1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05
Transcript
  • 1

    BAHA DE BIZKAIA GAS LNG TERMINAL

    GASTECH 2005

    Guillermo Gonzlez Avila / Juan Manuel Prez Garmendia

    14/03/05

  • 2

    LIST OF CONTENTS

    INTRODUCTION

    PROJECT MILESTONES

    LNG REGASIFICATION PLANT

    CONCLUSION

  • 3

    INTRODUCTION

    The Project involved the construction, commissioning, and Commercial Operations of two companies:

    BAHIA DE BIZKAIA GAS (BBG):LNG Regasification Plant and associated Maritime

    Terminal, 7 bcm

    BAHIA DE BIZKAIA ELECTRICIDAD (BBE):800 MWh Combined Cycle Power Plant

  • 4

    Both companies are owned by an equal partnership of four leading companies in the energy sector:

    INTRODUCTION

  • PROJECT MILESTONES

    BBE-BBG were created in April 1998

    Commencement of construction:

    BBE: March 2001

    BBG: December 2000

    Start-upBBE: November 2002 (first tests)

    BBG: August 2003 (first ship)

    Commencement of Commercial OperationsBBE: November 2003BBG: December 2003

    Total investment: 656BBE: 338 MILLIONBBG: 318 MILLION

  • OVERVIEW OF FACILITIES

  • NATURAL GAS GATEWAYS

  • BAHIA DE BIZKAIA LOCATION

  • BAHIA DE BIZKAIA SITE LOCATION

    Located in the town of Zierbena (Bizkaia)

    230.000 m2 at the Port of Bilbao: 150.000 m2 for BBG facilities and 80.000 m2 for BBE facilities

  • BAHIA DE BIZKAIA SITE

  • 11

    BBG REGASIFICATION PLANT

    BRIEF TECHNICAL DESCRIPTION

  • BBG LAYOUT

    Torch

    Sea Waterfrom BBE

    Sea WaterVaporisers 5 bar

    BBE 45 bar

    GdE 72 bar

    Sea Watercollection basin

    Submerged CombustionVaporisers

    PA 1021 x 133.000

    LiquifierFA 101

    Secondary Pumps

    PA 101 A/B2 x 2.00.000

    Truck Loading

    Px101 A/B/C

    Px102

    FB 101

    PrimaryPumps

    PrimaryPumps

    FB 102

    B.O. Compressor

    GB 103.A

  • BBG REGASIFICATION PLANT

    Regasification Plant capacity: Send-out rate: 800.000 Nm3/h NGAnnual send-out capacity: 7 bcm

    Dispatch:133.000 Nnm3/h to the Power Plant (BBE) at 36 bargthe remainder to the gas network at 72 barg

    Storage capacity:300.000 m3 LNG (2 tanks with a capacity of 150.000 m3 each)

    Future expansion of the plant:Send-out rate up to 1.200.000. Nm3/h NGA third tank of 150.000 m3 LNG

  • 14

    BBG REGASIFICATION PLANT

    Main components: Maritime Terminal

    Jetty

    LNG unloading system

    Storage system Tanks

    Process Unit LNG send-out system

    Vaporizers

    Boil-off recovery system

    Gas Metering Station

    Road tankers loading (trucks)

    Auxiliary Systems

  • 15

    BBG REGASIFICATION PLANT

    Maritime Terminal (1):

    Able to provide berthing for LNG carriers ranging from 70.000 m3 to 145.000 m3

    Main mooring components

    Mooring dolphins (concrete caissons): 2 for berthing, 6 for mooring, plus one for spillage recovery

    Main operations platform

    Gangways

    Defenses

    Fast release hooks

    Mooring rope tightness monitoring system

    Carrier approach monitoring system

  • 16

    BBG TERMINAL AERIAL VIEW

  • 17

    BBG TERMINAL AERIAL VIEW

  • 18

    BBG REGASIFICATION PLANT

    Maritime Terminal (2):

    LNG unloading system: Articulated unloading arms:

    3 for LNG, 1 for boil-off

    Unloading capacity:12.000m3/h (LNG)

    Connection to Plant:

    1 line 42 wide, 1 line 6 wide (LNG)

    1 line 30 wide (Boil-off)

    Spillage gathering pit

    Emergency Shutdown System (ESD)

