Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments
Transcript
Page 1: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Conclusions from CLIC(IWLC 2010, Geneva)

Ken Peach(JAI)

Comment

s

Page 2: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 2

Contents

• The Collaboration• Progress• Present Status & Plans

– Post-physical fire– Post-metaphorical fire [MTP]

• The Next Challenges

Disclaimer 1: These are my thoughts Disclaimer 2: Apologies to those many whose

excellent work is not cited – much better done in the other plenary and parallel sessions. I have selected just a few illustrations of where we are

Disclaimer 3: Detectors left to the next session (but a comment)

Page 3: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

The Collaboration

Page 4: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 4

Helsinki Institute of Physics( )Finland ( )IAP Russia

( )IAP NASU Ukraine ( )IHEP China

/ ( )INFN LNF Italy Instituto de Fisica Corpuscular

( )Spain / IRFU Saclay ( )France

( )Jefferson Lab USA / ( )John Adams Institute Oxford UK

. Polytech University of Catalonia( )Spain

( )PSI Switzerland ( )RAL UK

/ ( )RRCAT Indore India ( )SLAC USA

( )Thrace University Greece ( )Tsinghua University China ( )University of Oslo Norway

( )Uppsala University Sweden ( )UCSC SCIPP USA

( )ACAS Australia ( )Aarhus University Denmark ( )Ankara University Turkey

( )Argonne National Laboratory USA ( )Athens University Greece

( )BINP RussiaCERN

( )CIEMAT Spain ( )Cockcroft Institute UK ( )ETHZurich Switzerland

( )Gazi Universities Turkey

/ ( )John Adams Institute RHUL UK ( )JINR Russia

( )Karlsruhe University Germany ( ) KEK Japan

/ ( ) LAL Orsay France / ( )LAPP ESIA France

/ ( ) NIKHEF Amsterdam Netherland ( )NCP Pakistan

- . . ( )North West Univ Illinois USA ( )Patras University Greece

The CLIC Collaboration40 institutes, 21 countries & growing

Delahaye

41

Fermilab

Page 5: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 5

New CLIC website: http://clic-study.org/

Page 6: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Progress

Page 7: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 7

Progress-1: Energy scanning

• The issue– Small (10%) scans can always be done

• Tune magnets, detune RF

– Optimise the machine for one energy• Running at much lower (or higher) energy

– Compromised luminosity– Needs a machine reconfiguration– Cannot be done quickly (within a few hours)

» Can it be done at all?

Page 8: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 8

Progress-1: Energy scanning-2

• Compensate partially for loss of (useful) luminosity from decreasing the RF gradient by increasing the pulse length

Schulte

Page 9: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 9

Progress-2: Accelerating Structures

80 85 90 95 100 105 110 115 12010

-7

10-6

10-5

10-4

10-3

Average unloaded gradient (MV/m)

Bre

akdo

wn

prob

abili

ty /(

m)

T18 [1] 230 ns, 1400 hT18 [2] KEK 252 nsT18 [3] 230 ns, 200 hTD18 [1] 230 ns, 1000 hTD18 [2] KEK 252 nsCLIC goal

CLIC Goal

with damping

without damping

Delahaye

Wuensch

Page 10: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 10

Progress-2: PETS

• 8 PETS breakdown events in 1.55 ×107 pulses (125 hours)– Breakdown rate 5.3 ×10-7/pulse [CLIC Goal <2 ×10-7/pulse]

• (excluding the 8 in the cluster – 1.3 ×10-7/pulse)

– last 80 hours no breakdowns were registered• BDR <1.2x10-7/pulse

Wuensch

1.55x107 pulses

Page 11: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 11

CTF3

• 4 x combination– Lower current Missing klystron– But back in operation – continue work

20102010

20 A20 A

Current from

Linac

Current from

Linac

Current after Delay

Loop

Current after Delay

Loop

Current in thering

Current in thering

20092009

Tecker

26 A26 A

Page 12: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 12

PHIN

• specifications successfully demonstrated during the June run

• measurements along pulse train

(03 March 2010) Emittance Measurement along the Pulse Train of 1.2µs

Emittance

Tecker

Page 13: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 13

Beam Stability

Beam current along TL2, TL2’ and TBTS 21 Aug

Page 14: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

IWLC 2010, 19.10.2010Frank Tecker CTF3 results

Two-beam acceleration in CTF3maximum probe beam acceleration of 11 MeV measured

=> gradient ~55 MV/m

RF calibrations to be verified

Drive beam OFFDrive beam OFFDrive beam ONDrive beam ON

Page 15: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 15

CLIC Feasibility status

• ILWC: experimental results and plans scrutinized – compared with parameter specifications for feasibility demonstration.

