 3.81

Quarryproducts 0.00 9.66 14.24 10.67

Othermaterials(reinforcingsteel) 2.81 5.56 3.22 3.79

Allmaterials 25.76 26.74 39.69 33.89

EQUIPMENT

Hire/depreciation 38.46 22.10 20.89 24.07

Fuel 1.70 9.46 5.23 5.81

Allequipment 40.16 31.57 26.12 29.89

ALLINPUTSb 100.00 100.00 100.00 100.00

Expenditureweights(FromTable4ofthisIS)

0.1623 0.2736 0.5641 1.00

Note:a. Thedataintheshadedcolumnrepresenttheinputpercentsharesusedinthe2013roadmaintenancesub-index.b. Componentsmaynotnecessarilyadduptothetotalsduetorounding.Source: BITREestimates.

Info

rmat

ion

shee

t4

9

25

Table B4 Arterial roads sub-index: input per cent shares—2013

State / territory road authorities’ input

per cent shares

Local governments’ input per cent

shares

Private sector contractors’ input

per cent shares

Road expenditurea

weighted input per cent shares

LABOUR

Site-based 33.37 31.88 19.33 25.04

Office-based 6.65 7.66 9.14 8.33

Alllabour 40.02 39.54 28.47 33.37

MATERIALS

Bituminousmaterials 28.52 14.41 18.00 18.73

Cementandconcrete 3.08 3.07 6.72 5.13

Quarryproducts 0.00 10.66 12.19 9.79

Othermaterials(reinforcingsteel) 3.08 5.26 6.07 5.37

Allmaterials 34.69 33.40 42.99 39.02

EQUIPMENT

Hire/depreciation 24.13 18.83 23.26 22.19

Fuel 1.16 8.23 5.28 5.42

Allequipment 25.29 27.06 28.54 27.61

ALLINPUTSb 100.00 100.00 100.00 100.00

Expenditureweights(FromTable4ofthisIS)

0.1623 0.2736 0.5641 1.00

Note:a. Thedataintheshadedcolumnrepresenttheinputpercentsharesusedin2013arterialroadssub-index.b. Componentsmaynotnecessarilyadduptothetotalsduetorounding.Source: BITREestimates.

Table B5 Sealed local roads sub-index: input per cent shares—2013

State / territory road authorities’ input

per cent shares

Local governments’ input per cent

shares

Private sector contractors’ input

per cent shares

Road expenditurea weighted input per cent

shares

LABOUR

Site-based 23.18 29.33 22.73 24.61

Office-based 1.42 6.94 7.91 6.59

Alllabour 24.60 36.26 30.64 31.20

MATERIALS

Bituminousmaterials 15.39 14.67 19.11 17.29

Cementandconcrete 0.00 4.38 7.88 5.64

Quarryproducts 0.00 12.08 11.42 9.75

Othermaterials(reinforcingsteel) 2.56 7.64 6.92 6.41

Allmaterials 17.95 38.76 45.33 39.09

EQUIPMENT

Hire/depreciation 55.56 17.25 18.45 24.15

Fuel 1.88 7.72 5.59 5.57

Allequipment 57.44 24.97 24.04 29.72

ALLINPUTSb 100.00 100.00 100.00 100.00

Expenditureweights(FromTable4ofthisIS)

0.1623 0.2736 0.5641 1.00

Notes:a. Thedataintheshadedcolumnrepresenttheinputpercentsharesusedinthethe2013sealedlocalroadssub-index.b. Componentsmaynotnecessarilyadduptothetotalsduetorounding.Source: BITREestimates.

Info

rmat

ion

shee

t4

9

26

Table B6 Unsealed local roads sub-index: input per cent shares—2013

Local governments’ input per cent shares

Private sector contractors’ input per cent shares

Road expenditure weighteda input per cent shares

LABOUR

Site-based 30.49 29.25 29.65

Office-based 5.05 8.04 7.06

Alllabour 35.54 37.29 36.71

MATERIALS

Bituminousmaterials 1.51 0.07 0.54

Cementandconcrete 1.88 0.86 1.19

Quarryproducts 20.48 26.79 24.73

Othermaterials(reinforcingsteel) 4.81 7.00 6.29

Allmaterials 28.69 34.71 32.75

EQUIPMENT

Hire/depreciation 25.45 21.93 23.08

Fuel 10.33 6.07 7.46

Allequipment 35.77 28.00 30.54

ALLINPUTSb 100.00 100.00 100.00

Expenditureweights(FromTable4ofthisIS)

0.3266 0.6734 1.00

Note:a. Thedataintheshadedcolumnrepresenttheinputpercentsharesusedinthe2013unsealedlocalroadssub-index.b. Componentsmaynotnecessarilyadduptothetotalsduetorounding.Source: BITREestimates.

