DUST MANAGEMENT PLAN (DMP) December 2015 Version Date Section Modified Reason for Modification Review Team 1 February 2005 All Original Management Plan MCC Technical Services Department Carbon Based Environmental 2 December 2010 All 5 Yearly Review MCC Technical Services Department Carbon Based Environmental 3 December 2015 All 5 Yearly Review MCC Environmental, Technical Services and Production Departments Approved by Senior Operations Manager: Grant Clouten – signature on file Effective Date: 1 December 2015 Established 1907 Muswellbrook Coal Company Limited
Transcript
Page 1: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

       

DUST MANAGEMENT PLAN (DMP) 

  

December 2015   

Version  Date  Section Modified Reason for Modification 

Review Team 

1  February 2005  All Original Management 

Plan MCC Technical Services Department 

Carbon Based Environmental 

2 December 

2010 All  5 Yearly Review 

MCC Technical Services Department Carbon Based Environmental 

3 December 

2015 All  5 Yearly Review 

MCC Environmental, Technical Services and Production 

Departments 

  

Approved by Senior Operations Manager: Grant Clouten – signature on file  Effective Date: 1 December 2015 

 

Established 1907

Muswellbrook Coal Company Limited

Page 2: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

 

Version 3 December 2015 Page i

TABLE OF CONTENTS 1.0  INTRODUCTION ............................................................................... 1 1.1  SCOPE ....................................................................................................... 1 1.2  OBJECTIVES ............................................................................................... 1 

2.0  STATUTORY REQUIREMENTS ........................................................... 2 2.1  DUST CRITERIA ........................................................................................ 10 2.2  MONITORING METHODOLOGY ............................................................... 10 

3.0  DUST MITIGATION AND CONTROL PROCEDURES ........................... 11 3.1  IDENTIFICATION OF PROPERTIES AFFECTED BY DUST ............................ 11 3.2  DUST CONTROL PROCEDURES ................................................................ 11 3.3  SHORT TERM EPISODIC EVENTS ............................................................. 12 

4.0  DUST MONITORING PROGRAM ..................................................... 13 4.1  WEATHER MONITORING ........................................................................ 13 4.2  DUST DEPOSITION .................................................................................. 15 4.3  TOTAL SUSPENDED PARTICULATES ........................................................ 15 4.4  PARTICULATE MATTER (PM10) ............................................................... 15 

5.0  COMPLAINT MANAGEMENT .......................................................... 16 6.0  EXTERNAL RELATIONS ................................................................... 16 6.1  COMMUNITY CONSULTATION ................................................................ 16 6.2  OTHER MINING COMPANIES .................................................................. 16 

7.0  INCIDENT REPORTING ................................................................... 17 8.0  INDEPENDENT DUST INVESTIGATION ............................................ 17 9.0  EXTERNAL REPORTING .................................................................. 17 9.1  ANNUAL ENVIRONMENTAL MANAGEMENT REPORT ............................. 18 

10.0  ENVIRONMENTAL AUDITS .......................................................... 18 11.0  REVIEW OF MANAGEMENT PLAN ............................................... 18 12.0  RESPONSIBILITES ........................................................................ 19 

 LIST OF TABLES 

Table 1: Statutory Requirements ..................................................................................... 2 Table 2: Long Term Particulate Matter Criteria ............................................................. 10 Table 3: Short Term Particulate Matter Goal ................................................................. 10 Table 4: NSW EPA Amenity Based Criteria for Dust Fallout ........................................... 10 Table 5: Air Monitoring Methodology ............................................................................ 10 Table 6: Meteorological Monitoring Methodology ........................................................ 10 Table 7: Control Procedures for Wind Blown Dust ........................................................ 11 Table 8: Control Procedures for Mining Generated Dust Sources ................................. 11 Table 9: Control Measures for Short Term Episodic Events ........................................... 12 Table 10: Depositional Dust Gauge Locations ................................................................ 15 Table 11: TSP Monitoring Locations ............................................................................... 15 Table 12: PM10 Monitoring Locations ........................................................................... 16 Table 13: Management Plan Responsibilities................................................................. 19 

 

Page 3: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 1

1.0 INTRODUCTION Muswellbrook  Coal  Company  (MCC)  is  a  wholly  owned  subsidiary  of  the  Idemitsu Kosan  Company  Ltd.  Group.  MCC  has  a  long  association  with  coal  mining  at Muswellbrook,  with  underground  coal  mining  commencing  in  1907  and  open  cut operations  in  1944.  The  mine  is  located  on  Muscle  Creek  Road,  approximately  3 kilometres to the north‐east of Muswellbrook.  On  September  1,  2003,  Development  Consent  for  DA  205/2002  was  granted  by Muswellbrook Shire Council (MSC) to extend the former MCC No.1 Open Cut. The No.1 Open  Cut  Extension  commenced  operations  in March  2005  and  has  a  capacity  to produce up to 2,000,000 tonnes coal per annum. This approval has subsequently been modified to allow the relocation of the Mine  Infrastructure Area (MIA) and to extend the mine life to 2020.  