Delsahaye

System Item Feasibility Issue Unit Nominal Achieved How Feasibility

Fully loaded accel effic % 97 95 CTF3 Freq&Current multipl - 2*3*4 2*4 CTF3

12 GHz beam current A 4.5*24=100 3.5*8=28 CTF3

12 GHz pulse length nsec 240 240 CTF3Intensity stability 1.E-03 0.75 0.6 CTF3

Drive beam linac RF phase stability Deg (1GHZ) 0.05 0.035 CTF3, XFEL

PETS RF Power MW 130 130 TBTS/SLAC

PETS Pulse length ns 170 >170 TBTS/SLAC

PETS Breakdown rate /m < 1·10-7 >1.2 10-6 TBTS/SLAC

PETS ON/OFF - @ 50Hz - CTF3/TBTS 2011

Drive beam to RF efficiency % 90% - CTF3/TBL

RF pulse shape control % < 0.1% - CTF3/TBTSStructure Acc field MV/m 100 100Structure Flat Top Pulse length ns 170 170 Structure Breakdown rate /m MV/m.ns < 3·10-7 5·10-5(D) 2010-11Rf to beam transfer efficiency % 27 15 2010-11

Drive to main beam timing stability psec 0.05 - CTF3 2012

Main to main beam timing stability psec 0.07 - CTF3 2012

Emitttance generation H/V nm 500/5 3000/12

Emittance preservation: Blow-upH/V

nm 160/15 160/15 2010-12

Main Linac components microns 15 2010Final-Doublet microns 2 to 8 2010

Quad Main Linac nm>1 Hz 1.5

Final Doublet (assuming feedbacks) nm>4 Hz 0.2

Beam Driven RF

power generation

Accelerating Structures

(CAS)

Two Beam Acceleration

Vertical stabilisation 0.13

(principle)

Drive beam generation

10 (princ.)

Power producton and probe beamacceleration in Two beam module MV/m - ns

Two Beam Acceleration

2010-11

2010-12

Alignement & Mod.Test Bench

CTF3 Test Stand, SLAC,

KEK

2011-12100 - 170 55 - 170

ATF, NSLS/SLS + simulation

Alignment

Stabilisation Test Bench

TBTS

Ultra low beam

emittance & sizes

Ultra low Emittances

Page 16: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Present Status & Plans

Page 17: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 17

“Circumstances Beyond Our Control”

• The fire (March 4th)

• The “Lehman” effect– Reduced CERN budget

2011-2015(Lehman: 16/9/08

CERN impact 16/6/10)

Page 18: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 18

Schedule (February 2010)Optics improvements (DL dispersion)Full transport to CLEXBunch length control (first tests)TBTS initial PETS testsCALIFES setupnew setup when MKS13 available

PETS conditioned to nominal power/pulse length

Accelerating structure conditioned to nominal power/pulse length

PETS breakdown rate measurements?

Test of new PETS on-off scheme

Two-Beam test power & energy gain, 100MV/m

Beam Loading compensation experiment

Measurement of breakdown kicks

Measurement of effect of beam loading on breakdown rate

TBL studies

• Stability studies & improvements• PETS no recirculation• Phase stability• Operation at 5 Hz (or more)• Control of beam losses• Coherent Diffraction Radiation …

TBL studies 30% deceleration ?

1

2

3

4

5

6

8

7

1st TBL PETS installation

2nd run PHIN

1 2 3

4 65

2nd TBL PETS installation7 8

Page 19: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 19

Schedule (updated)

PETS conditioned to nominal power/pulse lengthTBL PETS tests

Accelerating structure conditioned to nominal power/pulse length

PETS breakdown rate measurements???

