Communicating Advanced Geophysical Classification to Stakeholders Herb Nelson Program Manager for Munitions Response SERDP & ESTCP 571-372-6400 [email protected]
Transcript
Page 1: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

Communicating Advanced Geophysical Classification to Stakeholders

Herb Nelson Program Manager for Munitions Response

SERDP amp ESTCP 571-372-6400

herbnelsonnrlnavymil

Outline

Before the first engagement with stakeholders

At the first planning meeting

During the course of the project

At the conclusion of the field work

M2S2 Webinar - Communicating Classification to Stakeholders 2

   

   

Before You Meet with Stakeholders

Develop a basic understanding of the technology you donrsquot have to be able to solve the equations that describe

the process

EMI data rarr intrinsic parameters rarr classification decision

Make sure classification is appropriate to your site this stuff is great and works most places but not everywhere

Make sure you have a qualified contractor

M2S2 Webinar - Communicating Classification to Stakeholders 3

Training Resources

USACE Training

ITRC ldquoTech Regrdquo Guidance Document amp Internet-based Training

ESTCP Training Resources

M2S2 Webinar - Communicating Classification to Stakeholders 4

     

At the First Planning Meeting

There is a big change here but it may not be what you think wersquove always left metal in the ground

missed detections due to obstructions anomalies below threshold

we just didnrsquot know much about that metal

Using classification we know a lot about the items we leave in the ground and we have put quality systems in place to prove it

M2S2 Webinar - Communicating Classification to Stakeholders 5

   

   

At the First Planning Meeting

Donrsquot exaggerate the capabilities of classification itrsquos a really cool technology

there really are no silver bullets

Seek buy-in on the remedial action objectives defined and quantitative RAOs make classification much easier

should have been spelled out in the DD or ROD

M2S2 Webinar - Communicating Classification to Stakeholders 6

At the First Planning Meeting

Be ready with a thoughtfully-developed QAPP

This is the cornerstone of the QCQA process and should enable all team members to have confidence in the project results

M2S2 Webinar - Communicating Classification to Stakeholders 7

   

During the Course of the Project

Enforce the QC reporting schedule specified in the QAPP and make sure the QA Geophysicist stays up to date

Stakeholder confidence is increased by

early identification of QC issues careful and complete root cause analyses

prompt implementation of any required corrective actions

M2S2 Webinar - Communicating Classification to Stakeholders 8

Example Project Documentation

Surface Clearance Memo

IVS Tech Memo

Weekly QC Reports throughout the field work

Anomaly Selection Tech Memo

Intrusive Investigation Report

Final Analysis Report and Justification for Stop Dig Point

M2S2 Webinar - Communicating Classification to Stakeholders 9

Surface Clearance Memo

Was everything found consistent with the CSM

Is there anything the analysts need to know

M2S2 Webinar - Communicating Classification to Stakeholders 10

CSM Evidence Found in Surface Sweep

37-mm projectile Y 236-in rocket Y 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N

IVS Tech Memo

Is the Sensor Functioning Properly and Ready to Collect Data

SLO Initial Dynamic IVS Seed Position 050 Accuracy

025

Y o

ffset

(m)

000

IVS Seed 1 IVS Seed 2

-025

-050 X offset (m)

-050 -025 000 025 050

M2S2 Webinar - Communicating Classification to Stakeholders 11

IVS Tech Memo Are the remedial objectives achievable

M2S2 Webinar - Communicating Classification to Stakeholders 12

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 2: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

Outline

Before the first engagement with stakeholders

At the first planning meeting

During the course of the project

At the conclusion of the field work

M2S2 Webinar - Communicating Classification to Stakeholders 2

   

   

Before You Meet with Stakeholders

Develop a basic understanding of the technology you donrsquot have to be able to solve the equations that describe

the process

EMI data rarr intrinsic parameters rarr classification decision

Make sure classification is appropriate to your site this stuff is great and works most places but not everywhere