1.1 SCOPE 

The Development Consent requires the preparation, approval and  implementation of an  Environmental  Management  Strategy  (EMS)  and  subordinate  Environmental Management Plans  (EMP).   One of these EMPs  is the Dust Management Plan  (DMP).  Whilst  this  plan  specifically  addresses  issues  related  to  the  management  of  dust generating activities, it should be read in conjunction with other EMP’s.  This DMP also address other approval and licence conditions that relate to MCC’s dust management  system.   This DMP has been prepared  to manage dust  related  impacts associated with mining at MCC and operation of  the Coal Handling and Preparation Plant (CHPP).  This DMP has been prepared  in consultation with Environmental Protection Authority (EPA) to the satisfaction of MSC.  

1.2 OBJECTIVES 

The main objective of  the DMP  is  to manage and minimise  the  impact of dust  from mining operations on the environment and nearby residences.   The following actions will be undertaken to achieve this objective: 

Detail the methods to be used to minimise dust emissions; 

Maintain a dust monitoring program; 

Identify  the  risk  levels  at  which mine  operations may  need  to  be modified  to manage compliance; 

Define the measures to manage short term episodic events; 

Define the mechanisms for community consultation; 

Detail  the management measures  to  be  undertaken  where  the  dust  levels  are demonstrated to exceed the criterion;  

Detail the Complaint Handling Procedure; 

Detail the specifications and procedures to be used for the purpose of Independent Dust Investigations; and 

Specify the regulatory reporting requirements. 

Page 4: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 2

2.0 STATUTORY REQUIREMENTS The relevant approval and licence conditions are shown in Table 1 along with information on where they are addressed in this plan.  

Table 1: Statutory Requirements Approval/ Licence 

Condition No. Condition  Section 

Development Consent 

6.1.3  The Applicant shall, prior to the commencement of operations, prepare and implement a Dust Management Plan for the DA area to deal with and manage the dust impacts generated by, or associated with the Project. This Plan shall detail air quality safeguards and procedures for dealing with dust emissions from the construction and operation of the Project to the satisfaction of MSC and EPA and updated as directed. The Plan shall be prepared in consultation with and be updated as required by MSC. This Plan shall include, but not be limited to, details of: 

This plan 

6.1.3 (i)  the identification of properties which will be affected by dust generated by the mine in accordance with the criteria detailed in condition 6.1.1; 

3.1 

6.1.3 (ii)  specifications of the procedures for the dust monitoring program for the purpose of undertaking independent dust investigations; 

8.0 

6.1.3 (iii)  outline the procedure to notify property owners and occupiers as identified by monitoring as likely to be affected by dust generated by the mine in excess of criteria detailed in condition 6.1.1; 

7.0 

6.1.3 (iv)  mitigation measures to be employed to minimise dust emissions during the operation phase. This should include proactive/predictive and reactive mitigation measures to be employed to minimise dust emissions including visible dust emanating from the site; 

3.2 

6.1.3 (v)  The Applicant shall ensure the prompt and effective rehabilitation of all disturbed areas of the DA area following the completion of mining and associated activities in that area to minimise the generation of wind blown dust; 

3.2 

6.1.3 (vi)  the use of existing protocol for handling dust complaints that include recording, reporting and acting on complaints; 

5.0 

Page 5: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 3

Approval/ Licence 

Condition No. Condition  Section 

6.1.3 (vii)  outline of response and/or management measures to be undertaken in the event of complaints from a landowner where dust levels are demonstrated, in accordance with Condition 6.1.4, to be below the dust criteria in condition 6.1.1; 

5.0 

6.1.3 (viii)  appropriate mechanisms for community consultation;  6.1 

6.1.3 (ix)  equipment to be available and used to control dust generation;  3.3 

6.1.3 (x)  methods to determine when and how the mine operation is to be modified to minimise the potential for dust emissions, particularly from surface activities; 

3.3 

6.1.3 (xi)  details of locations and frequency of existing dust monitoring and deposition gauges at the residential areas as agreed by the EPA, as part of a licence variation; 

4.0 

6.1.3 (xii)  measures to manage and mitigate short term episodic events including investigations into the relationships between short‐term variations in dust levels (particularly TSP and dust deposition) and levels of complaints and annoyance, with a view to reviewing the monitoring approaches; and 

3.3 

6.1.3 (xiii)  as far as practicable details of the interrelationships of this plan with the dust management plans of other mining operations in the vicinity. 

