Enhancement of productivity after reservoir stimulation of the hydro- thermal reservoir Gross Schönebeck with different fracturing concepts Günter Zimmermann & Geothermics Group GeoForschungsZentrum Potsdam
Transcript
Page 1: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Enhancement of productivity after reservoir stimulation of the hydro-thermal reservoir Gross Schönebeck with different fracturing concepts

Günter Zimmermann & Geothermics GroupGeoForschungsZentrum Potsdam

Page 2: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Operations overviewopen hole proppant frac

Jan/Feb 2002production test / logging4130-4190m (frac 1)4080-4118m (frac 2)production test / logging

open hole waterfrac

start Jan/Feb 20033874-4294m, borehole instabilityproduction test

cont. Nov/Dec 20034135-4309mproduction test / logging

Dec 2004injection test

drilling 2. well

Page 3: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

hydraulic stimulation of sandstones (Feb 2002)

qi

pwhpat

Open Hole Packer

7“ Liner

3 ½“ Fracstring

9 5/8“ Casing

5“ Fracstring

p,T Memory Fracinterval5 7/8“

OH-Interval

3874 m

4294 m

2309 m

Sand Plug

Expansion Joints

dzdpRRf

dzdpslurry

concept:

• open-hole stimulation

• high-viscous fluid(HTU-Gel + citric acid)

• proppant

result:

• increase of productivity

• FOI = 2

• not sufficient for economics

Legarth et al., Geothermics, 2003

Page 4: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

flowmeter-log after gel-proppant treatment

Page 5: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

4294 m

3874 m

7“ Liner 32#

7“ Liner-Hanger

9 5/8“ Casing

2309 m

2350 m

5 7/8“ borehole

13 3/8“ Casing

18 5/8“ stand pipe

205,3 m

open hole waterfrac (Jan/Feb 2003)

Siltstone

Vulkanites

Sandstone

max.25 l/s

250 bar

well Groß Schönebeck / casing profile

Page 6: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

flow back test march 2003

0

5

10

15

20

25

30

0 5000 10000 15000 20000 25000

time [sec]

flow

[l/s

]

0

20

40

60

80

100

120

140

160

180

head

pre

ssur

e [b

ar]

head pressure

flow

productivity indexPI = 3-4 m³/(h MPa)FOI = 4

Page 7: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

FMI measurements after 1. waterfrac treatment

Holl et al. EAGE, 2004

dept

h[ m

]

4127

4128

Page 8: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

waterfrac cont. (Nov/Dec 2003)

4309 m

4134 m

3820,6 m3874 m

5“ Liner 15#, N80

7“ Liner 32#5“ Liner Hanger(15#, mech.) + integr. packer

7“ treatm. packer(IDmin 56 mm)

7“ Liner-Hanger

5“x3 ½“ G105IF-drillpipe (TK34);3 slip joints, ID 57 mm

9 5/8“ Casing

2309 m

2350 m

5 7/8“ borehole

5“, 15#, N80 pre-perforated Liner (93 holes/m, Ø1,5cm

Cup-Packer, OD 140 mm

2331,8 m

2300,6 m

13 3/8“ Casing

18 5/8“ stand pipe

4305,7 m

205,3 m

max.80 l/s

500 bar

pre-perforatedliner

well Groß Schönebeck / casing profile

Page 9: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

massive waterfrac treatment nov. 2003

Page 10: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

fracture dimensions

50

40

30

20

10

00 10 20 30 40 50

199

160

120

80

40

0

0.80

0.64

0.48

0.32

0.16

00 10 20 30 40 50

120

96

72

48

24

0

Rate (l/s) Fracture Length (m)

Total Fracture Height (m)Average Width (cm)

time (h)

Page 11: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

productivity development

0

1

2

3

4

5

6

7

8

PI [m

³/(h

MPa

)]

CLT Jan2001 CLT Feb2002 PT Aug2002 IT Jan2003 FB Feb2003 FB Dec2003167 m³12,3 hours13,5 m³/h

307 m³14 hours22,4 m³/h

580 m³37 days1 m³/h

720 m³8,3 days3,6 m³/h

250 m³5 hours50 m³/h

859 m³24 hours50 m³/h

gel-proppant treatment

1. waterfrac treatment

2. waterfrac treatment

volumetimeflow rate

FOI = 2

FOI = 4

FOI = 8

Page 12: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Injection experiment 2004/2005

aim: transmissibility and flow profile

Q = 2 l/sInjection time = 18 daysShut-in = 76 daysRemaining head pressure = 4.5 MPa

Flow back & temperature logQ = 2 l/s

Page 13: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Injection experiment 2004/2005

8.0 -

4.0 -

2.0 -

time [days]0 10 20 30 40 50 60 70 80 90

flow

rate

[l/s] 0.0 -

pres

sure

[MPa

]

6.0 -

Page 14: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Injection experiment 2004/2005

Transmissibility T = k h = 4.1 x 10-14 m³ = 0.041 Dm

Fracture half length xf = 255 m

Fracture conductivity Fc = 9.6 x 10-13 m³ = 0.96 Dm

Page 15: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

temperature logs during flow back 2005

4130

4140

4150

4160

4170

4180

4190

4200

4210

4220

4230

4240

4250

4260

138

139

140

141

142

143

144

145

146

147

temperature [°C]

dept

h [m

]

stat down stat up dyn down dyn up

dynamic temperture log

static temperature log

Flowrate q = 2 l/s

Page 16: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

results & conclusion

- gel & proppant treatment in sandstones => FOI = 2problem: ⇒ generation of tensile fractures ⇒ no self propping effect⇒ number of proppant layers to low ⇒ closure of fractures at low differential pressure