Make sure you have a qualified contractor

M2S2 Webinar - Communicating Classification to Stakeholders 3

Training Resources

USACE Training

ITRC ldquoTech Regrdquo Guidance Document amp Internet-based Training

ESTCP Training Resources

M2S2 Webinar - Communicating Classification to Stakeholders 4

     

At the First Planning Meeting

There is a big change here but it may not be what you think wersquove always left metal in the ground

missed detections due to obstructions anomalies below threshold

we just didnrsquot know much about that metal

Using classification we know a lot about the items we leave in the ground and we have put quality systems in place to prove it

M2S2 Webinar - Communicating Classification to Stakeholders 5

   

   

At the First Planning Meeting

Donrsquot exaggerate the capabilities of classification itrsquos a really cool technology

there really are no silver bullets

Seek buy-in on the remedial action objectives defined and quantitative RAOs make classification much easier

should have been spelled out in the DD or ROD

M2S2 Webinar - Communicating Classification to Stakeholders 6

At the First Planning Meeting

Be ready with a thoughtfully-developed QAPP

This is the cornerstone of the QCQA process and should enable all team members to have confidence in the project results

M2S2 Webinar - Communicating Classification to Stakeholders 7

   

During the Course of the Project

Enforce the QC reporting schedule specified in the QAPP and make sure the QA Geophysicist stays up to date

Stakeholder confidence is increased by

early identification of QC issues careful and complete root cause analyses

prompt implementation of any required corrective actions

M2S2 Webinar - Communicating Classification to Stakeholders 8

Example Project Documentation

Surface Clearance Memo

IVS Tech Memo

Weekly QC Reports throughout the field work

Anomaly Selection Tech Memo

Intrusive Investigation Report

Final Analysis Report and Justification for Stop Dig Point

M2S2 Webinar - Communicating Classification to Stakeholders 9

Surface Clearance Memo

Was everything found consistent with the CSM

Is there anything the analysts need to know

M2S2 Webinar - Communicating Classification to Stakeholders 10

CSM Evidence Found in Surface Sweep

37-mm projectile Y 236-in rocket Y 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N

IVS Tech Memo

Is the Sensor Functioning Properly and Ready to Collect Data

SLO Initial Dynamic IVS Seed Position 050 Accuracy

025

Y o

ffset

(m)

000

IVS Seed 1 IVS Seed 2

-025

-050 X offset (m)

-050 -025 000 025 050

M2S2 Webinar - Communicating Classification to Stakeholders 11

IVS Tech Memo Are the remedial objectives achievable

M2S2 Webinar - Communicating Classification to Stakeholders 12

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 3: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

   

   

Before You Meet with Stakeholders

Develop a basic understanding of the technology you donrsquot have to be able to solve the equations that describe

the process

EMI data rarr intrinsic parameters rarr classification decision

Make sure classification is appropriate to your site this stuff is great and works most places but not everywhere

Make sure you have a qualified contractor

M2S2 Webinar - Communicating Classification to Stakeholders 3

Training Resources

USACE Training

ITRC ldquoTech Regrdquo Guidance Document amp Internet-based Training

ESTCP Training Resources

M2S2 Webinar - Communicating Classification to Stakeholders 4

     

At the First Planning Meeting

There is a big change here but it may not be what you think wersquove always left metal in the ground

missed detections due to obstructions anomalies below threshold

we just didnrsquot know much about that metal

Using classification we know a lot about the items we leave in the ground and we have put quality systems in place to prove it

M2S2 Webinar - Communicating Classification to Stakeholders 5

   

   

At the First Planning Meeting

Donrsquot exaggerate the capabilities of classification itrsquos a really cool technology

there really are no silver bullets

Seek buy-in on the remedial action objectives defined and quantitative RAOs make classification much easier

should have been spelled out in the DD or ROD

M2S2 Webinar - Communicating Classification to Stakeholders 6

At the First Planning Meeting

Be ready with a thoughtfully-developed QAPP

This is the cornerstone of the QCQA process and should enable all team members to have confidence in the project results