6.2 

6.1.3 (xiv)  mobile tankers equipped with a pump and sprays must be provided to suppress dust from unsealed roads when in use. 

3.2 

6.1.3 (xv)  the measures currently employed at MCC for the reduction of wind blown dust as outlined in Section 7.8 of the EIS. 

3.2 

6.1.4 (a) (i)  The Applicant shall: monitor dust deposition and the concentration of total suspended particulate matter and of PM10 particulate matter in accordance with a Dust Monitoring Plan submitted to the EPA. The Environment Protection Licence will include conditions specifying the location, frequencies and methods used to monitor air emissions; 

4.0 

6.1.4 (a) (ii)  monitor and report against the NSW EPA goals of 50ug/m3 (24‐hour average) and 30ug/m3 (annual mean).  The results of this monitoring and reporting are to be incorporated into the AEMR; 

4.0, 9.0 

6.1.4 (a) (iii)  establish in consultation with the EPA, dust deposition and TSP monitoring sites as approved by the EPA.  The sampling method, units of measure, interval and frequency of monitoring will be as set out in the Approved Methods for sampling and analysis of Air Pollutants in NSW; 

4.0 

Page 6: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 4

Approval/ Licence 

Condition No. Condition  Section 

6.1.4 (a) (iv)  include sites for monitoring impacts of dust at the nearest non‐mine owned residences and locations as may be determined to be necessary by MSC and in accordance with the Dust Management Plan referred to in Condition 6.1.3; 

4.0 

6.1.4 (a) (v)  provide reporting once every 12 months on the performance of the control measures and of the monitoring system detailed the EIS and conditions of this consent, unless otherwise agreed by MSC.  The reports shall be included in the AEMR and provided to MSC within fourteen days of completion of the report; and 

9.0 

6.1.4 (a) (vi)  provide all results and analysis of air quality monitoring in the AEMR including a determination of the dust deposition rate in g/m2/month, which shall be plotted in the AEMR. 

9.0 

6.1.4 (b) (i)  In the event that a landowner or occupier considers that dust from the Project at his/her dwelling is in excess of the criteria detailed in Table 1, Table 2 and Table 3 in condition 6.1.1, and MSC is satisfied that an investigation is required, the Applicant shall upon the receipt of a written request from MSC: consult with the landowner or occupant affected to determine his/her concerns; 

8.0 

6.1.4 (b) (ii)  modify the mining activity or take other steps in accordance with the Dust Management Plan if exceedences are demonstrated by the independent investigations to result in part from the Project related activity. This may include: (i)  introduction of additional controls, either of dust generation from individual sources on the site or on site operations, or modify operations to attempt to ensure that the dust criteria are achieved;  and/or; (ii)  negotiate, as far as reasonably practicable, an agreement with the landowner or provide such forms of benefit or amelioration of the impact of dust as may be agreed between the parties as providing acceptable compensation for the dust levels experienced.   

8.0 

6.1.4 (b) (iii)  conduct follow up investigation(s) to the satisfaction of the MSC, where necessary. Note:  Vacant land in this condition means the whole of the lot in a current plan registered at the Land Titles Office as at the date of this consent that does not have a dwelling situated on the lot and is permitted to have a dwelling on that lot 

8.0 

Page 7: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 5

Approval/ Licence 

Condition No. Condition  Section 

6.1.4 (c)  If the independent dust investigations in sub‐clause (b) above confirm that dust levels from the Project alone are in excess of the relevant criteria detailed in Table 1, Table 2 and Table 3 above in condition 6.1.1, and if the measures in sub‐clause (b)(ii) (1) above do not reduce the dust levels, from the Project alone, below the criteria in Table 1, Table 2 and Table 3 in condition 6.1.1, or if agreement in accordance with sub‐clause (b)(ii) (2) above cannot be reached, the Applicant shall at the written request of the owner acquire the relevant property.  Acquisition shall be in accordance with the procedures set out in Condition 11.1. 

8.0 

6.1.4 (d)  Further independent investigation(s) shall cease if MSC is satisfied that the relevant criteria in Table 1, Table 2 and Table 3 in condition 6.1.1 are not being exceeded and are unlikely to be exceeded in the future. 

