Ministry of Energy and Mineral Resources Republic of Indonesia Japan, September 16th 2015 Kementerian Energi dan Sumber Daya Mineral | Energi Untuk Kesejahteraan Rakyat INDONESIA’S LNG SUPPLY AND FUTURE DEVELOPMENT LNG Producer-Consumer Conference 2015
Transcript
Page 1: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

Japan, September 16th 2015

Kementerian Energi dan Sumber Daya Mineral | Energi Untuk Kesejahteraan Rakyat

INDONESIA’S LNG SUPPLY AND FUTURE DEVELOPMENT

LNG Producer-Consumer Conference 2015

Page 2: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

I. INDONESIA GAS RESERVE & PRODUCTION

AGENDA

IV. CLOSING REMARKS

II. FUTURE GAS & LNG PROJECT

2

III. Domestic Demand (Virtual Pipeline, Investment)

Page 3: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

I. Indonesia Gas Reserve & Production

3

Page 4: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

INDONESIA’S UPSTREAM OIL & GAS

Aging Production

Fasility

Lack of Gas

Infrastructure

Declining Reserved

Declining Production

Reserves Replacement Ratio ~50%

Main Sources of Domestic

Energy

Decreasing Exploration

Success Ratio

LenghtyExploration

Process

Sumber : SKK Migas, DJMG

*) source: WoodMackenzie

Page 5: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

CBM RESOURCES = 453.30 TCF

PROVEN = 100,26 TSCFPOTENTIAL = 49,04 TSCFTOTAL = 149,30 TSCF

GAS RESERVE

As of January 1st 2014

Total CBM Basin = 11(Advance Resources International, Inc., 2003)

Contracts Signed up to Aug 2015 : 54CBM PSCs

SHALE GAS POTENTIAL= 574 TCF

Total Shale Gas Basin = 14(Geology Agency, 2010)

1st Unconventional PSC was signed on May 2013, Currently 5 PSC

2,56

7,06

3,22

50.84

23.42

NATUNA7,51

NORTH SUMATRA

15.21

17,9

CENTRAL SUMATRA

ACEH (NAD)

SOUTH SUMATRA

WEST JAVA

6,44

EAST JAVA

EAST BORNEO

CELEBES

MOLUCCAS

PAPUA

(Advance Resources Interational, Inc., 2003 processed)

1.15

13,99

Indonesia’s Gas Reserve

5

Page 6: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

INDONESIA’S OIL AND GAS WORKING ACREAGES

Produksi

Eksplorasi

54 CBM PSC 5 SHLE GAS PSC

Page 7: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

II. Future GAS & LNG Project

7

Page 8: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

MADURA BD

Production (2016):110 MMscfd,

SOUTH SULAWESI

NORTH SUMATERA

WEST JAVA

EAST JAVA

MASELA

PAPUA

CENTRAL SULAWESI

JANGKRIK

IDD

EAST KALIMANTAN

CENTRAL SUMATERA

SOUTH SUMATERA

LAMPUNG

CENTRAL JAVA

RIAU ISLANDS

DONGGI SENORO

ABADI

TANGGUH TRAIN-3Production (2017):450 MMscfd, 4100 bopd

Production:Bangka: 120 MMscfd (2016)Gehem Hub: 420 MMscfd (2020)Gendalo Hub: 700 MMscfd (2020)

Production (2025):990 MMscfd

Production :Senoro: 310 MMscfd (2015), 6000 bopdDonggi: 60 MMscfd (2016), Matindok : 65 MMscfd(2017), 500 bopd

SOUTH MAHAKAM 3

Production (2015):120 MMscfd,

Production (2019):3,8 MTPA LNG ,3200 bopd

JTB-C

Production (2019)330 MMscfd

BUKIT TUA Production (2016):20000 bopd50 MMscfd

KEPODANG

Production (2015):116 MMscfd

ONGOING FUTURE Gas Projects

Natuna D-Alpha

Production (YTD):Reserved 4,6TCF

Page 9: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

Proven Reserves (in TCF)

