+ All Categories
Home > Documents > Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5...

Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5...

Date post: 30-Mar-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
19
Iran
Transcript
Page 1: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

Iran

Page 2: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

Acknowledgments

The (I)NDC Content Briefs were produced by the Climate Policy

Team of the World Bank Climate Change Group. The team was led

by Sebastian Wienges and Ana Bucher under the supervision of

Stephen Alan Hammer. Detail analysis of country (I)NDC was

provided by Tom Witt, Jiawei Song, Karan Chouksey (mitigation

components), Yin Qiu, Yunziyi Lang, and Prajwal Baral (adaptation

components). The team is grateful for all comments and

suggestions received from regional and sector specialists

regarding the presentation and synthesis of relevant information.

© 2016 International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433, U.S.A. Internet: www.worldbank.org

Climate Policy Team | World Bank Group

Page 3: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

Introduction      In response to a growing interest in understanding (Intended) Nationally DeterminedContributions ((I)NDCs) and with regard to the ultimate goal of supporting countries'implementation of their national climate targets, the World Bank Climate Policy Team (WB­CPT) has

reviewed all developing countries (I)NDCs' submitted to the UNFCCC. The (I)NDC Content Brief

aims to provide a summary analysis of existing and instead country mitigation and adaptation

policies and plans, commitments and targets, implementation strategies and sector priorities,

associated costs and conditionalities, and stated gaps and needs, among other issues. 

      The (I)NDC content briefs are created solely on the basis of information from submitted(I)NDCs and makes no inferences about robustness, quality, or viability of intended policiesor actions. 

The (I)NDCs review will help implementing organizations like the World Bank Group (WBG) identify

and familiarize with a range of country priorities in terms of sectoral engagement, and needs in

terms of capacity building, technology transfer, and financing. Based on this comprehensive

mapping exercise, the WBG will develop a useful, easy­to­use, and interactive database and briefs

of all (I)NDCs to inform a wide range of WBG initiatives and client engagement processes, including

the development of Systematic Country Diagnostics (SCDs) and Country Partnership Frameworks

(CPFs), and at a later stage respond to the more specific requests from all WBG Global Practices

(GPs), regions, and country units for the identification of potential development opportunities,

analytical studies and technical assistance to support countries' implementation of planned policies

and actions. In­depth summaries of (I)NDCs by sectors and regions will be prepared at a later stage. 

      In regards to Adaptation, although no global adaptation mechanism is established, the ParisAgreement parties are required to engage in adaptation planning and implementation of actions

which include preparation of adaptation plans. The Adaptation section of a large number of

submitted (I)NDCs, aims to increase development planning and scale the ability of countries to

adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse

gas emissions development, in a manner that does not threaten sustainable development. In

addition to requested finance, the implementation of country commitments is largely tied to

significant amounts of external assistance to support development and execution of adaptation

plans. Although subsequent (I)NDCs are not explicitly required to have an adaptation component,

the process will ensure increased resilience is recognized under the UNFCCC and climate finance

mobilization is enhanced with an aim to achieve a balance between adaptation and mitigation flows.

Climate Policy Team | World Bank Group

Page 4: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

Table of Contents

I Overall Planning and Preparation Process 

II  Mitigation

  Economy­wide Targets

  Economy­wide Policies

  Mitigation Actions and Policies

III  Adaptation

  Adaptation Targets

  Adaptation Context

  Adaptation Actions and Policies

Acronyms

BAU Business as Usual NAMA Nationally Appropriate MitigationActions

CIF­PPCR Climate Investment Funds ­ PilotProgram for Climate Resilience

NAP National Adaptation Plan

DRM Disaster Risk Management NAPA National Adaptation Programmesof Action

INDC Intended Nationally DeterminedContributions

REDD+ Reducing emissions fromdeforestation and forestdegradation and the role ofconservation, sustainablemanagement of forests andenhancement of forest carbonstocks in developing countries

LEDS Low Emission DevelopmentStrategy

LULUCF Land Use and Land Use Changeand Forestry

|

|

|

Climate Policy Team | World Bank Group

Page 5: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

Overall Planning and

Preparation Process

How reliable is the prioritization of the (I)NDC? How serious is thegovernment about implementing policies and actions to achieve the (I)NDCtargets?

Political decision of adoption of INDC at:Head of state level

Interministerial level CABINET OF MINISTERS

Parliament

Ministry Level

Technical development of INDC through a participatory processStakeholder involvement

Multisector commision

Have development benefits been assessed and considered in the planningprocess?

Are there climate policies and actions already in place/under development?

LEDS YES

NAMAS

NAPA

Climate Policy Team | World Bank Group

$N/A

(in Billion USD)

TOTAL COST OF

IMPLEMENTATION (mitigation and adaptation)

Page 6: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

Existing policies:National Strategy for Climate Change

Has the INDC development been supported by a development partner?Technical support

Financial support

Implementation Plans and Needs

Specific requests for international provision of means of implementation:

Technology Transfer YES

Financial support YES

Capacity Building YES

Does the INDC intend the private sector to be involved in theimplementation of the NDC?