8.0 

6.1.4 (e)  Monitoring for the concentration of a pollutant emitted to the air required to be conducted by a licence under the Protection of the Environment Operations Act 1997, in relation to the development or in order to comply with a relevant local calculation protocol must be done in accordance with: * any methodology which is required by or under the Protection of the Environment Operations Act 1997 to be used for the testing of the concentration of the pollutant; * if no such requirement is imposed by or under the Protection of the Environment Operations Act 1997, any methodology which the condition of the licence or the protocol (as the case may be) requires to be used for that testing; or * if no such requirement is imposed by or under the Protection of the Environment Operations Act 1997 or by a condition of the licence or the protocol (as the case may be), any methodology approved in writing by the EPA for the purposes of that testing prior to the testing taking place 

4.0 

6.2 (a)  The Applicant shall ensure the prompt and effective rehabilitation of all disturbed areas of the DA area following the completion of mining and associated activities in that area to minimise the generation of wind blown dust. 

3.2 

6.2 (b)  Activities occurring at the premises must be carried out in a manner that will minimise emissions of dust from the premises. 

3.0 

Page 8: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 6

Approval/ Licence 

Condition No. Condition  Section 

9.2 (a)  The Applicant shall, throughout the life of the mine and for five years after the completion of mining in the DA area, prepare and submit an Annual Environmental Management Report (AEMR) to the satisfaction of MSC and DMR. The AEMR shall review the performance of the mine against the Environmental Management Strategy and the relevant Mining Operations Plans, the conditions of this consent, and other licences and approvals relating to the mine. To enable ready comparison with the predictions made in the EIS, diagrams and tables, the report shall include, but not be limited to, the following matters: (i) an annual compliance audit of the performance of the project against conditions of this consent and statutory approvals; (ii) assess the extension against predictions made in the EIS and the terms and commitments in the documents listed in condition 1.1; (iii) a review of the effectiveness of the environmental management of the mine in terms of EPA, DIPNR, DMR, MSC requirements; (iv) results of all environmental monitoring required under this consent or other approvals, including interpretations and discussion by a suitably qualified person; (v) identification of trends in monitoring results over the life of the mine; (vi) an assessment of any changes to agricultural land suitability resulting from the Mining Operations, including cumulative changes; (vii) a listing of any variations obtained to approvals applicable to the DA area during the previous year; (viii) the outcome of the water budget for the year, the quantity of water used from water storages and details of exchange of any water from the site; (ix) status of rehabilitation and revegetation works; and (x) environmental management targets and strategies for the next year, taking into account identified trends in monitoring results. 

9.1 

Page 9: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

C

Approval/ Licence 

Condition No. 

9.3 (d)  Tlirdctc

P1.1  Ta

M2.1  FmTo

Musw

Versio

The Applicant musicence under the eturn the Applicadischarges), providconditions and prohat are payable. Icalculation worksh

The following poinand/ or the setting

For each monitorimonitor (samplingThe licensee mustopposite in the ot

wellbrook Coal Compa

on 3

st provide an annProtection of theant must report onde a summary of ovide a calculatioIf load based feesheets with the ret

nts referred to in tg of limits for the 

ng/discharge poing and obtaining ret use the samplingher columns: 

any Limited 

C

ual return to the  Environment Opn the annual moncomplaints relatinn of licence fees (s apply to the activturn. This may for

Environmen

the table below aemission of pollu

nt or utilisation aresults by analysis)g methods, units o

December 2015

Condition 

EPA in relation toerations Act 1997nitoring undertakeng to the develop(administrative fevity the applicantrm part of the AEM

ntal Protection Li

are identified in thutants to the air fr

rea specified belo) the concentratioof measure, and s

o the developmen7 in relation to theen (where the actpment, report on cees and, where re will be required tMR. 

cence 

his licence for the rom the point. 

ow (by a point numon of each pollutasample at the freq

Dust Managemen

nt as required by ae development. Intivity results in pocompliance with llevant, load basedto submit load‐ba

purposes of mon

mber), the licensent specified in Coquency, specified 

nt Plan 

Page 7

S

any n the ollutant licence d fees) ased fee 

nitoring 

ee must olumn 1. 

Section 

9.0 

4.0 

4.0 

Page 10: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

C

Approval/ Licence 

Condition No. 