M2S2 Webinar - Communicating Classification to Stakeholders 7

   

During the Course of the Project

Enforce the QC reporting schedule specified in the QAPP and make sure the QA Geophysicist stays up to date

Stakeholder confidence is increased by

early identification of QC issues careful and complete root cause analyses

prompt implementation of any required corrective actions

M2S2 Webinar - Communicating Classification to Stakeholders 8

Example Project Documentation

Surface Clearance Memo

IVS Tech Memo

Weekly QC Reports throughout the field work

Anomaly Selection Tech Memo

Intrusive Investigation Report

Final Analysis Report and Justification for Stop Dig Point

M2S2 Webinar - Communicating Classification to Stakeholders 9

Surface Clearance Memo

Was everything found consistent with the CSM

Is there anything the analysts need to know

M2S2 Webinar - Communicating Classification to Stakeholders 10

CSM Evidence Found in Surface Sweep

37-mm projectile Y 236-in rocket Y 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N

IVS Tech Memo

Is the Sensor Functioning Properly and Ready to Collect Data

SLO Initial Dynamic IVS Seed Position 050 Accuracy

025

Y o

ffset

(m)

000

IVS Seed 1 IVS Seed 2

-025

-050 X offset (m)

-050 -025 000 025 050

M2S2 Webinar - Communicating Classification to Stakeholders 11

IVS Tech Memo Are the remedial objectives achievable

M2S2 Webinar - Communicating Classification to Stakeholders 12

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 4: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

Training Resources

USACE Training

ITRC ldquoTech Regrdquo Guidance Document amp Internet-based Training

ESTCP Training Resources

M2S2 Webinar - Communicating Classification to Stakeholders 4

     

At the First Planning Meeting

There is a big change here but it may not be what you think wersquove always left metal in the ground

missed detections due to obstructions anomalies below threshold

we just didnrsquot know much about that metal

Using classification we know a lot about the items we leave in the ground and we have put quality systems in place to prove it

M2S2 Webinar - Communicating Classification to Stakeholders 5

   

   

At the First Planning Meeting

Donrsquot exaggerate the capabilities of classification itrsquos a really cool technology

there really are no silver bullets

Seek buy-in on the remedial action objectives defined and quantitative RAOs make classification much easier

should have been spelled out in the DD or ROD

M2S2 Webinar - Communicating Classification to Stakeholders 6

At the First Planning Meeting

Be ready with a thoughtfully-developed QAPP

This is the cornerstone of the QCQA process and should enable all team members to have confidence in the project results

M2S2 Webinar - Communicating Classification to Stakeholders 7

   

During the Course of the Project

Enforce the QC reporting schedule specified in the QAPP and make sure the QA Geophysicist stays up to date

Stakeholder confidence is increased by

early identification of QC issues careful and complete root cause analyses

prompt implementation of any required corrective actions

M2S2 Webinar - Communicating Classification to Stakeholders 8

Example Project Documentation

Surface Clearance Memo

IVS Tech Memo

Weekly QC Reports throughout the field work

Anomaly Selection Tech Memo

Intrusive Investigation Report

Final Analysis Report and Justification for Stop Dig Point

M2S2 Webinar - Communicating Classification to Stakeholders 9

Surface Clearance Memo

Was everything found consistent with the CSM

Is there anything the analysts need to know

M2S2 Webinar - Communicating Classification to Stakeholders 10

CSM Evidence Found in Surface Sweep

37-mm projectile Y 236-in rocket Y 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N

IVS Tech Memo

Is the Sensor Functioning Properly and Ready to Collect Data

SLO Initial Dynamic IVS Seed Position 050 Accuracy

025

Y o

ffset

(m)

000

IVS Seed 1 IVS Seed 2

-025

-050 X offset (m)

-050 -025 000 025 050

M2S2 Webinar - Communicating Classification to Stakeholders 11

IVS Tech Memo Are the remedial objectives achievable

M2S2 Webinar - Communicating Classification to Stakeholders 12

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 5: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