Info

rmat

ion

shee

t4

9

27

ReferencesABS2013a,Producer Price Indexes, Australia, June 2013,ABScatalogueno.6427.0,<http://www.abs.gov.au/AUSSTATS>

ABS2013b,Average Weekly Earnings, Australia, May 2013,ABScatalogueno.6302.0,<http://www.abs.gov.au/AUSSTATS>

ABS2013c,Consumer Price Index, Australia, June 2013,ABScatalogueno.6401.0,<http://www.abs.gov.au/AUSSTATS>

Arup(2013)Inputpercentsharesinprivatesectorroadconstructionandmaintenanceprojects:ResultsfromasurveyundertakenforBITRE(unpublished),June2013.

AustralianPetroleumInstitute2013, Weekly Diesel Prices Report, week ending 1 July, viewedJuly2013at<http://www.aip.com.au/pricing/weeklydieselreport.htm>

Austroads(2013),Austroads’listofContractorsprequalifiedundertheNationalpre-qualificationsystemforcivilconstructioncontracts,availableathttp://www.austroads.com.au/project-delivery/prequalification#ListofContractorsPrequalifiedunderNationalPrequalificationSystem

BITRE2013,Yearbook2013:AustralianInfrastructureStatistics,StatisticalReport,BITRE,Canberra,ACT.

BITRE2012,BITRERoadConstructionandMaintenancePriceIndex, InformationSheet45(November2012),BITRE,Canberra.

BITRE2011a,BITRERoadConstructionandMaintenancePrice Index, InformationSheet42(October2011),BITRE,Canberra.

BITRE2011b,PublicRoad-RelatedExpenditureandRevenueinAustralia,InformationSheet40(February2011),BITRE,Canberra.

BITRE2009a,PublicRoad-RelatedExpenditureandRevenueinAustralia,InformationSheet37(November2009),BITRE,Canberra.

BITRE2009b,PublicRoad-RelatedExpenditureandRevenueinAustralia,InformationSheet29(February2009),BITRE,Canberra.

BITRE2008a,PublicRoad-RelatedExpenditureandRevenueinAustralia,InformationSheet27(February2008),BITRE,Canberra.

BITRE2008b,PublicRoad-RelatedExpenditureandRevenueinAustralia,InformationSheet25(October2008),BITRE,Canberra.

BTCE1997,BTCERoadConstructionandMaintenancePriceIndex(InformationPaper41),AustralianGovernmentPublishingService,Canberra.

NationalTransportCommission2012,Heavyvehiclecharges.ReporttotheStandingCouncilofTransportandInfrastructure,NTC,February2012.

Info

rmat

ion

shee

t4

9

28

©CommonwealthofAustralia2013ISSN1440-9593ISBN978-1-922205-51-3November2013/INFRA1991

CreativeCommonsAttribution3.0AustraliaLicenceisastandardformlicenceagreementthatallowsyoutocopy,communicateandadaptthispublicationprovidedthatyouattributetheworktotheCommonwealthandabidebytheotherlicenceterms.Asummaryofthelicencetermsisavailablefromhttp://creativecommons.org/licenses/by/3.0/au/deed.en.Thefulllicencetermsareavailablefromhttp://creativecommons.org/licenses/by/3.0/au/legalcode.

Thispublicationshouldbeattributedinthefollowingway;BureauofInfrastructure,TransportandRegionalEconomics(BITRE),2013,BITRE Road Construction and Maintenance Price Index and Sub-Index—2013 update,InformationSheet49,BITRE,Canberra.

AcknowledgementTheinformationsheetwascompiledbyBryanLeeintheInfrastructureandSurfaceTransportStatisticsSection.BryanLeealsoundertookmostoftheworktosurveylocalgovernments.AnatoliLightfootundertookthesurveysofstate/territoryroadauthorities.ARUP,aprivatesectorconsultingfirm,wascommissionedbyBITREtocollectdatafromtheprivatesector.

Coverphoto:Roadgrader.ImagecourstesyofCaterpillarInc.

Use of the Coat of ArmsTheDepartmentofthePrimeMinisterandCabinetsetsthetermsunderwhichtheCoatofArmsisused.PleaserefertotheDepartment’sCommonwealthCoatofArmsandGovernmentBrandingwebpagehttp://www.dpmc.gov.au/guidelines/index.cfm#brandandinparticular,theGuidelinesontheuseoftheCommonwealthCoatofArmspublication.

Contact usThispublicationisavailableinPDFformat.Allotherrightsarereserved,includinginrelationtoanyDepartmentallogosortrademarkswhichmayexist.Forenquiriesregardingthelicenceandanyuseofthispublication,pleasecontact:

DepartmentofInfrastructureandRegionalDevelopmentBureauofInfrastructure,TransportandRegionalEconomics(BITRE)GPOBox501,CanberraACT2601,Australia

Telephone:(international)+61262747210Fax: (international)+61262746855Email: [email protected]: www.bitre.gov.au


Recommended