M2.2 

M3.1  Mm(at(r(catNpf

Musw

Versio

Monitoring for themust be done in aa) any methodolohe pollutant; or b) if no such requequires to be usec) if no such requapproved in writinhe testing taking Note: The Protectipurposes to be coor the Sampling a

wellbrook Coal Compa

on 3

e concentration occordance with:ogy which is requi

uirement is imposed for that testingirement is imposeng by the EPA for place ion of the Environnducted in accordand Analysis of Air

any Limited 

C

of a pollutant emit

ired by or under t

ed by or under th; or ed by or under ththe purposes of t

nment Operationsdance with test mr Pollutants in NSW

December 2015

Condition 

tted to the air req

the Act to be used

he Act, any metho

e Act or by a condhat testing prior t

s (Clean Air) Regulmethods containedW". 

quired to be cond

d for the testing o

odology which a co

dition of this licento 

lation 2010 requird in the publicatio

Dust Managemen

ucted by this licen

f the concentratio

ondition of this lic

nce, any methodo

res testing for ceron "Approved Me

nt Plan 

Page 8

S

nce 

on of 

cence 

ology 

rtain ethods 

Section 

4.0 

4.0 

Page 11: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 9

Approval/ Licence 

Condition No. Condition  Section 

R 1.1  The licensee must complete and supply to the EPA an Annual Return in the approved form comprising: (a) a Statement of Compliance; and (b) a Monitoring and Complaints Summary. A copy of the form in which the Annual Return must be supplied to the EPA accompanies this licence. Before the end of each reporting period, the EPA will provide to the licensee a copy of the form that must be completed and returned to the EPA. 

9.0 

  

Page 12: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 10

2.1 DUST CRITERIA 

Dust criteria are set in Development Consent DA205/2002 and are reproduced in Table 2 to Table 4.   

Table 2: Long Term Particulate Matter Criteria Pollutant  Standard / Goal  Agency 

Total Suspended Particulate Matter (TSP) 

90g/m3 (annual mean)  NH&MRC 

Particulate Matter  

<10g (PM10) 30g/m3 (annual mean)  NSW EPA 

Note: This is shown as Table 1 in DA205/2002. 

 Table 3: Short Term Particulate Matter Goal 

Pollutant  Standard/Goal  Agency 

Particulate Matter 

<10m (PM10) 50g/m3 (24‐hour average)  NSW EPA 

Note: This is shown as Table 2 in DA205/2002. 

 Table 4: NSW EPA Amenity Based Criteria for Dust Fallout 

Pollutant Averaging Period 

Maximum Increase in Deposited Dust Levels 

Maximum Total Deposited Dust Levels 

Deposited Dust  Annual  2g/m2/month  4g/m2/month Note: This is shown as Table 3 in DA205/2002. Note: Dust is assessed as insoluble solids as defined by AS 3580.10.1‐1991(AM‐19) 

 

2.2 MONITORING METHODOLOGY 

The  monitoring  methodologies  outlined  in  Development  Consent  DA205/2002  are reproduced in Table 5 and Table 6.  

Table 5: Air Monitoring Methodology 

Pollutant Units of Measure 

Frequency  Sampling Method 

Particulate Matter – PM10  g/m3  Continuous  AS3580.9.8 ‐ 2001 

Total Suspended Particles  g/m3  1 day in 6 24‐hour composite 

sample 

Particulates – Deposited Matter 

g/m2/month  Continuous  AM‐ 19 

Note: This is shown as Table 4 in DA205/2002. 

 Table 6: Meteorological Monitoring Methodology 

Parameter  Units of Measure  Frequency  Sampling Method 

Atmospheric inversion 

0C/100m  Continuous  Instrumental 

Wind Direction    Continuous  Instrumental 

Wind Speed  m/sec  Continuous  Instrumental Note: This is shown as Table 5 in DA205/2002. 

 

Page 13: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 11

3.0 DUST MITIGATION AND CONTROL PROCEDURES 

3.1 IDENTIFICATION OF PROPERTIES AFFECTED BY DUST 

An Air Quality Assessment was prepared as part of the EIS for MCC.   This assessment concluded  that  no  properties  would  be  expected  to  experience  concentrations  of either PM10, TSP or dust deposition above the appropriate goal or standard as a result of the proposal.  

3.2 DUST CONTROL PROCEDURES 

Dust can be generated from two primary sources, either windblown dust from exposed areas, or dust generated by mining activities. The control procedures for these sources are outlined in Table 7 and Table 8.  

Table 7: Control Procedures for Wind Blown Dust 

Source  Control Procedures 

Areas disturbed by mining 

Disturb only the minimum area necessary for mining.  

Reshape, topsoil and rehabilitate completed overburden emplacement areas after the completion of overburden tipping. 

Coal Handling and Coal Stockpile Areas 

Maintain coal handling areas in a moist condition using water carts to minimise windblown and traffic generated dust. 

Clean‐up after any spillage event. 

Water carts to operate around the coal stockpile area to suppress dust on roadways and the coal stockpiles. 

 Table 8: Control Procedures for Mining Generated Dust Sources 

Source  Control Procedures 

Haul road dust 

All roads and traffic areas will be watered using water carts to minimise the generation of dust. 