Are carbon pricing/international market mechanisms intended?YES

Are there any barriers identified?ECONOMIC SANCTIONS IMPOSED ON ECONOMIC,

FINANCIAL AND TECHNOLOGICAL SECTORS

Link list:• Iran INDC Factsheet (projected per capita emissions): http://www.climate­energy­college.net/files/site1/factsheets/Iran_INDCFactsheet_UoM­PRIMAP_GWPAR4.pdf 

Climate Policy Team | World Bank Group

Page 7: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

-4%

$17.5 billion

additional -8%

$52.5 billion

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

Mitigation

ECONOMY-WIDE TARGETS

Conditionality: INDC page link

Unconditional part of mitigation target:Estimated costs for implementation:

Conditional part of mitigation target:Estimated costs for implementation:

Coverage of Gases: CO , CH , N O, HFCs, PFCs, SF , NF

Other Targets:

POLICIES:

National Strategy for Climate Change; National Monitoring, Reporting and Verification (MRV)mechanisms, operational by 2020

Phasing out of energy subsidies (for fossil fuels)

TARGET YEAR

2030TARGET TYPE

-12%Relative Emission Reduction

Compared to BAU (%)

2010

70.00(in Billion USD)

COST OFIMPLEMENTATION

2 4 2 6 3

Climate Policy Team | World Bank Group

Page 8: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESENERGY

Policies: INDC page link

Phasing out of energy subsidies (for fossil fuels)

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Plans:

Gas Flaring   P. 6

Renewable Energy

Gas-to-Power

Energy Efficiency

Supply-Side Efficiency: Power GenerationEfficiency Improvement: CogenerationPlants

Supply-Side Efficiency: Grid/Energy LossReduction

Energy: General   P. 6

Climate Policy Team | World Bank Group

Page 9: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

Technologies needed to curb and utilize gasflares

Reduction of gas flaring

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

GAS FLARINGPlans: INDC page link

Reduction of gas flaring P. 6

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 10: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESINDUSTRIES Plans:

Industries: General

Climate Policy Team | World Bank Group

Page 11: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESLULUCF/FORESTRY Plans:

LULUCF/Forestry: General

Conservation

Climate Policy Team | World Bank Group

Page 12: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESWASTE Plans:

Waste: General

Climate Policy Team | World Bank Group

Page 13: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESECONOMY-WIDE

Policies: INDC page link

National Strategy for Climate Change; National Monitoring, Reporting andVerification (MRV) mechanisms, operational by 2020

P. 5

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 14: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

N/A

N/A

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

Adaptation

ADAPTATION TARGETS

ADAPTATION CONTEXT

Existing National Development/Resilience Policies and Plans

National Communications

NAPs

NAPAS

CIF-PPCRs

Sectoral Strategies

Cross-cuttingNATIONAL STRATEGY FORCLIMATE CHANGE

Conditionality:

Unconditional part of adaptation implementation

Conditional part of adaptation implementation

Conditional upon international provision of meansof implementation

YES

TARGET YEAR

2030N/A

(in Billion USD)

COST OFIMPLEMENTATION

Climate Policy Team | World Bank Group

Page 15: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 100000.00 million

Technology Transfer:modern environmental friendly technologiesfor supplying water (desalination, recyclingand water treatment);

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

WATER

WATER

MANAGEMENT

Actions:

CONDITIONAL ACTIONS: INDC page link

Investment in water resources infrastructure is focused on demandmanagement, increasing productivity and efficiency, reducing losses inwater yield, water networks and providing new water resources

P. 9

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 16: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 40000.00 million

Technology Transfer:

modern and eco-friendly and climate smartagricultural technology and practices forscattered local communities in 2/3 of thecountry’s area

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

ENVIRONMENT

ECOSYSTEM AND

BIODIVERSITY

Actions:

CONDITIONAL ACTIONS: INDC page link

Improve the environment and protecting natural resources

P. 9

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 17: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

development of on-line monitoringnetwork of climate observation system;

general circulation models (for nationaland regional application with monitoringand observing features for forest fires);

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

DISASTER RISK

MANAGEMENT (DRM)

MONITORING AND

EVALUATION

SYSTEM

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 18: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

access to new and environmentally soundtechnologies for industrial production, aswell as forest fire fighting systems;early-warning and monitoring systems ofclimate extreme events, dust and sandstorms and access to global satellite data.

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iran | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

EARLY WARNING

SYSTEM Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 19: Iran - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IR.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê(ÞÞÎD(Hë(çëçÏÞgÊH .(Ê iÞ ëHë=' (ëçÞ .(H= àRH .(#ªÆ¼¯

Recommended