Demands until 2030 (in TCF)

Legends :

World’s Reserves

Indonesia (19%)

Indonesia contributes 19% of total Asia Pacific gas reserves

(source: BP Statistical Review of World Energy 2014)

Sebaran Cadangan Gas di Indonesia, (source: Indonesian Annual Reserve Report as of 1-1-2014)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Asia Pacific’s Reserves

8.2%

Nat

una

D-Al

pha

IDD

Tang

guh

Trai

n 3

MAS

ELA

Dong

giSe

noro

DONE

Sebaran Permintaan Gas (Contracted) di Indonesia, (source: Indonesian Gas Balance Report as of Q1 2015)

Pengembangan Lapangan Gas Secara Lebih Optimal Akan Membutuhkan Dukungan Infrastruktur Yang

Memadai

Page 10: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

III. Domestic Demand

10

Page 11: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

GAS INFRASTRUCTURE INVESTMENT OPPORTUNITIES2015 – 2025

11

INVESTMENTPipeline

USD 8.5 billionLiquefaction & Regasification

USD 8 billionLPG

USD 0.42 billion

Gas StationUSD 13 billion

City GasUSD 2.5 billion

TOTALUSD 32.42 billion

Page 12: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

35.000 MW ELECTRICITY PROJECTà Opportunity as an Anchor Buyer

TOTAL POWER: 13.432 MW (38%)

2.867 MW

1.091 MW

6.754 MW

1.830 MW

450 MW

440 MW

TOTAL GAS NEEDED:1.009 MMSCFD

267 MMSCFD

86 MMSCFD

423 MMSCFD

147 MMSCFD 48 MMSCFD

38 MMSCFD

12

Page 13: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of IndonesiaMinistry of Energy and Mineral Resources Republic of Indonesia

VIRTUAL PIPELINE FOR GAS POWER PLANT IN PAPUA & MALUKU

PLTMG Saumlaki 10 MW PLTMG Merauke 20 MW

PLTMG Dobo 10 MWPLTMG Langgur 20 MW

MPP Papua (Jayapura) 50 MWPLTMG Jayapura Peaker 40 MW

PLTMG Timika Peaker 10 MW

PLTMG Fak-Fak 10 MW

MPP Papua Barat (Manokwari) 20 MWPLTMG Biak 15 MW

PLTMG Serui 10 MWPLTMG Bintuni 10 MW

PLTMG Nabire 20 MW

PLTMG Seram Peaker 20 MW

PLTMG Ambon Peaker 30 MWMPP Maluku (Ambon) 70 MW

PLTMG Namlea 10 MW

Gas Salawati

Gas Bintuni

1.524 NM144.4 MMSCFD

862 NM78.6 MMSCFD

1.494 NM15 MMSCFD

HUB

Page 14: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

V. Closing Remarks

14

Page 15: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

INDONESIA GAS BALANCE YEAR 2015 - 2030STARTING

GAS IMPORT

Page 16: INDONESIA S LNG SUPPLY AND FUTURE DEVELOPMENT · PLTMG Ambon Peaker 30 MW MPP Maluku (Ambon) 70 MW PLTMG Namlea 10 MW Gas Salawati Gas Bintuni 1.524 NM 144.4 MMSCFD 862 NM 78.6 MMSCFD

Ministry of Energy and Mineral Resources Republic of Indonesia

Closing Remarks

16

Gas Demand for the

(1.2x from current demand)

Gas Demand for the next 5 years:

8,679 MMSCFD (1.2x from current demand)

INVESTMENT NEEDED

Virtual Pipeline for Eastern Part of Indonesia

To initiate this, the anchor buyer will be for electricity sector and develop

the area surrounds it.

ASEAN LNG Hub (Hub for LNG price reference in ASEAN

territory)

2

3

4

1Prospective of Indonesia Gas Supply

Development from ConventionalmandUnconvetional encourage with some Attracrive Incentive Challenging