    Fire-fighting system

    Unloading operations control room

  • 19

    BBG UNLOADING ARMS

  • 20

    BBG REGASIFICATION PLANT

    STORAGE SYSTEM: Two 150.000 m3 full-containment storage tanks Operating pressure: 200 - 250 mbar g External dimensions:77m diameter; 52m high

    LNG SEND-OUT SYSTEM: LOW PRESSSURE (primary) PUMPS:

    Pump the LNG from the tanks to the high pressure pumps 2X265 m3/h + 2X485 m3/h, per tank

    HIGH PRESSURE (secondary) PUMPS: Discharge the LNG at 80 bar to the vaporizers 4 x 256 m3/h + 3 x 385 m3/h

    RECONDENSER. Compressed boil-off is condensed into the LNG stream

  • 21

    BBG-STORAGE TANKS

  • 22

    BBG REGASIFICATION PLANT

    VAPORIZERS:

    LNG is gasified in the vaporizers

    Seawater vaporizers: 4x200.000 Nm3/h

    Using warm sea water from the condenser of the Power plant

    25.000 m3/h sea water

    Submerged combustion vaporizer. 1x200.000 Nm3/h

    Backup unit in the event the seawater vaporizers are out of service

    BOIL-OFF RECOVERY SISTEM: Boil-off gas produces in the tanks is sent to the compressor and then

    to the recondenser

    2 compressors

  • 23

    BBG SEAWATER VAPORIZERS

  • 24

    BBG SUBMERGED COMBUSTION VAPORIZER

  • 25

    BBG BOIL-OFF COMPRESSORS

  • 26

    BBG ROAD TANKER LOADING BAY

  • 27

    SHIPPING PROCEDURES

    LNG carriers must undergo a process aimed at ensuring theirsuitability and compatibility with BBG Terminal prior to berthing in it.Such process comprises the following steps:

    Information Exchange: The Terminal sends out to the LNG carrierOwner company a document containing a General Description of the Terminal, while the Owner or Shipping Agent must in turn provide the Terminal with the proposed general arrangement and vessel questionnaire form.

    Compatibility Study: BBG compatibility questionnaire (based onrecommendations from both SIGTTO and OCIMF) sets the operationaland safety criteria for operating at the Terminal.

    Issuance of the document Procedures for the mooring of LNG carriers at the Port of Bilbao, which describes the required maneouvres to enter the port, berth, unload and exit the port area in safe conditions.

  • 28

    SHIPPING PROCEDURES

    Attainment of Vetting Certificate (issued by Repsol Vetting so far)

    Issuance to LNG carrier of BBG Operations Procedures, which include the Ship/Shore Safety Checklist, a Pre-meeting Agenda, emergency

    procedures, details of the ESD system and other relevant details for berthing,

    unloading and unberthing operations.

    Upon completion and compliance with the aforementioned step, clearance to

    berth is granted, and unloading operations are allowed to commence.

  • 29

    TERMINAL SAFETY FEATURES

    BBG Terminal has been fitted with state-of-the-art safety features whichinclude, amongst others, the following:

    Distance and speed control panels for approaching and berthingoperations

    Alarm and blockade against excessive displacement of carrier duringunloading operations (disconnection of unloading arms and automatic

    closure of connecting valves between the Terminal and the carrier)

    Fast-release hooks for emergency unberthing

    ESD (Emergency Shutdown System)

    Spill tray fitted to hold as far as 131m3

    Evacuation to Flare of all relief valves in the unloading area

  • 30

    CONCLUSION

    A total number of 48 LNG carriers have moored at BBG Terminal from commissioning (August 8th, 2003) up to December 31st, 2004.

    ORIGIN OF LNG: NIGERIA 70%ARGELIA 20% MISC. 10%

    2003 2004 YTD 31.12.04

    NUMBER OF CARRIERS UNLOADED 11 37 48

    UNLOADED LNG (106 m3) 1,3 4,39 5,69

    PRODUCTION (GWH) 7.300 29.816 37.116

  • 31

    CONCLUSION

    It is worth mentioning that no safety incidents have taken place atall in the berthing and unloading operations of the 48 LNG carriers mentioned above.

    The only circumstance worth mentioning was a longer stay thanexpected at the Terminal on account of adverse weatherconditions in the case of the very last carrier of the year 2004.

    Credit for such level of accomplishment in safety standards can be granted both to the specific characteristics of the Port ofBilbao, as well as to the strict safety requirements set by BBG Operations Procedures, which are rigorously enforced withoutexception.