Long term haul roads will be sheeted with hard wearing material. 

Minor roads  Development of minor roads will be limited to be only as 

required by mining. 

Minor roads used regularly for access will be watered. 

Topsoil stockpiling 

All topsoil stockpiles will be located and shaped to minimise the area exposed to prevailing winds. 

Long term topsoil stockpiles, not used for over 6 months will be revegetated. 

Drilling 

Dust aprons will be lowered during drilling. 

Drills will be equipped with dust extraction cyclones or water injection systems. 

Water injection or dust suppression sprays will be used when high levels of dust are being generated. 

Page 14: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 12

Source  Control Procedures 

Blasting  Stemming will be used at all times. 

Blasting will occur in accordance with the Blast‐Vibration Management Plan relating to meteorological conditions.  

Raw Coal Receival Bin  Sprays are to be used when tipping raw coal into the 

receival bin during high wind events. 

Coal Handling and Preparation Plant 

Sprays are fitted at transfer points. 

 

Equipment  to  be  available  and  used  to  control  dust  generation  include: water  cart (sprays on haul roads and coal stockpiles), sprays at the Raw Coal Receival Bin, sprays at conveyor transfer points, dust extraction cyclones or water injection systems on drill rigs.  

3.3 SHORT TERM EPISODIC EVENTS 

Periods of high dust emissions usually relate to periods of high wind speeds, especially when  the wind speed exceeds 5m/s. The primary wind directions are generally  from the  south  east  in  summer, winter  and  autumn  and  from  the  northwest  during  the winter.   Short term episodic events generally result from: 

Wind gusts related changes in the wind direction; 

Periods of high wind speeds; and 

Blasting operations.  The procedures to manage short term episodic events that may affect Muswellbrook are shown in Table 9.  

Table 9: Control Measures for Short Term Episodic Events 

Scenario  Control Procedures 

Wind speeds greater than 5m/s from the mining operation towards Muswellbrook or a real‐time dust alarm is triggered. 

Initial warning provided to OCE. 

OCE to confirm that all available water trucks and fixed spray systems are operational. 

Blasting may be deferred. 

OCE to inspect operations to identify any operations that are generating dust emissions and identify further mitigation measures. 

Page 15: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 13

Scenario  Control Procedures 

Wind speeds greater than 10m/s. 

All topsoil stripping and/or placement activities are to be stopped. 

All operations on out‐of‐pit overburden dumps are to cease. 

Blasting will be deferred. 

Maximum availability of dust suppression equipment to be used. 

OCE to inspect operations to identify any activities that are causing excessive dust emissions and stop these activities. 

 MCC  will  conduct  an  investigation  to  determine  whether  there  is  any  relationship between short term total suspended particulates (TSP) and dust deposition levels, and the frequency of community complaints related to dust.  This investigation will involve comparison of monitored monthly dust levels for TSP, dust deposition and community complaints  information  to determine any  relationships or  trends.   The  results of  this investigation will be reported in the Annual Environmental Management Report.  

4.0 DUST MONITORING PROGRAM The Dust Monitoring Program incorporates four major components. These are: 

Weather monitoring; 

Monitoring of dust deposition levels; 

Monitoring of the level of Total Suspended Particulates (TSP); and 

Monitoring of the level of fine dust particles less than 10µg (PM10).  This program has been developed  in consultation with the EPA.   The  locations of the monitoring sites can be seen in Figure 1.  All monitoring equipment will be maintained and calibrated as required.  

4.1 WEATHER MONITORING 

The principal Meteorological Monitoring Station (MMS) at Site 4  is established to the immediate west of  the No.1 Open Cut with supplemental stations established at  the three  Real  Time  Environmental  Monitoring  (RTEM)  stations.  The  MMS  and  RTEM stations continuously relay weather data to a website that site personnel have access to.  The following weather data is captured on a real time basis at all stations: 

wind speed; 

wind direction; 

air temperature; 

humidity; 

barometric pressure; and 

rainfall.  In  addition  atmospheric  inversion  is  calculated  and  is  based  on  air  temperature measurements from two stations, RTEM2 (Site 2) and the MMS (Site 4). 

Page 16: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Musw

Versio

ellbrook Coal C

on 3

Company Limite

F

ed 

igure 1: Du

December 2015

st Monitori

5

ing Location

D

ns 

ust Manageme

P

ent Plan 

Page 14

 

Page 17: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 15

4.2 DUST DEPOSITION 

Dust deposition gauges measure the amount of dust deposited in an area. The amount is  reported  in  terms  of  grams  of  dust  deposited  per  square  metre  per  month (g/m2/month). This method measures dust from all sources. The samples are collected on  a  30±2  day  cycle  and  sent  to  a  laboratory  for  analysis.  Any  sample  containing excessive organic or foreign matter (such as insects, vegetation and bird droppings) is excluded for reporting process.  MCC has  a network of 8 dust deposition  gauges with  the  locations of  these  gauges shown in Figure 1 with a description provided in Table 10.  

