FTE Calculation for SPOC Functions
Frankfurt, 2011.12.20
FTE calculation method
All numbers accumulated are based on the SPOC Teams own presentation attached to this document.
The numbers I worked with are the average of the numbers in the document of Ender.
The amount of time spent on one change is 20 mins. The amount of time spent on each e-mail is 5 mins. The amount is requests is calculated for a month. One FTE in Hungary = 130 working hours per month
Microsoft PowerPoint 97-2003 Slide Show
Types of requests
Unix requests 325 Verschlüsselung 225 Komplexer Changes 250 (Lead ChM responsiblity, excluded from the
calculation) DSS changes (IP, DNS, DHCP, etc.) 15 Mailanhang zustellen 40 VDI 15 Firewall 20 Blackberry 15 Datensicherung 25 SMTP Freischaltung 15 Active Directory 75 Software Rollout Support 25 Virenschutz 35
E-mails in the SPOC FMB
An average of 500 emails per month needs to be answered.
Efforts in numbers
Based on the above calculation method the total amount of changes is 1100.
This means 284 hours of work per month. Additional 41 hours are spent to answer emails. In total this is 325 hours of work. The result is exactly 2,5 FTE per month which is required for the
above work.