     

At the First Planning Meeting

There is a big change here but it may not be what you think wersquove always left metal in the ground

missed detections due to obstructions anomalies below threshold

we just didnrsquot know much about that metal

Using classification we know a lot about the items we leave in the ground and we have put quality systems in place to prove it

M2S2 Webinar - Communicating Classification to Stakeholders 5

   

   

At the First Planning Meeting

Donrsquot exaggerate the capabilities of classification itrsquos a really cool technology

there really are no silver bullets

Seek buy-in on the remedial action objectives defined and quantitative RAOs make classification much easier

should have been spelled out in the DD or ROD

M2S2 Webinar - Communicating Classification to Stakeholders 6

At the First Planning Meeting

Be ready with a thoughtfully-developed QAPP

This is the cornerstone of the QCQA process and should enable all team members to have confidence in the project results

M2S2 Webinar - Communicating Classification to Stakeholders 7

   

During the Course of the Project

Enforce the QC reporting schedule specified in the QAPP and make sure the QA Geophysicist stays up to date

Stakeholder confidence is increased by

early identification of QC issues careful and complete root cause analyses

prompt implementation of any required corrective actions

M2S2 Webinar - Communicating Classification to Stakeholders 8

Example Project Documentation

Surface Clearance Memo

IVS Tech Memo

Weekly QC Reports throughout the field work

Anomaly Selection Tech Memo

Intrusive Investigation Report

Final Analysis Report and Justification for Stop Dig Point

M2S2 Webinar - Communicating Classification to Stakeholders 9

Surface Clearance Memo

Was everything found consistent with the CSM

Is there anything the analysts need to know

M2S2 Webinar - Communicating Classification to Stakeholders 10

CSM Evidence Found in Surface Sweep

37-mm projectile Y 236-in rocket Y 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N

IVS Tech Memo

Is the Sensor Functioning Properly and Ready to Collect Data

SLO Initial Dynamic IVS Seed Position 050 Accuracy

025

Y o

ffset

(m)

000

IVS Seed 1 IVS Seed 2

-025

-050 X offset (m)

-050 -025 000 025 050

M2S2 Webinar - Communicating Classification to Stakeholders 11

IVS Tech Memo Are the remedial objectives achievable

M2S2 Webinar - Communicating Classification to Stakeholders 12

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 6: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

   

   

At the First Planning Meeting

Donrsquot exaggerate the capabilities of classification itrsquos a really cool technology

there really are no silver bullets

Seek buy-in on the remedial action objectives defined and quantitative RAOs make classification much easier

should have been spelled out in the DD or ROD

M2S2 Webinar - Communicating Classification to Stakeholders 6

At the First Planning Meeting

Be ready with a thoughtfully-developed QAPP

This is the cornerstone of the QCQA process and should enable all team members to have confidence in the project results

M2S2 Webinar - Communicating Classification to Stakeholders 7

   

During the Course of the Project

Enforce the QC reporting schedule specified in the QAPP and make sure the QA Geophysicist stays up to date

Stakeholder confidence is increased by

early identification of QC issues careful and complete root cause analyses

prompt implementation of any required corrective actions

M2S2 Webinar - Communicating Classification to Stakeholders 8

Example Project Documentation

Surface Clearance Memo

IVS Tech Memo

Weekly QC Reports throughout the field work

Anomaly Selection Tech Memo

Intrusive Investigation Report

Final Analysis Report and Justification for Stop Dig Point

M2S2 Webinar - Communicating Classification to Stakeholders 9

Surface Clearance Memo

Was everything found consistent with the CSM

Is there anything the analysts need to know

M2S2 Webinar - Communicating Classification to Stakeholders 10

CSM Evidence Found in Surface Sweep

37-mm projectile Y 236-in rocket Y 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N

IVS Tech Memo

Is the Sensor Functioning Properly and Ready to Collect Data

SLO Initial Dynamic IVS Seed Position 050 Accuracy

025

Y o

ffset

(m)