Table 10: Depositional Dust Gauge Locations Location Identifier  Description of Location 

D7  Queen St Muswellbrook – west of operations 

D17  Sandy Creek Road – northwest of operations 

D18  Sandy Creek Road – north of operations 

D19  McCullys Gap – north of operations 

D22  Muscle Creek Road – southeast of operations 

D24  Sandy Creek Road – northwest of operations 

D26  Muscle Creek Road – southeast of operations 

D29  Queen St – Muswellbrook 

 

4.3 TOTAL SUSPENDED PARTICULATES 

Total Suspended Particulates (TSP) is measured by an instrument called a high volume air  sampler  (HVAS) on a  six day cycle. Air  is pumped  through a  filter at a prescribed rate and the TSP left on the filter is measured via laboratory analysis.   A HVAS measuring TSP is located at each of the three RTEM stations. The locations are shown on Figure 1 with a description provided in Table 11.  

Table 11: TSP Monitoring Locations Location Identifier  Description of Location 

Site 1  Queen St Muswellbrook – west of operations 

Site 2  Sandy Creek Road – northwest of operations 

Site 3  Corner Sandy Creek Road and St Heliers Road – northwest of operations 

 

4.4 PARTICULATE MATTER (PM10) 

Particles  less  than  10µg mean  aerodynamic  diameter  (PM10) will  be measured  on  a continuous basis using either a Tapered Element Oscillating Microbalance  (TEOM) or Beta Attenuation Mass (BAM) unit.  The TEOM and BAM units continuously relay PM10 data to a website that site personnel have access to.    In addition one HVAS with a PM10 head operates on a six day cycle.  The locations of these units are shown in Figure 1 with a description provided in Table 12.    

Page 18: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 16

 Table 12: PM10 Monitoring Locations 

Location Identifier  Description of Location 

Site 1 (TEOM)  Queen St Muswellbrook – west of operations 

Site 2 (TEOM)  Sandy Creek Road – northwest of operations 

Site 3 (BAM)  Corner Sandy Creek Road and St Heliers Road– northwest of operations 

Nesbit (HVAS)  Sandy Creek Road – northwest of operations 

 

5.0 COMPLAINT MANAGEMENT Dust  related  complaints by  the  community  can be directed  to  the 24 hour  toll  free telephone  Environmental  Contact  Line  1800  600  205.  Complaints  shall  be  recorded and responded to in accordance with the MSC Complaints Mechanism.  

6.0 EXTERNAL RELATIONS 

6.1 COMMUNITY CONSULTATION 

Community consultation in respect to dust management occurs by: 

Dust monitoring data is made available on MCC’s website; 

Dust monitoring data is provided to the Community Consultative Committee (CCC) and the minutes of the meeting are made available to the public on MCC’s website; 

The results of environmental monitoring are published in the AEMR; 

Timely responses are provided to residents in the event of a complaint or inquiry; and 

The  CCC  receives  reports  at  each  committee meeting  on  the  number  of  dust‐related complaints and the action taken. 

 This CCC provides a direct line of communication between MCC and representatives of the local community.   

6.2 OTHER MINING COMPANIES 

Other operating mines or approved mines nearest  to Muswellbrook  include Drayton Coal, Mt Arthur Coal, Bengalla Mine, proposed Mount Pleasant Mine and Dartbrook Mine  (currently  under  care  and  maintenance),  which  are  all  further  southwest/ northwest to MCC.  Therefore, under south easterly wind conditions, these mines will have their lowest impact on Muswellbrook residences when MCC is having its greatest impact. Conversely, nearby mines will have  their maximum  impact on Muswellbrook residences when winds are  from the west to northwest, whilst MCC's operations are having  their  least  impact.   As a  result of  this  there have been  relatively  few,  if any, instances where cumulative effects have been experienced as a result of dust impacts from MCC in conjunction with neighbouring mines.   

Page 19: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 17

7.0 INCIDENT REPORTING In  the  event  that  an  initial  investigation  concludes  that  a  dust  related  incident  has occurred the  incident will be reported to MSC and EPA within 24 hours of confirming the incident.  Within  6  days  of  notifying MSC  and  EPA  of  an  incident, MCC will  submit  a written report that: a) Describes the date, time, and nature of the incident; b) Identifies the cause (or likely cause) of the incident; c) Describes what action has been taken to date; and d) Describes the proposed measures to address the incident.  In the event that the criteria shown in Table 2 to Table 4 are exceeded at a non‐mine residence from MCC operations alone MCC shall notify the resident of the results and discuss the results.  