- 1. massive waterfrac treatment => FOI = 4- 2. massive waterfrac treatment => FOI = 8problem: ⇒ only impact in volcanic rocks⇒ closure of sandstone layers at low differential pressure

recommendation: - separate treatments for sediments & volcanic rocks- waterfrac treatment in volcanic rock (with optional tie-back)- gel & proppant treatment in sediments

(with increasing number of proppant layers)

Page 17: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Quo vadis Groß Schönebeck 4?

Page 18: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Thermal-hydraulic modelling

Injection temperature T = 70°CReservoir temperature T = 150 °CQ = 75 m³/hSimulation time = 30 yearsFrac conductivity = 1DmTransmissibility = 1DmFrac half length GrSk3/90 = 150 mFrac half lengths GrSk4/05 = 250 m

GrSk3/90GrSk4/05

Page 19: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Injection experiment 2004/2005

Page 20: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Injection experiment 2004/2005

Transmissibility T = k h = 4.1 x 10-14 m³ = 0.041 Dm

Fracture half length xf = 309 m

Fracture conductivity Fc = 7.8 x 10-13 m³ = 0.78 Dm

Page 21: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Reservoir conditions (applied in FracPro)

10 mD0.145 bar/m59.3 MPaupperDethlingen

10 mD0.125 bar/m52.2 MPalowerDethlingen

1 mD0.16 bar/m68.4 MPavolcanics

pore fluidpermeability

closurestress gradient

fracpressure

Page 22: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Reservoir conditions (applied in FracPro)

0.59 MPa m1/20.1855 GPaupperDethlingen

0.59 MPa m1/20.1855 GPalowerDethlingen

1.72 MPa m1/20.255 GPavolcanics

fracturetoughness

Poisson‘sratio

Youngs modulus

Page 23: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

productivity development

2-3103-5upperDethlingen

3-5306-10lowerDethlingen

3-5102-4Volcanics

FOI =PI(stim)/PI(initial)

productivity indexafter stimulation[m³/h MPa]

initial productivityindex[m³/h MPa]

Page 24: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

waterfrac stimulation in volcanics

Page 25: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

waterfrac stimulation in volcanics

Time (min)0 1600 3200 4800 6400 8000

00

160240

320480

480720

640960

8001200

0

40

80

120

160

200

Surface Pressure (bar) (698.93)BHP from Frac Model (bar) (968.68)

Total Friction (bar) (155.30)

Time (min)0 1600 3200 4800 6400 8000

0

2

4

6

8

10

0

5000

10000

15000

20000

25000Slurry Rate (m3/min) (9.00) Slurry Total (m3) (19776.83)

Page 26: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

waterfrac stimulation in volcanics

Time (min)0 1600 3200 4800 6400 8000

00

400.40

800.80

1201.20

1601.60

1992

0

30

60

90

120

150

Fracture Length (m) (184.68)Average Width (cm) (1.73)

Total Fracture Height (m) (127.89)

Time (min)0 1600 3200 4800 6400 8000

0

24

48

72

96

120

0

6

12

18

24

30Fracture Upper Height (m) (101.53) Fracture Lower Height (m) (26.35)

Page 27: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Time (min)0 30 60 90 120 150

00

200100

400200

600300

800400

1000500

00

12016

24032

36048

48064

60080

BHP from WB Model and/or Data (bar) Model Net Pressure (bar) (153.42)

Surface Pressure (bar) (274.50)Total Friction (bar) (10.09)

Time (min)0 30 60 90 120 150

000

300000.80100

600001.60200

900002.40300

1.2e+053.20400

1.5e+054

500

00

3004

6008

90012

120016

150020

Proppant Total (kg) (118012.44)Slurry Rate (m3/min) (3.00)Slurry Total (m3) (421.63)

Proppant Concentration (g/L) (0.00)Proppant conc. in fracture (kg/m2) (18

gel-proppant treatment in sandstones

(kg/m2)(18,38)

Page 28: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

gel-proppant fracture dimensions

Time (min)0 30 60 90 120 150

00

120.40

240.80

361.20

481.60

602

0

20

40

60

80

99

Fracture Length (m) (49.97)Average Width (cm) (1.24)

Total Fracture Height (m) (82.61)

Time (min)0 30 60 90 120 150

0

10

20

30

40

50.00

0

10

20

30

40

50.00

Fracture Upper Height (m) (43.22) Fracture Lower Height (m) (39.39)

Page 29: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

proppant concentration

Page 30: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

proppant concentration

Page 31: Enhancement of productivity after reservoir stimulation of ...engine.brgm.fr/web-offlines/conference-stimulation_of_reservoir_and... · Enhancement of productivity after reservoir

Proppants

Expectations:

High conductive fracture, CfD ≥ 1

High long term permeability

Controlling movement of fines

Good placing of appropriate concentration

CarboHSP 20/40

83 % Al2O3, 5 % SiO2

ρ= 2.0 g/cm3

Crushtest 0.7 % fines at 67 MPa


Recommended