000

IVS Seed 1 IVS Seed 2

-025

-050 X offset (m)

-050 -025 000 025 050

M2S2 Webinar - Communicating Classification to Stakeholders 11

IVS Tech Memo Are the remedial objectives achievable

M2S2 Webinar - Communicating Classification to Stakeholders 12

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 7: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

At the First Planning Meeting

Be ready with a thoughtfully-developed QAPP

This is the cornerstone of the QCQA process and should enable all team members to have confidence in the project results

M2S2 Webinar - Communicating Classification to Stakeholders 7

   

During the Course of the Project

Enforce the QC reporting schedule specified in the QAPP and make sure the QA Geophysicist stays up to date

Stakeholder confidence is increased by

early identification of QC issues careful and complete root cause analyses

prompt implementation of any required corrective actions

M2S2 Webinar - Communicating Classification to Stakeholders 8

Example Project Documentation

Surface Clearance Memo

IVS Tech Memo

Weekly QC Reports throughout the field work

Anomaly Selection Tech Memo

Intrusive Investigation Report

Final Analysis Report and Justification for Stop Dig Point

M2S2 Webinar - Communicating Classification to Stakeholders 9

Surface Clearance Memo

Was everything found consistent with the CSM

Is there anything the analysts need to know

M2S2 Webinar - Communicating Classification to Stakeholders 10

CSM Evidence Found in Surface Sweep

37-mm projectile Y 236-in rocket Y 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N

IVS Tech Memo

Is the Sensor Functioning Properly and Ready to Collect Data

SLO Initial Dynamic IVS Seed Position 050 Accuracy

025

Y o

ffset

(m)

000

IVS Seed 1 IVS Seed 2

-025

-050 X offset (m)

-050 -025 000 025 050

M2S2 Webinar - Communicating Classification to Stakeholders 11

IVS Tech Memo Are the remedial objectives achievable

M2S2 Webinar - Communicating Classification to Stakeholders 12

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 8: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

   

During the Course of the Project

Enforce the QC reporting schedule specified in the QAPP and make sure the QA Geophysicist stays up to date

Stakeholder confidence is increased by

early identification of QC issues careful and complete root cause analyses

prompt implementation of any required corrective actions

M2S2 Webinar - Communicating Classification to Stakeholders 8

Example Project Documentation

Surface Clearance Memo

IVS Tech Memo

Weekly QC Reports throughout the field work

Anomaly Selection Tech Memo

Intrusive Investigation Report

Final Analysis Report and Justification for Stop Dig Point

M2S2 Webinar - Communicating Classification to Stakeholders 9

Surface Clearance Memo

Was everything found consistent with the CSM

Is there anything the analysts need to know

M2S2 Webinar - Communicating Classification to Stakeholders 10

CSM Evidence Found in Surface Sweep

37-mm projectile Y 236-in rocket Y 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N

IVS Tech Memo

Is the Sensor Functioning Properly and Ready to Collect Data

SLO Initial Dynamic IVS Seed Position 050 Accuracy

025

Y o

ffset

(m)

000

IVS Seed 1 IVS Seed 2

-025

-050 X offset (m)

-050 -025 000 025 050

M2S2 Webinar - Communicating Classification to Stakeholders 11

IVS Tech Memo Are the remedial objectives achievable

M2S2 Webinar - Communicating Classification to Stakeholders 12

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 9: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

Example Project Documentation

Surface Clearance Memo

IVS Tech Memo

Weekly QC Reports throughout the field work

Anomaly Selection Tech Memo

Intrusive Investigation Report

Final Analysis Report and Justification for Stop Dig Point

M2S2 Webinar - Communicating Classification to Stakeholders 9

Surface Clearance Memo

Was everything found consistent with the CSM

Is there anything the analysts need to know

M2S2 Webinar - Communicating Classification to Stakeholders 10

CSM Evidence Found in Surface Sweep

37-mm projectile Y 236-in rocket Y 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N