Test of new PETS on-off scheme

Two-Beam test power & energy gain, 100MV/m

Beam Loading compensation experiment

Measurement of breakdown kicks

Measurement of effect of beam loading on breakdown rate

2nd TBL PETS installation

6 weeks PHINphase-coding

Laser preparation

TBL studies(limited)

• Stability studies & improvements• PETS no recirculation• Phase stability• Operation at 5 Hz (or more)• Control of beam losses• Coherent Diffraction Radiation …

TBL studies 30% deceleration ?

1

1

2

2

3

3

4

5

6

8

7

4 5 67

8

1

4

2 3

65

7 8

Beam

Water tower

& circuit mainte-nance

TBL PETS install.windo

w

Page 20: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 20

CFT3: post-fire status

• Many feasibility issues addressed– e.g. RF phase stability

• 6 months delay in the final 3 goals– Measurement of effect of beam loading

on breakdown rate– Test of new PETS on-off scheme– TBL studies 30% deceleration

• Serious but not catastrophic• Delay on CDR less

– but delay in presentation to SPC

• On track to complete CDR next year

Page 21: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 22

“Lehman” impact

• Increase in resources for CLIC– Materials 11.919.0MCHF– Personnel 12.810.9MCHF

• Overall increase ~60%

– but• Shortage of manpower• Collaboration CLIC & LCD Budgets 2010-2015

0

5

10

15

20

25

30

35

40

2010 2011 2012 2013 2014 2015

MC

HF

CLIC: Materials

CLIC: Personnel

CLIC: Total

LCD:Personnel

LCD: Materials

LCD: Total

Total

Page 22: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 23

CLIC Tentative Schedule

Draft ConceptualDesign Report

(CDR)

Final CLIC CDR andproposal next phase

@ CERN Council

European Strategyfor Particle Physics @ CERN Council

Project Implementation Plan (PIP) and

proposal for next phase

2010 2011 2012 2013 2014 2015 2016 2017 2018

Feasibility issues (Accelerator&Detector) Conceptual design & preliminary cost estimation

Engineering, industrialisation & cost optimisation ?Project Preparation

Project Implementation ?

After Delsahaye

Page 23: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 24

A new project plan is being developed

~50 FTE

~60 MCHF

~50 FTE

~60 MCHF

Corsini

Page 24: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Detectors

Page 25: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 26

CLIC CDR Volume 3: Physics & Detectors

• Four Main Editors- Lucie Linssen (CERN)

- Akiya Miyamoto (KEK, Asia)

- Marcel Stanitzki (RAL, Europe)

- Harry Weerts (ANL, Americas)

Stanitski

Page 26: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 27

CLIC CDR: P&D Editorial TeamStanitski

Page 27: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

The Next Challenges

Page 28: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 29

From Rolf on Monday …Heuer

Page 29: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 30

… and from SteinarStapnes

Page 30: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 31

We need to be ready to assess the implications

??

Page 31: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 32

Summary – a mixed year

• Excellent technical progress to the CDR– Delayed ~6 months by the fire– Address remaining feasibility issues – On track for CDR by end 2011

• Plans developed for the post-CDR phase– Disrupted by the financial crisis

• But a revised plan emerging

• Opportunities for greater collaboration– Prepare for the post 2012 landscape

• New connections ILCCLIC?• New organisational structures?

• Wait for “good news” from the LHC

Page 32: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Thank you

Page 33: Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.

Ken Peach John Adams Institute IWLC 2010 22 October 2010 34

CLIC – Zero (Project after 2016?)

100 m100 m

TBATBA

DBA0.48 GeV, 4.2 A

DLDL

CR2CR2

CR1CR1

CompressionCompression2 x 3 x 42 x 3 x 4

DB Turn aroundDB Turn around0.48 GeV, 101 A 0.48 GeV, 101 A

6.5 GeV, 1.2 A6.5 GeV, 1.2 A

0.2 GeV, 101 A 0.2 GeV, 101 A

CALIFES type injectorCALIFES type injector0.2 GeV, 1.2 A0.2 GeV, 1.2 A

20% of CLIC DB energy

10% of a CLIC decelerator sector

Corsini