8.0 INDEPENDENT DUST INVESTIGATION In  the  event  that  a  landowner  or  occupier  considers  that  dust  from MCC  at  their dwelling is in excess of the criteria detailed in Table 2 to Table 4, and MSC is satisfied that an investigation is required, MCC shall upon the receipt of a written request from MSC: 

consult with the landowner or occupant affected to determine their concerns; 

determine whether any modification to the mining activity needs to be acted on or take other steps in accordance with the DMP if exceedences are demonstrated by the independent investigations to result in part from MCC’s activities; and 

conduct follow up investigation(s) to the satisfaction of the MSC, where necessary.  Further  independent  investigation(s)  shall  cease  if MSC  is  satisfied  that  the  relevant criteria are not being exceeded and are unlikely to be exceeded in the future.  If the independent dust investigations confirm that dust levels from MCC alone are in excess of the relevant criteria and if the measures above do not reduce the dust levels, from MCC alone, below the relevant criteria, or if agreement cannot be reached, MCC shall at  the written  request of  the owner acquire  the  relevant property.   Acquisition shall be in accordance with the procedures set out in DA205/2002.  

9.0 EXTERNAL REPORTING Within  2  weeks  of  approval  of  this  DMP,  a  copy  will  be  made  available  to  the Community Consultative Committee (CCC), relevant agencies and for public viewing via the MCC website.  The  performance  of  MCC’s  DMP  will  be  reported  through  a  number  of  external reporting requirements, which include; 

Annual Environmental Management Report (AEMR); 

EPL Annual Licence Return; 

Page 20: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 18

Regular updates of monitoring results on the MCC website; and 

CCC Meetings.  

9.1 ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 

The AEMR will include a summary of: 

Dust monitoring  results  and  comparison  to  the  criteria, monitoring  results  from previous years and predictions in the Environmental Impact Statement; 

Summary of dust related complaints and management measures undertaken; 

Identification of any trends in the monitoring results; 

Measures undertaken during the period to monitor compliance; 

Identification of any non‐compliance, and management measures undertaken; and 

Review  of  the  performance  of  management  measures  and  the  monitoring program. 

 

10.0 ENVIRONMENTAL AUDITS In  accordance  with  the  Project  Approval,  every  three  years  MCC  will  fund  an Independent  Environmental  Audit  that will  be  performed  by  an  independent  third party  that  has  been  endorsed  by  MSC.    The  audit  will  include  consultation  with relevant agencies.  These environmental  audits will  assess  the environmental performance of MCC  and compliance  against  the  predictions  in  the  EIS,  conditions  of  the  Project  Approval, mining  leases, water  licences  and Environmental Protection  Licence, and  review  the adequacy of strategies, plans and/or programs and recommend measures or actions to improve the environmental performance of MCC.  

11.0 REVIEW OF MANAGEMENT PLAN The DMP will be reviewed; 

Within 3 months of changes to Development Consent or licence conditions relating to dust management; 

Following reportable incidents at MCC relating to dust management; 

Following an independent environmental audit which recommends changes to the DMP;  

If there is a relevant change in technology or legislation; and 

Every five years, or as directed by MSC, in accordance with Condition 3.2(f) of the Development Consent Conditions. 

 

 

Page 21: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

Muswellbrook Coal Company Limited  Dust Management Plan 

Version 3 December 2015 Page 19

12.0 RESPONSIBILITES Table 13 outlines the responsibilities relating to the DMP.  

Table 13: Management Plan Responsibilities 

Position  Task  Timing 

Senior Operations Manager 

Provide adequate resources to implement the requirements of the DMP 

Annual review 

Maintenance Superintendent 

Maintain equipment  As per maintenance schedule 

OCE  Implement dust control mitigation measures as outlined in DMP 

As outlined in DMP 

Environmental Coordinator 

Notify regulatory authorities of any dust management related incidents 

Following any dust management related incident 

Coordinate response to all dust management related complaints 

Following dust management related complaint 

Coordinate reviews of the DMP  As outlined in DMP 

Coordinate monitoring as required in DMP (includes maintenance and calibration) 

As required (minimum monthly) 

Coordinate reporting as required in DMP 

As required (minimum monthly) 

Page 22: Approved Dust Management Plan 2015 - Idemitsu · 2016-03-03 · Muswellbrook Coal Company Limited Dust Management Plan Version 3 December 2015 Page 4 Approval/ Licence Condition No.

 