IVS Tech Memo

Is the Sensor Functioning Properly and Ready to Collect Data

SLO Initial Dynamic IVS Seed Position 050 Accuracy

025

Y o

ffset

(m)

000

IVS Seed 1 IVS Seed 2

-025

-050 X offset (m)

-050 -025 000 025 050

M2S2 Webinar - Communicating Classification to Stakeholders 11

IVS Tech Memo Are the remedial objectives achievable

M2S2 Webinar - Communicating Classification to Stakeholders 12

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 10: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

Surface Clearance Memo

Was everything found consistent with the CSM

Is there anything the analysts need to know

M2S2 Webinar - Communicating Classification to Stakeholders 10

CSM Evidence Found in Surface Sweep

37-mm projectile Y 236-in rocket Y 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N

IVS Tech Memo

Is the Sensor Functioning Properly and Ready to Collect Data

SLO Initial Dynamic IVS Seed Position 050 Accuracy

025

Y o

ffset

(m)

000

IVS Seed 1 IVS Seed 2

-025

-050 X offset (m)

-050 -025 000 025 050

M2S2 Webinar - Communicating Classification to Stakeholders 11

IVS Tech Memo Are the remedial objectives achievable

M2S2 Webinar - Communicating Classification to Stakeholders 12

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 11: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

IVS Tech Memo

Is the Sensor Functioning Properly and Ready to Collect Data

SLO Initial Dynamic IVS Seed Position 050 Accuracy

025

Y o

ffset

(m)

000

IVS Seed 1 IVS Seed 2

-025

-050 X offset (m)

-050 -025 000 025 050

M2S2 Webinar - Communicating Classification to Stakeholders 11

IVS Tech Memo Are the remedial objectives achievable

M2S2 Webinar - Communicating Classification to Stakeholders 12

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 12: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

IVS Tech Memo Are the remedial objectives achievable

M2S2 Webinar - Communicating Classification to Stakeholders 12

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 13: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

Anomaly Selection Tech Memo Were all the blind seeds detected within spec

M2S2 Webinar - Communicating Classification to Stakeholders 13

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 14: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

Intrusive Investigation Report

Were all recovered items consistent with analystrsquos predictions

M2S2 Webinar - Communicating Classification to Stakeholders 14

SW-30825

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 15: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

Intrusive Investigation Report

M2S2 Webinar - Communicating Classification to Stakeholders 15

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 16: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

What We Are Doing to Facilitate This

Develop a set of standard QC and QA plots in UX‑Analyze

Work hard at the QC interface between data collection and data analysis

Make sure both of the above are in line with the evolving QAPP template

M2S2 Webinar - Communicating Classification to Stakeholders 16

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 17: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

M2S2 Webinar - Communicating Classification to Stakeholders 17

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 18: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

Contractor Stop Dig Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 18

23 digs past the last TOI

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 19: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

Verify The Threshold

M2S2 Webinar - Communicating Classification to Stakeholders 19

200 digs past the last TOI

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 20: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 20

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 21: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

Validate the Process

M2S2 Webinar - Communicating Classification to Stakeholders 21

200 digs past the last TOI

100 randomly selected

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 22: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

   

   

   

Verification and Validation

Involve the stakeholders early and often in planning

draft plan before field work

final plans after contractor completes field work

Verify the stop-dig threshold dig past the last TOI

Validate the whole process targeted investigation of items classified as likely clutter

M2S2 Webinar - Communicating Classification to Stakeholders 22

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23

Page 23: Communicating Advanced Geophysical Classification to ... · 60-mm mortar Y 75-mm projectile Y 81-mm mortar N 3-in stokes mortar Y Unexpected munition N . 1 . IVS Tech Memo ... final

For More Information

serdp-estcporg

Featured Initiatives gt Munitions Response Initiatives gt Classification Applied to Munitions Response

Or

Search ndash Classification Applied to Munitions Response

M2S2 Webinar - Communicating Classification to Stakeholders 23


Recommended